Value Engineering the Termination of the Blue River Flood Conveyance Channel

23
US Army Corps of Engineers BUILDING STRONG ® Value Engineering the Termination of the Blue River Flood Conveyance Channel Alan Schlindwein, PE US Army Corps of Engineers Kansas City, Missouri June 14, 2012 Robert Prager, PE Strategic Value Solutions, Inc Independence, Missouri

description

Robert Prager, PE Strategic Value Solutions, Inc Independence, Missouri . Value Engineering the Termination of the Blue River Flood Conveyance Channel. Alan Schlindwein, PE US Army Corps of Engineers Kansas City, Missouri June 14, 2012. Battle of Westport. - PowerPoint PPT Presentation

Transcript of Value Engineering the Termination of the Blue River Flood Conveyance Channel

Page 1: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

US Army Corps of EngineersBUILDING STRONG®

Value Engineering the Termination of the Blue River Flood Conveyance Channel

Alan Schlindwein, PEUS Army Corps of Engineers

Kansas City, Missouri

June 14, 2012

Robert Prager, PEStrategic Value Solutions, Inc

Independence, Missouri

Page 2: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Battle of Westport

AKA: The Gettysburg of the West

Page 3: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

The Real Brush Creek(after USACE project)

Page 4: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

1st & 2nd Battles of the Big Blue at Byram’s Ford

Page 5: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Byram’s Ford

Page 6: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Blue River Flood Conveyance Channel

35,000 cfs Flood Control Channel

New Bridges Remapping of

Floodplain

Page 7: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

3rd Battle of Byram’s Ford

Concrete Grade Control Structure

Page 8: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Proposed Grade Control Structure

Page 9: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Byram’s Ford Industrial Park

Page 10: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Stated Goals

Prevent the headcutting at the battlefield location

Limit maximum flood elevation to pre-project conditions

Control velocity upstream to manage scour along the riverbanks

Page 11: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Design

The structure was designed to stop head-cutting and control flood elevations upstream to pre-project conditions which in turn aided in managing scour at the battlefield location and along the riverbanks by controlling velocity.

Page 12: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Externalities Construction of the grade control structure would

affect the channel upstream of this project and create pre-project conditions, i.e., flooding in areas that had not experienced flooding since the channel project began would now be flooded again.

Page 13: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Page 14: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Page 15: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

The Value Ah Ha! The current flood levels

can be maintained to limit maximum flood elevation to below pre-project conditions

Grade controls can be distributed along the river rather than at a concrete waterfall

Perfection

CostFu

nctio

ns0%

100%

Poor Value

Best Value

Page 16: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Page 17: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Stated Goals PROTECT THE

CHANNEL PRESERVE THE

BATTLEFIELD

By Mimicking Natural Processes

Page 18: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Work with River

Continuum

Riffle PoolSequence

Place at end of Bend

Page 19: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

54000 59000 64000 69000 74000 79000680

700

720

740

760

780

800

820

840

Ground100yrbridgeslow flow

River Profile - Newbury & Proposed GCS

Page 20: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Grade Control at KC Zoo

Page 21: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

Rock Grade Control Structure

Page 22: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®

2000 cfs flow

Page 23: Value Engineering the Termination of the  Blue River Flood  Conveyance Channel

BUILDING STRONG®