Overview of Valmec

Founded by an experienced team of EPC and contracting professionals, each with more than

25 years in the Australian and international oil and gas industry, Valmec’s focus is on the delivery of

value to our clients through innovative project solutions, superior service and faster time-to-market

options in the energy and infrastructure markets.

Completions & Commissioning Solutions

Being a multidiscipline turnkey construction contractor, an integral part of the completion and

handover phases are the acceptance testing and final commissioning of any facility or installation.

Through our experienced teams of engineers, supervisors and trades personnel, Valmec provide the

following support:

> Technical field resources OEM trained to support the installation and commissioning of equipment

and plant, inclusive of OEM requirements and your commissioning plans;

> Mechanical and piping resources for hydrostatic and pneumatic testing, including draining,

chemical cleaning, drying and blow throughs and vessel internal fit-out;

> Electrical and Instrumentation resources for hazardous area inspections, loop checking, and cause

& effect / function verification.

Valmec’s team of experienced personnel are accustomed to utilising client Turnover and Completions

databases and can tailor our approach in handing over the project to our clients’ system

commissioning needs.

The Valmec Offering

The Valmec Difference

> Valmec offer full in-house, self-executed blue collar construction spectrum of trades personnel

including SMP, E&I, & Civil/Earthworks disciplines;

> Valmec incorporate pre-commissioning and completions documentation progressively to allow

commissioning to commence immediately upon completion of physical work on site;

> OEM certified and trained technicians for gas compression and processing equipment;

> Valmec can lead, manage or support your commissioning and decommissioning activities and

requirements.

> Valmec can complete your site finishing works such as fencing, blue metal, pathways and signage

etc., within a brownfields permit controlled environment.

Capabilities

Pre-commissioning and testing OEM start up and commissioning

EEHA inspection and sign off Real time documentation

Commissioning technicians and support personnel

Bump starts, cold loop and hot loop functional testing

Integrity testing Start up and blow throughs

Operations transition support Temporary works and spares

Depressurising and purging Decommissioning

Experience

Mandurah Lateral Pipeline Pigging Project

Turee Creek Compressor Station

Ungani Facility Development

Client ATCO Gas Client APA Group Client Buru Energy

Location Mandurah, WA Location Newman, WA Location Broome, WA

Scope Pipeline purge, shut down, preparation and subcontractor management of operational pipeline

Scope SMP pre-commissioning, electrical, control and instrumentation testing, hot and cold loop checking, purging and gas introduction preparation

Scope Pre-commissioning of minimalist package and balance of plant components, ready for introduction of three phase upstream well hydrocarbons