V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series L ow M ass T apes 12 different lengths were produced for barrel 3 harness 50 m Al/ 50 m kapton was used Lengths needed: Left Harness 1317 mm - 2024 mm Right Harness 1350 mm - 2061 mm Tapes produced on sheets 12 A sheets + 12 B sheets processed Ends electroplated with Ni/SnPb A and B sheets laminated 12 double sheets Cut 12 tapes/sheet 144 tapes pre-series tapes produced 60 were shipped to Taiwan 26.4.2002 In addition 90 short (30 cm) tapes were produced for soldering tests at Taiwan

Transcript of V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low...

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

Pre-series Low Mass Tapes

12 different lengths were produced for barrel 3 harness50 m Al/ 50 m kapton was used

Lengths needed:Left Harness 1317 mm - 2024 mm Right Harness 1350 mm - 2061 mm

Tapes produced on sheets 12 A sheets + 12 B sheets processedEnds electroplated with Ni/SnPbA and B sheets laminated 12 double sheets Cut 12 tapes/sheet144 tapes pre-series tapes produced 60 were shipped to Taiwan 26.4.2002

In addition 90 short (30 cm) tapes were produced for soldering tests at Taiwan

Acceptance:

Underetching of lines (reduction of average metal trace width) shall be less than 100 microns.Conductor width reduction shall not exceed 30 % of the nominal conductor width.Conductor spacing shall not be reduced by more than 30 % due to conductor edge roughness, spikes, etc.Line resistance shall be smaller than 0.15 /m for 4.5mm lines and 1.7 /m for 0.5 mm lines.Inter line resistance shall be greater than 100 M. Leakage current < 100 nA at 500V

There shall be no lifted Al lands on the delivered tapes.

Al thickness shall not be changed by the process by more than 10 %.

Adhesive flow on coverlay edges shall not be more than 2mm.

Electroplated surface shall be solderable in accordance with IEC 68-2-20.

Plating adhesion shall be tested in accordance with IPC-TM-650, method 2.4.1. using a strip of pressure sensitive tape. Misalignment of lines on top and bottom layer shall be smaller than 0.2 mm in laminated area.

The yield of the production of double layer tapes shall be greater than 80 %. For small quantities, lower yield figures can be agreed.

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia

SCT week, Valencia, June 2002

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

Optical inspection (now at ELGO-LINE)

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

Optical inspection:

24 errors (11 are due to error on mask)

Electrical test: 4 breaks (were also revealed with optical inspection)6 additional cables out of spec. (Rint < 100 M)1 tape damaged during cutting

Yield:Optical: 120/144 = 83 %Electrical: 134/144 = 93 %Total: 113/144 = 78 %

Without mask error: 113/132 = 85 %

Plating adhesion was checked and was in agreement with IPC standard.

Solderability (wetting) check before and after aging (16 hours at 155oC) OK

Plating thickness: Sn/Pb 9.1 0.4 m Ni 2.3 ± 0.2 m

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

nominal value

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

Side view of Ni/SnPb plated Al line

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

Tape dimensions : Nominal thickness:

2x(50m + 18 m + 50 m) + 25 m + 37.5 = 298.5 m Al glue kapton glue coverlayer

Measured thickness: 295 - 310 m, with some 330 m spots in transition part, improvement foreseen.

Tape width: 21.1 mm

Bending test:(on short tapes S13)

r = 2 mm

20 bends OK40 bends 1 line broken60 bends all lines broken - top layer all lines OK - bottom layer

r = 3 mm

50 bends OK80 bends 1 line broken 100 bends 2 lines R increase 130 bends 2 lines broken

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

Conclusions:

Pre-series tapes produced within agreed specifications.

Further improvements:

more precise lengths, labeling on sheet masks improved lamination processadhesion of electroplating - new requirement will be specified after the test method will be agreed.

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

LMT production schedule

delivery of 1st production batch 9 weeks after reception of GTS material at ELGOLINE

assuming material arrival at July 15

10 % - Sep 1520 % - Sep 30 40 % - Oct 2160 % - Nov 1880 % - Dec 16 100 % - Jan 20, 2003

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June

2002

Adhesion of Ni/Al

What is good adhesion - our wishes more demanding thanstandards. Pull strength of IPC specified tape only 1N/mm,we are testing 10 N/mm They can be fulfilled - previous batches proved that

ELGOLINE in contact with ATOTECH parameters were at the edge of what was allowed by the QA

QC procedures investigated

- calibrated peel strength sticky kapton tape - simple soldering of tapes to PCB + pull test