Fabrication FacilityThe Fabrication facility is located in the industrial area of Isando, Johannesburg, and was established for the purpose of fabrication of boiler tube protection shields and general steel/platework fabrication. The Fabrication Facility consists of the following sections;• Manufacturing• NonDestructiveTesting• WeldingProcedureDevelopment• WelderTrainingCentre

ManufacturingOurmanufacturingFacilitywasestablishedonthe1stMarch2011andwillbefullyoperationalfrom1stMay2011.

• Guillotine-Upto3mwideby16mmthick• PressBrake-Upto250ton,knifelength

3.2m

Tube ShieldsBoilertubeprotectionshieldscanbemanufacturedfortubeoutsidedimensionsof38.0to76.0mmby3mlonginthefollowingmaterials;

• CarbonSteel• 304&310StainlessSteel

NonDestructiveTestingOurNonDestructiveTesting(NDT)Sectionprovidesacomprehensiveserviceinthefollowing disciplines;

• Radiography(RT)• UltrasonicTesting(UT)• MagneticParticleInspection(MPI)• DyePenetrantInspection(DPI)• HardnessTesting(Vickers,Brinell)• PositiveMaterialIdentification(PMI)• WallThicknessTesting• Endoscope

AllNDTproceduresandspecificationsareEskomapproved

SHERQThe AJT Isando site has been assessed and certi-fiedinaccordancewiththerequirementsof;• ISO9001• NOSA(5stars)

Welding The welding section is tasked with;

• ProcedureDevelopment• Weldertrainingandcertification• Highpressurepipe/tubeWelding.• PreandPostWeldHeatTreatment(PWHT)

Using the following processes;

• TungstenInertGasWelding(TIG)• ShieldedMetalArcWelding(SMAW)• FluxCoreArcWelding(FCAW)• GasMetalArcWeldingusingInertorActive

gases(GMAW)

Allweldingprocedurespecifications(WPS)andprocedurequalificationrecords(PQR)conformtotherequirementsofBSEN15614andASMEIX.TheyhavebeenreviewedandapprovedbybothanAuthorizedInspectionAuthority(AIA)andInternationalWeldingEngineer(IWE).

Utility Boiler and Environmental Division Isando Fabrication Facility

JOHN THOMPSON. A division of ACTOM (Pty) Ltd

Press Brake GuillotineMaximum safety rating

42 Diesel Road, IsandoP.O.Box 8382, Edenglen, 1613 Tel:+27 (0)11 392-0900 Fax:+27 (0)11 392-0938

e-mail: [email protected]

www.johnthompson.co.za