US Army Corps of Engineers
BUILDING STRONG®
Kentuckiana Post Industry Day
Civil Works Program OverviewLouisville District
Matt Schueler
Civil Project Management & Programs
Planning, Programs and Project Management Division
February 4, 2015
�
IL
INOH
KY
Louisville
TN
T
T
TT
CAVE RUN
BUCKHORN CARR CREEK
GREEN RIVER
BARREN RIVER
NOLIN
ROUGH RIVER
PATOKA
1
2
OLMSTED L&D
MARKLAND L&D
MISSISSINEWA
SALAMONIE J. EDWARD ROUSH
CLARENCE J. BROWN
CAESAR CREEK
CAGLES MILL
MONROE
JOHN T. MYERSL&D
SMITHLAND L&D
WILLIAM H. HARSHA
WEST FORK MILL CREEK
OHIO
RIVER
RIVER
L&D 53
T
NEWBURGH L&DCANNELTON McALPINE L&D
WABASH
L&D 52
BROOKVILLE
CECIL M. HARDEN
TAYLORSVILLETTT
T
T
T
Civil Works Boundary
2
Civil Works
FY13 FY14 FY150
50,000100,000150,000200,000250,000300,000
FY13 – FY15 TOTAL CIVIL WORKS PROGRAM ($000)
3
Construction 159,258 191,198 243,483 O&M 77,992 92,344 97,025 FCCE 3,907 3,496 3,069 GI 1,734 1,845 1,063 Regulatory 4,255 4,285 4,355CIV TOTAL: 247,147 293,168 348,995
FY15 Civil ProgramFY13 Army Detail by Installation ($447,300,000)
4
CG$243.5M
69.8%
FCCE $3.1M 0.9%
O&M $97M 27.8%
REG $4.4M 1.2%
GI $1.1M 0.3%
FY15 Total Louisville District Civil Works Program
CGGIO&MRegFCCE
Civil Works Program…NavigationOlmsted L&D
– Lock Chambers (2) and Approach Wall construction complete
– Dam construction continues Tainter Gates (18 Shells)
– Last 2 shells set in 2014 LWS– Tainter gate No. 1 erected 2014
Navigation Pass (25 Shells)– Foundation prep on-going– First 7 shells set in 2014 LWS
– Wicket Lifter Barge Marine Design Center scheduled award
Oct/2015
– Lock Renovations Lock Maintenance awarded Mar/2014 Auxiliary Maintenance Bulkheads awarded
Feb/2014
5
Civil Works Program…Navigation
JT Myers Lock Extension
The ARRA upper bank approach widening is complete.
Resident Engineer’s Building is complete. Remaining design & construction are
dependent upon future appropriations. Possible reevaluation study
JT Myers Major Rehabilitation Completion of Major Rehab report on dam
6
Civil Works Program…Flood Risk Management Paducah, KY Reconstruction
Design underway Total Project Cost - $20M Rehabilitation of existing floodwall/ levee, repair/replacement of pump station equipment, CMPs, concrete, and other appurtenant features
Indianapolis North Sections of PH 3B Levee complete Supplemental EIS/Record of Decision PH 3A/3C Alteration complete
Ohio River Greenway, IN Clarksville/Jeff segment New Albany segment
Mill Creek, OH Design of Remedial Repairs to
Previously-Constructed Sections
7
Civil Works Program…Flood Risk Management
Dam Safety Modification
Rough River Dam, KYGrouting contract scheduled
for award in March 2015
8
Civil Works Program…Flood Risk Management
Continuing Authorities Program
New Albany, IN• Feasibility study of the South Fork of the Rolling Fork River
Franklin, IN• Feasibility study to address flooding within the Young’s Creek watershed
Planning Assistance to States
Owensboro, KY—Panther Creek• Development of stormwater alternatives for the City of
Owensboro
9
Civil Works Program…Ecosystem Restoration
Green River Watershed Assessment Study Integrated Water Resources Management Env Flow Assessments Active River Analysis – Conservation Mapping Identification of Requirements for Water Use Strategy
Northern KY Riverfront Feasibility Study 12 mile study area corridor on the left bank of
the Ohio River from Bellevue to Newport Restoration of the river corridor and
enhancement of public use and access to the river
Licking River, KY Watershed Assessment Study10
Civil Works Program…Ecosystem Restoration
Continuing Authorities Program – Section 1135
Green River Dam Feasibility Study • Control Tower modifications to enable
greater control of water temperature during releases
Monroe Lake Moist Soil Management Study• Restoration of aquatic, wetland and
riparian habitat adjacent to Monroe Lake
Bee Slough – Evansville, IN
11
Civil Works Program…Recreation
Ohio Riverfront, Cincinnati, OH
Phase I and II construction complete Phase III under construction
12
Civil Works Program
QUESTIONS?