URI Inner Space Center Meeting III

January 9, 2007

Page 2: URI Inner Space Center Meeting III January 9, 2007.

Today’s Meeting Goals and OutcomesToday’s Meeting Goals and Outcomes

• Update and recalibrate

• Refine data management test objectives for 2007 field season

• Develop a plan for use of shore-based consoles for 2007 field season

•Better define operational needs for 2008

• Draft a strawmam business plan for the ISC

• Develop a plan for drafting a service center proposal for the ISC

URI Inner Space Center Meeting IINovember 29, 2006

Page 3: URI Inner Space Center Meeting III January 9, 2007.

ISC TimelineISC Timeline

URI Inner Space Center Meeting IINovember 29, 2006

Page 4: URI Inner Space Center Meeting III January 9, 2007.

Data ManagementData Management

•Receiving data and information

•Protection and QA/QC

•Monitoring, trouble shooting

•Dissemination

•Archive – temp and permanent

•Standard formats

•Documentation

•Limited processing

•SCS compatible

Overview of ISC FunctionalityOverview of ISC Functionality

URI Inner Space Center Meeting IINovember 29, 2006

Page 5: URI Inner Space Center Meeting III January 9, 2007.

Overview of ISC FunctionalityOverview of ISC Functionality

Remote consolesRemote consoles

•Oversight and management

•Real-time data

•Help desk within limits (exclude hardware)

•Push software

URI Inner Space Center Meeting IINovember 29, 2006

Page 6: URI Inner Space Center Meeting III January 9, 2007.

Telepresence Plan for joint project 07Telepresence Plan for joint project 07

• Look at our ultimate functionality goals for the Okeanos

• Look at our 2007 field season audiences and their

functionality requirements

• Outline what functionality can be realistically implemented

for the 2007 field season

• Outline what additional functionality should be developed

for testing during the 2007 field season

URI Inner Space Center Meeting IINovember 29, 2006

Page 7: URI Inner Space Center Meeting III January 9, 2007.

Intended Audiences for 2007 Field SeasonIntended Audiences for 2007 Field Season

• Bob Ballard at URI/Mystic• URI/IFE/IAO faculty at URI• IAO students at URI• Immersion Presents at URI/Mystic• Outreach support for Smithfield Schools• Outreach level support for remote science consoles

– Silver Spring console– Potential PMEL and UNH consoles

URI Inner Space Center Meeting IINovember 29, 2006

Page 8: URI Inner Space Center Meeting III January 9, 2007.

Telepresence Goals for OkeanosTelepresence Goals for Okeanos(Long-term)(Long-term)

• Real-time navigation with embedded bathymetry

• Target dropping at the RSCs

• Real-time vehicle/vessel status information

• Real-time sensor data

• Remote viewing of sonar display

• Remote viewing of HD framegrabs

URI Inner Space Center Meeting IINovember 29, 2006

Page 9: URI Inner Space Center Meeting III January 9, 2007.

Telepresence Goals for OkeanosTelepresence Goals for Okeanos(Long-term)(Long-term)

• Consolidated event logging from ship and shore

• Automatic logging of Video (AsRun logs)

• Automated generation of post-activity reports (tracklines, activity duration, operational footprint, etc)

• Automated file transport between RSP and RSC

• Web-based management of past and upcoming events and activities.

URI Inner Space Center Meeting IINovember 29, 2006

Page 10: URI Inner Space Center Meeting III January 9, 2007.

Functionality Requirement for given Functionality Requirement for given AudiencesAudiences

• Real-time time-series data plots• Real-time display of sonar data• Real-time display of HD frame grabs• Real-time navigation with bathymetry• Post dive maps, tracklines, etc.

• Centralized event planning and management

URI Inner Space Center Meeting IINovember 29, 2006

Page 11: URI Inner Space Center Meeting III January 9, 2007.

Recommended development priorities for Recommended development priorities for additional functionalityadditional functionality

• Automatic logging of video system (AsRun logs)• Automated generation of post-activity reports

(tracklines, activity duration, operational footprint, etc)

• Automated system for file transport between RSP and RSCs

URI Inner Space Center Meeting IINovember 29, 2006