The edilon)(sedra Urban Slab Track system Rik Monteban Sales Manager Netherlands Urban Track conference d.d. 24/25 June 2010

Transcript of Urban Track presentatie Praag · edilon)(sedra organisation " Main activities: design, production...

The edilon)(sedra

Urban Slab Track system

Rik Monteban Sales Manager Netherlands Urban Track conference d.d. 24/25 June 2010

edilon)(sedra organisation

• Main activities: design, production and installation of systems for ballast less track for train, tram and metro.

• 200 FTE worldwide • Own R&D departments and research facilities• Full service partner

ERS-HR

ERS-LR

ERS-CR

EBS

EDF (-FF)

Prefab-bridge

SB-steel bridge

Prefab-slabs

LC HR/LR

Basic systems

edilon)(sedra rail systems

STMSSemi prefab bridge

ERS-M

edilon)(sedra rail systemsdevelopment partner and systems supplier

First a brief reminder:

Karlsruhe KaiserstrasseRefurbishment of city center track

edilon)(sedra Urban Slab Track system

Traffic frequency 37 trams per hour Yearly € 250.000,- maintenance on streetwork onlyRefurbishment with prefabricated imprinted slabs

Requirements- Short building time- High esthetical and qualitydemands

- Isolation of sound and fibration

edilon)(sedra -LR-PSVBK Karlsruhe Kaiserstraße

Aangepast platen bij haltes

edilon)(sedra -LR-PSVBK Karlsruhe Kaiserstraße

Details

edilon)(sedra -LR-FTVBK Karlsruhe Kaiserstraße

edilon)(sedra -LR-PS

Versatile rail profiles

Aangepast platen bij haltes

edilon)(sedra -LR-PSVBK Karlsruhe Kaiserstraße

Aangepast platen bij haltes

edilon)(sedra -LR-PSVBK Karlsruhe Kaiserstraße

Stockholm Spårvägen City project etapp 1

– Spårvägen City Etapp 1 - Sedra SDS System 200 mtr.– Spårvägen City Etapp 1 - Edilon Urban Slab Track 760 mtr.

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

• Project start up considerations

– Design, construct and build– Intensive road traffic– Narrow work space and level crossings cannot be closed– Royal marriage comming up, therefore need to hurry up

• Project caracteristcics

– Total building time 6 weeks– Drainage, cable and welding boxes integrated– Optimizing track comfort– Reduction of airborne noise– Isolation of low frequency fibrations– Responsibility for road and track specificaly devided– Low Life Cycle Costs

edilon)(sedra – Stockholm Spårvägen City

• Design Edilon Urban Slab Track– Prefab concrete slabs– Steel trough– Coupling bars between the slabs– Edilon Embedded Rail System– Top layer with asphalt– STM mat for low frequency vibrations

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

edilon)(sedra – Stockholm Spårvägen City

This picture will be replaced by a finished track picture

edilon)(sedra – Urban Slab Track system

This ends this presentation.

Thank you for your kind attention

Is there time for Questions?