Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New...

4
Updated HBD FEM Diagram Clock Master Clock fanout ADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse

Transcript of Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New...

Page 1: Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.

Updated HBD FEM Diagram

Clock Master

Clock fanout ADCOptical

out

Backplane

Crate

GTM/Ethernet

New Daughter card + DCM

Test pulse

Page 2: Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.

ADC Clock master Optical trasmitter

backplane Clock fanout

Page 3: Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.

Status• All boards are designed for the FEM system except for

the test pulse board.– Only the optical out need to be checked before fabrication

• Testing procedure– Clock master need to be tested first

• System download • Serial read-back• Clocks

– Clock fanout board next – Backplane +ADC – We now have a standalone system– Need optical board -> New DCM daughter card

• New DCM daughter card will be designed soon.

• Good news– We finally get HBD money

• Now we can fabricate these boards and buy the parts

Page 4: Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.

Need to work out soon

• What items need to be purchased now for the data taking (long lead time items)– Power supply– Signal cables (how many we need ?)– Clock cables– What is the minimal channels need to be

instrumented?• how many ADC boards needed to built?• We don’t have production money

– Normally this fund is released after prototype and final design review.