UPDATE ON THE NIGERIA SUGAR MASTER PLAN
Transcript of UPDATE ON THE NIGERIA SUGAR MASTER PLAN
UPDATE ON THE NIGERIA
SUGAR MASTER PLAN
ISO FOCUS ON NIGERIA
THURSDAY, 5 NOVEMBER, 2020
Population: 206,630,269 (2020 estimate-7th)Land Mass: 923,769 km2 (32nd)
GDP (PPP): $1.275 trillion (23rd)
Per Capita GDP: $5,066 (129th)
GDP Growth Rate: -6.10% (YoY)
NSMPOBJECTIVES, KEY ELEMENTS, DELIVERABLES
NSM
PO
BJE
CTI
VES
Raise local production of sugar
to attain self-sufficiency;
Create huge number of job
opportunities;
Stem the tide of unbridled
sugar importation;
Contribute to the production of
ethanol and generation of
electricity.
NSMP: KEY ELEMENTS
Mandatory Backward Integration Program (BIP)
Outgrowers Support Scheme
Import Quota
Administration
Protective Tariff
Regime
Sector-Specific
Incentives
Creation of 37,378 permanent jobs
US$65.8million savings in forex on fuel imports
annually (E10 mandate
US$350-500million forex will be saved from sugar
importation
Production of 1.75metric tonnes of Sugar
Production of 116million litres of ethanol
Creation of 79,803 casual jobs
Generation of 411.7MW of electricity
NSMP Deliverables
/Targets
ON-GOING PROJECTS….
• Location: Numan, Lamorde LGA, Adamawa State
• Coordinates: Latitude:9⁰ 35.398’N; Longitude: 11⁰54.707’E (Elevation: 153m ASL)
• Operator: Dangote Sugar Refinery Plc
• Year of Establishment: 1976 (Privatised in 2003)
• Available Land: 12,500ha
• Land Developed: 8,178ha
• Land Under Cane: 6,300ha
• Outgrower Farmers: 292 Outgrower Farms: 307ha
• Mill Capacity: 3,500TCD expansion to 6,000TCD
• Jobs Created: 5,821
• Current Status: Field expansion on-going while Factory capacity is being expanded to 6,000TCD.
• Expected Sugar Output: 85,000MT/annum
• Expected Date of Commissioning: 1st Quarter, 2020
DANGOTE SUGAR-Numan
DANGOTE SUGAR- Tunga
• Location: Tunga, Awe LGA, Nasarawa State
• Coordinates: Latitude: 8⁰ 01.360’N; Longitude: 9⁰ 23.353’E
• Elevation: 90m ASL• Operator: Dangote Sugar Plc• Available Land: 40,000ha• Land Developed: 150ha• Land Under Cane: 100ha nursery• Mill Capacity: 12,000TCD mill(Phase 1).
• Current Status: Field development and contract award for machinery.
• Expected Sugar Output: 170,000MT/annum (Phase I).
• Expected Date of Commissioning:2023 (Phase I)
BUA SUGAR -Lafiagi
• Location: Lafiagi, Kwara State, Elevation: 79m ASL
• Coordinates: Latitude: 8⁰ 52.278’N; Longitude: 5⁰ 24.636’E
• Operator: BUA International Group
• Year of Establishment: 1992 (Privatised in 2008)
• Available Land: 12,000ha
• Land Developed: 5,696ha
• Land under Cane: 1,500ha
• Outgrower Farmers: Yet to take-off
• Mill Capacity: 10,000TCD Integrated Factory is under construction.
• To produce sugar, ethanol and co-generate electricity.
• Jobs created: 1,408
• Current Status: Field expansion and Machinery installation on-going.
• Expected Sugar Output: 143,000MT/annum
• Expected Date of Commissioning: 2nd Quarter 2020.
GOLDEN SUGAR - Sunti
• Location: Sunti, Mokwa LGA, Niger State
• Coordinates: Latitude: 9⁰ 6.744’N; Longitude:5⁰ 13.494’E (Elevation: 75m ASL)
• Operator: Golden Sugar Company (Affiliate ofFlour Mills of Nigeria Plc)
• Year Established: 2010 (Old Sunti Sugar Projectestab. In 1974, Privatised in 2005)
• Available Land: 7,000ha
• Land Developed: 3,000ha
• Land Under Cane: 2,858ha
• Outgrower Farmers: 115 (Pilot Scheme).Outgrower Farms: 141ha
• Mill Capacity: 3,500TCD
• Jobs created: 3,700
• Current Status: Field expansion and sugarproduction on-going.
• Expected Sugar: Production: 50,000MT/annum.
• Expected Date of Commissioning: Factorycommissioned in March, 2018
GNAL SUGAR-Gagarawa
• Location: Gagarawa, Jigawa State• Coordinates: Latitude: 12⁰ 14.809’N; Longitude: 9⁰ 35.655’E
• Operator: GNAL is a wholly owned subsidiary company of Lee Group
• Year Established: 2017• Available Land: 12,000ha• Land Developed: 550ha• Land Under Cane: 150ha nursery• Mill Capacity: 5,000TCD(Phase 1) & another 5000TCD (Phase 2).
• Current Status: Field development on-going and contract award for machinery.
• Expected Sugar Output: 75,000MT/annum (Phase I).
• Expected Date of Commissioning:2022
PROJECTS ON THE DRAWING BOARD…
PROJECTS ON THE DRAWING BOARD
Sean-Zara Sugar (Kwara State) -1,500TCD on a 4,000ha farm land
Crystal Sugar (Jigawa State) –1,500TCD on a 4,000ha farm land
Contec Global Coy (Kebbi State)- 7,000TCD on 18,000ha farm land
Gummi Sugar (Zamfara State) -1,500TCD mill on a 4,000ha farm land
ON-GOING MINI SUGAR PROJECTS
Oyo State Sugar Processors, Iseyin, Oyo State – 300TCD
OYO SUGAR
Goronyo Sugar Factory, Goronyo, Sokoto State – 500TCD.
GORONYO SUGAR
Cocaset Sugar Company, Ondo State – 500TCD
COCASET SUGAR
CHALLENGESEconomy, Business Environment, Land, Climate Change
Economy
Recession
Exch. Rate
Forex Scarcity
Presidential Intervention
FloodingEWSDykes
LandBusiness
EnvironmentClimate Change/Natural Disaster Boko Haram
Incentives(SS)
PEBEC
93mln HaCommunity Agitations
Land Use ActTown Hall Meeting
CSR Out-grower
NEC Intervention
REVISED PERFORMANCE FRAMEWORK & TARGETS
Dangote Sugar Current Capacities
Project site AreaRequired(Ha)
Yield (TC/Ha) Total Tons Cane TotalCrushingDays
FactoryCapacityTCD
FactoryRecoveryTC/TS
Total SugarOutput T/Ann
SSCL, Phase1Numan
10,000 90 900,000 150 6,000 10.5 85,000
TungaPhase1
20,000 90 1,800,000 150 12,000 10.5 170,000
Total 37,500 90 3,375,000 150 18,000 10.5 255,000
Dangote Sugar Additional Capacities Required
Project Site AreaRequired(Ha)
Yield(TC/Ha)
Total Tons Cane TotalCrushingDays
FactoryCapacityTCD
FactoryRecoveryTC/TS
Total SugarOutput T/Ann
SavannahNuman Phase2
18,000 90 1,620,000 150 10,800 10.5 150,000
Tunga Phase 2 20,000 90 1,800,000 150 12,000 10.5 170,000
Total 38,000 90 3,420,000 150 24,000 10.5 320,000
BUA & SGSE Current & Additional Capacities Required
Project Site Area
Required
(Ha)
Yield
(TC/Ha)
Total Tons
cane
Total
Crushing
days
Factory
Capacity
TCD
Factory
Recovery
TC/TS
Total Sugar
Output T/Ann
LASUCO Lafiagi 17,500 90 1,575,000 150 10,000 10.5 142,857
Shonga, Kwara 10,600 90 950,000 150 6,500 10.5 90,000
Project Site AreaRequired(Ha)
Yield(TC/Ha)
Total Tonscane
TotalCrushingdays
FactoryCapacityTCD
FactoryRecoveryTC/TS
Total SugarOutput T/Ann
SGSEL Sunti 6,000 90 540,000 150 3,500 10.5 50,000
Toto, Nasarawa 20,000 90 1,800,000 150 12,000 10.5 170,000
Other Initiatives Under the
NSMP
180 New Varieties, 2 New Bio-factories.
Investment in Research, Development and Innovation
11 Large scale sites completed, 5 on-going, 8 Small scale sites
Pre-Feasibility Studies
Nigeria Sugar InstituteCapacity Development, R&D Back-up
Thank You!