Sinaarsi - intelekti.ge 7.pdf · 4 IV Tavi. sokoebis samefo ..... 117 mogzauroba droSi ..... 120
Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121...
Transcript of Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121...
Up
Dn
114
I&E Storage
117
112 110 109 108 107 106 105 104 103 102
150 151 152 153149148147146145144
143
140
139
Elev.
118
111
125124
123122
120
126
127
128
138
129
130
131
137
136
135
132
134
15
7
101
115116
119
Alarm Panel
142
141
Up
Dn
Up
WHM Storage
121
125A
PROJECTNORTH
TRUENORTH
NORT
HPARTIAL FIRST FLOOR PLAN - NEW DISPATCH CENTERSCALE: 1/8" = 1'-0"A-1
1
GENERAL CONSTRUCTION NOTES:THE WORK AREA FOR THIS PROJECT IS AT THE PENNSYLVANIA GAME COMMISSION (PGC) HEAD QUARTERS BUILDING LOCATED AT 2001 ELMERTONAVENUE, HARRISBURG, PA 17110. THE PROPERTY IS OWNED BY THE COMMONWEALTH OF PENNSYLVANIA. ALL WORK SHALL BE INSTALLED INACCORDANCE WITH BUILDING AND SAFETY CODES MANDATED BY FEDERAL, STATE AND LOCAL GOVERNMENT LAWS, ORDINANCES ANDREGULATIONS.
THE WORK HOURS FOR THIS PROJECT SITE ARE DURING REGULAR PGC BUSINESS HOURS WHICH ARE MONDAY THROUGH FRIDAY, 7:45 AM TO 4:00PM. WORK DURING DIFFERENT HOURS MUST HAVE THE PRIOR WRITTEN APPROVAL BY THE PGC. REQUESTS FOR DIFFERENT WORKING HOURSMUST BE SUBMITTED TWO DAYS IN ADVANCE.
ACCESS TO THE WORK AREA WILL BE AT THE BUILDING'S PARKING LOT LOCATED ADJACENT TO THE LOADING DOCK. CONTRACTOR PARKING ANDSTAGING WILL BE PROVIDED AT THE SAME LOCATION. NEW BUILDING MATERIALS MAY BE BROUGHT INTO THE BUILDING THROUGH THEOVERHEAD DOORS AT THE LOADING DOCK. THE ELEVATOR MAY BE USED TO TRANSPORT MATERIALS FROM THE GROUND FLOOR TO THE FIRSTFLOOR, TEMPORARY ELEVATOR PROTECTION MUST BE INSTALLED TO PROTECT THE INTERIOR FINISHES OF THE ELEVATOR FROM DAMAGE.
THE BUILDING WILL REMAIN OPEN FOR BUSINESS DURING THE CONSTRUCTION. THE NEW DISPATCH CENTER SPACE WILL BE SURRENDERED TOTHE CONTRACTOR FOR THE DURATION OF THIS WORK. THE CONTRACTOR MUST STAGE AND SCHEDULE HIS WORK ACTIVITIES TO AVOIDDISRUPTION TO THE BUILDING OPERATIONS.
TEMPORARY HEAT, ELECTRIC AND WATER UTILITIES WILL BE PROVIDED FOR THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDINGTEMPORARY SANITARY FACILITIES NECESSARY FOR HIS WORKERS. THERE IS NO SEPARATE PAYMENT FOR PROVIDING TEMPORARY UTILITIESNECESSARY TO COMPLETE THE WORK.
THE CONTRACTOR SHALL PROVIDE SIGNS, BARRICADES, WARNING TAPE, SAFEGUARDS, ETC. TO KEEP THE PUBLIC FROM THE WORK AREASINSIDE AND OUTSIDE THE BUILDING. SAFETY AT THE WORK SITE IS THE CONTRACTORS RESPONSIBILITY.
THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE PRIOR TO THE START OF WORK AND SHALL NOTIFYTHE ARCHITECT IF ANY DISCREPANCIES OCCUR FOR CLARIFICATION.
CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING FOR SUPPORT AS REQUIRED FOR COMPLETE INSTALLATION.
1.
2.
3.
4.
5.
7.
6.
8.
PROJECT LOCATIONSEE DRAWING A-2 FOR ENLARGED PLANS
OF NEW DISPATCH CENTER
.
CT3CT2
CT1
CT5
CT4
CT6
D2
D3D4
D1
CT7
NOTE:THE DISPATCH CENTER MODULAR FURNITURE SYSTEMS SHOWNWILL BE FURNISHED AND INSTALLED BY OTHERS, VIA ASEPARATE CONTRACT, AFTER THE COMPLETION OF THISPROJECT WORK. THE MODULAR FURNITURE IS SHOWN FORINFORMATION PURPOSES ONLY. SEE ELECTRICAL DRAWINGSFOR NEW ELECTRICAL WIRING AND DEVICES TO BE INSTALLEDTO SUPPORT THE NEW MODULAR FURNITURE.
NEW DISPATCH CENTER
+/- 3'-3"
+/-3
'-7"
PENNSYLVANIA GAME COMMISSION
REVISIONS
DAUPHIN CO.
PARTIAL FIRST FLOOR PLAN
SUSQUEHANNA TWP.PGC HEAD QUARTERS BLDG.NEW CONSOLIDATED DISPATCH CENTER - PHASE 1
PROJECT NO.
DATE:SHEET NO.
DRAWN BY:PGC-HQ-20-01
A-110/13/2020C. CLOUSER
PROJECTNORTH
TRUENORTH
NORT
H
KEY PLANNO SCALE
AREA OF WORK
PARTIAL FIRST FLOOR PLAN SHOWN
FRO
NT
EN
TR
Y
PENNSYLVANIA GAME COMMISSIONHEADQUARTERS BUILDING2001 ELMERTON AVENUEHARRISBURG, PA 17110
WORK SHOWN ON THIS SHEET SHALL BE PROVIDEDBY THE GENERAL CONTRACTOR (GC-CONTRACT No. 1)UNLESS SPECIFICALLY STATED OTHERWISE.
Up
Dn
114
I&E Storage
117
140
Elev.
118
125124
123 122 120
115
116
119
141
WHM Storage
121
125A
NEW DISPATCH CENTER
117A
120
117B
CLOS.
MENSRESTROOM
WOMENSRESTROOM
PLAN ROOM OFFICE
PLOTTERROOM SURVEYORS
OFFICE
BREAKROOM
CORRIDOR
CO
RR
IDO
R
(N.I.C.) (N.I.C.)
(N.I.C.)
(N.I.C.) (N.I.C.)
(N.I.C.)
(N.I.C.)
118
1 1
1
948 S.F.
F
F
F
2 3
2 3
2 3
2 3
2 3
2 3
2 3141 S.F.
(N.I.C.)
2 3
4
4
5
5
5 5
66
6
7
7
8
8
45KVA
30KVA
9
NOTE:SEE ELECTRICALDRAWINGS FOR NEWTRANSFORMERSLOCATION AND SIZES.
4
2A-3
2A-3
SIM.
1010
11V.I.F.
11V.I.F.
11V.I.F.
11V.I.F.
10
PIPE
CH
ASE
PROVIDEDBY E.C.
11V.I.F.12
V.I.F.
V.I.F.12
CRCR
1313
MAT'L.
3'-0"
120118
117A
WIDTHDOORNo.
1 3/4"7'-0"
HARDWARETHK.HEIGHT
WOOD
MAT'L. GLAZING
EXIST.
FIRERATING
FIRERATING
EXISTING TO BE REUSEDEXISTING TO BE REUSED
117B
1) REMOVE AND REINSTALL EXISTING SOLID CORE WOOD DOORS AND HARDWARE WITHIN NEW METAL DOOR FRAMES.
2) REMOVE AND DISPOSE OF EXISTING METAL DOOR FRAMES. FURNISH AND INSTALL NEW WIDER 16 GAGE MIN.STEEL DOUBLE RABBET KNOCK DOWN DOOR FRAMES TO ACCOMMODATE NEW INTERIOR WALL SOUNDPROOFING MATERIALS AND FINISHES.
3) DOOR NUMBERS 117A & 117B SHALL RECEIVE NEW ELECTRIFIED DOOR STRIKES AND DOOR ACCESS CARD CONTROLS, FURNISH AND INSTALLED BY STATE SECURITY CONTRACTOR, VIA A SEPARATE CONTRACT (ADT).COORDINATE AND SCHEDULE THE INSTALLATION OF NEW DOOR FRAMES, EXISTING DOORS AND NEW DOOR HARDWARE TO ALLOW ACCESS FOR NEW WIRING OF ELECTRIFIED STRIKES AND CARD ACCESS CONTROLS TOAVOID ANY DOOR HARDWARE CONFLICTS.
DOOR SCHEDULE NOTES:
EXIST.EXIST.EXIST.
3'-0" 7'-0"3'-0" 7'-0"3'-0" 7'-0"
1 3/4"1 3/4"1 3/4"
WOODWOODWOOD
SEE H.W. GROUP 1 NONENONENONENONE
SEE H.W. GROUP 1METAL 20 MIN. NEW WIDER DOOR FRAME REQUIRED
METALMETALMETAL
20 MIN.20 MIN.20 MIN.
REMARKS
NEW WIDER DOOR FRAME REQUIREDNEW WIDER DOOR FRAME REQUIREDNEW WIDER DOOR FRAME REQUIRED
(3)
ROOM FINISH SCHEDULE
NUM
BER
NAM
E
DISPATCH CENTER
120
117
NOTE:
BASE
NORT
H
SOUT
H
EAST
FLOO
R
(1) (3)(3)(2)WALL
REM
ARKS
WES
T
CEIL
ING
(4)(3) (5)
OFFICE
ROOM FINISH SCHEDULE KEY NOTES:
AAB
AA
A A A AA A A AC C C C
AAB
CLOSET118B
EXISTING LIGHT GAGE METAL STUD PARTITION WALLS, DOORS AND DOOR FRAMES TO BE DEMOLISHD BY PGC STAFF, NOT IN CONTRACT.
EXISTING LIGHT GAGE METAL STUD PARTITION WALLS TO REMAIN, GYPSUM PANELS AT INTERIOR WALL SURFACES TO BE DEMOLISHED BYPGC STAFF, NOT IN CONTRACT.
FURNISH AND INSTALL NEW SOUND BATT MATERIAL WITHIN ALL OPEN WALL FRAMING CAVITIES. FURNISH AND INSTALL NEW SOUND SOAKPANELS TO EXPOSED METAL WALL FRAMING (ONE SIDE ONLY). FURNISH AND INSTALL NEW 5/8-INCH THICK GYPSUM PANEL SYSTEMFASTENED THROUGH NEW SOUND SOAK PANELS TO EXISTING METAL WALL FRAMING. PROVIDE A LEVEL 4 GYPSUM WALL. FURNISH ANDINSTALL ONE COAT OF PAINT PRIMER AND TWO FINISH COATS OF NO VOC, SEMI GLOSS, LATEX ENAMEL PAINT FINISH TO ALL WALLSURFACES. FURNISH AND INSTALL NEW 6" HIGH VINYL COVE BASE TO MATCH NEW FINISH FLOORING SYSTEM. SEE PROJECTSPECIFICATIONS.
EXISTING PARTITION WALL TO REMAIN, PATCH AND REPAIR EXISTING GYPSUM FINISHES, APPLY TWO COATS OF PAINT TO ALL WALLSURFACES.
REMOVE AND REINSTALL EXISTING DOORS AND DOOR HARDWARE. STEEL DOOR FRAMES SHALL BE DEMOLISH AND REPLACED WITH NEW16 GAGE STEEL KNOCK DOWN DOOR FRAMES WITH WIDER JAMBS FOR THE NEW SOUND SOAK PANEL AND GYPSUM WALL FINISHES.REINSTALL EXISTING DOORS AND DOOR HARDWARE WITHIN NEW DOOR FRAMES. NEW FRAMES SHALL BE FACTORY PREPARED TOACCEPT EXISTING AND NEW DOOR HARDWARE. SEE DOOR SCHEDULE THIS DRAWING.
NEW AUDIBLE AND VISUAL DEVICES SHOWN ON PLAN WILL BE PROVIDED VIA A SEPARATE CONTRACT WITH STATE FIRE ALARM VENDOR,NEW GENERAL CONSTRUCTION SHALL BE COORDINATED WITH THE FIRE ALARM VENDOR TO ALLOW ACCESS FOR NEW ROUGH AND FINALWIRING TO SUPPORT THESE NEW DEVICES.
FURNISH AND INSTALL NEW STATICWORX CARPET TILE SYSTEM, CLEAN AND PREPARE EXISTING FLOORS, PROVIDE FLOOR LEVELING,PRIMERS , UNDERLAYMENTS AND ADHESIVES REQUIRED FOR INSTALLATION IN ACCORDANCE WITH THE MANUFACTURER'S PRODUCTSPECIFICATIONS. SEE PROJECT SPECIFICATIONS.
FURNISH AND INSTALL NEW 5/8-INCH THICK GYPSUM PANELS AT EXISTING COLUMN COVERS, PROVIDE ADDITIONAL LIGHT GAGE METALFRAMING AND BLOCKING AS REQUIRED FOR RECONSTRUCTION.
FURNISH AND INSTALL NEW QUIET BARRIER SPECIALTY 1 1/4-INCH COMPOSITE PANELS FASTENED TO THE EXISTING WALL SURFACES,BEHIND THE NEW ELECTRICAL TRANSFORMERS IN ROOM 123.
FURNISH AND INSTALL NEW QUIET BARRIER PIPE WRAP AT EXITING UN-INSULATED MECHANICAL AND SANITARY PIPING LOCATED WITHINTHE EXPOSED WALL CAVITIES, PIPE CHASES AND ABOVE THE CEILING.
FURNISH AND INSTALL NEW WOOD BLOCKING WITHIN EXISTING METAL STUD PARTITION WALLS FOR FUTURE INSTALLATION OF FOUR (4)NEW WALL HUNG 60 INCH FLAT SCREEN TELEVISIONS/MONITORS. NEW TELEVISION/MONITOR LOCATIONS AND MOUNTING HEIGHTS SHALLBE DETERMINED AT THE INITIAL JOB CONFERENCE. TELEVISIONS AND MOUNTING BRACKETS SHALL BE FURNISHED AND INSTALLED BYPGC STAFF.
SURFACED MOUNTED WALL HUNG DIGITAL CLOCK, TO BE FURNISH AND INSTALLED BY PGC STAFF. PROPOSED LOCATION SHOWN FORCOORDINATION PURPOSES ONLY AND FOR NEW ELECTRICAL OUTLET TO POWER CLOCK.
NEW CARD READER, WALL MOUNTED. NEW DOOR ACCESS CONTROLS AND ELECTRIC LATCH SHALL BE FURNISH AND INSTALLED BY PGCSECURITY VENDOR, COORDINATED INSTALLATION OF NEW DOOR FRAME, DOOR AND DOOR HARDWARE WITH SECURITY VENDOR TOAVOID CONFLICTS.
1
2
3
4
5
6
7
8
9
10
NEW DISPATCH CENTER FLOOR PLAN - CONSTRUCTION NOTES
MEN'S RESTROOM115WOMEN'S RESTROOM116
123 STORAGE A A A A A AAB B B B B BBA A A A A AA
11
NEW QUIET DOOR ADJUSTABLE PERIMETER SEAL, NEW QUIET DOOR AUTOMATIC DOOR SEAL, NEW ADA COMPLIANTALUMINUM DOOR THRESHOLD, NEW NORTON 8501 ADA COMPLIANT DOOR CLOSER, NEW SARGENT 8200 SERIES MORTISELATCH/LOCKSET SET WITH STOREROOM FUNCTION, EXISTING DOOR HINGES AND DOOR STOPS TO BE REUSED.
HARDWARE GROUP #1:
12
13
A.F.F. - ABOVE FINISHED FLOOR
V.I.F. - VERIFY IN FIELD
N.I.C. - NOT IN CONTRACT
ABBREVIATIONS LEGEND
PENNSYLVANIA GAME COMMISSION
REVISIONS
DAUPHIN CO.
NEW DISPATCH CENTER FLOOR PLAN, NOTES & SCHEDULES
SUSQUEHANNA TWP.PGC HEAD QUARTERS BLDG.NEW CONSOLIDATED DISPATCH CENTER - PHASE 1
PROJECT NO.
DATE:SHEET NO.
DRAWN BY:PGC-HQ-20-01
A-210/13/2020C. CLOUSER
PROJECTNORTH
TRUENORTH
NORT
HNEW DISPATCH CENTER - FLOOR PLANSCALE: 1/4" = 1'-0"A-2
1
PROJECTNORTH
TRUENORTH
NORT
H
KEY PLANNO SCALE
AREA OF WORK
FRO
NT
EN
TR
Y
PENNSYLVANIA GAME COMMISSIONHEADQUARTERS BUILDING2001 ELMERTON AVENUEHARRISBURG, PA 17110
WORK SHOWN ON THIS SHEET SHALL BE PROVIDEDBY THE GENERAL CONTRACTOR (GC-CONTRACT No. 1)UNLESS SPECIFICALLY STATED OTHERWISE.
Up
Dn
114
I&E Storage
140
Elev.
125124
119
141
WHM Storage
125APLOTTER
ROOM SURVEYORS
OFFICE
BREAKROOM
CORRIDOR
CO
RR
IDO
R
(N.I.C.) (N.I.C.)
(N.I.C.)
(N.I.C.) (N.I.C.)
(N.I.C.)
(N.I.C.)SD
(N.I.C.)
(N.I.
C.)
SD
SD
SD
SD SD
SD
SD
SD
1
1
1
2 2
2
4
3
3
3
33 3
4 4
4
5
5
5
5
5
5 5
5
6
6 6
7
7
7
8
8
8
8
8
8
8
8
8
118CLOS.
(N.I.C.)
EX. COL.
EX. COL.
6
4
8
8
8
RCP LEGEND
SD
TYPICAL WALL SECTIONSCALE: 3/4" = 1'-0"A-3
2
NEW SUSPENDED CEILING SYSTEM
EXISTING 3 5/8" LIGHT GAGE METAL STUDPARTITION WALL FRAMING
NEW 1/4" THICK SOUND SOAK PANELS
NEW 5/8" THICK GYPSUM WALL PANELSw/ LEVEL 4 FINISH
EXISTING 1/2" THICK GYPSUM WALL FINISH,TO REMAIN AS IS
NEW SOUND BATT INSULATION TO BEINSTALLED WITHIN ALL WALL FRAMING CAVITIES
NEW 6" HIGH VINYL COVE BASE ADHERED TONEW GYPSUM WALL SURFACE
NEW STATICWORX CARPET TILE FINISHFLOORING SYSTEM
EXISTING SUSPENDED CONCRETE SUB-FLOOR
NEW SUSPENSION CABLES, ANCHOR TOEXISTING FLOOR AND ROOF STEELSTRUCTURAL MEMBERS AND METAL DECKINGABOVE
9'-0
"
5" (NEW WALL THICKNESS)
NEW CEILING WALL ANGLE, MITER CORNERS
8'-9
"123 117
(EXI
STIN
G W
ALL
HEI
GH
T)
(NEW
CEI
LIN
G H
EIG
HT)
EXISTING SUSPENDEDCEILING, TO REMAIN
FURNISH AND INSTALL A NEW 2'x2' SUSPENDED ACOUSTICAL TILE CEILING SYSTEM, 8'-9" A.F.F. AT THE NEW DISPATCH CENTER. THE NEWCEILING WITHIN THE OFFICE, ROOM 120, WILL REMAIN AT SAME ELEVATION, +/- 8'-6" A.F.F. INSTALLATION SHALL BE IN ACCORDANCEWITH THE MANUFACTURES PRODUCT SPECIFICATIONS AND INSTALLATION PROCEDURES.
EXISTING 2'x4' SUSPENDED ACOUSTICAL TILE CEILING SYSTEM TO REMAIN, PROVIDE NEW ACOUSTICAL PANELS TO MATCH EXISTING ATLOCATIONS WHERE FLUORESCENT LIGHTING FIXTURES HAVE BEEN REMOVED. SEE ELECTRICAL DRAWINGS. SCHEDULE ANDCOORDINATE THIS WORK WITH ELECTRICAL CONTRACTOR.
FURNISH AND INSTALL NEW AIR DIFFUSERS WITHIN NEW SUSPENDED CEILING SYSTEM. PROVIDE NEW INSULATED FLEX DUCT ANDHARDWARE AS REQUIRED TO RE-CONNECT AIR DIFFUSERS TO EXISTING BRANCH SUPPLY DUCT WORK ABOVE THE CEILING.
FURNISH AND INSTALL NEW PLENUM RETURN GRILLS WITHIN NEW SUSPENDED CEILING SYSTEM.
EXISTING PENDENT SPRINKLER HEADS WILL BE RAISED, VIA A SEPARATE CONTRACT WITH STATE SPRINKLER VENDOR, TOACCOMMODATE THE NEW SUSPENDED CEILING ELEVATION. NEW CEILING WORK SHALL BE COORDINATED WITH THE SPRINKLERVENDOR TO SUPPORT THESE MODIFICATIONS. SPRINKLER VENDOR SHALL PROVIDE FINISHED TRIM OR ESCUCHEONS AROUND HEAD.
RE-INSTALL EXISTING SMOKE DETECTORS WITHIN NEW SUSPENDED CEILING SYSTEM. PROVIDE ALL SUPPORTS AND HARDWAREREQUIRED FOR RE-INSTALLATION. EXISTING SMOKE DETECTOR FLEXIBLE METAL CLAD CIRCUITRY AND BACK BOX SHALL REMAIN.
FURNISH AND INSTALL NEW QUIET BATT 30 SOUNDPROOFING INSULATION OVER THE NEW SUSPENDED CEILING SYSTEMS. INSTALLATIONSHALL BE IN ACCORDANCE WITH THE MANUFACTURES PRODUCT SPECIFICATIONS AND INSTALLATION PROCEDURES.
EXISTING LIGHT FIXTURES TO BE DEMOLISHED BY ELECTRICAL CONTRACTOR. PROVIDE NEW CROSS TEES, ACOUSTICAL PANELS ANDADDITIONAL SUSPENSION CABLES, AS REQUIRED FOR INSTALLATION OF NEW LED LIGHTING FIXTURES AND DEMOLITION OF EXISTINGLIGHT FIXTURES. SEE ELECTRICAL DRAWINGS FOR NEW LIGHT FIXTURE LOCATIONS TO BE INSTALLED WITHIN EXISTING CEILINGSYSTEMS. SCHEDULE AND COORDINATE THIS WORK WITH ELECTRICAL CONTRACTOR.
1
2
3
4
5
6
7
NEW DISPATCH CENTER REFLECTED CEILING PLAN - CONSTRUCTION NOTES
8
NOTE:COORDINATE THE INSTALLATION OF NEW SUSPENDED CEILINGSYSTEMS, NEW CEILING MOUNTED COMPONENTS AND ELECTRICALDEVICES (OCCUPANCY SENSORS) WITH THE ELECTRICAL DRAWINGSTO AVOID CONFLICTS AND OBSTRUCTIONS.
PENNSYLVANIA GAME COMMISSION
REVISIONS
DAUPHIN CO.
NEW DISPATCH CENTER REFLECTED CEILING PLAN AND NOTES
SUSQUEHANNA TWP.PGC HEAD QUARTERS BLDG.NEW CONSOLIDATED DISPATCH CENTER - PHASE 1
PROJECT NO.
DATE:SHEET NO.
DRAWN BY:PGC-HQ-20-01
A-310/13/2020C. CLOUSER
PROJECTNORTH
TRUENORTH
NORT
HNEW DISPATCH CENTER - REFLECTED CEILING PLANSCALE: 1/4" = 1'-0"A-3
1
PROJECTNORTH
TRUENORTH
NORT
H
KEY PLANNO SCALE
AREA OF WORK
FRO
NT
EN
TR
Y
PENNSYLVANIA GAME COMMISSIONHEADQUARTERS BUILDING2001 ELMERTON AVENUEHARRISBURG, PA 17110
WORK SHOWN ON THIS SHEET SHALL BE PROVIDEDBY THE GENERAL CONTRACTOR (GC-CONTRACT No. 1)UNLESS SPECIFICALLY STATED OTHERWISE.
E001
SYMBOLS &ABBREVIATIONS
AH
AH
WLS
SYMBOL SCHEDULE - ELECTRICAL ELECTRICAL LINETYPE KEY(APPLIES TO ALL ELECTRICAL SYMBOLS)
MECHANICAL ABBREVIATIONS
ABBREVIATIONS
“”
SYMBOL SCHEDULE - TELECOMMUNICATIONS
SYMBOL SCHEDULE - SECURITY
10/15/2020
ED100
PARTIAL GROUNDFLOOR PLAN -DEMOLITION -ELECTRICAL
AH
AH
WLS
N
10/15/2020
ED101
PARTIAL FIRSTFLOOR PLAN -DEMOLITION -ELECTRICAL
AH
AH
WLS
N
Up
Dn
114
Storage
117
112 110 109 108 107 106 105 104 103 102
150 151 152 153149148147146145144
143
140
139
Elev.
118
111
125
124
121123 122 120
126
127
128
138
129
130
131
137
136
135
132
134
15
7
101
115116
119
Alarm Panel
142
141
Up
Dn
Up
Storage
10/15/2020
ED102
PARTIAL SECONDFLOOR PLAN -DEMOLITION -ELECTRICAL
AH
AH
WLS
N
10/15/2020
10/15/2020
E200
PARTIAL GROUNDFLOOR PLAN -
POWER & SYSTEMS
AH
AH
WLS
N
10/15/2020
Up
Dn
Elev.
Alarm Panel
Up
Dn
Up
FUTURE FUTURE
FUTUREFUTURE
E201
PARTIAL FIRSTFLOOR PLAN -
POWER & SYSTEMS
AH
AH
WLS
N
EMERGDISPATCHCENTER
-
CORRIDOR123
EMERGDISPATCHCENTER
-
OFFICE120
WOMEN'SRESTROOM
115
MEN'SRESTROOM
116
OFFICE-
BREAK ROOM127
10/15/2020
E202
PARTIAL SECONDFLOOR PLAN -
POWER & SYSTEMS
AH
AH
WLS
N
COMPUTERROOM
123
10/15/2020
E501
DETAILS
AH
AH
WLS
10/15/2020
E601
SCHEDULES
AH
AH
WLS
LIGHTING FIXTURE SCHEDULE
LIGHTING FIXTURE SCHEDULE NOTES:
LIGHTING CONTROL SYSTEM - COMPONENT SCHEDULE (WATTSTOPPER)
SYMBOL DESCRIPTION BASIS OF DESIGN MANUFACTURER/SERIES NOTES
LIGHTING CONTROL SYSTEM - SEQUENCE OF OPERATION MATRIXSPACE DESCRIPTION GENERAL LINE VOLTAGE CONTROLS DIGITAL CONTROLS
AREA NAME AREA NUMBER LIGHTING ZONES TARGET MAINTAINEDAVERAGE (FC)
CONTROL FUNCTION:ON/OFF OR DIM
TIME-OUT SETTINGS(MINUTES)
TOGGLE SWITCHCONTROL
WALL SWITCHSENSOR CONTROL
(OCC/VAC)ANALOG SENSOR
CONTROL (OCC/VAC) MANUAL CONTROLS SENSOR CONTROL(OCC/VAC)
10/15/2020