Univ Of Zagreb Uglesic Prevention Of Flashover

25
1 Prevention of Flashover on a Double-circuit 220 kV Line Ivo Uglešić*, A. Xemard**, V. Milardić*, B. Filipović-Grčić* *Faculty of Electrical Engineering and Computing University of Zagreb, Croatia **EDF R&D, Paris, France EMTP-RV USER GROUP MEETING, DUBROVNIK, 30 APRIL 2009

Transcript of Univ Of Zagreb Uglesic Prevention Of Flashover

Page 1: Univ Of Zagreb Uglesic Prevention Of Flashover

1

Prevention of Flashover on a Double-circuit 220 kV

Line

Ivo Uglešić*, A. Xemard**, V. Milardić*, B. Filipović-Grčić*

*Faculty of Electrical Engineering and Computing

University of Zagreb, Croatia

**EDF R&D, Paris, France

EMTP-RV USER GROUP MEETING, DUBROVNIK, 30 APRIL 2009

Page 2: Univ Of Zagreb Uglesic Prevention Of Flashover

2

OUTLINE OF PRESENTATION

INTRODUCTION

SIMULATION OF LIGHTNING STROKES TO

TRANSMISSION LINE

MODELING PROCEDURE FOR TRANSIENT

SIMULATIONS

SIMULATION RESULTS

CONCLUSIONS

Page 3: Univ Of Zagreb Uglesic Prevention Of Flashover

3

INTRODUCTION

- The case study is related to the improvement of the lightning

performance of a 220 kV double-circuit overhead line, which connects

the thermo power plant to the rest of the power system.

- Several double-circuit outages provoked by lightning caused the

interruption of power supply of the power plant.

- To avoid back-flashovers due to lightning strokes to tower or

overhead shielding wires, the tower footing resistance should be as

low as possible.

- Installation of unbalanced insulation on a double-circuit line is one of

possible solution for suppression of double-circuit simultaneous

faults.

- Installation of line surge arresters (LSA).

Page 4: Univ Of Zagreb Uglesic Prevention Of Flashover

4

The goal of the simulation is to determine the distribution of lightning

current amplitudes which strike HV transmission line towers and shield

wires or the phase conductors directly.

The Monte Carlo method is used – reproducing numerically a

stochastic problem.

The log–normal distribution of lightning current amplitude:

SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE

P - probability of occurrence of lightning current amplitude

higher than I.

Page 5: Univ Of Zagreb Uglesic Prevention Of Flashover

5

The general expression for the striking distance:

SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE

R - striking distance,

I - lightning current amplitude,

a - constant [3.3 – 10.6],

b - constant [0.5 – 0.85].

In calculations is used a=7.2, b=0.65.

Page 6: Univ Of Zagreb Uglesic Prevention Of Flashover

6

SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE

4,5 m

6,5 m

5,0 m

6,7

m6,0

m6

,0 m

A

B

C

30,00m

27,30m

24,60m

22,00m

19,50m

17,10m

4,5 m

6,5 m

5,0 m

6,7

m6

,0 m

6,0

m

3D model of the part of the studied transmission line

Page 7: Univ Of Zagreb Uglesic Prevention Of Flashover

7

SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE

-Total number of simulations 37932,

-1000 simulations finished with phase conductor strikes,

-25635 ground strikes,

-11297 with shielding wire and tower strikes,

-shielding failure occurs in 8.85% cases.

According to statistical calculation, the following characteristics of

the crest values of the current for lightning striking phase conductors

are calculated:

- average value: 15.40 kA,

- variance: 98.36 kA,

- standard deviation: 9.92 kA,

- maximal phase conductor strike current: 42.80 kA,

- critical current: 47.30 kA.

Page 8: Univ Of Zagreb Uglesic Prevention Of Flashover

8

SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE

Distribution of lightning currents striking phase conductors

0

0,01

0,02

0,03

0,04

0,05

0,06

0,07

0,08

0,09

0,1

1-3 3-5 5-7 7-9 9-11 11-13 13-15 15-17 17-19 19-21 21-23 23-25 25-27 27-29 29-31 31-33 33-35 35-37 37-39 39-41 >41

Classes (kA)

Pro

bab

ilit

y

Distribution of lightning currents striking phase conductors

Page 9: Univ Of Zagreb Uglesic Prevention Of Flashover

9

SIMULATION OF LIGHTNING STROKES TO TRANSMISSION LINE

Distribution of lightning currents striking top of towers or shielding wire

Distribution of lightning currents striking top of towers or shielding wire

0

0,05

0,1

0,15

0,2

0,25

1-1010-20

20-3030-40

40-5050-60

60-7070-80

80-90

90-100

100-110

110-120

120-130

130-140

140-150

150-160

160-170

170-180

180-190

Classes (kA)

Pro

bab

ilit

y

Page 10: Univ Of Zagreb Uglesic Prevention Of Flashover

10

MODELING PROCEDURE FOR TRANSIENT SIMULATIONS

The lightning stroke hitting a tower or a phase conductor can be

replaced by a surge current generator and a resistor (Norton

generator).

The CIGRE Lightning Current Waveform model can approximate well

the concave form of the lightning current front.

The transmission line, conductors and earth wire is represented by

several multi-phase untransposed distributed parameter line spans at

both sides of the point of the lightning stroke impact.

Tower surge impedances are calculated using equation:

Page 11: Univ Of Zagreb Uglesic Prevention Of Flashover

11

MODELING PROCEDURE FOR TRANSIENT SIMULATIONS

Phase voltages at the instant at which a lightning stroke impacts the

line must be included.

Insulators are represented using the area criterion that involves

determining the instant of breakdown using the formula:

DEdUU

t

T

k

0

0

U(τ) is the voltage applied at time t,

U0 is a minimum voltage to be exceeded before any breakdown

process can start or continue,

k and U0 and DE are constants corresponding to an air gap

configuration and overvoltage polarity,

T0 is the time from which U(τ) > U0.

Page 12: Univ Of Zagreb Uglesic Prevention Of Flashover

12

MODELING PROCEDURE FOR TRANSIENT SIMULATIONS

Tower footing resistances are modelled taking into account ionization:

R0 - footing resistance at low current and low frequency, i.e. 50 Hz,

I - stroke current through the resistance,

Ig - limiting current to initiate sufficient soil ionization.

ρ - soil resistivity m ;

E0 - soil ionization gradient, recommended value: 400 kV/m .

Page 13: Univ Of Zagreb Uglesic Prevention Of Flashover

13

MODELING PROCEDURE FOR TRANSIENT SIMULATIONS

EMTP-RV Model of footing resistance ionization

Page 14: Univ Of Zagreb Uglesic Prevention Of Flashover

14

MODELING PROCEDURE FOR TRANSIENT SIMULATIONS

The model of gapless type LSA includes non-linear and dynamic

behaviour of the arrester.

0

100

200

300

400

500

600

700

800

0,1 1 10 100

Current (kA)

Vo

ltag

e (

kV

)

U-I characteristic of surge arrester for the 220 kV line (Ur=210 kV)

Page 15: Univ Of Zagreb Uglesic Prevention Of Flashover

15

MODELING PROCEDURE FOR TRANSIENT SIMULATIONS

Model of 220 kV double-circuit line

8 9

Z=

13

9.3

Ω

Z=

13

9.3

Ω

Z=

13

5.2

Ω

6 7

Z=

13

9.3

Ω

5

Z=

13

9.3

Ω

4

Z=

13

9.3

Ω

3

Z=

13

5.2

Ω

2

Z=

13

9.3

Ω

1

Z=

13

9.3

Ω

upper

middle

lower

Tra

ns

mis

ion

lin

e

27

6 m

Tra

ns

mis

ion

lin

e

34

3 m

Tra

ns

mis

ion

lin

e

10

km

Tra

ns

mis

ion

lin

e

28

9 m

Tra

ns

mis

ion

lin

e

40

2 m

Tra

ns

mis

ion

lin

e

29

5 m

Tra

ns

mis

ion

lin

e

21

3 m

Tra

ns

mis

ion

lin

e

45

9 m

Tra

ns

mis

ion

lin

e

35

0 m

Shield wire

1000 Ω

31 kA, 72 kA,

96 kA, 138 kA

Stroke to tower

Tra

ns

mis

ion

lin

e

10

km

Page 16: Univ Of Zagreb Uglesic Prevention Of Flashover

16

SIMULATION RESULTS

When a lightning strikes the top of a 220 kV tower the occurrence of

the back-flashover depends on many parameters:

- peak current magnitude and maximal steepness,

- tower footing resistance,

- flashover voltage of insulation clearances,

- magnitude and phase angle of the voltage,

- atmospheric condition (rain, snow, pressure, temperature, humidity)

etc.

Page 17: Univ Of Zagreb Uglesic Prevention Of Flashover

17

SIMULATION RESULTS

Back-flashovers in relation to the lightning current magnitude and the

footing resistance of a tower

Page 18: Univ Of Zagreb Uglesic Prevention Of Flashover

18

SIMULATION RESULTS

Back-flashovers in relation to the lightning current magnitude and the

footing resistance of a tower (LSA in the upper phase)

Page 19: Univ Of Zagreb Uglesic Prevention Of Flashover

19

SIMULATION RESULTS

Back-flashovers in relation to the lightning current magnitude and the

footing resistance of a tower (LSA in the middle phase)

Page 20: Univ Of Zagreb Uglesic Prevention Of Flashover

20

SIMULATION RESULTS

Back-flashovers in relation to the lightning current magnitude and the

footing resistance of a tower (LSA in the lower phase)

Page 21: Univ Of Zagreb Uglesic Prevention Of Flashover

21

SIMULATION RESULTS

Back-flashovers in relation to the lightning current magnitude and the

footing resistance of a tower (LSAs in middle and lower phases)

Page 22: Univ Of Zagreb Uglesic Prevention Of Flashover

22

SIMULATION RESULTS

Back-flashover rate of one circuit of the 220 kV line: not protected by

LSAs, protected by LSA in middle phase (B), LSA in lower phase (C)

and LSAs in lower and middle phases (B and C)

0

1

2

3

4

5

6

7

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

Tower resistance (Ohms)

Nu

mb

er

of

Bac

k-f

las

ho

ve

r R

ate

s (

an

nu

al, p

er

10

0k

m o

f li

ne

)

NO LSA

LSA in B

LSA in C

LSAs in B and C

Page 23: Univ Of Zagreb Uglesic Prevention Of Flashover

23

SIMULATION RESULTS

Total flashover rate (back and shield failure) of one circuit of the 220 kV

line: not protected by LSAs, protected by LSA in middle phase (B), LSA

in lower phase (C) and LSAs in lower and middle phases (B and C)

0

1

2

3

4

5

6

7

8

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

Tower resistance (Ohms)

Nu

mb

er

of

Fla

sh

ov

er

Ra

tes

(an

nu

al,

per

10

0km

of

lin

e)

NO LSA

LSA in B

LSA in C

LSAs in B and C

Page 24: Univ Of Zagreb Uglesic Prevention Of Flashover

24

CONCLUSIONS

The following recommendations can be given for the purpose of

optimization of the number of LSAs:

-Improvement of footing resistances on towers if economically

justified.

-No LSA (tower footing resistance < 21 ).

-LSA in the lower phase (tower footing resistance > 21 and < 47 ).

-LSAs in the middle and lower phases (tower footing resistance > 47

< 150 ).

-Arresters installed in all 3 phases at selected towers with tower

footing resistance > 150 (the installation of three LSAs in one circuit

will only prevent back-flashover in that circuit on that tower and back-

flashovers could occur on neighboring towers).

Page 25: Univ Of Zagreb Uglesic Prevention Of Flashover

25

Prevention of Flashover on a Double-circuit 220 kV

Line

Ivo Uglešić*, A. Xemard**, V. Milardić*, B. Filipović-Grčić*

*Faculty of Electrical Engineering and Computing

University of Zagreb, Croatia

**EDF R&D, Paris, France

EMTP-RV USER GROUP MEETING, DUBROVNIK, 30 APRIL 2009