UN/ECE/WP29/GRPE Noriyuki ICHIKAWA - CIRCABC - … · · 2009-03-19P1 UN/ECE/WP29/GRPE WLTP...
-
Upload
nguyencong -
Category
Documents
-
view
222 -
download
3
Transcript of UN/ECE/WP29/GRPE Noriyuki ICHIKAWA - CIRCABC - … · · 2009-03-19P1 UN/ECE/WP29/GRPE WLTP...
P1
UN/ECE/WP29/GRPEWLTP Technical Secretary
Noriyuki ICHIKAWAver.1 : 26 Feb. 2009
WORLDWIDE HARMONIZEDLIGHT-DUTY TEST PROCEDURE
Working Paper No. WLTP-03-xx(3rd WLTP Meeting, 10 Jun 2009)
P2CONTENTS (1)
1. OBJECTIVES2. SCOPE OF WORKS3. OVERALL SCHEDULE4. PHASE I
4-1. SCHEDULE4-2. ORGANIZATION DURING PHASE I 4-3. IN-USE DRIVING DATA COLLECTION4-4. DATA ANALYSIS METHODOLOGY4-5. NEW CYCLE DEVELOPMENT4-6. VALIDATION TESTS
P3
4-7. CONFIRMATION(ROUND ROBIN) TESTS4-8. TEST PROCEDURE DEVELOPMENT4-9. DEVELOPMENT OF gtr TEXT
5. PHASE II5-1. SCHEDULE5-2. ORGANIZATION DURING PHASE II 5-3. OFF CYCLE5-4. DURABILITY 5-5. IN-SERVICE CONFORMITY5-6. gtr TEXT FOR PHASE II
CONTENTS (2)
P4
IN ITS NOVEMBER 2007 SESSIONS, WP.29 DECIDED TO SET UP AN INFORMAL GROUP UNDER GRPE TO PREPARE, WITHIN THE NEXT 2 YEARS, A ROADMAP FOR DEVELOPMENT OF THE WORLDWIDE HARMONIZED LIGHT-DUTY TEST PROCEDURE (WLTP).
DURING TWO(2) INFORMAL GROUP MEETING ON WLTP (4TH JUN. 2008 AND 14TH JAN. 2009), THE FOLLOWINGS WERE AGREED WITHIN CONTRACTING PARTIES.
1. OBJECTIVES
ROADMAP IS EXPECTED TO BE PROPOSED BY JUN. 2009 TO ACCELERATE THE WLTP gtr DEVELOPMENT.DEADLINE OF gtr DEVELOPMENT WAS SET BY THE END OF 2013.CONCRETE ITEMS TO BE HANDLED OR EXCLUDED IN WLTP gtr TEXT.
P5
UPON PREVIOUS DISCUSSION DURING WP.29 AND WLTP INFORMAL GROUP MEETINGS,
THE OBJECTIVES OF THIS ROADMAP ARE
1. TO DEFINE SCOPE OF WORKS2. TO CLARIFY TIME SCHEDULE3. TO MAKE IT CLEAR TIME FRAME
OF EACH WORK ELEMENT4. TO SET ORGANIZATION
FOR FUTURE WORKS5. TO ESTIMATE EXPECTED BUDGET
1. OBJECTIVES
P6
GENERALTHE FOLLOWING WERE AGREED DURING 2ND WLTP INFORMAL GROUP MEETING (14TH JAN. 2009).
2. SCOPE OF WORKS (1)
MAC(AIR CONDITIONER) SHOULD BE INCLUDED.BROAD POWER SOURCES SHOULD BE INCLUDEDTYPE APPROVAL / CERTIFICATION AND OBD MATTER SHOULD BE EXCLUDED.PENDING
THE FOLLOWING WERE AGREED DURING 147TH
WP29 MEETING (XXTH MAR. 2009).DURABILITY / IN-SERVICE CONFORMITY SHOULD BE INCLUDED / EXCLUDED
P7
PHASE I : DEVELOP NEW DRIVING CYCLE AND ASSOCIATED TEST PROCEDURE
PHASE II : SUPPLEMENTAL WORKS
TO MEET DEADLINE(END OF 2013) OF gtr DEVELOPMENT, THIS WORK WAS DIVIDED INTO TWO(2) PHASES.
OFF-CYCLEDURABILITYIN-SERVICE CONFORMITY
2. SCOPE OF WORKS (2)
P8
PHASE I
2. SCOPE OF WORKS (3)
TEST PROCEDURE
COMMONTERMINOLOGY
MEASUREMENTTECHNIQUE
IN-USE DRIVINGDATA COLLECTION
WORLD-WIDECOMMONDRIVING CYCLE
FUELPROPERTIES
ICE VEHICLESHYBRID VEHICLEELECTRIC VEHICLEFLEX FUEL VEHICLE
EXHAUSTEMISSION
P9
PHASE IIOFF CYCLE
DURABILITY
IN-SERVICE CONFORMITY
ENGINE OPERATION AREA OUTSIDE NEW DRIVING CYCLE (INCLUDING DEFEAT DEVICE) MAC (AIR CONDITIONER)LOW AMBIENT TEMPERATUREHIGH ALTITUDE
WHOLE VEHICLE DURABILITY TEST PROCEDUREBENCH AGING METHOD
VEHICLE SELECTION CRITERIANUMBER OF TEST VEHICLESODOMETER CRITERIAPASS/FAIL JUDGMENT CRITERIA
2. SCOPE OF WORKS (4)
P103. OVERALL SCHEDULE
2009 2013 2015 2016
- PHASE I -DEVELOP WORLD-WIDE
COMMON DRIVING CYCLE
WLTP gtr WLTP gtrRevision
161st
WP29167th
WP29
NOV. NOV.
58th
GRPE66th
GRPE70th
GRPE
JUN. JUN.JUN.
PROPOSE ROADMAPDECIDE SPONSOR CPs
3RD PARTIES
2010 2011 2012 2014
170th
WP29
NOV.
72nd
GRPE
JUN.
LOW TEMP. / PRESSUREDURABILITYIN-SERVICE CONFORMITY
ENGINE OPERATION AREA OUTSIDE NEW DRIVING CYCLEMAC (AIR CONDITIONER)
- PHASE II -
P11
2009 2010 2011 2012 2013GRPE GRPE GRPE GRPE GRPE GRPE GRPE GRPEGRPE
Jun. Jan. Jan. Jan. Jan.Jun. Jun. Jun. Jun.
4. PHASE I WORKS< 4-1. SCHEDULE >
IN-USE DRIVINGDATA COLLECTION
DATA ANALYSISMETHODOLOGY
VALIDATION TESTS
DEVELOPNEW DRIVING CYCLE
ROUND ROBINTESTS, if necessary
PHASE IHOME PAGE
CONFIRMATION TESTS
TERMINOLOGYTEST PROCEDURE
TEST EQUIPMENTS
DNC TEAM
DTP TEAM
REFLECTION
gtr TEXT DEVELOPMENTINFORMAL FORMAL
P12
DNC TEAMLEADER
(DEVELOP NEW DRIVING CYCLE)
4. PHASE I WORKS< 4-2. ORGANIZATION DURING PHASE I –1 >
GO TO PHASE I HOME PAGE
WLTP IGCHAIRMAN
SECRETARY(MANAGE OVERALL PROGRESS)(COORDINATE DNC/DTP TEAM)
(DEVELOP WLTP gtr TEXT)
DTP TEAMLEADER
(DEVELOP TEST PROCEDURE)
SPONSORCPs
INDEPENDENT EMISSION LAB.s(CONFIRMATION/ROUND ROBIN TESTS)
? ?
TO ACCELERATE THE PROGRESS, TEAM ACTIVITIES ARE DONE WITH RELATIVELY SMALL EXPERTS TEAM. ALL OUTPUT ARE DISCUSSED WITHIN WLTP IG.
P13
DNC TEAMLEADER
(DEVELOP NEW DRIVING CYCLE)
4. PHASE I WORKS< 4-2. ORGANIZATION DURING PHASE I –2 >
(DATA COLLECTION CPs)
(DATA ANALYSIS / METHODOLOGY)(NEW DRIVING CYCLE DEVELOPMENT)
(VALIDATION TESTS)
GO TO PHASE I HOME PAGE
3RD
PARTY (a)
SPONSORCP (A) 3RD
PARTY (b)
SPONSORCP (B) 3RD
PARTY (c)
SPONSORCP (C) . . . .
P14 4. PHASE I WORKS< 4-2. ORGANIZATION DURING PHASE I –3 >
DTP TEAMLEADER
(DEVELOP TEST PROCEDURE)(TERMINOLOGY)
(TEST EQUIPMENTS)(FUEL PROPERTY)
GO TO PHASE I HOME PAGE
ASSIGNMENT FOR SPECIFIC WORKS WILL BE DECIDEDBASED ON DTP TEAM LEADER PROPOSAL
3RD
PARTY (a)
SPONSORCP (A) 3RD
PARTY (b)
SPONSORCP (B)ISO . . . .
P15 4. PHASE I WORKS< 4-3. IN-USE DATA COLLECTION >
2009 2010GRPE GRPE GRPE
PREPARATION1. REVIEW CURRENT
POSSESS DATA2. SELECTION OF
TEST VEHICLE3. SELECTION OF
AREA & ROUTE4. PLANNING
WORK CONTENTS
ORGANIZATIONAND BUDGET
Jan. Jun.Jun.
DATA COLLECTION
REPORT
ADDITIONALDATA COLLECTION,if necessary
GATEWAY COMPLETE
DATA CHECK& REVIEW
STATISTICAL DATA(APPLICABLE VEHICLE CATEGORIES :
CATEGORY 1-1 AND 2 WITH MAXIMUM MASS <=3.5 ton )NUMBERS OF VEHICLESTOTAL ANNUAL MILEAGESCHARACTERISTIC USE PER TYPE OF ROAD
GO TO PHASE I HOME PAGE
P16 4. PHASE I WORKS< 4-3. IN-USE DATA COLLECTION >
2009 2010GRPE GRPE GRPE
PREPARATION
Jan. Jun.Jun.
DATA COLLECTION ADDITIONALDATA COLLECTION
GATEWAY
DATA CHECK& REVIEW
STATISTICAL DATA
WORK CONTENTS
ORGANIZATIONAND BUDGET
DECIDE3RD PARTIES
3RD PARTIESMP : 500 HRS
EP : € 0
MP : 150 HRS
EP : € 0
MP : 1,500 HRS
EP : € 0
/ EACH CP
/ EACH CP
MP : MANPOWER
EP : EXPENSE
MP : P17
EP : P17
GO TO PHASE I HOME PAGE
P17
GO TO PHASE I HOME PAGE
4. PHASE I WORKS< 4-3. IN-USE DATA COLLECTION >
WORK CONTENTS
ORGANIZATIONAND BUDGET
≒ € 130KGRAND TOTAL
25,600800UNIT-DAYSDIESEL: 4 UNITS x 8 DAYS
TOTALUNIT
75015UNIT-DAYS10 UNITS x 5 DAYSFUEL EXPENSES
60,0001,250UNIT-DAYSPETROL: 6 UNITS x 8 DAYSDEPRECIATION TO ON-BOARD MEASURING EQUIPMENTS
4,000400UNIT-TIMESON-BOARD IONSTRUMENT INSTALLERS: 10 UNITSTRAVEL & COMMUTING EXPENSES
6,250125MAN-DAYS10 UNITS x 5 DAYS x 1 PERSONPERSONNEL EXPENSES (ASSISTANTS)
12,500250MAN-DAYS10 UNITS x 5 DAYS x 1 PERSONPERSONNEL EXPENSES (DRIVERS)
3,000100UNIT-DAYS10 UNITS x 3 DAYSCOMMUNICATIONS/TRANSPORT EXPENSES ( RENTAL CARS)
3606TIMES10 UNITS x 6 TIMESFEES FOR PAID FREEWAYS
2,500250UNITFOR 10 UNITSCONSUMABLES FOR COLLECT DATA
12,000150UNIT-DAYS10 UNITS x 8 DAYSTEST VEHICLE RENTAL FEES
EXPENSES (€)UNITNOTESEXPENSE BREAKDOWN
NOTE : ABOVE FIGURES ARE BASED ON10 TEST VEHICLES / REGION, NOT PER COUNTRY
MP : 160 HRS (PROJECT MANAGEMENT)
P18 4. PHASE I WORKS< 4-4. DATA ANALYSIS METHODOLOGY >
2009 2010
INITIAL DEVELOPMENT MODIFICATION
PROPOSAL& DISCUSSION
APPROVAL& APPLY
WORK CONTENTS ORGANIZATIONAND BUDGET
Jan.Jun.
GATEWAY
WEIGHTING FACTOR (URBAN/RURAL/MOTORWAY)WEIGHTING FACTOR (REGIONS)PARTS CLASSIFICATION (SPEED? AREA?)DRIVING / IDLING PROFILESHORT TRIP PROFILE (AVERAGE SPEED/ACCELERATION/...)TOTAL MODE DURATION (URBAN/RURAL/MOTORWAY)NUMBER OF SHORT TRIP/IDLINGEXTRACT APPROPRIATE SHORT TRIP(CHI-SQUARED BASED ANALYSIS, OTHERS)COLD/HOT STARTGEAR SHIFT POINTVERIFICATION
Jun.GRPE GRPE GRPE
GO TO PHASE I HOME PAGE
P19 4. PHASE I WORKS< 4-4. DATA ANALYSIS METHODOLOGY >
2009 2010
INITIAL DEVELOPMENT MODIFICATION
Jan.Jun.
GATEWAY
Jun.GRPE GRPE GRPE
WORK CONTENTS ORGANIZATIONAND BUDGET
MP : MANPOWER
EP : EXPENSE
GO TO PHASE I HOME PAGE
3RD PARTIES 3RD PARTIES
MP : 500 HRS
EP : € 1.2K *
MP : 250 HRS
EP : € 1.2K *
* ) TRAVEL EXPENSE : 2 TIMES
P20
2010 2011 2012 2013GRPE GRPE GRPE
Jan. Jun.Jun.GRPE
Jan.GRPE
Jun.GRPE
Jan.+
Apr.
4. PHASE I WORKS< 4-5. NEW CYCLE DEVELOPMENT >
DEVELOPMENT OF INITIAL MODE
PROPOSAL-2
WORK CONTENTS
ORGANIZATIONAND BUDGET
VALIDATION TESTS ANALYSIS
PROPOSAL-1GATEWAY
CONFIRMA-TION TEST
FINAL
IN-USE DATAANALYSISMETHODOLOGY
MODE STRUCTUREMODE DURATION WEIGHTING FACTOR(URBAN/RURAL/MOTORWAY)NUMBER OF SHORT TRIP / IDLINGGEAR SHIFT POINT
WEIGHTING FACTOR(URBAN/RURAL/MOTORWAY)ARRANGEMENT OF SHORT TRIP / IDLINGGEAR SHIFT POINT COLD / HOT START
FINALMODIFICATIONMODIFICATION
REFLEC
TIONR
EFLE
CTI
ON
GO TO PHASE I HOME PAGE
P21
2010 2011 2012 2013GRPE GRPE GRPE
Jan. Jun.Jun.GRPE
Jan.GRPE
Jun.GRPE
Jan.+
Apr.
4. PHASE I WORKS< 4-5. NEW CYCLE DEVELOPMENT >
DEVELOPMENT OF INITIAL MODE
GATEWAY
FINALMODIFICATION
MODIFICATION
WORK CONTENTS
ORGANIZATIONAND BUDGET
MP : 2,000 HRS
EP : € 2.4K *
MP : 2,000 HRS
EP : € 2.4K *
MP : 1,500 HRS
EP : € 1.2K **
MP : MANPOWER
EP : EXPENSE
GO TO PHASE I HOME PAGE
3RD PARTIES 3RD PARTIES 3RD PARTIES
*) TRAVEL EXPENSE : 4 TIMES**) TRAVEL EXPENSE : 2 TIMES
P22
2010 2011 2012GRPE GRPE GRPE
Jan. Jun.Jun.GRPE
Jan.GRPE
Jun.+
Apr.
4. PHASE I WORKS< 4-6. VALIDATION TESTS >
WORK CONTENTS
ORGANIZATIONAND BUDGET
GATEWAY REPORT
PREPARATIONVALIDATION 1UNDER CURRENTTEST PROCEDURE
VALIDATION 2UNDER PROPOSED NEW
TEST PROCEDURE
TEST ITEMSTEST VEHICLEMATRIXPROCURETEST VEHICLETEST SITEPREPARATION
DRIVABILITYSMOOTH THROTTLE OPERATIONAPPROPRIATE SHIFT POINTCLUTCH OFF POINTMODE TRACEABILITY, SLIPREPEATABILITY
MODIFICATION ONDRIVING CYCLE
REPORT REPORT
GO TO PHASE I HOME PAGE
P23 4. PHASE I WORKS< 4-6. VALIDATION TESTS >
TEST VEHICLES MATRIX
WORK CONTENTS
ORGANIZATIONAND BUDGET
★
★
★
★
D*
★
D* D*P*P*P*D*P*
EVALUATION ITEMS
★
★★
★★
★★
★
★
★
★
HIGH
★
★★
★★
SMALL
DTC**POWER TO MASS RATIO
★★★REPEATABILITY
★★TIRE LOCK, SLIP
★★MODE TRACEABILITY
★★CLUTCH OFF POINT
★★APPROPRIATE SHIFT POINT
★★SMOOTH THROTTLE OPERATION
DRIVEABILITY/PRACTICABILITY
MEDIUMSMALL
P* : PETROL ENGINE, D* : DIESEL ENGINEDTC** : DRIVETRAIN COEFFICIENT Im x If 1000= x V x 2πr 60
DETAILED VEHICLE SPECIFICATION WILL BE DECIDED DURING PREPARATION.EMISSION CONTROL SYSTEM :
BIN5 or MORE, EURO5 or MORE, J-SULEV
★:VALIDATION1, ★:VALIDATION2
GO TO PHASE I HOME PAGE
P24
2010 2011 2012GRPE GRPE GRPE
Jan. Jun.Jun.GRPE
Jan.GRPE
Jun.+
Apr.
4. PHASE I WORKS< 4-6. VALIDATION TESTS >
GATEWAY
PREPARATION VALIDATION 1UNDER CURRENTTEST PROCEDURE
VALIDATION 2UNDER PROPOSED NEW
TEST PROCEDURE
WORK CONTENTS
ORGANIZATIONAND BUDGET
MP : MANPOWER
EP : EXPENSE
3RD PARTIES 3RD PARTIES 3RD PARTIES
MP : 160 HRS
EP : € 0
MP : 320 HRS
EP : € 50K
MP : 2,000 HRS
EP : € 300K
NOTE : ABOVE FIGURES ARE BASED ONVALIDATION 1 : 4 VEHICLES X 10 TESTSVALIDATION 2 : 8 VEHICLES X 30 TESTSMP : 8HRS / TEST (PREPARATION/CHECK/ANALYSIS)EP : € 1.25K / TEST
+ TEST VEHICLE FEE GO TO PHASE I HOME PAGE
P25
2012 2013GRPE GRPE GRPE
Jan. Jun.Jun.GRPE
Jan.
4. PHASE I WORKS< 4-7. CONFIRMATION TESTS >
WORK CONTENTS
ORGANIZATIONAND BUDGET
CONFIRMATIONTESTS
GATEWAY
SMALL MODIFICATIONON DRIVING CYCLE
PERFORM A SERIES OFTEST PROCEDURECONFIRM PRACTICABILITY AND REPRODUCIBILITY
JUDGE NECESSITYOF ROUND ROBIN TESTS
+ CORRELATION
PREPARATION
TEST ITEMSTEST VEHICLEMATRIXPROCURETEST VEHICLETEST SITEPREPARATION
REPORT REPORT
ROUND ROBIN TESTS,if necessary
GO TO PHASE I HOME PAGE
COMBINATION OFIW CLASSESPOWER SOURCESTRANSMISSION
EMISSION SYSTEMLATEST OR EQUIVALENT
REFLECT TO gtr TEXT
P26
2012 2013GRPE GRPE GRPE
Jan. Jun.Jun.GRPE
Jan.
4. PHASE I WORKS< 4-7. CONFIRMATION TESTS >
CONFIRMATIONTESTS
GATEWAY
PREPARATION
ROUND ROBIN TESTS,if necessary
WORK CONTENTS
ORGANIZATIONAND BUDGET
PARTICIPANT CPsINDEPENDENT LABs
MP : 80 HRS
EP : € 0
MP : 200 HRS
EP : € 40K
GO TO PHASE I HOME PAGE
/ EACH LAB. / EACH LAB.
NOTE : LEFT FIGURES ARE BASED ON# OF TESTS : 5 VEHICLES X 5 TESTSMP : 8HRS / TEST EP : € 1.25K / TEST
€ 2K / VEHICLE FEE
EP : + SHIPPING FEE
P27
2010 2011 2012 2013GRPE GRPE GRPE GRPE GRPE GRPE GRPEGRPE
Jan. Jan. Jan. Jan.Jun. Jun. Jun. Jun.
4. PHASE I WORKS< 4-8. TEST PROCEDURE DEVELOPMENT >
TERMINOLOGY TEST PROCEDUREEMISSION CONSTITUENTIW CLASSROAD-LOAD MEASUREMENTELECTRIC LOADCALCULATION FORMULAFLEX FUEL VEHICLEHYBRID VEHICLEELECTRIC VEHICLE
GATEWAYFINAL
DRAFT NEW TEST PROCEDURE
for VALIDATION 2
TEST EQUIPMENTSCHASSIS DYNAMOMETERANALYZER / CVS / TUNNELOTHERS(FAN, CYLINDER GAS, SHED,....)MINIMUM INVESTMENT
WORK CONTENTS ORGANIZATIONAND BUDGET
GO TO PHASE I HOME PAGE
MODIFY
INITIAL
P28
2010 2011 2012 2013GRPE GRPE GRPE GRPE GRPE GRPE GRPEGRPE
Jan. Jan. Jan. Jan.Jun. Jun. Jun. Jun.
4. PHASE I WORKS< 4-8. TEST PROCEDURE DEVELOPMENT >
TERMINOLOGY TEST PROCEDURE
GATEWAY
TEST EQUIPMENTS
WORK CONTENTS ORGANIZATIONAND BUDGET
GO TO PHASE I HOME PAGE
ISO3RD PARTIES
ISO3RD PARTIES
ISO3RD PARTIES
MP : 2,000 HRS
EP : € 30K
MP : 2,000 HRS
EP : € 30K
MP : 800 HRS
EP : € 0
NOTE : ABOVE EP FIGURES ARE BASED ON# OF TESTS : 5 VEHICLES X 10 TESTSEP : € 1.25K / TEST
€ 2K / VEHICLE FEE
P29
GRPE
4. PHASE I WORKS< 4-9. DEVELOPMENT OF gtr TEXT >
INFORMAL FORMAL
ORGANIZATIONAND BUDGET
WORK CONTENTS
GATEWAY
2011 2012 2013GRPE GRPE
Jan. Jun.GRPE
Jan.GRPE
Jun.Jun.GRPE
Jan.
DEVELOPMENT OF gtr TEXT
GENERATE OVERALL gtr STRUCTURECOMBINE DNC AND DTP TEAM WORKSDEVELOP gtr TEXTEDITORIAL CHECK SPONSOR CPs
MP : 1,600 HRS
EP : € 0
DNC TEAM WORKS
DTP TEAM WORKS
GO TO PHASE I HOME PAGE
P30
GRPE GRPE GRPE GRPE GRPE GRPE GRPEGRPEJan. Jan. Jan. Jan.Jun. Jun. Jun. Jun.
5. PHASE II WORKS< 5-1. SCHEDULE >
PHASE IIHOME PAGE
ENGINE OPERATION AREA OUTSIDE NEW DRIVING CYCLEMAC
DURABILITY
IN-SERVICE CONFORMITY
gtr TEXT FOR PHASE II
FORMALESTABLISH ORGANIZATION DURING PHASE II
2012 2013 2014 2015 2016
INFORMAL
NEW DRIVING CYCLE (95% LEVEL)
GRPE GRPEJan.Jun.
gtr TEXT DEVELOPMENTFOR PHASE I
PRE-WORKS
LOW AMBIENT TEMPERATUREHIGH ALTITUDE
OFF CYCLE
FORMAL
INFORMAL
P31
OFF CYCLE SUB-GROUP
WLTP IGCHAIRMAN
SECRETARY(MANAGE OVERALL PROGRESS)
(DEVELOP WLTP gtr TEXT)
SPONSORCPs
5. PHASE II WORKS< 5-2. ORGANIZATION DURING PHASE II >
GO TO PHASE II HOME PAGE
MAC SUB-GROUP
DURABILITY SUB-GROUP
IN-SERVICE CONFORMITY SUB-GROUP
NOTE : CONCRETE ORGANIZATION WILL BE SET IN JAN. 2012
P32
GRPE GRPE GRPE GRPE GRPE GRPE GRPEGRPEJan. Jan. Jan. Jan.Jun. Jun. Jun. Jun.
2012 2013 2014 2015 2016GRPE GRPE
Jan.Jun.
5. PHASE II WORKS< 5-3. OFF CYCLE-1 >
WORK CONTENTS
ORGANIZATIONAND BUDGET
GATEWAY JUDGE NECESSITYOF OFF CYCLE
DEVELOP DEFEATSTRATEGYANTI CYCLEBEATINGAMBIENT TEMP.AMBIENT PRES.DRIVER SELECT-ABLE SWITCH
DEFICIENCIESEXEMPTIONS
DEVELOP TEST PROCEDURE
DECIDETEST METHOD
OPERATION CONDITIONS OUTSIDE NEW DRIVING CYCLE
VALIDATION TEST
MODIFY
COMPARISONTEST METHOD
MODE DRIVINGENGINE MAPPINGSTATEMENT
FINALINITIAL
GO TO PHASE II HOME PAGE
PRE-WORKDEVELOP CANDIDATE
OFF CYCLE MODE
EVALUATION OFCANDIDATE OFF
CYCLE MODE
P33
GRPE GRPE GRPE GRPE GRPE GRPE GRPEGRPEJan. Jan. Jan. Jan.Jun. Jun. Jun. Jun.
2012 2013 2014 2015 2016GRPE GRPE
Jan.Jun.
WORK CONTENTS
ORGANIZATIONAND BUDGET
5. PHASE II WORKS< 5-3. OFF CYCLE-2 >
LOW AMBIENT TEMPERATURESET TEST CONDITIONDEFINE FUEL SPECIFICATION
HIGH ALTITUDESET TEST CONDITIONDEFINE FUEL SPECIFICATION
MAC(AIR CONDITION)
COMPARISON TESTMETHOD
FULL ENVIRONMENTALCELLAC PARTS EVALUATIONSIMULATIONAPPROPRIATEINVESTMENT
DEVELOPTEST PROCEDURE
VALIDATION TESTS
MODIFY
FINAL FINALINITIAL
FUNDAMENTALWORKS
ECJAPAN(2010 ~ )USA(SC03 STUDY
- DONE )
P34
GRPE GRPE GRPE GRPE GRPE GRPE GRPEJan. Jan. Jan.Jun. Jun. Jun. Jun.
2012 2013 2014 2015
WORK CONTENTS
ORGANIZATIONAND BUDGET
5. PHASE II WORKS< 5-4. DURABILITY >
GATEWAY
WHOLE VEHICLE DURABILITY TESTREVIEW CURRENT AND NEW WLTP CYCLE(DEVELOP DURABILITY DRIVING CYCLE, if necessary)TEST POINTSTEST FUEL
BENCH AGING TESTDEFINE EMISSION CONTROL PARTSDEVELOP BENCH AGING METHODTEST FUEL
FINALINITIAL
DEVELOPTEST PROCEDURE MODIFY
GO TO PHASE II HOME PAGE
P35
GRPE GRPE GRPE GRPE GRPE GRPE GRPEJan. Jan. Jan.Jun. Jun. Jun. Jun.
2012 2013 2014 2015
5. PHASE II WORKS< 5-5. IN-SERVICE CONFORMITY >
WORK CONTENTS
ORGANIZATIONAND BUDGET
GATEWAY
VEHICLE SELECTION CRITERIADEFINE ENGINE FAMILYREJECTION CRITERIANUMBER OF TEST VEHICLESODOMETER CRITERIA
PASS/FAIL JUDGMENTNUMBER OF SAMPLEENGINE FAMILY
IN-SERVICE TESTINGAS-RECEIVED CONDITIONOBD INFORMATIONCONDUCT MAINTENANCE IF NECESSARYSECOND TEST IF NECESSARYMEASURED EMISSION CONSTITUENTS(TAIL PIPE, CO2, EVAPORATIVE, ...) FUEL PROPERTY
FINALINITIAL
MODIFY
GO TO PHASE II HOME PAGE
P36
GRPE GRPE GRPE GRPE GRPE
Jan. Jan. Jan.Jun. Jun. Jun.2013 2014 2015 2016
5. PHASE II WORKS< 5-6. gtr TEXT FOR PHASE II >
WORK CONTENTS
ORGANIZATIONAND BUDGET
GATEWAY
GRPE
gtr TEXT FOR LOW AMBIENT TEMPERATUREHIGH ALTITUDE DURABILITYIN-SERVICE CONFORMITY
GO TO PHASE II HOME PAGE
GRPE
Jan. Jun.GRPE
FORMAL
gtr TEXT FORENGINE OPERATION AREA OUTSIDE NEW DRIVING CYCLEMAC
INFORMALFORMALINFORMAL