Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office...

8
Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure to Space” “The planning and manufacturing of concrete precast elements with the Neulandt 3P system — a pioneering innovation by the company—can be read directly from the architecture of the new office building in Amstetten.” Schenker Weber Salvi

Transcript of Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office...

Page 1: Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure

Umdasch Group Office Building 1/8

Umdasch Group Office BuildingProject Competition 2019

1st Prize

“From Structure to Space”

“The planning and manufacturing of concreteprecast elements with the Neulandt 3P system — a

pioneering innovation by the company—can be read directly from the architecture of the new office

building in Amstetten.”

Sch

enke

rWeb

erSalvi

Page 2: Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure

Umdasch Group Office Building 2/8

Sch

enke

rWeb

erSalvi

Page 3: Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure

Umdasch Group Office Building 3/8

Sch

enke

rWeb

erSalvi

“An office landscape with flexible functions is composed with the precast wall, door, beam, slab, and slatted façade components. The architecture becomes a showpiece of the

creative spatial potentials of precast technology.”

Page 4: Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure

Umdasch Group Office Building 4/8

Sch

enke

rWeb

erSalvi

“A simple canon achieves complex plasticity and ornamenta-tion. Diverse spatial typologies emerge by adding or omitting

basic components.”

Page 5: Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure

SalviWeb

er

Umdasch Group Office Building 5/8

Sch

enke

r

Page 6: Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure

Umdasch Group Office Building 6/8

Sch

enke

rWeb

erSalvi

“The ceiling slabs can be joined or removed. In the multistory atrium a scissor stairway creates a communicative connection

between the floors and forms the heart of the complex.”

Page 7: Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure

Umdasch Group Office Building 7/8

Sch

enke

rWeb

erSalvi

“The slatted façade forms a permeable filter zone to theheterogeneous surroundings of the industrial park in

Amstetten, while serving as a sun screen and lending thesite an unmistakable identity.”

Page 8: Umdasch Group Office Building - Schenker Salvi Weber · 2020-01-09 · Umdasch Group Office Building 1/8 Umdasch Group Office Building Project Competition 2019 1st Prize “From Structure

Umdasch Group Office Building 8/8

SalviWeb

erSch

enke

r

P R O J E C T D E T A I L S

– Commission Tpe: Invited, single-stage competition

– Client: Umdasch Group AG

– Location: Amstetten, AT

– Competition: 2019

– Realization: 2020 – 2022

– Status: Planning Phase

– GFA: 8500 m2

– Energy Efficiency: Passive House Standard

– Team: Michael Salvi, Andres Schenker, Veronika Ševčíková, Tina Tobisch, Thomas Weber, Philipp Wemmer

C O O P E R A T I O N

– Bim Coordination: ODE

– Statics: Gmeiner Haferl

– Building Physics: IBO – Österreichisches Institut für Bauen und Ökologie

– Building Services Engineering: CES

– Fire Safety: IMS Brandschutz

– Visualization: Miss 3