ULMA Corporate Presentation English
Click here to load reader
-
Upload
ulma-construction -
Category
Documents
-
view
166 -
download
13
description
Transcript of ULMA Corporate Presentation English
![Page 1: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/1.jpg)
The Solution for each job
© U
LMA
Con
stru
cció
n 2
01
2
Service • Proximity • Effective engineering • Innovation
ULMA Construcción
![Page 2: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/2.jpg)
2
Th
e C
om
pan
yULMA Group
ULMA ConstrucciónULMA Construcción
ULMA Group
![Page 3: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/3.jpg)
3
ULMA Construccion is a company of the ULMA Group
ULMA Group: www.ulma.com
Sales 702 million EUR4200 employees (December 2011)
8 business units developing their activity in very different sectors
Common experiences, shared culture and values
ULMA Group is part of MONDRAGON Corporation
MONDRAGON Corporation:www.mondragon-corporation.com
Sales 13.4 billion EUR83,000 employees (December
2011)
ULMA Group
ULMA Group
ULMA ConstruccionFormwork and Scaffolding
ULMA AgricolaGreenhouses
ULMA PackagingPackaging Equipment
ULMA PipingFlanges and Fittings
ULMA Hormigon PolimeroPrecast systems for Building
ULMA Carretillas ElevadorasCounterbalanced Warehouse equipment
ULMA Handling SystemsLogistics Engineering
ULMA Conveyor ComponentsIdlers and Pulleys
![Page 4: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/4.jpg)
4
Company founded in 1961
Our objectives:
-Excellence in the service
-Establishing long lasting relationships T
he C
om
pan
y
Proximity to the client: our key to success50 years among the best demonstrates our business track record
![Page 5: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/5.jpg)
5
Th
e C
om
pan
y
Proximity to the client: our key to success50 years among the best demonstrates our business track record
Total sales (million Euros)
2005 2006 2007 2008 2009 2010 2011
297
367
420400
296 297296
![Page 6: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/6.jpg)
6
Th
e C
om
pan
y
Proximity to the client: our key to success50 years among the best demonstrates our business track record
Employees evolution
2005 2006 2007 2008 2009 2010 2011
19062100
2786 2759
2364
2178
2054
![Page 7: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/7.jpg)
7
Th
e C
om
pan
y
Worldwide presenceInternational activity
USA
CANADA
SPAIN
FRANCE
GERMANYCZECH REPUBLIC
POLAND
UKRAINE
KAZAKHSTAN
CHINA
MEXICO
PERU
CHILEARGENTINA
BRASIL
PORTUGAL
ITALY
SLOVAKIA
ROMANIA
UAE
INDIA
SINGAPORE
![Page 8: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/8.jpg)
8
EFFECTIVE ENGINEERING
Technology and optimal engineering solutions
Technical solutions for projects analysed together with the client
Th
e C
om
pan
y
A proposal designed to obtain the highest performance and profitabilityThe Solution for each job
![Page 9: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/9.jpg)
9
INNOVATION
Continuous innovation in products and solutions
Maximum economy and profitability on the site
Th
e C
om
pan
y
A proposal designed to obtain the highest performance and profitabilityThe Solution for each job
![Page 10: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/10.jpg)
10
PLANNING AND SAVINGS
We achieve the best planning, saving time and work
Th
e C
om
pan
y
A proposal designed to obtain the highest performance and profitabilityThe Solution for each job
Grafsystem, the software developed by ULMA, enables obtaining quickly and easily:
- Assembly drawings
- Detailed material lists
![Page 11: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/11.jpg)
11
Th
e C
om
pan
y
A proposal designed to obtain the highest performance and profitabilityThe Solution for each job
ON-SITE ASSISTANCE
Assistance and help on the construction site
All necessary documentation for
erection and use of the product is provided
![Page 12: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/12.jpg)
12
Th
e C
om
pan
y
A proposal designed to obtain the highest performance and profitabilityThe Solution for each job
TRAINING
Continuous training for our teams
Continuous and specific training for our clients
![Page 13: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/13.jpg)
13
Th
e C
om
pan
y
High quality and effective delivery of materials to the siteGlobal service
LOGISTICS
Objective: To optimise the service up to the efficient delivery of the materials at the final destination
Optimal operations management and control
Efficient delivery of materials to the construction site
![Page 14: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/14.jpg)
14
Th
e C
om
pan
y
High quality and effective delivery of materials to the siteGlobal service
CLEANING AND MAINTENANCE
Guarantee of materials in perfect conditions for use
![Page 15: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/15.jpg)
15
Th
e C
om
pan
y
High quality and effective delivery of materials to the siteGlobal service
PRE-ASSEMBLING
Option to deliver pre-assembled units to the job site
![Page 16: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/16.jpg)
16
Th
e C
om
pan
y
Because to build well, safety is importantSafety and reliability
MANUFACTURING
One of the largest production plants in
Europe
Totally automated and robotised processes
Effective product and service quality
system
![Page 17: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/17.jpg)
17
Th
e C
om
pan
y
Because to build well, safety is importantSafety and reliability
QUALITY IN ALL PRODUCTS
Highly qualified production team
Products certified from accredited bodies
We have the registered company certificate ISO 9001 since 1994
![Page 18: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/18.jpg)
18
Th
e C
om
pan
y
Because to build well, safety is importantSafety and reliability
SAFETY WITH ALL PRODUCTS AND IN ALL SITES
Total collective and individual protection of
the workers and of third parties
Objectives:
• Reduce cost and time when erecting and dismantling
• Maximise workers’ safety
Safety at erection time as well as during the use of the system
![Page 19: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/19.jpg)
19
In the design and manufacturing phase: ISO 14001 certificate for environmental management
In usage: products that do not generate negative impact in their use
In re-usage: very long-lasting products that require minimal maintenance
And at the end of the life cycle: recyclable products
Th
e C
om
pan
y
Because to build well, safety is importantSafety and reliability
ENVIROMENTAL MANAGEMENT
![Page 20: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/20.jpg)
20
Pro
du
ct
Port
folio
The Solution for each job
Vertical Formworks
Horizontal Formworks
Civil Engineering Systems
Props and Shoring Systems Scaffolding
ORMA Modular FormworkMEGAFORM Modular FormworkNEVI Modular FormworkMEGALITE Modular FormworkCOMAIN Handset FormworkENKOFORM V-100 Vertical FormworkBIRA Circular FormworkLGR Column FormworkCLR Circular Column FormworkSingle-sided Formwork SystemsUniversal Column Platform
ATR Self-climbing SystemsHWS Hydraulic Windshield SystemConventional Climbing Systems
CC-4 Horizontal FormworkVR TableENKOFLEX Horizontal FormworkRAPID Horizontal FormworkRECUB Recoverable Waffle FormworkBTM Horizontal Beam Formwork
ENKOFORM H-120 FormworkMK StructuresH-33 TrussMT Gantry BracketG Heavy Duty Bracket
SP PropEP PropALUPROP Aluminium PropG Shoring SystemBRIO Shoring SystemT-60 Shoring SystemMK Shoring SystemsT-500 Shoring System
Formwork Beams and Plywood
BRIO Modular ScaffoldingDORPA Frame ScaffoldingBRIO Façade Support
Climbing Systems
Timber Beams and Plywood
![Page 21: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/21.jpg)
21
Very flexible panel system
Wide panel range
Permissible concrete pressure 80 kN/m2
Steel frame and birch plywood
Panels joined by clamps
Certification GSV
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Heavy duty, versatile vertical formworkORMA Modular Formwork
![Page 22: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/22.jpg)
22
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Heavy duty, versatile vertical formworkORMA Modular Formwork
COLUMNS
Wide panel range :
Heights: 2.7 – 1.2 – 0.6 m
Widths: 0.72 – 0.92 – 1.32 m
Columns:
From 30 x 30 cm to 120 x 120 cm
Adjustment every 5 cm
Permissible concrete pressure: 80 kN/m2
![Page 23: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/23.jpg)
23
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Vertical formwork for large wall areas in imperial dimensionsMEGAFORM Modular Formwork
Modular system for walls and columns in imperial units
Wide panel range
Permissible concrete pressure 1650 psf
Steel frame and birch plywood
Panels joined by clamps
![Page 24: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/24.jpg)
24
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
The perfect balance between lightness and strengthNEVI Modular Formwork
Modular light panel system
Wide range of solutions
Permissible concrete pressure 60 kN/m2
Steel frame and birch plywood
Panels joined by clamp
Manual or crane handling
Common accessories with other ULMA systems
![Page 25: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/25.jpg)
25
Modular light panel system in imperial units
Wide panel range
Permissible concrete pressure 1250 psf
Steel frame and birch plywood
Panels joined by MEGALITE clamps
Manual or crane handling
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Light handset formwork in imperial dimensionsMEGALITE Modular Formwork
![Page 26: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/26.jpg)
26
Handset formwork: does not need crane
Wide panel range
Permissible concrete pressure 40 kN/m2
Steel frame and birch plywood
Panels joined by bolts
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
The lightest formworkCOMAIN Handset Formwork
![Page 27: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/27.jpg)
27
Flexible and polyvalent system
Optimised formwork according to required concrete pressure
Excellent finishes
Optimized transportation volume
Safety elements easy to fasten to the panels
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
The flexible system for all types of applications and finishesENKOFORM V-100 Vertical Formwork
![Page 28: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/28.jpg)
28
Steel circular formwork with adjustable radius
Wide range of panel heights
Permissible concrete pressure 80 kN/m2
Simple curvature blocking system
Panels joined by clamps
Compatible with ORMA
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Steel formwork adapted to circular geometries using easy curving systemBIRA Circular Formwork
![Page 29: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/29.jpg)
29
Light panels: handling without crane
Steel frame and plastic plywood
Handset panels in the whole range
Connecting items are integrated in the panels and can not be lost
Permissible concrete pressure 80 kN/m2
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Light formwork of great performance for column formingLGR Column Formwork
![Page 30: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/30.jpg)
30
Semi-circular steel forms
Simple connection of forms by bolts
Connectors for lifting and stabilising integrated in the panel
Permissible concrete pressure 80 kN/m2
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Fast and simple solution for forming circular columnsCLR Circular Column Formwork
![Page 31: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/31.jpg)
31
Two types of single-sided formwork supports:
UCAB walers for wall height up to 3.3 m
EUC frames for wall height up to 7.2 m
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Simple solution for single-sided wallsSingle-sided Formwork Systems
![Page 32: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/32.jpg)
32
Working platform for concrete pouring in column formwork
Safety
Simple assembly
Integrated guardrails
Pro
du
ct
Port
folio -
Vert
ical Form
work
s
Safe pouring platforms for all types of column formworkUniversal Column Platform
Universal Column Platform on ORMA Modular Formwork
Universal Column Platform on LGR Column Formwork
Universal Column Platform on CLR column formwork
![Page 33: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/33.jpg)
33
Support structure to lift the formwork without a crane
Lifting by hydraulic and mechanical solutions
Pro
du
ct
Port
folio –
Clim
bin
g S
yste
ms
High-rise construction without craneATR Self-climbing Systems
Climbing process: alternately lifting the mast and the
bracket / formwork set vertically along the wall
![Page 34: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/34.jpg)
34
Pro
du
ct
Port
folio –
Clim
bin
g S
yste
ms
Safe work in high-rise constructionHWS Hydraulic Windshield System
Safety edge protection for the floor to be poured and the two previous ones
Protection against falls and wind
Lifted hydraulically or with crane
Based on MK system
![Page 35: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/35.jpg)
35
Formwork support structures used to pour high walls in several casting steps
Brackets are anchored on the concrete structure
Different options in order to offer the optimal solution
Possibility of rolling-back and tilting the formwork
Pro
du
ct
Port
folio –
Clim
bin
g S
yste
ms
Climbing solutions for any geometryConventional Climbing Systems – Climbing Brackets
BF-170 brackets with ORMA vertical formwork
CM-220 brackets with ORMA vertical formwork
CR-250 Climbing brackets MK brackets
![Page 36: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/36.jpg)
36
Support for casting single sided vertical and inclined walls
The brackets allow using common accessories with the MK system
Pro
du
ct
Port
folio –
Clim
bin
g S
yste
ms
The solution for vertical and inclined single-sided climbingConventional Climbing Systems – Single-sided Climbing Brackets
![Page 37: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/37.jpg)
37
Solution for in-situ hollow shafts
Typically combined with conventional climbing brackets on the wall’s external face
Totally standard and conventional items
Pro
du
ct
Port
folio –
Clim
bin
g S
yste
ms
Formwork support for hollow shaftsConventional Climbing Systems – KSP Shaft Platforms
Platform support on box-out by means of gravity pawl
Platform support on folding bracket
![Page 38: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/38.jpg)
38
Support for the formwork
Support for enclosure or repairing previously built walls
Foldable
Pro
du
ct
Port
folio –
Clim
bin
g S
yste
ms
Safe and stable areas for works at big heightsConventional Climbing Systems – Perimeter Working Platforms
![Page 39: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/39.jpg)
39
Light aluminium formwork
Allows erection in two steps: first grid and then panels
Two options:
•with panels
•with plywood
Possibility of changing main beam’s direction 90º
Excellent concrete finish
Drophead: strike the formwork and leave just the props and heads supporting the slab
Pro
du
ct
Port
folio –
Hori
zon
tal Form
work
s
Light, safe, high performance formwork that provides excellent concrete finishesCC-4 Horizontal Formwork
![Page 40: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/40.jpg)
40
Formwork with high performance rates
Based on props, heads and timber beams
High finish quality
Standard and made-to-measure dimensions
Items for moving and lifting the tables available
Safety items incorporated
Pro
du
ct
Port
folio –
Hori
zon
tal Form
work
s
Table formwork for high performancesVR Table
![Page 41: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/41.jpg)
41
Simple formwork: easy to use
Based on props, heads and timber beams
High finish quality
Great versatility: adaptable to irregular geometries
Pro
du
ct
Port
folio –
Hori
zon
tal Form
work
s
A flexible slab formwork systemENKOFLEX Horizontal Formwork
![Page 42: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/42.jpg)
42
Light steel structure with three-layer board
Fast and simple erection
High performance rate
Safe system
Pro
du
ct
Port
folio –
Hori
zon
tal Form
work
s
Easy and fast to erect slab formworkRAPID Horizontal Formwork
Nets under formwork: collective protection verified by AIDICO, the Construction Technology Institute in Spain
Recoverable structure Remaining structure
![Page 43: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/43.jpg)
43
Formwork for bidirectional reticular slabs
Light steel grid with recoverable waffles
Fast and simple to erect
Common items with RAPID
Pro
du
ct
Port
folio –
Hori
zon
tal Form
work
s
Waffle system for reticular slabsRECUB Recoverable Waffle Formwork
Nets under formwork: collective protection verified by AIDICO, the Construction Technology Institute in Spain
![Page 44: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/44.jpg)
44
Steel beams as main and secondary elements
Great durability
Great versatility: it adapts to irregular geometries
High finish quality
Pro
du
ct
Port
folio –
Hori
zon
tal Form
work
s
Flexible, long lasting formworkBTM Horizontal Beam Formwork
![Page 45: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/45.jpg)
45
Support for casting any section, mainly bridge deck sections
Allows to adapt the formwork to the most complex geometries using standard
material
Pro
du
ct
Port
folio –
Civ
il E
ng
ineeri
ng
Syste
ms
Flexible horizontal formwork for bridge decksENKOFORM H-120 Formwork
![Page 46: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/46.jpg)
46
System based on beams and connectors
The MK beams are the base to multiple applications
Allows to form high load carrying capacity systems, mainly in the civil engineering
field
Pro
du
ct
Port
folio –
Civ
il E
ng
ineeri
ng
Syste
ms
Versatile structure for Civil EngineeringMK Structures
![Page 47: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/47.jpg)
47
Truss designed to bear high loads in big spans applications
Joint modules to achieve the desired length
Pro
du
ct
Port
folio –
Civ
il E
ng
ineeri
ng
Syste
ms
Truss for big spansH-33 Truss
![Page 48: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/48.jpg)
48
Support on piers for the main beams of bridge deck formwork
It is also a very practical solution for casting bracing beams in bridge pylons
Pro
du
ct
Port
folio –
Civ
il E
ng
ineeri
ng
Syste
ms
Support for beams on piersMT Gantry Bracket
![Page 49: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/49.jpg)
49
Used in the construction of cantilever concrete structures at big heights
Execution of cantilever structures as pier heads and pier segments
Pro
du
ct
Port
folio –
Civ
il E
ng
ineeri
ng
Syste
ms
Support for high loads in cantileverG Heavy Duty Bracket
![Page 50: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/50.jpg)
50
Fast adjustment
Long-lasting prop
Epoxi painted
Pro
du
ct
Port
folio –
Pro
ps a
nd
Sh
ori
ng
Syste
ms
The versatile propSP Prop
1 Loaded prop
2 Pin lifted to activate the support for fast striking
3 Unloaded prop
![Page 51: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/51.jpg)
51
Certified product according to the European standard EN 1065
Wide range
Hot dip galvanised
Non disengageable components
Pro
du
ct
Port
folio –
Pro
ps a
nd
Sh
ori
ng
Syste
ms
Certified according to the European standard EN 1065EP Prop
Prevents the operator from hurting his hands between the inner and
outer tube
![Page 52: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/52.jpg)
52
Pro
du
ct
Port
folio –
Pro
ps a
nd
Sh
ori
ng
Syste
ms
Light, strong and high load capacity propALUPROP Aluminium Prop
High load light aluminium prop
Can be joined with brace frames to form shoring towers
Disengageable and fast extending inner tube
Props can be connected end to end
Great durability
Approved product
![Page 53: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/53.jpg)
53
Horizontal formwork support in building construction
Light, fast and simple to erect
Possibility of using fixed or telescopic working platforms for erection
Pro
du
ct
Port
folio –
Pro
ps a
nd
Sh
ori
ng
Syste
ms
Light shoring systemG Shoring System
![Page 54: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/54.jpg)
54
Shoring system to support ENKOFLEX, VR Tables, BTM or ENKOFORM H-120 formwork
systems
Based on BRIO multidirectional scaffolding items
Hot dip galvanised
Pro
du
ct
Port
folio –
Pro
ps a
nd
Sh
ori
ng
Syste
ms
Light, highly versatile shoring systemBRIO Shoring System
![Page 55: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/55.jpg)
55
Shoring towers basically made up of frames and diagonal braces
High erection performance
Hot dip galvanised items
Pro
du
ct
Port
folio –
Pro
ps a
nd
Sh
ori
ng
Syste
ms
Versatile shoring system with multiple applicationsT-60 Shoring System
Approved product
![Page 56: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/56.jpg)
56
High load capacity shoring towers
Based on MK beams
Main use: civil engineering
Pro
du
ct
Port
folio –
Pro
ps a
nd
Sh
ori
ng
Syste
ms
Versatile shoring system for high loadsMK Shoring Systems
![Page 57: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/57.jpg)
57
Heavy-duty support to high loads at great heights
Main use: civil engineering
Pro
du
ct
Port
folio –
Pro
ps a
nd
Sh
ori
ng
Syste
ms
High load capacity shoring systemT-500 Shoring System
![Page 58: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/58.jpg)
58
Pro
du
ct
Port
folio –
Tim
ber
Beam
s a
nd
Ply
wood
High quality timber beams and plywood for the most stringent job requirementsFormwork Beams and Plywood
3-layer boards
Phenolic plywood
Birch Plywood (birch)
Beto Plywood (birch and spruce)
Spruce Plywood (spruce)
Made up of 3 cross bonded spruce layers
![Page 59: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/59.jpg)
59
Pro
du
ct
Port
folio –
Tim
ber
Beam
s a
nd
Ply
wood
High quality timber beams and plywood for the most stringent job requirementsFormwork Beams and Plywood
For vertical and horizontal formwork systems
Double T section, 200 mm high and 80 mm wide
Protected against humidity
Reinforced ends
VM20 Timber beam
Both beam ends are protected with plastic caps
![Page 60: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/60.jpg)
60
Pro
du
ct
Port
folio –
Scaff
old
ing
Highly flexible scaffolding for multiple applicationsBRIO Modular Scaffolding
Scaffolding system based on standards, ledgers and diagonals
Enables erecting tridimensional structures
Standards have 8 holes collars 50 cm spaced to fix other elements
Hot dip galvanised items
Product certifications:
BRIO scaffolding is certified under the European standards EN 12810-1/2 and EN 12811-1/2/3
![Page 61: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/61.jpg)
61
Pro
du
ct
Port
folio –
Scaff
old
ing
Façade scaffoldingDORPA Frame Scaffolding
Façade scaffolding mainly made up of closed and open frames, ledgers, diagonal braces and platforms
Certified under the European standards EN 12810-1/2 and EN 12811-1/2/3
Hot dip galvanised items
Product certifications:
![Page 62: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/62.jpg)
62
Façade retention system
Mainly used in façade restoration and maintenance
Collective safety devices integrated in the assembly
Hot dip galvanised items
Pro
du
ct
Port
folio –
Scaff
old
ing
Robust and safe to erectBRIO ST Façade Support
![Page 63: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/63.jpg)
63
Som
e C
om
ple
ted
Pro
jects
Shopping Malls
Educational and Health Care Centres
Industrial and Energy Constructions
Sport Complexes
Cultural and Religious Buildings
Business and Public Office Buildings
Residential Buildings
Stations and Airports
Bridges and Tunnels
Hydro Projects and WastewaterTreatment Plants
The Solution for each job
![Page 64: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/64.jpg)
64
Among Europe’s largest shopping and leisure areas
500,000 m2 total built area
6,500 parking spots 15,000 m2 office building
Sh
op
pin
g M
alls
On-site advice and efficient supplyMarineda Plaza Shopping Mall, A Coruña, Spain
![Page 65: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/65.jpg)
65
The largest shopping mall in the province of Lublin
Total area: 126,000 m2
2 large hypermarkets 70 shops Roof and a 18,500 m2 multi-level parking garage
Sh
op
pin
g M
alls
Construction profitability with versatile productsOLIMP IV Shopping Mall, Lublin, Poland
![Page 66: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/66.jpg)
66
Sh
op
pin
g M
alls
Columns of more than 10 m with ENKOFORM systemSanta Anita Wholesale Market, Lima, Peru
15 pavilions of various dimensions (the wholesale pavilions: 9,408 m2)
High safety requirements
![Page 67: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/67.jpg)
67
4 interconnected buildings with 8 floors, of which 4 are below ground level
Total useful area: 40,244 m2
Ed
ucati
on
al an
d H
ealt
h C
are
Cen
tres
Perfect finish on horizontal and vertical surfaces
Cáceres Hospital, Spain
![Page 68: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/68.jpg)
68
3 polygonal blocks and different heights
233 beds 1 heliport
Total area: 28,000 m2
13 floors (1 ground level, 2 basements and 10 floors
with an area of 1,800 m2)
Ed
ucati
on
al an
d H
ealt
h C
are
Cen
tres
RECUB, reusable in less than 72 hoursAmil Hospital, São Paulo, Brazil
![Page 69: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/69.jpg)
69
New Medical Centre II
Key element for the restructuring and modernisation of the University Clinic in Düsseldorf
Gross area: 46,700 m2
Gross volume: 200,000 m3
Ed
ucati
on
al an
d H
ealt
h C
are
Cen
tres
Shoring system and formwork adapted to the construction requirementsUniversity Clinic, Düsseldorf, Germany
![Page 70: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/70.jpg)
70
The new Woodstock General Hospital, with 3 storeys and modern facilities, substitutes the city’s old hospital
Total area: 32,500 m2
Ed
ucati
on
al an
d H
ealt
h C
are
Cen
tres
CC-4, a perimeter formwork for safe and efficient slabsWoodstock General Hospital, Ontario, Canada
![Page 71: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/71.jpg)
71
Planned over a quarry in disuse
Capacity for more than 30,000 spectators
2 stands on the sides of the playing field, and 3 circular galleries through them
2 underground parking levelsSp
ort
s C
om
ple
xes
A display of ULMA’s products’ performanceBraga Stadium, Portugal
![Page 72: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/72.jpg)
72
Gross area: 36,000 m2
The roof structure composed of 4 beams, with a maximum length of 200 m, is supported by 8 concrete columns with a diameter of 2 meters
Sp
ort
s C
om
ple
xes
Construction efficiency in formwork solutionsRCD Espanyol Soccer Stadium, Barcelona, Spain
![Page 73: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/73.jpg)
73
Part of the construction work consisted of demolishing 3 stands, maintaining only the historic façade of the fourth one
The stadium, of a quasi-rectangular shape (215 x 183 m ground area) and with capacity for 33,000 spectators, now has fully covered stands
Sp
ort
s C
om
ple
xes
Profitability and safety in simultaneous workLegia Stadium, Warsaw, Poland
![Page 74: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/74.jpg)
74
Tennis complex 160 x 167 m, 35 m tall:
3 indoor courts 16 outdoor courts 1 parking area commercial area
The Magic Box is the only venue in the world where it is possible to play both indoors and outdoors in the same tournament
Sp
ort
s C
om
ple
xes
Time savings with maximum material rotationThe Magic Box, Madrid, Spain
![Page 75: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/75.jpg)
75
Total area: 42,000 m2 exclusively for sports use
1 tennis court for competitions 1 paddle court for competitions 19 tennis courts (10 covered and 9 open air) 22 paddle courts (10 covered, 10 open air, and 2 glass) Other facilities and services (gym, swimming pools, playground areas, parking)
Sp
ort
s C
om
ple
xes
Profitability with modular formwork in special geometriesMontecarmelo Sports Club, Madrid, Spain
![Page 76: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/76.jpg)
76
The aim of this large project is the creation of the innovative, enclosed aquatic centre
to hold swimming tournaments and possibly Olympic games
3 swimming pools (1 olympic size;
1 diving pools; 1 multi-use swimming)
The area where the olympic pool is located has capacity for 15,000 people
Sp
ort
s C
om
ple
xes
Specific solutions for avant-garde projectsSports Complex, Dubai, UAE
![Page 77: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/77.jpg)
77
The short execution period of this football stadium required high-performance formwork and shoring systems, as well as efficient logistics.
Construction time: 6 months
Stadium capacity: 54,000 people
Sp
ort
s C
om
ple
xes
Global on-site solutionRutgers University Stadium, New Jersey, USA
![Page 78: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/78.jpg)
78
It is one of the largest construction projects carried out in recent years in North Rhine-Westphalia
During the first phase, approximately 30,000 m³ of concrete were used
Ind
ustr
ial an
d E
nerg
y C
on
str
ucti
on
s
Efficiency in large volumes of concrete pouringPower Plant, Datteln, Germany
![Page 79: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/79.jpg)
79
Ind
ustr
ial an
d E
nerg
y C
on
str
ucti
on
s
Profitable safety in complex projectsPetronor Coke Plant, Muskiz, Spain
Petronor refinery restoration
The plant with the biggest capacity in the Iberian peninsula, and one
of the most important ones in Europe
![Page 80: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/80.jpg)
80
Cement production capacity: 1,100 tons/day
Materials used: 2,700 tons steel 30,000 m2 formwork 20,000 m3 concrete
Ind
ustr
ial an
d E
nerg
y C
on
str
ucti
on
s
T-60, the perfect falsework for tall structuresXambioa Cement Factory, Brazil
![Page 81: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/81.jpg)
81
The aim of the project is gas transport
Construction work:
1 plant 1 sea terminal 1 gas pipeline of approximately 300 km in length
For the execution of the sea terminal, a 1.4 km long bridge was built
Ind
ustr
ial an
d E
nerg
y C
on
str
ucti
on
s
High performance and versatile applicationsPampa Melchorita Project, Peru
![Page 82: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/82.jpg)
82
Ind
ustr
ial an
d E
nerg
y C
on
str
ucti
on
s
ENKOFLEX, formwork that is precise and adaptable to construction needsRheinhafen Power Plant, Karlsruhe, Germany
This 100 m long, 50 m wide and 43 m high multi-story building required a system of 2 m thick solid foundations
![Page 83: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/83.jpg)
83
ULMA was the formwork and shoring supplier for more than 15 construction projects:
The Water Tower The Aragon Pavilion The Spain Pavilion The Participants Area The Congress Hall The Metropolitan Water Park The Aquarium covering 7,850 m2 and with
50 fish tanks, the largest in Europe etc.
Cu
ltu
ral an
d R
elig
iou
s B
uild
ing
s
High productivity in large usesEXPO Zaragoza 2008, Spain
![Page 84: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/84.jpg)
84
Cultural centre designed by Oscar Niemeyer
Plans to be the driving force for the recovery of an area degraded by industrial activity
Cu
ltu
ral an
d R
elig
iou
s B
uild
ing
s
The ideal adaptation to unique geometriesOscar Niemeyer Cultural Centre, Avilés, Spain
![Page 85: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/85.jpg)
85
The project involved transforming the existing Opera and Philharmonic of Białystok into a new European Center for Music and Art
The first phase construction: Total useful surface area: 9,424 m²
Constructed area: 6,302 m²
Hall capacity: 1,000 people (200 seats)
Cu
ltu
ral an
d R
elig
iou
s B
uild
ing
s
T-60 Shoring System, effective in any applicationBialystok Philharmonic, Białystok, Poland
![Page 86: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/86.jpg)
86
Works carried out without visits interruption (more than 10 million visitors yearly)
Work divided into 4 phases with optimised material rotation
Multi-directional scaffolding and stairs to provide access to all points of the facade
Cu
ltu
ral an
d R
elig
iou
s B
uild
ing
s
Multiple applications with BRIO scaffoldingRestoration of the Basilica del Pilar, Zaragoza, Spain
![Page 87: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/87.jpg)
87
The 3 buildings, forming the museum complex, have a total of 26,892 m2, covered by a large 8,000 m2 shield joining them
Cu
ltu
ral an
d R
elig
iou
s B
uild
ing
s
A great challenge, in the safe and profitable execution, of all the systemsReina Sofia Art Museum, Madrid, Spain
![Page 88: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/88.jpg)
88
This office skyscraper is considered to be one of the most respectful towards the environment
Height: 300 m
Floors: 55
Total area: 200,000 m2
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
ATR system, productivity at great heightsOne Bryant Park, New York, USA
![Page 89: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/89.jpg)
89
Built area: 424,000 m2
Grupo Santander’s headquarters
Also provides spaces for leisure
Restaurants Shopping areas Sports facilities Parking Transportation services Healthcare centres Training centres
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
High execution rates and guaranteed safetyBSCH Financial City, Madrid, Spain
![Page 90: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/90.jpg)
90
Skyscraper for multiple uses
25 office floors to offices of 1,600 m2 33 floor Luxury 5* hotel (500 rooms) 6 underground floors of 7,500 m2
Height: 236 m
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
236 m of automatic climbing for core walls (ATR) and perimeter windshield (HWS)S y V Tower, Madrid, Spain
![Page 91: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/91.jpg)
91
4 office buildings with a height of 170 m
1 five stars hotel with 250 rooms
1 convention centre, shops and a private club
More than 570,000 m2
New headquarters
of the Abu Dhabi
Financial Centre
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
Global solution for walls, columns and slabsAbu Dhabi Financial Center, UAE
![Page 92: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/92.jpg)
92
New European Hyundai’s headquarters in Frankfurt
Total area: 25,000 m2Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
Fast execution for a peculiar architectureHyundai Motor Europe Building, Frankfurt Am Main, Germany
![Page 93: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/93.jpg)
93
Total useful area: 56,000 m²
13 floors
4 level parking garage (830 vehicles)
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
RECUB, 2,200 m2 of slab in a single set-upLandmark Building, São Paulo, Brazil
![Page 94: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/94.jpg)
94
2 towers for offices and laboratories Tower 1: 16 floors Tower 2: 10 floors
Total useful area: 8,000 m²
The building operates as an ecosystem
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
Formwork and falsework for a perfect finishFusionopolis Solaris, Singapore
![Page 95: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/95.jpg)
95
2 towers Tower 1: Hotel Tower 2: Office building
Height: 120 m
Total area: 40,000 m²
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
Self-Climbing ATR, profitability and adaptation to complex geometriesFira Towers, Barcelona, Spain
![Page 96: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/96.jpg)
96
Capacity: 5,000 people
Directly connected to the new congress building there will be a hotel offering 336 rooms, a wellness area, cafes and a restaurant
Stringent concrete finish requirements
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
Flexible solutions and construction savingsWorld Conference Center, Bonn, Germany
![Page 97: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/97.jpg)
97
2,500 m2 structure
16 m high fair-faced concrete walls
4 floors and a height of 4 m between them
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
Project optimized with ENKOFORM V-100 and RECUBSchlumberger Administrative Building, Brazil
![Page 98: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/98.jpg)
98
Built area: more than 75,000 m2
Height: 118 m
30 floors
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
VR Table for high performanceWestin Libertador Hotel, Lima, Peru
![Page 99: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/99.jpg)
99
Total useful area: 51,000 m²
Height: 94 m
27 floors
1 underground parking (300 vehicles)
Perimeter windshield system
Bu
sin
ess a
nd
Pu
blic O
ffice B
uild
ing
s
Safe and profitable work at heightBelvedere Center Tower, Warsaw, Poland
![Page 100: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/100.jpg)
100
Underground building and parking (598 vehicles)
52 parking slots for buses
Large drop beams
3 floors
Sta
tion
s a
nd
Air
port
s
Application of unique solutions in a large projectBus Station, Pamplona, Spain
![Page 101: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/101.jpg)
101
2,900 m² new passenger terminal
Platform expansion: 3 floors
Strict safety standards
Standard elements for various geometries
Sta
tion
s a
nd
Air
port
s
High construction performance: safety and speedLa Palma Airport, Canary Islands, Spain
![Page 102: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/102.jpg)
102
Peru’s main airport
Traffic of more than 8 million passengers per year
Sta
tion
s a
nd
Air
port
s
Global service and product versatility throughout the projectExpansion of Jorge Chávez Airport, Lima, Peru
![Page 103: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/103.jpg)
103
First urban train service in the Arabian peninsula
52.1 km and 47 stations
Sta
tion
s a
nd
Air
port
s
Execution of a large construction project with quality and safetyDubai Metro, UAE
![Page 104: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/104.jpg)
104
7 storey residential buildings
400 apartments
Resid
en
tial B
uild
ing
s
Application of safe proceduresResidential complex, Tolosa, Spain
![Page 105: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/105.jpg)
105
170 m high twin towers, joined together by a 3-storey podium
Both of them have 34 floors, 2 of them underground
Resid
en
tial B
uild
ing
s
ENKOFLEX and VR Table, profitable combination in the execution of slabsDonna Towers, Dubai Silicon Oasis, UAE
![Page 106: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/106.jpg)
106
9 towers with different geometries
7 towers with 158 m high and 48 floors and the remaining 2 tower with 28 floors
Shopping centre area: 78,000 m²
Resid
en
tial B
uild
ing
s
Wide product range with multiple applicationsCidade Jardim Park, São Paulo, Brazil
![Page 107: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/107.jpg)
107
2,100 homes with an area between 110 m2 and 130 m2
Resid
en
tial B
uild
ing
s
Solutions with modular and versatile formworkBosques Zinantepec Residential Complex, Toluca, Mexico
![Page 108: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/108.jpg)
108
Monolithic 427 m long viaduct
260 m tunnel
2 twin overpasses
Bri
dg
es a
nd
Tu
nn
els
Effective engineering with high performance, safety low costAP1 Eibar-Vitoria Highway, Basagoiti Viaduct, Spain
![Page 109: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/109.jpg)
109
Bridge length: 243 m
Pylon height: 51 m
Bri
dg
es a
nd
Tu
nn
els
Planning and savings in a project with complex orographyBridge over the Skawa River, Zembrzyce, Poland
![Page 110: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/110.jpg)
110
It decongests the access to the city
High performance rates
Bri
dg
es a
nd
Tu
nn
els
Material rotation, project profitabilityAritzeta-Urumea Junction Stretch, 2nd Road Bypass of San Sebastián, Spain
![Page 111: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/111.jpg)
111
New access roads to the Dos Valires tunnel
Piers of special shapes
Bri
dg
es a
nd
Tu
nn
els
Perfect combination of formwork technics and on site technical consultingAccess to Dels 2 Valires Tunnel, Andorra
![Page 112: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/112.jpg)
112
This viaduct establishes the administrative borders of the city
Peculiar piers shape: 4 columns (2 trapezoidal and 2 rectangular)
Bri
dg
es a
nd
Tu
nn
els
Formwork with aesthetic qualityViaduct over the Piotrków Trybunalski beltway, Poland
![Page 113: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/113.jpg)
113
This bridge connects Romania and Bulgaria
Also, various overpasses were built:
Kula Rail: 193 m long Vidin Entrante
Bri
dg
es a
nd
Tu
nn
els
Reduction of times and costs with self-launching beamsBridge over the Danube, Vidin-Calafat, Romania
![Page 114: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/114.jpg)
114
Length: 505 meters
Cross section of the deck: 6.6 m
Viaduct for the high speed train
Bri
dg
es a
nd
Tu
nn
els
Versatility of systems for a 6.6 m heightZadorra Viaduct, Álava, Spain
![Page 115: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/115.jpg)
115
Project respectful with the surroundings
Atypical arch curvature
Bri
dg
es a
nd
Tu
nn
els
Customised solutions for atypical structuresBridge over the Kamienna River, Szklarska Poręba, Poland
![Page 116: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/116.jpg)
116
Length: 1,000 meters
Height: 40 meters above the ground
The span reaches 125 m
Bri
dg
es a
nd
Tu
nn
els
Profitable construction of viaduct with starter pier capTrapagarán Viaduct, South Metropolitan Variant, Bilbao, Spain
![Page 117: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/117.jpg)
117
300 meters long and 26 meters height
Deck size: 31.7 m wide and 2.8 m thick
Bri
dg
es a
nd
Tu
nn
els
On site material pre-assembly, reduction of work timeJiamin Viaduct, Jiamin Highway, China
![Page 118: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/118.jpg)
118
4,500 m² of mosaic tiles
2 carriageways 7 m wide
Bri
dg
es a
nd
Tu
nn
els
A 124 m challenge of unique geometry using ENKOFORM H-120Dragon Bridge, Alcalá De Guadaira, Seville, Spain
![Page 119: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/119.jpg)
119
Length: 25 kilometres
This project solves the road communication in the Valley of Mexico where more than 4 million vehicles circulate
Bri
dg
es a
nd
Tu
nn
els
Optimal application of NEVI Modular FormworkLos Remedios-Ecatepec Highway, Mexico
![Page 120: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/120.jpg)
120
Length: 1,798 meters
This two-pylon hanging bridge reaches 75.60 m at its highest
point
200 m span between pylons
Bri
dg
es a
nd
Tu
nn
els
Climbing systems for piers higher than 70 metersAracaju Bridge, Sergipe, Brazil
![Page 121: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/121.jpg)
121
Two twin structures for
pedestrians and cyclist use
The cross section is a dome with variable
dimensions and thickness (0.15 to 0.57 m)
Very strict concrete finish requirements
Bri
dg
es a
nd
Tu
nn
els
ENKOFORM H-120, the perfect adaptation to the elliptical multiple radii arch Manzanares Walkway, Madrid, Spain
![Page 122: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/122.jpg)
122
Bridge structure: 422 m long, 35 m wide and 58 m high
Solution with a cantilevered structure under the bridge core, since an open upper
level was required
Bri
dg
es a
nd
Tu
nn
els
Structures MK, innovative and flexible product with efficient set upLochkov Bridge, Slivenec-Lahovice Highway, Prague, Czech Republic
Outer wing formwork Intermediate formwork Slab formwork
![Page 123: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/123.jpg)
123
The work was performed 50 m above the river
The arch has a variable thickness (1.5 to 0.8 m), 5 m wide and 90 m long
Bri
dg
es a
nd
Tu
nn
els
Execution of 5 meters of structure in less than 7 daysArch bridge over the Mangart River, Slovenia
![Page 124: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/124.jpg)
124
This area connects the Scandinavian countries with Greece through Germany, the Czech Republic, Austria and Italy
Length: 560 m
Height: 18 m
Bri
dg
es a
nd
Tu
nn
els
Efficient solutions with standard partsKoberny Bridge, D3 Tábor-Veselí nad Lužnic Highway, Czech Republic
![Page 125: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/125.jpg)
125
The longest infrastructure in Spain, 1,444 m long, built with the incremental launching method
It forms part of the high speed train in the North-Northeast Corridor
Bri
dg
es a
nd
Tu
nn
els
Agile planning, fast movement and cost savingsArenteiro Viaduct, Ourense, Spain
![Page 126: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/126.jpg)
126
Transformation into a double highway
The Cadavedo viaduct is made up of an 11.80 m wide and 432.5 m long continuous deck
Bri
dg
es a
nd
Tu
nn
els
Self-launching beams, the solution for complicated terrainA-8 Cantabrian Highway. Ballota-Cadavedo Stretch, Spain
![Page 127: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/127.jpg)
127
With 800 m long, both tunnels are 30.5 m wide, 9.5 m high and
have an internal diameter of 13.5 m
The formwork carrier covered 12.5 m
Bri
dg
es a
nd
Tu
nn
els
Service and fast response with standard systemsFalse Tunnel in Catania-Siracusa Highway, Carlentini, Italy
![Page 128: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/128.jpg)
128
The tunnel galleries: 15.7 m wide, 6.2 m long and 9 m high
Improvement of the traffic circulation in the Pesaro area
Bri
dg
es a
nd
Tu
nn
els
28 t fast transfer formwork carrier trolleyNatural tunnel, Pesaro, Italy
![Page 129: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/129.jpg)
129
World Heritage Site by UNESCO. Projected in 1886 by the engineer Teofilo Seyrig, disciple of Gustave
Eiffel
Full bridge restauring
390 m long and 62 m above the river
Bri
dg
es a
nd
Tu
nn
els
Guaranteed safety and versatility with BRIO Modular ScaffoldingDom Luis I Bridge, Oporto, Portugal
![Page 130: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/130.jpg)
130
434 m long, 35 m wide and 10 m deep
Access possible for ships up to 20,000 TPM and 290 m
Hyd
ro P
roje
cts
an
d W
aste
wate
r Tr
eatm
en
t P
lan
ts
Optimal application of large volumes of formwork for a short execution periodNew Floodgate, Seville, Spain
Made by the same designers as the Panama Canal
Foundations, buttresses, garages and counter-garages, diffusers…
![Page 131: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/131.jpg)
131
The largest infrastructure project carried out in Mexico within the last 10 years
Second biggest project in terms of power generation among the ones built to date in Mexico
Hyd
ro P
roje
cts
an
d W
aste
wate
r Tr
eatm
en
t P
lan
ts
A hydraulic construction project with excellent quality and finishes El Cajón Hydroelectric Project, Tepic, Mexico
![Page 132: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/132.jpg)
132
232 m long and 63 m high
It holds 7.53 cubic hectometres
Supplies drinking water to nearly 60,000 inhabitants
Hyd
ro P
roje
cts
an
d W
aste
wate
r Tr
eatm
en
t P
lan
ts
Safety in concrete pouring at heightIbiur Dam, Baliarrain, Spain
![Page 133: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/133.jpg)
133
More than 40 constructions
Septic tank: radial walls with 16 m diameter and a height of up to 12.9 m
Secondary settling tanks: 3 radial structures with 20 m of diameter and 5.5 m height
Biological reactor: 6.15 m high and more than 10,000 m² reinforced concrete structure
Hyd
ro P
roje
cts
an
d W
aste
wate
r Tr
eatm
en
t P
lan
ts
Optimal solutions for circular structuresSewage Treatment Plant, Katowice, Poland
![Page 134: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/134.jpg)
134
It provides water to more than 2 million people:
Construction of a hydraulic water collector Water Treatment Plant 27 km long channel which includes 2 tunnels
(5 km each) and 5 tanks (2,000-9,000 m3)
Hyd
ro P
roje
cts
an
d W
aste
wate
r Tr
eatm
en
t P
lan
ts
Construction profitability with modular systems and standard componentsPotable Water Treatment Plant, Huachipa, Peru
![Page 135: ULMA Corporate Presentation English](https://reader038.fdocuments.in/reader038/viewer/2022102508/54574e00b1af9f0c4d8b4a38/html5/thumbnails/135.jpg)
www.ulma-c.com
00FIP06