ADDENDUM NO. 23 TO THE AGREEMENT DATED JUNE15, 2018
BETWEEN GREATER ORLANDO AVIATION AUTHORITY AND MSE GROUP, LLC
Project: FY22 On-Call Baseline Environmental Impact Investigations (BEIi), Orlando International Airport
THIS ADDENDUM is effective this U£?f'.- day of OcJ-do.-c..r , 2crz-l and between the GREATER ORLANDO AVIATION AUTHORITY ("Authority"), and GROUP, LLC ("Consultant').
WITNESSETH:
, by MSE
WHEREAS, by Agreement dated June 15, 2018 Authority and Consultant entered into an agreement for Consultant to provide Continuing Environmental Engineering consulting services; and
WHEREAS, under the Agreement, Consultant agreed to perform such additional services for the Authority as are contained in any additional scope of work established by the Authority in any addendum to the Agreement and accepted in writing by the Consultant; and
WHEREAS, the Authority and the Consultant desire to enter into this Addendum to the Agreement to provide for additional services to be rendered by the Consultant under the terms of said Agreement.
NOW, THEREFORE, in consideration of the premises and the mutual covenants herein contained, the Authority and the Consultant do hereby agree as follows:
1. Consultant shall perform additional services in accordance with the terms of the Agreement and the attached Exhibit "A." Consultant shall be paid for such additional services according to the payment terms set forth in the Agreement.
2. Consultant shall be compensated for such additional services in the NOT TO EXCEED amount of FIFTY THOUSAND AND NO/100 DOLLARS ($50,000.00), broken down as follows:
Professional Fees: Professional Fees: Reimbursable Expenses:
Total:
NTE: LS: NTE:
$30,000.00 $0.00
$20,000.00
$50,000.00
3. A. Consultant hereby certifies that it is not on the Scrutinized Companies that Boycott Israel List and is not engaged in a boycott of Israel, as defined in Florida Statutes § 287 .135, as amended;
AND
B. (applicable to agreements that may be $1,000,000 or more) - Consultant hereby certifies that it is: ( 1) not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List as defined in Florida Statutes
Addendum 23 to Agreement dated June 15, 2018
Page 1 of 2 Rev 8/2017
§ 287.135; and (2) not engaged in business operations in Cuba or Syria, as defined in Florida Statutes§ 287.135, as amended.
4. Authority may terminate the Agreement for cause and without the opportunity to cure if the Consultant is found to have submitted a false certification or has been placed on the Scrutinized Companies that Boycott Israel List or is engaged in a boycott of Israel.
In the event the Agreement is for One Million Dollars ($1,000,000.00) or more, Authority may terminate this Agreement for cause and without the opportunity to cure if the Consultant is found to have submitted a false certification or has been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List or is engaged in business operations in Cuba or Syria.
5. Except as expressly modified in this Addendum, the Agreement dated June 15, 2018 and all prior addenda will remain in full force and effect.
IN WITNESS WHEREOF ~ he parties hereto by their duly authorized representatives, have executed this Addendum this V ' day of N o \J- , 20~ .
Approved as to Form and Legality (for the benefit of GOAA only)
thls?f'~ ay of Af'o,r . 20&1
By: k?,, A~. NELSON MULLINS BRO"AD AND CASSEL. Legal Counsel Greater Orlando Aviation Authority
Addendum 23 to Agreement dated June 15, 2018
GREATER ORLANDO AVIATION AUTHORITY
By: ~ Davin D. Ruohomaki Sr. Director Engineering & Construction
MSE GROUP, LLC
By: &{UM.,lJ ~ ~.
Signature (Duly Authorized Rep.)
James E. Cotton Printed Name
Senior Geologist Title
Page 2 of 2 Rev 8/2017
-- w w w = - = GREATER ORLANDO AVIATION AUTHORITY
Orlando International Airport One Jeff Fuqua Boulevard
Orlando, Florida, 32827-4392 (407) 825-2001
Memorandum
To:
From:
Date:
Members of the Construction Committee
Dan Carrington Environmental Manager
October 26, 2021
Re: Request for Approval of an Addendum to the Continuing Environmental Engineering Services Agreement with MSE Group, LLC to provide FY22 On-call Baseline Environmental Impact Investigations (BEIi) at the Orlando International Airport.
Consultant's proposal, dated September 3, 2021 (Revised October 18, 2021), is to conduct Baseline Environmental Impact Investigations on as needed basis for fiscal year 2022 at the Orlando International Airport.
If approved, these services would be effective the date of Construction Committee approval.
This continuing consultant was selected for this task based on (0 all that apply):
IZI Experience D Available Personnel IZI Current Workload
IZI Expertise IZI Equitable Distribution D Other:
The MWBE/LDB participation has been reviewed by the Office of Small Business Development. Their findings and recommendation are attached.
GH Funding is from Operation & Maintenance (301.712.170.5310010.000.000000). Funding source verified by ~ ,#~ of Construction Finance on J..Q_/ 20 / .1.:!._ as correct and available.
It is respectfully requested that the Construction Committee approve an Addendum to the Continuing Environmental Engineering Services Agreement with MSE Group, LLC for the services contained herein and the amount as shown below:
Not to Exceed Fees Lump Sum Fees Not to Exceed Expenses TOTAL Reviewed by AAC
Greater Orlando Aviation Authority (12/14) Construction Committee Memorandums EDC-1 Ba
EXHIBIT "A"
$30,000.00 $0.00
$20,000.00 $50"'-000.00
<.. L ')'") j'
Req. 90064
ITEM 15 10/26/2021
September 3, 2021 (revised October 18, 2021)
ECOLOGICAL I ENVIRONMENTAL I ENGINEERING
Electronic Mail Delivery Only [email protected]
Mr. Dan Carrington Greater Orlando Aviation Authority 5855 Cargo Road Orlando, Florida 32827
RE: FY2022 On-call Baseline Environmental Impact Investigation Orlando International Airport Orlando, Florida Continuing Environmental Engineering Consulting Services - June 15, 2018
Dear Mr. Carrington:
Proposal
MSE Group, LLC (MSE) is pleased to present our proposal to provide On-call Baseline Environmental Impact
Investigations (BEIi) at the Greater Orlando Aviation Authority (GOAA) properties located in Orlando, Florida.
This scope will be conducted under MSE's Agreement for Continuing Environmental Engineering Consulting
Services dated June 15, 2018.
Background GOAA operates and maintains the Orlando International Airport (OIA) . As part of the maintenance activities,
occasional due-diligence BEiis are requested . These investigations could be the result of property
divestitures, acquisitions, leases, or from newly discovered hazardous material or petroleum product
releases. Accordingly, GOAA has requested a proposal to complete a BEIi on an as-needed basis.
Scope of Work The objective of the BEIi is to evaluate current environmental conditions at designated locations to determine
the presence of a release or threatened release of hazardous substances or petroleum products. The details
of the scope of the work will be defined upon request and will generally follow the guidelines established by
ASTM Standard E 1527-13 for Phase I Environmental Site Assessments, Chapter 22 of the Florida Department
of Transportation (FOOT) Project Development and Environment (PD&E) Manual for roadway corridor
assessments, and/or the Florida Department of Environmental Protection (FDEP) Chapter 62-780 of the Florida
Administrative Code (FAC) for multi-media assessments. In general, it is assumed the following scope of work
will be completed as needed on a per task basis:
5858 S. Semoran Blvd.• Orlando, FL 32822 • 407 .629.8180 (T) • 407 .629.7595 (F)
Task 1: Public Records Review
Baseline Environmental Impact Investigations Proposal Fiscal Year 2022
Orlando International Airport September 3, 2021 (revised October 18, 2021)
Prior to mobilizing to the site, MSE proposes to complete a public records search for the subject property and
vicinity to inform the scope of work and to identify potential sources of contamination. The database search
will include online reviews of publicly available records , and/or the purchase of a database report from a third
party. If a database report is purchased, the report will include a radius map report, historical data report(s) ,
Sanborn maps, city directories, and historical aerial(s), if available and applicable . Following the records
review, MSE personnel will perform reconnaissance of the subject property to observe for indications of a
release or threatened release.
Task 2: Subsurface Utility Survey
Prior to intrusive investigation practices, subsurface utility investigation and designation will be performed as
needed. Sunshine 811 will be utilized to located utilities; however, in the event this service is unable to access
or locate the utilities in the vicinity of the site, a subsurface utility engineer (SUE) will be utilized to locate and
designate any utilities that may be present. The SUE may utilize ground penetrating radar (GPR) and/or
electromagnetic induction to locate the utilities. The utilities will be designated with flags, tape, and/or spray
paint. If needed, test pits may be necessary to define the depth, size , and/or material of construction of a
utility. Test pits would be advanced using a vac-truck and backfilled using native soil from the site.
Task 3: Multi-Media Screening and Sampling
Based on the nature of the release and the subject property's location, multiple forms of media may be
affected, and multiple analyses may be needed. In general, sampling activities will be performed in
accordance with the FDEP Standard Operating Procedures for Field Activities DEP-SOP-001 /01 . If
groundwater samples are needed, they will be collected from monitoring wells installed manually or by
utilizing a direct push technology (DPT) rig . The wells ~ill be installed in general accordance with the FDEP
Monitoring Well Design and Construction Guidance Manual, 2008. Samples collected for analysis will be
packed and transported to a National Environmental Laboratory Accredited laboratory for analysis.
Task 4: Project Report
Following the completion of the field activities and review of the analytical data a report will be generated that
summarizes the tasks performed and results of the analytical testing . The report may include summary
tables, figures with site, sample, and contamination locations identified, field forms, and analytical reports.
The report will also include recommendations for additional assessment or remediation work if needed.
COST PROPOSAL The scope of services defined above will be completed on a time and materials basis for each requested service per the June 15, 2018 Continuing Environmental Engineering Consulting Services Contract and will not exceed $50,000 . MSE will utilize the unit rates provided in Attachment A.
MWBE/LDB Commitment MSE has teamed with Southern Research Laboratories, Inc., RL Reed and Associates, Inc., Ambient Technologies, Inc., and L&S Diversified, LLC, to provide the analytical, hazardous materials testing , environmental drilling, surveying, and utility locating services for this project. Each of these companies is a certified Orange County Minority/Woman-owned Business Enterprise.
Page 2
Baseline Environmental Impact Investigations Proposal Fiscal Year 2022
Orlando International Airport September 3, 2021 (revised October 18, 2021)
MSE may also utilize SGS Accutest, a non-small business subcontractor, to support laboratory analytical services as needed. A breakdown of their fees is provided in Attachment A.
Closure We appreciate the opportunity to submit this proposal. If you have any questions or require additional
information, please contact me at 407.304.9568 or [email protected].
Very truly yours,
MSE Group, LLC
James Cotton, PG Contract Manager
Attachments:
Attachment A - Proposed Unit Rate Fees Attachment B - Truth in Negotiation Certification
Page 3
Attachment A
Cost Estimate
Greater Orlando Aviation Authority
Continuing Environmental Engineering Consulting Services - June 15, 2018 -October 18, 2021
ITEM RA~ tlNIT
MSE PERSONNEL _LABOR
Principal Engineer/Scientist $231.00 Hour
Associate Enqineer/Scientist $178.00 Hour
Senior II Professional $150.00 Hour
Senior I Professional $126.00 Hour
Project II Professional $113.00 Hour
Project I Professional $99.00 Hour
Document Control $92.00 Hour
Staff II Professional $84.00 Hour
Senior Technician $76.00 Hour
Staff I Professional $70.00 Hour
Technician $58.00 Hour
Ad min/Clerical $51.00 Hour
. - ~E~SONAL P~OT.ECTIME EQUIPMENT Level D PPE (Hard Hat, Work Gloves, Boots, Cotton Clothes, Safety Glasses) $25.00 Per Man/Day
Respirator) $40.00 Per Man/Day
Respirator Cartridges (Mercury) $36.00 Pair
Respirator Cartridges (OVAG) $20.00 Pair
Respirator Cartridges (HEPA P100) $13.00 Pair
Respirator Cartridges (ACID/GAS) $20.00 Pair
Respirator Cartridges (AMMONIA) $25.00 Pair
Respirator Cartridges (MUL Tl-GAS) $25.00 Pair
Respirator Cartridges (ORGANIC/HEPA) $40.00 Pair
TYVEK TYCHEM QC (HOODS AND BOOTS) $14.00 Each
TYVEK TYCHEM SL- SEALED SEAMS SUITS (HOODS & BOOTS) $30.00 Each
Rain Suits $30.00 Each
Acid Splash Suit $50.00 Each
Neoprene Gloves (HEAVY DUTY) ' $13.00 Pair
PVC Coated Gloves $6.00 Pair
Disposable Gloves (Latex) $25.00 Box
Viton Gloves $125.00 Pair
MISCELLANEOUS EQUIPMENT/EXPENDABLES
Caution Tape (1000') $32.00 Roll
Industrial Debris Bags (42 Gallon) $35.00 Box
Clean Rags (Heavy Duty Paper) $28.00 200 Sheet 80> Clean Rags (Cloth) $95.00 25Ib Box
SAMPLING/TESTING EQUIPMENT
Crew Truck $130.00 Day
Database Report (EDR) $250.00 Each
OVA PIO METER - (Multi Rae 3000) $105.00 Day
OVA FID METER - (Photovac MicroFID) $160.00 Day
Calibration Gas Kit (lsobutylene) $20.00 Day
Calibration Gas (FOUR GAS + ISOBUTYLENE) $305.00 Cylinder (17L)
MUL TIGAS/PID COMBO METER $88.00 Day
YSI 63 PH/CONDUCTIVITY/TEMP METER $35.00 Day
YSI 556 (DO/COND/pH/ORP) with FLOW CELL $140.00 Day
Oil/Water Interface Probe $90.00 Day
Turbidity Meter $50.00 Day ...
Attachment A
Cost Estimate Greater Orlando Aviation Authority
Continuing Environmental Engineering Consulting Services - June 15, 2018 ~
October 18, 2021 ,ITEM RAliE UNFT '
Water Level Indicator $50.00 Day
LOTO Equipment Sets (HASPS, LOCKS, TAGS) $25.00 Day
Wet/Dry Vacuum $25.00 Dav
Drum Vacuum $25.00 Day
PH Paper $15.00 Roll
Radiation Meter (Vicoreen) $40.00 Day
ISCO Composite Sampler $70.00 Day
1/4" ID Poly Down Well Tubing (100FT) $22.00 Roll 3/8" Poly Down Well Tubing (1 OOFT) $38.00 Roll
Silicone Tubing $4.00 LF
Peristaltic Pump $50.00 Day
Disposable Coliwasa (glass) $18.00 Each
55 Gallon Drum (DOT Open Top Metal) $75.00 Each
Soil Sampling Kit (Augers, bowls, Jars, Decon Equip) $35.00 Day
Sl!JBSl!JRF,ACE UTILITY/ SURVEY SERVICES - l&S DIVERSIFIED, ,lll;!C
Subsurface Utility Designation (EM and GPR) $150.00 Hour
Vac-Truck for Test Pits $180.00 Hour
Subsurface Utility Engineer (PM) $120.00 Hour
Survey (Topographic) $150.00 Hour
PSM Senior Surveyor $140.00 Hour
Survey CADD Technician $65.00 Hour
Utility Coordinator $120.00 Hour
IND©OR AIR QUALITY SERVICES - RL ijEED ~ ASSOClATES, ill'ilG
Project Professional $103.00 Hour
Field Tech/Air Monitor $47.00 Hour
CAD $47.00 Hour
Admin . Suooort $36.00 Hour
Licensed Asbestos Consultant (LAC) $125.00 Hour
Certified Industrial Hygienist (CIH) $130.00 Hour
DRl!,...LING SERVICES - AMBIENT TECHNOL,OGI_ES, LLC
Direct Push Rig $1,500.00 Day
Well Installation Permit $44.00 per well
Well Materials (2" PVC) $10.00 per foot
8" Flush Completion $125.00 per well
4" Above Grade Completion $135.00 per well
Well Development $75.00 per well
55 Gallon Drum (DOT Open Top Metal) $55.00 per well ANALYTICAL SERVICES - SGS A'CCUliEST
Pertluoalkyl Substances (PFOA and PFOS) in Water $165.00 Each Pertluoalkyl Substances (PFOA and PFOS) in Soil $165.00 Each
ANAlOCAL SERVICES - SOUTHERN RESEARCH LABORATORIES
TCLP Extraction Procedure (ZHE) (1311) $90.00 Each
TCLP Volatile Organics by GC-MS (1311/82608) $135.00 Each
TCLP Semi-Volatile Organics by GC-MS (1311 /8270) $295.00 Each
TCLP 8 RCRA Metals (Solids & Wastes) $125.00 Each
TCLP Chloropheno:xy Herbicides in Soil & Waste (1311 /8151 A) $250.00 Each
TCLP Organophosphorus Pesticides in Soil & Waste (1311/8141) $175.00 Each
TCLP Organochlorine Pesticides & PCBs (1311 /8081 A-82) $150.00 Each L
Attachment A
Cost Estimate Greater Orlando Aviation Authority
,~ Continuing Environmental Engineering Consulting Services - June 15, 2018 October 18, 2021
ITEM, RATE UNIT RCRA 8 Metals, Soil & Waste (As,Ba,Cd,Cr,Pb,Hg,Se,Ag) $125.00 Each
RCRA 8 Metals, Water (As ,Ba,Cd,Cr,Pb,Hg,Se,Ag) $125.00 Each
RCRA 4 Metals, Soil & Waste (As,Cd,Cr,Pb,) $60.00 Each RCRA 4 Metals, Water (As,Cd,Cr,Pb,) $60.00 Each Volatile Organics~Low Level Method in Soil & Waste by GC-MS (5035/8260) $135.00 Each
Volatile Organics in Water by GC-MS (5030/8260) $135.00 Each
Semi-Volatile Organics in Soil & Waste by GC-MS (3550/8270) $295.00 Each Semi-Volatile Organics in Water by GC-MS (3510/8270) $295.00 Each
Florida-Petroleum Range Organics in Water (FL-PRO) $95.00 Each
Florida-Petroleum Range Organics in Soil and Waste (FL-PRO) $125.00 Each PAHs in Soil and Waste by GC-MS (3550/8270C-SIM) $135.00 Each Polynuclear Aromatic Hydrocarbons in Water by GC-MS (3550/8270C-SIM) $135.00 Each
Petroleum Solvents - Sites (Table B) (8260-VOA/PAHs/TRPH) $250.00 Each (8260-VOA/P AHs/TRPH/EDB/ As/Cd/Cr/Pb/Chloride/Sulfate/TDS) $398.00 Each
FAC 62-770 Gas & Kerosene Group (8260(VOA/VOH), 8270-SIM(PAH), FL-PRO, 8011, Pb) in Water $350.00 Each FAG 62-770 Gas & Kerosene Group (8260(VOA) , 8270-SIM(PAH) , FL-PRO) in Soil & Waste $250.00 Each
Soil & Waste $795.00 Each Water $795.00 Each Table E-Soils(VOA,VOH,PAHs,As,Cd,Cr,Pb,TRPH) in Soil and Sediment $395.00 Each
Table E-GW (VOA,VOH,PAHs,EDB,As,Cd,Cr,Pb,TRPH,Chloride, Sulfate, TDS) in Water $495.00 Each
Chlorophenoxy Herbicides in Soil & Waste (8151) $250.00 Each Chlorophenoxy Herbicides in Water (615/8151) $250.00 Each
Organochlorine Pesticides in Soil & Waste (8081) $150.00 Each Organochlorine Pesticides in Water (608/8081) $150.00 Each
Organophosphorus Pesticides in Soil & Waste (8141) $175.00 Each Organophosphorus Pesticides in Water (614/8141) $175.00 Each Preburn, Virgin {8260/FL- PRO/As/ Cd/Cr/Pb $275.00 Each
$395.00 Each
MSE NTE Labor Fees $28,500.00 57.0% MSE NTE Subcontractor Fees (RL Reed & Associates, Inc. [W/MBE]) $1,500.00 3.0% MSE NTE Expenses $5,000.00 10.0% MSE NTE Subcontractor Expenses $15,000.00
L&S Diversified , LLC (W/MBE) $1,200.00 2.4% Ambient Technologies, Inc. (MBE) $1,800.00 3.6% Southern Research Laboratories (W/MBE) $7 ,000.00 14.0% SGS Accutest $5,000.00 10.0%
Total NTE Amount $50,000.00 The above referenced fees and expenses are estimated . The actual fees and expenses will vary based on
scope of work performed.
3
TRUTH IN NEGOTIATION CERTIFICATION
The Consultant hereby certifies, covenants, and warrants that wage rates and other factual unit costs
supporting the compensation for this project's agreement are accurate, complete, and current at the
time of contracting.
The Consultant further agrees that the original agreement price and any additions thereto shall be
adjusted to exclude any significant sums by which the Aviation Authority determines the agreement
price was increased due to inaccurate, incomplete, or noncurrent wage rates and other factual unit
costs. All such agreement adjustments shall be made within (1) year following the end of the contract.
For purposes of this certificate, the end of the agreement shall be deemed to be the date offinal billing
or acceptance of the work by the Aviation Authority, whichever is later.
Consultant MSE Group, LLC
By: ~l,{,,{_,,LJ ~ . C,y 't[ii,, V
Print Name: James Cotton, Sr Geologist
Date: 10/18/2021
GREATER OR
MEMORANDUM
To: Members of the Construction Committee
From: George I. Morning, Director of Small Business Development Department
Date : October 26, 2021
Handout 10/26/2021
Item 15 Revised OSBD
Memo
Re: Request for Approval of an Addendum to the Continuing Environmental Engineering Services Agreement with MSE Group, LLC to provide FY22 On-Call Baseline Environmental Impact Investigations (BEIi) at the Orlando International Airport .
We have reviewed the qualifications of the subject contract's MWBE/LDBNBE specifications and determined that MSE Group, LLC proposesl23%I MWBE participation on this Addendum.
Our analysis indicates that MSE Group, LLC is eligible for award of the subject Addendum.
MWBE UTILIZATION FORM FOR NON-FEDERALLY FUNDED PROJECTS
PLEASE COMPLETE THIS FORM
This form should be used to report Construction and Engineering /Professional Services activities.
Name of Airport: Orlando International Airp_ort
Address: One Jeff Fu_g_ua Boulevard, Orl~ndo, FL 32827
Telephone No: (407) 825-7130
Project Name & Number: Request for Approval of an Addendum to the Continuing Environmental Engineering Services Agreement with MSE Group, LLC to provide FY22 On-Call Baseline
Environmental Impact Investigations (BEIi) at the Orlando International Airport.
1. Construction Information:
Addendum Amount:
2. MWBE Goal by Group Representation:
Asian Pacific American Actual Result -------Asian Subcontinent American Actual Result -------Black American _______ Actual Result
Caucasian Female American
Hispanic American
Native American
Other Total MWBE Goal
3.a. Prime Contractor Information:
Actual Result -------Actual Result -------Actual Result -------Actual Result -------Actua I Res ult -------
Name: _________________________ _
Address: _________________________ _
City, State, Zip: _________________________ _
Telephone: _________________________ _
3.b. Name and Address of MWBE Subcontractor Name: _________________________ _
Address: _________________________ _
City, State, Zip: ________________________ _ Telephone: _________________________ _
3.c. • Identity:
Work ltem(s):
Amount of Subcontract
Percent of Prime Contract (%):
4. Engineering/Professional Services Information:
Addendum Amount: $50,000.00
5. MWBE Goal by Group Representation:
Asian Pacific American 1,200.00 Actual Result Asian Subcontinent American Actual Result
Black American 7,000.00 Actual Result Caucasian Female American 1,500.00 Actual Result
Hispanic American 1,800.00 Actual Result
Native American Actual Result
Other Actual Result Total MWBE Goal 11,500.00 Actual Result
6.b. Engineering/ Professional Service Firm Information:
Name: MSE Group, LLC
Address: 5858 S. Semoran Blvd.
City, State, Zip: Orlando, FL 32822
Telephone: (407) 629-8180
6.b. Name and Address of MWBE Subconsultant
Name: Please see attached
2.4%
14.0%
3.0%
3.6%
23.0%
Address: _________________________ _
City, State, Zip: _________________________ _
Telephone: _________________________ _
6.c. *Identity:
Work ltem(s):
Amount of Subcontract
Percent of Prime Contract (%):
I certify that the information included on this form and its attachment is correct Si_g_nature: Ede/is Molina Date: 10/26/21
for George I. Morning, Director of Small Business Development Department
• In Items 3.c. and 6.c. above specify the identity of MWBE Subcontractors and E/PS Firms (e.g. Black American, Hispanic American, Asian Subcontinent American, Asian Pacific American, Caucasfan Female American, Native American & Other)
MWBE Subcontractor/Subconsultant Certification
Project Name & Number: Request for Approval of an Addendum to the Continuing Environmental Engineering Services Agreement with
MSE Group, LLC to provide FY22 On-Call Baseline Environmental Impact Investigations (BEIi ) at the Orlando
International Airport.
Prime Firm: MSE Group, LLC
Addendum Amount: $50,000.00
Company Name Ambient Technologies, Inc. L & S Diversified, LLC
Address 4610 Central Avenue 405 Lake Howell Road, Suite 1001
City, State, Zip St. Petersburg, FL 33711 Maitland, FL 32751
Phone 727.209.2334 407-681-3836
Identity Hispanic American Asian Pacific American
Work Item Drilling Services Subsurface Utility/Survey Services
Amount of Subcontract $1,800.00 $1,200.00
Percentage 3.6% 2.4%
Company Name Southern Research Laboratories, Inc. RL Reed & Associates, Inc.
Address 2251 Lynx Lane, Suite 1 8901 Valencia Gardens Drive
City, State, Zip Orlando, FL 32804 Orlando, FL 32825
Phone 407.522.7100 321-303-9033
Identity Black American Caucasian Female American
Work Item Anal:ttical Services Hazardous material s testing
Amount of Subcontract I $7,000.00 I $1,500.00
Percentage 14.0% 3.0%
Company Name
Address
City, State, Zip
Phone
Identity
Work Item
Amount of Subcontract
Percentage
Company Name
Address
City, State, Zip
Phone
Identity
Work Item
Amount of Subcontract
Percentage
$11,500.00 23.0%
$50,000.00
Minutes of the Construction Committee Meeting, October 26, 2021 Page 9 of 10
Upon motion of Ms. Sharman, second by Mr. Gilliam, vote carried to approve a Job Order Construction Services Addendum to the Continuing Vertical Construction Services Agreement with Gomez Construction Company, for VS00018 South APM Skylight Panel Replacement, for the total amount of $42,550.10, which includes the lump sum amount of $38,374.10, and the not-to-exceed allowance amount of $4,176.00, with funding from previously-approved Operations and Maintenance Funds.
REQUEST FOR APPROVAL OF AN ADDENDUM TO THE CONTINUING PROGRAM AND PROJECT MANAGEMENT SERVICES (OAR PRIME ENTITY) AGREEMENT WITH GEOTECH CONSULTANTS INTERNATIONAL, INC. DBA GCI INC. TO PROVIDE CONSTRUCTION PHASE OAR SERVICES FOR V-S00018, SOUTH APM SKYLIGHT PANEL REPLACEMENT, AT THE ORLANDO INTERNATIONAL AIRPORT. 12. Mr. Pancoast presented the memorandum, dated October 26, 2021. Agenda Item Nos. 11 and 12 were considered in one motion. Discussion ensued .
Upon motion of Ms. Sharman, second by Mr. Gilliam, vote carried to approve an Addendum to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International, Inc. dba GCI Inc. to provide Construction Phase OAR Services for V-S00018 South APM Skylight Panel Replacement, for the total not-to-exceed fee amount of $2,601.00, with funding from previously-approved Operation and Maintenance Funds.
REQUEST FOR APPROVAL OF A NO COST AMENDMENT TO ADDENDUM NO. 96 TO THE CONTINUING PROGRAM AND PROJECT MANAGEMENT SERVICES (OAR PRIME ENTITY) AGREEMENT WITH GEOTECH CONSULTANTS INTERNATIONAL, INC. DBA GCI INC. FOR A NO COST TIME EXTENSION AND ADDITIONAL PROGRAM MANAGEMENT AND OVERSIGHT OAR SERVICES FOR W-00360, AIRSIDES 2 AND 4 APM SYSTEMS UPDATE OVERSIGHT SERVICES, AT THE ORLANDO INTERNATIONAL AIRPORT. 13. Mr. Johnson presented the memorandum, dated October 26, 2021 .
Upon motion of Mr. Gilliam, second by Mr. Pelletier, vote carried to approve a No Cost Amendment to Addendum No. 96 to the Continuing Program and Project Management Services (OAR Prime Entity) Agreement with Geotech Consultants International , Inc. dba GCI , Inc. for a No Cost Time Extension and Additional Program Management and Oversight Oar Services for W-00360, Airsides 2 and 4 APM Systems Update Oversight Services; there is no fiscal impact associated with this item.
REQUEST FOR APPROVAL OF AN ADDENDUM TO THE CONTINUING CIVIL ENGINEERING CONSULTANT SERVICES AGREEMENT WITH AVCON, INC. FOR LABORATORY ANALYSIS OF AIRFIELD PAVEMENT ASPHALT CORES IN RESPONSE TO A FUEL SPILL, AT THE ORLANDO INTERNATIONAL AIRPORT. 14. Mr. Sorondo presented the memorandum, dated October 26, 2021. Discussion ensued.
Upon motion of Mr. Hunt, second by Ms. Sharman , vote carried to approve an Addendum to the Continuing Civil Engineering Consultant Services Agreement with AVCON , Inc. for Laboratory Analysis of Airfield Pavement Asphalt Cores in response to a fuel spill, for the total amount of $54,182.00, which includes the lump sum fee amount of $2,704 .00, and the not-to-exceed expense amount of $51,478.00, with funding from previously-approved Operation and Maintenance Funds.
REQUEST FOR APPROVAL OF AN ADDENDUM TO THE CONTINUING ENVIRONMENTAL ENGINEERING SERVICES AGREEMENT WITH MSE GROUP, TO PROVIDE FY 2022 ON-CALL BASELINE ENVIRONMENTAL IMPACT INVESTIGATIONS (BEIi), AT THE ORLANDO INTERNATIONAL AIRPORT. 15. [A handout was presented, which included a Revised Office of Small Business Development Participation Memorandum.] Mr. Carrington presented the memorandum, dated October 26, 2021 . Discussion ensued.
Upon motion of Mr. Hunt, second by Mr. Pelletier, vote carried to approve an addendum to the continuing environmental engineering services agreement with MSE group, to provide FY 2022 on-call baseline environmental impact investigations (BEIi), for the total amount of $50,000.00, which includes the not-to-exceed fee amount of / $30,000.00, and the not-to-exceed expense amount of $20,000 .00, with funding from Operation and MaintenanceV Funds.