Tyrone Skinner Welder 2

4
RESUME OF TYRONE SKINNER Summary of Qualifications Structural Welder with 10 years of experience, with Tig and with Flux core Certified pipe welder stick, tig and flux core process Maintains a successful accident-free record OSHA-10 Experience Areotek Newport News Industrial 5/2015 to present Welder Commercial nuclear structural and pipe welding Fitting gussets Frontal plate stiffeners Once fitted in place usage of the correct welding process FCAW And GTAW The E91T1-GM-H4 FCAW AND ER100S-1 GTAW welding process would be used in completion of minimum and maximum weld size for gussets and strong back fit up Pipe welding with an 1/8 of an inch backing ring using the ER70S- 1 GTAW weld process Welding of pipe couplers using ER70S-3 GTAW Usage of air powered hand tool needle gun, angle grinder, pencil grinder, 90 die grinder, etc…. CTR Newport News Shipyard 4/2013 to 11/2015 Welder Applied appropriate welding techniques for structural fabrication Blueprint knowledgeable navy and commercial nuclear Welded sound barriers on navy carrier using SMAW and FCAW processes

Transcript of Tyrone Skinner Welder 2

Page 1: Tyrone Skinner Welder 2

RESUME OF TYRONE SKINNER

Summary of Qualifications Structural Welder with 10 years of experience, with Tig and with Flux core Certified pipe welder stick, tig and flux core process Maintains a successful accident-free record OSHA-10

Experience AreotekNewport News Industrial 5/2015 to presentWelder

Commercial nuclear structural and pipe welding Fitting gussets Frontal plate stiffeners Once fitted in place usage of the correct welding process FCAW And GTAW The E91T1-GM-H4 FCAW AND ER100S-1 GTAW welding process would be used in completion of

minimum and maximum weld size for gussets and strong back fit up Pipe welding with an 1/8 of an inch backing ring using the ER70S-1 GTAW weld process Welding of pipe couplers using ER70S-3 GTAW Usage of air powered hand tool needle gun, angle grinder, pencil grinder, 90 die grinder, etc….

CTRNewport News Shipyard 4/2013 to 11/2015Welder

Applied appropriate welding techniques for structural fabrication Blueprint knowledgeable navy and commercial nuclear Welded sound barriers on navy carrier using SMAW and FCAW processes Welded storage racks Using the mirror weld technique when in tough and tight positions Used backend ceramic to build welds when oversized gaps are presented Performed structural welding as per industry standards Stainless steel welding process Stick welding using 6010 7018 10718 Self-visional inspector level 1

Newport News Shipyard 9/2011 to 1/25/2013Structural welder

FCAW process using .045 wire. 2G, 3G and 4G positions. Structural weld wire way coaming Support beams and angles Using techniques such as mirror

welding Knowledge of preheat interpass plasma arc cutters Reading and interpreting drawings Welding of foundations to the deck bulkheads and overheads Stick welding using 7018 11018 309L 10718Usages of welding techniques to complete the job

Page 2: Tyrone Skinner Welder 2

Working with various types of metals HSLA 65,100, hy 80 100 etc… Utilized various hand tools and power tools Fabrication of metal to assemble

BAE Systems 10/5/2010 to 5/6/2011Welder

Operated a grinder passing a structural welding test Usage of torch Stick welding using 7018 11018 309L 10718 Used air powered/electric Applied appropriate welding techniques for structural fabrication Deck removal and replacement Foundation installment with welding processes flux and stick Interpretation of blueprint Knowledgeable welding symbols aluminum TIG welding to install foundation upon navy battle

ship vessels

Northrop Grumman 4/20/2010 to 5/25/2010Welder

Usage of torch Ability to read drawings and/ or blueprints Weld fabricated and assembled foundation using 7018 11018 10718 using 3/32 and 1/8 rods

overhead, vertical, and horizontal welding making up teebar to deck and bulk heads Repaired small holes and, or cracks by tig welding reading blue-prints Welding symbol

knowledge Structural welder for the sheet metal department

Northrop Grumman 7/09 to 1/22/10 Welder/Fitter Newport News, Va

Assembling foundations from blue prints/drawing Measuring, cutting materials. Welding, layout, interpret drawings for metal fabrication,

installations for repair and upgrades on marine vessels Fabricates by cutting, burning, and welding various metals Stick welding using 6010 7018 10718 Using power tools mig/tig welding thin and thick gauge

material gas torch usage to remove old existing plate and cutting for new material

Northrop Grumman 4/7/08 to 8/13/08 Welder/Fitter

Reading blue prints stick welding 7018 10718 6010 Installation of bulkheads doing flux core welding .035 .045 Assembling foundation together Putting up false bulkheads Structural weld stainless water tight deck coaming using 309L Mig/Tig

welding carbon Tig/Heli-arc welding on carbon steel

Page 3: Tyrone Skinner Welder 2

Northrop Grumman 6/13/06 to 3/17/08

Welder/Fitter

Usage of the SMAW stick welding processes 6010, 10718, 7018, 309L, 316L Used Tig welding to complete aluminum-based jobs storage and clothing lockers for the navy,

flux core butts tee beveled fillet welds butts Weld deck inserts using the ceramic taping technique Have experience in the use of a hand torch Reading blue prints Tack welding, using power and air tools Coming up with the right

measurements to each of the jobs

Education Franklin Senior High School, Franklin, L, St. Mary Parish 2001 to 2005DiplomaNew Horizons, Hampton, Va Apprenticeship and Adult Training Certification Tig, Mig, and FluxcoreThomas Nelson, Hampton, Va Pipe welding