    TYPES OF CONSTRUCTIONM CHINERY

  • 8/13/2019 Types of Construction Machinery 2

    2/66

    FOLLOWING ARE THE

    MAJOR TYPES OF EQUIPMENTS

    THAT IS BEING USED IN THECONSTRUCTION INDUSTRY

  • 8/13/2019 Types of Construction Machinery 2

    3/66

    Construction Equipment

    Management (operations) It plays significant role in execution of modern high cost time

    bound construction projects.

    Present time construction equipment in construction work it has

    become an indispensable item of resources.

    It produces output at an accelerated speed, and completion of

    task in limited time.

    Equipment saves manpower which is becoming scarce, costly

    and more demanding day by day.

    It improves productivity, quality, and safety.

    Equipment planning means to identify the constructionequipment for execution of project task. It needs

    1. Assessing performance capability

    2. Assessing date wise requirement numbers and type of

    equipment, and finally participating in the selection of equipment

    to be required.

  • 8/13/2019 Types of Construction Machinery 2

    4/66

    While submitting their bits and even for monitoring outputof equipment requires the data in respect of variouselements of cost constituting owning and operating costas wells the output.

    Proper selection of equipment timely requirement andgetting in time repair and good maintenance will improveworkability, intern production and timely completionprojects.

    Data of equipment is required for generally used inconstruction project which is helpful to

    1. Engineers2. Quantity surveyors3. Builders.

    Today machines are used in every field and every stageof construction.

    Reduction in cost of construction has become the centraltheme to survive and grow in construction business.Therefore wherever machines save the cost in laboring

    give superior finish in all such works machines are beingem lo ed.

  • 8/13/2019 Types of Construction Machinery 2

    5/66

    Cost Parameter of Time

    Rupee today is more worth than tomorrow.Inflation reduces value of money over time.

    Large projects and heavy cost is undertaken after

    a careful calculating its cost over a completion

    time. Large projects two to ten years duration. If

    the project is not completed during this period the

    cost due to inflation becomes so high that the

    project may run into investment crunch and thus

    the whole investment may go waste. Thus the

    strict time restriction in which huge output of

    construction is to be achieved make the use of

    machine inevitable.

  • 8/13/2019 Types of Construction Machinery 2

    6/66

    Infrastructure development is the key to thedevelopment of the nation .Immediately after

    independence; India has embarked upon a

    massive Programmes of development.

    Infrastructure development involves movement oflarge amount of construction materials in short

    time as well as shifting heavy loads. Manual

    labour has many limitations and use of machines

    facilities undertaking and completing largehazardousworks in a given time frame, machines

    also become financially advantageous at certain

    magnitude of work.

  • 8/13/2019 Types of Construction Machinery 2

    7/66

    The various construction tasks which can be performedwith equipments includes

    1. Surveying2. Excavation3. Hauling4. Transportation5. Compaction6. Grading7. Hoisting8. concreting9. Pre-casting

    10. Plastering, Finishing, Trenching, Pipe laying, Cable layingetc.

    Support equipments at Project site such as Generators,Pumping sets, Treatment Plants, and other utility serviceequipments etc.

  • 8/13/2019 Types of Construction Machinery 2

    8/66

    In the construction equipment one should know1. Classification of major equipment.

    2. Earth factor in earth work

    3. Earth excavating equipment

    4. Earth cutting and hauling equipment

    5. Earth compaction and grading

    6. Concreting Plant &Equipment.

    7. Cranes for material handling.

  • 8/13/2019 Types of Construction Machinery 2

    9/66

    STAGE TYPE OF WORK MACHINERIES

    PRELIMENARY SITE

    DEVELOPMENT

    FOUNDATION

    SUPER STRUCTURE

    WATERBODIES

    MANAGEMENT,FINISHING

    TUNNELINING CANALS

    TUNNELING CANALS

    ROAD MAKING,

    ASPHALTING

    EARTH MOVING

    EXCAVATING , GRABBING

    ,CLEARANCE

    SHORT TRANSPORTATION

    OF SOIL

    LONG TANSPORTATION

    COMPACTING,

    EXCAVATING LOADING

    DIGGING

    DEWATERING

    ROCK BREAKINGCONCREATING

    MATERIAL HANDLING

    PLASTERING

    STONE CUTTING

    DRILLING, DIGGING

    EARTH MOVING

    CONSTRUCTION OF

    PAVEMENT

    SURFACE FINISHING

    DOZERS TRACK OR

    WHEELED

    SCRAPPERS

    DUMPERS , TIPPERS

    HEAVY ROLERS

    SHEEP FOOT ROLLERS

    VIBRATING ROLLERS

    COMPACTING MACHINE

    PUMPS

    POWE HAMMERSCOMPOSITE MACHINES

    PNEUMATIC TOOLS

    MIXERS,CONVAYOR

    BELTS,AGITATORS,

    VIBRATORS

    TOWER CRANES,

    MOBILE CRANES

    PLASTERING MACHINES

    POWER SAWS

    AIR COMPRESSORS,

    EXCAVATORS, BACK HOE,

    MOTER GRADERS, PAVERS

    HOT MIXER PLANT

  • 8/13/2019 Types of Construction Machinery 2

    10/66

    DOZER TRACK

  • 8/13/2019 Types of Construction Machinery 2

    11/66

  • 8/13/2019 Types of Construction Machinery 2

    12/66

    SCRAPER

  • 8/13/2019 Types of Construction Machinery 2

    13/66

    DUMPER

  • 8/13/2019 Types of Construction Machinery 2

    14/66

    TIPPER

  • 8/13/2019 Types of Construction Machinery 2

    15/66

    HEAVY ROLLER SHEEP FOOT ROLLER

    VIBRATING ROLLER

  • 8/13/2019 Types of Construction Machinery 2

    16/66

    POWER HAMMER

  • 8/13/2019 Types of Construction Machinery 2

    17/66

    PNEUMATIC TOOLS

  • 8/13/2019 Types of Construction Machinery 2

    18/66

    MIXER , CONVEYOR BELT

  • 8/13/2019 Types of Construction Machinery 2

    19/66

    CONVEYOR BELT

  • 8/13/2019 Types of Construction Machinery 2

    20/66

    PRIMARY EARTH EXCAVATING EQUIPMENTS ARE THE TRACTOR MOUNTED

    EXCAVATORS .IT OPERATES ON STATIONARY

    MOOD .THEY DUMP EXCAVATED MATERIALS

    ON THE SIDES OR DIRECTILY INTO THEWAITING TIPPERS /DUMP TRACK THEY

    GRADUALLY MOVE THE POSITION

    AS THE WORK PROGRESS

  • 8/13/2019 Types of Construction Machinery 2

    21/66

    FACE SHAVELS

    IT OPERATES FROM A FLAT

    SURFACE,PRODUCING UPWORD DIGGINGACTION ,EXCAVATING AND FILLING THE

    BUCKET AS IT CLIMBES.AFTER THE BUCKETFILLED ITS UPPER PART SWING S TO THEDUMPING POSITION WHER THE BUCKETEMPTIED IN A WAITING TRUCK. THERE AFTER ITRETURNS TO ITS ORIGINAL POSITION AND

    STARTS THE NEXT CYCLE OF EXCAVATION .BUCKET CAPACITY VARIES FROM 0.3M3 TO3.25M3 AND ITS CUTTING LENGTH VARIESFROM 7M TO 10.5M

  • 8/13/2019 Types of Construction Machinery 2

    22/66

    FACE SHOVEL

  • 8/13/2019 Types of Construction Machinery 2

    23/66

    BACK HOE OR EXCAVATORS

    IT IS PRIMARILY USED FOR EXCAVATING

    BELOW ITS TRACK LEVELS BACK HOE ARE

    GENERALLY TRACK MOUNTED BUT SMALL

    CAPACITY EQUIPMENT HAVE WHEEL MOUNTEDTO ADD TO THEIR MOBILITY

    BUCKETS HAVING STRUCK CAPACITY 0.38 M3

    TO 3.25M3 CAPABILITY OF DIGGING DEPTH

    FROM 5M TO 9.5 M .

  • 8/13/2019 Types of Construction Machinery 2

    24/66

    BACK HOE

  • 8/13/2019 Types of Construction Machinery 2

    25/66

    EARTH EXCAVATING AND FITTING

    EQUIPMENT

    TYPE OFEQUIPMENT FEATURE BUCKET STRUCKCAPACITY

    1. FACE SHOVEL MAXIMUM CUTTINGHt(M)

    IDEAL OUTPUT /Hr

    (LOOSE , EASY

    DIGGING)

    7.0 7.0 7.0 7.5 8.510.

    60 90 120 180 220

    300

    2. BACK HOE OR

    EXCAVATER

    MAXIMUM DIGGING

    DEPTH (M)

    IDEAL OUTPUT / HR

    5.0 6.5 7.5 8.0 9.0

    9.0

    48 72 96 144 176

    240

    BUCKET SIZE 0.38 0.57 0.76 1.14 1.53 2.30

    ENGINE HP 50 75 100 130 160 200

  • 8/13/2019 Types of Construction Machinery 2

    26/66

    OUTPUT PLANNING DATA

    PLANNED OUTPUT = IDEAL OUTPUT *CORRECTION FACTOR * PERFORMANCE

    FACTOR

    IDEAL OUTPUT = BUCKET OUTPUT/CYCLE*

    NO OF CYCLES/HR

    BUCKET OUTPUT /CYCLE = BUCKET STRUCK

    CAPACITY

    NO OF CYCLES = 60/EACH CYCLE TIME INMIN

  • 8/13/2019 Types of Construction Machinery 2

    27/66

    CORRECTION FACTOROUTPUT ADJUSTMENT FACTOR FOR SECONDARY TASK

    EQUIPMENT NATURE OF SECONDARYTASK

    TASK n

    SHOVEL MOVEMENT FROM

    EXCAVATING

    PLACE TO MALVADING PLACE

    TASK n

    1.WITHIN VICINITY 1.0

    2. LITTLE MOVEMENT 0.6 TO 0.9

    3. APPRECIABLE MOVEMENT 0.4 TO 0.6

    BACK HOE

    TRENCHING

    1. EQUAL TO BUCKET WIDTH 1.0

    2. MORE THAN BUCKET WIDTH

    WIDTH

    0.7 TO 0.9

  • 8/13/2019 Types of Construction Machinery 2

    28/66

    CORRECTION FACTOR

    EQUIPMENT FACTOR

    MULTIPLIES

    FACE SHOVEL 1.00

    BACK HOE 0.80

    SOIL DIGGING

    FACTORDIGGING EFFORT FACTORMULTIPLIES

    EASY DIGGING 1.00

    MEDIUM DIGGING 0.85

  • 8/13/2019 Types of Construction Machinery 2

    29/66

    SWING FACTOR

    ANGLE OFSWING

    45 60 75 90 120 150 180

    FACTOR VALUE 1.2 1.16 1.07 1.0 0.88 0.79 0.71

    LOAD CASTING FACTOR

    METHOD OF CASTING FACTOR MULTIPLIES

    OPEN AREA RESTRICTED AREA

    SIDE CASTING 1.0 0.8

    LOADING IN VEHICLE 0.8 0.6

  • 8/13/2019 Types of Construction Machinery 2

    30/66

    EXAMPLE

    ESTIMATE THE HOURLY PRODUCTION IN BULK

    VOL (CCM) OF A BACK HOE WITH BUCKETCAPACITY OF 0.96cum EMPLOYED ON

    EXCAVATION OF A FOUNDATIN FOUR METRES

    DEEP IN HARD DIGGING SOIL . THE EXCAVATED

    EARTH IS TO BE LOADED IN WAILING DUMPTRACKS PLACED AT A SWING ANGLE OF 75 .

    THE EXPECTED PERFORMANCE IS 83%

    IDEAL OUTPUT ASSUMED150 CUBIC M/HR

    BACKHOE OUTPUT USING EQUIPMT

    CONVERSION = A* 0.8

  • 8/13/2019 Types of Construction Machinery 2

    31/66

    CORRECTION FACTOR

    SOIL FACTOR FOR HARD DIGGING - 0.67

    FOOD FACTOR FOR LOADING INTO VEHICLE -

    0.87

    SWING FACTOR FOR 75 - 1.05

    CORRECTION FACTOR = 0.67*0.87*1.05 = 0.56 PERFORMANCY n = 0.83

    HENCE EXPECTED OUTPUT

    = IDEAL OUTPUT * CORRECTION FACTOR *

    PERFORMANCE n

    = 150*0.8*0.56*0.83

    = 56 cubm/hr

  • 8/13/2019 Types of Construction Machinery 2

    32/66

    HAULING EQUIPMENT

    REAR DUMPER TIPPER AND REAR DUMPERTRICULOR AS HIGH WAY HAULING

    GENERALLY FRONT END LOADERS AND

    EXCAVATORS ARE USED TO LOAD TIPPERS

    AND DUMPERS

    THE NO OF HAULAGE VEHICLE REQUIRED

    = 1 + CYCLE TIME / TRIP OF

    VEHICLE/LOAD FILLING TIME OF VEHICLE

  • 8/13/2019 Types of Construction Machinery 2

    33/66

    HAULING EQUIPMENT

  • 8/13/2019 Types of Construction Machinery 2

    34/66

    PROBLEM

    CONSTRUCTION OF A MILITARY HELIPAD AT AN

    ATTITUDE OF 2400 m INVOLVES 80,000 CUBM(LOOSE) OF AREA EXCAVATION OF SOFT SOIL . THETASK IS TO BE COMPLETED IN 200 WORKING HRS .THE COMPANY ENTRUSTED WITH THE EXECUTIONOF THE TASK HAS TOO DOZER EACH WITH AN

    OUTPUT OF 220CUBM/HR UNDER JOB CONDITION. IT ALSO HOLDS WHEELAND 22 CUBM DUMP

    TRUCKS ONE LOADER CAN LOAD IN TRUCKS BOUT120CUBM OF EXCAVATED SOIL/Hr

    THE DUMP TRUCK CYCLE TIME FOR DISPOSED OFEXCAVATED MATERIALS IN 35 MINUTES .

    THIS INCLUDES 7 MINUTES OF LOADING TIME BY ALOADER TEAM CONSISTING OF 2 LOADERS

  • 8/13/2019 Types of Construction Machinery 2

    35/66

    ESTIMATE THE OUTPUT OF FRONT ENDLOADER FOR LOADING EXCAVATED SOIL

    HEAP INTO DUMP TRUCKS AND DETERMINE

    APPROXIMATELY THE NO OF DOZERS ,

    LOADERS AND DUMPERS REQUIRED TOCOMPLTE THE TASK ON TIME

  • 8/13/2019 Types of Construction Machinery 2

    36/66

    ATTITUDE AT HEIGHT OF 2400 cm

    THE SOIL REQUIRED FOR HELIPAD IS 80888 CUBcm TIME PERIOD OF COMPLETION200 HRS

    MACHINERIES USED DOZERS - 2NOS

    OUTPUT OF EACH DOZER IS 220CUBM/HR

    ALSO WHEEL LOADER MACHINE IS USED CAPACITY OF EACH BUCKET IS 22CUBM

    WHEEL LOADER OUTPUT/HR120CUBM/HR

    EACH CYCLE TIME OF DUMP TRUCK35 MIN

    TIME OF FRONT END LOADER ? NO OF DOERS , LOADERS ,DUMPER?

  • 8/13/2019 Types of Construction Machinery 2

    37/66

    NOW OUTPUT/HR OF EACH DOZER 220CUBM/HR

    TOTAL WORKING HR OF EACH DOZER200

    OUTPUT = 220 * 200 = 44000 CUBM EXCAVATION QUANTITY = 80000CUBM

    NO OF DOZERS = 80000/44000 = 1.8

    i.e 2 DOZER

  • 8/13/2019 Types of Construction Machinery 2

    38/66

    LOADERS REQUIRED = EXCAVATION /HR BYDOZERS/ LOADER OUTPUT /HR

    = NO OF DOZERS*DOZEROUTPUT/HR

    LOADER OUTPUT /HR

    = 2*220/120 = 4 LOADERS

    1 DOZER = 2 LOADER (1 TEAM)

    2 TEAMS

  • 8/13/2019 Types of Construction Machinery 2

    39/66

    DUMPERS REQUIRED FOR EACH LOAD OFTEAM = 1 + DUMPER CYCLE TIME

    LOADING TIME

    = 1+ 35/7

    = 1+5 = 6

    TOTAL DUMPERS REQUIRED = 6*2 = 12

  • 8/13/2019 Types of Construction Machinery 2

    40/66

    LOADER

    FRONT END WHEEL LOADER AREGENERALLY AVAILABLE AND THEY ARE

    EQUIPPED WITH A FRONT MOUNTED

    GENERAL PURPOSE BUCKET EACH

    TRANSPORTER FOR SHORT DISTANCE IT IS AVAILABLE AS WHEEL MOUNTED AND

    TRACK MOUNTED

    IT CAN SPREAD AND COMPACT THE FILLING

    MATERIAL

  • 8/13/2019 Types of Construction Machinery 2

    41/66

    OUTPUT DATA

    THE OUTPUT DEPENDS UPON THE SIZE OFBUCKET AND HP OF ENGINE

    BUCKET CAPACITY ARE SPECIFIED BY THEMANUFACTURER EITHER IN TERMS OF

    HEAPED CAPACITY OR STRUCK CAPACITY PLANNING IN MODE ON LOOSE SOIL STRUCK

    CAPACITY OF THE BUCKET

    HEAPED CAPACITY IS CONVERTED TO

    STRUCK CAPACITY BUCKET CAPACITY = BUCKET HEAPED

    CAPACITY * FILL FACTOR

  • 8/13/2019 Types of Construction Machinery 2

    42/66

    FILL FACTOR

    NATURE OF SOIL BUCKET FILLFACTOR

    COMMON EARTH 0.95

    SAND AND GRAVEL 0.95

    HARD CLAY 0.80

    BLASTED ROCK 0.70

  • 8/13/2019 Types of Construction Machinery 2

    43/66

    BULL DOZER

    IT IS ONE OF THE HEAVY EARTH MOVINGMACHINERY USED FOR , IT COME UNDER

    EARTH CUTTING AND HAULING EQUIP.

    1.DITCHING

    2.GRUBBING

    3.STUMPING

    4.PIONEERING

    5.STRIPPING 6.MOVING AND LEVELLING

  • 8/13/2019 Types of Construction Machinery 2

    44/66

    BULL DOZER

    IT IS TO CUT AND SHIFT EARTH FROM ONEPLACE TO OTHER . THEY ARE AVAILABLE WITH

    DIFFERENT TYPES OF BLADES

    IT IS A VERSATILE MACHINE

    BULL DOZER IS USED TO MOVE EARTH UPTO100m EXCAVATING TO A SHALLOW DEPTH OF

    200m AT A TIME

    OTHER TYPES OF EARTH CUTTING AND

    HAULING EQUIP 1.FRONT END LOADER

    2.TOWED SCRAPER

    3.MOTORISED SCRAPER

  • 8/13/2019 Types of Construction Machinery 2

    45/66

    BULL DOZER

  • 8/13/2019 Types of Construction Machinery 2

    46/66

    IT COMES UNDER DIFFERENT TYPES OFBLADES(4NO)

    S BLADE STRAIGHT USED FOR FORWARD

    PUSHING OF EARTH

    U BLADE IT HAS LARGE CAPACITY AND IS

    USED FOR PUSHING LOOSE MATERIAL

    ANGLE A BLADE FOR PUSHING SOIL TO

    ONE SIDE , IT IS REQUIRED IN HILL ROAD

    FORMATION CUTTING

    P BLADE FOR PUSH LOADING A SCRAPPER

  • 8/13/2019 Types of Construction Machinery 2

    47/66

    BULL DOZER OUTPUTDOZER OPTIMUM OUTPUT = DOZER IDEAL OUTPUT *

    CORRECTION FACTOR

    DOZER PLANNING DATA = DOZER OPTIMUM OUTPUT *

    PERFORMANCE FACTORS

    NOW CORRECTION FACTORS DEPENDS ON THE FOLLOWING FACTOR

    1 . BLADE FACTOR S 1.00

    A 0.75

    U 1.25

    2. TRANSMISSION FACTOR - 80% OF IDEAL OUTPUT

  • 8/13/2019 Types of Construction Machinery 2

    48/66

    3.GRADE FACTOR - AS PER SLOPEFOR PLANNING PURPOSE IT CAN BE TAKEN

    AS

    4. SOIL FACTOR

    DOWN HILL +2.5 * GRADE %

    UP HILL -2 * GRADE %

    DIGGING EFFORT NATURE OF SOIL SOIL FACTOR

    EASY DIG SAND,GRAVEL 1.0

    MEDIUM DIG COMMON EARTH INNATURAL STATE

    0.85

    HARD DIG HARD STUFF CLAY ,

    SOFT ROCK

    0.67

  • 8/13/2019 Types of Construction Machinery 2

    49/66

    5.SWING FACTORIN PLACE (OR BANK) VOLUME =

    BULK VOL

    SWELL FACTOR

    FLY WHEEL HP ONE WAY HAUL DISTANCE IN METRES

    15M 30M 45M 60M

    60 -75 220 115 78 73

    75 - 125 375 195 132 123

    125 - 200 514 266 180 169

    200 275 705 350 246 229

  • 8/13/2019 Types of Construction Machinery 2

    50/66

    EXAMPLE

    DETERMINE THE OUTPUT OF A BULL DOZERHAVING 215 HP ENGINE FILLED WITH AGRADE RATEDCAPACITY 4.40CUBM

    THE DOZER IS EMPLOYED FOR EXCAVATING

    A HARD CLAYED AREA WITH AVERAGEHAULAGE OF 50M ON A GROUND WITHDOWN SLOPE OF 10% .IT HAS A DIRECTDRIVE TRANSMISSION AND ITS EXPECTEDPERFORMANCE IN 50MIN/HR

    SOLUTION

    OUTPUT/HR = IDEALOUTPUT/HR*CORRECTION FACTOR *PERFORMANCE FACTOR

  • 8/13/2019 Types of Construction Machinery 2

    51/66

    1. IDEAL OUTPUT/HR FOR 50M HAULAGE OF 215 HPDOZER WITH S BLADE OF CAPACITY 4.4CUBM =200CUBM/HR

    2. CORRECTION FACTOR APPLICABLE

    SOIL FACTOR FOR HARD DIGGING= 0.67

    BLADE FACTOR FOR ABLADE = 0.65

    GRADE FACTOR FOR 10% DOWN GRADE ASSISTANCE = 1+2.5 * 10% = 1.25

    TRANSMISSION FACTOR FOR DIRECT DRIVE0.8

    SWELLING FACTOR OF CLAYED SOIL1.3

    LOOSE VOL

    BANK VOL = 1/1.3CORRECTION FACTOR = 0.67*0.65*1.25*0.8*0.4355*1/1.3=

    0.335

    PERFORMANCE FACTOR FOR 50MIN/HR = 0.83

    OUTPUT = 200 *0.83*0.335 = 55.61CUBM/HR

  • 8/13/2019 Types of Construction Machinery 2

    52/66

    COMPACTING EQUIPMENT

    TYPES OF COMPACTING EQUIPMENTSMOOTH DRUM VIBRATION , PADDED , DUAL

    DRUM ASPHALT

    NOW PRODUCTION OF SPREADING

    EQUIPMENT

    TIME FOR COMPLETING JOB:

    NO OF PASSES *DISTANCE IN Km

    AVG SPEED IN Km/Hr * n FACTOR

  • 8/13/2019 Types of Construction Machinery 2

    53/66

    COMPACTING EQUIPMENT

  • 8/13/2019 Types of Construction Machinery 2

    54/66

    EQUIPMENT PRODUCTION DEPENDS ON THECOMPACTED THICKNESS OF MATERIAL

    AVERAGE SPEED

    FLY WHEEL POWER

    WEIGHT OF OPERATING

    FREQUENCY OF VIBRATION

  • 8/13/2019 Types of Construction Machinery 2

    55/66

    COMPACTED SOIL /SUB BASE /ASPHALTICCONCRETE IMCUBM/HR

    = W*S*L*0.83

    P

    W= EFFECTIVE ROLLING WITH WIDTH OF COMPACTION (M)

    S= AVERAGE SPEED OF COMPACTION (M/HR)

    L = COMPACTED THICKNESS OF THE MATERIAL

    P= NO OF PASSES REQD TO ACHIEVE DESIREDCOMPACTION ( DEPENDS UPON WEIGHT AND TYPE OFCOMPACTIONAND THE REQD DENSITY TO ACHIEVE)

    WHILE SELECTING THE ROLLER OR WIDTH IN RELATION

    TO WIDTH OF THE LAYDOWN LANE TO BE TAKEN INTOCONSIDERATION

    NO OF PASSES DEPEND UPON WEIGHT AND TYPE OF THECOMPACTER AND THE REQUIREMENT OF DENSITY TO BE

    ACHEIVED

  • 8/13/2019 Types of Construction Machinery 2

    56/66

    CRANES AND HOISTS

    CRANES ARE HOISTING DEVICES AND THEYARE USED FOR LIFTING MATERIAL/

    EQUIPMENTS MACHINERY

    BASICALLY THEY ARE OF TWO TYPES OF

    CRANES

    1. MOBILE CRANES

    2.TOWER CRANES

  • 8/13/2019 Types of Construction Machinery 2

    57/66

    MOBILE CRANES ARE THE BEST MEANS FORLIFTING AND SHIFTING OF SMALL TO HEAVYLOADS. THEY ARE OF THREE TYPES

    1.GRAWLER MOUNTED CRANES

    2. SELF PROPELLED RUBBER TYREDWHEELS CRANE

    3. TRUCK MOUNTED

    TOWER CRANES

    1.STATIONARY CRANES 2.TRAVELLING CRANES

    3.CLIMBING CRANES

    MOBILE CRANE TOWER

  • 8/13/2019 Types of Construction Machinery 2

    58/66

    MOBILE CRANE TOWER

    CRANE

  • 8/13/2019 Types of Construction Machinery 2

    59/66

    ESTIMATING CRANE OUTPUT

    CAPACITY TO HANDLE LOAD = GRA=OVEOUTPUT/HR= LOAD/CYCLE* CYCLES/HR

    TO REFER MACHINERY MANUAL FOR

    LOAD/CYCLE AND CYCLES/HR

  • 8/13/2019 Types of Construction Machinery 2

    60/66

  • 8/13/2019 Types of Construction Machinery 2

    61/66

    TOTAL CYCLE / TIME

    :.n = 44 min/hr AND SHIFTING AT 5 TONSLOAD IN EACH CYCLE

    5 TON LOADS * CYCLES IN ONE HOUR (OF

    44 MIN)

    44 * 5

    11

    = 20 TON/HR

  • 8/13/2019 Types of Construction Machinery 2

    62/66

    METHOD OF COMPUTING OWNING AND

    OPERATING COST OF AN EQUIPMENT

    TO GET COST OF EQUP/HR , TOUNDERSTAND OWNING AND OPERATING

    COST

    EQPTLOADER : - FLYWHEEL POWER

    112HPPAYLOAD = 2722kg

    (A)COST AT SITE FOR 1.53 CUBM (FOR

    EARTH)

    Rs 1500000 .00

    LESS TYRE REPLACEMENT COST Rs. 40000 . 00

    LANDED PRICE LESS COST OF TYRES Rs. 1460000 . 00

    LESS : RESALE VALUE : Rs . 150 000 . 00

  • 8/13/2019 Types of Construction Machinery 2

    63/66

    (B) NET VALUE FOR DEPRECIATION :

    Rs 1310000.00

    (C) OWNING COST

    1. DEPRECIATION : NET DEPRECIATION VALUE

    LIFE IN HRS

    = 1310000.00 = Rs 81.88 HR

    16000ASSUMING ANNUAL USE IN HRS = 16000 HRS

    INTEREST @ 12% AND INSURANCE @ 1%LANDED PRICE * % INVESTMENT = TOTAL

    ANNUAL RATEANNUAL USE IN HRS

    = RS.67,03/HR

  • 8/13/2019 Types of Construction Machinery 2

    64/66

    REPAIR COST

    REPAIR COST TYRES: REPLACEMENT COST = 40000

    ESTIMATED LIFE 3200

    = Rs 12.50

    NORMAL REPAIR = 90% OF LANDED COSTTYRECOST

    TOTAL HOUR

    = 0.9 * 150000040000 = Rs 81.88/hr16000