Tyler Hopwood Design and Architecture Portfolio

47
TYLER DEE HOPWOOD DESIGN AND ARCHITECTURE

description

A compilation of my design and architecture work to date.

Transcript of Tyler Hopwood Design and Architecture Portfolio

TYLERDEE HOPWOODDESIGN AND ARCHITECTURE

2

PORTFOLIO CONTENTSPERSONAL

Resume 3

ARCHITECTURAL PROJECTS

Urban Visions: The Elevated City Grid 4 Chicago Wellness and Community Center 10

Palazzo Della Rountunda 18

Oak Park Public Market 24

Judson University Lindner Connection 32

Jerry’s Cafe 38

GRAPHIC DESIGN AND SKETCHES

Helvetica Icons 41

The Village Pedaler: Rebrand 42

NCARB Lecture Poster 43

Jerry’s Cafe Rebrand 44

European Study Tour 46

”Before you act, listen. Before you react, think. Before you spend, earn. Before you criticize, wait. Before you pray, forgive. Before you quit, try.” -Ernest Hemingway

32

TYLER HOPWOODARCHITECT AND DESIGNER

OBJECTIVE In whatever I do, I will give one hundred percent, pushing myself to

continue to learn more, and following the example of those with more

experience than I in the fields of graphic design and architecture.

EDUCATION Bachelor of Arts in architectural studies at Judson University

Fall 2008- Spring 2012. School of Art, Design, and Arcitecture

European Study Tour

May 2011; Studied in Italy, Spain, and France

Wheaton Academy

Fall 2006-Fall 2008, Private school in West Chicago, IL

INVOLVEMENT Residential Assistant at Judson University & SERVICE August 2010- May 2012. Assisted in the spiritual, physical, and mental

wellness of freshmen at Judson University’s dorm, Wilson Hall

Camp Counselor at Camp Harvest

Summer 2010. Spiritual Leader and mentor of freshmen high school boys

Small Group Leader at Judson University

September 2009-May 2012. Facilitated a small group of men in the

development of their spiritual and social lives

Pure Pressure at Harvest Bible Chapel

September 2005- June 2008. Part of high school youth group

leadership team in charge of event planning, announcements, and

community building.

ACHIEVEMENTS National Honors Society

Wheaton Acadeny 2008

Presidential Award

Wheaton Academy 2008

SKILLS Adobe Suite (Photoshop, Illustrator, InDesign) expert

Google Sketchup expert

Kerkythea Rendering intermediate

Rhino 4/Grasshopper beginner

Autocad 2012 expert

Maya beginner

Revit 2012 beginner

After Effects beginner

Manual Drafting

Physical Model Building

Presentation skills

Photography

EMPLOYMENT BLC Remodeling

June 2007-August 2009. Assisted with Carpentry, electrical, plumbing

and foundation work

American Eagle Outfitters

April-August 2008. Cashier and Sales Associate

Harvest Bible Chapel Building Services Operator

September 2008-2010. In charge of building maintenance, event

planning and security

MCHC Renders

2011-present. Cofounder. Architectural digital rendering and modeling

REFERENCES Professor Ian Hoffman Professor of Architecture Judson University [email protected] 847-628-1014

Ronnie Follett Residential Director Judson University [email protected] 848-912-7065

[email protected]

4

SPRING SEMESTER, SENIOR YEAR (2012)

TYPE mixed use high rise

SIZE 100,000 sq. ft.

LOCATION Eisenhower Expressway, Illinois

DURATION twelve weeks

INSTRUCTOR Professor Sean Gallagher

URBAN VISIONS THE ELEVATEDCITY GRID

54

6

PROJECT DESCRIPTION

Urban Visions is a prototypical project based over a highway. The site chosen could also be a prototypical site or one specific to a certain area. The site chosen for this project is specific. Located at Western Ave and I290, the high rise would act as a gateway to the city. In order to identify with the city, I used the idea of the city grid, specifically Chicago’s. Thus the idea of the vertical city grid was created.

The specific site was chosen due to its proximity to Chicago, its accessibility of and on the highway, and its proximity to mass transit (CTA “L”). However the site was not pedestrian friendly. My goal is to therefore create green space on the ground level and also along Western Ave. to promote more pedestrian traffic in a safer environment.

This project is a comprehensive project, in which we must integrate life safety, HVAC, electrical, sustainable elements, ideas on structure, etc, into the design. While my building is conceptual in nature, I am still able to incorporate everything necessary in order to make this a safe, sustainable, and buildable building.

Throughout this project, I began to understand all the different elements that must go into the building. I also began to learn how to bring conceptual design and work it into a realistic and buildable level, while still maintaining my original ideas. Overall this project prepared me for the reality of architecture and all that it involves.

[SITE ANALYSIS & BUILDING CONCEPT]

pedestrian inhibitors

circulation from highway

CTA mass transit line

1. extrusion of city grid 2. crucial business blocks 3. crucial residential blocks 4. “structural” streets 5. vertical extrusion of residential & business blocks

6. vertical extrusion of structural streets

retail conference open office

fitness center residential green space

main atrium mechanical rooms vertical structure

elevator shafts stair cores parking

76

[ELEVATIONS AND SECTIONS]

WEST ELEVATION

SOUTH ELEVATION CROSS SECTION (VIEWING EAST)

8

[PLANS AND SUSTAINABLE FEATURES]

GROUND FLOOR (RETAIL & MECHANICAL)

FIFTH FLOOR (OPEN OFFICE)

NINTH FLOOR (RESIDENTIAL)

life safety: sprinkler layout

electrical: lighting layout

HVAC: heating and cooling

sustainability: daylighting

sustainability: ventilation

winter sun @ 27°

summer sun @ 27°

natural ventilation

98

summer @ 9am summer @ 12pm summer @ 3pm fall @ 9am fall @ 12pm fall @ 3pm winter @ 9am winter @ 12pm winter @ 3pm

ENTRY PERSPECTIVE BIRDSEYE VIEW

[SUN STUDY AND IMAGERY]

10

FALL SEMESTER, SENIOR YEAR (2011)

TYPE mixed use community center

SIZE 42.,000 sq. ft.

LOCATION South Chicago, Illinois

DURATION eight weeks

INSTRUCTOR Professor Keelan Kaiser

CHICAGO COMMUNITY WELLNESSCENTER

1110

12

[SITE ANALYSIS]

Upon doing site analysis I came to the conclusion that I wanted to preserve the natural views and block out views to the street. The lack of natural vegetation along Stoney Island Avenue also made the integration of green space in and around the building important for the well-being of the occupants of the building. The north/south orientation also proved a problem in allowing day lighting. A courtyard is necessary to provide adequate lighting.

site

buildings removed/ buildings kept green space analysis

pedestrian circulation desireable and non-desirable views

PROJECT DESCRIPTION

The Chicago Community Wellness Center (CCWC) is a multi-purpose building meant to repair the damaged urban fabric in the area and provide services that are lacking. Located on Stoney Island Avenue this project has the opportunity to help create community by 1) providing activities for children and young adults to engage in, and 2) create a place of relief and regeneration through controlling views and creating green spaces.

One of the main programmatic focuses of this project is the CCWC multipurpose theater. Because it is a multipurpose space, the study of acoustics was important to this project. Therefore I focused on the reverb times of the space, the specific shape of the space, and the materials chosen for the space.

One major issue of this project was the site shape. The southern exposure to the site is very minimal, creating a lot of east/west heat gain. Throughout the project I focused on how to maximize southern exposure while also controlling east and west exposure.

This project helped me begin to understand two things about architecture. The first was how to integrate sustainable factors into the building, specifically natural day lighting and green spaces, and begin to move towards a zero energy building. The second was how to calculate and design for electrical lighting and acoustics, how the shape and material affects a space, and how specific uses control certain design factors pertaining to the two.

1312

[FLOOR PLANS]

The icons on the left hand side represent the different services offered in the community center. As you can see more than one service can be provided in a single space, allowing for the maximum potential of area in square feet.

14

[IMAGERY AND ELEVATIONS]

SCCWC ENTRY PERSPECTIVE

SOUTH ELEVATION EAST ELEVATION

THEATRE PERSPECTIVE

1514

THEATRE PERSPECTIVE BIRDSEYE NIGHT TIME

NORTH ELEVATION

16

material area (Ft2) volume (ft3)walls, plywood paneling: 8577 455400walls, gypsum board: 10050floor, wood: 9780Walls, Random fissured panels: 3967Uholstered seating 6000Ceiling, random fissured panels 9780

125 250 500 1000 2000 4000walls, plywood paneling: 8577 0.28 0.22 0.17 0.09 0.1 0.11walls, gypsum board: 10050 0.1 0.08 0.05 0.03 0.03 0.05floor, wood: 3912 0.15 0.11 0.1 0.07 0.06 0.07Walls, Random fissured panels: 3809 0.52 0.58 0.6 0.8 0.92 0.8Uholstered seating 6000 0.6 0.74 0.88 0.96 0.77 0.9Ceiling, random fissured panels 9780 0.52 0.58 0.6 0.8 0.92 0.8Wall, Glass 2040 0.18 0.06 0.04 0.03 0.04 0.05

walls, plywood paneling: SA 2401.6 1886.94 1458.1 771.9 857.7 943.5walls, gypsum board: SA 1005 804 502.5 301.5 301.5 502.5floor, wood: SA 586.8 430.32 391.2 273.8 234.7 273.8Walls, Random fissured panels: SA 1980.7 2209.22 2285.4 3047 3504 3047Uholstered seating SA 3600 4440 5280 5760 4620 5400Ceiling, random fissured panels SA 5085.6 5672.4 5868 7824 8998 7824Wall, Glass SA 367.2 122.4 81.6 61.2 81.6 102

15027 15565.28 15867 18040 18597 18093

Reberberation Time (seconds) 1.5153 1.4628712 1.4351 1.262 1.224 1.258

warmth 1.10413brilliance 0.920502

Center Octave Band

MULTI PURPOSE THEATRE REVERB TIME

RAY TRACING

[SCCWC MULTI-PURPOSE THEATRE ACOUSTIC ANALYSIS]

1716

3’

3’

10

37.5’

57.5’

3’

3’

10

Day chapel (short section)

Day chapel (long section)

Day chapel plan w/ light fixtures

Cavities Ceiling: 3’Room: 10’Floor: 3’

Cavity RatiosCeiling: .6608Room: 2.202Floor: .6608

DimensionsWidth: 37.5’Length: 57.5’Area: 2,156.75’

Cavity ReflectionsCeiling: 80%Floor: 50%CU: .53

Good LFF: .65 Number of Luminaires

30 x 2,157.757,300 x .59 x .65 = 23 Lamps

Maintained Illuminance: 30

DAY CHAPEL LUMINAIRE ESTIMATION

[LIGHTING ANALYSIS FOR DAY CHAPEL]

18

FALL SEMESTER, SENIOR YEAR (2011)

TYPE mixed use education center

SIZE 32,000 sq. ft.

LOCATION Rome, Italy

DURATION two weeks

INSTRUCTOR Professor Keelan Kaiser

PALLAZODELLA ROUTUNDA

1918

20

[SUSTAINABILITY FACTORS AND PALAZZO ORGANIZATION]

SECOND FLOOR

dormitories

library

SITE LOCATION

pantheon

FIRST FLOOR

cafe

oratory

entry courtyard

PROJECT DESCRIPTION

Located in Rome, Italy, Palazzo Della Rotunda is a mixed use education center used by students studying abroad. The goal of this three week charette is two fold. One, to design a palazzo that fits in with the context and does not compete with the contextual landmark that is the Pantheon. And two, to create a visible hierarchy both horizontally and vertically.

While most buildings within the immediate context are traditional in nature, my partner and I wanted to create a building that was modern in material and in technology, while still maintaining a respect for its traditional character. Therefore the facade facing the piazza is very simple in nature while maintaining a sense of hierarchy, while the facade facing the alley and the courtyard are quite modern in nature, both materialistically, technologically and formally.

A respect to the Pantheon also played a great deal in the influence in our design. First we wanted to show a respect to its antiquity and its place in the architectural world and second. We wanted to maximize views to the Pantheon especially in the dormitories and cafe areas. Because most visitors to the palazzo will be students, the view of the Pantheon to the students can be influential across many facets of education. Therefore the view to the Pantheon was very important to our design.

Sustainably we knew that palazzos in the area that were built centuries ago were very good at controlling ventilation and day lighting passively. This palazzo, being built in a modern era, could not only look to the past for precedent but incorporate modern technology, such as stack ventilation and operable shading devices to control the elements.

BUILDING SECTION

2120

[SUSTAINABILITY FACTORS AND PALAZZO ORGANIZATION]

BUILDING SECTION

Above: Elevation looking out onto the piazza. Facade made of concrete with color admixtures allows building to fit within context. Hierarchy is determined by size of windows and the depth of wood trim within the windows. (Project cover image for reference)

Left: Stack ventilation brings air through windows and into the solar hallway where air rises through vents in the floor and eventually exits through the top most windows on the court-yard facade.

SOUTH ELEVATION (PLAZA VIEW)

22

[PALAZZO DELLA ROUTUNDA IMAGERY]

SOLAR HALLWAY PERSPECTIVE

COURTYARD BIRDSEYE COURTYARD EXPERIENTIAL VIEW

2322

PIAZZA VIEW

STREET VIEW

PANTHEON VIEW

24

SPRING SEMESTER, JUNIOR YEAR (2011)

TYPE public community market

SIZE 24,000 sq. ft.

LOCATION Oak Park, IL

DURATION seven weeks

INSTRUCTOR Professor Ian Hoffman

OAK PARKPUBLICMARKET

2524

26

[SITE ANALYSIS]PROJECT DESCRIPTION

The Oak Park Public Market, because it is a market, is a great opportunity to create community. One way to create community is through connection, so I decided to focus on visual connection. If there is a visual connection to the market from multiple locations, different people will be drawn to the same location thus causing community. However, the form of the building must stand out enough as to cause visual interest to bring people to the area. Therefore I used sight lines to the building to directly create the form of my market.

A secondary focus was the structure of the market. Because most of the contents within the market would be organic, including human occupants, I wanted to focus on a structure that was organic in nature. I drew influence from the dragonfly wing and the cell structure of a leaf. The organic structure then influenced the overall aesthetic of the building and created an organic feel to the building.

VIEWS @ 12’ VIEWS @ 24’ VIEWS @ 36’COMPOSITE VIEWS

1st floor crucial views

2nd floor crucial views

3rd floor crucial views

composite ofcrucial views

building axis

building envelope

BUILDING EXTENDED SITE market site site amenities

2726

[FLOOR PLANS]

FIRST FLOOR

1

2

3

4

SECOND FLOOR

5

6

7

THIRD FLOOR

8

10

11

9

1. Building ops. Offices 2. Cold/Dry Storage3. Restrooms4. Market floor

5. Kitchen/Storage6. Private Event Space7. Oak Park Market Cafe 8. Administrative Offices

9. Open Office/Conference10. Bridge to Library11. Terrace MARKET STALL

28

[BUILDING SECTIONS]

SECTION STUDY [15ft. increments]

30’ 45’ 60’

75’ 90’ 105’

120’ 135’ 150’

165’ 180’

2928

solar control skin

double paned low e glazing

structural exoskeleton

floor plates

circulation

market stalls

CROSS SECTION @ 90’

[BUILDING ELEMENTS]

structuralInfluences

30

[OAK PARK PUBLIC MARKET IMAGERY]

OUTDOOR MARKET VIEW

3130

NIGHT ENTRY PERSPECTIVE

32

FALL SEMESTER, SENIOR YEAR (2011)

TYPE pedestrian bridge

SIZE 75,000 sq. ft.

LOCATION Judson University Elgin, Illinois

DURATION three weeks

INSTRUCTOR Professor Ian Hoffman

JUDSONUNIVERSITYLINDNERCONNECTION

3332

34

PROJECT DESCRIPTION

Lindner Tower, which functions as a dormitory, faculty offices, and classrooms (among other things), is quite segregated from the rest of the campus. The routes to the tower are also circuitous and pointlessly long. The goal of the Lindner Connection is to not only create a direct connection via bridge, but also design the site in such a way to create better traffic flow, parking, and an opportunity to allow for two more dorms on campus.

For the design of the site and of the bridge and dorms, I was influenced by the possibilities of direct connections and also preserving the visible connections from the tower. Creating new dorms and a bridge between the campus and the tower can create a physical connection but impede connection visually. Based on my visual connection diagram, I drew the forms of the site and dorms, and designed the bridge in such a way that the pedestrian would have to walk the shortest amount of distance while still connecting to the other two dorms.

The redesign of the space between the two creates a stronger visual connection and a physical connection that was lacking before. The site redesign also allows for a better use of space which was previously a large open parking lot.

[SITE ANALYSIS]

approach tolindner

views fromlindner

direct connections

parking

green space

walkway

proposed dorms

bridge

SITE SECTION

3534

[SITE SECTION AND IMAGREY]

RIVER ROAD VIEW HAWAC VIEW DORM ENTRY

36

[PHYSICAL MODEL] [BRIDGE SECTION]

MODEL ELEVATION

MAST DETAIL

section cut

3736

[BRIDGE SECTION]

structural lateral supports

bridge decking

bending moment structure (longitudinal)

bending moment structure

life safety railing

primary tension cables

structural vertical support

secondary tension cables

bridge mast

[BRIDGE ELEMENTS]

38

WINTER BREAK, JUNIOR YEAR (2010)

TYPE cafe

SIZE 500 sq. ft.

LOCATION Judson University Elgin, Illinois

DURATION four weeks

CLIENT Keelan Kaiser and the School of Business

JERRY’SCAFEAT JUDSON

3938

CAFE PERSPECTIVE

BAR PERSPECTIVE

BUILT DESIGN

UNDER CONSTRUCTION

PROJECT DESCRIPTION

Jerry’s Cafe at Judson University is a redesign of a previous cafe which was not generating any business, The redesign allows for much more cafe area seating and also defines the space much better than the previous cafe. As a campus wide service, I and two other classmates not only completely designed the cafe area, but also selected and bought materials for the cafe and built it to completion. The cafe project gave me experience on the design and building process, specifically in the dealing of clients (the

school), coworkers, building materials, and budget.

[DESIGN/BUILD PROCESS]

40

SPRING SEMESTER, SENIOR YEAR (2012)

DURATION sixteen weeks

INSTRUCTOR Professor Christopher Murphy

GRAPHICDESIGN AND VISUAL COMMUNICATION

4140

[HELVETICA ICONS]

PROJECT DURATION: 2 daysHelvetica icons is a creative project, taking the helvetica alphabet and symbols, using the scissors tool and creating icons from them. In order for the icons to appear cohesive, I chose a theme: studying and scholastics.

42

village pedaler

everything in the storefor a limited time only

25 percent off

stop salivating. start sweating.

tyler hopwood249 pawtucket ave.elgin, IL 60124

[THE VILLAGE PEDALER: REBRAND]

village pedaler

everything in the storefor a limited time only

25 percent off

stop salivating. start sweating.

tyler hopwood249 pawtucket ave.elgin, IL 60124

est. 1978

contact name1945 GYORR AVE. SOUTH ELGIN, IL 60177 VP.COM847.741.5938 [email protected]

VILLAGE PEDALER

PROJECT DURATION: 4 weeksVillage Pedaler is a Bicycle Shop in South Elgin, Illinois who is struggling for an identity with their company. My job was to create a logo that would create an accurate identity of the shop, then design business cards and advertisements that would give a vision of branding.

4342

[NCARB LECTURE POSTER]

DESIGNING YOURFUTURE

ONE DOT EQUALS

ONE IDP CREDIT HOUR

IDP 2.0NICK SERFASS Assistant Director, IDP, AIA, NCARB, LEED AP

THULIN PERFORMANCE HALLJudson UniversityThompson Center

WEDNESDAY, APRIL 45:00-6:30 PMFood to follow

CHANGE IS COMING. ARE YOU PREPARED?NCARB in assosiation with AIAS presents:

PROJECT DURATION: 2 weeksJudson University had a unique opportunity to host Nick Serfass as he introduced the Architecture school to the new IDP 2.0 for interns. In order to inform students of this special opportunity I was given the task of designing posters to put around campus.

44

[WAYFINDING: JERRYS CAFE]

MONDAYTUESDAYWEDNESDAYTHURSDAY

FRIDAYSATURDAY & SUNDAY

7 AM - 2 AM

7 AM - 5 AM6 AM - 11 AM

MONDAYTUESDAYWEDNESDAYTHURSDAY

FRIDAYSATURDAY & SUNDAY

7 AM - 2 AM

7 AM - 5 AM6 AM - 11 AM

PUT INHANDAPPLY TOMOUTH

COFFEELATTECAPPACHINO

TEA

DECAFSHOTSSYRUPMILKCUSTOMDRINK

FREAKIN’ HOT DRINK: BE SAFE, USE PROTECTION

-JERRY CAIN

JERRY’S CAFE

blt

ICED COFFEE

bacon turkeycheddar melt

croissants

smoothiebeVeraGes

snacks

sandWiches

pastries

Jerrys.com

With syrup, chocolate

W/ StraWberrieS, bananaS, kiWiS, blueberrieS, mangoS, orange, pineapple

pepsi, sierra mist, fanta, root beer

blueberry, chocolate, banana

candy bargranola bar

fruit cup

$3.00

$3.00

$1.00

$1.25

$1.00

$1.00

$1.50

$1.25

$4.45

$3.00

$5.00

$3.00

$2.00

$3.50

$1.25

est. 2013

ChICkEn wrap

Soda

bagElmuffin

pestochickenmeltblended

coffeedrink

build youroWn SandWich

in the harm a Weber center

PROJECT DURATION: 4 weeksAlthough the physical cafe has been designed and built, the cafe does not have an identity yet. This project not only gives the cafe an identity but creates a presence throughout Judson campus through ordering kiosks, mobile coffee carts, and way finding maps to direct visitors through campus and to Jerry’s.

LOGOPROCESS

CAFEBRANDING

4544

MAP &WAYFINDING

CAFE &KIOSKS

46

MAY TERM, JUNIOR YEAR (2011)

TYPE architectural drawing

LOCATION Spain, Italy, France

DURATION five weeks

INSTRUCTOR Professor Christopher Miller and Jhennifer Amundson

EUROPEAN

STUDYTOUR

4746

[SKETCHES]

loggia in Sienna bridge at Plaza de España overlooking the Alhambra

patio study in Sevilla

hierarchical study of the MACBA in Barcelona

sustainable study in Venice