TWAD-Schedule of Rates for 2014-2015

275
7/23/2019 TWAD-Schedule of Rates for 2014-2015 http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 1/275

Transcript of TWAD-Schedule of Rates for 2014-2015

Page 1: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 1/275

Page 2: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 2/275

Page 3: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 3/275

STANDARD SCHEDULE OF RATES

FOR THE YEAR 2014-2015

Page 4: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 4/275

Page 5: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 5/275

PROCEEDING OF THE MANAGING DIRECTOR, TWAD BOARD,

HEAD OFFICE, CHEPAUK, CHENNAI-5

PRESENT: THIRU C.VIJAYARAJ KUMAR, I.A.S.,

MANAGING DIRECTOR 

Proc.No. 6682/SDO.4/COM/2014/dt. 30.10.2014

Sub : TWAD Board-Schedule of Rates for 2014-15 – State Level

Technical Committee-Rates finalized – Communicated – reg.

Ref : 1. Managing Director, TWAD Board, Chennai-5 Proc.No.3397/

SDO.4 / COM / 2014 / dt. 09.07.2013.

2. The Secretary to Govt. (Expenditure), FinanceDepartment, Secretariat, Chennai.9 Lr.No.178/ Secy (Exp)/

2014-3 dt. 08.09.2014 communicated vide Deputy

Secretary to Government, MA & WS Department,

Secretariat, Chennai.9 Lr. No. 19308/WS.4/2014-3 dt.

16.09.2014.

3. Minutes of the Special Committee meeting held on

21.10.2014.

4. Minutes of the State Level Technical Committee meeting

held on 27.10.2014 at TWAD Board, Head Office, Chennai.5

****

In the reference first cited, a copy of the approved Schedule of Rates of TWAD Board

for the year 2013-14 was communicated to all the Chief Engineers, Superintending Engineers,

Executive Engineers of TWAD Board for adoption.

Necessary proposals were called for, for the revision of rates for adoption during

2014-15. In the minutes of the meeting held under the Chairmanship of Principal Secretary

to Government, Finance Department on 03.09.2014, communicated in the ref 2nd cited, a

Special Committee of Govt. to finalise Schedule of Rates for TWAD Board and CMWSS Board

was formulated. The Special Committee reviewed the proposals of TWAD Board Schedule of 

Rates, analysed and after detailed deliberations recommended the rates in the reference 3 rd

Page 6: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 6/275

cited for adoption of the Schedule of Rates for the year 2014-15 for TWAD Board. The

proposals recommended by Special Committee of Government were placed before the State

Level Technical Committee meeting held on 27.10.2014 at TWAD Board, Head Office for

discussion and taking decision. The State Level Technical Committee after detailed discussion

approved the proposals with certain recommendations.

Based on the recommendations of State Level Technical Committee a draft Schedule of 

Rates for 2014-15 were prepared and approved by the Committee.

The copy of the approved Schedule of Rates of TWAD Board for the year 2014-15 is

communicated to all the Chief Engineers, Superintending Engineers and Executive Engineers

of TWAD Board for adoption with effect from 01.07.2014 onwards.

The Chief Engineers, Superintending Engineers and Executive Engineers are requestedto acknowledge the receipt of this proceeding along with the enclosures.

Encl. : One booklet of TWAD Board

Schedule of Rates for 2014-15

Sd./-Managing Director

TWAD Board, Chennai.5.

To

All the Chief Engineers/Superintending Engineers/Executive Engineers of TWAD Board.

All the Joint Chief Engineers of Head Office, TWAD Board, Chennai.5

Page 7: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 7/275

TAMILNADU WATER SUPPLY AND DRAINAGE BOARD STANDARD

SCHEDULE OF RATES FOR THE YEAR 2014–2015

INDEX

Sl.CONTENTS PAGE NO

No.

I General Notes 1-8

II Rates for Labour 9-14

III Rates for Materials 15-91

IV Rates for pump sets 93-125

V Rates for Building Materials 127-136

VI Rates for other Construction Materials 137-152

VII Rates for Electrical Items 153-172

VIII Rates for work 173-202

IX Rates for Conveyance of Materials 203-214

X Rates for Miscellaneous items 215-228

XI Rates for Earth work Excavation for pipe laying works 229-232

XII Rates for Earth works Excavation and

Refilling for pipe line works on Linear Measurement Basis 233-235

XIII Rates for Earth work Excavation other than

pipe laying and wells 237-250

Page 8: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 8/275

Page 9: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 9/275

GENERAL NOTES

Page 10: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 10/275

Page 11: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 11/275

1

I. GENERAL NOTES

1. For items not covered in the schedule of rates, the Superintending Engineer 

can fix the rates based on the lowest sealed quotations duly observing all the

departmental formalities under intimation to the concerned Chief Engineer 

and Head Office.

2. For special nature of works, for which rates are not covered in the Schedule

of Rates, such as Road works, Water Supply, Drainage etc., separate schedule

of rates issued by the respective Officers/Department / Board are to be

followed.

3. Extra percentage other than those for the specified areas noted below, shall

not be allowed.

1. Corporation Limits.

An extra 10% on the Rates of Labour, Rates of Works and for Head Load

shall be allowed for the works in Chennai Corporation limit & belt area of 

32 km around Chennai Corporation, Madurai Corporation limits, Coimbatore

Corporation limits and also for works in Hosur Taluk.

2. An extra 5% on the Rates of Labour, Rates of Works and for Head Load

shall be allowed for the works in Trichy, Salem, Tirunelveli, Tiruppur, Erode,

Thoothukudi and Vellore Corporation limits.

3. Restricted areas:

I. An extra 10% on the Rates of Labour and Rates of Works shall be

allowed for  sewer works under unhygienic condition.

II. An extra 10% on the Rates of Labour, Rates of Works and Conveyance

charges shall be allowed for works in the campus of Central Jails.

III. An extra 5% on the Rates of Labour, Rates of Works and Conveyance

charges shall be allowed for works in the campus of Sub-Jails.

IV. An extra 20%  on the Rates of Labour, Rates of Materials, Rates of 

Works, Conveyance Charges and Head Load shall be allowed for works

in Reserve Forest Areas.

4. Special Nature of Works

 I. i. 5 times over the basic rates for earthwork excavation for both

rural and urban areas is allowed for putting trial pits.

ii. 5 times over the basic rates for earthwork excavation for leak

rectification works is allowed.

Page 12: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 12/275

2

iii. If the works are done (leak rectification works) in odd hours

(i.e) 8.00PM to 8.00AM of the next day, 7.50 times over the

basic rate is allowed.

II. For individual footings of the service reservoirs, valve pits double

the relevant rate for earthwork excavation is allowed.

III. An extra 5% is allowed for laying of  sewers under UGSS for earthwork

excavation alone below 4m depth.

5. For Works in Hills:

As the transport facilities in most of the Hilly Areas are now considerably

improved and as there is no necessity for allowing extra percentage as hitherto

followed, the Hilly Areas are now again regrouped as detailed hereunder and

the extra percentage allowable has been revised accordingly and fixed.

The conveyance table approved and furnished in the Schedule of Rates

under the Head “Conveyance table”, Conveyance of materials by Road

on hills shall be adopted for all works in hills.

i. For works in Nilgiris District an extra 40% on the rates of labour, rates of 

work, head load and an extra 25 %  on the rates of materials shall be

allowed.

ii. For works in Mudumalai Sanctuary, Shandy Nallah Sheep Farm,

Dansandle areas, an extra 40% over rates of labour, rates of work and

head load and an extra 25% on the rates of materials shall be allowed.

iii. works in  Valparai Area an extra 40% on the  rates of labour, rates of 

work, head load and an extra 25% on the rates of materials shall be allowed.

iv. For works in Gudiyalathur, Siruvani, Thavalamalai Hills, Talavadi Hills,

Bargur Hills, Anamalai, Chennimalai and Sivanmalai Hills an extra 20%

on the Rates of Labour, Rates of Materials, Rates of Works and Head Load

shall be allowed.

v. For works in Western Ghats  of Virudhunagar, Coimbatore, Tirunelveli & 

Kanyakumari Districts an extra 20%  on the Rates of Labour, Rates of Materials, Rates of Works and Head Load shall be allowed.

vi. (a) An Extra 50% on the Rates of Labour for works in Thekkady shall be

allowed.

(b) Add 25% extra shall be allowable on the Rates of Materials which are

to be supplied at Thekkady, subject to the condition that there shall not be

any extra on conveyance, tollgate fee, interstate allowance, etc. The

Page 13: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 13/275

3

conveyance charge as applicable for Ghat Road, Cart Track, etc., as per 

schedule of rates is only applicable.

vii. An extra 60% shall be allowable on the Rates of Materials to be supplied

for Periyar Dam Site subject to the condition that there shall not be any

extra on conveyance, tollgate fee, interstate allowance, etc. The conveyancecharge as applicable for Ghat Road, Cart Track, etc., as per Schedule of Rates

is only applicable.

viii. An extra 100% on the Rates of Labour for works in Periyar Dam Site under 

normal condition shall be allowed.

ix. An extra 150% on the Rates of Labour for works in Periyar Dam Site under 

hanging condition shall be allowed

x. An extra 50% on the Rates of Labour, Rates of Materials, Rates of Works

and Head Load shall be allowed for works at Lower Camp above KuruvanthuBridge, Bodi Hills, Cumbam mettu, Sirumalai, Pachai Kamatchi Hills, Palani

Hills, Thiruparankundram Hills, Idumban Hills, Megamalai Panchayat and

Thummakundu Panchayat.

xi. An extra 40% on the Rates of Labour, Rates of Works and Head Load and

an extra 25% over the rates of materials shall be allowed for the works at

Kodaikanal.

xii. An extra 25% on the Rates of Labour, Rates of Materials, Rates of Works

and Head Load shall be allowed for works in Yercaud, Yercaud Sub-Taluk,

Boothamalai, Aranuthumalai, Sarugumalai and Thiruchengode Hills in Salem

& Namakkal District.

xiii. An extra 40% on the Rates of Labour, Rates of Works and Head Load and

an extra 25%  over the Rates of Materials shall be allowed for works in

Kalrayan Hills, Pachamalai Hills and Kolli Hills in Salem & Namakkal Districts.

xiv. An extra 40% on the Rates of Labour, Rates of Works and Head Load and

an extra 25%  over the Rates of Materials shall be allowed for works in

Jawadhu Hills, Elagiri Hills, Kalrayan Hills, Nakkanamalai Hills, Naickerneri Hills

in Thiruvannamalai and Vellore Districts.

xv. An extra 40% on the Rates of Labour, Rates of works and Head Load and

an extra 25% over the Rates of Materials shall be allowed for works in

Piranmalai covering Oduvarpatti, Kattugudipatti, Ponnadaipattu, V.Pudur Village,

Mamalai covering Vannar Irruppu, Nagamangalam Villages, Usilamalai covering

Poolankurichi Village, Hillocks at Musundapatti, Usilam, Ammapatti and

Thuthampatti in Sivagangai District.

Page 14: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 14/275

4

xvi. An extra 40% on the Rates of Labour, Rates of Works and Head Load and

an extra 25% over the Rates of Materials shall be allowed for works in

Chitteri Hills, Sittiling in Kalrayan Hills in Dharmapuri District.

xvii. An extra 40% on the Rates of Labour, Rates of Works and Head Load and

an extra 25% over the Rates of Materials shall be allowed for works inKalrayan Hills in Cuddalore and Villupuram Districts.

xviii.An extra 40% on the Rates of Labour, Rates of Works and Head Load and

an extra 25% over the Rates of Materials shall be allowed for works in

Pachamalai Hills in Trichy, Karur and Perambalur Districts.

6. ISLANDS in Ramanathapuram District:

a. For works in Rameswaram Island:

An extra 25% on the Rates of Labour, Rates of Works and Head Load

shall be allowed.

b. For works in Other Islands:

An extra 125%  on the Rates of Labour, Rates of Materials, Rates of 

Works, Conveyance Charges and Head Load shall be allowed for other 

Islands in Ramanathapuram viz., (1) Upputhannie Island,

(2) Puleevilaichalli Island, (3) Aalaippar Island, (4) Valimunai Island,

(5) Appa Island, (6) Thalaiyari Island, (7) Valai Island, (8) Mullai

Island, (9) Manoli Island (10) Minoliputti Island, (11) Nadu Island,

(12) Nallathannie Island, (13) Pullivasal Island, (14) Poomarichan Island,15) Muyal Island, (16) Singala Island and (17) Kurusedar Island.

c. For works in Islands of Thoothukudi District:

An extra 125% on the Rates of Labour, Rates of Materials, Rates of 

Works, Conveyance Charges and Head Load shall be allowed for Van,

Kasuvar, Karaichalli Island and Vilankuchali Islands.

7. TUNNELS:

An extra 15% on the Rates of Labour and Rates of Works shall be allowed

for works inside Tunnels.

8. DAM SITES UNDER HANGING CONDITION (Other than Periyar Dam

Site)

An extra 75%  on the Rates of Labour employed for the items of works,

which may have to be executed by hanging from the top of Dam through

slings (or) rope ladders to work in dizzy height. (This will apply only

for maintenance and repair works).

Page 15: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 15/275

5

9. General Foot Note:

i) The rates of labour means the labour rates fixed under the head, Rates

of Labour.

ii) Rates of works includes the labour for earthwork, refilling foundation,

dismantling, jungle clearance, head load etc. also where human labour 

alone is involved.

iii) The percentage increase provided for the materials are applicable only

for the materials which are quarried or manufactured locally in

the specified area.

iv) The percentage increase provided for Rates of Works  are allowable

only on the items where human labour alone is involved.

v) The percentage increase provided for Conveyance Charges are allowable

for the distance covered in the specified area/ Special Tract only.

vi) The extra percentage allowable as specified above shall not be applicable

for the materials / works covered under “Rates of other construction

materials” and “Rates of Electrical items of works”. Similarly, no

conveyance charges shall be allowed for the items covered under these

two categories. The rates approved therein are applicable at site of 

work.

vii) While adopting source of any materials inside the special tracts viz.,

Corporation limits, Reserve Forest Areas, Hilly areas, Islands, Dam Sitesetc., where extra percentage allowable for the materials which are quarried

or manufactured locally, it is the duty of the officer in charge of the work

(not below the rank of Assistant Executive Engineer), to analyse and

confirm whether the finished cost of such materials/ works are higher if 

the materials are conveyed and brought to the site from the areas

outside the specified area, where such extra percentage are not

permissible.

10. LEAD

District-wise average lead may be approved by the concerned Chief 

Engineers based on the approved quarry by the PWD.

Page 16: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 16/275

6

1 For works in ChennaiCorporation limits and belt areaof 32 KM around ChennaiCorporation, MaduraiCorporation limits, CoimbatoreCorporation limits and also forworks in Hosur Taluk.

2. For works in Trichy, Salem,Tirunelveli, Tiruppur, Erode,Thoothukudi and Vellore

Corporation limits.

3. Restricted Areas

i. For Sewer works underunhygienic condition

ii For works in Central jail Campus

iii For works in Sub Jail Campus

iv For works in Reserve Forest

Areas

4 Hills

i. For works in Nilgiris District

ii. For works at MudumalaiSanctuary, Shandy Nalla SheepForm, Dansandle Area

iii For works at Valparai

iv For works at Gudiyalathur,Siruvani, Thavalamalai Hills,Thalavadi Hills, Bargur Hills,Anamalai, Chenni Malai andSivanmalai Hills

v. For works in Western Ghats of Virudhunagar, Coimbatore,Tirunelveli and KanyakumariDistricts.

10% — 10% — 10%

5% -- 5% - 5%

10% — 10% — —

10% — 10% 10% —

5% — 5% 5% —

20% 20% 20% 20% 20%

40% 25% 40% — 40%

40% 25% 40% — 40%

40% 25% 40% — 40%

20% 20% 20% — 20%

20% 20% 20% — 20%

STATEMENT SHOWING THE EXTRA PERCENTAGE ALLOWABLE AS PER 

GENERAL NOTE TO SCHEDULE OF RATES FOR THE YEAR 2014-2015

Sl.No. Area   Labour Material

Rate of work(where

human labourinvolved)

ConveyanceHeadLoad

PERCENTAGE EXTRA ALLOWABLE ON

Page 17: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 17/275

7

In Madurai, Theni & Dindigul

Districts.

vi. For works at Thekkady

vii For works at Periyar Dam Site

viii For works at Periyar Dam Siteunder normal condition

ix For works at Periyar Dam Siteunder hanging condition

x For works at Lower Camp above

Kuruvanthu Bridge, Bodi Hills,Cumbum Mettu, Sirumalai,Pachai Kamatchi Hills, PalaniHills, Tiruparankundram Hills,Irdumban Hills, MegamalaiPanchayat and ThummakunduPanchayat

xi For works at Kodaikanal

xii. For works at Yercaud Hills,Yercaud Sub-Taluk,Boothamalai, Aranuthumalai,

Sarugumalai and TiruchengoduHills in Salem & NamakkalDistricts.

xiii For works at Kalrayan Hills,Pachamalai Hills, Kolli Hills inSalem and Namakkal Districts.

xiv For works at Jawadhu Hills,Elagiri Hills, Kalrayan Hills,Nakkanamalai Hills, NaickenneriHills in Thiruvannamalai andVellore Districts.

xv. For works at Piranmalai coveringOduvarpatti, Kattugudipatti,Pannadaipattu, V.Pudur Villages,Mamalai covering Vannar Iruppu,Nagamangalam Villages, Usilamalaicovering Poolankurichi Village,Hillocks at Musundapatti, Usilam,Ammapatty and Thuthampatti inSivagangai District.

50% 25% — — —

— 60% — — —

100% — — — —

150% — — — —

50% 50% 50% — 50%

40% 25% 40% — 40%

25% 25% 25% — 25%

40% 25% 40% — 40%

40% 25% 40% — 40%

40% 25% 40% — 40%

Sl.No. Area   Labour Material

Rate of work(where

human labourinvolved)

ConveyanceHeadLoad

PERCENTAGE EXTRA ALLOWABLE ON

Page 18: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 18/275

8

xvi. For works at Chitheri Hills,

Sittiling in Kalrayan Hills inDharmapuri District.

xvii For works at Kalrayan Hills inCuddalore and VillupuramDistricts.

xviii For works at Pachamalai Hills inTrichy, Karur and PerambalurDistricts.

5 ISLANDS

I For works at RameswaramIsland in RamanathapuramDistrict.

ii For works in other Islands viz.,Upputhannie, Puleevilaichalli,Alaiappar, Valimunai, Appa,Thalaiyari, Valai, Mullai, Manoli,Minidiputti, Nadu, Nallathannie,Pullivasal, Poomarichan, Muyal,Singala,Kuruseedar Islands inRamanathapuram District.

iii For works in Van, Kasvar,Karaichalli and VilankurichiIslands in Thoothukudi District.

6 TUNNELS

i Where human labour alone isinvolved

7 DAM SITES UNDER HANGINGCONDITION

i. For works at dam sites other

than Periyar Dam Site, whichmay be executed by hangingfrom top of dam through slingsor rope ladders to work in dizzyheight.

40% 25% 40% — 40%

40% 25% 40% - 40%

40% 25% 40% — 40%

25% - 25% - 25%

125% 125% 125% 125% 125%

125% 125% 125% 125% 125%

15% - 15% - -

75% - - - -

Sl.No. Area   Labour Material

Rate of work(where

human labourinvolved)

ConveyanceHeadLoad

PERCENTAGE EXTRA ALLOWABLE ON

Page 19: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 19/275

RATES FOR LABOUR 

Page 20: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 20/275

Page 21: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 21/275

11

TWAD BOARD

RATES FOR LABOUR 

Schedule Rate

Item No.  Description Unit

in Rupees

1 Driller Day 381.002 Assistant Driller Day 313.00

3 Special heavy labour for driving sheet pile Day 381.00

4 Boring Attendant Day 279.00

5 Water Meter Reader Day 266.00

6 Helper for Rig Day 279.00

7 a. Electrician with LEE/DEE and ‘C’ certificate Day 487.00

b. Electrician with LEE/ DEE Day 466.00

C. Electrician with ITI and ‘C’ Certificate Day 418.00

d. Electrician with ITI ‘and B’ Certificate Day 381.00

e. Electrician with ITI Day 381.00

8 a. Pump Operator with ITI Day 381.00

b. Pump Operator without ITI Day 324.00

9 Laboratory Attender SSLC/ 10th Std passed Day 266.00

10 a. Filter Bed Operator with D.M.E. Day 466.00

b. Filter Bed Operator with ITI Day 381.00

c. Filter Bed operator without I.T.I. Day 324.00

11 Cleaner for Treatment Unit, Pump and vehicles Day 266.00

12 Boring Mechanic for Hand Boring set Day 324.00

13 Turn Cock (Experience in pipe line Operation

and maintenance Day 266.0014 Fitter (Pipe laying / Bar bending) I Class Day 357.00

15 Fitter (Pipe laying / Bar bending) II Class Day 331.00

16 Sewer Cleaner Day 266.00

17 Store Attender SSLC /10th Std Passed Day 266.00

18 Divers and Well Sinkers Day 487.00

19 Hammer Man (Geophysical survey) Day 266.00

20 Geological Assistant Day 390.00

21 Maintenance Assistant Day 279.00

22 Plant Operator, SSLC passed with 3 years experience Day 313.00

23 Reverse Osmosis (R.O.) Plant Operator SSLC passedwith 3 years experience Day 381.00

24 Mechanic with ITI Day 381.00

25 a. Carpenter I Class Day 401.00

b. Carpenter II Class Day 368.00

26 a. Cleaner I Gr. Day 215.00

b. Cleaner II Gr. Day 203.00

27 a. Fitter I Class Day 363.00

b. Fitter II Class Day 339.00

Page 22: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 22/275

12

28 Floor Polisher Day 317.00

29 Gardener Day 240.00

30 Head Mazdoor for Well sinking Day 266.00

31 a. Driver (Light duty) Day 317.00b. Driver (Heavy duty) Day 339.00

32 Jumper Mazdoor Day 240.00

33 a. Maistry, Road Inspector & Work Inspector Day 306.00

b. Maistry, Road Inspector & Work Inspector

(Degree holder) Day 339.00

34 a. Mason for Brick Work - I Class Day 410.00

b. Mason for Brick Work - II Class Day 368.00

35 a. Mason for Stone Work - I Class Day 410.00

b. Mason for Stone Work - II Class Day 368.00

36 a. Mazdoor Category I Day 257.00

b. Mazdoor Category II Day 232.00

c. Head Mazdoor Day 266.00

37 a. Moplah - I Class Day 316.00

a. Moplah - II Class Day 291.00

38 a. Painter/Varnisher-I Class Day 331.00

b. Painter/Varnisher-II Class Day 306.00

39 Pile Driver Day 291.00

40 a. Plumber I Class Day 357.00

b. Plumber II Class Day 331.00

41 Pump Driver Day 266.00

42 a. Stone cutter- I Class Day 316.00b. Stone cutter- II Class Day 291.00

43 a. Welder/ Bracer - I Class Day 316.00

b. Welder/ Bracer - II Class Day 291.00

44 Well sinking Diver working with Helmet

(above two metres depth of water) Day 368.00

Technical Assistant

45 a. Technical Assistant Gr.I (BE passed) Day 527.00

b. Technical Assistant- Gr.II

(Diploma in Engg. Passed/ B.E. failed/

Degree in Geology for ground water) Day 474.00c. Technical Assistant Gr.III

(Diploma in Engg. Failed / ITI (Civil) passed Day 401.00

46 a. Laboratory Assistant. Gr.I

(Post Graduate in Science) Day 401.00

b. Laboratory Assistant. Gr.II (Degree in Science/

Degree in Geology for ground water) Day 368.00

c. Laboratory Assistant Grade III (with Degree

qualification to work as works clerk) Day 331.00

Schedule Rate

Item No.  Description Unit

in Rupees

Page 23: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 23/275

13

47 a. Mazdoor employed for Geological maping Day 257.00

b. Mazdoor employed for Pitting, Trenching,

Sampling and Drilling works Day 257.00

c. Mazdoor employed for GeophysicalInvestigation works Day 257.00

d. Head Mazdoor to supervise exploratory works Day 272.00

48 Mixer Operator (including concrete mixer ) Day 280.00

49 Mixer Driver Day 266.00

50 Compressor Operator Day 280.00

51 Computer Operator

a. Gr.I [B.E. (Computer Science)/

M.Sc., (Computer Science)] Day 527.00

b. Gr.II [B.Sc., (Computer Science)/

Diploma in Computer Science] Day 474.0052 Stone & Crusher Operator Day 280.00

53 Heavy Mazdoor Day 280.00

54 Wireman Grade I/ Electrician Grade I Day 358.00

55 Wireman Grade II/ Electrician Grade II Day 339.00

56 Electrical Helper Day 255.00

57 Laboratory Attendant Day 228.00

58 Electrical Maistry Day 390.00

59 Axe Mazdoor Day 240.00

60 Blacksmith - 1st Class Day 317.00

61 Blacksmith - 2nd Class Day 291.00

62 Boat Mazdoor Day 266.00

63 Bullocks pair with driver (with bandy) Day 474.00

64 Bullocks single with driver (with bandy) Day 342.00

65 Caulker Day 266.00

66 Ferry Mazdoor Day 266.00

67 Hammer Mazdoor Day 255.00

68 Mechanic - 1st Class Day 317.00

69 Mechanic - 2nd Class Day 291.00

70 Navagonies or Javali Man - 1st Class Day 266.00

71 Sawyer Day 291.00

72 Smith 1st Class Day 316.0073 Smith 2nd Class Day 291.00

74 Sprayer Mazdoor (for bitumen, tar etc.,) Day 240.00

75 Syrang-1st Class Day 316.00

76 Syrang-2 nd Class Day 291.00

77 Thatcher Day 255.00

78 Tinker 1 st Class Day 255.00

79 Tinker 2 nd Class Day 240.00

80 Turner 1 st Class Day 291.00

Schedule Rate

Item No.  Description Unit

in Rupees

Page 24: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 24/275

14

81 Turner 2 nd Class Day 266.00

82 Time Keeper Ist Class Day 316.00

83 Time Keeper 2nd Class Day 291.00

84 Well Diver for removing silt - 1 st Class Day 316.0085 Well Diver for removing silt - 2nd Class Day 291.00

86 Well sinker - 1st Class Day 357.00

87 Well sinker - 2nd Class Day 331.00

88 Wodder Day 266.00

89 Cinema Operator (ITI Passed) Day 331.00

90 B.Sc., (Agriculture) Passed Day 474.00

91 Irrigation Community Organiser Grade I

[B.E(Agri) passed/B.Sc.,(Agri)Passed/PG (Geology) & 

Rural Development] Day 508.00

92 Irrigation Community Organiser Grade II [B.E (Agri)]failed / B.Sc.,(Agri)failed /Diploma in Agri. Passed)] Day 423.00

93 Heat Master Operator Day 266.00

94 Raker Day 266.00

95 Lift Operator Day 306.00

96 Sound Service Operator Day 255.00

Schedule Rate

Item No.  Description Unit

in Rupees

Page 25: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 25/275

RATES FOR MATERIALS

Page 26: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 26/275

Page 27: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 27/275

17

1.0 PVC PIPE WITH EXCISE DUTY AS PER IS 4985 / 2000

Sl. Description Unit

Rate for 2014-15 in

NoRupees

I Quarter II Quarter III Quarter IV Quarter

I 4KSC

1 63mm Metre 54.00 55.00 55.502 75mm Metre 76.00 77.50 78.503 90mm Metre 107.00 109.00 110.004 110mm Metre 156.00 158.50 160.505 125mm Metre 203.00 206.50 209.006 140mm Metre 253.50 258.00 261.007 160mm Metre 332.00 338.00 342.008 180mm Metre 423.50 431.00 436.509 200mm Metre 521.50 530.50 537.0010 225mm Metre 668.50 680.00 688.5011 250mm Metre 813.00 827.00 837.5012 280mm Metre 1050.00 1067.50 1080.50

13 315mm Metre 1304.50 1327.00 1343.50II 6KSC

1 50mm Metre 47.00 48.00 48.502 63mm Metre 77.00 78.50 79.503 75mm Metre 107.50 109.50 111.004 90mm Metre 156.00 158.50 160.505 110mm Metre 224.50 228.50 231.506 125mm Metre 298.00 303.00 307.007 140mm Metre 368.00 374.50 379.508 160mm Metre 474.50 483.00 489.009 180mm Metre 608.00 618.50 626.5010 200mm Metre 758.50 772.00 781.50

11 225mm Metre 967.00 983.50 996.0012 250mm Metre 1203.00 1223.50 1239.0013 280mm Metre 1511.00 1537.00 1556.0014 315mm Metre 1919.00 1952.00 1976.00III 10KSC

1 50mm Metre 76.00 77.50 78.502 63mm Metre 119.50 121.50 123.003 75mm Metre 170.00 173.00 175.004 90mm Metre 241.00 245.50 248.505 110mm Metre 358.50 365.00 369.506 125mm Metre 463.00 471.00 477.507 140mm Metre 581.00 591.50 599.00

8 160mm Metre 760.50 774.00 784.009 180mm Metre 956.00 973.00 985.5010 200mm Metre 1216.00 1237.00 1252.5011 225mm Metre 1554.00 1580.50 1600.0012 250mm Metre 1922.50 1955.50 1979.5013 280mm Metre 2408.00 2449.00 2479.5014 315mm Metre 3047.00 3099.00 3137.00

Note : The rates are inclusive of all taxes, duties and transportation charges to stockyardanywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance fromstock yard to site are extra.Excise Duty-12.36%, VAT-5%.

Page 28: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 28/275

18

I 4KSC

1 63mm Metre 49.00 50.00 50.502 75mm Metre 68.00 69.00 70.003 90mm Metre 95.00 96.50 98.004 110mm Metre 138.00 140.50 142.005 125mm Metre 178.50 181.50 184.006 140mm Metre 222.00 226.00 229.007 160mm Metre 290.50 295.50 299.508 180mm Metre 373.00 379.50 384.509 200mm Metre 459.00 467.00 473.0010 225mm Metre 590.00 600.50 608.0011 250mm Metre 719.00 731.50 740.5012 280mm Metre 908.00 923.50 935.50

13 315mm Metre 1152.00 1172.00 1186.50II 6KSC

1 50mm Metre 40.50 41.00 42.002 63mm Metre 69.50 70.50 71.503 75mm Metre 95.00 96.50 98.004 90mm Metre 136.50 139.00 140.505 110mm Metre 196.50 200.00 202.506 125mm Metre 261.50 266.00 269.507 140mm Metre 326.00 332.00 336.008 160mm Metre 420.00 427.50 433.009 180mm Metre 532.50 542.00 549.0010 200mm Metre 668.50 680.50 689.00

11 225mm Metre 856.00 871.00 881.5012 250mm Metre 1065.50 1084.00 1097.5013 280mm Metre 1340.50 1363.50 1380.5014 315mm Metre 1695.50 1724.50 1746.00III 10KSC

1 50mm Metre 67.00 68.00 69.002 63mm Metre 106.00 108.00 109.003 75mm Metre 149.50 152.00 154.004 90mm Metre 212.50 216.50 219.005 110mm Metre 316.00 321.50 326.006 125mm Metre 410.00 417.50 422.507 140mm Metre 510.00 519.00 526.00

8 160mm Metre 668.50 680.50 689.009 180mm Metre 842.00 857.00 868.0010 200mm Metre 1079.50 1098.00 1112.0011 225mm Metre 1371.50 1395.00 1412.5012 250mm Metre 1697.00 1726.50 1747.5013 280mm Metre 2129.50 2166.00 2193.0014 315mm Metre 2692.50 2738.50 2772.50

Note : The rates are inclusive of VAT at 5% and transportation charges to stockyardanywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance fromstock yard to site are extra.

1.1 PVC PIPE WITHOUT EXCISE DUTY AS PER IS 4985/2000

Sl. Description Unit

Rate for 2014-15 in

NoRupees

I Quarter II Quarter III Quarter IV Quarter

Page 29: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 29/275

19

1.2 PVC CASING PIPE with Excise Duty AS PER IS 12818 / 2010

Sl. Description Unit

Rate for 2014-15 in

NoRupees

I Quarter II Quarter III Quarter IV Quarter

1 150mm CS Metre 548.00 557.50 564.50

2 150mm CM Metre 705.00 717.50 726.50

3 150mm RS Metre 815.00 828.00 837.00

4 200mm CS Metre 1000.00 1017.00 1030.00

5 200mm CM Metre 1288.00 1310.50 1327.50

6 200mm RS Metre 1488.00 1511.00 1528.00

Note : The rates are inclusive of all taxes, duties andtransportation charges to stockyard

anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from

stock yard to site are extra. Excise Duty-12.36%, VAT-5%.

1.3 PVC CASING PIPE without Excise Duty AS PER IS 12818 / 2010

Sl. Description UnitRate for 2014-15 in Rupees

No I Quarter II Quarter III Quarter IV Quarter

1 150mm CS Metre 489.00 497.50 503.502 150mm CM Metre 618.50 629.50 638.00

3 150mm RS Metre 728.00 739.50 747.50

4 200mm CS Metre 893.00 908.50 919.50

5 200mm CM Metre 1122.00 1142.00 1157.00

6 200mm RS Metre 1329.00 1349.50 1364.50

Note : The rates are inclusive of VAT at 5% and transportation charges to stockyardanywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from

stock yard to site are extra.

CS - Casing Shallow depth up to 80m

CM - Casing Medium depth 81m to 250m

RS - Ribbed screen pipe

Page 30: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 30/275

20

1.4 UPVC- non pressure pipes as per IS 15328/2003

Sl No. Description Unit

Rate for 2014- 15in Rupees

With Excise Withoutduty Excise duty

I SN8-SDR 34(S 16.5)

1 110mm Per Metre 204.00 183.00

2 125mm Per Metre 288.00 265.00

3 160mm Per Metre 438.00 392.00

4 200mm Per Metre 690.00 616.00

5 250mm Per Metre 1100.00 1019.00

6 315mm Per Metre 1745.00 1613.00

7 400mm Per Metre 2806.00 2591.00

II SN4-SDR 41(S 20)1 125mm Per Metre 246.00 196.00

2 160mm Per Metre 375.00 265.00

3 200mm Per Metre 576.00 421.00

4 250mm Per Metre 937.00 658.00

5 315mm Per Metre 1468.00 1019.00

6 400mm Per Metre 2365.00 1613.00

III SN2-SDR 51(S 25)

1 160mm Per Metre 301.00 269.00

2 200mm Per Metre 461.00 412.00

3 250mm Per Metre 751.00 694.00

4 315mm Per Metre 1188.00 1097.00

5 400mm Per Metre 1897.00 1753.00

Note: The above rates are inclusive of all taxes , duties and transportation charges to

stockyard anywhere in Tamilnadu. Unloading, stacking at stock yard and

Conveyance from stock yard to site are extra. Excise duty at 12.36% and VAT

at 5%.

Page 31: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 31/275

21

 1.5 PVC SPECIALS AS PER IS 7834/1987

Sl.No. Description Unit Rate for 2014 -15 in Rupees

PVC THREADED COUPLER 

1 63 mm x 50 mm Each 35.00

2 75 mm x 50 mm Each 53.00

3 90mm x 80 mm Each 72.00

4 110 mm x 100 mm Each 125.00

5 140 mm x 125 mm Each 181.00

UNEQUAL TEE

1 63 mm x 50 mm Each 64.00

2 75 mm X 50 mm Each 129.00

3 90 mm x 50 mm Each 186.00

4 90 mm x 63 mm Each 155.00

5 90 mm x 75 mm Each 155.00

6 110 mm x 50 mm Each 278.00

7 110mm x 63 mm Each 233.00

8 110 mm x 90mm Each 233.00

9 140mm x 50 mm Each 387.00

10 140 mm x 63 mm Each 387.00

11 140 mm x 90 mm Each 387.00

12 140 mm x 110 mm Each 397.00

13 160 mm x 50 mm Each 473.00

14 160 mm x 63 mm Each 473.00

15 160 mm x 90 mm Each 473.00

16 160 mm x 110mm Each 473.00

17 160 mm x140 mm Each 568.00

PVC REDUCER COUPLER 

1 63 mm x 50 mm Each 35.00

2 75 mm x 63 mm Each 36.00

3 90 mm x 63 mm Each 56.00

4 90 mm x 75 mm Each 56.00

5 110 mm x 63 mm Each 75.006 110 mm x 75 mm Each 75.00

7 110 mm x 90 mm Each 98.00

8 140 mm x 63 mm Each 112.00

9 140 mm x 90 mm Each 113.00

10 140 mm x 110 mm Each 117.00

11 160 mm x 110 mm Each 183.00

12 160 mm x 140 mm Each 198.00

Page 32: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 32/275

22

PVC REDUCER MULTI STAGE

1 90 mm x 63 mm Each 81.00

2 110 mm x 63 mm Each 157.00

3 110 mm x 75 mm Each 157.00

4 110 mm x 90 mm Each 177.00

5 140 mm x 90 mm Each 179.00

PVC REDUCER FABRICATED

1 75 mm x 63 mm Each 48.00

2 90 mm x 75 mm Each 73.00

3 110 mm x 90 mm Each 112.00

4 140 mm x 110 mm Each 179.00

5 160 mm x 140 mm Each 272.00

SADDLE PIECE

1 63 mm x 20 mm Each 75.00

2 75 mm x 20 mm Each 93.00

3 90 mm x 20 mm Each 108.00

4 110 mm x 20 mm Each 119.00

5 140 mm x 20 mm Each 177.00

6 160 mm x 20 mm Each 231.00

Note: The above rates are inclusive of all taxes, duties and transportation charges

anywhere in Tamilnadu.Excise duty 12.36% and VAT 5%.

Sl.No. Description Unit Rate for 2014 -15 in Rupees

Page 33: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 33/275

23

    1 .   5

   P   V   C   S   P   E   C   I   A   L   S   A   S   P   E   R   I   S   1   0   1   2   4   /   1   9   8   2   P  a  r   t  -   I   I

  c  o  n   t . .

   S   l .

   R  a   t  e   f  o  r   2   0   1   4

  -   1   5

   i  n

   R  u  p  e  e  s

   N  o .

   D  e  s  c  r   i  p   t   i  o  n

   2   0  m  m

   2   5  m  m

   3   2  m  m

   4   0  m  m

   5   0  m  m

   6   3  m  m

   7   5  m

  m

   9   0  m  m

   1   1   0  m  m

   1   4   0  m  m

   1   6   0  m  m

   2   0   0  m  m

   1

   P   V   C   C  o  u  p   l  e  r  s   f  a   b  r   i  c  a   t  e   d   4   K   S   C

  -

  -

  -

  -

   1   2 .   0

   0

   1   8 .   0

   0

   2   3

 .   0   0

   3   4 .   0

   0

   5   9 .   0

   0

   1   1   6 .   0

   0

   1   4   7 .   0

   0

   2   4   9 .   0

   0

   2

   P   V   C   C  o  u  p   l  e  r  s   f  a   b  r   i  c  a   t  e   d   6   K   S   C

  -

  -

  -

  -

   1   8 .   0

   0

   2   3 .   0

   0

   2   6

 .   0   0

   4   7 .   0

   0

   7   3 .   0

   0

   1   5   1 .   0

   0

   2   1   3 .   0

   0

   4   0   2 .   0

   0

   3

   P   V   C   B  e  n   d  s   f  a   b  r   i  c  a   t  e   d   4   K   S   C

  -

  -

  -

  -

   3   2 .   0

   0

   3   8 .   0

   0

   6   2

 .   0   0

   9   8 .   0

   0

   1   4   0 .   0

   0

   3   8   4 .   0

   0

   6   2   4 .   0

   0

   1   1   8   3 .   0

   0

   4

   P   V   C   B  e  n   d  s   f  a   b  r   i  c  a   t  e   d   6   K   S   C

  -

  -

  -

  -

   3   5 .   0

   0

   5   8 .   0

   0

   1   0   2

 .   0   0

   1   4   2 .   0

   0

   2   3   5 .   0

   0

   6   1   8 .   0

   0

   1   0   0   9 .   0

   0

   2   0   4   4 .   0

   0

   5

   P   V   C   E  q  u  a   l    T  e  e   F  a   b  r   i  c  a   t  e   d   4   K   S   C

  -

  -

  -

  -

   3   5 .   0

   0

   4   3 .   0

   0

   4   6

 .   0   0

   1   1   3 .   0

   0

   1   7   5 .   0

   0

   2   6   9 .   0

   0

   3   2   4 .   0

   0

   4   0   4 .   0

   0

   6

   P   V   C   E  q  u  a   l    T  e  e   F  a   b  r   i  c  a   t  e   d

   B   I   S   1   0   1   2   4   /   1   9   8   2   P  a  r   t   V

   6   K   S   C

  -

  -

  -

  -

   3   9 .   0

   0

   8   6 .   0

   0

   1   1   4

 .   0   0

   1   8   1 .   0

   0

   3   0   4 .   0

   0

   3   9   4 .   0

   0

   4   2   1 .   0

   0

   5   0   0 .   0

   0

   7

   P   V   C   C  o  u  p   l  e  r  s   (   M  o  u   l   d   )

   B   I   S   7   8   3   4   /   1   9   7   5   P  a  r   t   V   I

   6 .   0

   0

   1   0 .   0

   0

   1   1 .   0   0

   1   9 .   0

   0

   2   8 .   0

   0

   4   8 .   0

   0

   7   2

 .   0   0

   1   1   3 .   0

   0

   1   5   7 .   0

   0

   2   3   1 .   0

   0

   3   1   2 .   0

   0

   4   8   2 .   0

   0

   8

   P   V   C   E   l   b  o  w   (   M  o  u   l   d   )

   B   I   S   7   8   3   4   /   1   9   7   5   P  a  r   t   V   I

   8 .   0

   0

   1   0 .   0

   0

   1   3 .   0   0

   2   5 .   0

   0

   4   8 .   0

   0

   5   2 .   0

   0

   7   7

 .   0   0

   1   1   4 .   0

   0

   1   7   6 .   0

   0

   3   5   4 .   0

   0

   4   3   6 .   0

   0

   5   2   6 .   0

   0

   9

   P   V   C   E  q  u  a   l    t  e  e   (   M  o  u   l   d   )

   B   I   S   7   8   3   4   /   1   9   7   5

   9 .   0

   0

   1   7 .   0

   0

   2   5 .   0   0

   2   7 .   0

   0

   5   3 .   0

   0

   9   6 .   0

   0

   1   1   2 .   0

   0

   1   8   2 .   0

   0

   2   9   0 .   0

   0

   7   1   1 .   0

   0

   7   9   2 .   0

   0

   1   1   8   6 .   0

   0

   1   0

   P   V   C   M  a   l  e   T   h  r  e  a   d  e   d   A   d  o  p   t  e  r

  -

  -

  -

  -

   2   6 .   0

   0

   3   5 .   0

   0

   3   6

 .   0   0

   6   5 .   0

   0

   1   1   3 .   0

   0

   1   7   3 .   0

   0

   1   9   6 .   0

   0

   3   1   7 .   0

   0

   1   1

   P   V   C   E  n   d   C  a  p

   4 .   0

   0

   5 .   0

   0

   9 .   0   0

   1   2 .   0

   0

   1   4 .   0

   0

   2   4 .   0

   0

   4   3

 .   0   0

   6   5 .   0

   0

   8   6 .   0

   0

   1   7   8 .   0

   0

   2   5   1 .   0

   0

   3   8   3 .   0

   0

   1   2

   P   V   C   T  a   i   l   p   i  e  c  e  w   i   t   h  o  u   t

   f   l  a  n  g  e

   (   B   I   S  m  a  r   k  s   )

  -

  -

  -

  -

   2   9 .   0

   0

   3   1 .   0

   0

   3   9

 .   0   0

   5   7 .   0

   0

   8   6 .   0

   0

   1   4   8 .   0

   0

   2   1   3 .   0

   0

   3   1   9 .   0

   0

   1   3

   P   V   C   f   l  a  n  g  e   d   T  a   i   l   p   i  e  c  e

  -

  -

  -

  -

  -

   1   8   1 .   0

   0

   2   1   6

 .   0   0

   2   7   0 .   0

   0

   3   1   5 .   0

   0

   5   2   4 .   0

   0

   6   8   6 .   0

   0

   1   0   2   7 .   0

   0

   N  o   t  e  :   T   h  e  a   b  o  v  e  r  a   t  e  s  a  r  e

   i  n  c   l  u  s   i  v  e  o   f  a   l   l    t  a  x  e  s ,   d  u   t   i  e  s  a  n   d

   t  r  a  n  s  p  o  r   t  a   t   i  o  n  c   h  a  r  g  e  s  a  n  y  w   h  e  r

  e   i  n   T  a  m   i   l  n  a   d  u .   E  x  c   i  s  e   d  u   t  y   1   2 .   3

   6   % 

  a  n   d   V   A   T   5   % .

Page 34: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 34/275

24

2.0 HDPE PIPES - PE 100 with excise duty AS PER IS 4984/1995

Sl. Description Unit

Rate for 2014-15

Noin Rupees

I Quarter II Quarter III Quarter IV Quarter

PN 6

1 50 mm metre 62.00 62.00 63.50

2 63 mm metre 96.50 96.50 98.50

3 75 mm metre 139.00 139.50 142.00

4 90 mm metre 196.00 196.50 200.50

5 110 mm metre 288.00 288.50 294.50

6 125 mm metre 373.00 374.00 381.50

7 140 mm metre 469.00 470.00 479.50

8 160 mm metre 611.00 612.50 625.00

9 180 mm metre 771.00 773.00 788.50

10 200 mm metre 949.00 951.50 970.50

11 225 mm metre 1189.50 1192.50 1216.5012 250 mm metre 1481.00 1484.50 1514.50

13 280 mm metre 1857.00 1861.50 1899.00

14 315 mm metre 2351.00 2357.00 2404.00

15 355 mm metre 2980.00 2987.50 3047.00

16 400 mm metre 3853.00 3862.50 3940.00

17 450 mm metre 4874.00 4886.50 4984.00

18 500 mm metre 6026.00 6041.00 6162.00

19 560 mm metre 7545.00 7564.00 7715.00

20 630 mm metre 9551.00 9575.00 9766.50

PN 81 50 mm metre 78.00 78.00 80.00

2 63 mm metre 124.00 124.50 127.00

3 75 mm metre 174.50 175.00 178.50

4 90 mm metre 251.00 251.50 256.50

5 110 mm metre 373.00 374.00 381.50

6 125 mm metre 482.00 483.00 493.00

7 140 mm metre 603.00 604.50 616.50

8 160 mm metre 786.00 788.00 803.50

9 180 mm metre 992.50 995.00 1015.00

10 200 mm metre 1224.00 1227.00 1251.5011 225 mm metre 1550.00 1554.00 1585.00

12 250 mm metre 1909.00 1914.00 1952.00

13 280 mm metre 2395.00 2401.00 2449.00

14 315 mm metre 3028.00 3035.50 3096.50

15 355 mm metre 3832.00 3841.50 3918.50

16 400 mm metre 4966.00 4978.50 5078.00

17 450 mm metre 6263.00 6279.00 6405.00

18 500 mm metre 7742.50 7762.00 7917.50

Page 35: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 35/275

25

19 560 mm metre 9741.00 9765.50 9960.50

20 630 mm metre 12323.00 12354.00 12601.00

PN 10

1 50 mm metre 95.00 95.00 97.00

2 63 mm metre 151.00 151.50 154.50

3 75 mm metre 213.00 213.50 218.00

4 90 mm metre 305.00 306.00 312.00

5 110 mm metre 451.00 452.00 461.00

6 125 mm metre 581.00 582.50 594.00

7 140 mm metre 727.00 729.00 743.50

8 160 mm metre 949.00 951.50 970.50

9 180 mm metre 1204.00 1207.00 1231.00

10 200 mm metre 1386.50 1390.00 1420.0011 225 mm metre 1873.00 1877.50 1915.50

12 250 mm metre 2307.00 2313.00 2359.00

13 280 mm metre 2890.00 2897.50 2955.00

14 315 mm metre 3661.00 3670.00 3743.50

15 355 mm metre 4656.00 4667.50 4761.00

16 400 mm metre 6032.00 6047.00 6168.00

17 450 mm metre 7609.00 7628.00 7780.50

18 500 mm metre 9340.50 9364.00 9552.50

19 560 mm metre 11776.00 11805.50 12041.50

20 630 mm metre 14918.00 14955.50 15254.50PN 12.5

1 50 mm metre 115.00 115.50 117.50

2 63 mm metre 179.00 179.50 183.00

3 75 mm metre 253.00 253.50 258.50

4 90 mm metre 366.00 367.00 374.50

5 110 mm metre 542.00 543.50 554.00

6 125 mm metre 698.00 700.00 713.50

7 140 mm metre 876.00 878.00 896.00

8 160 mm metre 1142.00 1145.00 1168.00

9 180 mm metre 1445.00 1448.50 1477.5010 200 mm metre 1782.00 1786.50 1822.00

11 225 mm metre 2256.00 2261.50 2307.00

12 250 mm metre 2775.00 2782.00 2837.50

13 280 mm metre 3480.00 3488.50 3558.50

14 315 mm metre 4406.00 4417.00 4505.50

15 355 mm metre 5593.00 5607.00 5719.00

16 400 mm metre 7251.00 7269.00 7414.50

17 450 mm metre 9172.00 9195.00 9379.00

Sl. Description Unit

Rate for 2014-15

Noin Rupees

I Quarter II Quarter III Quarter IV Quarter

Page 36: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 36/275

26

18 500 mm metre 11307.00 11335.50 11562.00

19 560 mm metre 14174.00 14209.50 14493.50

20 630 mm metre 17935.00 17980.00 18339.50PN 16

1 50 mm metre 138.00 138.50 141.00

2 63 mm metre 217.00 217.50 222.00

3 75 mm metre 307.00 308.00 314.00

4 90 mm metre 442.00 443.00 452.00

5 110 mm metre 655.00 656.50 670.00

6 125 mm metre 847.00 849.00 866.00

7 140 mm metre 1060.00 1062.50 1084.00

8 160 mm metre 1388.00 1391.50 1419.50

9 180 mm metre 1750.00 1754.50 1789.5010 200 mm metre 2162.00 2167.50 2211.00

11 225 mm metre 2733.00 2740.00 2794.50

12 250 mm metre 3372.00 3380.50 3448.00

13 280 mm metre 4227.00 4237.50 4322.50

14 315 mm metre 5342.00 5355.50 5462.50

15 355 mm metre 6778.00 6795.00 6931.00

16 400 mm metre 8787.00 8809.00 8985.00

17 450 mm metre 11135.00 11163.00 11386.00

18 500 mm metre 13731.00 13765.50 14040.50

Note: The above rates are inclusive of all taxes, duties and transportation charges to

stockyard anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance

from stock yard to site are extra. Excise duty 12.36% and VAT 5%.

Sl. Description Unit

Rate for 2014-15

Noin Rupees

I Quarter II Quarter III Quarter IV Quarter

Page 37: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 37/275

27

2.1 HDPE PIPES - PE 100 without excise duty AS PER IS 4984/1995

Sl. Description Unit

Rate for 2014-15

Noin Rupees

I Quarter II Quarter III Quarter IV Quarter

PN 6

1 50 mm metre 56.00 56.00 57.50

2 63 mm metre 88.00 88.00 90.00

3 75 mm metre 124.50 125.00 127.50

4 90 mm metre 172.50 173.00 176.50

5 110 mm metre 255.50 256.00 261.50

6 125 mm metre 331.00 332.00 338.50

7 140 mm metre 414.50 415.50 424.00

8 160 mm metre 541.00 542.50 553.50

9 180 mm metre 680.50 682.00 696.00

10 200 mm metre 841.50 843.50 860.50

11 225 mm metre 1067.50 1070.00 1091.5012 250 mm metre 1309.50 1313.00 1339.00

13 280 mm metre 1642.00 1646.00 1679.50

14 315 mm metre 2079.50 2085.00 2126.50

15 355 mm metre 2633.50 2640.00 2693.50

16 400 mm metre 3406.00 3414.50 3483.50

17 450 mm metre 4308.00 4319.00 4406.00

18 500 mm metre 5326.50 5340.00 5447.50

19 560 mm metre 6912.00 6929.00 7063.50

20 630 mm metre 8751.50 8773.00 8943.50

PN 81 50 mm metre 70.00 70.00 71.50

2 63 mm metre 110.00 110.50 112.50

3 75 mm metre 154.50 155.00 158.00

4 90 mm metre 222.00 222.50 227.00

5 110 mm metre 331.50 332.50 339.00

6 125 mm metre 425.50 426.50 435.00

7 140 mm metre 532.50 534.00 544.50

8 160 mm metre 696.00 698.00 712.00

9 180 mm metre 877.50 879.50 897.50

10 200 mm metre 1081.00 1083.50 1105.5011 225 mm metre 1370.50 1374.00 1401.50

12 250 mm metre 1687.50 1692.00 1726.00

13 280 mm metre 2116.50 2122.00 2164.50

14 315 mm metre 2678.00 2685.00 2739.00

15 355 mm metre 3388.50 3397.00 3465.50

16 400 mm metre 4391.00 4402.00 4490.50

17 450 mm metre 5515.50 5529.50 5642.00

18 500 mm metre 6818.00 6835.50 6974.00

Page 38: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 38/275

28

19 560 mm metre 8922.50 8944.50 9118.00

20 630 mm metre 11256.00 11283.50 11503.50

PN 10

1 50 mm metre 85.50 85.50 87.50

2 63 mm metre 132.50 133.00 135.50

3 75 mm metre 190.00 190.50 194.50

4 90 mm metre 269.50 270.00 275.50

5 110 mm metre 399.00 400.00 408.00

6 125 mm metre 514.00 515.50 525.50

7 140 mm metre 641.50 643.00 656.00

8 160 mm metre 839.00 841.00 858.00

9 180 mm metre 1066.00 1068.50 1090.00

10 200 mm metre 1222.00 1225.50 1252.00

11 225 mm metre 1655.50 1659.50 1693.00

12 250 mm metre 2041.00 2046.00 2087.50

13 280 mm metre 2556.00 2562.50 2614.00

14 315 mm metre 3237.50 3245.50 3311.00

15 355 mm metre 4117.00 4127.50 4210.50

16 400 mm metre 5330.00 5343.50 5451.00

17 450 mm metre 6726.50 6743.50 6879.00

18 500 mm metre 8310.00 8331.00 8498.50

19 560 mm metre 10788.50 10815.00 11025.00

20 630 mm metre 13665.50 13699.00 13965.00

PN 12.5

1 50 mm metre 102.50 103.00 105.00

2 63 mm metre 163.00 163.50 166.50

3 75 mm metre 228.50 229.00 233.50

4 90 mm metre 334.00 335.00 341.50

5 110 mm metre 494.50 495.50 505.50

6 125 mm metre 634.50 636.00 648.50

7 140 mm metre 795.00 797.00 812.50

8 160 mm metre 1039.50 1042.00 1062.50

9 180 mm metre 1312.50 1315.50 1341.50

10 200 mm metre 1619.50 1623.50 1655.50

11 225 mm metre 2052.50 2057.50 2098.00

12 250 mm metre 2523.00 2529.00 2578.50

13 280 mm metre 3167.00 3175.00 3237.00

14 315 mm metre 4009.50 4019.50 4098.00

15 355 mm metre 5086.50 5099.00 5199.00

16 400 mm metre 6596.00 6612.00 6741.50

Sl. Description Unit

Rate for 2014-15

Noin Rupees

I Quarter II Quarter III Quarter IV Quarter

Page 39: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 39/275

29

17 450 mm metre 8402.00 8422.50 8586.00

18 500 mm metre 10358.50 10384.00 10585.50

19 560 mm metre 12981.50 13013.00 13266.0020 630 mm metre 16427.50 16467.50 16787.50

PN 16

1 50 mm metre 124.00 124.50 127.00

2 63 mm metre 206.00 206.50 210.50

3 75 mm metre 277.50 278.00 283.50

4 90 mm metre 400.00 401.00 409.00

5 110 mm metre 597.00 598.50 610.00

6 125 mm metre 770.00 772.00 787.00

7 140 mm metre 964.00 966.50 985.50

8 160 mm metre 1262.00 1265.00 1290.009 180 mm metre 1591.50 1595.50 1626.50

10 200 mm metre 1964.00 1969.00 2007.50

11 225 mm metre 2486.50 2492.50 2541.50

12 250 mm metre 3067.00 3074.50 3134.50

13 280 mm metre 3843.50 3853.00 3928.50

14 315 mm metre 4860.50 4872.50 4968.00

15 355 mm metre 6165.00 6180.00 6301.00

16 400 mm metre 7993.00 8012.50 8169.50

17 450 mm metre 10198.50 10223.50 10422.00

18 500 mm metre 12878.00 12908.50 13153.50

Note:The above rates are inclusive of VAT at 5% and transportation charges to stockyard

anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from stock yard

to site are extra.

Sl. Description Unit

Rate for 2014-15

Noin Rupees

I Quarter II Quarter III Quarter IV Quarter

Page 40: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 40/275

30

2.2 SPECIALS FOR HDPE PIPES AS PER IS 8360/1977/Part I, II, III

Sl. Description Unit

Rate for 2014-15

Noin Rupees

90 Degree Bend Equal Tee

PN 6

1 50 mm each 50.00 57.002 63 mm each 73.00 79.003 75 mm each 100.00 106.004 90 mm each 153.00 218.005 110 mm each 252.00 357.006 125 mm each 354.00 390.007 140 mm each 476.00 536.008 160 mm each 679.00 788.009 180 mm each 984.00 1120.0010 200 mm each 1336.00 1493.0011 225 mm each 1835.00 2106.0012 250 mm each 2440.00 2863.00

13 280 mm each 3375.00 3979.0014 315 mm each 6258.00 5488.0015 355 mm each 8380.00 7676.0016 400 mm each 11866.00 11226.0017 450 mm each 15742.00 15324.0018 500 mm each 24873.00 25016.0019 560 mm each 30745.00 31270.0020 630 mm each 36834.00 47654.00

PN 8

1 125 mm each 398.00 488.002 140 mm each 532.00 668.003 160 mm each 757.00 967.00

4 180 mm each 1058.00 1349.005 200 mm each 1430.00 1802.006 225 mm each 1954.00 2513.007 250 mm each 2629.00 3390.008 280 mm each 3637.00 4685.009 315 mm each 7558.00 6418.0010 355 mm each 10777.00 8928.0011 400 mm each 15731.00 12947.0012 450 mm each 22409.00 18286.0013 500 mm each 30736.00 33075.0014 560 mm each 43194.00 41410.0015 630 mm each 61502.00 52728.00

PN 10

1 50 mm each 68.00 72.002 63 mm each 112.00 124.003 75 mm each 144.00 177.004 90 mm each 202.00 282.005 110 mm each 326.00 472.006 125 mm each 502.00 658.007 140 mm each 655.00 908.008 160 mm each 926.00 1463.009 180 mm each 1416.00 1960.00

Page 41: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 41/275

31

10 200 mm each 1838.00 2584.00

11 225 mm each 2483.00 3548.0012 250 mm each 3315.00 4825.0013 280 mm each 4598.00 6897.0014 315 mm each 9649.00 9081.0015 355 mm each 12223.00 13752.0016 400 mm each 17932.00 18850.0017 450 mm each 22937.00 23942.0018 500 mm each 30755.00 41135.0019 560 mm each 52215.00 69428.0020 630 mm each 74445.00 98947.00

PN 12.51 125 mm each 586.00 835.00

2 140 mm each 818.00 1178.003 160 mm each 1171.00 1754.004 180 mm each 1625.00 2514.005 200 mm each 2174.00 3444.006 225 mm each 3094.00 4532.007 250 mm each 3952.00 6185.008 280 mm each 5656.00 8717.009 315 mm each 11999.00 11445.0010 355 mm each 15876.00 16375.0011 400 mm each 22416.00 21896.0012 450 mm each 32670.00 41443.0013 500 mm each 44776.00 59428.0014 560 mm each 62836.00 83429.0015 630 mm each 89491.00 118773.00

PN 161 50 mm each 111.00 116.002 63 mm each 173.00 170.003 75 mm each 202.00 290.004 90 mm each 311.00 443.005 110 mm each 568.00 806.006 125 mm each 612.00 1014.007 140 mm each 857.00 1427.008 160 mm each 1487.00 2171.009 180 mm each 2007.00 3106.0010 200 mm each 2691.00 4263.00

11 225 mm each 3830.00 5607.0012 250 mm each 4898.00 7666.0013 280 mm each 7003.00 10793.0014 315 mm each 14859.00 14768.0015 355 mm each 19670.00 21139.0016 400 mm each 27829.00 36867.0017 450 mm each 39657.00 50197.0018 500 mm each 54365.00 72003.00

Note:The above rates are inclusive of Excise duty at 12.36%, VAT at 5% andtransportation charges anywhere in Tamilnadu.

Sl. Description Unit

Rate for 2014-15

Noin Rupees

90 Degree Bend Equal Tee

Page 42: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 42/275

32

2.3 JOINTING OF HDPE PIPES

Sl No. Description UnitRate for 2014-15

in Rupees.

1 50 mm Joint 51.00

2 63 mm Joint 64.00

3 75 mm Joint 77.00

4 90 mm Joint 92.00

5 110 mm Joint 112.00

6 125 mm Joint 128.00

7 140 mm Joint 143.00

8 160 mm Joint 163.00

9 180 mm Joint 184.00

10 200 mm Joint 204.00

11 225 mm Joint 230.00

12 250 mm Joint 255.00

13 280 mm Joint 286.00

14 315 mm Joint 321.00

15 355 mm Joint 362.00

16 400 mm Joint 408.00

17 450 mm Joint 459.00

18 500 mm Joint 510.00

19 560 mm Joint 635.00

20 630 mm Joint 727.00

Page 43: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 43/275

33

3.0 A.C.PRESSURE PIPES AS PER IS 1592 / 2003(Without Excise Duty)

Sl.No Description UnitRate for 2014-15

in Rupees

I Class 15

1 80mm Metre 228.00

2 100mm Metre 301.00

3 125mm Metre 392.00

4 150mm Metre 564.00

5 200mm Metre 966.00

6 250mm Metre 1225.00

7 300mm Metre 1718.00

8 350mm Metre 2114.00

9 400mm Metre 2748.00

10 450mm Metre 3259.00

II Class 20

1 80mm Metre 253.002 100mm Metre 410.00

3 125mm Metre 487.00

4 150mm Metre 703.00

5 200mm Metre 1229.00

6 250mm Metre 1574.00

7 300mm Metre 2218.00

8 350mm Metre 2748.00

9 400mm Metre 3590.0010 450mm Metre 4329.00

Note: Excise duty shall be charged extra at 12.36% for non fly ash pipes. Theabove rates are inclusive of VAT at 5% and transportation charges to stockyardanywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyancefrom stock yard to site are extra.

Page 44: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 44/275

34

 3.1 A.C. COUPLER AS PER IS 1592 /2003(Without Excise Duty)

Sl.No Description UnitRate for 2014-15

in Rupees

I Class 15

1 80mm Each 198.00

2 100mm Each 252.00

3 125mm Each 318.00

4 150mm Each 440.00

5 200mm Each 625.00

6 250mm Each 739.00

7 300mm Each 936.00

8 350mm Each 1192.00

9 400mm Each 1718.00

10 450mm Each 2080.00

II Class 20

1 80mm Each 202.002 100mm Each 256.00

3 125mm Each 334.00

4 150mm Each 470.00

5 200mm Each 685.00

6 250mm Each 896.00

7 300mm Each 1165.00

8 350mm Each 1501.00

9 400mm Each 2182.00

10 450mm Each 2666.00

Note: Excise duty shall be charged extra at 12.36% for non fly ash pipes. Theabove rates are inclusive of VAT at 5% and transportation charges anywherein Tamilnadu.

Page 45: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 45/275

35

 3.2 C.I.D.JOINTS AS PER IS 8794 / 1988

Sl.No Description UnitRate for 2014-15

in Rupees

I Class 15

1 80mm Each 374.00

2 100mm Each 469.00

3 125mm Each 592.00

4 150mm Each 758.00

5 200mm Each 1102.00

6 250mm Each 1434.00

7 300mm Each 1730.00

8 350mm Each 2910.00

9 400mm Each 3629.00

10 450mm Each 4358.00

II Class 20

1 80mm Each 383.002 100mm Each 475.00

3 125mm Each 638.00

4 150mm Each 768.00

5 200mm Each 1171.00

6 250mm Each 1544.00

7 300mm Each 1589.00

8 350mm Each 3096.00

9 400mm Each 3716.00

10 450mm Each 4389.00

Note: Excise Duty is applicable on CID Joints.The above rates are inclusive of Vat at 5% and transportation chargesanywhere in Tamilnadu.

Page 46: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 46/275

36

4.0 C.I. SPUN PIPES AS PER IS 1536/2001 Amendment No.3.July 2008

Sl No. Description Unit

Rate for 2014- 15in Rupees

With Excise Withoutduty Excise duty

I LA Class

1 80mm Metre 1135.00 1073.00

2 100mm Metre 1406.00 1330.00

3 125mm Metre 1824.00 1723.00

4 150mm Metre 2182.00 2062.00

5 200mm Metre 3182.00 3008.00

6 250mm Metre 4290.00 4055.00

7 300mm Metre 5534.00 5232.00

8 350mm Metre 7116.00 6729.00

9 400mm Metre 8661.00 8189.00

10 450mm Metre 10494.00 9923.00

11 500mm Metre 12353.00 11678.00

12 600mm Metre 16427.00 15532.00

13 700mm Metre 21239.00 20079.00

14 750mm Metre 23848.00 22549.00

II A Class1 80mm Metre 1234.00 1166.00

2 100mm Metre 1548.00 1464.00

3 125mm Metre 1989.00 1881.00

4 150mm Metre 2389.00 2259.00

5 200mm Metre 3457.00 3269.00

6 250mm Metre 4673.00 4417.00

7 300mm Metre 6050.00 5720.00

8 350mm Metre 7719.00 7298.00

9 400mm Metre 9466.00 8949.00

10 450mm Metre 11526.00 10898.00

11 500mm Metre 13455.00 12721.00

12 600mm Metre 17932.00 16956.00

13 700mm Metre 23133.00 21867.00

14 750mm Metre 25986.00 24567.00

Page 47: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 47/275

37

III B Class

1 80mm Metre 1323.00 1251.00

2 100mm Metre 1651.00 1561.00

3 125mm Metre 2142.00 2025.00

4 150mm Metre 2574.00 2434.00

5 200mm Metre 3737.00 3533.00

6 250mm Metre 5053.00 4778.00

7 300mm Metre 6552.00 6197.00

8 350mm Metre 8368.00 7913.00

9 400mm Metre 10218.00 9661.00

10 450mm Metre 12434.00 11758.00

11 500mm Metre 14559.00 13764.00

12 600mm Metre 19427.00 18368.00

13 700mm Metre 24930.00 23562.00

14 750mm Metre 28115.00 26575.00

Note: The above rates are inclusive of VAT at 5% and transportation charges to

stockyard anywhere in Tamilnadu. Unloading, stacking at stock yard andConveyance from stock yard to site are extra. Excise duty at 12.36%

Sl No. Description Unit

Rate for 2014- 15in Rupees

With Excise Withoutduty Excise duty

Page 48: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 48/275

38

4.1 C.I D/F PIPES AS PER IS 7181/1986 & IS 1537

Sl No. Description Unit

Rate for 2014- 15in Rupees

With Excise Withoutduty Excise duty

I STANDARD

1 80mm to 200mm Kg 69.00 62.00

2 250mm to 400mm Kg 72.00 65.00

3 450mm to 750mm Kg 80.00 72.00

II NON-STANDARD

1 80mm to 200mm Kg 77.00 69.00

2 250mm to 400mm Kg 79.00 71.00

3 450mm to 750mm Kg 80.00 72.00

4.2 CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1993

Sl No. Description Unit

Rate for 2014- 15in Rupees

With Excise Withoutduty Excise duty

I STANDARD

1 80mm to 200mm Kg 67.00 61.00

2 250mm to 400mm Kg 81.00 73.00

3 450mm to 750mm Kg 84.00 76.00

II. NON-STANDARD

1 80mm to 200mm Kg 68.00 62.00

2 250mm to 400mm Kg 82.00 77.00

3 450mm to 750mm Kg 84.00 78.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywherein Tamilnadu.Excise duty at 12.36%

Page 49: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 49/275

39

5.0 G I PIPES (MEDIUM) AS PER IS 1239/PART I/90

Sl.No Size Unit

Rate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

1 15mm metre 94.00 86.00

2 20mm metre 124.00 114.00

3 25mm metre 179.00 166.00

4 32mm metre 226.00 209.00

5 40mm metre 263.00 242.00

6 50mm metre 356.00 330.00

7 65mm metre 456.00 422.00

8 80mm metre 565.00 522.00

9 100mm metre 806.00 744.00

10 125mm metre 1157.00 1069.00

11 150mm metre 1292.00 1195.00

Note: The above rates are inclusive of all taxes, duties and transportationcharges to stockyard anywhere in Tamilnadu. Unloading, stacking at stockyard and Conveyance from stock yard to site are extra. Excise duty 12.36%and VAT 5%.

Page 50: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 50/275

40

5.1 G.I. SPECIALS AS PER IS

Sl.No. Description UnitRates for 2014-15

in Rupees

GI REDUCER (HEAVY)

1 100 mm x 80 mm Each 404.00

2 100 mm x 65 mm Each 404.003 100 mm x 50 mm Each 404.00

4 80 mm x 65 mm Each 251.00

5 80 mm x 50 mm Each 251.00

6 80 mm x 40 mm Each 251.00

7 80 mm x 32 mm Each 251.00

8 65 mm x 50 mm Each 174.00

9 65 mm x 40 mm Each 174.00

10 65 mm x 32 mm Each 174.00

11 65 mm x 20 mm Each 174.00

12 50 mm x 40 mm Each 95.0013 50 mm x 32 mm Each 95.00

14 50 mm x 20 mm Each 95.00

15 40 mm x 32 mm Each 64.00

16 40 mm x 20 mm Each 64.00

GI REDUCER (MEDIUM)

1 100 mm x 80 mm Each 292.00

2 100 mm x 65mm Each 292.00

3 100 mm x 50 mm Each 292.00

4 80 mm x 65 mm Each 161.00

5 80 mm x 50 mm Each 122.006 80 mm x 40 mm Each 122.00

7 80 mm x 32 mm Each 122.00

8 65 mm x 50 mm Each 91.00

9 65 mm x 40 mm Each 91.00

10 65 mm x 32 mm Each 91.00

11 65 mm x 20 mm Each 91.00

12 50 mm x 40 mm Each 61.00

13 50 mm x 32 mm Each 61.00

14 50 mm x 20 mm Each 61.00

15 40 mm x 32 mm Each 40.0016 40 mm x 20 mm Each 40.00

G I UNEQUAL TEE (HEAVY)

1 100 mm x 80 mm Each 785.00

2 100 mm x 65mm Each 785.00

3 100 mm x 50 mm Each 785.00

4 80 mm x 65 mm Each 457.00

5 80 mm x 50 mm Each 457.00

6 80 mm x 40 mm Each 457.00

Page 51: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 51/275

41

7 80 mm x 32 mm Each 457.00

8 65 mm x 50 mm Each 336.00

9 65 mm x 40 mm Each 336.00

10 65 mm x 32 mm Each 336.0011 65 mm x 20 mm Each 336.00

12 50 mm x 40 mm Each 200.00

13 50 mm x 32 mm Each 200.00

14 50 mm x 20 mm Each 200.00

15 40 mm x 32 mm Each 126.00

16 40 mm x 20 mm Each 126.00

17 32 mm x 20 mm Each 90.00

G.I UNEQUAL TEE(MEDIUM)

1 100 mm x 80 mm Each 445.00

2 100 mm x 65mm Each 445.00

3 100 mm x 50 mm Each 445.004 80 mm x 65 mm Each 220.00

5 80 mm x 50 mm Each 220.00

6 80 mm x 40 mm Each 220.00

7 80 mm x 32 mm Each 220.00

8 65 mm x 50 mm Each 154.00

9 65 mm x 40 mm Each 154.00

10 65 mm x 32 mm Each 154.00

11 65 mm x 20 mm Each 154.00

12 50 mm x 40 mm Each 91.00

13 50 mm x 32 mm Each 91.00

14 50 mm x 20 mm Each 91.0015 40 mm x 32 mm Each 65.00

16 40 mm x 20 mm Each 65.00

17 32 mm x 20 mm Each 65.00

MS BOLTS AND NUTS

1 16 mm dia x 65 to 90 mm

length fully threaded bolts

and nuts with 2 Nos. Kg. 76.00

2 20mm dia and above x

90mm to 120mm length fully

threaded bolts and

with nuts 2 Nos. Kg. 79.00

RUBBER INSERTION SHEET

1 3 Ply R.I. Sheet Kg. 66.00

AC COWL

1 80 mm dia Each 29.00

2 100 mm dia Each 49.00

Note : The above rates are inclusive of all taxes, duties and transportation

charges.Excise duty 12.36% and VAT at 5%.

Sl.No. Description UnitRates for 2014-15

in Rupees

Page 52: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 52/275

42

   5 .   1

   G .   I .

   S   P   E   C   I   A   L   S

   A   S

   P   E   R   I   S

   C   O   N   T   I   N   U   E   D … .

   S   l .   N  o .

   D  e  s  c  r   i  p   t

   i  o  n

   R  a   t  e   f  o  r   2   0   1   4  -   1   5

   i  n   R  u  p  e  e  s

   1   5  m  m

   2   0  m

  m

   2   5  m  m

   3   2  m  m

   4   0

  m  m

   5   0  m  m

   6   5  m  m

   8   0  m  m

   1   0   0  m  m

   1

   G .   I .

   E  q  u  a   l    E   l   b  o  w  p   l  a   i  n

   1   9 .   0

   0

   2   6 .   0

   0

   4   0 .   0

   0

   6   5 .   0

   0

   8   2

 .   0   0

   1   2   5 .   0

   0

   2   2   3 .   0

   0

   3   2   9 .   0

   0

   5   9   0 .   0

   0

   2

   G .   I .

   E  q  u  a   l    T  e  e  p   l  a

   i  n

   2   9 .   0

   0

   3   6 .   0

   0

   5   2 .   0

   0

   7   6 .   0

   0

   1   1   2 .   0

   0

   1   8   5 .   0

   0

   2   9   9 .   0

   0

   4   1   3 .   0

   0

   7   3   8 .   0

   0

   3

   G .   I .

   C  o  u  p   l   i  n  g

   1   7 .   0

   0

   1   8 .   0

   0

   2   4 .   0

   0

   4   3 .   0

   0

   6   5

 .   0   0

   9   7 .   0

   0

   1   7   2 .   0

   0

   2   0   4 .   0

   0

   4   0   9 .   0

   0

   4

   G .   I .

   F   l  a  n  g  e  s  e   t

  —

  —

  —

  —

  —

   6   0 .   0

   0

   7   3 .   0

   0

   8   2

 .   0   0

   1   3   7 .   0

   0

   5

   G .   I .

   C  r  o  s  s

   4   4 .   0

   0

   5   5 .   0

   0

   8   9 .   0

   0

   1   4   4 .   0

   0

   1   8   6 .   0

   0

   2   8   1 .   0

   0

   4   5   1 .   0

   0

   6   8   6 .   0

   0

   9   0   4 .   0

   0

   6

   G .   I .

   H  e  x   N   i  p  p   l  e

   1   7 .   0

   0

   3   0 .   0

   0

   3   0 .   0

   0

   4   7 .   0

   0

   6   1

 .   0   0

   8   3 .   0

   0

   1   4   8 .   0

   0

   2   0   3 .   0

   0

   3   0   1 .   0

   0

   7

   G .   I .

   T   h  r  e  e   W  a  y   E   l   b  o  w

   3   8 .   0

   0

   5   8 .   0

   0

   8   4 .   0

   0

   1   3   4 .   0

   0

   1   7   6 .   0

   0

   2   8   2 .   0

   0

  —

  —

  —

   8

   G .   I .

   P   l  u  g   D   i  a   H  e  a   d

   T  a  p  e  r   T   h  r  e  a   d

   8 .   0

   0

   1   6 .   0

   0

   1   6 .   0

   0

   2   8 .   0

   0

   2   8

 .   0   0

   5   2 .   0

   0

   7   2 .   0

   0

   1   0   2 .   0

   0

   1   4   4 .   0

   0

   9

   G .   I .

   B  e  n   d

   1   8 .   0

   0

   3   0 .   0

   0

   4   7 .   0

   0

   5   8 .   0

   0

   7   6

 .   0   0

   1   1   4 .   0

   0

   2   1   1 .   0

   0

   2   9   3 .   0

   0

   5   1   4 .   0

   0

   1   0

   G .   I .

   U  n   i  o  n

   5   1 .   0

   0

   5   5 .   0

   0

   9   2 .   0

   0

   1   3   0 .   0

   0

   1   6   6 .   0

   0

   2   3   5 .   0

   0

   4   6   2 .   0

   0

   6   1   4 .   0

   0

   9   1   4 .   0

   0

   1   1

   G .   M .

   F  e  r  r  u   l  e

   2   8   6 .   0

   0

   4   2   9

 .   0   0

   6   3   2 .   0

   0

  —

  —

  —

  —

  —

  —

   1   2

   G .   I .  s   t  o  p  c  o  c   k

   1   3   6 .   0

   0

   1   8   1

 .   0   0

   3   2   9 .   0

   0

   4   9   3 .   0

   0

   7   3   3 .   0

   0

   1   0   5   8 .   0

   0

   1   4   0   2 .   0

   0

   1   7   8

   4 .   0

   0

   2   8   2   2 .   0

   0

   1   3

   R  u   b   b  e  r  s   h  e  e   t   f  o  r

   F   l  a  n  g  e  s  e   t

  —

  —

  —

  —

  —

   1   1 .   0

   0

   1   1 .   0

   0

   1   6

 .   0   0

  —

   1   4

   G .   I .

   R  e   d  u  c  e   d   E   l   b  o

  w   P   l  a   i  n

   2   4 .   0

   0

   2   6 .   0

   0

   4   4 .   0

   0

   7   0 .   0

   0

   9   2

 .   0   0

   1   3   6 .   0

   0

   2   4   4 .   0

   0

   3   6   6 .   0

   0

   6   3   1 .   0

   0

   1   5

   G .   I .

   R  e   d  u  c  e   d   T  e  e   P   l  a   i  n

   3   1 .   0

   0

   4   3 .   0

   0

   6   4 .   0

   0

   9   5 .   0

   0

   1   2   5 .   0

   0

   1   8   4 .   0

   0

   3   2   8 .   0

   0

   4   3   8 .   0

   0

   8   2   6 .   0

   0

   1   6

   G .   I .

   R  e   d  u  c  e   d   S  o  c   k  e   t   P   l  a   i  n

   1   8 .   0

   0

   3   7 .   0

   0

   4   0 .   0

   0

   5   6 .   0

   0

   9   0

 .   0   0

   1   2   2 .   0

   0

   1   8   4 .   0

   0

   2   4   5 .   0

   0

   3   4   8 .   0

   0

   1   7

   G .   I .

   C   h  e  c   k   N  u   t

   1   1 .   0

   0

   1   6 .   0

   0

   2   2 .   0

   0

   3   2 .   0

   0

   4   3

 .   0   0

   5   8 .   0

   0

   1   0   1 .   0

   0

   1   3   1 .   0

   0

   1   7   3 .   0

   0

   1   8

   G .   I .

   R  e   d  u  c  e   d   N   i  p  p

   l  e

   1   7 .   0

   0

   2   0 .   0

   0

   3   6 .   0

   0

   8   2 .   0

   0

   9   6

 .   0   0

   1   4   8 .   0

   0

   2   7   6 .   0

   0

   3   0   7 .   0

   0

   4   2   7 .   0

   0

   1   9

   G .   I .

   D  u  m  m  y   (   H  e  a

  v  y   )

  —

  —

  —

  —

   1   8

 .   0   0

   2   8 .   0

   0

   3   6 .   0

   0

   4   6

 .   0   0

   8   2 .   0

   0

   2   0

   G .   I .

   D  u  m  m  y   (   M  e   d   i  u  m   )

  —

  —

  —

  —

   1   6

 .   0   0

   2   4 .   0

   0

   3   2 .   0

   0

   4   0

 .   0   0

   7   7 .   0

   0

   2   1

   M .   S .   S  a   d   d   l  e   P   i  e  c  e

  —

  —

  —

  —

  —

   7   0 .   0

   0

   7   7 .   0

   0

   8   9

 .   0   0

   1   1   9 .   0

   0

   2   2

   W  a  s   t  e   N  o   t   T  a  p

  —

   1   0   0

 .   0   0

  —

  —

  —

  —

  —

  —

  —

   2   3

   C .   I .

   F  o  o   t  v  a   l  v  e  w   i   t   h  s   t  a   i  n  e  r

  —

  —

  —

  —

  —

   3   1   9 .   0

   0

  —

   4   7   5 .   0

   0

  —

   2   4

   M .   S .   C

   l  a  m  p  s  e   t

  —

  —

  —

  —

  —

  —

  —

   3   9   6 .   0

   0

  —

   N  o   t  e  :   T   h  e  a   b  o  v  e  r  a   t  e  s  a  r  e   i  n  c   l  u  s   i  v  e  o   f  a   l   l    t  a  x  e  s ,

   d  u   t   i  e  s  a  n   d   t  r  a  n  s  p  o  r   t  a   t   i  o  n  c   h  a  r  g  e  s .   E  x  c   i  s  e   d  u   t  y   1   2 .   3

   6   %   a

  n   d   V   A   T  a   t   5   % .

Page 53: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 53/275

43

   5 .   2   G .   M

   G   A   T   E   V   A   L   V   E   S

   A   S   P   E   R   I   S

   S   l .   N  o .

   D  e  s  c  r   i  p   t

   i  o  n

   R  a   t  e   f  o  r   2

   0   1   4  -   1   5

   i  n   R  u  p  e  e  s

   1   5  m  m

   2   0  m

  m

   2   5  m  m

   3   2  m  m

   4   0  m  m

   5   0  m  m

   6   5  m  m

   8   0  m  m

   1   0   0  m  m

   1

   G .   M .   G  a   t  e  v  a   l  v  e  s

  —

   4   1   0 .   0   0

   5   5   3 .   0   0

   7   2   5 .   0   0

   9   8   6

 .   0   0

   1   6   0   8 .   0   0

   2   5   0   7 .   0   0

   3   9   4

   4 .   0   0

   6   7   6   8 .   0   0

   2

   G .   M .   N  o  n   R  e   t  u

  r  n  v  a   l  v  e  s

  —

  —

  —

  —

  —

   1   5   9   4 .   0   0

   1   5   9   4 .   0   0

   2   5   5

   8 .   0   0

  —

   N  o   t  e  :   T   h  e  a   b  o  v  e  r  a   t  e  s

  a  r  e   i  n  c   l  u  s   i  v  e  o   f  a   l   l    t  a  x  e  s ,   d  u

   t   i  e  s  a  n   d   t  r  a  n  s  p  o  r   t  a   t   i  o  n  c   h  a  r

  g  e  s  a  n  y  w   h  e  r  e   i  n

   T  a  m   i   l  n  a   d  u   E  x  c   i  s  e

   D  u   t  y   1   2 .   3   6   %   a  n   d   V   A   T  a   t   5   %

 .

Page 54: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 54/275

44

6.0 DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS K7

AS PER IS 8329/2000

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

1 100 mm metre 1054.00 943.00

2 150 mm metre 1558.00 1394.00

3 200 mm metre 2013.00 1802.00

4 250 mm metre 2651.00 2372.00

5 300 mm metre 3344.00 2992.00

6 350mm metre 4072.00 3645.00

7 400 mm metre 4886.00 4376.00

8 450 mm metre 5776.00 5173.00

9 500 mm metre 6809.00 6095.00

10 600 mm metre 8973.00 8036.00

11 700 mm metre 12288.00 11008.00

12 750 mm metre 14106.00 12627.00

13 800 mm metre 16127.00 14436.00

14 900 mm metre 19945.00 17852.00

15 1000 mm metre 23503.00 21061.00

Note: The above rates are inclusive of all taxes , duties and transportationcharges to stockyard anywhere in Tamilnadu. Unloading, stacking at stockyard and Conveyance from stock yard to site are extra. Excise duty at12.36% and VAT at 5%.

Page 55: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 55/275

45

6.1 DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS K9

AS PER IS 8329/2000

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

1 100 mm metre 1194.00 1068.00

2 150 mm metre 1762.00 1577.00

3 200 mm metre 2391.00 2139.00

4 250 mm metre 3204.00 2866.00

5 300 mm metre 4051.00 3624.00

6 350mm metre 4899.00 4383.00

7 400 mm metre 5878.00 5259.00

8 450 mm metre 7066.00 6325.00

9 500 mm metre 8173.00 7312.00

10 600 mm metre 10816.00 9682.00

11 700 mm metre 13894.00 12438.00

12 750 mm metre 15589.00 13957.00

13 800 mm metre 17306.00 15499.00

14 900 mm metre 21292.00 19052.00

15 1000 mm metre 25103.00 22485.00

Note: The above rates are inclusive of all taxes , duties and transportationcharges to stockyard anywhere in Tamilnadu. Unloading, stacking at stockyard and Conveyance from stock yard to site are extra. Excise duty at12.36% and VAT at 5%.

Page 56: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 56/275

46

6.2 DUCTILE IRON CLASS PN10 FLANGED PIPES

AS PER IS 8329/2000

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

I) 4 m length of pipes

1 80 mm Each 6345.00 5813.00

2 100 mm Each 7347.00 6605.00

3 150 mm Each 10556.00 9669.00

4 200 mm Each 14620.00 13392.00

5 250 mm Each 19283.00 17663.00

6 300 mm Each 24233.00 22198.00

7 350mm Each 32497.00 29524.00

8 400 mm Each 41620.00 37591.009 450 mm Each 50384.00 45667.00

10 500 mm Each 59603.00 54594.00

11 600 mm Each 80512.00 73746.00

12 700 mm Each 101452.00 91704.00

13 750 mm Each 134228.00 122950.00

14 800 mm Each 130636.00 117447.00

15 900 mm Each 178270.00 160271.00

16 1000mm Each 209185.00 188064.00

II) 5 m length of pipes

1 80 mm Each 7340.00 6724.002 100 mm Each 9516.00 8555.00

3 150 mm Each 13857.00 12458.00

4 200 mm Each 18492.00 16625.00

5 250 mm Each 25119.00 22583.00

6 300 mm Each 32092.00 28852.00

7 350 mm Each 39124.00 35700.00

8 400 mm Each 49250.00 44277.00

9 450 mm Each 59359.00 53366.00

10 500 mm Each 68401.00 62204.00

11 600 mm Each 92884.00 85080.0012 700 mm Each 114004.00 104426.00

13 750 mm Each 129145.00 116682.00

14 800 mm Each 144886.00 130257.00

15 900 mm Each 197019.00 177127.00

16 1000 mm Each 231598.00 208215.00

Note: The above rates are inclusive of all taxes , duties and transportationcharges to stockyard anywhere in Tamilnadu. Unloading, stacking at stockyard and Conveyance from stock yard to site are extra. Excise duty at12.36% and VAT at 5%.

Page 57: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 57/275

47

6.3 DUCTILE IRON SPECIALS AS PER IS 9523/2000

Sl.No. Description UnitRates for 2014-15

in Rupees

ALL SOCKET

1 100mm - 200 mm dia Kg 112.00

2 250 mm - 300 mm dia Kg 112.00

3 350 mm - 450 mm dia Kg 114.00

4 500 mm - 600 mm dia Kg 119.00

5 700 mm - 750 mm Kg 175.00

6 800mm Kg 175.00

7 900 mm Kg 185.00

8 1000 mm Kg 201.00

ALL FLANGE

1 100mm - 200 mm dia Kg 117.00

2 250 mm - 300 mm dia Kg 117.00

3 350 mm - 450 mm dia Kg 119.00

4 500 mm - 600 mm dia Kg 124.00

5 700 mm - 750 mm Kg 185.00

6 800 mm Kg 185.00

7 900 mm Kg 201.00

8 1000 mm Kg 201.00

Note: In respect of flanged and spigot, flanged and socketted type specials,the rate applicable for flanged type specials is allowed.

Note: The above rates are inclusive of excise duty at 12.36% , VAT at 5%and transportation charges anywhere in Tamilnadu.

Page 58: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 58/275

48

 7.0 PSC PIPES AS PER IS 784 / 2001

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

I. 4 KSC

1 350 mm Metre 2202.00 2035.00

2 400 mm Metre 2447.00 2261.00

3 450 mm Metre 2759.00 2547.00

4 500 mm Metre 2791.00 2577.00

5 600 mm Metre 3327.00 3073.00

6 700 mm Metre 3791.00 3613.00

7 800 mm Metre 4609.00 4373.00

8 900 mm Metre 5552.00 5292.00

9 1000 mm Metre 6707.00 6257.00

10 1100 mm Metre 7529.00 7194.00

11 1200 mm Metre 9733.00 9143.00

II 6 KSC1 350 mm Metre 2477.00 2288.00

2 400 mm Metre 2680.00 2510.00

3 450 mm Metre 2860.00 2719.00

4 500 mm Metre 3004.00 2856.00

5 600 mm Metre 3595.00 3400.00

6 700 mm Metre 3909.00 3729.00

7 800 mm Metre 4763.00 4558.00

8 900 mm Metre 5750.00 5488.00

9 1000 mm Metre 6938.00 6640.00

10 1100 mm Metre 7772.00 7435.00

11 1200 mm Metre 10034.00 9651.00III 8 KSC

1 350 mm Metre 2491.00 2301.00

2 400 mm Metre 2697.00 2571.00

3 450 mm Metre 2873.00 2731.00

4 500 mm Metre 3040.00 2893.00

5 600 mm Metre 3700.00 3496.00

6 700 mm Metre 4049.00 3868.00

7 800 mm Metre 4947.00 4739.00

8 900 mm Metre 5972.00 5707.00

9 1000 mm Metre 7209.00 6908.00

10 1100 mm Metre 8115.00 7774.0011 1200 mm Metre 10423.00 10035.00

IV 10 KSC

1 350 mm Metre 2515.00 2331.00

2 400 mm Metre 2728.00 2612.00

3 450 mm Metre 2936.00 2794.00

4 500 mm Metre 3122.00 2975.00

5 600 mm Metre 3812.00 3532.00

6 700 mm Metre 4203.00 4020.00

7 800 mm Metre 5138.00 4928.00

Page 59: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 59/275

49

8 900 mm Metre 6199.00 5931.00

9 1000 mm Metre 7483.00 7179.00

10 1100 mm Metre 8450.00 8105.00

11 1200 mm Metre 10812.00 10420.00

V 12 KSC

1 350 mm Metre 2556.00 2379.00

2 400 mm Metre 2796.00 2665.00

3 450 mm Metre 3014.00 2872.00

4 500 mm Metre 3215.00 3067.00

5 600 mm Metre 3936.00 3637.00

6 700 mm Metre 4374.00 4189.00

7 800 mm Metre 5361.00 5149.00

8 900 mm Metre 6454.00 6183.009 1000 mm Metre 7763.00 7456.00

10 1100 mm Metre 8787.00 8438.00

11 1200 mm Metre 11354.00 10955.00

VI 14 KSC

1 350 mm Metre 2595.00 2413.00

2 400 mm Metre 2877.00 2725.00

3 450 mm Metre 3092.00 2949.00

4 500 mm Metre 3309.00 3159.00

5 600 mm Metre 4079.00 3787.00

6 700 mm Metre 4546.00 4359.00

7 800 mm Metre 5587.00 5371.008 900 mm Metre 6734.00 6460.00

9 1000 mm Metre 8240.00 7927.00

10 1100 mm Metre 9332.00 8976.00

11 1200 mm Metre 11829.00 11425.00

VII 16 KSC

1 350 mm Metre 2651.00 2514.00

2 400 mm Metre 2905.00 2781.00

3 450 mm Metre 3170.00 3026.00

4 500 mm Metre 3404.00 3253.00

5 600 mm Metre 4195.00 3875.00

6 700 mm Metre 4720.00 4532.00

7 800 mm Metre 5809.00 5592.00

8 900 mm Metre 7424.00 7142.00

9 1000 mm Metre 8593.00 8276.00

10 1100 mm Metre 10128.00 9661.00

11 1200 mm Metre 12699.00 12167.00

Note: The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu.Excise duty 12.36%.

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

Page 60: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 60/275

50

8.0 BAR WRAPPED STEEL CYLINDER PIPES AS PER IS 15155

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

4 Ksc Pipe

1 350mm Metre 3167.00 3054.00

2 400mm Metre 3481.00 3360.00

3 450mm Metre 3949.00 3818.00

4 500mm Metre 4245.00 4109.00

5 600mm Metre 5750.00 5395.00

6 700mm Metre 7111.00 6780.00

7 800mm Metre 8457.00 7810.00

8 900mm Metre 10885.00 10128.00

9 1000mm Metre 12520.00 11570.00

10 1100mm Metre 15385.00 14737.0011 1200mm Metre 17401.00 16076.00

12 1300mm Metre 20570.00 20148.00

13 1400mm Metre 24151.00 22311.00

14 1500mm Metre 24947.00 23048.00

6 Ksc Pipe

1 350mm Metre 3172.00 3059.00

2 400mm Metre 3492.00 3371.00

3 450mm Metre 3965.00 3834.00

4 500mm Metre 4263.00 4127.00

5 600mm Metre 5775.00 5415.006 700mm Metre 7146.00 6805.00

7 800mm Metre 8493.00 7847.00

8 900mm Metre 10905.00 10165.00

9 1000mm Metre 12791.00 11816.00

10 1100mm Metre 15395.00 14984.00

11 1200mm Metre 17624.00 16281.00

12 1300mm Metre 20590.00 20168.00

13 1400mm Metre 24216.00 22373.00

14 1500mm Metre 25011.00 23106.00

8 Ksc Pipe

1 350mm Metre 3175.00 3062.00

2 400mm Metre 3512.00 3391.00

3 450mm Metre 3983.00 3852.00

4 500mm Metre 4285.00 4149.00

5 600mm Metre 5801.00 5431.00

6 700mm Metre 7171.00 6826.00

7 800mm Metre 8537.00 7887.00

Page 61: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 61/275

51

Sl.No Size Unit

Rate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

8 900mm Metre 10931.00 10204.00

9 1000mm Metre 13050.00 12064.00

10 1100mm Metre 15410.00 15091.00

11 1200mm Metre 17843.00 16484.00

12 1300mm Metre 20616.00 20194.00

13 1400mm Metre 24281.00 22434.00

14 1500mm Metre 25081.00 23170.00

10 Ksc Pipe

1 350mm Metre 3177.00 3064.00

2 400mm Metre 3537.00 3416.00

3 450mm Metre 4005.00 3874.00

4 500mm Metre 4310.00 4174.00

5 600mm Metre 5829.00 5457.006 700mm Metre 7197.00 6852.00

7 800mm Metre 8588.00 7934.00

8 900mm Metre 10957.00 10243.00

9 1000mm Metre 13080.00 12178.00

10 1100mm Metre 15430.00 15111.00

11 1200mm Metre 18069.00 16692.00

12 1300mm Metre 20642.00 20220.00

13 1400mm Metre 24397.00 22539.00

14 1500mm Metre 25177.00 23261.00

12 Ksc Pipe1 350mm Metre 3180.00 3067.00

2 400mm Metre 3565.00 3444.00

3 450mm Metre 4031.00 3900.00

4 500mm Metre 4338.00 4202.00

5 600mm Metre 5859.00 5483.00

6 700mm Metre 7226.00 6878.00

7 800mm Metre 8941.00 8262.00

8 900mm Metre 10985.00 10296.00

9 1000mm Metre 13106.00 12204.00

10 1100mm Metre 15455.00 15136.00

11 1200mm Metre 18121.00 16897.00

12 1300mm Metre 20668.00 20246.00

13 1400mm Metre 24496.00 22632.00

14 1500mm Metre 25276.00 23353.00

14 Ksc Pipe

1 350mm Metre 3183.00 3070.00

2 400mm Metre 3587.00 3466.00

3 450mm Metre 4062.00 3931.00

Page 62: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 62/275

52

4 500mm Metre 4368.00 4232.00

5 600mm Metre 5894.00 5509.00

6 700mm Metre 7252.00 6904.00

7 800mm Metre 9087.00 8579.00

8 900mm Metre 11011.00 10549.00

9 1000mm Metre 13132.00 12230.00

10 1100mm Metre 15515.00 15196.00

11 1200mm Metre 18389.00 17424.00

12 1300mm Metre 20694.00 20272.00

13 1400mm Metre 24680.00 23885.00

14 1500mm Metre 26642.00 24614.00

16 Ksc Pipe

1 350mm Metre 3188.00 3075.002 400mm Metre 3612.00 3491.00

3 450mm Metre 4098.00 3967.00

4 500mm Metre 4775.00 4634.00

5 600mm Metre 6092.00 5936.00

6 700mm Metre 7615.00 7435.00

7 800mm Metre 9577.00 9370.00

8 900mm Metre 11971.00 11463.00

9 1000mm Metre 13956.00 12893.00

10 1100mm Metre 16593.00 16052.00

11 1200mm Metre 19425.00 17945.00

12 1300mm Metre 24118.00 22734.0013 1400mm Metre 26803.00 24762.00

14 1500mm Metre 28007.00 25877.00

18 Ksc Pipe

1 350mm Metre 3193.00 3080.00

2 400mm Metre 3652.00 3531.00

3 450mm Metre 4162.00 4031.00

4 500mm Metre 4945.00 4802.00

5 600mm Metre 6369.00 6210.00

6 700mm Metre 7963.00 7779.00

7 800mm Metre 10028.00 9816.008 900mm Metre 12519.00 12253.00

9 1000mm Metre 15049.00 14751.00

10 1100mm Metre 17398.00 17060.00

11 1200mm Metre 21427.00 21022.00

12 1300mm Metre 25159.00 23856.00

13 1400mm Metre 28375.00 27862.00

14 1500mm Metre 31008.00 28648.00

Note: The above rates are inclusive of VAT at 5% and transportation chargesanywhere in Tamilnadu. Excise duty at 12.36%.

Sl.No Size Unit

Rate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

Page 63: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 63/275

53

9.0 GRP PIPES AS PER IS 12709 / 1994 (WATER SUPPLY)

Sl .No Description Unit

Rate for 2014-15 in Rupees

Stiffness class 248Kpa Stiffness class 496Kpa

With Without With Without

Excise Excise Excise ExciseDuty Duty Duty Duty

PN 3

1 200mm metre 1855.00 1682.00 2041.00 1850.00

2 250mm metre 2530.00 2291.00 2783.00 2520.00

3 300mm metre 2984.00 2703.00 3282.00 2973.00

4 350mm metre 3693.00 3345.00 4062.00 3680.00

5 400mm metre 4029.00 3649.00 4432.00 4014.00

6 450mm metre 4676.00 4235.00 5144.00 4659.00

7 500mm metre 5327.00 4826.00 5860.00 5309.00

8 600mm metre 7179.00 6503.00 7897.00 7153.00

9 700mm metre 9043.00 8190.00 9947.00 9009.00

10 800mm metre 10946.00 9914.00 12041.00 10905.00

11 900mm metre 13906.00 12596.00 15297.00 13856.00

12 1000mm metre 16701.00 15128.00 18371.00 16641.00

13 1100mm metre 19863.00 17989.00 21849.00 19788.00

14 1200mm metre 22627.00 20493.00 24890.00 22542.00

15 1300mm metre 25100.00 22734.00 27610.00 25007.00

16 1400mm metre 29609.00 26819.00 32570.00 29501.00

17 1500mm metre 33722.00 30545.00 37094.00 33600.00

18 1600mm metre 37102.00 33605.00 40812.00 36966.00

19 1700mm metre 40648.00 36817.00 44713.00 40499.00

20 1800mm metre 48594.00 44143.00 53453.00 48557.00

21 1900mm metre 53836.00 48762.00 59220.00 53638.00

22 2000mm metre 57980.00 52516.00 63778.00 57768.00

23 2100mm metre 63396.00 57422.00 69736.00 63164.00

24 2200mm metre 67861.00 61465.00 74647.00 67612.00

PN 6

1 200mm metre 1890.00 1712.00 2079.00 1883.002 250mm metre 2564.00 2323.00 2820.00 2555.00

3 300mm metre 2998.00 2716.00 3298.00 2988.00

4 350mm metre 3705.00 3357.00 4076.00 3693.00

5 400mm metre 4040.00 3660.00 4444.00 4026.00

6 450mm metre 4696.00 4252.00 5166.00 4677.00

7 500mm metre 5372.00 4866.00 5909.00 5353.00

8 600mm metre 7190.00 6513.00 7909.00 7164.00

Page 64: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 64/275

54

9 700mm metre 9066.00 8211.00 9973.00 9032.00

10 800mm metre 10975.00 9940.00 12073.00 10934.00

11 900mm metre 13941.00 12626.00 15335.00 13889.00

12 1000mm metre 16730.00 15154.00 18403.00 16669.00

13 1100mm metre 19938.00 18060.00 21932.00 19866.00

14 1200mm metre 22768.00 20622.00 25045.00 22684.00

15 1300mm metre 25145.00 22776.00 27660.00 25054.00

16 1400mm metre 29635.00 26842.00 32599.00 29526.00

17 1500mm metre 33756.00 30575.00 37132.00 33633.00

18 1600mm metre 37122.00 33623.00 40834.00 36985.00

19 1700mm metre 40706.00 36869.00 44777.00 40556.00

20 1800mm metre 48810.00 44212.00 53691.00 48633.00

21 1900mm metre 53864.00 48788.00 59250.00 53667.00

22 2000mm metre 58020.00 52553.00 63822.00 57808.00

23 2100mm metre 63427.00 57450.00 69770.00 63195.00

24 2200mm metre 67982.00 61576.00 74780.00 67734.00

PN 9

1 200mm metre 1927.00 1746.00 2120.00 1921.00

2 250mm metre 2601.00 2357.00 2861.00 2593.00

3 300mm metre 3046.00 2759.00 3351.00 3035.00

4 350mm metre 3770.00 3415.00 4147.00 3757.00

5 400mm metre 4164.00 3771.00 4580.00 4148.00

6 450mm metre 4830.00 4375.00 5313.00 4813.00

7 500mm metre 5487.00 4970.00 6036.00 5467.00

8 600mm metre 7311.00 6622.00 8042.00 7284.00

9 700mm metre 9203.00 8334.00 10123.00 9167.00

10 800mm metre 11179.00 10126.00 12297.00 11139.00

11 900mm metre 14113.00 12783.00 15524.00 14061.00

12 1000mm metre 16977.00 15378.00 18675.00 16916.00

13 1100mm metre 20249.00 18342.00 22274.00 20176.00

14 1200mm metre 23189.00 21004.00 25508.00 23104.00

15 1300mm metre 25637.00 23222.00 28201.00 25544.00

16 1400mm metre 30187.00 27342.00 33206.00 30076.00

17 1500mm metre 34470.00 31221.00 37917.00 34343.00

18 1600mm metre 37781.00 34219.00 41559.00 37641.00

Sl .No Description Unit

Rate for 2014-15 in Rupees

Stiffness class 248Kpa Stiffness class 496Kpa

With Without With WithoutExcise Excise Excise ExciseDuty Duty Duty Duty

Page 65: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 65/275

55

19 1700mm metre 41896.00 37948.00 46086.00 41743.00

20 1800mm metre 50071.00 45352.00 55078.00 49887.00

21 1900mm metre 55220.00 50016.00 60742.00 55018.00

22 2000mm metre 59556.00 53944.00 65512.00 59338.00

PN 12

1 200mm metre 1964.00 1780.00 2160.00 1958.00

2 250mm metre 2638.00 2389.00 2902.00 2628.00

3 300mm metre 3088.00 2798.00 3397.00 3078.00

4 350mm metre 3842.00 3480.00 4226.00 3828.00

5 400mm metre 4190.00 3795.00 4609.00 4175.00

6 450mm metre 4913.00 4450.00 5404.00 4895.00

7 500mm metre 5580.00 5053.00 6138.00 5558.00

8 600mm metre 7558.00 6845.00 8314.00 7530.00

9 700mm metre 9546.00 8646.00 10501.00 9511.00

10 800mm metre 11530.00 10444.00 12683.00 11488.00

11 900mm metre 14824.00 13428.00 16306.00 14771.00

12 1000mm metre 17554.00 15900.00 19309.00 17490.00

13 1100mm metre 21208.00 19210.00 23329.00 21131.00

14 1200mm metre 24237.00 21953.00 26661.00 24148.00

15 1300mm metre 26785.00 24261.00 29464.00 26687.00

16 1400mm metre 31589.00 28613.00 34748.00 31474.00

17 1500mm metre 35888.00 32507.00 39477.00 35758.00

18 1600mm metre 39400.00 35688.00 43340.00 39257.00

19 1700mm metre 43352.00 39267.00 47687.00 43194.00

20 1800mm metre 51827.00 46942.00 57010.00 51636.00

21 1900mm metre 56976.00 51607.00 62674.00 56768.00

22 2000mm metre 83704.00 75815.00 92074.00 83397.00

PN 15

1 200mm metre 2001.00 1812.00 2201.00 1993.00

2 250mm metre 2675.00 2423.00 2943.00 2665.00

3 300mm metre 3176.00 2876.00 3494.00 3164.00

4 350mm metre 3972.00 3597.00 4369.00 3957.00

5 400mm metre 4356.00 3947.00 4792.00 4342.00

6 450mm metre 5104.00 4623.00 5614.00 5085.00

7 500mm metre 5786.00 5240.00 6365.00 5764.00

Sl .No Description Unit

Rate for 2014-15 in Rupees

Stiffness class 248Kpa Stiffness class 496Kpa

With Without With WithoutExcise Excise Excise ExciseDuty Duty Duty Duty

Page 66: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 66/275

56

8 600mm metre 7870.00 7129.00 8657.00 7842.00

9 700mm metre 9931.00 8995.00 10924.00 9895.00

10 800mm metre 12136.00 10992.00 13350.00 12091.00

11 900mm metre 15367.00 13919.00 16904.00 15311.00

12 1000mm metre 18465.00 16727.00 20312.00 18400.00

13 1100mm metre 22129.00 20043.00 24342.00 22047.00

14 1200mm metre 25410.00 23015.00 27951.00 25317.00

15 1300mm metre 27984.00 25349.00 30782.00 27884.00

16 1400mm metre 32976.00 29869.00 36274.00 32856.00

17 1500mm metre 37476.00 33944.00 41224.00 37338.00

18 1600mm metre 41285.00 37395.00 45414.00 41135.00

19 1700mm metre 45390.00 41111.00 49929.00 45222.00

20 1800mm metre 54101.00 49002.00 59511.00 53902.00

Note: The above rates are inclusive of VAT at 5%, transportation charges anywhere

in Tamilnadu and cost of coupling and specials.Excise duty at 12.36%.

Sl .No Description Unit

Rate for 2014-15 in Rupees

Stiffness class 248Kpa Stiffness class 496Kpa

With Without With WithoutExcise Excise Excise ExciseDuty Duty Duty Duty

Page 67: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 67/275

57

10.0 M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001WITHINTERNAL LINING AND EXTERNAL COATING (WITH EXCISE DUTY)

Sl.No.

Dia metre & 

thickness of pipe in mm

Bare

pipepermetre

CMLInternal

6mm to12mm

thick permetre

CMCexternal

20mmthick per

metre

Internalfood

grade

epoxycoating

406micr.per

metre

Externalepoxy

Coating

406micr.per

metre

CTEexternalcoating

& wrapping

permetre

External

Polyethy-l ineSheetingper metre

Transpo-ration

an ywhere inTamil-

nadu permetre

1 168.3X2.6 543.00 301.00 503.00 519.00 640.00 562.00 702.00 266.00

2 168.3X3.2 665.00 301.00 503.00 519.00 640.00 562.00 702.00 266.00

3 168.3X4 829.00 301.00 503.00 519.00 640.00 562.00 702.00 266.00

4 168.3X4.5 931.00 301.00 503.00 519.00 640.00 562.00 702.00 266.00

5 219.1X2.6 712.00 393.00 635.00 672.00 831.00 736.00 910.00 266.00

6 219.1X3.6 978.00 393.00 635.00 672.00 831.00 736.00 910.00 266.00

7 219.1X4.5 1219.00 393.00 635.00 672.00 831.00 736.00 910.00 266.00

8 219.1X6.3 1694.00 393.00 635.00 672.00 831.00 736.00 910.00 266.00

9 273X3.6 1224.00 489.00 775.00 838.00 1034.00 916.00 1135.00 266.00

10 273X4 1357.00 489.00 775.00 838.00 1034.00 916.00 1135.00 266.00

11 273X5 1690.00 489.00 775.00 838.00 1034.00 916.00 1135.00 266.00

12 273X6.3 2120.00 489.00 775.00 838.00 1034.00 916.00 1135.00 266.00

13 323.9X4 1612.00 582.00 908.00 1003.00 1180.00 1084.00 1348.00 266.00

14 323.9X4.5 1812.00 582.00 908.00 1003.00 1180.00 1084.00 1348.00 266.00

15 323.9X5.6 2248.00 582.00 908.00 1003.00 1180.00 1084.00 1348.00 266.00

16 323.9X7.1 2837.00 582.00 908.00 1003.00 1180.00 1084.00 1348.00 266.00

17 355.6X4 1776.00 640.00 991.00 1003.00 1348.00 1191.00 1478.00 266.00

18 355.6X5 2211.00 640.00 991.00 1003.00 1348.00 1191.00 1478.00 266.00

19 355.6X5.6 2473.00 640.00 991.00 1003.00 1348.00 1191.00 1478.00 266.00

20 355.6X8 3512.00 640.00 991.00 1003.00 1348.00 1191.00 1478.00 266.00

21 406.4X4 2033.00 735.00 1124.00 1208.00 1545.00 1365.00 1691.00 266 .00

22 406.4X5 2336.00 735.00 1124.00 1208.00 1545.00 1365.00 1691.00 266 .00

23 406.4X6.3 3184.00 735.00 1124.00 1208.00 1545.00 1365.00 1691.00 266 .00

Rate for 2014-15 in Rupees

Page 68: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 68/275

58

Sl.No.

Dia metre & thickness of pipe in mm

Barepipeper

metre

CMLInternal6mm to12mm

thick permetre

CMCexternal

20mmthick per

metre

Internalfood

gradeepoxy

coating406

micr.permetre

Externalepoxy

Coating406 micr.

permetre

CTEexternalcoating

& wrapping

permetre

ExternalPolyethy-

l ineSheetingper metre

Transpo-ration

an ywhere in

Tamil-nadu per

metre

24 406.4X8.8 4419.00 735.00 1124.00 1208.00 1545.00 1365.00 1691.00 266 .00

25 457X4 2289.00 828.00 1146.00 1208.00 1736.00 1121.00 1854.00 266.00

26 457X5 2852.00 828.00 1146.00 1208.00 1736.00 1121.00 1899.00 266.00

27 457X6.3 3584.00 828.00 1146.00 1208.00 1736.00 1121.00 1899.00 266 .00

28 457X10 5745.00 828.00 1146.00 1208.00 1736.00 1121.00 1899.00 266.00

29 508X5 3254.00 919.00 1270.00 1315.00 1927.00 1246.00 2112.00 319.00

30 508X5.6 3620.00 919.00 1270.00 1315.00 1927.00 1246.00 2112.00 319 .00

31 508X6.3 4093.00 919.00 1270.00 1315.00 1927.00 1246.00 2112.00 319 .00

32 508X11 7085.00 919.00 1270.00 1315.00 1927.00 1246.00 2110.00 319.00

33 610X5.8 4514.00 1103.00 1528.00 1573.00 2315.00 1494.00 2534.00 400.00

34 610X6.3 4934.00 1103.00 1528.00 1573.00 2315.00 1494.00 2534.00 400.00

35 610X12.5 9656.00 1103.00 1528.00 1573.00 2315.00 1494.00 2533.00 400.00

36 711X6.3 5719.00 1288.00 1781.00 1809.00 2315.00 1747.00 2955.00 400.00

37 711X7.1 6455.00 1288.00 1781.00 1809.00 2697.00 1747.00 2955.00 400.00

38 711X14.2 12806.00 1288.00 1781.00 1809.00 2697.00 1747.00 2952.00 400.00

39 813X7.1 7400.00 1473.00 2034.00 2107.00 2697.00 1994.00 3382.00 532.00

40 813X8 8345.00 1473.00 2034.00 2107.00 3090.00 1994.00 3382.00 532.00

41 813X18 18527.00 1473.00 2034.00 2107.00 3090.00 1994.00 3377.00 532 .00

42 914X8 9394.00 1654.00 2289.00 2365.00 3090.00 2247.00 3798.00 799.00

43 914X8.8 10287.00 1654.00 2289.00 2365.00 3472.00 2247.00 3798.00 799.00

44 914X10 11649.00 1654.00 2289.00 2365.00 3472.00 2247.00 3798.00 799 .00

45 914X17.5 20310.00 1654.00 2289.00 2365.00 3472.00 2247.00 4438.00 799.00

46 1016X8.8 11493.00 1837.00 2545.00 2640.00 3854.00 2491.00 4438.00 1596.00

47 1016X10 13015.00 1837.00 2545.00 2640.00 3854.00 2491.00 4438.00 1596.00

48 1016X20 25770.00 1837.00 2545.00 2640.00 3854.00 2491.00 4438.00 1596.00

Page 69: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 69/275

59

Sl.No.

Dia metre & thickness of pipe in mm

Barepipeper

metre

CMLInternal6mm to12mm

thick permetre

CMCexternal

20mmthick per

metre

Internalfood

gradeepoxy

coating406

micr.permetre

Externalepoxy

Coating406 micr.

permetre

CTEexternalcoating

& wrapping

permetre

ExternalPolyethy-

l ineSheetingper metre

Transpo-ration

an ywhere in

Tamil-nadu per

metre

49 1067X8.8 12072.00 1837.00 2674.00 2640.00 3854.00 2618.00 4438.00 1596.00

50 1067X10 13698.00 1837.00 2674.00 2640.00 4045.00 2618.00 4438.00 1596.00

51 1067X11 15010.00 1837.00 2674.00 2640.00 4045.00 2618.00 4438.00 1596.00

52 1118X8.8 12648.00 2062.00 2798.00 2910.00 4247.00 2742.00 4648.00 1596.00

53 1118X10 14328.00 2062.00 2798.00 2910.00 4247.00 2742.00 4648.00 1596.00

54 1118X11 15745.00 2062.00 2798.00 2910.00 4247.00 2742.00 4648.00 1596.00

55 1219X10 15639.00 2209.00 2798.00 2910.00 4635.00 2989.00 5067.00 1596.00

56 1219X11 17214.00 2209.00 2798.00 2910.00 4635.00 2989.00 5067.00 1596.00

57 1219X12.5 19524.00 2209.00 2798.00 2910.00 4635.00 2989.00 5067.00 1596.00

58 1422X12.5 22830.00 2573.00 3562.00 4163.00 5405.00 3483.00 5910.00 1596.00

59 1422X14.2 25874.00 2573.00 3562.00 4163.00 5405.00 3483.00 5910.00 1596.00

60 1626X14.2 29601.00 3022.00 4067.00 4163.00 6180.00 3986.00 6742.00 1915.00

61 1626X16 33327.00 3022.00 4067.00 4163.00 6180.00 3986.00 6742.00 1915.00

62 1829X14.2 33379.00 3281.00 4579.00 4680.00 6944.00 4494.00 7528.00 1915.00

63 1829X16 37525.00 3281.00 4579.00 4680.00 6944.00 4494.00 7528.00 1915.00

64 1829X17.5 41041.00 3281.00 4579.00 4680.00 6944.00 4494.00 7528.00 1915.00

65 2032X16 41724.00 3685.00 5090.00 5202.00 7719.00 4944.00 8449.00 2297.00

66 2032X17.5 45607.00 3685.00 5090.00 5202.00 7719.00 4944.00 8449.00 2297.00

67 2032X20 52063.00 3685.00 5090.00 5202.00 7719.00 4944.00 8449.00 2297.00

68 2235X17.5 50226.00 4056.00 5596.00 5719.00 8494.00 5483.00 9292.00 2297.00

69 2235X20 57364.00 4056.00 5596.00 5719.00 8494.00 5483.00 9292.00 2297.00

70 2235X22.2 63556.00 4056.00 5596.00 5719.00 8494.00 5483.00 9292.00 2297.00

71 2540X20 65235.00 4607.00 6360.00 6506.00 9663.00 6236.00 10562.00 2528.00

72 2540X22.2 72321.00 4607.00 6360.00 6506.00 9663.00 6236.00 10562.00 2528.00

73 2540X25 81424.00 4607.00 6360.00 6506.00 9663.00 6236.00 10562.00 2528.00

Note: The above rates are inclusive of Excise duty at 12.36% and VAT at 5%.

Page 70: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 70/275

60

10.1 M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001WITHINTERNAL LINING AND EXTERNAL COATING (WITHOUT EXCISE DUTY)

Sl.

No.

Dia metre & 

thickness of pipe in mm

Barepipe

permetre

CMLInternal

6mm to12mm

thick permetre

CMCexternal

20mmthick per

metre

Internalfood

grade

epoxycoating

406micr.per

metre

Externalepoxy

Coating

406micr.per

metre

CTEexternalcoating

& wrapping

permetre

ExternalPolyethy-

lineSheetingper metre

Transpo-ration any

where inTamil-naduper metre

1 168.3X2.6 483.00 268.00 448.00 440.00 570.00 500.00 625.00 266.00

2 168.3X3.2 592.00 268.00 448.00 440.00 570.00 500.00 625.00 266.00

3 168.3X4 738.00 268.00 448.00 440.00 570.00 500.00 625.00 266.00

4 168.3X4.5 829.00 268.00 448.00 440.00 570.00 500.00 625.00 266.00

5 219.1X2.6 634.00 350.00 565.00 570.00 740.00 655.00 810.00 266.00

6 219.1X3.6 870.00 350.00 565.00 570.00 740.00 655.00 810.00 266.00

7 219.1X4.5 1085.00 350.00 565.00 570.00 740.00 655.00 810.00 266.00

8 219.1X6.3 1508.00 350.00 565.00 570.00 740.00 655.00 810.00 266.00

9 273X3.6 1089.00 435.00 690.00 710.00 920.00 815.00 1010.00 266.00

10 273X4 1208.00 435.00 690.00 710.00 920.00 815.00 1010.00 266.00

11 273X5 1504.00 435.00 690.00 710.00 920.00 815.00 1010.00 266.00

12 273X6.3 1887.00 435.00 690.00 710.00 920.00 815.00 1010.00 266.00

13 323.9X4 1435.00 518.00 808.00 850.00 1050.00 965.00 1200.00 266.00

14 323.9X4.5 1613.00 518.00 808.00 850.00 1050.00 965.00 1200.00 266.00

15 323.9X5.6 2001.00 518.00 808.00 850.00 1050.00 965.00 1200.00 266.00

16 323.9X7.1 2525.00 518.00 808.00 850.00 1050.00 965.00 1200.00 266.00

17 355.6X4 1581.00 570.00 882.00 850.00 1200.00 1060.00 1315.00 266.00

18 355.6X5 1968.00 570.00 882.00 850.00 1200.00 1060.00 1315.00 266.00

19 355.6X5.6 2201.00 570.00 882.00 850.00 1200.00 1060.00 1315.00 266.00

20 355.6X8 3126.00 570.00 882.00 850.00 1200.00 1060.00 1315.00 266.00

21 406.4X4 1809.00 654.00 1000.00 1075.00 1375.00 1103.00 1505.00 266 .00

22 406.4X5 2079.00 654.00 1000.00 1075.00 1375.00 1103.00 1505.00 266 .00

23 406.4X6.3 2834.00 654.00 1000.00 1075.00 1375.00 1103.00 1505.00 266 .00

Rate for 2014-15 in Rupees

Page 71: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 71/275

61

Sl.No.

Dia metre & thickness of pipe in mm

Barepipeper

metre

CMLInternal6mm to12mm

thick permetre

CMCexternal

20mmthick per

metre

Internalfood

gradeepoxy

coating406

micr.permetre

Externalepoxy

Coating406 micr.

permetre

CTEexternalcoating

& wrapping

permetre

ExternalPolyethy-

l ineSheetingper metre

Transpo-ration

an ywhere in

Tamil-nadu per

metre

24 406.4X8.8 3933.00 654.00 1000.00 1075.00 1375.00 1103.00 1505.00 266 .00

25 457X4 2037.00 737.00 1020.00 1075.00 1545.00 1016.00 1650.00 266.00

26 457X5 2538.00 737.00 1020.00 1075.00 1545.00 1016.00 1690.00 266.00

27 457X6.3 3190.00 737.00 1020.00 1075.00 1545.00 1016.00 1690.00 266 .00

28 457X10 5113.00 737.00 1020.00 1075.00 1545.00 1016.00 1690.00 266.00

29 508X5 2896.00 818.00 1130.00 1170.00 1715.00 1129.00 1880.00 319.00

30 508X5.6 3222.00 818.00 1130.00 1170.00 1715.00 1129.00 1880.00 319 .00

31 508X6.3 3643.00 818.00 1130.00 1170.00 1715.00 1129.00 1880.00 319 .00

32 508X11 6306.00 818.00 1130.00 1170.00 1715.00 1129.00 1880.00 319.00

33 610X5.8 4017.00 982.00 1360.00 1400.00 2060.00 1330.00 2255.00 400 .00

34 610X6.3 4391.00 982.00 1360.00 1400.00 2060.00 1330.00 2255.00 400 .00

35 610X12.5 8594.00 982.00 1360.00 1400.00 2060.00 1330.00 2255.00 400.00

36 711X6.3 5090.00 1146.00 1585.00 1610.00 2090.00 1555.00 2630.00 400.00

37 711X7.1 5745.00 1146.00 1585.00 1610.00 2400.00 1555.00 2630.00 400.00

38 711X14.2 11397.00 1146.00 1585.00 1610.00 2400.00 1555.00 2630.00 400.00

39 813X7.1 6586.00 1311.00 1810.00 1875.00 2400.00 1775.00 3010.00 532.00

40 813X8 7427.00 1311.00 1810.00 1875.00 2750.00 1775.00 3010.00 532.00

41 813X18 16489.00 1311.00 1810.00 1875.00 2750.00 1775.00 3010.00 532 .00

42 914X8 8361.00 1472.00 2037.00 2105.00 2750.00 2000.00 3380.00 799.00

43 914X8.8 9155.00 1472.00 2037.00 2105.00 3090.00 2000.00 3380.00 799.00

44 914X10 10368.00 1472.00 2037.00 2105.00 3090.00 2000.00 3380.00 799 .00

45 914X17.5 18076.00 1472.00 2037.00 2105.00 3090.00 2000.00 3380.00 799.00

46 1016X8.8 10229.00 1635.00 2265.00 2350.00 3430.00 2260.00 3824.00 1596.00

47 1016X10 11583.00 1635.00 2265.00 2350.00 3430.00 2260.00 3824.00 1596.00

48 1016X20 22935.00 1635.00 2265.00 2350.00 3430.00 2260.00 3824.00 1596.00

Page 72: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 72/275

62

Sl.No.

Dia metre & thickness of pipe in mm

Barepipeper

metre

CMLInternal6mm to12mm

thick permetre

CMCexternal

20mmthick per

metre

Internalfood

gradeepoxy

coating406

micr.permetre

Externalepoxy

Coating406 micr.

permetre

CTEexternalcoating

& wrapping

permetre

ExternalPolyethy-

l ineSheetingper metre

Transpo-ration

an ywhere in

Tamil-nadu per

metre

49 1067X8.8 10744.00 1635.00 2380.00 2350.00 3430.00 2330.00 3950.00 1596.00

50 1067X10 12191.00 1635.00 2380.00 2350.00 3600.00 2330.00 3950.00 1596.00

51 1067X11 13359.00 1635.00 2380.00 2350.00 3600.00 2330.00 3950.00 1596.00

52 1118X8.8 11257.00 1835.00 2490.00 2590.00 3780.00 2440.00 4137.00 1596.00

53 1118X10 12752.00 1835.00 2490.00 2590.00 3780.00 2440.00 4137.00 1596.00

54 1118X11 14013.00 1835.00 2490.00 2590.00 3780.00 2440.00 4137.00 1596.00

55 1219X10 13919.00 1966.00 2490.00 2590.00 4125.00 2660.00 4510.00 1596.00

56 1219X11 15320.00 1966.00 2490.00 2590.00 4125.00 2660.00 4510.00 1596.00

57 1219X12.5 17376.00 1966.00 2490.00 2590.00 4125.00 2660.00 4510.00 1596.00

58 1422X12.5 20319.00 2290.00 3170.00 2836.00 4810.00 3100.00 5260.00 1596.00

59 1422X14.2 23028.00 2290.00 3170.00 3427.00 4810.00 3100.00 5260.00 1596.00

60 1626X14.2 26345.00 2690.00 3620.00 3705.00 5500.00 3616.00 6000.00 1915.00

61 1626X16 29661.00 2690.00 3620.00 3705.00 5500.00 3616.00 6000.00 1915.00

62 1829X14.2 29707.00 2920.00 4075.00 4165.00 6180.00 4000.00 6700.00 1915.00

63 1829X16 33397.00 2920.00 4075.00 4165.00 6180.00 4000.00 6700.00 1915.00

64 1829X17.5 36526.00 2920.00 4075.00 4165.00 6180.00 4000.00 6700.00 1915.00

65 2032X16 37134.00 3280.00 4530.00 4630.00 6870.00 4400.00 7520.00 2297.00

66 2032X17.5 40590.00 3280.00 4530.00 4630.00 6870.00 4400.00 7520.00 2297.00

67 2032X20 46336.00 3280.00 4530.00 4630.00 6870.00 4400.00 7520.00 2297.00

68 2235X17.5 44701.00 3610.00 4980.00 5090.00 7560.00 4880.00 8270.00 2297.00

69 2235X20 51054.00 3610.00 4980.00 5090.00 7560.00 4880.00 8270.00 2297.00

70 2235X22.2 56565.00 3610.00 4980.00 5090.00 7560.00 4880.00 8270.00 2297.00

71 2540X20 58059.00 4100.00 5660.00 5790.00 8600.00 5550.00 9400.00 2528.00

72 2540X22.2 64365.00 4100.00 5660.00 5790.00 8600.00 5550.00 9400.00 2528.00

73 2540X25 72467.00 4100.00 5660.00 5790.00 8600.00 5550.00 9400.00 2528.00

Note: The above rates are inclusive of VAT at 5%.

Page 73: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 73/275

63

10.2 MS SPECIALS AS PER IS 1916

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 MS specials with inside lining / epoxy

coating and outside coating with

cement mortar 25mm thick. Kg 91.00

2 MS specials without inside lining

and outside coating Kg 82.00

3 MS specials without inside lining

and outside coating but with anti

rust painting. Kg 85.00

Note : The above rates are inclusive of VAT and transportation charges anywhere

in Tamilnadu. Excise duty 12.36% and VAT 5%.

10.3 MS CASING PIPE

Sl.No. Description Unit  Rate for 2014-15

in Rupees

Supply and delivery of MS Casing

pipes confirming to IS

1 100 mm Metre 823.00

2 125 mm Metre 1030.00

3 150 mm Metre 1236.00

Note : The above rates are inclusive of VAT and transportation charges anywhere inTamilnadu. Excise duty 12.36% and VAT 5%.

Page 74: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 74/275

64

11.0 RCC NON PRESSURE SPUN PIPE AS PER IS 458/2003

RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003manufactured with sulphate resistence cement with 12 mm HI -alumina lining withrubber ring joints.

Sl. No. Internal Dia. UnitRate for 2014-15 in Rupees

NP2 Class NP3 Class NP4 Class

1 200mm One metre 536.00 659.00 686.00

2 250mm One metre 633.00 799.00 841.00

3 300mm One metre 846.00 1056.00 1112.00

4 350mm One metre 1132.00 1397.00 1475.00

5 400mm One metre 1457.00 1931.00 2011.00

6 450mm One metre 1889.00 2454.00 2678.00

7 500mm One metre 2288.00 2780.00 3090.00

8 600mm One metre 2449.00 3197.00 3562.00

9 700mm One metre 3604.00 4878.00 5045.00

10 800mm One metre 4196.00 5832.00 6292.00

11 900mm One metre 4629.00 6725.00 7274.00

12 1000mm One metre 5489.00 7441.00 8598.00

13 1100mm One metre 6544.00 10630.00 11837.00

14 1200mm One metre 7509.00 12974.00 14285.00

15 1400mm One metre 8982.00 16060.00 18300.00

16 1500mm One metre 17657.00 19415.00 20255.00

17 1600mm One metre 20539.00 23880.00 24825.00

Note: The rate is inclusive of VAT at 5 % and transportation charges to stockyardanywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance fromstock yard to site are extra. Excise duty at 12.36% extra

Page 75: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 75/275

65

11.1 RUBBER GASKETS AS PER IS 5382/1985 (Reaffirmed 1998)

Sl. No. Internal Dia. UnitRate for 2014-15 in Rupees

NP2 Class NP3 Class NP4 Class

1 200mm Each 34.00 39.00 46.00

2 250mm Each 39.00 46.00 54.00

3 300mm Each 46.00 54.00 60.00

4 350mm Each 54.00 66.00 72.00

5 400mm Each 60.00 85.00 92.00

6 450mm Each 66.00 100.00 106.00

7 500mm Each 72.00 121.00 126.00

8 600mm Each 119.00 158.00 164.00

9 700mm Each 165.00 192.00 206.00

10 800mm Each 185.00 226.00 232.00

11 900mm Each 226.00 284.00 291.00

12 1000mm Each 291.00 336.00 357.00

13 1100mm Each 324.00 397.00 404.00

14 1200mm Each 337.00 421.00 437.00

15 1400mm Each 489.00 715.00 731.00

16 1500mm Each 767.00 936.00 954.00

17 1600mm Each 846.00 1048.00 1079.00

Note: The rate is inclusive of Excise duty at 12.36%, VAT at 5% and transportation chargesanywhere in Tamilnadu.

Page 76: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 76/275

66

12.0 CI D/F SLUICE VALVE WITH CAP/ WHEEL

AS PER IS 14846/2000 PN 1.0 WITH ISI MARKING

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

1 50 mm Each 3512.00 3184.00

2 65mm Each 4228.00 3702.00

3 80mm Each 4426.00 4012.00

4 100mm Each 5898.00 5347.00

5 125mm Each 7385.00 6695.00

6 150mm Each 8893.00 8063.00

7 200mm Each 15526.00 14076.00

8 250mm Each 24774.00 22306.00

9 300mm Each 30866.00 27985.00

10 350mm Each 47994.00 43151.00

11 400mm Each 61131.00 54962.00

12 450mm Each 77276.00 69478.00

13 500mm Each 97104.00 87305.00

14 600mm Each 142759.00 128353.00

15 700mm Each 271656.00 246289.00

16 750mm Each 310185.00 278883.0017 800mm Each 374894.00 337062.00

18 900mm Each 503437.00 456425.00

19 1000mm Each 632866.00 573768.00

20 1100mm Each 892792.00 802698.00

21 1200mm Each 983548.00 891703.00

Note: The above rates are inclusive of VAT at 5% and transportation chargesanywhere in Tamilnadu.Excise duty at 12.36%.

Page 77: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 77/275

67

12.1 C.I. D/F REFLUX VALVE AS PER I.S. 5312/2004/ PART I/ 84 PN 1.0

WITH BYE-PASS ARRANGEMENTS WITH ISI MARKING

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

1 50 mm Each 3515.00 3187.00

2 65 mm Each 4114.00 3730.00

3 80 mm Each 4992.00 4528.00

4 100 mm Each 6439.00 5839.00

5 125 mm Each 8029.00 7279.00

6 150 mm Each 9764.00 8854.00

7 200 mm Each 19582.00 17753.00

8 250 mm Each 28867.00 26172.00

9 300 mm Each 37730.00 34208.00

10 350 mm Each 59342.00 53801.00

11 400 mm Each 85041.00 76460.00

12 450 mm Each 109288.00 99082.00

13 500 mm Each 157470.00 142764.00

14 600 mm Each 211522.00 191770.00

Note : The above rates are inclusive of VAT at 5% and transportation chargesanywhere in Tamilnadu.Excise duty at 12.36%

Page 78: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 78/275

68

12.2 C.I. DOUBLE AIR VALVE AS PER ISI 14845/2000

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

1 40 mm Each 4265.00 3866.00

2 50 mm Each 5266.00 4775.00

3 80 mm Each 7120.00 6455.00

4 100 mm Each 9694.00 8789.00

5 150mm Each 19430.00 17615.00

6 200mm Each 30504.00 27426.00

Note : The above rates are inclusive of VAT at 5% and transportation charges anywhere

in Tamilnadu.Excise duty at 12.36%.

12.3 CI SINGLE AIR VALVE AS PER ISI 14845/2000

Sl.No Size UnitRate for 2014-15in Rupees.

With Excise Withoutduty Excise duty

1 15mm Each 1012.00 918.00

2 25 mm Each 1459.00 1322.00

3 40 mm Each 1823.00 1652.00

4 50 mm Each 2020.00 1831.00

5 80 mm Each 2704.00 2453.00

6 100 mm Each 2946.00 2670.00

7 150mm Each 6053.00 5489.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywherein Tamilnadu. Excise duty at 12.36%.

Page 79: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 79/275

69

12.4 DI SINGLE CHAMBER AIR RELEASE VALVE

Manufacture, Supply and Delivery of Tamper proof DI single chamber air releasevalves with pressure range from PN 1.0 to 2.5 with body and cover made of DuctileIron of Grade GGG 40 conforming to IS 1865 with Food Grade Epoxy Powdercoating(EP-P) inside and for outside of colour blue RAL 5005. All internal partssuch as float, shell etc., cover bolts, made of Austenitic alloy steel of SS AISI304/316. The float for DN 50 made of Polytetrafluroethylene/ Austenitic alloy steelof AISI 304/316. Gaskets and seals of EPDM / Neoprene rubber for TWAD Boardworks anywhere in Tamil Nadu

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 50mm each 25347.00

2 80mm each 33815.00

3 100mm each 39480.00

4 150mm each 48062.005 200mm each 56074.00

Note: The rates are inclusive of Transportation charges. Excise duty at 12.36%and VAT at 5% extra.

12.5 CI SLUICE VALVES NON RAISING SPINDLE TYPES TO PRESSURE RATINGOF 1.6 PN TO BE USED IN PUMP HOUSES (LONG BODY/ LONG FACE TOFACE) Conforming to IS.

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 100mm 1No. 7274.00

2 125mm 1No. 9014.00

3 150mm 1No. 11704.00

4 200mm 1No. 20060.00

5 250mm 1No. 27028.00

6 300mm 1No. 37303.00

With spur gear arrangements

7 350mm 1No. 59991.00

8 400mm 1No. 78155.00

9 450mm 1No. 96596.00

10 500mm 1No. 121380.00

11 600mm 1No. 178447.00

Note : The rate is inclusive of taxes, duties and handling charges.Excise duty at12.36%,VAT at 5%

Page 80: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 80/275

70

12.6 BUTTERFLY VALVES WITH TOP AND BOTTOM OF S.S. 410 SHAFT, WAFER LINER/ WITH REDUCTION GEAR UNIT INCLUDING ALL TAXES, DUTIESAND HANDLING CHARGES (Conforming to BS 5155 & IS 13095/1996)

12.6.1 WAFER LINER 

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 100mm 1 No 2812.00

2 150mm 1 No 3985.00

3 200mm 1 No 11062.00

4 250mm 1 No 14281.00

5 300mm 1 No 19187.00

12.6.2 D/F GEAR OPERATED

Sl.No. Description Unit   Rate for 2014-15in Rupees

1 400mm 1 No 75923.00

2 450mm 1 No 88766.00

3 500mm 1 No 95922.00

4 600mm 1 No 112255.00

Conforming to standard BS 5155 Butterfly valve with Body, Disc and retainer of Cast Iron Grade F.260 with EDPM rubber sleeve. Internal hardware shall be confirmingto AISI 304. External hardware Carbon Steel shall be confirming to IS 1367. Top

and bottom shaft stainless steel to AISI 410. Body and disc should be tested(Hydro test) to 15 kg/sq.cm.

12.7 NON RETURN VALVES12.7.1 WAFER TYPE (DUAL PLATE CHECK VALVE) CONFORMING TO IS

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 100mm 1 No 3391.00

2 150mm 1 No 7551.00

3 200mm 1 No 13849.00

4 250mm 1 No 24131.00

5 300mm 1 No 30828.00

Note : The rate is inclusive of taxes, duties and handling charges. Excise duty at12.36%, VAT at 5%.

Page 81: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 81/275

71

12.7.2 DOUBLE FLANGED (DUAL PLATE CHECK VALVE)

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 400mm 1 No. 76864.00

2 450mm 1 No. 84192.00

3 500mm 1 No. 93678.00

4 600mm 1 No. 115763.00

5 700mm 1 No. 198775.00

6 800mm 1 No. 329166.00

7 900mm 1 No. 460334.00

8 1000mm 1 No. 598711.00

9 1200mm 1 No. 1983462.00

Construction conforming to standard API 594. Body should confirm cast iron GradeFG 260 (IS 210), Disc plates confirming to ASTM A216, hinch pin/ stop pin/ springshould be of SS to AISI 410/304. Body seat should be of EDPM rubber. The bodyshould be tested to 15 kg/ sq.cm and seat should be tested to 10 kg/ sq.cm

12.7.3 D/F NON RETURN VALVE (OUT DOOR USE)

CI SINGLE DOOR/ MULTY DOOR NON RETURN VALVE CONFORMING TO IS 5312/2003(Part I & II) TO BE FIXED AFTER WATER METER/ FLOW RECORDER ON PUMPINGMAIN NEAR PUMP HOUSE WITH DASH POT ARRANGEMENT FOR 90% FAST CLOSING& 10% SLOW CLOSING.

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 300mm 1 No. 57988.00

2 350mm 1 No. 85431.00

3 400mm 1 No. 107379.00

4 450mm 1 No. 141976.00

5 500mm 1 No. 186088.00

6 600mm 1 No. 285952.00

7 700/750mm 1 No. 448524.00

8 800mm 1 No. 520698.00

9 900mm 1 No. 1046009.00

10 1000mm 1 No. 1359923.00

11 1100mm 1 No. 1673837.00

12 1200mm 1 No. 1882928.00

Note : The rate is inclusive of taxes, duties and handling charges. Excise duty at12.36%, VAT at 5%.

Page 82: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 82/275

72

12.8 KINETIC AIR VALVES FOR HANDLING MORE VOLUMES OFAIR INPUMPING MAIN, DOUBLE ORIFICE KINETIC AIR VALVE CONFIRMINGTO IS 14845 TAMPER PROOF DESIGN (PN-1)

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 50mm 1 No 11471.002 80mm 1 No 14198.00

3 100mm 1 No 19079.00

4 150mm 1 No 35057.00

5 200mm 1 No 51603.00

Note : The rate is inclusive of taxes, duties and handling charges. Excise duty at12.36%, VAT at 5%.

12.9 DI D/F GATE VALVES

SUPPLY AND DELIVERY OF DI D/F GATE VALVES (SOFT SEATED) RESILIENTSEATED SOFT SEALING GATE VALVES (SLUICE VALVES) WITH BODY BONNET OFDUCTILE CAST IRON OF GRADE GGG40, WEDGE FULLY RUBBER LINED WITH EPDM,REPLACEABLE SPINDLE NUT, WITHOUT GLAND PACKING AND WITH 3 O-RINGPROTECTION ON THE SHAFT AND SEALS OF NBR AND THE VALVES SHOULD BE OFVACCUM TIGHT AND 100% LEAK PROOF WITH FACE TO FACE DIMENTIONS AS EPRBS5163-89/ ISI 14846-2000/ DIN 3202 F 4. ALL THE VALVES SHOULD BE WITHELECTROSTATIC POWDER COATING BOTH INSIDE AND OUTSIDE WITH POCKET LESSSTRAIGHT THRO’ BODY PASSAGE. ALL LTHE VALVES ARE TO BE COMPATIBLE FORBURRIED APPLICATION WITH PRESSURE RATING PN 10/16

Sl.No. Description Unit   Rate for 2014-15in Rupees

1 50mm 1 No 9042.00

2 80mm 1 No 11164.00

3 100mm 1 No 14718.00

4 150mm 1 No 23173.00

5 200mm 1 No 38510.00

6 250mm 1 No 55909.00

7 300mm 1 No 80607.00

8 350mm 1 No 207449.00

9 400mm 1 No 255976.00

Note: The rates are inclusive of duties, all taxes, transportation charges etc.Exciseduty 12.36%, VAT 5%

Page 83: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 83/275

73

12.10 DI D/F BUTTERFLY VALVES

SUPPLY AND DELIVERY OF DI D/F BUTTERFLY VALVES WITH GGG 400/12 OREQUIVALENT GRADE AS PER IS3896 (PART 2) 1985 AND SUBSEQUENT REVISIONSDOUBLE ECENTRICALLY DISC WITH RENEVABLE SOFT SEAL ON THE DISC AND BODYSEAT FACE OF STAINLESS STEEL / NICKEL WELD OVERLAY MICROFINISHED WITHPOWDER OR LIQUID EPOXY COATING WITH MINIMUM THICKNESS OF 250 MICRONS

APPLIED ON BOTH BODY AND DISC INSIDE AND OUTSIDE FACE TO FACE DIMENSIONSAS PER AWWA C 504 OR BS 5155 OR IS 13095

Sl.No. Description UnitRate for 2014-15 in Rupees

PN 10 PN 16

1 400mm 1 No 145681.00 200048.00

2 450mm 1 No 203285.00 227002.00

3 500mm 1 No 206473.00 243718.00

4 600mm 1 No 269411.00 326256.00

5 700mm 1 No 404117.00 485371.00

6 800mm 1 No 509174.00 611304.007 900mm 1 No 654861.00 764012.00

8 1000mm 1 No 843374.00 984445.00

9 1100mm 1 No 1113152.00 1298798.00

10 1200mm 1 No 1325465.00 1329001.00

Note: The rates are inclusive of duties, all taxes, transportation charges etc.Exciseduty 12.36%, VAT 5%

12.11 DI Non - Return Valve

Manufacture, Supply and Delivery of DI D/F Slanted seat Swing Check Valve. Body

of ductile cast iron GGG-40 and disc of ductile cast iron GGG-40 with fullyencapsulated EPDM rubber, where both faces can be used. Electrostatic epoxypowder/liquid coating (EP-P) inside and outside color blue RAL 5005 with minimumcoating thickness of 250 microns. The EPDM rubber & Epoxy Powder should beapproved by W 270. (EP-P it is a resi-coat powder approved for drinking waterapplication, applied through fusion bonding process by dipping the shot-blastedcasted components heated up to 200 deg C). Face to face dimensions as perEN558-1, series 48 and flange connections as per EN 1092-2/IS 1538.

Sl.No. Description Unit  Rate for 2014-15

in Rupees

1 40mm 1 No 10665.00

2 50mm 1 No 11302.00

3 65mm 1 No 14457.00

4 80mm 1 No 15713.00

5 100mm 1 No 18552.00

6 125 mm 1 No 28249.00

7 150mm 1 No 35518.00

8 200 mm 1 No 56501.00

9 250mm 1 No 108182.00

10 300mm 1 No 146275.00Note: The rates are inclusive of duties, all taxes, etc.

Page 84: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 84/275

74

12.12 DI Wafer type Butterfly ValveManufacturing, supply and delivery of resilient seated wafer type butterfly valve inaccordance with EN 593, centric disk mounted in three maintenance-free bearingbushes, tight in both flow directions, Replaceable rubber sleeve with integratedseal for functionally reliable use for flared flanges, welding flanges, PE flanges aswell as loose flanges with V-collar, Stable seat due to collar with vulcanized support

ring. Vaccum tight upto 1 Torr. Face to face length acc.to 558-1, basic series20(DIN 3202/k1). With Electrostatic epoxy powder coating (EP-P) inside andoutside color blue RAL 5005 with minimum coating thickness of 250 microns. TheEPDM rubber & Epoxy Powder should be approved by W 270.(EP-P it is resi-coatpowder approved for drinking water application, applied through fusion bondingtechnology process by dipping the shot-blasted casted components heated upto200 deg C).

Sl.No. Description UnitRate for 2014-15

in Rupees

1 40mm 1 No 11653.00

2 50mm 1 No 11653.00

3 65mm 1 No 12043.00

4 80mm 1 No 13113.00

5 100mm 1 No 15382.00

6 125 mm 1 No 17436.00

7 150mm 1 No 26487.00

8 200 mm 1 No 31311.00

9 250mm 1 No 52283.00

10 300mm 1 No 87418.0011 350mm 1 No 133529.00

12 400mm 1 No 182245.00

13 450mm 1 No 305059.00

14 500mm 1 No 312389.00

Note: The rates are inclusive of duties, all taxes, etc.

Page 85: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 85/275

75

12.13 DI Disk Check Valve

Manufacture, supply and delivery of DI D/F Slanted seat Tilting Disc Swing CheckValve in single piece body and closed eye disc construction. Hemisherical discwith 59 degree inclination for fast open and closing. Corrosion proof and wearresistent(triple offset) disc face & body seat face, both made of fusion bonded

Nickel Chromium weld overlay and microfinished. Body and disc of ductile cast ironGGG-40, medium free(dry) shafts of stainless steel and bearings of Zinc-free Bronze,Valve should have provision for internal damping unit for reducing the effects of water hammer/surge, if required at later stage. Electrostatic epoxy powder/liquidcoating(EP-P) inside and outside color blue RAL 5005 with minimum coating thicknessof 150 microns. The EPDM rubber & Epoxy Powder should be approved by W270.(EP-P it isa resi-coat powder approved for drinking water application, appliedthrough fusion bonding technology process by dipping the shot-blasted castedcomponents heated upto 200deg C). Face to face dimensions as per EN 558-1series 14 and flange connections as per EN 1092-2/IS

Sl.No. Description UnitRate for 2014-15 in Rupees

PN 10 PN 16

1 200mm 1 No 434562.00 434562.00

2 250mm 1 No 437412.00 437412.00

3 300mm 1 No 439353.00 439353.00

4 350mm 1 No 497848.00 497848.00

5 400mm 1 No 489358.00 489358.00

6 450mm 1 No 670253.00 674845.00

7 500mm 1 No 596761.00 658930.00

8 600mm 1 No 812413.00 825959.00

9 700mm 1 No 1791004.00 1832909.00

10 800mm 1 No 2081864.00 2161262.00

11 900mm 1 No 2370659.00 2489202.00

12 1000mm 1 No 2900515.00 2937343.00

Note: The rates are inclusive of duties, all taxes, etc.

Page 86: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 86/275

76

12.14 DI Diaphragm ValveManufacture supply and delivery of DI D/F Diaphragm type own medium controlledvalve having visual position indicator with cast body of ductile iron grade GGG 40/SG 400-12 as per IS 3896-Part-2-1985 with integrated valve seat of Ni-Cr overlaywelding and micro finished, customized control cylinder for linear control behaviour,preformed diaphragm and pull-out safe profile sealing ring of EPDM, threaded inserts

(CORFIX) to prevent the coating from coming off in the connections area as wellas corrosion and incrustations in the control circuit. Pilot valve system having SSfittings as per Standard parts acc. DIN 2353/EN ISO 8434, all external tubingparts of SS 1.4571, ball valves, pilot valve, speed control, High capacity transparentfilter included, Tightness to DIN EN 12 266-1, leakage rate A. 2 pressure gaugesfor operator-friendly control to determine the actual inlet and outlet pressureconnected directly to the valve. Flange connection dimensions according to EN1092, Part 2, all parts(Epoxy coating, and diaphragm) in contact with medium areas per KTW and DVGW certified(harmless). The EPDM rubber & Epoxy coating (EP-P) should be approved by W270.(EP-P)

Sl.No. Description UnitRate for 2014-15

in Rupees

1 50mm 1 No 340549.00

2 65mm 1 No 367694.00

3 80mm 1 No 367460.00

4 100mm 1 No 391013.00

5 125 mm 1 No 422455.00

6 150mm 1 No 483211.00

7 200 mm 1 No 737243.00

8 250mm 1 No 1043249.00

9 300mm 1 No 1559432.00

10 350mm 1 No 1823336.00

Note: The rates are inclusive of duties, all taxes, etc.

Page 87: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 87/275

77

12.15 DI Surge Control Valve

Manufacturing, supply and delivery of single chamber, double orifice DI Air Valvewith Triple function(Venting, admitting and venting during operation), Tamper proof in one piece construction (Both Large and small orifice housed in the housing)itself directly operated by the medium with customized orifice for controlled venting

of defined quantities of Air. The valve shall prevents vaccum and reduces pressuresurges after power failure at pump stations. It shall controls the filling quantity of the pipeline when unregulated pumps start up. With high speed discharge up tosonic velocity(300 m/s), with flange dimension to EN 1092-2. Body and cover inductile cast iron of grade GGG 40. All internal parts such as float, shell etc & allcover bolts of austenitic alloy steel and DN 50 float of HOSTAFLON and gasketsand seals of EPDM of grade W 270(approved for drinking water) with Electrostaticepoxy powder coating (EP-P) inside and outside color blue RAL 5005 with minimumcoating thickness of 250 microns.

Sl.No. Description UnitRate for 2014-15

in Rupees

1 50mm 1 No 107193.002 80mm 1 No 118285.00

3 100mm 1 No 133458.00

4 150mm 1 No 189898.00

5 200 mm 1 No 279086.00

Note: The rates are inclusive of duties, all taxes, etc.

Page 88: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 88/275

78

12.16 DI Plunger type flow control Valve

Manufacturing, supply and delivery of DI D/F Plunger type(Control valve) with onepiece body of ductile cast iron of grade GGG-40, all internal parts of stainlesssteel. Piston guides of bronze welded overlay & micro-finished and bearing bush of zinc free Bronze. Valve/profile sealing seat shall be in the no-flow zone. Doublesealing effect between the body and the plunger shall be by Quadring Seal (twist

free operation). The valve shall be designed to operate smoothly throughout thespecified flow range without cavitation. Corrosion protected medium free bearingin the body by way of double O-ring seal and encapsulated shaft seal. There shallbe no obstacles in the main flow passage except the plunger and the attachedcontrol cylinders. Plunger shall be by means of stainless steel crank drive mechanism.Face-to-face dimensions EN558-1 basic series 15 and 1.5X DN from DN500 andflange connections as per EN1092-2.

Sl.No. Description UnitRate for 2014-15

in Rupees

1 150mm 1 No 748884.00

2 200mm 1 No 860631.00

3 250mm 1 No 1137071.00

4 300mm 1 No 1403075.00

5 400 mm 1 No 2096467.00

6 450mm 1 No 2802841.00

7 500 mm 1 No 3709545.00

8 600mm 1 No 5392370.00

9 700mm 1 No 6043761.00

10 800mm 1 No 7027594.00

11 900mm 1 No 9362319.00

12 1000mm 1 No 10719320.00

Note: The rates are inclusive of duties, all taxes, etc.

12.17 OHT FLOW CONTROL VALVE

Supply and delivery of the following sizes of OHT flow control valve with femaleBSP treaded ends, (20mm length) with Stainless Steel Body as per ANSI 202Grade, Plug, Flange – Nylon 66, (to be tested at NABL accredited lab.) Triangularnotch type flow control path with opening reference scale arrangements for flownotch and Upstream & Downstream pressure checking spring loaded moutharrangements. Working Pressure 10 KSC, (FCRI, Palgaut pressure test and flow

test to be furnished).

Sl.No. Description UnitRate for 2014-15

in Rupees

a. 40mm (1 lpm to 400lpm

adjustable type arrangements) each 4,950.00

b 100mm (20 lpm to 2000 lpm

adjustable type arrangements) each 17,900.00

Note: The above rates are inclusive all taxes and transportation charges.

Page 89: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 89/275

79

13.0 SALT GLAZED STONEWARE PIPE AS PER IS 651-1992 OF 0.6 M LENGTHOF0.6 M LENGTH

Sl.No. Description UnitRate for 2014-15

in Rupees

1 100mm Each 76.00

2 150mm Each 133.00

3 200mm Each 210.00

4 250mm Each 322.00

5 300mm Each 567.00

Note: Excise duty ‘Nil’. The rate is inclusive of VAT at 5% and transportationcharges to stockyard anywhere in Tamilnadu. Unloading, stacking at stockyard and Conveyance from stock yard to site are extra.

14.0 SULPHATE RESISTANT CEMENT AS PER IS 12330/1988

Sl.No. Description UnitRate for 2014-15

in Rupees

1 Sulphate Resistant Cement asper IS 12330/1988 and asamended from time to time. MT 6660.00

Note: The rate is inclusive of duties all taxes and at F.O.R destination

15.0 FIBER REINFORCED CONCRETE FRAME AND COVER AS PER TYPEHD - 20, IS 12592/2002 , PART 1 & 2

Sl.No. Description UnitRate for 2014-15

in Rupees

1 56cm dia heavy duty Each 2737.00

2 56cm dia extra heavy duty Each 2737.00

3 60 cm dia heavy duty Each 3084.00

4 60 cm dia extra heavy duty Each 3161.00

Note: Excise duty ‘NIL’. The rate is inclusive of VAT at 14.5% and transportationcharges anywhere in Tamilnadu.

Page 90: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 90/275

80

16.0 WATER METER CONFORMING TO ISO 4064 & DIRT BOX STRAINER 

Supply and delivery of Woltman model with removal mechanism water meters confirmingto ISO 4064 part I, II,III class B with life cycle test certificate from FCRI or any Govt .Organisation . The water meters shall have magnetic drivers or mechanical drivers andshall be versatile for installation in any position . The meters shall be hydrodynamically,hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as

per ISO 4064 class B specification. Dry dial excavated counter housing fully protectedagainst flooding ensuring easy reading in all climates.

Sl.No. Description UnitRate for 2014-15 in Rupees

Water meter Dirt BoxErectionCharges

1 15 mm Each 1112.00 - 250.00

2 20mm Each 1402.00 - 350.00

3 25mm Each 3850.00 - 725.00

4 40mm Each 7968.00 - 1600.00

5 50mm Each 9548.00 2814.00 2213.00

6 80mm Each 12653.00 4785.00 2750.00

7 100mm Each 16232.00 5868.00 4300.00

8 150mm Each 26496.00 9292.00 5475.00

9 200mm Each 29838.00 11235.00 6300.00

10 250mm Each 65736.00 24150.00 7500.00

11 300mm Each 112381.00 45172.00 7650.00

12 400mm Each 187976.00 75191.00 7800.00

13 500mm Each 220500.00 109368.00 7800.00

Note: 1. Excise Duty’ Nil’ for Watermeter and Dirtbox Strainer.2. The rate is inclusive of TNVAT at 5% and transportation charges anywhere

in Tamilnadu.3. Erection charges includes earth work excavation,labour charges, cutting

and threading, conveyance,welding and hire charges for tools and plantsets., complete.

16.1 ORIFICE TYPE ELECTRONIC WATER METER 

SUPPLY, DELIVERY, FIXING TESTING AND COMMISSIONING OF BEST EFFICIANT ORIFICETYPE ELECTRONIC WATER METER USING DIFFERENCIAL PRESSURE SENSING ELEMENTWITH FLANGE INSERTABLE ORIFICE PLATE SUITABLE FOR D,D/2 TAPPING AS PER BS 1042SPECIFICATION.THE METER SHOULD BE SUITABLE TO BE CONNECTED TO CONVERTORTO GIVE A REMOTE INDICATION OF TOTALISATION AND FLOW RATE WITH A OPTION FORCOMPUTER CONNECTIVITY INCLUDING SENSOR AND TOTALISER INCLUDING ALL TAXES,DUTIES AND HANDLING CHARGES.

Sl.No. Description UnitRate for 2014-15

in Rupees

1 150 to 450mm 1 NO. 212000.00

2 475 to 750mm 1 NO. 239664.00

3 775 to 1200mm 1 NO. 308400.00

Note: The rate includes Excise duty at 12.36%, VAT at 5% handling andinstallation charges.

Page 91: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 91/275

81

16.2 FULL BORE ELECTROMAGNETIC FLOW METER 

Electromagnetic Flow Meter shall be a velocity sensing Electromagnetic type,microprocessor based signal converter, sealed housing, flanged tube meter for 1.0Mpa working pressure, manufactured to highest standard available for mag-meters,equipped with minimum six digit digital totalizers, reading in units of kiloliters and

shall be accurate within 0.5% of Measured value, shall operate within a range of 0.3m/sec to 4 m/sec and be constructed as follows:Meter tube (Sensor) shall befabricated from stainless steel tube and use class PN10 flat face carbon streetflanges in accordance with IS 1538. These flanges shall be welded to the flowtube. The internal and external of the meter tube shall be blasted to near whiteand lined with hard rubber preferably by SBR or EPDM. Meter tube shall have aconstant nominal inside diameter offering no obstruction to the flow. The accuracyshould be inclusive of linearity, hysteresis, repeatability, temperature and pressureeffectsCoil Housing shall be fabricated from stainless steel for corrosion resistanceand welded to the tube providing a completely sealed environment for all coils,electrode connections and wiring harness capable of submerged or buriedoperation.Signal Converter shall be pulsed DC coil excitation type with auto zeroing.The signal converter shall be remotely mounted away from the meter. The converter

shall indicate direction of flow and provide a flow rate indication and a total of flowvolume for both forward and reverse directions.The converter shall provide anisolated 4-20 mA output into minimum 500-ohm load and a frequency output of amaximum of 0-10 KHZ and a scaled pulse output. The microprocessor based signalconverter shall have a self-diagnostic test mode and a backlit display thatcontinuously displays “Rate of Flow” and “Total Volume”.Converter shall be suppliedwith a programmable low flow drop out and empty pipe zero return. The signalconverter housing should be die-cast aluminium with glass window. The convertercum transmitter should be fully programmable form the front facia. The programmingshould be user friendly, self-prompting menu driven.

Sl.No. Description UnitRate for 2014-15

in Rupees1 10MM 1 NO. 82517.00

2 25 MM 1 NO. 89394.00

3 50 MM 1 NO. 96270.00

4 80 MM 1 NO. 103146.00

5 100 MM 1 NO. 123776.00

6 125 MM 1 NO. 137529.00

7 150MM 1 NO. 165034.00

8 200MM 1 NO. 199417.00

9 250MM 1 NO. 226922.00

10 300 MM 1 NO. 254428.00

11 350MM 1 NO. 343822.00

12 400MM 1 NO. 412586.00

13 450MM 1 NO. 495103.00

Page 92: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 92/275

82

14 500 MM 1 NO. 577620.00

15 600MM 1 NO. 756408.00

16 700 MM 1 NO. 797666.0017 800MM 1 NO. 907689.00

18 900 MM 1 NO. 1072723.00

19 1000 MM 1 NO. 1306522.00

20 1200 MM 1 NO. 1444051.00

21 1400MM 1 NO. 1787872.00

22 1600MM 1 NO. 2062930.00

23 1800 MM 1 NO. 2613044.00

24 2000 MM 1 NO. 3163159.00

25 2200 MM 1 NO. 3438216.00

26 2400MM 1 NO. 3713273.00

27 2600 MM 1 NO. 4125859.00

28 2800 MM 1 NO. 4469681.00

29 3000 MM 1 NO. 4813502.00

Note: The rate includes Excise duty at 12.36%, VAT at 5% handling andinstallation charges.

Sl.No. Description UnitRate for 2014-15

in Rupees

Page 93: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 93/275

83

17.0 HDPE TANK

Sl.No. Description UnitRate for 2014-15

in Rupees

1 Supply and delivery and fixing of  

HDPE tank as per IS 12701 / 1996

including loading, unloading,

transportation and labour charges

for fixing of the GI pipes and

specials for pipe connection

works including cutting, threading

and fixing charges etc.,

200 litres 1 No. 1460.00

500 litres 1 No. 3500.00

1000 litres 1 No. 7000.00

18.0 MS KIOSK

Sl.No. Description UnitRate for 2014-15

in Rupees

1 Supply and delivery of MS Kiosk

of size 0.75m x 0.45m x 0.75m made

up of MS angle of size 50mm x

50mmx 4mm alround covered with 1 No. 7300.00

16 gauge MS sheet and kiosk doormade up of MS plates of size 25mmx

3 mm including cutting, welding,

grinding, locking arrangements

and labour charges etc.,

Page 94: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 94/275

84

19.0 MS LADDER 

Sl No. Description Total Rs/EACH

1 Supply and Delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50mm x 6mm MS

angle for sides and steps in 16 mm MS plain rods fixedat 30cm C/C welded jointed etc ., providing with suitableside supports, clamps and locking arrangements providedwith two coats of approved enamel paint over one coatof redoxide paint , for providing access to roof top of OHT of suitable inclined length , including bottomanchorage and transportation and as directed by TWADBoard officers. The rate includes concrete bed block inCC 1:2:4 using 20mm HBGS at top and bottom of suitablesize with necessry anchor bolts.

For OHT Capacities

a 1. 10000 litres with - 7.5m staging height 18000

b 2. 20000 litres with - 7.5m staging height 18000

2 Fabrication, supply, delivery and fixing of outside MSLadder of 45cm clear wide made out of 50 mm x 50mmx 6mm MS angle for both sides and for steps at 30cmC/C welded jointed etc ., for I staging from GL to 1stlevel brace (weight 4.5kg/m) IInd and IIIrd staging uptofloor slab and IVth staging from floor slab to roof top.Supply, delivery and fixing of 32 mm GI pipes mediumfor hand rails from I stage to IVth stage. RCC M30Grade mix for Landing slab 5 nos. at Ground Level- 1No.and above Ground Level - 4Nos. Supply and fixing of 32mm GI pipe medium for hand rails for the Landingslab. Supplying and fixing of MS Base plate of 100mm X100mm X 6mm thick for fixing Anchore fastener bolt forfixing of hand rails at Landing slab and MS Ladderproviding locking arrangements with two coats of approved enamel paint over one coat of red oxide paintas per approved Type Design and as directed by TWAD

board officers.

For OHT Capacities

a 30000 litres capacity at 12.0m staging height 88000

b 40000 litres capacity at 12.0m staging height 88000

c 50000 litres capacity at 12.0m staging height 88000

d 60000 litres capacity at 12.0m staging height 88000

e 100000 litres capacity at 12.0m staging height 88000

Page 95: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 95/275

85

20.0 MS DOOR / WINDOW/VENTILATOR 

Sl.No. Description UnitRate for2014-15

in Rupees

1 Supply and Delivery Fabrication of 

MS doors and windows with outerframe and shutter frame in MS

angle of size 40mm x 40mm x 6

mm with MS flat 25mm x 25mm x

6mm and MS sheet of 18 gauge

including ventilating arrangements

using 20mm square MS rods with

locking arrangements including two

coats of approved enamel paint

over coat of red oxide including

cost of angles, plates, sheets,

fabrication charges, cost of hold

fast and transportation charges

etc., complete.

i Fully panelled Double leaf - Door 1.00 x 2.50 m 6050.00

ii. Fully pannelled Double leaf - Door 1.00m x2.10 m 5280.00

iii. Fully panelled Double leaf - Door 1.00m x2.00 m 3850.00

iv. Fully panelled Single leaf - Door 0.75 m x2.10 m 3245.00

v Fully panelled Single leaf - Door 0.90 m x 2.00 m 3465.00

vi. Fully panelled Single leaf - Door 0.90 m x 2.10 m 3850.00

vii Fully panelled Single leaf - Door 1.00 m x2.00 m 3610.00

viii Fully panelled Double leaf  

- Window (without Ventilator) 1.20 m x0.90 m 2860.00

ix Fully panelled Double leaf  

- Window (without Ventilator) 0.60 m x 0.90 m 2090.00

x Ventilator 0.45m x 0.60 m 1320.00

Page 96: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 96/275

86

21.0 Water Disinfection Equipment using Silver-Ionisation process

Specification:Supply,delivery,erection and commissioning of the following capacityof micro processor based water disinfection equipment using silver ionization processbased on Oligodynamic technology, suitable to provide directly to pumping main, orto sump or to overhead tank, with by-pass arrangements, controlling valves, micro

processor based control panel, in-built transformer, relay miniature circuit breaker,tool kits, spares etc. The water chambers are made of corrosion free stainlesssteel confirm to SS 304 investment casting, capable to withstand a pressure of 10Ksc with inbuilt electrodes mounted on powder coated mild steel cabinet of 20ggthickness with universal lock and key for safety. The control panel should havepump active indication to show that the water is flowing inside the chamber,electrode OK indication- to show that the electrode is working, Electrode highindication to show that electrode is clogged and electrode low indication to showthat electrode is nearing completion, for easy maintenance of the equipment.The silver ions produced by the electrode is totally non toxic at the dosed levels,as permitted by BIS standard and the residual effect of the disinfectant is longlasting for more than 2 days.The equipment is powered by a single phase 220V/50Hz power supply and provided with an on site disinfectant analysing kit with

consumables to do a minimum of 10 tests. The efficacy of the equipment must beproved by the reputed laboratories like NEERI, Nagpur,ITRC,Luknow.

Capacity of water Rate for

Sl. No.disinfection

Unit2014-15

 equipmentin in Rupees.litres/ hour

1 1000 each 19800.00

2 2000 each 23760.00

3 3000 each 48055.00

4 5000 each 50200.00

5 10000 each 89985.00

6 15000 each 96600.00

7 25000 each 194250.00

8 50000 each 358050.00

9 100000 each 479850.00

10 200000 each 945000.00

11 300000 each 1410150.00

12 400000 each 1874250.00

13 500000 each 2355150.00

Note : 1. Excise Duty is ‘Nil’. The rate is inclusive of transportation and VAT etc.,2. The rate is inclusive of electrodes in-built with equipment.

Page 97: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 97/275

87

21.1 REPLACEMENT ELECTRODE FOR WATER DISINFECTION EQUIPMENT USINGSILVER IONIZATION

Specification: Supply and delivery of electrode assembly suitable for water disinfectionequipment using silver ionization process using pure silver metal electrode and fixed onPVC/Nylon sheets and nuts with electrical leads for the following capacities. The supplyshould be with the quality test certificate from approved organisations.

Sl.No. Capapcity LPHLife of electrodes in

million litre at dosage Rate for 2014-15 in Rupees

0.01mg/lt 0.005mg/lt

1 1,000 2070.00

2 2,000 3450.00

3 3,000 6 12 5261.00

4 5,000 8 16 5845.00

5 10,000 9 18 6428.006 15,000 15 30 8768.00

7 25,000 30 60 23100.00

8 50,000 60 120 46754.00

9 100,000 120 240 93509.00

10 200,000 240 480 187017.00

11 300,000 360 720 279999.00

12 400,000 480 960 374035.00

13 500,000 600 1,200 467544.00

The above rates are inclusive of VAT at 5% and transportation charges anywhere inTamilnadu. Excise Duty ‘Nil’ 

Page 98: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 98/275

88

21.2 ELECTRO CHLORINATOR BASED ON COMMON SALT

Sl.No. Capacity in litres per day Rate for 2014-15in Rupees.

1 50,000 42240.00

2 1,00,000 53474.00

3 1,50,000 72600.00

4 2,00,000 82488.00

5 2,50,000 99924.00

6 3,00,000 110418.00

7 3,50,000 120846.00

8 4,00,000 130350.00

9 4,50,000 137933.00

10 5,00,000 139788.00

11 10,00,000 342825.00

12 20,00,000 503160.00

13 30,00,000 652470.00

14 40,00,000 811545.00

15 50,00,000 950040.00

16 60,00,000 1234170.00

17 70,00,000 1324575.00

18 80,00,000 1398915.00

19 90,00,000 1552845.0020 1,00,00,000 1761165.00

The above rates are inclusive of excise duty at 12.36%, VAT at 5% andtransportation charges anywhere in Tamilnadu.

Page 99: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 99/275

89

22.0 PROVIDING EPOXY COATING TO REINFORCEMENT STEEL BARS

Rate forSl No. Description unit 2014-15

in Rupees.

Providing Fusion Bonded Epoxycoating not less than 175micronsthickness and upto 300 microns toreinforcement of all diameters as perIS 13620/1993 including testing of coating at plant.The cost is inclusiveof cost on account of carefulhandling, PVC coated binding wires,touchup material supplied by coatingagency, repair work, loading,unloading and strengthening of bentrods etc., complete as per

specification and as directed by theEngineer in charge. (inclusive of all

taxes)

a. for 8mm to 16mm MT 13688.00

b. for 20mm to 32mm MT 10363.00

Note : Transportation charges included.

Page 100: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 100/275

90

23.0 MECHANICAL JOINT COLLARS

Sl No. Description Unit Rate for 2014-15 in Rupees.

Supply and Delivery of 

MJ Collars.

1 100mm Each 2426.00

2 150mm Each 3858.00

3 200mm Each 5036.00

4 250mm Each 7011.00

5 300mm Each 9101.00

6 350mm Each 12994.00

7 400mm Each 15477.00

8 450mm Each 17903.00

9 500mm Each 23100.00

10 600mm Each 29164.00

Note : The above rates are inclusive of Excise duty 12.36% and VAT at 5%

23.1 JOINTING OF MECHANICAL JOINT COLLARS

Sl No. Description unit Rate for 2014-15 in Rupees.

Labour charges for

 jointing of mechanical joint collar, nuts, gasketand fixing in position asdirected by departmentalofficers.

1 100mm Joint 63.00

2 150mm Joint 151.00

3 200mm Joint 156.00

4 250mm Joint 231.00

5 400mm Joint 485.00

6 450mm Joint 537.00

7 600mm Joint 1063.00

Page 101: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 101/275

91

24.0 DISJOINTING OF GI PIPES

Sl No. Description unitRate for 2014-15

in Rupees.

Disjointing of GI pipes as directed

by the departmental officers

1 Upto 80mm Each 35.00

2 Above 80mm Each 48.00

24.1 WELDING OF G.I. PIPES

Sl No. Description unitRate for 2014-15

in Rupees.

1 Welding of GI pipes as directedby the departmental officers forthe sizes

a) Upto 80 mm one welding 119.00 joint

b) Above 80mm one welding 134.00 joint

Page 102: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 102/275

Page 103: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 103/275

RATES FOR PUMP SETS

For individual specifications for various items regarding

pump sets & Electrical Equipments, the specifications

already given in the Manual for Pump sets should be

followed.

Page 104: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 104/275

Page 105: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 105/275

95

1.0 CENTRIFUGAL MONOBLOC PUMPSET WITH ISI MARK AS PER IS 9079/1989 WITHOUT PANEL BOARD (3 PHASE)

Sl.No.Duty H.P. of  

UnitRate for 2014-15

lpmxm Pumpset in Rupees

1 100x20 1.5 1 No 8356.00

2 150x20 1.5 1 No 12310.003 200x20 2 1 No 12791.00

4 250x20 3 1 No 14157.00

5 300x20 3 1 No 16366.00

6 350x20 3 1 No 16366.00

7 400x20 3 1 No 16718.00

8 450x20 3 1 No 16718.00

9 500x20 5 1 No 16981.00

10 700x20 5 1 No 20127.00

11 50x35 2 1 No 13286.00

12 100x35 2 1 No 15098.00

13 150x35 3 1 No 18260.00

14 200x35 3 1 No 20557.00

15 250x35 5 1 No 23100.00

16 300x35 5 1 No 23100.00

17 350x35 5 1 No 23100.00

18 400x35 7.5 1 No 24700.00

19 450x35 7.5 1 No 24700.00

20 500x35 7.5 1 No 24700.00

21 50x50 2 1 No 20556.00

22 100x50 5 1 No 23100.00

23 150x50 5 1 No 23100.00

24 200x50 7.5 1 No 24700.00

25 250x50 7.5 1 No 24700.00

26 300x50 7.5 1 No 24700.00

27 350x50 10 1 No 32290.00

28 400x50 10 1 No 32290.00

29 500x60 10 1 No 35200.00

Note: Rates are excluding excise duty and VAT. Duty of the Pumpsets is thecriteria for the rates.

Page 106: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 106/275

96

2.0. SINGLE PHASE SUBMERSIBLE PUMPSET AS PER IS 8034/1989WITHOUT PANEL BOARD 2014-15

Sl.No.Duty H.P. of  

UnitRate for 2014-15

lpmxm Pumpset in Rupees

1 15x40 0.50 1 No 13945.00

2 15x50 0.50 1 No 13945.003 15x60 0.50 1 No 14500.00

4 15x70 0.75 1 No 16754.00

5 15x80 1.00 1 No 16754.00

6 15x90 1.00 1 No 16754.00

7 15x100 1.00 1 No 19113.00

8 15x125 1.50 1 No 21713.00

9 15X150 2.00 1 No 23375.00

10 20x40 0.50 1 No 14500.00

11 20x50 0.50 1 No 14500.00

12 20x60 0.75 1 No 14500.00

13 20x70 0.75 1 No 16754.0014 20x80 1.00 1 No 16754.00

15 20x90 1.00 1 No 17063.00

16 20x100 1.00 1 No 20350.00

17 20X125 1.50 1 No 21713.00

18 20X150 2.00 1 No 23238.00

Note: Rates are excluding excise duty and VAT. Duty of the Pumpsets is thecriteria for the rates.

3.0. THREE PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 100MM DIABOREWELL AS PER IS 8034/1989 WITHOUT PANEL BOARD 2014-2015

Sl.No.Duty H.P. of  

UnitRate for 2014-15

lpmxm Pumpset in Rupees

1 30x40 0.50 1 No 14433.00

2 30x50 0.75 1 No 14568.00

3 30x60 0.75 1 No 15289.00

4 30x70 0.75 1 No 16110.00

5 30x80 1.00 1 No 18523.00

6 30x90 1.00 1 No 20213.00

7 30x100 1.50 1 No 20213.00

8 30x125 2.00 1 No 22138.00

9 40x40 0.75 1 No 14433.0010 40x50 0.75 1 No 15289.00

11 40x60 1.00 1 No 15289.00

12 40x70 1.00 1 No 19998.00

13 40x80 1.00 1 No 20863.00

14 40x90 1.50 1 No 22480.0015 40x100 1.50 1 No 22480.00

Note: Rates are excluding excise duty and VAT. Duty of the Pumpsets is thecriteria for the rates.

Page 107: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 107/275

97

3.1. THREE PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 150MM DIABOREWELL AS PER IS 8034/1989 WITHOUT PANEL BOARD 2014-2015

Duty H.P. of  Rate for

Sl.No.lpm x m Pumpset

Unit 2014-15in Rupees

1 50x40 2.00 1 No 196382 50x50 2.00 1 No 21640

3 50x60 2.00 1 No 22703

4 50X75 3.00 1 No 24204

5 50x100 3.00 1 No 31625

6 50x125 4.00 1 No 31656

7 50x175 5.00 1 No 40700

8 50x200 6.00 1 No 44550

9 50x225 7.50 1 No 57944

10 50x250 10.00 1 No 58046

11 50x275 10.00 1 No 66885

12 75x40 2.00 1 No 20968

13 75x50 2.00 1 No 21640

14 75x60 3.00 1 No 22703

15 75x75 3.00 1 No 25889

16 75x100 4.00 1 No 31625

17 75x125 4.00 1 No 37780

18 75x150 5.00 1 No 40013

19 75x175 6.00 1 No 40013

20 75x200 7.50 1 No 43760

21 75x225 10.00 1 No 57944

22 75x250 10.00 1 No 66885

23 75x275 10.00 1 No 66885

24 100x30 1.50 1 No 19638

25 100x40 2.00 1 No 20968

26 100x50 3.00 1 No 22925

27 100x60 3.00 1 No 24204

28 100x75 3.00 1 No 28538

29 100x100 4.00 1 No 33748

30 100x125 5.00 1 No 38769

Page 108: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 108/275

98

31 100x175 7.50 1 No 38769

32 100x200 10.00 1 No 4231333 100x225 10.00 1 No 55107

34 100x250 10.00 1 No 62580

35 125x25 1.50 1 No 19828

36 125x40 3.00 1 No 20968

37 125x50 3.00 1 No 22783

38 125x60 3.00 1 No 25207

39 125x75 3.00 1 No 27986

40 125x100 4.00 1 No 32799

41 125x125 6.00 1 No 38783

42 125x200 10.00 1 No 51094

43 125x225 10.00 1 No 62521

44 150x25 1.50 1 No 19828

45 150x40 3.00 1 No 20968

46 150x50 3.00 1 No 21640

47 150x60 3.00 1 No 2520748 150x75 4.00 1 No 27986

49 150x100 5.00 1 No 36388

50 150x125 6.00 1 No 36388

51 175x40 3.00 1 No 20968

52 175x50 3.00 1 No 25065

53 175x60 3.00 1 No 25778

54 175x75 4.00 1 No 25778

55 175x100 6.00 1 No 32206

56 200x25 2.00 1 No 19828

57 200x40 3.00 1 No 20968

58 200x50 4.00 1 No 25778

59 200x60 5.00 1 No 28538

60 200x75 5.00 1 No 28538

Duty H.P. of  Rate for

Sl.No.lpm x m Pumpset

Unit 2014-15in Rupees

Page 109: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 109/275

99

61 200x100 6.00 1 No 38350

62 200x125 7.50 1 No 43386

63 250x40 4.00 1 No 20968

64 250x50 4.00 1 No 25778

65 250x60 5.00 1 No 28538

66 250x75 6.00 1 No 34168

67 250x100 7.50 1 No 42679

68 250x125 10.00 1 No 48621

69 300x40 5.00 1 No 27829

70 300x50 6.00 1 No 28969

71 300x60 6.00 1 No 34168

72 300x75 7.50 1 No 39653

73 300x100 12.50 1 No 48144

74 350x40 5.00 1 No 26794

75 350x50 7.50 1 No 29811

76 350x60 7.50 1 No 39974

77 350x75 10.00 1 No 4267978 350x100 15.00 1 No 49944

79 400x40 6.00 1 No 32290

80 400x50 7.50 1 No 37749

81 400x60 7.50 1 No 39931

82 400x75 10.00 1 No 49151

83 500x40 7.50 1 No 33453

84 500x50 7.50 1 No 41904

85 500x75 12.50 1 No 53135

86 600x40 7.50 1 No 34605

87 600x50 12.50 1 No 46634

88 600x75 15.00 1 No 53730

Note: Rates are excluding excise duty and VAT. Duty of the Pumpsets is thecriteria for the rates.

Duty H.P. of  Rate for

Sl.No.lpm x m Pumpset

Unit 2014-15in Rupees

Page 110: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 110/275

100

4.0 OPENWELL SUBMERSIBLE PUMPSET WITH ISI MARK AS PER IS 14220WITHOUT PANEL BOARD

Duty H.P. of  Rate for

Sl.No.lpm x m Pumpset

Unit 2014-15in Rupees

1 50x25 1.00 1 No 17091.002 50x40 1.00 1 No 17091.00

3 50x50 1.50 1 No 20296.00

4 50x60 2.00 1 No 25384.00

5 50x75 4.00 1 No 38838.00

6 50x100 5.00 1 No 43017.00

7 50x125 6.00 1 No 54835.00

8 75x25 1.00 1 No 17091.00

9 75x40 1.50 1 No 19418.00

10 75x50 2.00 1 No 21711.00

11 75x60 2.00 1 No 25384.00

12 75x75 4.00 1 No 38838.00

13 75x100 5.00 1 No 43019.00

14 75x125 6.00 1 No 51248.00

15 75x150 7.50 1 No 69187.00

16 100x25 1.00 1 No 19191.00

17 100x40 2.00 1 No 21711.00

18 100x50 3.00 1 No 22823.00

19 100x60 4.00 1 No 38838.00

20 100x75 4.00 1 No 38838.00

21 100x100 5.00 1 No 43018.00

22 100x125 6.00 1 No 54835.00

23 125x25 3.00 1 No 19409.00

24 125x40 3.00 1 No 22823.0025 125x50 3.00 1 No 28236.00

26 125x75 4.00 1 No 38838.00

27 125x100 5.00 1 No 43018.00

28 125x125 6.00 1 No 54835.00

29 150x25 3.00 1 No 19409.00

30 150x40 3.00 1 No 22823.00

Page 111: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 111/275

101

31 150x50 3.00 1 No 22823.00

32 150x60 4.00 1 No 39215.00

33 150x75 4.00 1 No 39215.00

34 150x100 5.00 1 No 43019.00

35 150x125 7.50 1 No 69187.00

36 175x25 3.00 1 No 19409.00

37 175x40 3.00 1 No 22823.00

38 175x50 3.00 1 No 28236.00

39 175x60 4.00 1 No 38838.00

40 175x75 5.00 1 No 38838.00

41 175x100 6.00 1 No 47464.00

42 200x25 3.00 1 No 19409.00

43 200x40 4.00 1 No 22823.00

44 200x50 4.00 1 No 22823.00

45 200x60 4.00 1 No 38838.00

46 200x75 6.00 1 No 38838.00

47 200x100 7.50 1 No 47464.00

48 200x125 10.00 1 No 81955.00

49 250x25 3.00 1 No 19409.00

50 250x40 4.00 1 No 22823.00

51 250x50 5.00 1 No 28236.00

52 250x60 5.00 1 No 38838.00

53 250x75 7.50 1 No 47464.00

54 250x100 7.50 1 No 50271.00

55 250x125 10.00 1 No 85255.00

56 300x25 3.00 1 No 19409.00

57 300x40 5.00 1 No 22823.00

58 300x50 5.00 1 No 28236.00

59 300x60 6.00 1 No 38838.00

60 300x75 10.00 1 No 47464.00

Duty H.P. of  Rate for

Sl.No.lpm x m Pumpset

Unit 2014-15in Rupees

Page 112: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 112/275

102

Duty H.P. of  Rate for

Sl.No.lpm x m Pumpset

Unit 2014-15in Rupees

61 300x100 10.00 1 No 50271.00

62 350x25 3.00 1 No 22823.00

63 350x40 5.00 1 No 33393.00

64 350x50 7.50 1 No 33393.00

65 350x60 7.50 1 No 38838.00

66 350x75 10.00 1 No 47464.00

67 350x100 10.00 1 No 50271.00

68 400x25 3.00 1 No 22823.00

69 400x40 5.00 1 No 33393.00

70 400x50 5.00 1 No 33393.00

71 400x60 7.50 1 No 39936.00

72 400x75 10.00 1 No 50271.00

73 500x25 5.00 1 No 22823.00

74 500x40 5.00 1 No 33393.00

75 500x50 5.00 1 No 33393.00

76 500x75 10.00 1 No 50271.00

77 600x25 5.00 1 No 22823.00

78 600x40 7.50 1 No 33393.00

79 600x50 7.50 1 No 39936.00

80 600x75 10.00 1 No 50271.00

81 700x40 10.00 1 No 37323.00

82 700x60 10.00 1 No 50271.00

83 700x80 10.00 1 No 50271.00

84 700x100 10.00 1 No 50271.00

85 800x40 10.00 1 No 37323.00

86 800x60 10.00 1 No 50271.00

87 800x80 10.00 1 No 50271.00

88 800x100 10.00 1 No 50271.00

89 900x40 10.00 1 No 50271.00

90 900x60 10.00 1 No 50271.00

Page 113: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 113/275

103

Duty H.P. of  Rate for

Sl.No.lpm x m Pumpset

Unit 2014-15in Rupees

91 900x80 10.00 1 No 50271.00

92 900x100 10.00 1 No 50271.00

93 1000x40 15.00 1 No 59748.00

94 1000x60 15.00 1 No 59748.00

95 1000x80 20.00 1 No 67340.00

96 1000x100 35.00 1 No 107965.00

97 1250x40 20.00 1 No 63180.00

98 1250x60 25.00 1 No 96736.00

99 1250x80 35.00 1 No 117689.00

100 1250x100 35.00 1 No 117689.00

101 1500x40 20.00 1 No 72501.00

102 1500x60 30.00 1 No 104247.00

103 1500x80 40.00 1 No 121836.00

104 1500x100 50.00 1 No 195158.00

105 2000x40 30.00 1 No 108289.00

106 2000x60 45.00 1 No 121836.00

107 2000x80 50.00 1 No 121836.00

108 2000x100 60.00 1 No 121836.00

109 2500x40 35.00 1 No 121836.00

110 2500x60 60.00 1 No 121836.00

111 2500x80 75.00 1 No 121836.00

112 2500x100 90.00 1 No 121836.00

Note: Rates are excluding excise duty and VAT. Duty of the Pumpsets is the

criteria for the rates.

Page 114: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 114/275

104

   5 .   0

 .   R   A   T   E   S   F   O   R   H   O   R   I   Z   O   N   T   A   L   S

   P   L   I   T   C   A   S   T   I   N   G   C   E   N   T   R   I   F   U   G   A   L   P   U   M   P   (   1   5   0   0   R   P   M   )

   R  a   t  e

   f  o  r   2   0   1   4  -   1   5

   R  s .   i  n   L  a   k   h  s .

   S   l .   N  o .

   C  a  p  a  c   i   t  y   i

  n   L   P   M

   H  e  a   d   i  n

   M  e   t  r  e  s

   2   5

   3   0

   3   5

   4   0

   4   5

   5   0

   5   5

   6   0

   7   0

   8   0

   9   0

   1

   1   5   0   0

   2 .   5   5

   2 .   5   5

   3 .   0   1

   3 .   0   1

   3 .   0   4

   3 .   8

   2

   3 .   8   7

   3 .   8   8

   4 .   1   2

   4 .   1   2

   4 .   5   9

   2

   2   5   0   0

   2 .   5   5

   2 .   5   5

   3 .   1   1

   3 .   2   3

   3 .   9   1

   3 .   9

   4

   3 .   9   1

   4 .   1   5

   4 .   6   3

   4 .   7   9

   4 .   7   9

   3

   3   0   0   0

   2 .   5   5

   2 .   5   5

   3 .   2   3

   3 .   2   3

   3 .   5   0

   3 .   6

   3

   3 .   6   3

   4 .   1   5

   4 .   9   5

   4 .   9   5

   4 .   9   9

   4

   3   5   0   0

   2 .   5   5

   2 .   5   5

   3 .   2   3

   3 .   2   3

   4 .   5   8

   4 .   7

   0

   5 .   2   3

   5 .   4   3

   5 .   5   0

   5 .   9   9

   5 .   9   9

   5

   4   0   0   0

   2 .   9   5

   2 .   9   5

   3 .   2   3

   3 .   2   3

   4 .   1   8

   4 .   7

   0

   5 .   0   8

   5 .   1   6

   5 .   2   9

   5 .   2   9

   5 .   2   9

   6

   5   0   0   0

   3 .   4   1

   3 .   4   1

   3 .   4   1

   3 .   4   1

   4 .   8   6

   5 .   3

   5

   5 .   3   9

   5 .   9   4

   6 .   1   6

   6 .   1   6

   6 .   1   6

   7

   6   0   0   0

   3 .   2   3

   3 .   2   3

   4 .   7   0

   4 .   7   0

   4 .   8   6

   5 .   4

   4

   5 .   8   4

   6 .   4   1

   6 .   6   3

   6 .   6   3

   6 .   7   3

   8

   7   0   0   0

   4 .   3   3

   4 .   6   0

   4 .   8   6

   4 .   8   6

   5 .   3   3

   5 .   5

   5

   5 .   6   8

   6 .   4   1

   6 .   4   3

  -  -  -

  -  -  -

   9

   8   0   0   0

   4 .   4   5

   4 .   6   0

   4 .   6   1

   5 .   2   9

   5 .   5   5

   5 .   5

   5

   5 .   7   9

   5 .   9   5

   1   0 .   7   4

  -  -  -

  -  -  -

   1   0

   9   0   0   0

   4 .   4   5

   4 .   7   5

   4 .   7   9

   5 .   5   5

   5 .   5   5

   5 .   5

   6

   5 .   6   4

   5 .   7   6

   1   1 .   2   8

  -  -  -

  -  -  -

   1   1

   1   0   0   0   0

   4 .   4   5

   4 .   7   5

   4 .   8   0

   5 .   5   8

   5 .   5   8

   5 .   8   0

   5 .   8   0

   1   0 .   5   6

   1   3 .   3   9

   1   3 .   3   9

   1   3 .   4   9

   1   2

   1   5   0   0   0

   5 .   4   8

   5 .   4   8

   5 .   5   0

   6 .   7   6

   6 .   7   6

   7 .   4   8

   8 .   8   0

   1   1 .   6   8

   1   3 .   3   9

   1   3 .   3   9

   1   3 .   4   9

   1   3

   2   0   0   0   0

   6 .   0   1

   6 .   1   3

   6 .   1   4

   1   3 .   6   4

   1   3 .   6   4

   1   5 .   3

   1

   1   5 .   3   1

   1   5 .   3   1

   1   5 .   6   3

   1   5 .   6   3

   1   5 .   6   3

   1   4

   2   5   0   0   0

   1   5 .   6   6

   1   5 .   6   6

   1   5 .   6   6

   1   5 .   6   6

   1   5 .   6   6

   1   5 .   6

   6

   1   5 .   6   6

   1   5 .   6   6

   1   5 .   6   6

   1   5 .   6   6

   1   5 .   6   6

   1   5

   3   0   0   0   0

   1   5 .   5   8

   1   6 .   1   8

   1   6 .   9   4

   1   6 .   9   4

   1   6 .   9   4

   1   6 .   9

   4

   1   6 .   9   4

   2   0 .   3   1

   2   2 .   3   5

  -  -  -

  -  -  -

   N  o   t  e  :

   1   )   T   h  e  r  a   t  e  s  a  r  e

   i  n  c   l  u  s   i  v  e  o   f   M   S   b  a  s  e  p   l  a   t  e ,

   f   l  e  x   i   b   l  e   t  y  r  e  c  o  u  p   l   i  n  g  a  n   d   f  o  u  n   d  a   t   i  o  n   b  o   l   t  s .

   2   )   T   h  e  r  a   t  e  s  a  r  e

   i  n  c   l  u  s   i  v  e  o   f  a   l   l 

   d  u   t   i  e  s

   t  a  x  e  s   h  a  n   d   l   i  n  g  c   h  a  r  g  e  s  a  n   d  a   t   F .   O .   R .   d  e  s   t   i  n  a   t   i  o  n .

   3   )   E   f   f   i  c   i  e  n  c  y  m  a  y   b  e   t  a   k  e  n   f  r  o  m  u  n   i  v  e  r  s  a   l   c  u  r  v  e   f  o  r  c  a   l  c  u   l  a   t   i  o  n  o   f  m  o   t  o  r   H   P ,  o   t   h  e  r  w   i  s  e  m  a  n  u   f  a  c   t  u  r  e  r  s  m  a  y   b  e  c  o  n  s  u   l   t  e   d

   f  o  r  e   f   f   i  c   i  e  n  c  y

  c  u  r  v  e .

   4   )   N   P   S   H  r  e  q  u   i  r  e  m  e  n   t  s   h  o  u   l   d   b  e  a  s  s  e  s  s  e   d  a  n   d

  s  u  m  p  s   h  o  u   l   d   b  e   d  e  s   i  g  n  e   d  a  c

  c  o  r   d   i  n  g   l  y .

   5   )   E  x  c   i  s  e   d  u   t  y  a   t   1   2 .   3   6   % ,   V   A   T   5   %

Page 115: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 115/275

105

6.0. HORIZONTAL SQUIRREL CAGE MOTOR 1500 RPM

AC 3 Phase /415 V/ Horizontal SPDP 4 Pole Squirrel cageInduction motor for HSC Centrifugal pumps

Sl.No KW HPRate for 2014-15

in Rupees

1 9.3 12.5 87680.00

2 11 15 92247.00

3 15 20 107936.00

4 18.5 25 148081.00

5 22 30 162863.00

6 30 40 188515.00

7 37 50 235342.00

8 45 60 287375.00

9 55 75 287375.00

10 75 110 439003.00

11 90 120 462653.00

12 110 150 583322.00

13 125 170 750484.00

14 132 180 794963.00

15 150 200 802756.00

16 160 215 879888.00

17 180 240 879888.00

18 187 250 912250.00

19 200 270 978500.00

20 220 300 1281625.00

21 250 335 1461192.00

22 280 375 2025125.00

23 300 400 2172750.00

Note : The above rates are inclusive of excise duty, taxes, handling chargesetc.,Excise duty at 12.36%,VAT at 5%

Page 116: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 116/275

106

7.0. HORIZONTAL SQUIRREL CAGE MOTOR 1000 RPM

AC 3 Phase /415 V/ Horizontal SPDP 6 Pole Squirrel cageInduction moror for HSC Centrifugal pumps

Sl.No KW HPRate for 2014-15

in Rupees

1 9.3 12.5 80124.00

2 11 15 84194.00

3 15 20 118657.00

4 18.5 25 140133.00

5 22 30 180374.00

6 30 40 224988.00

7 37 50 281222.00

8 45 60 346434.00

9 55 75 396896.00

10 75 110 476392.00

11 90 120 540392.00

12 110 150 693838.00

13 125 170 825519.00

14 132 180 825519.00

15 150 200 881197.00

16 160 215 950338.00

17 180 240 1329990.00

18 187 250 1351262.00

19 200 270 1462571.00

20 220 300 1654514.00

21 250 335 1852233.00

Note: The above rates are inclusive of excise duty, taxes, handling charges

etc.,Excise duty at 12.36%,VAT at 5%

Page 117: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 117/275

107

   8 .   0 .

   V   E   R   T   I   C   A   L   T

   U   R   B   I   N   E   P   U   M   P   (   W   A   T   E   R   L   U   B   R

   I   C   A   T   E   D   )   C   O   N   F   I   R   M   I   N   G   T   O   I

   S   1   7   1   0   /   1   9   8   9   (   R   E   A   F   F   I   R   M   E   D

   1   9   9   9   )

   1   5   0   0   R   P   M   S

   U   I   T   A   B   L   E   F   O   R   V   E   R   T   I   C   A   L   H   O   L   L   O   W    S

   H   A   F   T   S   Q   U   I   R   R   E   L   C   A   G

   E

   R

  a   t  e   f  o  r   2   0   1   4  -   1   5

   R  s .   i  n   L  a   k   h  s .

   S   l .   N  o .

   C  a  p  a  c

   i   t  y   i  n   L   P   M

   H  e  a

   d   i  n   M  e   t  r  e  s

   1   5  m

   2   0  m

   3   0  m

   4   0  m

   5   0  m

   6   0  m

   7   0  m

   8   0  m

   9   0  m

   1   0   0  m

   1

   1

   5   0   0

   2 .   5   1

   2 .   5

   1

   2 .   6   8

   2 .   6   8

   2 .   7   7

   2 .   8   6

   3 .   0   2

   3 .   0   2

   3 .   3   4

   3 .   5   0

   2

   2

   0   0   0

   5 .   0   2

   5 .   6

   8

   6 .   2   7

   7 .   0   0

   8 .   1   8

   8 .   1   8

   8 .   1   8

   8 .   3   4

   8 .   5   1

   9 .   1   0

   3

   3

   0   0   0

   6 .   4   8

   6 .   6

   2

   7 .   3   4

   7 .   8   8

   8 .   8   4

   9 .   0   0

   9 .   3   5

   9 .   6   9

   9 .   1   0

   9 .   3   9

   4

   4

   0   0   0

   7 .   2   8

   7 .   3

   4

   9 .   1   3

   9 .   2   6

   9 .   3   9

   9 .   3   9

   9 .   6   9

   1   0 .   3   3

   1   0 .   6   1

   1   0 .   6   1

   5

   5

   0   0   0

   8 .   6   6

   8 .   8

   1

   9 .   3   9

   9 .   8   6

   1   0 .   4   7

   1   0 .   4   7

   1   0 .   9   0

   1   1 .   0   8

   1   1 .   2   3

   1   1 .   5   4

   6

   6

   0   0   0

   8 .   8   1

   8 .   8

   1

   9 .   3   9

   9 .   8   6

   1   0 .   4   7

   1   0 .   4   7

   1   0 .   9   0

   1   1 .   0   8

   1   1 .   2   3

   1   1 .   5   4

   7

   7

   0   0   0

   8 .   8   1

   8 .   8

   1

   9 .   3   9

   9 .   8   6

   1   0 .   4   7

   1   0 .   4   7

   1   1 .   2   3

   1   1 .   2   3

   1   1 .   2   3

   1   1 .   5   4

   8

   8

   0   0   0

   9 .   3   9

   9 .   5

   7

   9 .   8   6

   1   0 .   3   3

   1   0 .   6   1

   1   0 .   6   1

   1   1 .   2   3

   1   1 .   2   3

   1   1 .   2   3

   1   1 .   5   4

   9

   1

   0   0   0   0

   9 .   3   9

   9 .   5

   7

   9 .   9   5

   1   0 .   3   3

   1   0 .   6   1

   1   0 .   9   0

   1   1 .   2   3

   1   1 .   2   3

   1   1 .   5   4

   1   1 .   5   4

   1   0

   1

   5   0   0   0

   1   0 .   6   1

   1   0 .   6

   1

   1   0 .   6   1

   1   0 .   9   0

   1   1 .   5   4

   1   1 .   5   4

   1   1 .   8   2

   1   2 .   4   5

   1   2 .   7   3

   1   3 .   0   3

   1   1

   2

   0   0   0   0

   1   2 .   1   2

   1   2 .   4

   5

   1   3 .   0   5

   1   3 .   3   7

   1   3 .   9   6

   1   5 .   1   7

   1   6 .   6   9

   1   7 .   2   8

   1   9 .   7   2

   2   3 .   9   8

   1   2

   2

   5   0   0   0

   1   2 .   1   2

   1   2 .   4

   5

   1   3 .   0   5

   1   3 .   3   7

   1   3 .   9   6

   1   5 .   1   7

   1   6 .   6   9

   1   7 .   2   8

   1   9 .   7   2

   2   3 .   9   8

   1   3

   3

   0   0   0   0

   2   1 .   6   9

   2   2 .   7

   6

   2   4 .   0   2

   2   5 .   7   8

   2   5 .   7   8

   2   7 .   3   1

   2   7 .   3   1

   3   0 .   3   3

   3   0 .   3   3

   3   3 .   3   7

   N  o   t  e  :

   1   )   T   h  e  a   b  o  v  e  r  a   t  e  s  a  r  e

   i  n  c   l  u   d   i  n  g  e  x  c   i  s  e   d

  u   t  y  a   t   1   2 .   3   6   % ,   V   A   T   5   %  ,

   t  r  a  n  s

  p  o  r   t  a   i  o  n  a  n   d

   h  a  n   d   l   i  n  g  c   h  a  r  g  e  s  e   t  c . ,

   2   )   M  u   l   t   i  p   l  y  w

   i   t   h   1 .   1   5   f  o  r  o   i   l    l  u   b  r   i  c  a   t  e   d  p  u  m

  p  s   (   f  o  r  r  a  w  w  a   t  e  r   )

   3   )   R  a   t  e  s  g   i  v  e  n  a  r  e  w   i   t   h  s  u  s  p  e  n  s   i  o  n   l  e  n  g   t   h

  o   f   7  m ,   b  r  o  n  z  e   i  m  p  e   l   l  e  r ,   S   S   4   0

Page 118: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 118/275

108

9.0 VERTICAL HOLLOW SHAFT MOTORS FOR TURBINE PUMP

AC 3 Phase /415 V/ Vertical Hollow Shaft TEFC & SPDP 4 PoleSquirrel cage Induction moror 1500RPM

Sl.No KW HPRate for 2014-15

in Rupees

TEFC MOTORS

1 18.5 25 90583.00

2 22 30 96569.00

3 30 40 130250.00

4 37 50 168234.00

5 45 60 203025.00

SPDP MOTORS

6 55 75 335620.00

7 75 100 443689.00

8 90 120 456064.00

9 110 150 588566.00

10 125 170 602105.00

11 132 180 685867.00

12 150 200 773450.00

13 160 215 930486.00

14 180 240 966570.00

15 187 250 978219.00

16 200 270 1091529.00

17 220 300 1138112.00

18 250 335 1220780.00

19 280 375 1383250.00

20 300 400 1481601.00

Note: The rates are inclusive of excise duty,taxes,etc., Excise duty at 12.36%,

VAT at 5%.

Page 119: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 119/275

109

10.0 OIL NATURAL AND AIR NATURAL (ONAN) COOLED 11KV / 22KV / 11KVAND 22KV WITH COPPER WINDING CONFIRMING TO IS 2026

Sl.No Rating in KVARate for 2014-15in Rupees

11KV 22 KV 11KV/22KV

1 160 225600.00 252000.00 270000.002 200 252000.00 288000.00 306000.00

3 250 297000.00 324000.00 342000.00

4 315 333000.00 360000.00 387000.00

5 400 392400.00 445500.00 479700.00

Note :- Excise duty at 12.36 % and TNVAT at 5% and handling charges are extra.

10.1 OIL NATURAL AND AIR NATURAL (ONAN) COOLED 11KV / 22KV WITHCOPPER WINDING CONFIRMING TO IS 2026

Sl.No Rating in KVA Rate for 2014-15in Rupees

11KV/433V 22KV/433V

1 500 524700.00 564300.00

2 630 653400.00 693000.00

3 750/800 803000.00 882000.00

4 1000 957000.00 1035000.00

Note : Excise duty at 12.36%, TNVAT at 5% and handling charges are extra

Page 120: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 120/275

110

11.0. SINGLE PHASE PANEL BOARD WITH TWO LEVEL GUARD AND AUTO START

Sl. No. HP Unit Rate for 2014-15 in Rupees

1 1 1 No. 4160.00

2 1.5 1 No 4550.00

3 2 1 No 5200.00Note 1) The rate are excluding excise duty and taxes

2) Excise duty Nil and VAT at 5 % extra over the above rate.3) The above rates are inclusive of two level guard worth Rs.550/- and auto

star facility worth Rs. 400/-4) Timer is not recommended for this panel board.5) Panel board should be provided as per specification given in Board circular

No. 23/DCE/QATA/2004/Dt. 23.8.2004

11.1. 3 PHASE PANEL BOARD- D.O.L. WITH TWO LEVEL GUARD AND AUTO START

Sl. No. HP Unit Rate for 2014-15 in Rupees

1 1 1 No. 9750.002 2 1 No 9750.00

3 3 1 No 9750.00

4 4 1 No. 9750.00

5 5 1 No 9750.00

6 6 1 No 9750.00

Note 1) The rate are excluding excise duty and taxes2) Excise duty Nil and VAT at 5 % extra over the above rate.3)The above rates are inclusive of two level guard worth Rs.550/- and auto

star facility worth Rs. 400/-

4) For Timer facility if necessoryRs. 4000 may be added as extra.5) Panel board should be provided as per specification given in Board circular

No. 26/F.13/HOTC/DCE/QATA/2004-2/Dt. 22.9.2004

11.2 3 PHASE PANEL BOARD-STAR DELTA WITH TWO LEVEL GUARD AND AUTOSTART

Sl. No. HP Unit Rate for 2014-15 in Rupees

1 6 1 No. 12259.00

2 7.5 1 No 12870.00

3 10 1 No 15590.00

4 12.5 1 No. 16240.00

5 15 1 No 18026.00

6 20 1 No 18975.00

7 25 1 No 18975.00

Note 1) The rate are excluding excise duty and taxes.2) Excise duty Nil and VAT at 5 % extra over the above rate.3) The above rates are inclusive of two level guard worth Rs.550/- and auto

star facility worth Rs. 400/-.4) Timer is not recommended for this panel board.5) Panel board should be provided as per specification given in Board circular

No. 26/F.13/HOTC/DCE/QATA/2004-2/Dt. 22.9.2004

Page 121: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 121/275

111

11.3 DOL STARTER WITH SINGLE PHASING PREVNTOR WITH AMMETER CONFORMING TO IS 13947 WITH AUTO RESTART FACILITY FOR PUMPHOUSES WHERE PANEL BOARDS ARE AVAILABLE

Up to 10 HP rating Rs. 4416

(The above rates are inclusive of all taxes ,duties and handling charges

Excise duty at 12.36%,VAT 5 %)

11.4 FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLEFOR L.T.SQUIRREL CAGE MOTOR SQUIRREL CAGE MOTOR 

Sl. No. HP Unit Rate for 2014-15 in Rupees

1 30 to 37 1 No 172320.00

2 38 to 75 1 No 300520.00

3 76 to 135 1 No 418430.00

4 136 to 160 1 No 476848.005 161 to 250 1 No 704880.00

6 251 to 300 1 No 834240.00

7 301 to 500 1 No 1192760.00

8 501 to 750 1 No 1540024.00

11.5 FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLEFOR H.T.SQUIRREL CAGE MOTOR SQUIRREL CAGE MOTOR 

Sl. No. HP Unit Rate for 2014-15 in Rupees

1 250 1 No 682184.00

2 300 1 No 718217.00

3 350 1 No 772335.00

4 400 1 No 808393.00

5 500 1 No 844453.00

6 600 1 No 952633.00

7 700 1 No 1046390.00

8 800 1 No 1168994.00

9 900 1 No 1268158.00

10 1000 1 No 1475503.00

Note: **1) The rates are inclusive of excise duty taxes etc.2) DOL starters are to be adopted up to 6 HP3) Air break fully automatic star delta starters are suggested for above

6HP upto 20HP except submersible pumpsets for which fully automaticATS starters are to be adopted

4) FCMA soft starter are to be adopted for 100 HP and above.5)Excise duty at 12.36% VAT at 5%

Page 122: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 122/275

112

11.6 FULLY AUTOMATIC AIR BREAK STAR DELTA STARTER WITH SINGLE PHASINGPREVENTOR WITH AMMETER CONFIRMING TO IS 13947 WITH AUTORESTART FACILITY (FOR INSTALLING WHERE MV PANEL BOARD IS USED)

Sl. No. KW Rating HP Unit Rate for 2014-15 in Rupees

1 7.5 10 1 No 14165.00

2 11 15 1 No 14165.00

3 15 20 1 No 14950.00

4 18.5 25 1 No 14950.00

5 22 30 1 No 24400.00

6 30 40 1 No 27950.00

7 37 50 1 No 31875.00

Note: The above rates are inclusive of all taxes duties and handling charges

Excise duty at 12.36 % and VAT 5%

11.7 FULLY AUTOMATIC AIR BREAK AUTO TRANSFORMER STARTER WITHSINGLE PHASING PREVENTOR WITH AMMETER CONFIRMING TO IS13947 WITH AUTO RESTART FACILITY

Sl. No. KW Rating HP Unit Rate for 2014-15 in Rupees

1 5.5 7.5 1 No 27050.00

2 7.5 10 1 No 27050.00

3 9 12.5 1 No 30350.00

4 11 15 1 No 31750.00

5 15 20 1 No 66826.00

6 22 30 1 No 83275.00

7 30 40 1 No 90700.00

8 37 50 1 No 104990.00

9 45 60 1 No 117225.00

10 60 80 1 No 163315.00

11 75 100 1 No 179050.00

Note: The above rates are inclusive of all taxes duties and handling chargesExcise duty at 12.36 % and VAT 5%

Page 123: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 123/275

113

12.0. 3,3.5,4 CORE 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CABLE CONFORMING TO IS 1554 PART I WITH ISI MARKING

Sl.No Description UnitRate for 2014-15in Rupees

3 Core 3.5 Core 4 Core

1 4sq.mm metre 59.002 6sq.mm metre 71.00 126.00

3 10sq.mm metre 81.00 138.00

4 16sq.mm metre 85.00 182.00

5 25sq.mm metre 106.00 220.00

6 35sq.mm metre 130.00 259.00

7 50sq.mm metre 172.00 338.00

8 70sq.mm metre 228.00 433.00

9 95sq.mm metre 298.00 560.00

10 120sq.mm metre 358.00 685.00

11 150sq.mm metre 437.00 810.00

12 185sq.mm metre 539.00 994.00

13 240sq.mm metre 680.00 1255.00

14 300sq.mm metre 826.00 1540.00

15 400sq.mm metre 1057.00 1970.00

Note: Excise duty 12.36% and VAT at 5% are extra

Page 124: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 124/275

114

12.1. PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLECONFORMING TO IS 694/1990 FOR THE YEAR 2014-15

Sl.No Description Unit

Rate for 2014-15in Rupees

With excise duty Without

excise duty

1 1.5 sq.mm meter 69.00 62.00

2 2.5 sq.mm meter 111.00 99.00

3 4.0 sq.mm meter 162.00 144.00

4 6.0 sq.mm meter 220.00 196.00

5 10.0 sq.mm meter 386.00 343.00

6 16.0 sq.mm meter 587.00 523.00

12.2 RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALSAND LABOUR 

The cost of cable per meter will be the cost per joint

12.3 CABLE LAYING

Rate for 2014-15in Rupees

Sl.NoDescription For laying below For laying in

GL including trenches insideearth work in the pump room

Rupees or in air

1 up to 95 sq. mm 108.00 72.00

2 95 to 240 sq.mm 156.00 103.00

3 240 to 400 sq.mm 228.00 180.00

12.4 CABLE CLAMPS

Sl.No. Description UnitRate for the

year 2014-15

1 up to 95 sq. mm each 234.00

2 95 to 240 sq.mm each 286.00

3 240 to 400 sq.mm each 416.00

NOTE: 1. For every 3 metre length one set of clamp is to be provided2. Suitable number of clamps are to be arrived at according to the length3. Provision for cable trench and delivery pipe ducting are to be provided

in pump house detailed estimate.

Page 125: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 125/275

115

H.T. CABLE

12.5. PVC INSULATED ARMOURED ALUMINIUM CONDUCTOR CABLE

Sl.No Description UnitRate for 2014-15in Rupees

11KV 12KV

1 3 C 240 sq.mm metre 984.00 1203.00

2 3 C 185 sq.mm metre 820.00 1016.00

3 3 C 150 sq.mm metre 696.00 904.00

4 3 C 120 sq.mm metre 619.00 813.00

5 3 C 95 sq.mm metre 525.00 736.00

6 3 C 70 sq.mm metre 470.00 649.00

Note: Excise duty at 12.36% and VAT at 5% are extra

13.0 VACCUM PUMP SET WITH ACCESSORIES

Sl. No. Description Unit Rate for theyear 2014-15

1 Price for 5 HP Model/Rotary typeVaccum pumpsets (Pumpset + GIPipes + Fittings + Starters +Valves + 100 Lr.Tank) including

Transportation, handling chargesall taxes and duties 1 No 355000.00

2 Price for 10 HP Vaccum pumpsetwith all above Accessories 1 No 451300.00

3 150mm dia Pressure Gauge andVaccum guage including allaccessories as per specification(For Suction and Delivery to bemounted on wall on TeakWood Board) 1 No 6450.00

Note: The rates are inclusive of Excise duty at 12.36% and VAT at 5%.

Page 126: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 126/275

116

 14.0 MOULDED CASE CIRCUIT BREAKER(MCCB)

Sl.No. RangeRate for 2014-15 in Rupees

 3POLE 4 POLE

1 32-100 9825.00 12385.00

2 125 12600.00 15200.00

3 160 15600.00 19435.00

4 200 28264.00 29621.00

5 250 28264.00 33977.00

6 320 34200.00 39600.00

7 400 36000.00 41400.00

8 630 39826.00 48000.00

9 800 54000.00 71962.0010 1000 84000.00 108000.00

11 1250 94800.00 138000.00

12 1600 108000.00 170600.00

NOTE: 1) The rates are inclusive of all taxes, duties and handling charges andF.O.R. destination.

2) The rate for MCB for single phase useage, the PWD schedule of ratesshall be referred.

3) Add 35% cost of MCCB/ACB/ MCB towards the cost of fabrication

other fittings and labour4) Upto 15 KW distribution box shall be used for more than one outgoingloads and for rates PWD schedule rates shall be referred.

15.0 RATE FOR MIXED DIE ELECTRIC CAPACITOR WITH TNEB TESTCERTIFICATE WITH ACCESSORIES INCLUDING BANKING CONFORM TOIS 2834.Rs.400/- per KVAR (includign all taxes, duties and handling charges).

Note: a. The rate for mixed Die Electric Capacitor with Test Certificate givenas Rs.400/- per KVAR is inclusive of all taxes and duties and inclusiveof Banking charges, such as providing of copper bus bars with provisionfor adding atleast 2 capacitors at later date, cable entry box, fabricating

charges etc. complete. This rate is not applicable for replacement of capacitors which do not require banking and fabrication works.

Page 127: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 127/275

117

16.0 LT METERING BOX

Rate forSl.No. Description Unit the year

2014-15

1 Up to 50HP/37 KW (which includes LT meterpanel board 6 Nos. suitable fuse carriers 1 No. 22500.00

2 75 HP/56 KW (which includes LT meterpanel board 6 Nos. suitable fuse carriers 1 No. 29364.00

3 75HP-150HP/56-112 KW (which includes LTmeter panel board 6 Nos. suitable fuse carriers 1 No. 36696.00

4 IN HT supply using LT metering board(Above 150 HP below 200 HP) 112-150 KW 1 No. 60000.00

17.0 TRANSFORMER SUB STATION RELATED WORKS

Rate forSl.No. Description Unit the year

2014-15

1 Designing and preparation of CEIG drawings,obtaining Approval and safety certificateincluding submission of Completion report andrectification report. 1 No. 60000.00

2 Supply, delivery of 6 pole structure materialswith suitable Size RSJ along with all structurematerial are as under.

a For 11 KV Sub station 1 No. 300000.00

b For 22 KV Sub station 1 No. 420000.00

3 Construction of transformer plinth 1 No. 20000.00

4 Chain link fencing with gate including theTNEB 2 poles Spreading of materials as perCEIG requirements 1 No. 54000.00

5 Transformer yard earthing

a Upto 250 KVA Transformer sub station 1 No. 30000.00

b Above 250 KVA 1 No. 60000.00

6 Transformer sub station erection charges 1 No. 19068.00

Note: Provision for cement concrete flooring has to be made at the sub stationyard

Page 128: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 128/275

118

17.1 AIR CIRCUIT BREAKER 

Sl.No. Range in AMPSRate for 2014-15 in Rupees

 3POLE 4 POLE

1 1000 173125.00 213000.00

2 1250 183375.00 224625.003 1600 203500.00 261750.00

4 2000 254375.00 308000.00

5 2500 307000.00 375375.00

6 3200 364400.00 447700.00

7 4000 481625.00 591250.00

Note : The rates are inclusive of all taxes, duties, handling charges and F.O.R.destination.

18.0 SAFETY APPLIANCES

Rate forSl.No. Description Unit the year

2014-15

1 Electrical gloves tested to 11 KV /22 KV withwooden box dusted with french chalk powder 1 No. 564.00

2 Electrical quality 6mm thick rubber mat 1 No. 804.00

3 5 kg capacity ISI marked Dry chemical powderfire extinguisher 1 No. 2250.00

4 Fire Bucket-3 Nos Hooked to MS stand 1 No. 900.00

5 Laminated shock treatment chart 1 No. 600.00

6 Wooden First Aid Box 1 No. 756.00

7 Rechargeable Emergency lamp( 600mmfluorescent lamp) 1 No. 3256.00

H.T. SUPPLY

8 Wooden ladder –3M Ht. 1 No. 1350.00

9 Earth Discharge Rod 1 No. 1128.00

Note: The rates are inclusive of all taxes,duties, handling charges and F.O.Rdestination

Page 129: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 129/275

119

19.0 TOOLS

Rate forSl.No. Description Unit the year

2014-15

1 6” Chain wrench best India make 1 No. 600.00

2 8”Chain Wrench Best India Make 1 No. 840.003 Connector Screw Driver 901 Taparia Make 1 No. 48.00

4 200mm Screw Driver 825 Taparia Make 1 No. 84.00

5 300mm Screw Driver 829 Taparia Make 1 No. 156.00

6 400mm Screw Driver 930 Taparia Make 1 No. 225.00

7 200mm Cutting Plier Taparia Make 1 No. 276.00

8 800gm Ball Pane Hammer with Handle

Taparia Make 1 No. 346.00

9 Digital Tong Tester CE Make 1 No. 3250.0010 Digital Multi Meter CE Make 1 No. 2100.00

11 15” Screw Spanner Taparia Make 1 No. 720.00

12 12” Bearing Puller 1 No. 713.00

13 Lever Type Grease Gun 1 No. 563.00

14 12”Screw Spanner 1 No. 485.00

15 Crow Bar 5” 1 No. 495.00

16 1” Cold Chisel 1 No. 173.00

17 Hacksaw Frame with Blade 1 No. 108.00

18 Electrical Air Blower 1 No. 2650.00

19 Digital Tachometer 1 No. 1800.00

20 Hand Crimpling Tool 8” 1 No. 446.00

21 DE Spanner set 6 to 32 Jhalani Make 1 No. 900.00

22 Rings spanner set 6 to 32 Jhalani Make 1 No. 2158.00

23 Pipe Wrench 24” Jhalani Make 1 No. 1296.00

24 Pipe Wrench 14” Jhalani Make 1 No. 540.00

25 12” Flat rough File Scissors Make 1 No. 290.00

26 12” Flat smooth File Scissors Make 1 No. 427.00

27 12”Round File Rough Scissors 1 No. 340.00

28 12” Round File Smooth Scissors Make 1 No. 390.00

29 12”Half Round File Rough Scissors Make 1 No. 625.00

30 12”Half Round File Smooth Scissors Make 1 No. 625.00

Note: The rates are inclusive of all taxes,duties, handling charges and F.O.Rdestination

Page 130: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 130/275

120

20.0 PUMP ROOM WIRING AND OTHER ITEMS

Rate forSl.No. Description Unit the year

2014-15

1 Providing lighting wiring using MS conduit pipes

and specials with 2 runs 1.5 sq.mm PVC copperwire and 1 run 12 swg GI wire for earthingfor light, fans and 5A plug points includingswitch box 5A switch sockets ceiling rose andconsumables 1 No. 986.00

2 Supply of portable hand lamp with 100w bulb,lamp guard and wooden handle and 25M longflexible cable. 1 No. 863.00

3 Supply of pedestal fan 1 No. 3250.00

Note:1) Add 35% for wiring on the total fittings cost.2) The above rates are inclusive of all taxes duties handling charges and

F.O.R destination.3) Excise duty at 12.36% VAT 5%.

21.0 TWIN GI EARTHING

Rate forSl.No. Description Unit the year

2014-15

1 Upto 25 HP installation 1 No. 8663.00

2 Above 25-60 HP 1 No. 13860.00

3 Above 60-150 HP 1 No. 20790.00

4 Above 150 HP 1 No. 34650.00

Note: In case of collector well the distance from the bank of the river should beascertained to find out the weight of GI strip to be usd only in the footbridge and rate of Rs.47/- per Kg should be adopted for estimation andthis amount should be added with the above rates.

22.0 H.O.T. CRANE AND ACCESSORIES

Rate forSl.No. Description Unit the year

2014-15

1 2T capacity hand operated over head Travelling

(HOT) crane suitable for a span upto 6 Mtrs,and travel length upto 10 Mtrs. with clear liftupto 6 Mtrs. including gear type chain pulleyblock and geared Travelling trolley completewith all accessories excluding Girder 1 No. 330000.00

2 2T HOT crane with above specifications upto8 M Span 1 No. 360000.00

3 2T HOT crane with above specifications upto10 M Span 1 No. 386000.00

Page 131: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 131/275

121

4 3T capacity hand operated over head Travelling(HOT) crane suitable for a span upto 6 Mtrs,and travel length upto 10 Mtrs. with clear liftupto 6 M including gear type chain pulley blockand geared Travelling trolley complete withall accessories. 1 No. 360000.00

5 3T HOT crane with above specifications upto8 M Span 1 No. 386000.00

6 3T HOT crane with above specifications upto10 M Span 1 No. 396000.00

7 5T capacity hand operated over head Travelling(HOT) crane suitable for a span upto 6 Mtrs, andtravel length upto 10 M with clear lift upto 6 Mincluding gear type chain pulley block andgeared Travelling trolley complete with allaccessories. 1 No. 420320.00

8 5T HOT crane with above specifications upto8 M Span 1 No. 450000.00

9 5T HOT crane with above specifications upto10M Span 1 No. 500000.00

Note: The rates are inclusive of all taxes,duties, handling charges.

Page 132: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 132/275

122

   2   3 .   0

   C   A   R   R   Y   I   N   G   E   N   E

   R   G   Y   E   F   F   I   C   I   E   N   C   Y   I   M   P   R   O   V   E

   M   E   N   T   J   O   B   I   N   H   O   R   I   Z   O   N   T   A   L

   S   P   L   I   T   C   A   S   E   P   U   M   P   S    R

  u  p  e  e  s   i  n   T   h  o  u  s  a  n   d  s

   S   l .   N  o

   C  a  p  a  c   i   t  y   i  n   L   P   M

   R  a   t  e   f  o  r   t   h  e

  y  e  a  r   2   0   1   4  -   1   5

   H   E   A   D   I   N

   M   E   T   R   E   S

   2   5

   3   0

   3   5

   4   0

   4   5

   5   0

   5   5

   6   0

   7   0

   8   0

   9   0

   1

   1   5   0   0

   3   1

   3   1

   3   1

   3   1

   3   1

   2

   2   5   0   0

   3   7

   3   7

   3   7

   3   8

   3   9

   3

   3   0   0   0

   3   9

   3   9

   3   9

   3   9

   3   9

   4

   3   5   0   0

   3   9

   3   9

   3   9

   3   9

   4   0

   4   4

   4   4

   4   4

   5

   4   0   0   0

   3   9

   3   9

   4   2

   4   2

   4   4

   4   4

   4   4

   4   4

   6

   5   0   0   0

   4   0

   4   4

   4   4

   4   4

   4   4

   5   4

   5   4

   5   4

   7

   6   0   0   0

   4   4

   4   4

   4   4

   5   4

   5   4

   5   4

   5   9

   5   9

   8

   7   0   0   0

   5   4

   5   9

   6   8

   6   8

   7   2

   7   2

   7   2

   7   2

   7   2

   7   2

   9

   8   0   0   0

   7   2

   7   2

   7   2

   7   9

   7   9

   7   9

   7   9

   7   9

   7   9

   1   0

   9   0   0   0

   7   9

   7   9

   8   7

   8   7

   8   7

   8   7

   8   7

   8   7

   8   7

   1   1

   1   0   0   0   0

   8   7

   9   1

   9   1

   9   1

   9   1

   9   1

   9   1

   9   1

   9   1

   1   2

   1   5   0   0   0

   1   0   4

   1   1   0

   1   1   0

   1   1   0

   1   1   0

   1   1   0

   1   1   0

   1   1   0

   1   1   0

   1   3   7

   1   3   7

   1   3

   2   0   0   0   0

   1   2   9

   1   3   7

   1   3   7

   1   3   7

   1   3   7

   1   3   7

   1   3   7

   1   3   7

   1   3   7

   1   5   8

   1   5   8

   1   4

   2   5   0   0   0

   1   3   7

   1   5   8

   1   5   8

   1   5   9

   1   5   9

   1   5   9

   1   5   9

   1   5   9

   1   5   9

   1   6   8

   1   6   8

   1   5

   3   0   0   0   0

   1   5   8

   1   5   8

   1   6   1

   1   6   1

   1   6   8

   1   6   8

   1   6   8

   1   6   8

   1   6   8

   1   8   8

   1   8   8

   N  o   t  e  :

   T   h  e  r  a   t  e  s   f  o  r   t  e  s

   t   i  n  g  a  n   d  r  e  p  a   i  r  s ,   i   f  a  n  y  r  e  q  u   i  r

  e   d ,   f  o  r  p  u  m  p  s  e   t  s  w   i   l   l    b  e  e  x   t  r  a .

Page 133: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 133/275

123

   2   3 .   1   E   N   E   R   G   Y   E   F   F   I   C   I   E   N   C   Y   I   M   P   R   O   V   E   M   E   N   T   I   N   V   E   R   T   I   C   A

   L   T   U   R   B   I   N   E   P   U   M   P   S

   S   l .   N  o

   C  a  p  a  c   i   t

  y   i  n   L   P   M

   R  a   t  e   f  o  r   t   h  e  y  e  a  r   2   0   1   4  -   1   5

   H   E   A   D   I   N

   M   E   T   E   R   S

   1   5

   2   0

   2   5   3   0   3   5

   4   0   4   5   5   0

    5   5   6   0

   7   0   8   0   9   0

   1

   2   5

   0   0

   5   9   3   0   0

   5   9   3   0   0

   8   4   0   5   0

   9   3   9   0   0

   1   0   8   7   5   0

   1   0   8   6   0   0

   2

   3   0

   0   0

   5   9   3   0   0

   5   9   3   0   0

   8   4   0   5   0

   1   0   8   7   5   0

   1   2   3   6   0   0

   1   7   8   0   5   0

   3

   3   5

   0   0

   5   9   3   0   0

   5   9   3   0   0

   8   4   0   5   0

   1   1   8   6   5   0

   1   3   3   5   0   0

   1   8   2   9   5   0

   4

   4   0

   0   0

   6   3   2   6   0

   6   3   2   6   0

   8   9   0   0   0

   1   2   6   5   7   0

   1   4   8   3   5   0

   1   9   2   8   5   0

   5

   5   0

   0   0

   6   3   2   6   0

   6   3   2   6   0

   8   9   0   0   0

   1   2   6   5   7   0

   1   4   8   3   5   0

   1   9   2   8   5   0

   6

   6   0

   0   0

   6   9   2   0   0

   6   9   2   0   0

   9   3   9   0   0

   1   3   3   5   0   0

   1   5   8   2   5   0

   2   0   2   7   5   0

   7

   7   0

   0   0

   7   8   1   1   0

   7   8   1   1   0

   1   0   3   8   0   0

   1   3   8   4   5   0

   1   6   8   1   5   0

   2   1   2   6   5   0

   8

   8   0

   0   0

   8   6   9   7   0

   8   6   9   7   0

   1   1   3   7   0   0

   1   4   8   3   5   0

   1   7   8   0   5   0

   2   2   2   5   5   0

   9

   9   0

   0   0

   8   6   9   7   0

   8   6   9   7   0

   1   1   3   7   0   0

   1   4   8   3   5   0

   1   7   8   0   5   0

   2   2   2   5   5   0

   1   0

   1   0

   0   0   0

   9   7   8   6   0

   9   7   8   6   0

   1   1   8   6   5   0

   1   5   8   2   5   0

   1   8   2   9   5   0

   2   3   2   4   5   0

   1   1

   1   5

   0   0   0

   1   0   7   7   6   0

   1   0   7   7   6   0

   1   3   3   5   0   0

   1   6   8   1   5   0

   1   9   2   8   5   0

   2   4   2   3   5   0

   1   2

   2   0

   0   0   0

   1   1   8   6   5   0

   1   1   8   6   5   0

   1   4   3   4   0   0

   1   7   8   0   5   0

   2   0   2   7   5   0

   2   5   2   5   5   0

   1   3

   2   5

   0   0   0

   1   2   8   5   5   0

   1   2   8   5   5   0

   1   5   8   2   5   0

   1   8   2   9   5   0

   2   1   2   6   5   0

   2   6   2   1   5   0

   1   4

   3   0

   0   0   0

   1   3   8   4   5   0

   1   3   8   4   5   0

   1   6   8   1   5   0

   1   9   2   8   5   0

   2   2   2   5   5   0

   2   7   2   0   5   0

   N  o   t  e  :   T   h  e  r  a   t  e  s   f  o  r   t  e  s   t   i  n

  g  a  n   d  r  e  p  a   i  r  s ,   i   f  a  n  y  r  e  q  u   i  r  e   d ,   f  o  r  p  u  m  p  s  e   t  s  w   i   l   l    b  e  e  x   t  r

  a .

Page 134: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 134/275

124

24.0. Submersible Centrifugal Sewage non clog pumps

Supply and delivery of submersible centrifugal sewage non-clog pumps, vertical spindle typepump , wear resistance with submersible motor for the various duty conditions as stated inthe annexure. Pump shall be capable of handling min 100 mm solid size with sewage specificgravity of up to 1.05. Pump shall be of robust construction . Liquid passages shall be finishedsmooth and designed as to allow free passage to solids. Pump Impeller should be of Non-clog semi open type , single vane / multi vane preferably contra bloc or vortex impeller design.

Double mechanical seal with silicon carbide faces should be provided to protect the motorfrom ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30%above the operating speed. Pumps to have double bearings between the pump & motor. Thebearings life shall be minimum 100,000 hrs of operation with greased for life. Pump shouldbe provided with automatic coupling device including pedestal, duck foot bend, stainlesssteel guide pipe or related accessories of suitable size to facilitate lifting and lowering intoguide rails for easy maintenance. Pump shall be provided with a stainless steel lifting chainconforming to BS 970 Gr 304. Pump speed shall be of 960 for high duty pumps and 960/1450rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260 :IS210 morepreferably with hardened impeller. Shaft should be of stainless steel AISI 410. All thefasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3 ph, 415 V( + or – 10 % ) , 50 Hz ( + or - 5 % ) dry induction type. Motor shall be capable of giving rated output without reduction in the expected life span when operated continuously. The rotating assembly shall be dynamically balanced as per standards. The starting current

of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS startingunder any circumstances .The motor shall be suitable for full voltage star delta / ATS starting.The locked rotor current of the motor shall not exceed 600% of full load current unlessotherwise specified. Motor shall be designed to withstand 120 % of rated speed for twominutes without any mechanical damage , in either direction of rotation. The motor vibrationshall be within the limit specified in applicable standards . Motor should be of IE2, explosionproof compatible for VFD operation together with star-Delta / ATS starter, protection againstincrease in stator winding temperature (15 deg Celsius) , bearing temperature, leakage inthe stator housing and terminal box shall be provided and to be suitably interlocked with thecontrol panel for tripping the pump in case of increase in temperature beyond set limit.

Insulation class shall be of “Class H” and degree of protection shall be of IP 68 as per IS4691. Motor shall be suitable for continuous operation in fully submerged or partiallysubmerged condition.The pumpset shall be supplied with power cable of PVC insulated andPVC sheathed , copper , flexible ,round type with required conductor size and number of 

cores as per starting method and of specified length for continuous use under water and air.The control cable of PVC insulated , PVC sheathed , flexible for stator winding temperaturesensor 3 core x 1.5 sq.mm copper conductor and for bimetallic switches 2 core x 1.5 sqmmcopper conductor shall be provided. Motor shall be supplied with 10 mts of round submersible

copper cable of suitable size.

Sl. No. Description UnitRate for the year

2014-15

10 to 15 m head

1 Discharge Upto 20 M3 /hour 1 No 418886.00

2 Discharge 20 to 100 M3 /hour 1 No 446000.00

3 Discharge 100 to 200 M3 /hour 1 No 471000.00

4 Discharge 200 to 300 M3 /hour 1 No 712324.005 Discharge 300 to 400 M3 /hour 1 No 903840.00

6 Discharge 400 to 500 M3 /hour 1 No 973426.00

7 Discharge 500 to 600 M3 /hour 1 No 1208834.00

8 Discharge 600 to 700 M3 /hour 1 No 1208834.00

9 Discharge 700 to 800 M3 /hour 1 No 1196644.00

10 Discharge 800 to 900 M3 /hour 1 No 1278031.00

11 Discharge 900 to 1000 M3 /hour 1 No 1598594.00

12 Discharge 1000 to 1100 M3 /hour 1 No 1572333.00

Page 135: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 135/275

125

15 to 20 m head

13 Discharge Upto 20 M3 /hour 1 No 418886.00

14 Discharge 20 to 100 M3 /hour 1 No 446000.00

15 Discharge 100 to 200 M3 /hour 1 No 644049.00

16 Discharge 200 to 300 M3 /hour 1 No 712324.00

17 Discharge 300 to 400 M3

 /hour 1 No 903840.0018 Discharge 400 to 500 M3 /hour 1 No 973426.00

19 Discharge 500 to 600 M3/hour 1 No 1208834.00

20 Discharge 600 to 700 M3/hour 1 No 1208834.00

21 Discharge 700 to 800 M3/hour 1 No 1196644.00

22 Discharge 800 to 900 M3/hour 1 No 1278031.00

23 Discharge 900 to 1000 M3/hour 1 No 1598594.00

24 Discharge 1000 to 1100 M3/hour 1 No 1572333.00

20 to 25 m head

25 Discharge Upto 20 M3 /hour 1 No 496853.00

26 Discharge 20 to 100 M3 /hour 1 No 494385.00

27 Discharge 100 to 200 M3 /hour 1 No 716082.0028 Discharge 200 to 300 M3 /hour 1 No 780601.00

29 Discharge 300 to 400 M3 /hour 1 No 977464.00

30 Discharge 400 to 500 M3 /hour 1 No 1104334.00

31 Discharge 500 to 600 M3/hour 1 No 1598594.00

32 Discharge 600 to 700 M3/hour 1 No 1598594.00

33 Discharge 700 to 800 M3/hour 1 No 1572333.00

34 Discharge 800 to 900 M3/hour 1 No 1729409.00

35 Discharge 900 to 1000 M3/hour 1 No 1938346.00

36 Discharge 1000 to 1100 M3/hour 1 No 2246961.00

 25 to 30 m head

37 Discharge Upto 20 M3 /hour 1 No 494598.00

38 Discharge 20 to 100 M3 /hour 1 No 716082.00

39 Discharge 100 to 200 M3 /hour 1 No 780601.00

40 Discharge 200 to 300 M3 /hour 1 No 1060310.00

41 Discharge 300 to 400 M3 /hour 1 No 1060310.00

42 Discharge 400 to 500 M3 /hour 1 No 1523194.00

43 Discharge 500 to 600 M3/hour 1 No 1527502.00

44 Discharge 600 to 700 M3/hour 1 No 1527502.00

45 Discharge 700 to 800 M3/hour 1 No 1734846.00

46 Discharge 800 to 900 M3/hour 1 No 1734846.00

47 Discharge 900 to 1000 M3/hour 1 No 1904074.0048 Discharge 1000 to 1100 M3/hour 1 No 2500885.00

NOTE:- 1) The rates including ED for pumps

2) The Sales Tax / VAT Extra at 14.50%

3) The rates including transportation and handling charges etc.,

Page 136: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 136/275

Page 137: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 137/275

RATES FOR BUILDING MATERIALS

Page 138: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 138/275

Page 139: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 139/275

129

BUILDING MATERIALS

1. Cement - Rs. 5,600/ – per metric tonne

(Rupees Five Thousand and Six Hundred only)

The rate for cement is inclusive of all taxes, freight charges etc., at Stockyard/

Dealer’s Godown. Necessary lead charges (i.e. excluding loading and unloading charges),

as applicable as per conveyance table, may be allowed from the Stockyard / Dealer’s

Godown to the site of work, if duly certified by an Officer not below the rank of Assistant

Executive Engineer.

However, in the case, if the source is specified as “Stockyard” the same shall be

decided and approved by the Superintending Engineers concerned.

2. Steel Rods of all sizes- Rs.48, 000/- per metric tonne

(Rupees Forty Eight thousand only)

The rate for steel is inclusive of all taxes, freight charges, etc., at Stockyard /

Dealer’s Godown. Necessary lead charges (i.e. excluding loading and unloading charges),

as applicable as per conveyance table, may be allowed from the Stockyard / Dealer’sGodown to the site of work, if duly certified by an Officer not below the rank of Assistant

Executive Engineer.

However, in the case, if the source is specified as “Stockyard” the same shall be

decided and approved by the Superintending Engineers concerned.

(The above rates are subject to revision as and when revised by the PWD authorities)

Page 140: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 140/275

Page 141: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 141/275

131

BUILDING MATERIALS

Sl. No. Description UnitRates

in Rupees

3 Bricks-II Class Table Moulded (Chamber burnt)

a. 9” x 4 ½” x 3” 1000 Nos. 5830.00

b. 9” x 4 3/8 ” x 2 ¾” 1000 Nos. 5600.00

4 Bricks-II Class (Ground Moulded Chamber burnt)

a. 9”x4 ½” x3” 1000 Nos. 5020.00

b. 9”x4 3/8” x 2 ¾” 1000 Nos. 4875.00

5 Bricks-III Class (Country Bricks, Kiln burnt)

a 22 x 11 x 5 cm (8 ¾” x 4 ¼” x 2”) 1000 Nos. 3185.00

b. 22 x 11 x 5.7 cm (8 ¾” x 4 ¼” x 2 ¼”) 1000 Nos. 3325.00

c. 22 x 11 x 7cm (8 ¾ ” x 4 ¼ ” x 2 ¾”) 1000 Nos. 4220.00

6 Fly Ash bricks

a. 230 x 110 x 70mm 1000 Nos. 4875.00

b. 230 x 110 x 75mm 1000 Nos. 5020.00

7 Bricks Country (specially moulded for well steining)

a. 8 ¾ ”x 4 ¼ ” x 2” 1000 Nos. 1875.00

b. Perforated Bricks 19 x 9 x 9cm 1000 Nos. 2855.00

c. Terrace Bricks 15 x 7.5 x 2.5cm 1000 Nos. 734.00

8 Flat Tiles

a. 15cm x 15cm x 12mm 1000 Nos. 691.00

b. 15cm x 15cm x 20mm 1000 Nos. 819.00

9 Brick Jelly

a. 40mm Size cu.m. 524.00

b. 20mm size cu.m. 583.00

10 Pressed Tiles

a. 20cm x 20cm x 2cm 1000 Nos. 9230.00

b. 23cm x 23cm x 2cm 1000 Nos. 13080.00

11 Pan Tiles

a. 23cm x 8cm x 1.7cm 1000 Nos. 359.00

b. 16.5cm x 8cm x 1.7cm 1000 Nos. 298.00

12 Best Mangalore Tiles

a. 1st Class ’A’ 1000 Nos. 8630.00

b. Class ’AA’ 1000 Nos. 8790.00

c. Best Mangalore Ridge Tiles 1000 Nos. 25200.00

d. Best Mangalore Ceiling Tiles 1000 Nos. 5300.00

e. Best Mangalore Glass Roofing Tiles Each 250.00

f. Best Mangalore Ventilating Tiles (Single) Each 37.90

g. Best Mangalore Ventilating Tiles (Double) Each 47.45

13 Mosaic Flooring tiles GREY

a. 25cm x 25cm x 2cm 1000 Nos. 11600.00

b. 20cm x 20cm x 2cm 1000 Nos. 7400.00

Page 142: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 142/275

132

14 Mosaic (other colour)

a. 25cm x 25cm x 2cm 1000 Nos. 16000.00

b. 20cm x 20cm x 2cm 1000 Nos. 9460.00

c. Mosaic (Green) 20cm x 20cm x 2cm 1000 Nos. 11600.00

d. Mosaic (Green) 25cm x 25cm x 2cm 1000 Nos. 18200.00

e. Mosaic Chequered Tile of Grey colour

size 25 cm x 25 cm x 2 cm 1000 Nos. 14550.00

Stone and Road materials

15 Rough stone for Masonry works (Hard Granite) cu.m. 365.00

16 Rough stone for revetment works cu.m. 316.00

17 Jeddy size for revetment (Hard granite) cu.m. 348.00

18 Cut stone pillar of size 0.15 x 0.15 x 2.1M Each 136.00

19 From boulders without blasting for revetment cu.m. 93.00

20 From boulders without blasting for masonry cu.m. 122.00

21 Course Rubble stone for masonry works cu.m. 292.00

22 Course Rubble stone for Arch works cu.m. 316.00

23 Chisel dressed stone

a. 70cm x 30cm x 29cm Each 145.00

b. 37cm x 30cm x 29cm Each 130.00

24 Hammer dressed stone

a. 37cm x 30cm x 29cm Each 101.00

25 Cut stone fully dressed to size on all faces cu.m. 5200.00

26 Cut stone roughly dressed cu.m. 3590.00

27 Ashlar arch stone fully dressed to size all faces cu.m. 3960.00

28 Flooring stone SS size (not less than 10cm thick) sq.m. 290.00

29 Stone slab for culvert (3 faces, one line dressed)

a. Above 1.2m cu.m. 3770.00

b. Up to 1.2m cu.m. 3425.00

30 Stone slab for culvert (3 faces, two line dressed) cu.m. 4200.00

31 For lintel coping (3 faces, two line dressed) cu.m. 4200.00

32 Bond stones cu.m. 500.50

33 Kilometre stone 1.65 x 0.45 x 0.15m Each 360.00

34 Hecta metre stone

a. 0.90 x 0.10 x 0.10m Each 101.00

b. 0.75 x 0.23 x 0.10m Each 185.00

c. 0.90 x 0.15 x0.15m Each 181.00

35 Demarcation stone(Two line dressed for top 30cm)

a. 0.75 x 0.15 x 0.15m Each 75.00

b. 0.90 x 0.23 x 0.23m Each 97.00

c. 0.75 x 0.23 x 0.23m Each 90.00

d. 0.90 x 0.15 x 0.15m Each 83.00

Sl. No. Description UnitRates

in Rupees

Page 143: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 143/275

133

e. Demarcation Stone with letters cut 0.75x0.15x0.15m Each 101.00

f. Edge stone 0.45 x 0.15 x 0.15m Each 46.00

g. T.R.S. Bench Mark Stone neatly dressed the exposed

surface to a height of 15cm including cutting letters

i) 0.15 x 0.15 x 0.60m Each 116.00

ii) 0.10 x 0.10 x 0.25m Each 84.00

36. a. Guard Stone (Two line dressed for 45cm)

23cm dia 1.0m long Each 134.00

b. Guard stone (Top 0.70m chisel dressed and 0.50m

bottom roughly dressed) 0.23m x 0.23m x 1.20m long

(Two line dressed top 45cm) 23cm dia 1.0m long Each 143.00

c. Guard stone (Top 0.70m chisel dressed and 0.50m

bottom roughly dressed) 0.23m x 0.23m x 0.9m long

(Two line dressed top 45cm) 23cm dia 0.90m long Each 134.00

d. Guard stone (Top 0.70m chisel dressed and 0.50m

bottom roughly dressed) 0.15m x 0.15m x 0.90m long

(Two line dressed top 45cm) 23cm dia 0.90m long Each 93.00

e. Guard stone 90cm long 23cm dia Each 69.00

37 Hard broken Granite stone jelly (I.S.S.)

machine crushed / Hand broken.

i. 90mm size cu.m. 350.00

ii. 80mm size cu.m. 393.00

iii. 63mm size cu.m. 453.00

iv. 50mm size cu.m. 525.00

v. 40mm size cu.m. 816.00

vi. 25mm size cu.m. 701.00

vii. 20mm size cu.m. 1135.00

viii. 12mm size cu.m. 1053.00

ix. 10mm size cu.m. 775.00

x. 6mm size cu.m. 525.00

xi. 3mm size cu.m. 474.00

38 Quartz metal

i. 50mm cu.m. 79.80

ii. 40mm cu.m. 81.00

39 Soft broken stone

i. 63mm cu.m. 61.60

ii. 40mm cu.m. 68.90

40 Laterite 40mm to 75mm size cu.m. 79.80

41 Kankar 40mm to 75mm size cu.m. 79.80

42.a Soling stones 15cm cube (un blasted) cu.m. 93.10

b. Soling stones 15cm cube (blasted) cu.m. 152.40

Sl. No. Description UnitRates

in Rupees

Page 144: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 144/275

134

43.a Gravel cu.m. 143.00

b. Well Gravel cu.m. 118.00

c. Screened Kankar Gravel cu.m. 87.00

44.a Quarry rubbish cu.m. 79.00b. Stone dust cu.m. 101.00

c. Pond Ash (wet /dry) cu.m. 78.00

d Crushed Stone Sand cu.m. 403.00

45 Sand for Mortar cu.m. 176.40

46 Sand for Filling cu.m. 176.40

47 Clay for puddle and masonry cu.m. 31.40

48.i) Cuddapah slab 50mm thick sq.m 376.00

ii) Cuddapah slab 38mm/40mm thick sq.m 363.00

iii) Cuddapah slab 20mm/30mm thick sq.m 334.00

LIME

49 Shell Lime (Slacked and screened) cu.m. 1200.00

50 Freshly Slacked and Screened Burnt Lime Stone cu.m. 885.00

51 Stone Lime or Lime Metal cu.m. 78.00

TIMBER AND ROOFING MATERIALS

52 Teakwood scantlings (over 3m for joists and rafters)

Malabar cu.m. 107100.00

53 Teakwood scantlings (for tiebeams and

principal rafters) - Malabar cu.m. 105400.00

54 Teakwood scantlings (over 2m and below3m in length) - Malabar cu.m. 102600.00

55 Teakwood scantlings(below 2m in length ) – Malabar cu.m. 91300.00

56 Teakwood planks

i) Over 45cm wide and 12mm thick. cu.m. 113130.00

ii) Over 30cm and up to 45cm wide and 12mm thick cu.m. 105000.00

iii) Over 30cm and up to 45cm wide and

12mm to 25mm thick cu.m. 98340.00

iv) Over 30cm and up to 45cm wide and

25mm to 40mm thick cu.m. 94350.00

v) Over 15cm and up to 30cm wide and 12mm thick cu.m. 91830.00

vi) Over 15cm and up to 30cm wide and

12mm to 25mm thick cu.m. 87300.00

vii) Over 15cm and upto 30cm wide

and 25mm to 40mm thick cu.m. 85580.00

viii) Up to 15cm wide and 12mm thick cu.m. 83980.00

ix) Up to 15cm wide and 12mm to 25mm thick cu.m. 83980.00

x) Up to 15cm wide and 25mm to 40mm thick cu.m. 79320.00

Sl. No. Description UnitRates

in Rupees

Page 145: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 145/275

135

57 Teak wood reepers

i) 50mm x 25mm RM 70.15

ii) 50mm x 12mm RM 56.85

58 Country wood Scantlings

i) Up to 4m in length cu.m. 31660.00

ii) Over 4m in length cu.m. 33275.00

59 Country wood scantlings (for tiebeams and

principal rafters for trusses) cu.m. 33275.00

60 Jack wood Scantlings (up to 4m) cu.m. 34870.00

61 Silver Oak Scantling cu.m. 14365.00

62 Country wood planks

i) 40mm thick- upto 30cm wide cu.m. 36330.00

ii) 25mm thick - up to 30cm wide cu.m. 36330.00

iii) 40mm thick - over 30cm wide cu.m. 36330.00

iv) 25mm thick - over 30cm wide cu.m. 36330.00

63.a. Jack wood planks 25 to 40mm thick cu.m. 38060.00

b. Silver Oak plank (40mm thick) cu.m. 16360.00

c. Blue gum plank cu.m. 16760.00

64 Country wood reepers

a. 50mm x 25mm RM 31.90

b. 50mm x 12mm RM 23.00

65 Mango Plank cu.m. 15500.00

66.a. Palmyrah rafter(50mm to 60mm wide and 125mm depth) RM 45.50

b. Palmyrah leaves 100 Nos. 236.00

c. Palmyrah leaves (Labour for cutting) 100 Nos. 37.00

67 Casurina Poles

a. 13cm to 15cm diameter RM 30.50

b. 10cm to 13cm diameter RM 23.20

c. 8cm to 10cm diameter RM 17.80

d. 5cm to 8cm diameter RM 15.20

68 Eucalyptus Poles

a. 13cm to 15cm dia RM 30.50

b. 10cm to 13 cm dia RM 21.80

c. 8 cm to 10 cm dia RM 17.80

d. 5 cm to 8 cm dia RM 15.20

e. Below 5 cm RM 13.90

69 Eucalyptus Bullies 4cm to 5 cm dia & cross ties RM 11.20

70 Casurina Bullies 4cm to 5cm dia & cross ties RM 12.50

71 Bamboo large

i) 10cm diameter and above RM 11.20

ii) 7.5cm to 10cm diameter RM 9.90

Sl. No. Description UnitRates

in Rupees

Page 146: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 146/275

136

METAL AND IRON WORKS

72 Mild steel plates or sheets BG 10 Kg. 48.00

73 Mild Steel Angles 25mm x 25mm x 3mm Kg. 48.00

74.a) Binding wire (Black 18G) Kg. 48.00b) Binding wire (Galvanised – 18G) Kg. 48.00

75 G.I. sheets 30cm wide and 1.6mm thick sq.m. 335.00

76 Weld mesh

i) 7.5 x 2.5cm, 10 gauge sq.m. 325.00

ii) 7.5cm x 5cm, 10 gauge sq.m. 292.00

iii) 10cm x 10cm, 10 gauge sq.m. 158.00

77 Chicken Mesh sq.m. 35.00

78 Fly Proof Mesh sq.m. 100.00

79 Supplying mild steel grills for windows,

ventilators, etc., including priming coat Kg. 65.00

Note:

1. For Road works, the Schedule of Rates of Highways Department may be adopted in

respect of materials for which rates are not available in this schedule of rates.

2. For all the materials viz. Bricks and Tile products, Stone Jelly, Gravel, Sand, Lime

Stone etc., necessary incidental charges , loading charges and unloading charges

have been included in the basic cost of materials listed above. Hence no separate

incidental charges, loading and unloading charges shall be allowed for the above

materials.

Sl. No. Description UnitRates

in Rupees

Page 147: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 147/275

RATES FOR OTHER 

CONSTRUCTION MATERIALS

Page 148: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 148/275

Page 149: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 149/275

139

RATES OF OTHER CONSTRUCTION MATERIALS

Note: No extra on cost, conveyance charges shall be allowed for all the items includedunder this category. The rates approved therein are applicable at site of work.

Sl. No. Name of Material UnitRates

in Rupees

1 Water proofing compound Kg 42.35

2 Mild Steel Flats of all sizes Kg 48.00

3 Mild Steel Square Rods of all sizes Kg 48.00

4 First Quality Design Ceramic tiles of All colours

i 305 mm x 305 mm x 6 mm Each 50.80

ii 200 mm x 200 mm x 6 mm Each 22.35

iii 200 mm x 100 mm x 6 mm Each 12.10

5 First Quality Plain ceramic tiles of all colours

i 305 mm x 305 mm x 6 mm Each 36.30

ii 200 mm x 200 mm x 6 mm Each 16.25iii 200 mm x 100 mm x 6 mm Each 8.45

6 First quality White glazed tiles

i 150 mm x 150 mm x 6 mm Each 8.45

ii 100 mm x 200 mm x 6 mm Each 7.25

7 First quality colour glazed tiles

i 150 mm x 150 mm x 6 mm Each 9.65

ii 100 mm x 200 mm x 6 mm Each 8.45

8 First quality colour glazed tiles with printed design

i 150 mm x 150 mm x 6 mm Each 11.40

ii 100 mm x 200 mm x 6 mm Each 10.259 White Cement Kg 23.00

10 Colour Cement (White cement mixed with

colouring pigments) Kg 26.65

11 Multi-colour marble chips of all Grades / Sizes Bag 97.00

12 White Marble slab (Adanga) 18 mm to 20 mm thick

i 4’0'’ x 2’0'’ and above sq.m. 935.00

ii 2’0'’ x 2’0" or 2’0" x 1’0" or 1’0" x1’0" sq.m. 511.00

13 Granite tiles - (Superfine polished with Machine cut

edges) of size 2’0" x 1’0" or 1’0" x 1’0" or 1’0" x 0’6",

of 10 mm thick

a Jet Black sq.m. 902.00

b Ruby Red, Raw Silk sq.m. 781.00

c Sinthetic Grey, Paradise and Similar varieties. sq.m. 726.00

14 Granite slabs (Super fine polished with machine cut

edges) of sizes 4’x2' and above 18mm to 20mm thick.

a Jet Black sq.m. 1815.00

b Ruby Red, Raw Silk sq.m. 1694.00

Page 150: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 150/275

140

Sl. No. Name of Materials UnitRates

in Rupees

c Sinthetic Grey, Paradise and Similar varieties. sq.m. 1331.00

15 Polished shahabad stone slabs of 20 mm thick with

machine cut edges of size 2' 0" x 2’0" and above. sq.m. 363.00

16 Polished shahabad stone slabs 20 mm thick with

machine cut edges of size below 2' 0" x 2’0". sq.m. 302.00

17 Polished Rajasthan Kota stone slabs of 20 mm thick with

machine cut edges of size 2' 0" x 2’0" and above. sq.m. 533.00

18 Polished Rajasthan Kota stone slabs of 20 mm thick with

machine cut edges of size below 2' 0" x 2’0". sq.m. 467.00

19 Dolphur stone slabs - semi polished with machine cut

edges of all sizes

a 40 mm thick sq.m. 398.00

b 20 mm thick sq.m. 363.0020 Aluminium strips of size 40 mm wide x 1.5 mm thick RM 31.50

21 Brass strips of size 40 mm wide x 1.5 mm thick RM 60.00

22 Glass strips of size 40 mm wide and 4 mm thick RM 15.00

23 Marblex Tiles 3 mm thick sq.m. 605.00

24 Red Oxide - Superior quality for floor finish Kg 127.00

25 Decorative pressed tiles of 12 mm thick of 

all sizes and shapes sq.m. 1027.00

26 Exterior Emulsion Paint - Water based primer (Liquid) Litre 145.00

27 Alkali Resistant Distemper Primer Litre 145.00

28 Sandtex matt Litre 169.0029 Vinaratex or equivalent Textured coat sq.m. 218.00

30 Best Lac Polish / French Polish Litre 282.00

31 Varnish Litre 290.00

32 Cotton Waste Kg 9.20

33 Cement based Hydraulically pressed Anti skid tiles

(pattern design) - 20 mm thick sq.m. 484.00

34 Marble Powder Kg 4.80

35 Polishing Stone

i Rough Each 60.50

ii Medium Each 84.70

iii Fine / Nice Each 96.80

36 Oxalic Acid Kg 39.80

37 Turpentine Litre 26.60

38 Mansion polish 400 gram 159.00

39 Poly Sulphide Kg 181.00

40 Primer for expansion joints Kg 162.00

41 Filler material sq.m. 133.00

Page 151: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 151/275

141

Sl. No. Name of Materials UnitRates

in Rupees

42 Bond Breaker RM 3.60

43 PVC Water Bar 150mm wide with singel bulb RM 284.00

44 Plain G.I. sheet 0.8mm thick (22 Gauge) sq.m. 332.00

45 Phil Plug Each 4.8046 G.I. Screws

i 30mm x 6mm Each 1.20

ii 19mm x 6mm Each 0.75

47 G.I. Limpet / Cup Washers Each 1.75

48 Bitumen washers 15mm dia Each 1.20

49 Asbestos Cement pipe - 100mm dia 3 RM 133.35

50 A.C. shoe - 100mm dia Each 42.40

51 A.C. Bend - 100mm dia Each 48.50

52 A.C. Cylindrical Cowl - 100mm dia Each 72.75

53 C.I. Brackets for A.C. pipe 100mm dia Each 19.95

54 C.I. Grating - 100mm dia Each 29.30

55 Asbestos cement fully corrugated sheet - 6mm thick sq.m. 175.50

56 Asbestos cement plain sheet

i 6mm thick sq.m. 157.60

ii 4mm thick sq.m. 109.10

57 Asbestos cement adjustable ridges Pair 181.85

58 G.I. “J” or “L” Bolts with nuts 6mm Dia Each 3.60

59 Steel - special extruded sections for steel windows

and ventilators conforming to I.S.S. 7452 / 1990including Fabrication charges Kg 63.30

60 CRCA pressed steel Box section 18 Gauge or 1.25mm

thick for Door frames including providing holes and

fixing wooden blocks for fixing furniture and fittings

a With one coat of Red oxide priming coat. RM 427.00

b With powder coated primer RM 455.00

61 Aluminium extruded sections (for Doors, windows,

ventilartors, partitions, false ceiling etc.) including

charges for Anodising for 15 micron thickness

a Natural colour matt finish. Kg 306.00

b With powder coating of any colours. Kg 327.00

62 Alumninum Extruded Box Section for Staircase Hand

Rails including charges for Anodising for 15 micron

thickness - Natural colour matt finish Kg 312.00

63 Rubber beading for aluminium glazed doors RM 36.30

64 Rubber beading for aluminium glazed windows. RM 27.80

65 PVC / Woollen felt for aluminium doors 6mm thick RM 8.45

Page 152: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 152/275

142

Sl. No. Name of Materials UnitRates

in Rupees

66 Pivot for Aluminium Door Set 145.20

67 Hydraulic Door closer of various sizes of approved

quality using Aluminium Extruded section body

tubular type universal hydraulic door closer with

double speed adjustment like HARDWYN (make)

 ‘GAZEL’ (or) equivalent (with ISI Monogram) Each 867.30

68 Hydraulic Floor springs of various sizes double acton

hydraulic floor spring of approved quality, brand,

manufacture as per BIS standards for doors including

cost of cutting floors as required, embedding in to

floors and Stainles Steel Cover plates with Aluminium

Pivet and single piece M.S. sheet outer box with side

plate etc., capable of taking upto 130 Kg. weight fromdoor shutter, like HARDWYN make (U-32) or its

equivalent with ISI monogram. Each 2079.00

69 Lock for Aluminium doors Each 238.70

70 Lock for Aluminium sliding windows Each 59.40

71 Aluminium Grill of standard pattern (diamond shape) -

10mm thick including ‘F’ (or) ‘H’ Section. sq.m. 1960.00

72 Aluminium Grill of standard pattern (diamond shape) -

6mm thick including ‘F’ (or) ‘H’ Section. sq.m. 1585.00

73 Bolts and Nuts 10mm dia for false ceiling Each 5.25

74 Rawl Plugs for false ceiling Each 8.4075 PVC Roller for sliding windows Each 13.95

76 Synthetic Resin - Fevicol or equivalent

(Phenol Formal Dehide based Resin) Kg 181.50

77 Butt Hinges with nylon washers of various sizes.

Length and width (with required screws).

a 125mm x 30mm Each 73.30

b 100mm x 30mm Each 58.90

c 75mm x 30mm Each 40.40

d 50mm x 30mm Each 32.65

78 Tower Bolts of various lengths and diameter

(with required screws)

a 400mm long and 12mm dia Each 138.60

b 300mm long and 12mm dia Each 106.65

c 250mm long and 12mm dia Each 80.00

d 200mm long and 12mm dia Each 67.25

e 150mm long and 12mm dia Each 53.10

f 100mm long and 10mm dia Each 46.60

Page 153: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 153/275

143

Sl. No. Name of Materials UnitRates

in Rupees

g 75mm long and 10mm dia Each 32.65

79 Aldrops of following lengths and diameter with required

screws, bolts and nuts.

a 300mm long and 16mm dia Each 192.80

b 250mm long and 16mm dia Each 166.30

c 200mm long and 16mm dia Each 112.60

d 200mm long and 12mm dia Each 93.50

80 Handles “D” type of various sizes with required screws

a 200mm long Each 59.30

b 150mm long Each 53.10

c 100mm long Each 32.60

81 Ornamental handles of various sizes with required

screwsa 200mm long Each 152.35

b 150mm long Each 101.60

c 100mm long Each 56.10

82 Aluminium door stopper with rubber bush with

required screws Each 46.60

83 Rubber bush - 40 mm dia and 60 mm long with

required screws Each 24.20

84 Mortice Lock-(Godrej or equivalent) with required

screws with 3 Keys

a With night latch Each 534.70

b Without night latch Each 399.60

c Wire nails Kg 63.50

85 Teakwood beading

a 15mm x 12mm RM 15.80

b 35mm x 12mm RM 39.90

86 Teakwood Beading (ordinary)

a 30mm x 12mm RM 33.00

b 25mm x 12mm RM 26.60

87 Teakwood beading - Ornamental / designa 40mm x 12mm RM 93.15

b 40mm x 15mm RM 106.40

c 25mm x 12mm RM 72.60

d 15mm x 12mm RM 50.00

88 Medium Density Fibre (MDF) Board - Exterior Grade,

Both sides pre-laminated including external lipping with

kiln dried soft wood 35mm thick sq.m. 2125.00

Page 154: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 154/275

144

Sl. No. Name of Materials UnitRates

in Rupees

89 Medium Density Fibre (MDF) Board - exterior Grade -

Both sides pre-laminated, 12mm thick sq.m. 1025.00

90 MDF Board exterior Grade - Plain including external

lipping with kiln dried soft wood

i 35mm thick sq.m. 1730.00

ii 30mm thick sq.m. 1595.00

91 Medium density fibre (MDF) Board 12 mm thick

Exterior grade - with melamine finish.

a One side melamine finish sq.m. 1090.00

b Both sides melamine finish sq.m. 1225.00

92 Medium density fibre (MDF) board - Exterior grade -

Plain - With teak wood external lipping alround

a 35mm thick sq.m. 1863.00

b 30mm thick sq.m. 1663.00

93 Solid core Flush shutters with Teak ply on both side

with teak wook lipping alround 35 mm thick sq.m. 2195.00

94 Solid core Flush shutters with Teak ply on one side

and commercial ply on other side with teak wood

lipping alround 35 mm thick sq.m. 1925.00

95 Solid core Flush shutters with commercial ply on both

side with teak wood lipping alround 35 mm thick sq.m. 1663.00

96 Solid PVC door shutters using 19 Gauge 19mm MS square

tubes for styles and outer frames. 15mm MS square

tubes for top, lock and bottom rails. The steel tubes

shall be covered with 5mm thick solid PVC sheets.

Shutter using 5mm thick solid PVC sheets for panelling

shall rigidly fixed in position including necessary furniture

and fittings. The over all size of styles shall be 50mm x

30mm. The over all size of top rail, Lock rail and

bottom rail shall be 75mm x 30mm. The over all size of 

frames shall be 50mm x 45mm, with suitable rabate for

housing the shutter.

a Solid panel PVC door with frame sq.m. 3015.00

b Solid panel PVC door without frame sq.m. 2545.00

97a FRP door Shutter with FRP door frames made out of 

FRP Sheets of 3mm thick of over all size 65mm x 50mm

with rebate suitably reinforced using MS Angle / Flats,

cost of holdfasts and solid core FRP shutter Panel of 

5mm thick and hollow core frames of 3mm wall thickness

for styles and rails etc., of sizes specified by Engineers. sq.m. 3940.00

b Excluding door frames sq.m. 3270.00

Page 155: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 155/275

145

Sl. No. Name of Materials UnitRates

in Rupees

98a PVC panelled door shutters hollow type - 200 mm x 20

mm panels with 1 mm wall thickness for panels and

styles and rails of suitable size with 2 mm wall thickness

suitably reinforced using MS Angle / Flat including cost

of necessary Aluminium hinges and other furniture

fittings. sq.m. 2155.00

b Excluding door frames sq.m. 1905.00

99 RCC door frame of 100mm x 65mm cross sectional size

with necessary rebate for housing the shutters,

manufactured with cement concrete of grade not less

than M20 using 10 mm and below graded stone jelly

and using steel reinforcement as per C.E. (B) circular

instructions. RM 300.00100 Stainless Steel (Salem Stainless Steel) Door Frame

(Box Section using Stainless Steel Plate of 1mm thick)

of size 100 mm x 60 mm with a rebate of 30/ 35 mm x

15 mm on one side of the frame including supplying and

fixing dovetail splayed end stainless steel Hold fast etc., RM 908.00

101 Stainless Steel (Salem Stainless Steel) Door Frame

(Box Section using Stainless Steel Plate of 1.6mm thick)

of size100mmx60mm with a rebate of 30/ 35mm x

15mm on one side of the frame including supplying and

fixing dovetail splayed end stainless steel hold fast etc., RM 1270.00

102 Supplying and erecting pull and push type rolling shutter

with ISI make of approved size and section using 18 GI

sheet. The shutter shall be painted with one coat of 

red oxide primer and the rate is inclusive of hood covers,

transportation charges etc.,

A ROLLING SHUTTERS (WITH ISI MONOGRAM)

a Manually operated (up to 8 m2 area) sq.m. 2430.00

b Gear operated type (from 8 m2 to 12 m2 area) sq.m. 2700.00

c Electrically operated type (exceeding 12m2 area) sq.m. 2940.00

B ROLLING GRILLS (WITH ISI MONOGRAM)

a Manually operated (up to 8 m2 area) sq.m. 2480.00

b Gear operated (from 8 m2 to 12 m2 area) sq.m. 2777.00

c Electrically operated (exceeding 12 m2 area) sq.m. 3090.00

103 Barbed Wire - 10 Gauge - Two ply and four pronged 1 Kg or

(Galvanised) 6 RM 69.30

104 Chain link - 2" x 2" using 10 Gauge Galvanised Iron

Wire (of all sizes) sq.m. 178.50

Page 156: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 156/275

146

Sl. No. Name of Materials UnitRates

in Rupees

105 Pin Headed / Fluted / Figured Glass 3mm thick sq.m. 242.00

106 Plain Glass - 4mm thick sq.m. 326.70

107 Plain Sheet Glass - 5.5mm thick sq.m. 387.20

108 Metal screws (for Aluminium Doors, windows etc.)i 75mm x 8mm Each 2.30

ii 38mm x 6mm Each 1.65

iii 19mm x 8mm Each 1.15

iv 19mm x 6mm Each 0.85

109 Cement paint (First quality) Kg 53.10

110 Oil Bound Distemper Kg 78.50

111 Acrylic Distemper Kg 90.60

112 Primer for Plastic Emulsion paint Litre 156.75

113 Plastic Emulsion paint (First quality) Litre 315.15

114 Wood Primer Litre 156.75115 Synthetic Enamel paint for Wood work Litre 254.10

116 Red Oxide primer for Iron work Litre 145.50

117 Synthetic Enamel paint for Iron work Litre 242.55

118 Brass chromium plated screw down Tap 15 / 12mm Dia

(Heavy Type) Each 211.00

119 Chromium plated stop cock 15mm Dia Each 169.00

120 Brass chromium plated pillar Tap (Heavy type) -

15/12mm Dia Each 302.00

121 Brass chromium plated shower Rose - 100mm Dia Each 217.00

122 Wooden plug, clamp and screws Set 12.10123 Shellac 100 gram 18.15

124 Thread Ball Each 3.60

125 Oriya Type Indian Water closet 580mm x 440mm

with “P” or “S” Trap

i White Set 1143.00

ii Colour Set 1459.00

126 European Water closet with “P” or “S” Trap with

Double Flapped seat and seat cover with Brass Hinges

and 10 litre capacity PVC low level flusing tank with all

internal fittings

i White Set 2920.00

ii Colour Set 3300.00

127 European water closet with “P” or “S” Trap with

Double flapped seat and seat cover with Brass

Hinges and 12.5 litre capacity Porcelin low level flusing

tank with all internal fittings

i White Set 4120.00

ii Colour Set 4960.00

Page 157: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 157/275

147

128 Wash Hand Basin of size 550mm x 400mm with all

accessories such as cast iron brackets, 32mm dia C.P.

waste coupling, rubber plug and chain, 32mm dia ‘B’ 

Class G.I. waste pipe, 15mm dia G.M. wheel valve, 15mm

dia nylon connection, 15mm dia brass nipples, 15mm

C.P. pillar tap etc.

i White without pedastal Set 1585.00

ii White with pedastal Set 1905.00

iii Colour without pedastal Set 2125.00

iv Colour with pedastal Set 2345.00

129 White Porcelin Sink of size 600mm x 450mm x 200mm

with 32mm dia ‘B’ Class G.I. waste water pipe and

32mm dia C.P. waste coupling. Set 2030.00

130 Cuddapah Slab Sink of size 600mm x 450mm x 200mm

with 32mm dia ‘B’ Class G.I. waste water pipe & 32mm

dia C.P. waste coupling. Set 729.00

131 Cuddapah Slab Sink of size 600mm x 600mm x 200mm

with 32mm dia ‘B’ Class G.I. waste water pipe & 32mm

dia C.P. waste coupling. Set 964.00

132 Lipped Mouth Porcelin Flat Back Urinal with all

accessories such as 32mm dia Bell mouth PVC

connection, 15mm dia G.M. wheel value, 15mm dia

 ‘B’ Class G.I. waste water pipe, 15mm dia nylon

connection, 15 mm dia brass nipple etc.,

i White Set 889.00

ii Colour Set 1018.00

133 Porcelin soap dish of size 150mm x 150mm x 50mm

i White Each 186.00

ii Colour Each 254.00

134 Brass chromium plated soap tray of size 150mmx100mm Each 156.00

135 Brass chromium plated towel rail 60cm long and 20mmdia with Brackets Set 254.00

136 Anodised Aluminium Towel Rail 60cm long and 20mm

dia with Brackets. Set 127.00

137 PVC / Fibre Glass framed 5.5mm thick mirror, shelf 

type with Hard Board Backing

i 600mm x 450mm Each 471.00

ii 500mm x 400mm Each 381.00

Sl. No. Name of Materials UnitRates

in Rupees

Page 158: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 158/275

148

138 Stone ware gully trap of size 150mm x 100m with cast

Iron Double Gratings Each 169.00

139 Cast Iron Nahini / Floor Trap with stainless Steel Grating

i 100mm x 75mm Each 277.00

ii 75mm x 50mm Each 217.00

140 PVC Nahini / Floor Trap with PVC Grating

i 100mm x 75mm Each 150.00

ii 75mm x 50mm Each 132.00

141 Spun Yarn Kg 12.60

142 Hemp Yarn Kg 11.30

143 Gunny Tape / Kithan sq.m. 11.30

144 Tar Kg 42.60

145 Bitumen Felt 15 mm thick pad sq.m. 266.00146 Supplying, fabricating, erecting and fixing gyp board

false ceiling upto a ceiling height of 4.5m from floor level.

a Using plain sheets (10mm thick) sq.m. 763.00

b Using perforated sheets (10mm thick) sq.m. 990.00

147 Supplying and laying Glass wool for insulation including

necessary packing materials.

a Using 50mm thick Glass wool sq.m. 372.00

b Using 25mm thick Glass wool sq.m. 199.00

148 Vitrified Tiles of size 600 x 600 x 8 mm sq.m. 990.00

149 Pre-polished concrete anti-skid step tiles of 20mm thick sq.m. 531.00150 Colour designed glazed tiles 300 x 200 x 6 mm Each 31.10

151 Squatting Urinal Set 485.00

152 CI Brackets for fixing the sink set 115.00

153 Swan Neck Tap Each 271.00

154 Brass Screws (30 x 6 mm) Each 2.40

155 Brass Screws (75 x 10 mm) Each 4.80

156 Special clamp, teak wood plugs and screws Set 24.15

157 PVC Clamp, teak wood plugs and screws Set 9.65

158 Teak Wood plug Each 1.25

159 Teak wood plug (50 x 50 x 100 mm) Each 6.30

160‘ Manhole cover 60 x 60 cm (heavy duty) with frame Each 2079.00

161 Welding Charges

a 50 mm Each 1.85

b 40 mm Each 1.45

162 Add for painting/ tarring for Hex Nipple Each 2.40

163 Labour charges for fixing cuddapah slab to cup board sq.m. 38.00

164 Hire charges for polishing machinery Day 190.00

Sl. No. Name of Materials UnitRates

in Rupees

Page 159: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 159/275

149

165 Electricity charges Unit 9.90

WATER SUPPLY AND SANITARY ARRANGEMENTS

166 PVC ITEMS FINOLEX (OR) EQUIVALANT

(WITH ISI MONOGRAM)

1 PVC Pipes

a 15 mm Dia RM 15.10

b 20 mm Dia RM 22.35

c 25 mm Dia RM 38.10

d 32 mm Dia RM 56.90

e 40 mm Dia RM 89.00

Note (1) For Rainwater down fall pipe works, only PVC Pipe

of working Pressure of 4 kg. per sq.cm.

shall be adopted.(2) For Sanitary arrangement items of works, only PVC

Pipe of working Pressure of 6 kg. per sq.cm.

shall be adopted.

(3) For Water Supply arrangement items of works,

only PVC Pipe of working Pressure of 

10 kg.per sq.cm. shall be adopted.

167 PVC Specials for water supply arrangements

A Coupler

a 15 mm Dia Each 3.75

b 20 mm Dia Each 4.35

c 25 mm Dia Each 5.00

d 32 mm Dia Each 6.35

e 40 mm Dia Each 9.45

B Elbow

a 15 mm Dia Each 5.60

b 20 mm Dia Each 6.35

c 25 mm Dia Each 8.85

d 32 mm Dia Each 12.70

e 40 mm Dia Each 17.75

C BEND

a 15 mm Dia Each 6.35

b 20 mm Dia Each 7.60

c 25 mm Dia Each 10.10

d 32 mm Dia Each 15.10

e 40 mm Dia Each 20.30

D Tee

a 15 mm Dia Each 7.60

Sl. No. Name of Materials UnitRates

in Rupees

Page 160: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 160/275

150

b 20 mm Dia Each 8.85

c 25 mm Dia Each 12.70

d 32 mm Dia Each 15.20

e 40 mm Dia Each 25.40

E End Cap

a 15 mm Dia Each 3.75

F Reducer

a 20 mm x 15 mm Each 5.00

b 25 mm x 20 mm Each 5.60

c 32 mm x 25 mm Each 8.85

d 40 mm x 32 mm Each 11.95

e 50 mm x 40 mm Each 20.30

G Reducer Tee

a 20 mm x 15 mm Each 7.60

b 25 mm x 20 mm Each 8.85

c 32 mm x 25 mm Each 12.70

d 40 mm x 32 mm Each 15.20

e 50 mm x 40 mm Each 25.40

H Reducer Elbow

a 20 mm x 15 mm Each 6.35

b 25 mm x 20 mm Each 7.60

c 32 mm x 25 mm Each 10.10d 40 mm x 32 mm Each 12.70

e 50 mm x 40 mm Each 19.05

J Jet Nipple

a 25 mm Dia Each 16.45

b 32 mm Dia Each 21.55

Sl. No. Name of Materials UnitRates

in Rupees

Page 161: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 161/275

151

168 PVC SPECIALS FOR SANITARY

ARRANGEMENTS

FINOLEX (OR) EQUIVALENT

(WITH ISI MONOGRAM)

A Elbow

a 75 mm Each 69.60 56.90

b 90 mm Each 89.00 69.60

c 110 mm Each 107.80 89.00

d 160 mm Each 120.50 101.80

B Door Elbow

a 75 mm Each 89.00 63.60

b 90 mm Each 114.50 76.30

c 110 mm Each 139.80 120.50

d 160 mm Each 165.40 139.90

C Tee

a 75 mm Each 95.10 89.00

b 90 mm Each 120.50 107.80

c 110 mm Each 158.70 146.00

d 160 mm Each 178.10 157.80

D Tee with Door (Single)

a 75 mm Each 120.50 114.50

b 90 mm Each 146.00 127.00

c 110 mm Each 184.20 171.40d 160 mm Each 222.30 203.70

E Tee with Door (Double)

a 75 mm Each 152.70 146.00

b 90 mm Each 209.60 190.80

c 110 mm Each 254.60 241.80

d 160 mm Each 292.70 259.30

F Bend

a 75 mm Each 76.30 63.60

b 90 mm Each 95.10 76.30

c 110 mm Each 114.50 95.10d 160 mm Each 127.10 107.80

G “Y”

a 75 mm Each 101.80 95.10

b 90 mm Each 127.10 114.50

c 110 mm Each 165.40 152.70

d 160 mm Each 184.20 165.40

H “Y” with Door (single)

a 75 mm Each 120.50 114.50

Sl. No. Name of Materials Unit

Rates in Rupees

“O” Ring ByJointing Pasting

Page 162: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 162/275

152

b 90 mm Each 152.70 133.30

c 110 mm Each 203.70 178.10

d 160 mm Each 235.20 209.60

I “Y” with Door (Double)

a 75 mm Each 165.40 158.70

b 90 mm Each 222.30 203.70

c 110 mm Each 267.30 254.10

d 160 mm Each 323.40 292.50

J Double Tee with Door (Single)

a 75 mm Each 209.60 171.40

b 90 mm Each 241.80 196.90

c 110 mm Each 284.80 247.90

d 160 mm Each 318.20 280.00K Double “Y” with Door (single)

a 75 mm Each 229.10 190.80

b 90 mm Each 254.60 216.40

c 110 mm Each 292.70 273.30

d 160 mm Each 356.40 318.00

L Reducer

a 75 mm x 63 mm Each 69.60 56.90

b 110 mm x 63 mm Each 89.00 76.30

c 110 mm x 75 mm Each 101.80 89.00

d 110 mm x 90 mm Each 114.40 101.80f 160 mm x 110 mm Each 133.30 127.00

M Shoe

a 110 mm dia Each 76.30

b 160 mm dia Each 114.40

N Vent Cowl

a 50 mm dia Each 31.50

b 75 mm dia Each 50.90

c 110 mm dia Each 76.30

OTHER ITEMS :

169 PVC screw down tap heavy type 20 mm dia. Each 78.10

170 PVC screw down tap heavy type 15 mm dia. Each 60.50

171 PVC Adhesive (solution) 100 gm 36.30

172 PVC low level flushing tank with all

internal fittings - (wall mounting type)

a White - 10 litre capacity Set 908.00

b White - 7.5 litre capacity Set 696.00

c Colour - 10 litre capacity Set 1030.00

d Colour - 7.5 litre capacity Set 817.00

Sl. No. Name of Materials Unit

Rates in Rupees

“O” Ring ByJointing Pasting

Page 163: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 163/275

RATES FOR ELECTRICAL ITEMS

Page 164: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 164/275

Page 165: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 165/275

155

  ELECTRICAL ITEMS OF WORKSELECTRICAL LAMPS, FITTINGS AND CONNECTED ACCESSORIES

Note:- No extra on cost, conveyance charges shall be allowed for all the items includedunder this category. The rates approved therein are applicable at site of work.

Item

Description Unit

Rates

No. in Rupees

PART-A

1 INCANDESCENT BULBS 230V/ 250V GRADE

BC/ES WITH ISI

a. 15 Watts Each 11.00

b. 25 Watts Each 11.00

c. 40 Watts Each 11.00

d. 60 Watts Each 11.00

e. 100 Watts Each 11.00

f. 200 Watts Each 22.00

2 INCANDESCENT BULB 230V/250V GRADE BC/ ES

Colour 15 Watts Each 13.50

3 Blended lamp 160 Watts Each 266.00

3.a. PL LAMP (PHILIPS/ OSRAM)

a. 9 Watts Each 82.50

b. 11 Watts Each 88.00

c. 18 Watts Each 138.50

d. 36 Watts Each 154.00

4 FLUORESCENT TUBULAR LAMPS WITH ISI MARK

a. Cool Day light 2 Ft. 20 Watts Each 41.50

b. Cool Day light 4 Ft. 40 Watts Each 41.50

c. Cool Day light 4 Ft. 36 Watts Each 40.50

5 MERCURY VAPOUR DISCHARGE LAMP

230V GRADE 3 PIN BC

a. 80 Watts Each 191.00

b. 125 Watts Each 200.00

c. 250 Watts Each 489.00

d. 400 Watts Each 689.00

6 BOX TYPE SINGLE FLUORESCENT FITTING

WITH COPPER CHOKE AND CONDENSOR 

COMPLETE WITH ISI MARK

a. 4 Ft. 40 Watts with ballast Each 353.00

b. 4 Ft. 40 Watts Box type with Ballast

(Philips/ Crompton / Wipro) Each 519.00

Page 166: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 166/275

156

7 BOX TYPE TWIN FLUORESCENT FITTING

WITH COPPER CHOKE AND CONDENSOR[HPF]

COMPLETE WITH ISI MARK

a. 4 Ft. 40 Watts Each 663.00

b. 4 Ft. 40 Watts Box type (Philips/ Crompton ) With Ballast Each 865.00

8 INDUSTRIAL TYPE FLUORESCENT FITTING STOVE

ENAMELLED WITH COPPER CHOKE AND CONDENSOR 

(HPF) 4 Ft. 40W

a. Single type suitable for 1 No. tube Each 975.00

b. Twin type suitable for 2 Nos. tube Each 1,200.00

9 DECORATIVE AND SINGLE FLUORESCENT TYPE

FITTING WITH COPPER CHOKE AND CONDENSOR 

(HPF) COMPLETE SUITABLE FOR ONE NUMBER FLUORESCENT TUBE WITH ISI MARK

a. 4 Ft. 40 Watts with Perspex Deleted

10 DECORATIVE TWIN FLUORESCENT TYPE FITTING

WITH COPPER CHOKE AND CONDENSOR COMPLETE

SUITABLE FOR 2 NUMBERS FLUORESCENT TUBES

a. 4 Ft. 40W Twin Mirror optic Recessed mounting fitting Each 1,680.00

b. 4 Ft. 40W Twin Mirror optic Suspension type fitting.

(Philips/ Crompton /Wipro) Each 3,030.00

c. 4 Ft. 40W Twin Mirror Optic Recessed mounting type

fitting(Philips/ Crompton/ Wipro) Each 2,220.0011 SINGLE TYPE STREET LIGHT FLUORESCENT FITTING

SUITABLE FOR THE ONE NO. FLUORESCENT TUBE

WITH COPPER CHOKE AND CONDENSOR COMPLETE

a. 4 Ft. 40 Watts type Each 740.00

12 TWIN TYPE STREET LIGHTS FLUORESCENT FITTING

SUITABLE FOR 2 Nos. FLUORESCENT TUBES

WITH COPPER CHOKE AND CONDENSOR COMPLETE

a. 4 Ft. 40 Watts type Each 995.00

13 POST TOP LANTERN FITTING OF (INTEGRAL TYPE

WITH COPPER CHOKE AND CONDENSOR & 

NECESSARY ACCESSORIES (PHILIPS/

CROMPTON GREAVES/WIPRO)(SPHERICAL /

RIBBED /CONICAL ACRYLIC COVER)

a. Suitable for 125 Watts M.V lamp Each 3,580.00

b. Suitable for 70 Watts S.V. Lamp Each 3,770.00

c. Post top lantern fitting with S.C. holder suitable

for 160 W blended lamp/ incandescent lamp Each 2,060.00

ItemDescription Unit

RatesNo. in Rupees

Page 167: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 167/275

157

14 STARTERS FOR FLUORESCENT TUBES

a. Starters of capacity 20 Watts Each 11.00

b. Starters of capacity 40 Watts Each 11.00

15 POLYSTER FILLED COPPER CHOKE 250V/50 HZ

GRADE SUITABLE FOR (PHILIPS/CROMPTON/WIPRO)

a. 20 Watts fluorescent Tube Each 196.00

b. 40 Watts fluorescent Tube Each 196.00

c. 36/40W Electronic ballast for flu. Tube

(Philips/ Crompton ) Each 324.00

d. 36/40W Electronic ballast for flu. Tube

(Indo Asean/ Equivalent) Each 264.00

16 CONDENSOR FOR S.V/ M.V LAMP

a. 8 Mfd for 80 Watts Bulb Each 124.50

b. 10 Mfd for 125 watts Bulb Each 148.30

c. 15 Mfd for 250 Watts Bulb Each 198.00

d. 20 Mfd for 400 watts Bulb Each 273.00

17 Battern type Bakelite holder for lamp Each 19.80

18 Water tight bulk head fitting suitable for 100/60 watts

lamp with guard heavy type (PHILIPS/ BAJAJ/ Each 330.00

CROMPTON GREAVES)

19 Ceiling Rose Each 16.50

20.a. Ceiling fixtures 250/300mm complete with Gallery etc.Clear glass opac/ crystal suitable for 40/60 Watts Bulb Each 195.00

b. Ceiling luminaire with mirror optics suitable for 2 Nos.

9 Watts/11 Watts (Philips/Crompton/Bajaj) Each 1230.00

(FOR ITEMS 6 TO 13, 20 & 22 , THE RATES ARE

EXCLUSIVE OF COST OF TUBES AND LAMPS)

21 Fan clamp (dia 12mm) with 6mm MS side plates & 

45 cm cross arm Each 132.00

22 CALL BELLS

a. Call bell/ Buzzar 6mm suitable for AC/DC Each 49.50

b. Push bell Each 19.80

c. Gong bell 9” size suitable for 250 V Each 495.00

d. Gong bell 12” size suitable for 250V Each 716.00

23 WATER HEATER WITH ISI MARK

a. Automatic Electrical Water Heater with copper

container, with Glass Wool/ Puf insulation with MS

powder coated shell suitable for 25 Litres capacity

230V/1000W Each 5,770.00

ItemDescription Unit

RatesNo. in Rupees

Page 168: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 168/275

158

b. Automatic Electrica l Water Heater with copper

container, with Glass Wool/ Puf insulation with MS

powder coated shell suitable for 25 Litres capacity

230V/1000W(Venus/Racold)  Each 7,790.00

c. Automatic Electrica l Water Heater with copper

container, with Glass Wool/ Puf insulation with MS

powder coated shell suitable for 35 litres capacity

230V/1000W Each 6,690.00

d. Automatic Electrical Water Heater with copper

container, with Glass Wool/ Puf insulation with

MS powder coated shell suitable for 35 litres capacity

230V/1000W(Venus/Racold)  Each 8,950.00

PART ‘B’I FANS – CONFORMING TO ISS 374 / 1979

a. AC Ceiling fan complete 1200mm (48”) sweep with

300mm Down rod.(without regulator) Each 1,320.00

b. AC Ceiling fan complete 1400mm (56”) sweep with

300mm Down rod. (Without regulator) Each 1,415.00

c. Stepped electronic 300W/450W square type fan

regulator (Anchor Deluxe/Equivalent) Each 224.00

d. Dimmer type electronic 300W/450W square type fan

regulator (Anchor Deluxe/Equivalent) Each 179.00

e. AC Ceiling fan complete 1200mm (48”) sweep with

300mm Down rod.(without regulator) (Crompton make) Each 1,495.00

f. AC Ceiling fan complete 1400mm (56”) sweep with

300mm Down rod (Without regulator)

(Crompton make) Each 1,615.00

II EXHAUST FANS

a. AC Exhaust Fan 225 mm (9”) sweep (Light duty) Each 1,220.00

b. AC Exhaust Fan 300 mm (12”) sweep (Light duty) Each 1,395.00

c. AC Exhaust Fan 375 mm (15”) sweep (Light duty) Each 1,440.00

d. AC Exhaust Fan 450 mm (18”) sweep (Light duty) Each 2,020.00

e. AC Exhaust Fan 375 mm (15”) sweep (Heavy duty) Each 2,650.00

f. AC Exhaust Fan 450 mm (18”) sweep (Heavy duty) Each 3,300.00

III LOUVER SHUTTERS ARRANGEMENTS

a. MS/Fibre Louvers shutters arrangements for 300mm

AC Exhaust Fan Each 264.00

b. MS/Fibre Louvers shutters arrangements for 375mm

AC Exhaust Fan Each 280.00

ItemDescription Unit

RatesNo. in Rupees

Page 169: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 169/275

159

c. MS/Fibre Louvers shutters arrangements for 450mm

AC Exhaust Fan Each 313.00

PART “C”

I SWITCHES

a. 5 Amps (Flush type) Dozen 203.00

b. 5 Amps (Flush type staircase) Dozen 253.00

II DOUBLE POLE SWITCHES(GEM / HPL / HAVELLS /

EQUIVALENT)

a. 16 Amps DP Switch with metal clad (front handle) Each 476.00

b. 32 Amps DP Switch with metal clad (front handle) Each 975.00

c. 16 Amps DP Switch with metal clad (side handle) Each 394.00

d. 32Amps DP Switch with metal clad (side handle) Each 885.00

III.  TRIPLE POLE SWITCHES (SIDE HANDLE)(STANDARD /HPL/HAVELLS/ EQUIVALENT)

a. 100 Amps TPN Switch with HRC fuses

sheet steel double break Each 6,690.00

b. 125 Amps TPN Switch with HRC fuses

sheet steel double break Each 7,330.00

c. 200 Amps TPN Switch with HRC fuses

sheet steel double break Each 9,470.00

d. 315 Amps TPN Switch with HRC fuses

sheet steel double break Each 13,500.00

e. 400 Amps TPN Switch with HRC fuses

sheet steel double break Each 17,300.00

f. 16 Amps TPN Metal clad switch with rewirable fuse units Each 1,015.00

g 32 Amps TPN Metal clad switch with rewirable fuse units Each 1,500.00

h 63 Amps TPN Metal clad switch with rewirable fuse units Each 3,270.00

I 100 Amps Metal clad switch with rewirable fuse units Each 6,430.00

 j 200 Amps Metal clad switch with rewirable fuse units Each 9,750.00

IV.A  SWITCH DISCONNECTOR FUSE UNITS IN SHEET

STEEL ENCLOSURE (SDF) (L&T/SIEMENS)

1 63 A TPN switch disconnector fuse units in sheetsteel enclosure with HRC fuses Double break Each 4,130.00

2 100 A TPN switch disconnnector fuse units in sheet

steel enclosure with HRC fuses Double break Each 6,950.00

3 125 A TPN switch disconnnector fuse units in sheet

steel enclosure with HRC fuses Double break. Each 8,200.00

4 200 A TPN switch disconnnector fuse units in sheet

steel enclosure with HRC fuses Double break Each 10,300.00

ItemDescription Unit

RatesNo. in Rupees

Page 170: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 170/275

160

5 250 A TPN switch disconnnector fuse units in sheet

steel enclosure with HRC fuses Double break Each 12,850.00

6 315 A TPN switch disconnnector fuse units in sheet

steel enclosure with HRC fuses Double break Each 15,400.00

7 400 A TPN switch disconnnector fuse units in sheet

steel enclosure with HRC fuses Double break Each 17,700.00

IV.B. SWITCH DISCONNECTOR FUSE UNITS IN OPEN

EXECUTION (INTERIOR FOR CUBICAL) (L&T/SIEMENS)

1 63A TPN Switch disconnector fuse units interior only

with HRC fuses Double break Each 2,730.00

2 100 A TPN switch disconnnector fuse units interior

only with HRC fuses Double break. Each 4,970.00

3 125 A TPN switch disconnector fuse units interior

only with HRC fuses Double break. Each 6,770.00

4 200 A TPN switch disconnector fuse units interior

only with HRC fuses Double break. Each 8,740.00

5 250 A TPN switch disconnector fuse units interior

only with HRC fuses Double break. Each 11,400.00

6 315 A TPN switch disconnector fuse units interior

only with HRC fuses Double break. Each 14,300.00

7 400 A TPN switch disconnector fuse units interior

only with HRC fuses Double break. Each 16,900.00

V FUSE UNITS (ANCHOR /EQUIVALENT)

a. 16 Amps Porcelain fuse unit (500 V) Each 55.00

b. 32 Amps Porcelain fuse unit (500 V) Each 97.50

c. 63 Amps Porcelain fuse unit (500 V) Each 218.00

d. 100 Amps Porcelain fuse unit (500 V) Each 392.00

e. 200 Amps Porcelain fuse unit (500 V) Each 634.00

VI SINGLE PHASE DBS (GEM /EQUIVALENT)

a. 4 Way DB 16 Amps /Way with fuse & Neutral Each (250 V) Each 529.00

b. 6 Way DB 16 Amps /Way with fuse & Neutral Each (250 V) Each 719.00

c. 8 Way DB 16 Amps /Way with fuse & Neutral Each (250 V) Each 892.00

VII THREE PHASE DBS(GEM /EQUIVALENT)

a. 4 Way TPDB 16A/Way with fuse & Neutral link Each 2,085.00

b. 6 Way TPDB 16A/Way with fuse & Neutral link Each 2,860.00

c. 8 Way TPDB 16A/Way with fuse & Neutral link Each 3,460.00

d. 4 Way TPDB 32A/Way with fuse & Neutral link Each 2,640.00

e. 6 Way TPDB 32A/Way with fuse & Neutral link Each 3,520.00

f. 8 Way TPDB 32A/Way with fuse & Neutral link Each 4,460.00

g. 4 Way TPDB 63A/Way with fuse & Neutral link Each 6,160.00

h. 6 Way TPDB 63A/Way with fuse & Neutral link Each 7,930.00

ItemDescription Unit

RatesNo. in Rupees

Page 171: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 171/275

161

VIII CHANGE OVER SWITCHES(GEM /HAVELLS /

HPL/STANDARD /EQUIVALENT)

a. 16 Amps three phase 500 V 4 pole Change over switch Each 1,440.00

b. 32 Amps three phase 500 V 4 pole Change over switch Each 1,700.00

c. 63 Amps three phase 500 V 4 pole Change over switch Each 3,710.00

d. 100 Amps three phase 500 V 4 pole Change over switch Each 5,900.00

e. 200 Amps three phase 500 V 4 pole Change over switch Each 11,100.00

PART ‘D’

Ia. 5 Amps 3 pin and 2 pin combined flush type wall socket only. Each 27.70

b. 5 Amps /15 amps.3 pin flush type wall socket only. Each 62.30

c. 5 Amps 3 pin Top Each 39.20

d. 15 Amps 3 pin Top Each 55.40

e. 15 Amps Flush type switch Each 64.60

f. 10 Amps M.C plug with 3 pin Top Each 207.00

g. 20 Amps M.C plug with 3 pin Top Each 236.00

II.A. SINGLE PHASE WATT HOUR METERS [HPL/

EQUIVALENT)

a. AC single phase 230V/250V/50 HZ 5 Amps Watt Hour Meter Each 1,100.00

b. AC single phase 230V/250V/50 HZ 10 Amps Watt Hour Meter Each 1,100.00

c. AC single phase 230V/250V/50 HZ 20 Amps Watt Hour Meter Each 1,100.00

II.B. THREE PHASE WATT HOUR METERS

(ANCHOR / EQUIVALENT)

a. AC 3 phase 400V 50 HZ unbalanced load 4 wire

10 Amps Watt Hour Meter Each 2,270.00

b. AC 3 phase 400V 50 HZ unbalanced load 4 wire

25 Amps Watt Hour Meter Each 2,270.00

c. AC 3 phase 400 V 50 HZ unbalanced load 4 wire 50

Amps Watt Hour Meter Each 2,880.00

PART ‘E’

I SERVICE CONNECTION ACCESSORIES

LT. 1100V PVC ALUMINIUM CONDUCTOR 

ARMOURED UNDER GROUND CABLE WITH ISI MARK

a. 2 Core 6 sq.mm PVC armoured UG cable Metre 97.30

b. 2 Core 10 sq.mm PVC armoured UG cable Metre 118.50

c. 2 Core 16 sq.mm PVC armoured UG cable Metre 128.50

d. 2 Core 25 sq.mm PVC armoured UG cable Metre 146.00

II PVC INSULATED SINGLE CORE MULTI STRAND

FIRE RETARDANT FLEXIBLE COPPER CABLE WITH

ISI MARK CONFORMING TO IS 694/ 1990

a. 14/0.3 ( 1 sq.mm ) Metre 8.95

b. 22/0.3 ( 1.5 sq.mm ) Metre 14.05

ItemDescription Unit

RatesNo. in Rupees

Page 172: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 172/275

162

c. 36/0.3 ( 2.5 sq.mm ) Metre 21.80

d. 56/0.3 ( 4 sq.mm ) Metre 34.60

e. 84/0.3 ( 6 sq.mm ) Metre 51.20

f. 140/0.3 ( 10 sq.mm ) Metre 76.80

g. 101/0.45 ( 16 sq.mm ) Metre 125.50

h. 168/0.45 ( 25 sq.mm ) Metre 277.00

III CONDUCTOR 

a. Hard drawn copper conductor(Gauge No.8 & 6) KG 519.00

b. 14 SWG TC wire KG 531.00

c. GI No.8 wire and No. 6 wire KG 88.00

IV CABLE GLANDS

a. Cable gland suitable for 2 core 4 sq.mm UG cable Each 19.50

b. Cable gland suitable for 2 core 6 sq.mm UG cable Each 24.20c. Cable gland suitable for 2 core 10 sq.mm UG cable Each 28.80

d. Cable gland suitable for 2 core 16 sq.mm UG cable Each 42.60

e. Cable gland suitable for 2 core 25 sq.mm UG cable Each 50.80

f. Cable gland suitable for 3½ core 25 sq.mm UG cable Each 50.80

g. Cable gland suitable for 3½ core 35 sq.mm UG cable Each 64.60

h. Cable gland suitable for 3½ core 50 sq.mm UG cable Each 64.60

I Cable gland suitable for 3½ core 70 sq.mm UG cable Each 79.60

 j Cable gland suitable for 3½ core 95 sq.mm UG cable Each 97.00

k Cable gland suitable for 3½ core 120 sq.mm UG cable Each 123.50

l Cable gland suitable for 3½ core 150 sq.mm UGcable Each 162.50

m Cable gland suitable for 3½ core 185 sq.mm UGCable Each 192.50

n Cable gland suitable for 3½ core 240 sq.mm UG cable Each 192.50

o Cable gland suitable for 3½ core 300 sq.mm UGcable Each 230.00

p Cable gland suitable for 3 ½ core 400 sq.mm UGcable Each 328.00

q Cable gland suitable for 3 ½ core 500 sq.mm UG cable Each 382.00

r Cable gland suitable for 4 core 6 sq.mm UG cable Each 24.20

s Cable gland suitable for 4 core 10 sq.mm UG cable Each 28.80

t Cable gland suitable for 4 core 25 sq.mm UG cable Each 50.80

V FUSE WIRE(COPPER)

a. 5 Amps fuse wire Kg 519.00

b. 10 Amps fuse wire Kg 519.00

c. 20 Amps fuse wire Kg 519.00

VI NEUTRAL LINK 15 AMPS

a. 4 way Neutral Link Each 26.50

b. 6 way Neutral Link Each 39.30

c. 8 way Neutral Link Each 49.00

d. 12 way Neutral Link Each 71.00

ItemDescription Unit

RatesNo. in Rupees

Page 173: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 173/275

163

PART ‘ F ‘

M.S. BOX WITH PAINTING (16 SWG)

a. M.S Box of Size (100 x 100 x 75mm) Each 48.50

b. M.S Box of Size (150 x 100 x 75mm) Each 67.00

c. M.S Box of Size (200 x 150 x 75mm) Each 109.00

d. M.S Box complete with Lock & Key arrangements with

painting of size (300 x 200 x 100 mm) Each 330.00

PART ‘ G ‘

I MS ANGLES

a. 1½ “ x 1½” x 1/4" (37.5 x 37.5 x 6.24 mm)(1M= 3.25 Kg) KG 50.40

b. 1½”x 1½” x ½” (37.5 x 37.5 x 12.5mm) KG 50.40

c. 2" x 2" x ½” (50 x 50 x 12.5 mm) KG 50.40

II ALUMINIUM FLATa. Aluminium Flat (1"x 1/4") (25x 6.25 mm) KG 192.00

b. Aluminium Flat ( 1"x1/8") KG 192.00

III COPPER FLAT

a. Copper Flat (25 x 3 mm) KG 519.00

b. Copper Flat (25 x 6 mm) KG 519.00

c. Copper Flat (33 x 6 mm) KG 519.00

d. Copper Flat (50 x 6 mm) KG 519.00

IV POWER CAPACITOR 

a. Power capacitor for power factor improvement with

oil filled with discharge resistance 3 phase 415/440V KVAR 363.00

50 HZ conforming to ISS:2384 with ISI marking

PART ‘ H ‘

I CONDUIT MATERIALS 16 Gauge

a. Conduit pipe 16 mm (5/8") Heavy Gauge Metre 33.00

b. Conduit pipe 19 mm (3/4") Heavy Gauge Metre 34.10

c. Conduit pipe 25 mm (1") Heavy Gauge Metre 41.90

d. Conduit pipe 32 mm (1¼”) Heavy Gauge Metre 55.00

e. Conduit pipe 38 mm (1½”) Heavy Gauge Metre 65.00

II CONDUIT TEE BENDS

a. Conduit Tee bends 16 mm (5/8") Dozen 93.00

b. Conduit Tee bends 19 mm (3/4") Dozen 94.00

c. Conduit Tee bends 25 mm (1") Dozen 112.00

d. Conduit Tee bends 32 mm (1¼”) Dozen 116.00

e. Conduit Tee bends 38 mm (1½”) Dozen 145.00

f. Conduit Tee bends 50 mm (2") Dozen 181.00

III CONDUIT BENDS 16 Gauge

a. Conduit solid bends 16 mm (5/8") Dozen 88.00

ItemDescription Unit

RatesNo. in Rupees

Page 174: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 174/275

164

b. Conduit solid bends 19 mm (3/4") Dozen 98.00

c. Conduit solid bends 25 mm (1") Dozen 115.00

d. Conduit solid bends 32 mm (1¼”) Dozen 136.00

e. Conduit solid bends 38 mm (1½”) Dozen 193.00

f. Conduit solid bends 50 mm (2") Dozen 236.00

IV CONDUIT INSPECTION BEND 16 Gauge

a. Conduit Inspection bends 16 mm (5/8") Dozen 88.00

b. Conduit Inspection bends 19 mm (3/4") Dozen 91.00

c. Conduit Inspection bends 25 mm (1") Dozen 116.00

d. Conduit Inspection bends 32 mm (1 ¼”) Dozen 140.00

e. Conduit Inspection bends 38mm (1½”) Dozen 181.00

f. Conduit Inspection bends 50mm (2") Dozen 205.00

g. Conduit Inspection bends 65mm (2½”) Dozen 264.00PART ‘ I ‘

I PVC (RIGID) PIPES (1.8 MM THICK)WITH ISI MARK

a. PVC rigid pipes 16mm (5/8") Metre 14.20

b. PVC rigid pipes 20mm (3/4") Metre 20.40

c. PVC rigid pipes 25mm (1") Metre 30.30

d. PVC rigid pipes 32mm (1¼”) Metre 45.90

e. PVC rigid pipes 40mm (1½”) Metre 65.40

f. PVC rigid pipes 50mm (2") Metre 98.00

II PVC RIGID BENDS

a. PVC rigid bends 16mm (5/8") Each 3.30

b. PVC rigid bends 20mm (3/4") Each 3.30

c. PVC rigid bends 25mm (1") Each 4.50

d. PVC rigid bends 32mm (1¼”) Each 7.95

e. PVC rigid bends 40mm (1½”) Each 19.80

f. PVC rigid bends 50mm (2") Each 24.10

III PVC COUPLES

a. PVC Couples 16mm (5/8") Dozen 14.20

b. PVC Couples 19mm (3/4") Dozen 14.20

c. PVC Couples 25mm (1") Dozen 27.50

d. PVC Couples 32mm (1¼”) Dozen 62.70

e. PVC Couples 38mm (1½”) Dozen 135.00

f. PVC Couples 50mm (2") Dozen 141.00

IV PVC TEES

a. PVC Tees 16mm (5/8") Dozen 14.20

b. PVC Tees 19mm (3/4") Dozen 16.40

c. PVC Tees 25mm (1") Dozen 20.90

d. PVC Tees 32mm (1¼”) Dozen 93.60

ItemDescription Unit

RatesNo. in Rupees

Page 175: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 175/275

165

e. PVC Tees 38mm (1½”) Dozen 301.00

f. PVC Tees 50mm (2") Dozen 330.00

V PVC Saddles

a. PVC Saddles 16 mm (5/8") Dozen 3.30

b. PVC Saddles 19mm (3/4") Dozen 3.80

c. PVC Saddles 25mm (1") Dozen 4.40

d. PVC Saddles 32mm (1¼”) Dozen 5.50

e. PVC Saddles 38mm (1½”) Dozen 6.60

f. PVC Saddles 50mm (2") Dozen 13.20

VI PVC JUNCTION BOXES

a. Junction boxes 1,2,3 & 4 way 16 mm (5/8") Dozen 44.00

b. Junction boxes 1,2,3 & 4 way 19 mm (3/4") Dozen 44.00

c. Junction boxes 1,2,3 & 4 way 25 mm (1") Dozen 51.70d. Junction boxes 1,2,3 & 4 way 32 mm (1¼”) Dozen 115.00

e. Junction boxes 1,2,3 & 4 way 38 mm (1½”) Dozen 137.00

VII PVC Hylem sheets

a. Hylem sheet 3 mm thick Sq.m 672.00

VIII Insulation Tape PVC

a. PVC Insulation Tape (19mm) Roll/10 mts 16.40

b. Empire Tape (12 mm) Roll/10 mts 22.00

c. Empire Tape (19 mm) Roll/10 mts 26.40

PART ‘ J ‘

TEAK WOOD MATERIALS

I T.W. BOX CONCEALED TYPE

a. T.W. Box concealed type 12"x8"x3" Each 82.60

b . T.W.Box concealed type 8"x6"x3" Each 44.00

c. T.W. Box concealed type 6"x4"x3” Each 19.80

d. T.W. Box concealed type 4"x4"x3” Each 16.40

e. T.W. plugs 1½” x 1" x2" 1000 Nos. 341.00

f. T.W. Round blocks 100 Nos. 660.00

ItemDescription Unit

RatesNo. in Rupees

Page 176: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 176/275

166

PART ‘ K ‘

I CRIMPING LUGS SUITABLE FOR THEFOLLOWING SIZES

Size Aluminium Copper

a. 4 Sq.mm Each 1.60 4.60b. 6 Sq.mm Each 1.80 4.60

c. 10 Sq.mm Each 2.30 5.75

d. 16 Sq.mm Each 2.30 6.90

e. 25 Sq.mm Each 3.45 11.55

f. 35 Sq.mm Each 4.60 12.65

g. 50 Sq.mm Each 6.90 14.95

h. 70 Sq.mm Each 9.20 24.20

i. 95 Sq.mm Each 10.40 30.00

 j. 120 Sq.mm Each 13.85 41.50

k. 150 Sq.mm Each 18.45 53.10

l. 185 Sq.mm Each 24.20 80.80

m. 225 Sq.mm Each 35.80 115.00

n. 240 Sq.mm Each 39.25 115.00

o. 300 Sq.mm Each 54.25 155.80

p. 400 Sq.mm Each 80.80 236.00

II CABLE ROUTE INDICATOR 

a. Cable route indicator for L.T/ cable Each box 77.00

b Cable route indicator for H.T/ cable Each box 77.00

PART ‘ L ‘I BRASS SCREWS

a. Brass Screws (20mm) ¾” No.6 Gross 71.50

b Brass Screws (25mm) 1" No.6 Gross 77.00

c. Brass Screws (40mm) 1½” No.6 Gross 82.50

d. Brass Screws (20mm) 3/4" No.8 Gross 71.50

e. Brass Screws (25mm) 1" No.8 Gross 77.00

f. Brass Screws (50mm)2" No.10 Gross 159.00

g. Brass screws (75mm)3" No.10 Gross 236.00

II Coach screws 2"x¼” (50 x 6.25mm) Dozen 14.25

III CONDUIT SADDLES

a. Conduit Saddles 16mm (5/8") Gross 44.00

b Conduit Saddles 19mm (3/4") Gross 46.80

c. Conduit Saddles 25mm (1") Gross 55.00

d. Conduit Saddles 32mm (1¼”) Gross 71.50

e. Conduit Saddles 38mm (1½”) Gross 88.00

f. Conduit Saddles 50mm (2") Gross 99.00

g. Conduit Saddles 65mm (2½”) Gross 113.00

ItemDescription Unit

RatesNo. in Rupees

Page 177: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 177/275

167

IV SODIUM VAPOUR FITTINGS & LAMP

(For External Electrification & Campus lighting)

a. 250 Watts Sodium Vapour fittings Each 3490.00

b 250 Watts Sodium Vapour lamp Each 770.00

c. 150 Watts Sodium Vapour fittings Each 3440.00

d. 150 Watts Sodium Vapour lamp Each 660.00

e. 70 Watts Sodium Vapour fittings Each 2780.00

f. 70 Watts Sodium Vapour lamp Each 440.00

V SODIUM VAPOUR LAMP FITTING SINGLE PIECE DIE

CAST ALUMINIUM HOUSING & LAMP FOR HEAVY

TRAFFIC ROADS (PHILIPS/ CROMPTON CREAVES/

WIPRO/BAJAJ)

a. 400 Watts sodium vapour fittings Each 10460.00b 400 Watts sodium vapour lamp Each 1080.00

c. 250 Watts sodium vapour fittings Each 7100.00

d. 250 Watts sodium vapour lamp Each 880.00

e. 150 Watts sodium vapour fittings Each 6670.00

f. 150 Watts sodium vapour lamp Each 716.00

g. 70 Watts sodium vapour fittings Each 2860.00

h. 70 Watts sodium vapour lamps Each 495.00

VI MINIATURE CIRCUIT BREAKERS 240 V/ 415 V 50HZ “Legrand” All other

AC SUPPLY SUITABLE FOR BOTH LIGHTING AND /Hager ISI makes

MOTOR CIRCUITS. with ISI

 (Std.)/

HPL/

 Havell’s/

equivalent)

a. Single pole 6A to 32A,10 KA Each 202.50 148.00

b Single pole 40A , 10 KA Each 412.50 308.50

c. Single pole & Neutral 6A to 32A, 10 KA Each 588.00 446.00

d. Single pole & Neutral 40A, 10 KA Each 953.00 617.00

e. Double pole 6A to 32A, 10 KA Each 588.00 490.00f. Double pole 40A, 10 KA Each 953.00 670.00

g. Triple pole 6A to 32A, 10 KA Each 946.00 738.00

h. Triple pole 63A , 10 KA Each 1450.00 1185.00

I Triple pole & Neutral 6A to 32A, 10 KA Each 1250.00 963.00

 j. Triple pole & Neutral 63A, 10 KA Each 1870.00 1490.00

k. Four pole 6A to 32A, 10 KA Each 1250.00 1030.00

l. Four pole 63A, 10 KA Each 1870.00 1580.00

ItemDescription Unit

RatesNo. in Rupees

Page 178: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 178/275

168

VII MCB ISOLATORS

Legrand(MDS)/Hager(L&T) All other Makes with IS

(Standard)/HPL/ Havell’s

/equivalent)

DP TP FP DP TP FP

a. 32 A each 310.00 517.00 592.00 - - -

b 40 A each 428.00 740.00 950.00 297.00 544.00 664.00

c. 63 A each 573.00 860.00 1040.00 376.00 592.00 693.00

d. 100 A each -- 687.00 1100.00 486.00 773.00 845.00

VIII PLUG AND SOCKETS IN SHEET STEEL ENCLOSURE Legrand All other

WITHOUT MCBS (MDS)/ Makes

Hager with ISI

(L&T) (Std)/HPL

/Havell’s/

equivalent)

a. 10A single Pole Each 974.00 580.00

b 20A Single Pole Each 1045.00 585.00

c. 20A Double Pole Each 1130.00 —

d. 20A Triple Pole Each 1920.00 1110.00

e. 32A Triple Pole Each 2280.00 1500.00

f. 63A Triple Pole Each 9270.00 -

IX-I RCCB/ ELCB

a. 10 Amps 30 MA DP Each 2750.00 2020.00b 25 Amps 30 MA DP Each 2270.00 1740.00

c. 40 Amps 30 MA DP Each 2510.00 1840.00

IX-2 RCCB/ELCB (FOUR POLE)

a. 25 Amps 30 MA Each 3120.00 2140.00

b 40 Amps 30 MA Each 3160.00 2190.00

c. 63 Amps 30 MA Each 3650.00 2490.00

X HRC FUSES

a. 16 Amps Each 64.60 34.60

b 32 Amps Each 66.90 57.70

c. 63 Amps Each 138.00 72.50

d. 125 Amps Each 323.00 161.00

e. 160 Amps Each 403.00 217.00

f. 200 Amps Each 415.00 217.00

g. 250 Amps Each 577.00 321.00

ItemDescription Unit

RatesNo. in Rupees

Page 179: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 179/275

169

XI VERTICAL THREE PHASE DISTRIBUTION BOARD WITH MCBS

4 Way / 8 way / 12 Way Vertical TPMCB sheet steel distribution boards Flush type/Surface type fitted with Bus bars and Neutral links with single / Three phase MCB outgoings and separate 4 way provision for accommodating one No. 4 pole incoming MCB

 / Isolator and another separate 4 way provision for accommodating one No. 4 poleELCB/ RCD with label holder and provisions for taking up cable for size not less than

35 sq.mm

I MODULE TYPE WITH IP 20 PROTECTION

Description No. of ways No.of ways No.of Legrand All other makesincomer incomer outgoing (MDS) / with ISI (StdMCB/ ELCB/RCD ways HAGER HPL / Havell’s /

Isolator ( L & T) equivalent)Rate in Rs. Rate in Rs.

4 Ways 3 Phase DB 4 4 12 5360.00 3900.00

8 Ways 3 Phase DB 4 4 24 6620.00 5220.00

12 Ways 3 Phase DB 4 4 36 9630.00 6350.00

II. TPMCB DB WITH METAL/ACRYLIC DOOR COVER WITH IP 42 PROTECTION

Description No. of ways No.of ways No.of Legrand All otherincomer incomer outgoing (MDS) / makes withMCB/ ELCB/RCD ways HAGER ISI (Std

Isolator ( L & T) /HPL / Havell’s /equivalent)With With

metal ACRYLIC(Rate inDoor doorRupees)(Rate (Rate

in inRupees)Rupees)

4 Ways 3 Phase DB 4 4 12 6220 7500 5110

8 Ways 3 Phase DB 4 4 24 7880 9550 6290

12 Ways 3 Phase DB 4 4 36 10500 12700 7730

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION

Description No. of ways No.of ways No.of Legrand (MDS) /incomer incomer outgoing HAGER

MCB/ ELCB/RCD ways ( L & T) Rate in Rs.

4 Ways 3 Phase DB 4 4 12 11600.00

8 Ways 3 Phase DB 4 4 24 14000.00

12 Ways 3 Phase DB 4 4 36 18800.00

Page 180: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 180/275

170

XII HORIZONTAL THREE PHASE DISTRIBUTION BOARD WITH MCBS

4 way / 6 way / 8 way / 12 way TPMCB sheet steel distribution boards Flush type /Surface type fitted with Bus bars and Neutral links with single/ Three phase MCB outgoingsand separate 4 way provision for accommodating one No. 4 pole incoming MCB / Isolatorand another separate 4 way provision for accommodating one No. 4 pole ELCB / RCDwith label holder and provisions for taking up cable for size not less than 35 sq.mm

I MODULE TYPE WITH IP 20 PROTECTION

Description No. of ways No.of ways No.of Legrand All other makesincomer incomer outgoing (MDS) / with ISI (Std/MCB/ ELCB/RCD ways HAGER HPL / Havell’s /

Isolator ( L & T) equivalent)Rate in Rs. Rate in Rs.

4 Ways 3 Phase DB 4 4 12 1920.00 1200.00

6 Ways 3 Phase DB 4 4 18 2380.00 1510.00

8 Ways 3 Phase DB 4 4 24 2830.00 1830.00

12 Ways 3 Phase DB 4 4 36 4230.00 2500.00

II. TPMCB DB WITH METAL / ACRYLIC DOOR COVER WITH IP 42 PROTECTION

Description No. of ways No.of ways No.of Legrand All otherincomer incomer outgoing (MDS) / makes withMCB/ ELCB/RCD ways HAGER ISI (Std

Isolator ( L & T) /HPL / Havell’s /equivalent)With With

metal ACRYLIC(Rate inDoor door

Rupees)(Rate (Ratein in

Rupees)Rupees)

4 Ways 3 Phase DB 4 4 12 2600.00 3030.00 2060.00

6 Ways 3 Phase DB 4 4 18 3210.00 3720.00 2610.00

8 Ways 3 Phase DB 4 4 24 3850.00 4440.00 3200.00

12 Ways 3 Phase DB 4 4 36 5680.00 6760.00 4340.00

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION

DescriptionNo. of ways No.of ways No.of Legrand (MDS) /

incomer incomer outgoing HAGERMCB/ ELCB/RCD ways ( L & T) Rate in Rs.

Isolator

4 Ways 3 Phase DB 4 4 12 7340.00

6 Ways 3 Phase DB 4 4 18 8840.00

8 Ways 3 Phase DB 4 4 24 9650.00

12 Ways 3 Phase DB 4 4 36 13400.00

Page 181: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 181/275

171

XIII 7 SEGMENTS (3 TIER) 3 PHASE DISTRIBUTION BOARD WITH MCB

4 Way/6 way/8 way/12 Way TPMCB sheet steel distribution boards Flush type/Surfacetype fitted with Bus bars and Neutral links with single /Three phase MCB out goings andseparate 4 way provision for accommodating one No. 4 pole incoming MCB /Isolator andanother separate 4 way provision for accommodating one No. 4 pole ELCB/RCD (Totally8 ways in one segment)(3 x 4 ways in each segment) and separate provision for MCB /

Isolator)(Totally 12 Nos. ) for sub incomers in 3 segments with label holder andprovisions for taking up cable for size not less than 35 sq.mm

1. MODULE TYPE WITH IP 20 PROTECTION

Description No. of No.of ways No.of Sub No. of out Legrand (MDS)ways incomer incomers going ways /HAGER(L&T)

incomer ELCB/RCD Rate inMCB/ Rupees

Isolator

4 Ways 3 Phase DB 4 4 12 12 5780.00

6 Ways 3 Phase DB 4 4 12 18 6200.00

8 Ways 3 Phase DB 4 4 12 24 6580.00

12 Ways 3 Phase DB 4 4 12 36 7590.00

II.TPMCB DB WITH METAL /ACRYLIC DOOR COVER WITH IP 42 PROTECTION

Description No. of Legrand (MDS)ways No.of ways No.of Sub No. of out /HAGER(L&T)

incomer incomer incomers going ways Rate inMCB/ ELCB/RCD Rupees

Isolator

4 Ways 3 Phase DB 4 4 12 12 6140.00

6 Ways 3 Phase DB 4 4 12 18 6900.00

8 Ways 3 Phase DB 4 4 12 24 7700.0012 Ways 3 Phase DB 4 4 12 36 9800.00

XIVSINGLE PHASE DISTRIBUTION BOARD WITH MCBs

4 Way/8 way/12 Way Vertical SPMCB sheet steel distribution boards Flush type/Surfacetype fitted with Bus bars and Neutral links with single phase MCB out goings and separate2 way provision for accommodating one No. 2 pole incoming MCB /Isolator and anotherseparate 2 way provision for accommodating one No, 2 pole ELCB/RCD with label holderand provisions for taking up cable for size not less than 35 sq.mm

I MODULE TYPE WITH IP 20 PROTECTION

No. of ways Legrand All other makesincomer No.of ways No.of (MDS) / with ISI (Std

Description MCB/ incomer outgoing HAGER HPL / Havell’s /Isolator ELCB/RCD ways ( L & T) equivalent)

Rate in Rs. Rate in Rs.

4 Ways 3 Phase DB 2 2 4 705.00 383.00

4 Ways 3 Phase DB 2 2 8 880.00 485.00

4 Ways 3 Phase DB 2 2 12 1045.00 664.00

Page 182: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 182/275

172

II. SPMCB DB WITH METAL/ACRYLIC DOOR COVER WITH IP 42 PROTECTION

Description No. of ways No.of ways No.of Legrand All otherincomer incomer outgoing (MDS) / makes withMCB/ ELCB/RCD ways HAGER ISI (Std

Isolator ( L & T) /HPL /Rate in Rs. Havell’s /

equivalent)With With (Rate inmetal ACRYLIC Rupees)Door door(Rate (Rates

in inRupees) Rupees)

4 Ways 3 Phase DB 2 2 4 1025.00 1210.00 670.00

4 Ways 3 Phase DB 2 2 8 1280.00 1430.00 915.00

4 Ways 3 Phase DB 2 2 12 1540.00 1730.00 1180.00

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION.

Description No. of ways No.of ways No.of Legrand (MDS) /incomer incomer outgoing HAGERMCB/ ELCB/RCD ways ( L & T) Rate in Rs.

Isolator

4 Ways 3 Phase DB 2 2 4 3080.00

4 Ways 3 Phase DB 2 2 8 3610.00

4 Ways 3 Phase DB 2 2 12 4160.00

Page 183: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 183/275

RATES FOR WORKS

Page 184: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 184/275

Page 185: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 185/275

175

INFILTRATION WORKS

Schedule Rate inItem No. Description Unit Rupees

1 Earthwork excavation above water levelin light or sandy or clayey soils for

manhole wells, infiltration wells, suctionwells etc. including levelling the site with

an initial lead of 10 metres.

First depth of 2 metres One Cubic metre 43.00

Second depth of 2 metres One Cubic metre 67.00

Third depth of 2 metres One Cubic metre 97.00

Fourth depth of 2 metres One Cubic metre 135.00

2 Erection of Ring well below water levelincluding all incidental charges usingspecial tools and plants such as aircompressor helmet etc. complete and

including bailing out water.

a. For 0.90 metre dia Ring well (internal)

First depth of 2 metres One metre 343.00

Second depth of 2 metres One metre 631.00

Third depth of 2 metres One metre 1326.00

Fourth depth of 2 metres One metre 2647.00

Fifth depth of 2 metres One metre 5213.00

Sixth depth of 2 metres One metre 10434.00

b. For 1.2 metre dia Ring well (internal)

First depth of 2 metres One metre 381.00

Second depth of 2 metres One metre 761.00

Third depth of 2 metres One metre 1516.00

Fourth depth of 2 metres One metre 2840.00

Fifth depth of 2 metres One metre 5271.00

Sixth depth of 2 metres One metre 10529.00

c. For 1.50 metre dia Ring well (internal)

First depth of 2 metres One metre 440.00

Second depth of 2 metres One metre 873.00

Third depth of 2 metres One metre 1727.00

Fourth depth of 2 metres One metre 3441.00

Fifth depth of 2 metres One metre 6872.00

Sixth depth of 2 metres One metre 13684.00

Page 186: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 186/275

176

3 Sinking well below water levelincluding all incidental chargesusing special tools and plantssuch as air compressor, helmetetc., complete and including

bailing out water.

a. For 1.0 metre dia (internal)

First depth of 2 metres One metre 500.00 722.00

Second depth of 2 metres One metre 842.00 1322.00

Third depth of 2 metres One metre 1682.00 2641.00

Fourth depth of 2 metres One metre 3320.00 5273.00Fifth depth of 2 metres One metre 6320.00 9902.00

Sixth depth of 2 metres One metre 11866.00 18533.00

Seventh depth of 2 metres One metre 17411.00 25192.00

Eighth depth of 2 metres One metre 22958.00 31851.00

Nineth depth of 2 metres One metre 28500.00 38507.00

Tenth depth of 2 metres One metre 34046.00 45166.00

b. For 1.25 metre dia (internal)

First depth of 2 metres One metre 653.00 990.00

Second depth of 2 metres One metre 1308.00 1982.00Third depth of 2 metres One metre 2609.00 4008.00

Fourth depth of 2 metres One metre 4678.00 7204.00

Fifth depth of 2 metres One metre 8269.00 12780.00

Sixth depth of 2 metres One metre 14931.00 23135.00

Seventh depth of 2 metres One metre 21588.00 33495.00

Eighth depth of 2 metres One metre 28248.00 43852.00

Nineth depth of 2 metres One metre 34912.00 54211.00

Tenth depth of 2 metres One metre 41570.00 64570.00

c. For 2.0 metre dia (internal)First depth of 2 metres One metre 1015.00 1632.00

Second depth of 2 metres One metre 2024.00 3264.00

Third depth of 2 metres One metre 4038.00 6516.00

Fourth depth of 2 metres One metre 6455.00 11943.00

Fifth depth of 2 metres One metre 12618.00 21717.00

Sixth depth of 2 metres One metre 25231.00 40569.00

Seventh depth of 2 metres One metre 37841.00 59439.00

Schedule Description Unit

Rate in Rupees

Item No.

OrdinarySilt (or) claysoil (or)

pocketloose soilsandy soil

Page 187: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 187/275

177

Eighth depth of 2 metres One metre 50453.00 78301.00Nineth depth of 2 metres One metre 63065.00 97162.00

Tenth depth of 2 metres One metre 75675.00 116022.00

d. For 2.5 metre dia (internal)

First depth of 2 metres One metre 1280.00 2129.00

Second depth of 2 metres One metre 2662.00 4186.00

Third depth of 2 metres One metre 5320.00 8338.00

Fourth depth of 2 metres One metre 9908.00 15495.00

Fifth depth of 2 metres One metre 18446.00 28655.00

Sixth depth of 2 metres One metre 35624.00 53662.00

Seventh depth of 2 metres One metre 52797.00 78664.00

Eighth depth of 2 metres One metre 69973.00 103668.00

Nineth depth of 2 metres One metre 87146.00 128671.00

Tenth depth of 2 metres One metre 104325.00 153674.00

e. For 3.00 metre dia (internal)

First depth of 2 metres One metre 1654.00 2881.00

Second depth of 2 metres One metre 3278.00 5601.00

Third depth of 2 metres One metre 6548.00 11206.00

Fourth depth of 2 metres One metre 12638.00 21045.00

Fifth depth of 2 metres One metre 23620.00 39300.00

Sixth depth of 2 metres One metre 44770.00 68523.00

Seventh depth of 2 metres One metre 65918.00 97706.00

Eighth depth of 2 metres One metre 87066.00 126911.00

Nineth depth of 2 metres One metre 108214.00 156118.00

Tenth depth of 2 metres One metre 129364.00 185326.00

f. For 3.50 metre dia (internal)

First depth of 2 metres One metre 2104.00 3375.00

Second depth of 2 metres One metre 4091.00 6624.00

Third depth of 2 metres One metre 8164.00 13217.00Fourth depth of 2 metres One metre 15286.00 24773.00

Fifth depth of 2 metres One metre 28558.00 47102.00

Sixth depth of 2 metres One metre 54109.00 87435.00

Seventh depth of 2 metres One metre 79658.00 127770.00

Eighth depth of 2 metres One metre 105212.00 168100.00

Nineth depth of 2 metres One metre 130762.00 208434.00

Tenth depth of 2 metres One metre 156314.00 248768.00

Schedule Description Unit

Rate in Rupees

Item No.

OrdinarySilt (or) claysoil (or)

pocketloose soilsandy soil

Page 188: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 188/275

178

g. For 4.00 metre dia (internal)First depth of 2 metres One metre 2405.00 4049.00

Second depth of 2 metres One metre 4631.00 7752.00

Third depth of 2 metres One metre 9228.00 15489.00

Fourth depth of 2 metres One metre 17332.00 29020.00

Fifth depth of 2 metres One metre 32415.00 54118.00

Sixth depth of 2 metres One metre 61457.00 102436.00

Seventh depth of 2 metres One metre 90499.00 150753.00

Eighth depth of 2 metres One metre 119539.00 199074.00

Nineth depth of 2 metres One metre 148600.00 247059.00Tenth depth of 2 metres One metre 177625.00 291975.00

h. For 4.50 metre dia (internal)

First depth of 2 metres One metre 2872.00 4843.00

Second depth of 2 metres One metre 5631.00 9632.00

Third depth of 2 metres One metre 11304.00 19223.00

Fourth depth of 2 metres One metre 19659.00 36048.00

Fifth depth of 2 metres One metre 34076.00 67408.00

Sixth depth of 2 metres One metre 63377.00 112320.00

Seventh depth of 2 metres One metre 92777.00 157233.00Eighth depth of 2 metres One metre 122132.00 202145.00

Nineth depth of 2 metres One metre 151481.00 247393.00

Tenth depth of 2 metres One metre 180832.00 295711.00

i. For 5.00 metre dia (internal)

First depth of 2 metres One metre 3562.00 6007.00

Second depth of 2 metres One metre 6950.00 11147.00

Third depth of 2 metres One metre 13825.00 22259.00

Fourth depth of 2 metres One metre 25942.00 43590.00

Fifth depth of 2 metres One metre 46842.00 81455.00Sixth depth of 2 metres One metre 91598.00 154340.00

Seventh depth of 2 metres One metre 136353.00 227225.00

Eighth depth of 2 metres One metre 181106.00 300110.00

Nineth depth of 2 metres One metre 225864.00 372996.00

Tenth depth of 2 metres One metre 270621.00 445882.00

 j. For 6.00 metre dia (internal)

First depth of 2 metres One metre 5119.00 8372.00

Schedule Description Unit

Rate in Rupees

Item No.

OrdinarySilt (or) claysoil (or)

pocketloose soilsandy soil

Page 189: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 189/275

179

Second depth of 2 metres One metre 9924.00 16190.00Third depth of 2 metres One metre 18851.00 32363.00

Fourth depth of 2 metres One metre 37149.00 60637.00

Fifth depth of 2 metres One metre 69436.00 113106.00

Sixth depth of 2 metres One metre 131622.00 214005.00

Seventh depth of 2 metres One metre 193816.00 314903.00

Eighth depth of 2 metres One metre 256003.00 415801.00

Nineth depth of 2 metres One metre 318193.00 516697.00

Tenth depth of 2 metres One metre 380380.00 617595.00

NOTE: In case the water table is met with at depth of 2.00 m and below, from

the bed level, an extra percentage as under may be allowed over theexisting rates for items 3(a) to 3 (j) for the extra lift involved.

Where water table is 2.00m, below bed leveland upto 4.00 m 15% extra

Where water table is beyond 4.00m

and upto 6.00m 20% extra

Schedule Description Unit

Rate in Rupees

Item No.

OrdinarySilt (or) claysoil (or)

pocketloose soilsandy soil

Page 190: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 190/275

180

INFILTRATION WORKS

Schedule Rate inItem No. Description Unit Rupees

4a. Earthwork excavation above water level

in light or sandy soil for infiltration gallery,syphon or connecting pipeline and

connected works including refilling

complete.

First depth of 2 m One cubic metre 49.00

Second depth of 2 m One cubic metre 70.30

Third depth of 2 m One cubic metre 102.20

Fourth depth of 2 m One cubic metre 136.70

b. Earthwork excavation below water level

in light or sandy soil for infiltration gallery,

syphon or connecting pipe line and

connected works including shoring and

strutting and charges for special tools

and plants for bailing/ pumping etc., such

as air compressor and helmet.

First depth of 2 m One cubic metre 912.00

Second depth of 2 m One cubic metre 1289.20

Third depth of 2 m One cubic metre 1933.25

Fourth depth of 2 m One cubic metre 2805.00

c Earthwork excavation below water level

in clayey soil for infiltration gallery for

laying syphon pipe line or connecting pipeand connected works, shoring and

strutting and charges for special tools

and plants for bailing/pumping etc., such

as air compressor and helmet.

First depth of 2 m One cubic metre 1516.35

Second depth of 2 m One cubic metre 2107.05

Third depth of 2 m One cubic metre 3290.65

Fourth depth of 2 m One cubic metre 4925.80

d Earthwork excavation below water level

in soft disintegrated rock for infiltrationgallery, laying syphone pipe line/

connecting pipes etc., including shoring,

strutting and charges for special tools

and plants.

First depth of 2 m One cubic metre 1060.40

Second depth of 2 m One cubic metre 1413.00

Third depth of 2 m One cubic metre 2200.00

Fourth depth of 2 m One cubic metre 3803.80

Page 191: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 191/275

181

NOTE (i) For sinking wells in soil mixed with

pebbles boulder of size 80 mm to 600mm mixed with clay and silt below waterlevel, including bailing/ pumping waterand charges for special tools and plantsetc., complete, an extra 20% (Twentypercentage) over the rates for items2,3b,3c & 3d in the schedule of rates isallowed.

ii In case the water table is met with at adepth of 2.00m and below from the bedlevel, an extra percentage as undermay be allowed over the existing ratesfor items 4(b), 4(c) and 4(d) above the

extra lift involved

Where water table is 2.00m below bed

level and upto 4.00m. 10% extra

Where water table is beyond

4.00m and upto 6.00m 15% extra

Pipe laying works

5a Laying stoneware pipes and open joint

with fillet in the infliltration galleryexcluding cost of pipes but includingcharges of special tools and plant etc.,

such as air compressor and helmet.

I 200 mm dia stoneware pipes One metre 145.75

ii 225 mm dia stoneware pipes One metre 178.75

iii 300 mm dia stoneware pipes One metre 209.00

iv 350 mm dia stoneware pipes One metre 242.55

v 375 mm dia stoneware pipes One metre 300.85

vi 450 mm dia stoneware pipes One metre 310.20

b Laying and jointing PVC slotted pipes in

the inflitration gallery excluding cost of 

pipes but including charges for special

tools and plants etc., complete such as

air compressor and helmet.

200 mm dia (OD) PVC pipes One metre 108.35

315 mm dia (OD) PVC pipes One metre 165.55

c Refilling gallery trench and filter basins

with clean excavated sand free from

silt and clay One cubic metre 11.55

Schedule Rate inItem No. Description Unit Rupees

Page 192: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 192/275

182

6 Labour charges for laying filter media

below water level in all depths as per

specfification for infiltration gallery works

including screening cleaning and charges

for special tools and plant etc., complete

such as air compressor, helmets, sheet

piles

a Granite metal 6mm to 40mm One cubic metre 150.70

b Coarse sand passing through a sieve of  

four meshes to 2.5 centimetres and

retained in a sieve of ten meshes to 2.5 One cubic metre 747.45

centimetres and filling it under water

c Coarse sand passing through a sieve of  

ten meshes to 2.5 centimetres and

retained in a sieve of 200 meshes to One cubic metre 283.80

2.5 centimetres and filling it under water

d. Cost of coarse sand D-10 and D-20 for

laying gallery media for a lead not

exceeding 200m from the source to the One cubic metre 193.05

place of stacking including stacking

etc., complete.

e. Cost of hard granite metal of size

(B.S.S.) 6 mm to 12 mm filter media One cubic metre 1015.30

(machine crushed)(I) NOTE: For 6(a),(b) and (c):

The above rates are labour charges for

laying the filter media including

screening, cleaning etc., for a lead not

exceeding 200 metres from the place

of stacking to the point of laying the

media. The cost of materials and the

lead from the source to the place of 

stacking are to be paid for separately.

(ii) NOTE: FOR 6(d):

The above rates are applicable to caseswhere the screened materials is not less

than 10% of the collected material. In

specific cases where the screened

material is less than 10% of the collected

material, pr ior orders of the

Superintending Engineer, TWAD Board are

to be obtained in specific cases for

increased rate of labour required.

Schedule Rate inItem No. Description Unit Rupees

Page 193: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 193/275

183

(iii) NOTE: FOR 6(e)

The above rates are applicable to cases

where the screened materials is not lessthan 20% of the collected materials. In

case where the screened materials is less

than 20% of the collected material, prior

orders of the Superintending Engineer,

TWAD are to be obtained in specific cases

for increased rate of labour required.

Schedule Rate inItem No. Description Unit Rupees

Page 194: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 194/275

184

7a Lowering of C.I/ D.I Pipes and specials inthe trenches and laying to proper gradeand alignment and as directed by the

TWAD Officers.For depth upto 2m

80 mm dia C.I/ D.I Pipes and Specials One metre 7.90

100 mm dia C.I/ D.I Pipes and Specials One metre 9.20

125 mm dia C.I/ D.I Pipes and Specials One metre 11.90

150 mm dia C.I/ D.I Pipes and Specials One metre 15.90

200 mm dia C.I/ D.I Pipes and Specials One metre 19.90

250 mm dia C.I/ D.I Pipes and Specials One metre 25.10

300 mm dia C.I/ D.I Pipes and Specials One metre 27.80

350 mm dia C.I/ D.I pipes and specials One metre 34.50400 mm dia C.I/ D.I pipes and specials One metre 39.80

450 mm dia C.I/ D.I pipes and specials One metre 46.40

500 mm dia C.I/ D.I pipes and specials One metre 50.40

600 mm dia C.I/ D.I pipes and specials One metre 62.30

700 mm dia C.I/ D.I pipes and specials One metre 78.25

750 mm dia C.I/ D.I pipes and specials One metre 87.60

800 mm dia C.I/ D.I pipes and specials One metre 102.20

900 mm dia C.I/ D.I pipes and specials One metre 118.10

NOTE: i) For depth between 2m to 4m10% over basic rates and for 4m to 6m

20% over basic rate allowed

ii) For work of laying CI connecting pipe/

syphon basic pipe below water, doublethe above rates shall be allowed.iii) For laying pipes in sewer line exceptpumping main 10% more is allowed.

b Lowering GI pipes and specials in thetrenches and laying to proper grade andalignment and as directed by the TWAD

Officers

15mm to 40mm dia One metre 7.90

50mm to 65mm dia One metre 7.90

80mm to 100mm dia One metre 10.60

125mm to 150mm dia One metre 10.60

c Disjointing C.I. Tyton S/S pipes andspecials, and lifting C.I. Pipes from thetrenches and stacking at places shownby the departmental Officers.

For depth upto 2 m

Schedule Rate inItem No. Description Unit Rupees

Page 195: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 195/275

185

Schedule Rate inItem No. Description Unit Rupees

80 mm dia C.I. Pipes and specials One metre 7.90

100mm dia C.I. Pipes and specials One metre 9.20

125 mm dia C.I. Pipes and specials One metre 10.60150 mm dia C.I. Pipes and specials One metre 14.50

200 mm dia C.I. Pipes and specials One metre 15.90

250 mm dia C.I. Pipes and specials One metre 25.10

300 mm dia C.I. Pipes and specials One metre 26.60

350 mm dia C.I. Pipes and specials One metre 34.50

400 mm dia C.I. Pipes and specials One metre 37.20

450 mm dia C.I. Pipes and specials One metre 43.70

500 mm dia C.I.pipes and specials One metre 47.80

600 mm dia C.I.pipes and specials One metre 58.40

700 mm dia C.I.pipes and specials One metre 67.65

800 mm dia C.I.pipes and specials One metre 74.35

825 mm dia C.I.pipes and specials One metre 85.00

900 mm dia C.I.pipes and specials One metre 94.20

NOTE: For depth between % excess

allowed over

basic rate

2m to 4m 10%

4m to 6m 20%

d. Lowering of M.S pipes and specials intothe trenches and laying to proper grade

and alignment and as directed by the

TWAD Officers.

Up to 350mm dia One metre 25.10

400 mm Dia One metre 31.85

450 mm Dia One metre 34.50

500 mm Dia One metre 37.15

600 mm Dia One metre 46.40

700 mm Dia One metre 59.65900 mm Dia One metre 85.00

1000 mm Dia One metre 106.25

1050 mm Dia One metre 111.50

1100 mm Dia One metre 116.85

1200 mm Dia One metre 127.50

1400 mm Dia One metre 187.20

1600 mm Dia One metre 242.90

Page 196: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 196/275

186

Schedule Rate inItem No. Description Unit Rupees

NOTE: For depth between Percentage

excess allowed

over basic rate

2m to 4m 10%

4m to 6m 20%

8a Jointing the C.I/ D.I - S/S pipes and

specials with molten lead and Yarnincluding caulking the joints. (Including

cost of jointing materials)

For depth upto 2m

80 mm dia C.I/ D.I -S/S pipes and specials Each Joint 268.30

100 mm dia C.I/ D.I - S/S pipes and specials Each Joint 326.70

125 mm dia C.I/ D.I - S/S pipes and specials Each Joint 430.30

150 mm dia C.I/ D.I - S/S pipes and specials Each Joint 504.70

200 mm dia C.I/ D.I - S/S pipes and specials Each Joint 684.00

250 mm dia C.I/ D.I - S/S pipes and specials Each Joint 973.50

300 mm dia C.I/ D.I - S/S pipes and specials Each Joint 1055.90

350 mm dia C.I/ D.I - S/S pipes and specials Each Joint 1304.30

400 mm dia C.I/ D.I - S/S pipes and specials Each Joint 1589.80

450 mm dia C.I/ D.I - S/S pipes and specials Each Joint 2377.50

500 mm dia C.I/ D.I - S/S pipes and specials Each Joint 2669.75

600 mm dia C.I/ D.I - S/S pipes and specials Each Joint 3189.05

700 mm dia C.I/ D.I - S/S pipes and specials Each Joint 3600.80

750 mm dia C.I/ D.I - S/S pipes and specials Each Joint 4318.05

NOTE: For depth between Percentage

excess allowed

over basic rate

2m to 4m 10%

4m to 6m 15%

8b Jointing C.I/ D.I-S/S pipes and specials

with rubber gaskets (tyton joint)including cost of lubricants. (including

cost of jointing materials)For depth upto 2m

80 mm dia C.I/ D.I-S/S pipes and specials Each Joint 27.80

100 mm dia C.I/ D.I-S/S pipes and specials Each Joint 34.45

125 mm dia C.I/ D.I-S/S pipes and specials Each Joint 34.45

150 mm dia C.I/ D.I-S/S pipes and specials Each Joint 35.75

200 mm dia C.I/ D.I-S/S pipes and specials Each Joint 63.75

250 mm dia C.I/ D.I-S/S pipes and specials Each Joint 87.60

Page 197: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 197/275

187

300 mm dia C.I/ D.I-S/S pipes and specials Each Joint 104.80

350 mm dia C.I/ D.I-S/S pipes and specials Each Joint 114.15

400 mm dia C.I/ D.I-S/S pipes and specials Each Joint 148.70

450 mm dia C.I/ D.I-S/S pipes and specials Each Joint 209.80

500 mm dia C.I/ D.I-S/S pipes and specials Each Joint 258.90

600 mm dia C.I/ D.I-S/S pipes and specials Each Joint 351.90

700 mm dia C.I/ D.I-S/S pipes and specials Each Joint 471.45

750 mm dia C.I/ D.I-S/S pipes and specials Each Joint 588.30

800 mm dia C.I/ D.I-S/S pipes and specials Each Joint 759.72

900 mm dia C.I/ D.I-S/S pipes and specials Each Joint 997.40

NOTE: For depth between Percentage

excess allowed

over basic rate

2m to 4m 10%

4m to 6m 20%

8c Jointing the C.I/ D.I Double flanged pipes

and specials with rubber insertion to the

required specifications with M.S. bolts

and nuts, complete. (including cost of 

 jointing materials)

For depth upto 2m

For works above water level

80 mm dia C.I/ D.I Double flanged pipesand specials

Each Joint 84.95

100 mm dia C.I./D.I. Double flanged

pipes and specialsEach Joint 147.30

125 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 155.30

150 mm dia C.I./D.I. Double flanged

pipes and specialsEach Joint 254.95

200 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 280.15

250 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 401.10

300 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 442.20

350 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 576.45

400 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 865.95

Schedule Rate inItem No. Description Unit Rupees

Page 198: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 198/275

188

450 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 961.60

500 mm dia C.I/ D.I Double flanged

` pipes and specials Each Joint 1180.70

600 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 1615.10

700 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 1698.70

750 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 1739.95

800 mm dia C.I/ D.I Double flanged

pipes and specialsEach Joint 1783.75

900 mm dia C.I/ D.I Double flangedpipes and specials

Each Joint 2026.85

NOTE: For depth between Percentage

excess allowed

over basic rate

2m to 4m 10%

4m to 6m 15%

8d Jointing C.I/ D.I double flanged pipes and

specials with rubber insertion or anyequivalent to the required specificationswith M.S. bolts and nuts etc., completeincluding charges for special tools andplants such as air compressor and helmetsand sheet piles. etc (including cost of 

 jointing materials)

For depth upto 2m

For works below water level

80 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 179.20

100 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 266.90

125 mm dia C.I/ D.I Double flangedPipes and specials

Each Joint 297.50

150 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 425.00

200 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 490.00

250 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 669.40

Schedule Rate inItem No. Description Unit Rupees

Page 199: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 199/275

189

300 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 738.45

350 mm dia C.I/ D.I Double flanged

Pipes and specials Each Joint 915.10

400 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 1257.70

450 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 1399.95

500 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 1644.30

600 mm dia C.I/ D.I Double flanged

Pipes and specialsEach Joint 2315.00

NOTE: For depth between Percentage

excess allowed

over basic rate

2m to 4m 10%

4m to 6m 15%

8e Jointing the C.I/ D.I-S/S pipes and

specials with neat cement or cementmortar and spun yarn including caulkingthe joints, curing. (including cost of 

 jointing materials)

For depth upto 2m

80mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 65.00100mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 67.65

125mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 87.60

150mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 98.30

200mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 155.30

250mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 180.60

300mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 220.40

350mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 256.25

400mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 302.80

450mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 361.20

500mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 420.95

600mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 516.60

700mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 564.40

NOTE: For depth between Percentage

excess allowed

over basic rate

2m to 4m 10%

4m to 6m 15%

Schedule Rate inItem No. Description Unit Rupees

Page 200: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 200/275

190

9 Lowering RCC pipes and specials into

the trenches and laying to proper grade

and alignment

For depth upto 2m

150mm dia R.C.C. Pipes and Specials One metre 23.85

200mm dia R.C.C. Pipes and Specials One metre 25.10

250mm dia R.C.C. Pipes and Specials One metre 31.85

300mm dia R.C.C. Pipes and Specials One metre 37.15

350mm dia R.C.C. Pipes and Specials One metre 46.40

400mm dia R.C.C. Pipes and Specials One metre 50.40

450mm dia R.C.C. Pipes and Specials One metre 58.40

500mm dia R.C.C. Pipes and Specials One metre 67.65

600mm dia R.C.C. Pipes and Specials One metre 78.25700mm dia R.C.C. Pipes and Specials One metre 87.60

750mm dia R.C.C. Pipes and Specials One metre 91.55

800mm dia R.C.C. Pipes and Specials One metre 111.50

900mm dia R.C.C. Pipes and Specials One metre 131.40

1000mm dia R.C.C. Pipes and Specials One metre 151.40

1100mm dia R.C.C. Pipes and Specials One metre 176.55

1200mm dia R.C.C. Pipes and Specials One metre 196.55

1300mm dia R.C.C. Pipes and Specials One metre 216.40

NOTE: For depth between % excess

allowed

over basic rate

2m to 4m 10%

4m to 6m 15%

i) Each Collar joint is to be treated as one

 joint only

ii) For laying RCC pipes in sewage lines,

except pumping main, 5% more is allowed

10a Jointing RCC pipes with cement using

necessary collars including the cost of 

 jointing materials.

For depth upto 2m

150mm dia R.C.C. Pipes and Specials Each Joint 128.75

200mm dia R.C.C. Pipes and Specials Each Joint 157.95

250mm dia R.C.C. Pipes and Specials Each Joint 193.85

300mm dia R.C.C. Pipes and Specials Each Joint 217.80

350mm dia R.C.C. Pipes and Specials Each Joint 233.75

400mm dia R.C.C. Pipes and Specials Each Joint 252.30

Schedule Rate inItem No. Description Unit Rupees

Page 201: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 201/275

191

450mm dia R.C.C. Pipes and Specials Each Joint 296.10

500mm dia R.C.C. Pipes and Specials Each Joint 326.70

600mm dia R.C.C. Pipes and Specials Each Joint 389.05700mm dia R.C.C. Pipes and Specials Each Joint 452.85

750mm dia R.C.C. Pipes and Specials Each Joint 478.15

800mm dia R.C.C. Pipes and Specials Each Joint 496.75

900mm dia R.C.C. Pipes and Specials Each Joint 564.40

1000mm dia R.C.C. Pipes and Specials Each Joint 577.70

1100mm dia R.C.C. Pipes and Specials Each Joint 632.20

1200mm dia R.C.C. Pipes and Specials Each Joint 701.30

1300mm dia R.C.C. Pipes and Specials Each Joint 775.65

NOTE: For depth between % excess allowedover basic rate

2m to 4m 10%

4m to 6m 15%

Each collar joint is to be treated as

one joint only.

10b Jointing RCC pipes with lead and hemp

yarn using steel collars including thecost of jointing materials and caulking

the joints.

For depth upto 2m150mm dia R.C.C. Pipes Each steel collar 136.70

200mm dia R.C.C. Pipes Each steel collar 171.25

250mm dia R.C.C. Pipes Each steel collar 203.10

300mm dia R.C.C. Pipes Each steel collar 235.00

350mm dia R.C.C. Pipes Each steel collar 266.90

400mm dia R.C.C. Pipes Each steel collar 277.50

450mm dia R.C.C. Pipes Each steel collar 347.95

500mm dia R.C.C. Pipes Each steel collar 389.05

600mm dia R.C.C. Pipes Each steel collar 464.85

700mm dia R.C.C. Pipes Each steel collar 555.15

800mm dia R.C.C. Pipes Each steel collar 638.95

NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 10%

4m to 6m 15%

Schedule Rate inItem No. Description Unit Rupees

Page 202: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 202/275

192

11a Lowering AC/ GRP pipes and specials

into the trench carefully, laying toproper grade and alignment, jointing of 

A.C/ GRP pipes with simplex joints withrubber rings or with C.I. detachable

 joints or with M.S. couplers.

For depth upto 2m

80mm dia AC/ GRP Pipes One metre 11.85

100mm dia AC/ GRP Pipes One metre 15.90

125mm dia AC/ GRP Pipes One metre 23.85

150mm dia AC/ GRP Pipes One metre 26.55

200mm dia AC/ GRP Pipes One metre 35.75

250mm dia AC/ GRP Pipes One metre 43.70

300mm dia AC/ GRP Pipes One metre 55.75

350mm dia AC/ GRP Pipes One metre 62.30

400mm dia AC/ GRP Pipes One metre 71.70

450mm dia AC/ GRP Pipes One metre 83.60

500mm dia AC/ GRP Pipes One metre 99.55

600mm dia AC/ GRP Pipes One metre 119.50

700mm dia AC/ GRP Pipes One metre 147.35

NOTE: For depth between % excess allowed

over basic rate

2m to 4m 15%

4m to 6m 30%

11b Lowering PVC rigid/ HDPE pipes and

specials to trench and laying to propergrade and alignment, jointing with PVC

couplers with cement paste.

For depth upto 2m

Upto 40mm dia (OD) PVC/ HDPE pipe One metre 4.65

50mm to 75mm dia (OD) PVC/ HDPE pipe One metre 7.90

90mm to 110mm dia (OD) PVC/ HDPE pipe One metre 7.90

125mm to 160mm dia (OD) PVC/ HDPE pipe One metre 11.10

180mm to 250mm dia (OD) PVC/ HDPE pipe One metre 14.25

Over 250mm to 315mm dia (OD)

PVC/ HDPE pipe One metre 20.70

NOTE: For depth between Percentage

excess allowed

over basic rate

2m to 4m 15%

4m to 6m 30%

Schedule Rate inItem No. Description Unit Rupees

Page 203: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 203/275

193

11c Lowering PSC/ BWSC pipes and specials

into the trench and laying to propergrade and alignment and Jointing with

rubber gasketsFor depth upto 2m

Upto 350mm diameter One metre 62.30

400mm diameter One metre 72.95

450mm diameter One metre 84.95

500mm diameter One metre 99.55

600mm diameter One metre 120.75

700mm diameter One metre 135.45

800mm diameter One metre 147.35

900mm diameter One metre 160.65

1000mm diameter One metre 175.25

1100mm diameter One metre 188.60

1200mm diameter One metre 217.80

1300mm diameter One metre 241.70

1400mm diameter One metre 277.50

1500mm diameter One metre 308.10

NOTE: For depth between Percentage

excess allowed

over basic rate

2m to 4m 15%

4m to 6m 30%

11d Lowering CI collars with flange into the

trench and laying to proper grade andalignment and jointing PSC pipes with2 Nos of conical rubber rings and MSbolts and nuts excluding the cost of 

 jointing materials.

For depth upto 2m

Upto 350mm diameter Each collar 662.70

400mm diameter Each collar 775.65

450mm diameter Each collar 888.50

500mm diameter Each collar 1000.00

600mm diameter Each collar 1219.30

700mm diameter Each collar 1551.35

800mm diameter Each collar 1666.85

900mm diameter Each collar 1888.75

1000mm diameter Each collar 2218.15

1100mm diameter Each collar 2442.55

Schedule Rate inItem No. Description Unit Rupees

Page 204: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 204/275

194

1200mm diameter Each collar 2776.00

1300mm diameter Each collar 3113.35

NOTE: For depth between % excess allowedover basic rate

2m to 4m 15%

4m to 6m 30%

11e Testing of M.S. / C.I. / D.I / P.V.C. /

H.D.P.E / pipes with hydraulic testingequipment by filling with water (includingcost of water @ Rs. 60/KL) and testingto recommended pressure in convenientstetches and attending the bursts if any occured during the test, excludingthe cost of pipes, including otherincidential and operational charges etc.,complete for the following diametres of 

pipes.

Up to 100mm One metre 34.00

125mm One metre 40.00

150mm One metre 45.00

200mm One metre 55.00

250mm One metre 69.00

300mm One metre 84.00

350mm One metre 99.00

400mm One metre 115.00

450mm One metre 132.00

500mm One metre 161.00

600mm One metre 192.00

700mm One metre 244.00

750mm One metre 285.00

900mm One metre 329.00

1050mm One metre 424.00

1200mm One metre 533.00

12a Cutting C.I. Pipes true to axis and

filing smoothly and finishing the ends

complete

80mm dia CI pipes Each cutting 23.85

100mm dia CI pipes Each cutting 26.55

125mm dia CI pipes Each cutting 33.10

150mm dia CI pipes Each cutting 37.15

175mm dia CI pipes Each cutting 43.70

200mm dia CI pipes Each cutting 59.65

Schedule Rate inItem No. Description Unit Rupees

Page 205: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 205/275

195

Schedule Rate inItem No. Description Unit Rupees

250mm dia CI pipes Each cutting 75.60

300mm dia CI pipes Each cutting 84.95

350mm dia CI pipes Each cutting 107.50

375mm dia CI pipes Each cutting 132.80

400mm dia CI pipes Each cutting 139.35

450mm dia CI pipes Each cutting 149.95

500mm dia CI pipes Each cutting 165.90

525mm dia CI pipes Each cutting 200.45

600mm dia CI pipes Each cutting 204.55

675mm dia CI pipes Each cutting 244.35

700mm dia CI pipes Each cutting 257.65

750mm dia CI pipes Each cutting 265.65

800mm dia CI pipes Each cutting 278.90825mm dia CI pipes Each cutting 304.10

850mm dia CI pipes Each cutting 318.75

` 900mm dia CI pipes Each cutting 326.70

12b Cutting A.C. Pipes true to axis and

finishing the ends complete

80mm dia AC pipes Each cutting 9.15

100mm dia AC pipes Each cutting 10.60

125mm dia AC pipes Each cutting 11.85

150mm dia AC pipes Each cutting 14.50

200mm dia AC pipes Each cutting 19.85250mm dia AC pipes Each cutting 31.85

300mm dia AC pipes Each cutting 33.10

350mm dia AC pipes Each cutting 39.80

400mm dia AC pipes Each cutting 49.00

450mm dia AC pipes Each cutting 55.75

500mm dia AC pipes Each cutting 63.75

600mm dia AC pipes Each cutting 72.95

700mm dia AC pipes Each cutting 80.95

12c Cutting P.V.C. rigid pipes and specials true

to axis and finishing the ends complete

Upto 75mm dia (OD) PVC pipe Each cutting 3.10

90mm dia PVC pipes Each cutting 4.65

110mm dia PVC pipes Each cutting 4.65

125mm dia PVC pipes Each cutting 4.65

140mm dia PVC pipes Each cutting 4.65

160mm dia PVC pipes Each cutting 7.90

180mm dia PVC pipes Each cutting 9.45

Page 206: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 206/275

196

Schedule Rate inItem No. Description Unit Rupees

200mm dia PVC pipes Each cutting 9.45

250mm dia PVC pipes Each cutting 11.10

315mm dia PVC pipes Each cutting 12.65

12d. Cutting and Threading of GI pipes

a.i 15mm dia GI pipe, Cutting Each 3.95

ii. 15mm dia GI pipe, Threading Each 5.55

b.i 20mm dia GI pipe, Cutting Each 3.95

ii. 20mm dia GI pipe, Threading Each 5.75

c.i 25mm dia GI pipe, Cutting Each 4.80

ii. 25mm dia GI pipe, Threading Each 11.60

d.i 32mm dia GI pipe, Cutting Each 5.75

ii 32mm dia GI pipe, Threading Each 15.65

e.i 40mm dia GI pipe, Cutting Each 7.65ii 40mm dia GI pipe, Threading Each 17.60

f.i 50mm dia GI pipe, Cutting Each 9.75

ii. 50mm dia GI pipe, Threading Each 19.60

g.i 65mm dia GI pipe, Cutting Each 10.60

ii 65mm dia GI pipe, Threading Each 23.55

h.i 80mm dia GI pipe, Cutting Each 13.75

ii. 80mm dia GI pipe, Threading Each 29.65

i.i 100mm dia GI pipe, Cutting Each 19.60

ii. 100mm dia GI pipe, Threading Each 39.25

 j.i. 125mm dia GI pipe, Cutting Each 21.10 j.ii. 125mm dia GI pipe, Threading Each 42.35

13 Cutting R.C.C. Pipes true to axis and

finishing the ends complete

150mm dia R.C.C. Pipes Each cutting 33.10

200mm dia R.C.C. Pipes Each cutting 37.15

250mm dia R.C.C. Pipes Each cutting 47.80

300mm dia R.C.C. Pipes Each cutting 62.30

350mm dia R.C.C. Pipes Each cutting 65.00

400mm dia R.C.C. Pipes Each cutting 83.50

450mm dia R.C.C. Pipes Each cutting 91.55500mm dia R.C.C. Pipes Each cutting 102.20

600mm dia R.C.C. Pipes Each cutting 114.15

650mm dia R.C.C. Pipes Each cutting 119.50

700mm dia R.C.C. Pipes Each cutting 131.40

750mm dia R.C.C. Pipes Each cutting 135.45

800mm dia R.C.C. Pipes Each cutting 148.70

900mm dia R.C.C. Pipes Each cutting 157.95

1000mm dia R.C.C. Pipes Each cutting 170.00

Page 207: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 207/275

197

1100mm dia R.C.C. Pipes Each cutting 181.85

1200mm dia R.C.C. Pipes Each cutting 195.15

1300mm dia R.C.C. Pipes Each cutting 203.10

14a Removing the burst C.I. pipes from the

pipe line and removal of slushy soiland bailing out water and replacingthe pipeline with sound pipe including

 jointing and cost of refilling the pipelinewith water for retesting the pipe line etccomplete. (excluding cost of sound pipeand jointing materials and earth work)and as directed by the TWAD Board

Officers.

For depth upto 2m

80mm dia C.I. Pipes Each 615.00100mm dia C.I. Pipes Each 771.65

125mm dia C.I. Pipes Each 1008.00

150mm dia C.I. Pipes Each 1271.00

200mm dia C.I. Pipes Each 1773.10

250mm dia C.I. Pipes Each 2437.25

300mm dia C.I. Pipes Each 3101.35

350mm dia C.I. Pipes Each 3511.85

400mm dia C.I. Pipes Each 4486.75

450mm dia C.I. Pipes Each 4887.95

500mm dia C.I. Pipes Each 5484.25

600mm dia C.I. Pipes Each 6710.25

700mm dia C.I. Pipes Each 7325.20

750mm dia C.I. Pipes Each 8406.40

800mm dia C.I. Pipes Each 9494.30

825mm dia C.I. Pipes Each 11259.45

900mm dia C.I. Pipes Each 13736.75

NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 15%

4m to 6m 30%14b Removing the burst A.C. Pipes from the

pipe line and removal of slushy soil andbailing out water and replacing the pipeline with sound pipe including jointingand cost of refilling the pipe line withwater for retesting the pipe line etccomplete (excluding cost of sound pipeand jointing materials and earth work)and as directed by the TWAD Board

Officers

Schedule Rate inItem No. Description Unit Rupees

Page 208: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 208/275

198

For depth upto 2m

80mm dia AC. Pipes Each 355.95

100mm dia AC. Pipes Each 420.95

125mm dia AC. Pipes Each 529.85

150mm dia AC. Pipes Each 678.60

200mm dia AC. Pipes Each 952.25

250mm dia AC. Pipes Each 1217.90

300mm dia AC. Pipes Each 1516.80

350mm dia AC. Pipes Each 1665.60

375mm dia AC. Pipes Each 1874.00

400mm dia AC. Pipes Each 1984.40

450mm dia AC. Pipes Each 2026..85

500mm dia AC. Pipes Each 2226.10

600mm dia AC. Pipes Each 2591.30700mm dia AC. Pipes Each 3191.70

NOTE: For depth between % excess allowed

over basic rate

2m to 4m 15%

4m to 6m 30%

14c Removing the burst P.V.C. Pipes from the

pipe line and removal of slushy soil andbailing out water and replacing the pipeline with sound pipe including jointing andcost of refilling the pipe line with water

for retesting the pipe line etc., complete(excluding cost of sound pipe and jointing

materials and earth work) and as directed

by the TWAD Board Officers

Upto 63mm dia (OD) PVC Pipes Each 181.85

75mm dia (OD) PVC Pipes Each 228.40

90mm dia (OD) PVC Pipes Each 304.10

110mm dia (OD) PVC Pipes Each 369.20

125mm dia (OD) PVC Pipes Each 438.30

140mm dia to 160mm dia (OD) PVC Pipes Each 540.60

180mm dia to 200mm dia (OD) PVC Pipes Each 828.30

250mm dia to 280mm dia (OD) PVC Pipes Each 1009.45315mm dia (OD) PVC Pipes Each 1124.90

NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 15%4m to 6m 30%

14d Removing the burst R.C.C. pipes from thepipe line and removal of slushy soil and

Schedule Rate inItem No. Description Unit Rupees

Page 209: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 209/275

199

bailing out water and replacing the pipeline with sound pipe including jointing andcost of refilling the pipe line with water

for retesting the pipe line etc., complete.(excluding cost of sound pipe and jointingmaterials and earth work) and as directedby the TWAD Board OfficersFor depth upto 2m

150mm dia RCC Pipes Each 988.15

200mm dia RCC Pipes Each 1389.30

250mm dia RCC Pipes Each 1726.70

300mm dia RCC Pipes Each 2050.75

350mm dia RCC Pipes Each 2428.00

375mm dia RCC Pipes Each 2884.90

400mm dia RCC Pipes Each 3106.65450mm dia RCC Pipes Each 3473.30

500mm dia RCC Pipes Each 3865.15

525mm dia RCC Pipes Each 4399.10

600mm dia RCC Pipes Each 4518.65

650mm dia RCC Pipes Each 5042.00

700mm dia RCC Pipes Each 5142.90

800mm dia RCC Pipes Each 5675.50

900mm dia RCC Pipes Each 6269.30

1000mm dia RCC Pipes Each 6853.75

1100mm dia RCC Pipes Each 7467.40

1200mm dia RCC Pipes Each 8059.80

1300mm dia RCC Pipes Each 8455.60

NOTE: For depth between Percentageexcess allowedover basic rate

2m to 4m 15%4m to 6m 30%For sewerline works (Except pumpingmain) 5% extra over the above ratemay be adopted.

14e Charges for fixing MS Stepped split upcollar in position in the spigot and socketends of the PSC pipe carefully andcaulking the sides of the collar usinghemp yarn cement and hard crete andpouring the cement slurry mixed with useof hard crete in the stepped collarincluding cost of materials etc. complete

but excluding cost of stepped collar as

directed by the TWAD Board Officers

Schedule Rate inItem No. Description Unit Rupees

Page 210: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 210/275

200

Upto 1500mm dia PSC pipes Each 6501.70

Upto 1000mm dia PSC pipes Each 5197.30Upto 800mm dia PSC pipes Each 3031.00

Upto 700mm dia PSC pipes Each 2992.40Upto 600mm dia PSC pipes Each 2956.60Upto 500mm dia PSC pipes Each 2864.95

Note: For lighting arrangements during night

works due to emergency actual expenditure

incurred based on need for lighting may

be given extra as certified by the Executive

Engineer incharge of work at site

14f Charges for lowering, positioning and

fixing MS steps collars in AC pipe line

carefully and caulking the sides of collar

using hemp yarn, cement and hard creteinto the stepped collar including cost of 

 jointing materials such as cement, yarn,

bolt and nuts, MS washers, RI sheet

and hard crete etc. but excluding cost

of step collar and as directed by TWAD

Officers.

For 500mm dia AC pipe Each 2166.25

For 600mm dia AC pipe Each 2381.40

For 700mm dia AC pipe Each 2708.20

i) For removing the burst pipe in the

maintenance works when burst occursand replacing it with sound pipes

including the cost of refilling the trench

and the removal of slushy soil etc.,

Complete (Pipes and special jointing

materials will be supplied with in 200m

lead and at the respective TWAD Board

divisional stores free of cost). 2 times

ordinary rate allowed for the works are

during day time since the works are done

in confined reaches.

ii) If the works are done in odd hours (i.e)

8.00 P.M. to 8.00 A.M. of the next day,

3 times of ordinary rate is allowed

since the works are done in the

confined reaches.

 Slow Sand / Rapid Sand Filter Works

15 a.i) Labour for filling with broken stone of all

s izes wel l washed and c leaned, to be One cubic metre 70.30

free from impurities, including stacking

and laying in bed

Schedule Rate inItem No. Description Unit Rupees

Page 211: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 211/275

201

ii) Labour for filling the coarse sand passing

through a sieve of 10 meshes to 2.5cmand retained in 20 meshes to 2.5cm well One cubic metre 132.80

washed and cleaned to be free from

impurities including stacking

iii) Labour for filling with fine sand passing

through a sieve of ten meshes to2.5cm and retained in a sieve of 40 One cubic metre 11.60meshes to 2.5 cm well washed andcleaned to be free from impuritiesincluding stacking

15 b Labour for scraping and removing siltonly from the surface and sides of thefilter basin carrying the same to a One cubic metre 13.10

distance not exceeding 200 metres15c Labour for removing dirty sand in layer

of 25 mm uniform thickness from theslow sand filter, conveying, dropping thesand in a hopper with a lift of notexceeding 3 metres within a distance One square metre 15.85of 30 metres and delivering the washedsand in filter bed including removal and

carrying the dirt from collecting chamber

to a distance of upto 200 meters.

DRAINAGE WORKS

16 Laying and jointing with cement mortarstoneware pipes and specials in dry

condition and testing with water

100mm diameter stoneware pipes One metre

150mm diameter stoneware pipes One metre

200mm diameter stoneware pipes One metre

225mm diameter stoneware pipes One metre

250mm diameter stoneware pipes One metre

300mm diameter stoneware pipes One metre

375mm diameter stoneware pipes One metre

450mm diameter stoneware pipes One metreNOTE : The rates to be worked out vide

standard data appended as Item 17

Schedule Rate inItem No. Description Unit Rupees

Page 212: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 212/275

202

   D   A   T   A   I   L   L   U   S   T   R   A   T   I   O   N   (   R   A   T   E   S   F   O   R   I   T   E   M   N  o .   1

   6   )   I   T   E   M   N  o .   1

   7 .

   L   A   Y   I   N   G   A   N   D   J   O   I   N   T   I   N   G   S   T   O   N   E   W   A   R   E   P   I   P   E   S   F   O   R   O   N   E   R   U   N   N

   I   N   G   M   E   T   R   E

   (   O  n   l  y   f  o  r   i   l   l  u  s   t  r  a

   t   i  o  n  p  u  r  p  o  s  e  a  s  s  u  m   i  n  g   C  o  n  v  e  y  a  n  c  e  c   h  a  r  g  e  s   f  o  r   2   0   K   M   f  o  r   C  e  m  e  n   t

   &   S  a  n   d  a  n   d   8   K   M   f  o  r   S   t  o  n  e  w  a  r  e  p

   i  p  e  s   )

  L  e  n  g  t  h  o  f  e  a  c  h  p i  p  e i  n  c   m

   W  e i  g  h  t  o  f  S .   W  p i  p  e  s  f  o  r  3  0   m  (  A  s  p  e  r  H  a  n  d  B  o  o  k  o  f  P  H  E  )

   Q  u  a  n  t i  t  y  o  f  c  e   m  e  n  t i  n  K  g  f  o  r  5  0 j  o i  n  t  s

   L  a   b  o  u  r   f  o  r   L  a  y   i  n  g

  a  n   d   j  o   i  n   t   i  n  g

  T  o  t  a l  c  o  s  t  o  f   m  a  t  e  r i  a l  a  n  d  c  o  s  t  o  f  L  a  b  o  u  r  f  o  r  3  0   m  t  s .  (  T  o  t  a l  N  o .

  o  f  C  o l  u   m  n  1  0   &  1  5  )  (   R  s .  P  )

  C  o  n  v  e  y  a  n  c  e  o  f  p i  p  e  s  f  r  o   m  s  t  o  c  k  y  a  r  d  t  o  s i  t  e  o  f   w  o  r  k

  C  o  s  t  o  f  L  a  b  o  u  r  f  o  r  a l  e  n  g  t  h  o  f  3  0   m  o  f  S   W  p i  p  e  s  (  T  o  t  a l  N  o .  o  f  c  o l  u   m  n  1  1 ,  1  2 ,  1  3   &  1  4  )  (   R  s .  P .  )

  A   m  o  u  n  t

  N  o  s .

  A   m  o  u  n  t

  A   m  o  u  n  t

  A   m  o  u  n  t

  T  o  t  a l  c  o  s  t  o  f   m  a  t  e  r i  a l  s  (  T  o  t  a l  o  f  c  o l  u   m  n  s  5 ,  7 ,   &  9  )

  N  o  s .

  N  o  s .

  N  o  s .

   M  a  s  o  n  I

  C l  a  s  s

  F i  t  t  e  r  I  I  C l  a  s  s

   M  a  z  d  o  o  r  C  a  t  e  g  o  r  y  I

   M  a  z  d  o  o  r  C  a  t  e  g  o  r  y  I  I

  C  o  s  t  o  f  c  e   m  e  n  t  r  e  q  u i  r  e  d  f  o  r  5  0 j  o i  n  t  s  (   R  s .  )

  (  5  6  0  0  -  2  0   +  1  0  0 .  8  0  =  5  6  8  0 .  8  0  )

   Q  u  a  n  t i  t  y  o  f  s  a  n  d i  n  c  u  b i  c   m  e  t  r  e  s  f  o  r  5  0   m  o  r  t  a  r j  o i  n  t  s

  C  o  s  t  o  f  s  a  n  d  r  e  q  u i  r  e  d  f  o  r  5  0   m  o  r  t  a  r j  o i  n  t  s  a  t   R  s .  P  e  r  c  u   m  (  1  7  6 .  4  0   +  1  6  1 .  3  0  =  3  3  7 .  7  0  )

   Q  u  a  n  t i  t  y  o  f  s  p  u  n  o  f   t  a  r  r  e  d  y  a  r  n i  n  K  g

  C  o  s  t  o  f  y  a  r  n  a  t    R  s .  1  2 .  0  0  /  K  g

  T  o  t  a l  c  o  s  t  o  f l  a  y i  n  g  a  n  d j  o i  n  t i  n  g  S   W  p i  p  e  s   w i  t  h  C   M  a  n  d  p  a  c  k i  n  g

   w i  t  h  s  p  u  n  o  r  t  a  r  r  e  d  y  a  r  n  e  t  c .  c  o   m  p l  e  t  e  f  o  r  3  0   m l  e  n  g  t  h  (   R  s .  P  )

  T  e  s  t i  n  g  c  h  a  r  g  e  s i  n  c l  u  d i  n  g  c  o  n  v  e  y  a  n  c  e  o  f   w  a  t  e  r  t  o  o l  s  a  n  d

  p l  a  n  t  s  e  t  c .  (   R  s .  )

   D i  a   m  e  t  e  r  ( i  n   m   m  )

  T  o  t  a l  c  o  s  t  o  f l  a  y i  n  g  4 j  o i  n  t  s  s  t  o  n  e   w  a  r  e  p i  p  e  s  c  o   m  p l  e  t  e  f  o  r

  1   m  e  t  r  e  (   R  s .  P  )

   1

   2

   3

   4

   5

   6

   7

   8

   9

   1   0

   1   1

   1   2

   1   3

   1   4

   1   5

   1   6

   1   7

   1   8

   1   9

   2   0

   1   0   0

   6   0

   4   3   5

   4   5

   2   5   5 .

   6   4

   0 .

   0   4

   1   3 .

   5   1

   3 .

   6   3

   4   5 .

   7   4

   3   1   4 .

   8   9

   2

   8   2   0

   1

   3   3   1

   5

   1   2   8   5

   2

   4   6   4

   2   9   0   0

   3   2   1   4 .

   8   9

   2   1   6 .

   3   3

   1   8   9 .

   2   0

   3   6   2   0 .

   4   2

   1   2   0 .

   6   8

   1   5   0

   6   0

   7   5   0

   6   8

   3   8   6 .

   2   9

   0 .

   0   7

   2   3 .

   6   4

   5 .

   4   5

   6   8 .

   6   7

   4   7   8 .

   6   0

   3

   1   2   3   0

   2

   6   6   2

   6

   1   5   4   2

   3

   6   9   6

   4   1   3   0

   4   6   0   8 .

   6   0

   3   7   2 .

   9   8

   2   5   6 .

   3   0

   5   2   3   7 .

   8   8

   1   7   4 .

   6   0

   2   0   0

   6   0

   1   0   4   3

   9   8

   5   5   6 .

   7   2

   0 .

   0   8

   2   7 .

   0   2

   6 .

   9   0

   8   6 .

   9   4

   6   7   0 .

   6   8

   4

   1   6   4   0

   2

   6   6   2

   6

   1   5   4   2

   3

   6   9   6

   4   5   4   0

   5   2   1   0 .

   6   8

   5   1   8 .

   6   8

   2   5   8 .

   5   0

   5   9   8   7 .

   8   6

   1   9   9 .

   6   0

   2   2   5

   6   0

   1   1   8   5

   1   0   4

   5   9   0 .

   8   0

   0 .

   1   0

   3   3 .

   7   7

   8 .

   1   7

   1   0   2 .

   9   4

   7   2   7 .

   5   1

   5

   2   0   5   0

   3

   9   9   3

   7

   1   7   9   9

   5

   1   1

   6   0

   6   0   0   2

   6   7   2   9 .

   5   1

   7   0   3 .

   3   0

   2   9   9 .

   2   0

   7   7   3   2 .

   0   1

   2   5   7 .

   7   3

   2   5   0

   6   0

   1   3   7   5

   1   1   5

   6   5   3 .

   2   9

   0 .

   1   1

   3   7 .

   1   5

   8 .

   3   5

   1   0   5 .

   2   1

   7   9   5 .

   6   5

   5

   2   0   5   0

   3

   9   9   3

   7

   1   7   9   9

   5

   1   1

   6   0

   6   0   0   2

   6   7   9   7 .

   6   5

   8   1   6 .

   0   6

   3   0   9 .

   1   0

   7   9   2   2 .

   8   1

   2   6   4 .

   0   9

   3   0   0

   6   0

   2   1   8   0

   1   5   0

   8   5   2 .

   1   2

   0 .

   1   5

   5   0 .

   6   6

   1   1 .

   3   4

   1   4   2 .

   8   8

   1   0   4   5 .

   6   6

   6

   2   4   6   0

   3

   9   9   3

   1   2

   3   0   8   4

   6

   1   3

   9   2

   7   9   2   9

   8   9   7   4 .

   6   6

   1   2   9   3 .

   8   3

   3   9   3 .

   8   0

   1   0   6   6   2 .

   2   9

   3   5   5 .

   4   1

   3   7   5

   6   0

   2   4   2   5

   3   1   8

   1   8   0   6 .

   4   9

   0 .

   2   8

   9   4 .

   5   6

   1   8 .

   1   4

   2   2   8 .

   5   6

   2   1   2   9 .

   6   1

   7

   2   8   7   0

   3

   9   9   3

   1   4

   3   5   9   8

   7

   1   6

   2   4

   9   0   8   5

   1   1   2   1   4 .

   6   1

   1   4   3   9 .

   2   4

   4   4   2 .

   2   0

   1   3   0   9   6 .

   0   5

   4   3   6 .

   5   4

   4   5   0

   6   0

   -

   4   5   4

   2   5   7   9 .

   0   8

   0 .

   3   4

   1   1   4 .

   8   2

   2   7 .

   2   2

   3   4   2 .

   9   7

   3   0   3   6 .

   8   7

   8

   3   2   8   0

   3

   9   9   3

   1   6

   4   1   1   2

   8

   1   8

   5   6

   1   0   2   4   1

   1   3   2   7   7 .

   8   7

  -

  -

  -

   N  o   t  e  :

   1 .

   F  o  r  o   t   h  e  r   d   i  a  m  e   t  r  e

  o   f  p   i  p  e  s  n  o  w

  m  a  n  u   f  a  c   t  u  r  e   d ,

   t   h  e  r  a

   t  e  s  w   i   l   l   b  e   f   i  x  e   d   i  n   d  u  e  c  o  u  r  s  e  a   f   t  e

  r  o   b  s  e  r  v   i  n  g   d  a   t  a .

   2 .

   T   h  e  r  a   t  e  s  a  r  r   i  v  e   d  a   t  a   d  o  p   t   i  n  g   t   h  e   d  a   t  a  a  p  p  e  n   d  e   d   t  o   t   h   i  s

  s  c   h  e   d  u   l  e  o   f   R  a   t  e  s   i  s   f  o  r  w  o  r   k  s   d  o  n  e   i  n   t   h  e   f   i  r  s   t   2 .   0

   0  m

   d  e  p   t   h  e  x   t  r  a  p  e  r  c  e  n   t  a  g  e   5   %    f  o

  r   2  m

   t  o   2 .   5  m ,

   7 .   5

   0   %    f  o

  r   2 .   5

   0  m

   t  o   3  m ,

   1   0   % 

   f  o  r   3  m

   t  o   3 .   5   0  m ,

   1   5   % 

   f  o  r   3 .   5

   0  m

   t  o   4  m

  a  n   d   2   0   %

    f  o  r  a   b  o  v  e   4  m

   d  e  p   t   h

  o  v  e  r   b  a  s   i  c  r

  a   t  e  s  a  r  e  a   l   l  o  w  e   d .

   3 .

   T   h  e  a   b  o  v  e   d  a   t  a   d  o  e  s  n  o   t   i  n  c   l  u   d  e   b  a   l   i  n  g  c   h  a  r  g  e  s ,   b  a   l   i  n  g

  c   h  a  r  g  e  s   t  o   b  e  a   d   d  e   d  a  s  e  x   t  r  a  a  s  p  e  r  r  a   t  e  s  g   i  v  e  n   i  n   t   h  e  r  e   l  e  v  a  n   t   P   W   D

   S  c   h  e   d  u   l  e  o   f   R  a   t  e  s

  o  r  a  s  p  e  r  a  c   t  u  a   l  s .

   4 .

   T   h  e  c  o  n  v  e  y  a  n  c  e  c   h  a  r  g  e  s  a   d  o  p   t  e   d   f  o  r   C  e  m  e  n   t ,   S  a  n   d

   &   P   i  p  e  s  a  r  e  o  n   l  y   f  o  r   i   l   l  u  s   t  r  a   t   i  o  n  p  u  r  p  o  s  e .

   T   h  e  a  v  e  r  a  g  e   l  e  a   d   f  o  r  r  e  s  p

  e  c   t   i  v  e   d   i  s   t  r   i  c   t  s ,  a  s

  a  p  p  r  o  v  e   d   b  y   t   h  e   C   h   i  e   f   E  n  g   i  n  e  e  r  s   h  a   l   l   b  e  a   d  o  p   t  e   d   f  o  r   C

  e  m  e  n   t   &   S  a  n   d .

   T   h  e   l  e  a   d   f  o  r   P   i  p  e  s   h

  a   l   l   b  e  a   d  o  p   t  e   d ,  a  s  c  e  r   t   i   f   i  e   d   b  y   t   h  e  r  e  s  p  e  c   t   i  v  e   A  s  s   i  s   t  a  n   t

   E  x  e  c  u   t   i  v  e   E  n  g   i  n  e  e  r .

Page 213: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 213/275

RATES FOR CONVEYANCE OF

MATERIALS

Page 214: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 214/275

Page 215: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 215/275

205

CONVEYANCE

1) Rates for Conveyance of C.I/G.I/D.I. Pipes and Specials

For every 1 KM or part thereof Rate per Tonne in Rupees

up to 500 mm Above 500 mm

Beyond 8 KM to 25 KM 10.80 12.15

Above 25 KM to 50 KM 7.85 9.20

Above 50 KM to 80 KM 6.85 8.20

Above 80 KM to 125 KM 5.15 6.80

Above 125 KM to 200 KM 5.15 5.15

Above 200 KM 3.40 3.40

Note: 1) For lorry and cart consignments of capacity one Tonne and below, double therates may be allowed, when the total quantity to be transported is within1.00 M.T.

2) For Lorry consignments from 1 to 2 Tonnes, the rates admissible for two Tonnesmay be allowed, when the total quantity to be transported is within 2 M.T.3) For Lorry Consignments from 2 to 5 Tonnes, the rates admissible for 5 Tonnes

may be allowed, when the total quantity to be transported is within 5 M.T.4) Above 5 Tonnes of Lorry consignment, full lorry load rate of 9 Tonnes may be

allowed.5) For the conveyance of E.R.W.M.S. seamless pipes and specials up to 350mm dia,

the rates of C.I. Pipes of respective dia available in the Schedule of rates may beadopted.

6) An extra rate of Rs.27.20 per Tonne may be allowed for unloading from Railwaywagons and stacking before loading into carts and lorries.

Up to 125 mm 218.55 143.60 143.60 139.55 645.30

Over 125 mm up to200 mm

299.40 192.00 192.00 149.05 832.45

Over 200 mm up to350 mm

367.40 254.00 254.00 151.75 1027.15

Over 350 mm up to500 mm

459.60 300.85 300.85 170.75 1232.05

Over 500 mm up to700 mm

554.85 347.75 347.75 188.30 1438.65

Above 700mm 624.40 414.25 414.25 203.25 1656.15

Unloadingfrom

Railway

wagons orloading

intoRailwaywagons/

Tonne

2

Rs. P.

Loadinginto cartsor lorries/

Tonne

3

Rs. P.

Unloadingfrom cartsor lorries & 

stacking/Tonne

4

Rs. P.

Transportcharges upto 8km or

partthereof/

Tonne

5

Rs. P.

Total/Tonne

6

Rs. P.

Size

1

Page 216: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 216/275

206

2) Rates for Conveyance of M.S. Pipes and Specials

For every 1 KM or part thereof Rate per Tonne in Rupees

up to 500 mm Above 500 mm

Beyond 8 KM to 25 KM 24.35 27.05

Above 25 KM to 50 KM 17.45 21.00

Above 50 KM to 80 KM 15.05 18.90

Above 80 KM to 125 KM 11.85 15.10

Above 125 KM to 200 KM 11.85 11.85

Above 200 KM 8.40 8.40

Note : 1) For lorry and cart consignments of capacity one Tonne and below double therates may be allowed, when the total quantity to be transported is within1.00 M.T.

2) For Lorry consignments from 1 to 2 Tonnes the rates admissible for twoTonnes may be allowed, when the total quantity to be transported is within

2 M.T.

3) For Lorry Consignments from 2 to 5 Tonnes the rates admissible for 5 Tonnesmay be allowed, when the total quantity to be transported is within 5 M.T.

4) Above 5 Tonnes of Lorry consignment, full lorry load rate of 9 Tonnes may beallowed.

5) An extra rate of Rs.27.20 per Tonne may be allowed for unloading fromRailway wagons and stacking before loading into carts and lorries.

Up to 350 mm 825.50 571.50 571.50 346.90 2315.40

Over 350 mm up to500 mm

1037.20 677.35 677.35 384.85 2776.75

Over 500 mm up to700 mm

1251.85 777.10 777.10 425.50 3231.55

Above 700mm 1406.10 937.40 937.40 460.70 3741.60

Unloadingfrom

Railway

wagons orloading

intoRailwaywagons/

Tonne

2

Rs. P.

Loadinginto cartsor lorries/

Tonne

3

Rs. P.

Unloadingfrom cartsor lorries & 

stacking/Tonne

4

Rs. P.

Transportcharges upto 8km or

partthereof/

Tonne

5

Rs. P.

Total/Tonne

6

Rs. P.

Size

1

Page 217: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 217/275

207

3) Rates for Conveyance of R.C.C. /P.S.C/B.W.S.C. Pipes and Specials

Unloadingfrom

Railway

wagons orloading

intoRailwaywagons/

Tonne

2

Rs. P.

Loadinginto cartsor lorries/

Tonne

3

Rs. P.

Unloadingfrom cartsor lorries & 

stacking/Tonne

4

Rs. P.

Transportcharges upto 8km or

partthereof/

Tonne

5

Rs. P.

Total/Tonne

6

Rs. P.

Size

1

For every 1 KM or part thereof Rate per Tonne in Rupees

up to 500 mm Above 500 mm

Beyond 8 KM to 25 KM 9.25 12.40

Above 25 KM to 50 KM 6.25 9.40

Above 50 KM to 80 KM 5.20 8.55

Above 80 KM to 125 KM 5.20 6.80

Above 125 KM to 200 KM 5.20 5.20

Above 200 KM 3.45 3.45

Note : 1) For lorry and cart consignments of capacity 1 Tonne and below, double the rates

may be allowed, when the total quantity to be transported is within 1 M.T.

2) For Lorry consignments up to 5 MT (i.e.) above 1 MT Load, the rates admissiblefor 5 Tonnes may be allowed.

150 mm to 200 mm 169.30 130.00 130.00 159.85 589.15

Over 200 mm up to

350 mm210.10 166.30‘ 166.30 168.00 710.70

Over 350 mm up to

500 mm263.05 205.60 205.60 174.80 849.05

Over 500 mm up to

700 mm328.05 241.90 241.90 197.80 1009.65

Above 700mm 356.80 269.10 269.10 214.10 1109.10

Page 218: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 218/275

208

4) Rates for Conveyance of A.C. Pipes and Specials

For every 1 KM or part thereof Rate per Tonne in Rupees

up to 500 mm Above 500 mm

Beyond 8 KM to 25 KM 18.65 21.75

Above 25 KM to 50 KM 11.00 12.60

Above 50 KM to 80 KM 10.25 11.95

Above 80 KM to 125 KM 8.50 10.25

Above 125 KM to 200 KM 6.80 8.50

Above 200 KM 5.20 6.80

Note : 1) For lorry and cart consignments of capacity one Tonne and below double the ratesmay be allowed, when the total quantity to be transported is within 1 M.T.

2) For Lorry consignments from 1 to 2 Tonnes the rates admissible for two Tonnes maybe allowed, when the total quantity to be transported is within 2 M.T.3) For Lorry Consignments from 2 to 5 Tonnes the rates admissible for 5 Tonnes may

be allowed, when the total quantity to be transported is within 5 M.T.4) Above 5 Tonnes of Lorry consignment, full lorry load rate of 9 Tonnes may be

allowed.5) For the conveyance of E.R.W.M.S. seamless pipes and specials up to 350mm dia,

the rates of C.I. Pipes of respective dia available in the Schedule of Rates may beadopted.

6) An extra rate of Rs.27.20 / Tonne may be allowed for unloading from Railwaywagons and stacking before loading into carts and lorries.

Up to 125 mm 111.85 99.75 99.75 243.90 555.25

Over 125 mm up to

200 mm152.65 105.80 105.80 256.10 620.35

Over 200 mm up to

250 mm173.85 130.00 130.00 291.35 725.20

For 300 mm 187.45 136.05 136.05 299.45 759.00

For 350 mm 187.45 151.20 151.20 303.55 793.40

For 400 mm 195.00 167.80 167.80 323.90 854.50

For 450 mm 216.15 187.45 187.45 342.85 933.90

For 500 mm 229.80 207.10 207.10 353.65 997.65

For 600 mm 252.45 237.35 237.35 379.40 1106.55

For 700 mm 263.05 243.40 243.40 380.80 1130.65

Unloadingfrom

Railway

wagons orloading

intoRailwaywagons/

Tonne

2

Rs. P.

Loadinginto cartsor lorries/

Tonne

3

Rs. P.

Unloadingfrom cartsor lorries & 

stacking/Tonne

4

Rs. P.

Transportcharges upto 8km or

partthereof/

Tonne

5

Rs. P.

Total/Tonne

6

Rs. P.

Size

1

Page 219: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 219/275

209

5) Rates for Conveyance of PVC/ HDPE /GRP Pipes and Specials

For every 1 KM or part thereof Rate per Tonne in Rupees

Beyond 8 KM to 25 KM 35.10

Above 25 KM to 50 KM 23.45

Above 50 KM to 80 KM 20.55

Above 80 KM to 125 KM 15.35

Above 125 KM to 200 KM 11.90

Above 200 KM 8.50

Note: 1) For departmentally loading of PVC pipes and Rs.2.60 each length (6 m)Specials (excluding transport charges)Up to 110 mm dia

2) For departmentally unloading of PVC pipes and Rs.2.60 each length (6 m)Specials Up to 110 mm dia

3) a. For departmentally loading for Rs.144.95 per 1 MTremaining sizes of pipes

b. For departmentally unloading for Rs.144.95 per 1 MT

remaining sizes of pipes4) An extra rate of Rs.28.70/ Tonne may be allowed for unloading from Railway

wagons and stacking before loading into carts and lorries.

5) For lorry and cart consignments of capacity one Tonne and below double therates may be allowed, when the total quantity to be transported is within 1 M.T.

6) For Lorry consignments from 1 to 2 Tonnes the rates admissible for two Tonnesmay be allowed, when the total quantity to be transported is within 2 M.T.

7) For Lorry Consignments from 2 to 5 Tonnes the rates admissible for 5 Tonnes maybe allowed, when the total quantity to be transported is within 5 M.T.

50mm to 110mm OD 145.10 127.00 127.00 406.55 805.65

125mm to200mm OD 187.45 128.45 128.45 409.20 853.55

Over 200mm to

315mm OD 190.50 169.30 169.30 440.40 969.50

Over 315mm OD 193.50 173.80 173.80 478.35 1019.45

Unloadingfrom

Railwaywagons or

loadinginto

Railwaywagons/

Tonne

2

Rs. P.

Loadinginto cartsor lorries/

Tonne

3

Rs. P.

Unloadingfrom cartsor lorries & stacking/

Tonne

4

Rs. P.

Transportcharges upto 8km or

partthereof/

Tonne

5

Rs. P.

Total/Tonne

6

Rs. P.

Size

1

Page 220: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 220/275

210

6) Rates for Conveyance of SW Pipes and Specials

100 to 200 mm 210.10 137.55 137.55 222.20 707.40

Over 200 to 350 mm 266.10 176.85 176.85 239.80 859.60

Over 350 mm to

500 mm 334.10 213.15 213.15 260.15 1020.55

For every 1 KM or part thereof Rate per Tonne in Rupees

Beyond 8 KM to 25 KM 15.50

Above 25 KM to 50 KM 9.40

Above 50 KM to 80 KM 10.30

Above 80 KM to 125 KM 6.80

Above 125 KM to 200 KM 5.20Above 200 KM 3.45

Note: 1) For lorry and cart consignments of capacity one Tonne and below doublethe rates may be allowed, when the total quantity to be transported is within1 M.T.

2) An extra rate of Rs.28.70 / Tonne may be allowed for unloading from Railwaywagons and stacking before loading into carts and lorries.

Unloadingfrom

Railwaywagons or

loadinginto

Railwaywagons/

Tonne

2

Rs. P.

Loadinginto cartsor lorries/

Tonne

3

Rs. P.

Unloadingfrom cartsor lorries & stacking/

Tonne

4

Rs. P.

Transportcharges upto 8km or

partthereof/

Tonne

5

Rs. P.

Total/Tonne

6

Rs. P.

Size

1

Page 221: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 221/275

211

 7) Rates for Conveyance of Pig lead and Yarn

Pig lead / Yarn 72.50 61.95 61.95 81.30 277.70

For every 1 KM or part thereof Rate per Tonne in Rupees

Beyond 8 KM to 25 KM 9.25

Above 25 KM to 50 KM 7.85

Above 50 KM to 80 KM 6.85

Above 80 KM to 125 KM 5.20

Above 125 KM to 200 KM 5.20

Above 200 KM 3.45

Unloadingfrom

Railwaywagons or

loadinginto

Railwaywagons/

Tonne

2

Rs. P.

Loadinginto cartsor lorries/

Tonne

3

Rs. P.

Unloadingfrom cartsor lorries & stacking/

Tonne

4

Rs. P.

Transportcharges upto 8km or

partthereof/

Tonne

5

Rs. P.

Total/Tonne

6

Rs. P.

Size

1

Page 222: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 222/275

212

8 a) Rates for Conveyance of Materials by Road in Hills

Rate in Rupees

   S   l .   N  o .

   D   i  s   t  a  n  c  e   i  n   K   i   l  o  m  e   t

  r  e

   C  e  m  e  n   t  a  n   d   S   t  e  e

   l

   (   O  n  e  m  e   t  r   i  c   t  o  n  n  e

   )

   L   i  m  e  s   t  o  n  e ,   L  a   t  e  r   i   t  e ,   B  r   i  c   k   j  e   l   l  y ,

   W  o  o   d  w  o  r   k ,   P  o  n   d   A  s   h   (  w

  e   t   /   d  r  y   )

 ,  s   t  o  n  e   d  u  s   t

   (   O  n  e   C  u   b   i  c   M  e   t  r  e

   )

   R  o  u  g   h   S   t  o  n  e ,   B  o  n   d   S   t  o  n  e ,   C  u   t

   S   t  o  n  e ,   B  r  o   k  e  n   S   t  o  n  e   j  e   l   l  y ,   S  a  n   d ,

   G  r  a  v  e   l ,   S  u  r   k   i ,   E  a  r   t   h ,   C  r

  u  s   h  e   d

  s   t  o  n  e  s  a  n   d

   (   O  n  e   C  u   b   i  c   M  e   t  r  e

   )

   T   h   i  r   d   C   l  a  s  s   C  o  u  n   t  r  y   B

  r   i  c   k  s

   (   K   i   l  n   B  u  r  n   t   )

   (   1   0   0   0  n  o  s .   )

   B  r   i  c   k  s   I   I  c   l  a  s  s   C   h  a  m   b  e  r   b  u  r  n   t

   B  r   i  c   k  s   (   T  a   b   l  e   M  o  u   l   d  e   d   /   G

  r  o  u  n   d

   M  o  u   l   d  e   d   ) ,   F   l  y   A  s   h   B  r

   i  c   k  s

   (   1   0   0   0   N  o  s .   )

1 2 3 4 5 6 7 8

1 Co- efficient 1.00 1.10 1.60 1.35 1.80 2.25

2 Add for every extra 1 Km and part thereof……………

a 0 to 10 kms 10.86 11.94 17.38 14.66 19.54 24.44

b 10 to 20 kms 9.30 10.24 14.88 12.56 16.74 20.92

c 20 to 40 kms 8.00 8.80 12.80 10.80 14.40 18.00

d 40 to 80 kms 6.90 7.60 12.00 9.30 12.40 15.52

e Above 80 kms 6.30 6.94 10.08 8.50 11.34 14.18

   M  a  n  g  a   l  o  r  e   T   i   l  e  s   (   1   0   0   0   N  o  s .   )

   M  a  c   h   i  n  e   P  r  e  s  s  e   d   T   i   l  e  s   (   2   0   0   0   N  o  s .   )

   H  y   d  r  a  u   l   i  c  a   l   l  y  p  r  e  s  s  e   d   M

  o  s  a   i  c

   F   l  o  o  r   i  n  g   T   i   l  e  s   (   1   5   0   0   N

  o  s .   )

Note 1 The above rates do not include stacking charges [as per Circular Memo

No.230Wks.IV(2)/62-3 dated 16.06.1962 of Chief Engineer (General)]

2 For Conveyance of Materials on cart track, allow 20% extra over the aboverates excluding loading and unloading charges.

3 For Sandy and Slushy soil tracks, add 50% extra over the above ratesexcluding loading and unloading charges.

4 The quantity for Payment towards conveyance of earth in coloumn (5) is forthe pit measured quantity at the site of excavation only.

5 For conveyance of laterite, broken stone jelly, etc., through lorries, the ratesprovided are for the volume with voids.

6 For all materails which finds place in column 3,4,5,6,7 & 8 above, necessaryincidental charges, loading charges and unloading charges have been includedalready under their basic cost furnished below the head “Rates of Materials” itself. Hence, no separate incidental charges, loading and unloading chargesshall be allowed for the above materials.

Page 223: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 223/275

213

8 b) Rates for Conveyance of Materials by Road in plains

Rate in Rupees

1 2 3 4 5 6 7 8

1 Co efficient 1.00 1.10 1.60 1.35 1.80 2.25

2 Add for every extra 1Km and part there of 

a 0 to 10 kms 5.43 5.97 8.69 7.33 9.77 12.22

b 10 to 20 kms 4.65 5.12 7.44 6.28 8.37 10.46

c 20 to 40 kms 4.00 4.40 6.40 5.40 7.20 9.00

d 40 to 80 kms 3.45 3.80 6.00 4.65 6.20 7.76

e Above 80kms 3.15 3.47 5.04 4.25 5.67 7.09

3 Loading Charges 80.40 38.40 26.30 37.75 37.75 37.75

4 UnLoading Charges 80.40 38.40 26.30 37.75 37.75 37.755 Add above extra for

inter state works16.00 17.60 25.60 21.55 28.75 36.00

Note 1 The above rates do not include stacking charges [as per Circular Memo

No.230Wks.IV(2)/62-3 dated 16.6.1962 of Chief Engineer (General)]

2 For Conveyance of Materials on cart track, allow 20% extra over the above

rates excluding loading and unloading charges.

3 For Sandy and Slushy soil tracks, add 50% extra over the above rates

excluding loading and unloading charges.

4 The quantity for Payment towards conveyance of earth in coloumn (5) is forthe pit measured quantity at the site of excavation only.

5 For conveyance of Lateriate, Broken stone jelly, etc. through lorries, the

rates provided are for the volume with voids.

6 For all materails which finds place in coloumn 3,4,5,6,7 & 8 above, necessary

incidental charges, loading charges and unloading charges have been included

already under their basic cost furnished below the head “Rates of materials” 

itself. Hence, no separate incidental charges, loading and unloading charges

shall be allowed for the above materials.

   S   l .   N  o .

   D   i  s   t  a  n  c  e   i  n   K   i   l  o  m  e   t

  r  e

   C  e  m  e  n   t  a  n   d   S   t  e  e

   l

   (   O  n  e  m  e   t  r   i  c   t  o  n  n  e

   )

   L   i  m  e  s   t  o  n  e ,   L  a   t  e  r   i   t  e ,   B  r   i  c   k   j  e   l   l  y ,

   W  o  o   d  w  o  r   k ,   P  o  n   d   A  s   h   (  w

  e   t   /   d  r  y   )

 ,  s   t  o  n  e   d  u  s   t

   (   O  n  e   C  u   b   i  c   M  e   t  r  e

   )

   R  o  u  g   h   S   t  o  n  e ,   B  o  n   d   S   t  o  n  e ,   C  u   t

   S   t  o  n  e ,   B  r  o   k  e  n   S   t  o  n  e   j  e   l   l  y ,   S  a  n   d ,

   G  r  a  v  e   l ,   S  u  r   k   i ,   E  a  r   t   h ,   C  r

  u  s   h  e   d

  s   t  o  n  e  s  a  n   d

   (   O  n  e   C  u   b   i  c   M  e   t  r  e

   )

   T   h   i  r   d   C   l  a  s  s   C  o  u  n   t  r  y   B

  r   i  c   k  s

   (   K   i   l  n   B  u  r  n   t   )

   (   1   0   0   0  n  o  s .   )

   B  r   i  c   k  s   I   I  c   l  a  s  s   C   h  a  m   b  e  r   b  u  r  n   t

   B  r   i  c   k  s   (   T  a   b   l  e   M  o  u   l   d  e   d   /   G

  r  o  u  n   d

   M  o  u   l   d  e   d   ) ,   F   l  y   A  s   h   B  r

   i  c   k  s

   (   1   0   0   0   N  o  s .   )

   M  a  n  g  a   l  o  r  e   T   i   l  e  s   (   1   0   0   0   N  o  s .   )

   M  a  c   h   i  n  e   P  r  e  s  s  e   d   T   i   l  e  s   (   2   0   0   0   N  o  s .   )

   H  y   d  r  a  u   l   i  c  a   l   l  y  p  r  e  s  s  e   d   M

  o  s  a   i  c

   F   l  o  o  r   i  n  g   T   i   l  e  s   (   1   5   0   0   N

  o  s .   )

Page 224: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 224/275

214

9) Rates for Conveyance of materials by Head load

Rate in Rupees

LEAD LIFT

Above Add extra Add extra

10m and for every for everySl.No Description of material Unit upto additional 1m height

100m 100m or or partpart thereof  

thereof for morethan

2m lift

1 2 3 4 5 6

1 Rough Stone, Broken Stone Jelly,

Cut Stone, RCC Slab, Sand -cu.m 55.40 23.05 6.05

Cement Block, Wooden Scantling,

Wooden plank2 Lime, Lime Stone, Laterite,

Brick Jelly, Earth, Sand,Gravel,cu.m 29.50 23.05 4.50

Surki, Pond Ash (wet/dry),

Crushed Stone Sand, Stone Dust

3 a) Mangalore Tiles 1000 Nos. 60.00 30.20 7.65

b) Machine Pressed Tiles 2000 Nos. 60.00 30.20 7.65

c) Hydraulic Pressed Mosaic

Flooring Tiles1500 Nos. 60.00 30.20 7.65

d) Terrace Bricks, Flat Tilesand Pan Tiles

2500 Nos. 60.00 30.20 7.65

e) Bricks 1000 Nos. 60.00 30.20 7.65

4 Cement, A.C. Sheet, Bitumen,

Asphalt, TarM.T 55.40 30.20 6.05

5 Steel M.T 92.50 36.95 7.65

Note:

1 Fraction of 100 metres to be rounded off to the nearest 100 metres

2 The rates indicated in the table shall be applicable only to inaccessible places(i.e) the places Wherever the Bullock- Carts cannot move [Chief Engineer (General)Memo No.CTO(A) / 38153 / 89 / dated 03.02.1989]

3 For an initial lead of 10m and initial lift of 2m, no charge towards head load isallowable.

Page 225: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 225/275

RATES FOR MISCELLANEOUS

ITEMS

Page 226: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 226/275

Page 227: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 227/275

217

MISCELLANEOUS

Schedule Rates inItem No.

Description Unit Rupees

PLUMBING

1. A Laying of G.I. Pipes and specials to proper line

and level including jointing but excluding cost

of pipes and jointing materials for plumbing

works for providing water supply and sanitary

works in the premises of the building

6 mm to 32 mm dia One metre 9.55

40 mm to 50 mm dia One metre 9.55

65 mm to 150 mm dia One metre 12.75

b Bore cap using M.S. Flat of size 1 cm x 3 mm

and M.S. sheet on top with bolting

arrangements for securing the cap in position

(Bore caps with M.S. Couplings need not be

made)

5" Casing Pipes Each 292.20

6" Casing Pipes Each 309.65

8 “ Casing Pipes Each 340.40

2 Labour for cutting open road for laying water

mains or sewer.

a. B.T. Roads (or) Maccadam road One cu.m 390.00

b. Concrete Roads One cu.m 546.30

3 Labour for drilling, cutting, Threading and

Fixing Ferrules in distribution pipes.

10 mm dia Each 40.85

15 mm dia Each 51.10

20mm dia Each 64.20

25 mm dia Each 75.90

4 Labour charges for Painting TWAD Board

Emblem in accordance with the size and

specifications as approved by the Board on

the Service Reservoirs including cost of all

consumables, one coat of base paint,

scaffolding charges including painting NRDWP

Logo on the Service Reservoirs. Sqm 1432.45

5 Drilling holes in C.I/G.I. Dummy Flanges.

12 mm dia Each 14.35

15 mm dia Each 28.80

20 mm dia Each 41.70

22 mm dia Each 56.15

25 mm dia Each 70.55

Page 228: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 228/275

218

6 Labour for refilling with sand the socket hollows

of pipes including conveyance and stacking One cu.m 14.35

NOTE : 1) For depth between Percentage

excessallowed

over basic

rate

2 m to 4 m 15%

4 m to 6 m 30%

7 Lifting and positioning of C.I / G.I Pipes in

vertical direction for service reservoir pipe

connection

0 to 2 m Qtl 121.15

2 to 4 m Qtl 182.504 to 6 m Qtl 286.25

6 m to 8 m Qtl 395.90

8 m to 10 m Qtl 505.45

10 m to 12 m Qtl 613.60

12 m to 14 m Qtl 726.10

14 m to 16 m Qtl 827.10

16 m to 18 m Qtl 936.45

18 m to 20 m Qtl 1046.00

20 m to 22 m Qtl 1152.80

22 m to 24 m Qtl 1260.80

DRILLING WORKS

Using Hand Bore set

Drilling of borewells of size 4" to 5" dia. in

8a Sedimentary formation using hand boresets

including insertion of casing pipes and removal

of casing pipes etc., including supplying and One metre 457.20

packing of pebbles and conveyance of hand

Boreset including loading and unloading

b Drilling of borewells of size 6" to 8" dia. in

sedimentary formation using hand boreset

including insertion of casing pipe etc., and One metre 537.60supplying and packing of pebbles

(Conveyance of hand bore set including loading

and unloading to be done by the contractor)

c Using Hand Bore set

(For Investigation purpose)

I Drilling of borewells of size 4" to 5" dia. in

sedimentary formation using hand boresets

including insertion of casing pipes and removal

Schedule Rates inItem No.

Description Unit Rupees

Page 229: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 229/275

219

of casing pipes etc., including collection of One metre 340.40

samples as directed by the TWAD Board

Officers.

ii Drilling of borewells of size 6" to 8" dia. insedimentary formation using hand boresets

including insertion of casing pipes and removal One metre 398.85

of casing pipes etc., including collection of 

samples as directed by the TWAD Board Officers.

Using Calyx Drill

d Drilling of 4 1/2" diameter borewell by using

Calyx Drill including transporting charges and

insertion of casing pipes (excluding cost of 

casing pipe)

i. For Hilly terrain area One metre 1711.00ii. For Plain area One metre 1414.00

e Drilling 4 1/2" dia meter bores by using In-Well

rig in Hilly areasOne metre 720.00

f Reaming from 6" Pilot bore to 12" size bore as

directed by the TWAD Board OfficersOne metre 188.00

g Labour charges for inserting casing pipes

assembly (With slot or without slot) in the

drilled hole including welding the joint etc.,

complete and supplying and packing the One metre 180.00

annular space with pebbles of size and qualityas approved by the Executive Engineer

9 a Driving sheet piles for one metre length of 

gallery each side in sandy soil

i. First depth of 2 m One metre 355.00

ii Second depth of 2 m One metre 542.00

iii Third depth of 2 m One metre 1018.00

b Removing sheet piles from one metre length of 

gallery on each side including stacking the

sheet piles properly

i. First depth of 2 m One metre 55.30ii Second depth of 2m One metre 84.50

iii Third depth of 2 m One metre 122.70

10 Drilling of borwell inside well 115mm dia.

a) Vertical One metre 393.00

b) Horizontal One metre 431.00

11 Drilling of borewell inside well 150mm dia.

a) Vertical One metre 492.00

b) Horizontal One metre 520.00

Schedule Rates inItem No.

Description Unit Rupees

Page 230: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 230/275

220

12 Drilling of Borewells anywhere in Tamilnadu

including transportation from one place to

another with in Tamilnadu in alluvial soil

sedimentary strata of clay and sand stone P.S. toshale pebbles boulders etc. By first taking a M.D.S.S.

pilot bore of 140 mm/150mm dia and then Special

enlarging to required dia direct or reverse Specifications

rotary mud circulation method using rotary rigs,

fuel, labour and drilling bentonite and water

required for drilling at site ( Site will be shown

by the TWAD Board Officers) including

construction of mud pit.

a. Drilling of 140/150 mm pilot bore

i. Upto 60 m Depth ending below ground level One metre 822.00

ii From 60 m upto 90 m Depth ending from

ground level One metre 890.00

iii From 90 m upto 120 m Depth ending from

ground level One metre 944.00

iv From 120 m upto 150 m Depth ending from

ground level One metre 994.00

v From 150 m upto 180 m Depth ending from

ground level One metre 1009.00

vi From 180 m upto 210 m Depth ending from

ground level One metre 1042.00

vii From 210 m upto 240 m Depth ending fromground level One metre 1072.00

viii From 240 m upto 270 m Depth ending from

ground level One metre 1109.00

ix From 270 m upto 300 m Depth ending from

ground level One metre 1134.00

x From 300 m upto 330 m Depth ending from

ground level One metre 1161.00

xi From 330 m upto 360 m Depth ending from

ground level One metre 1185.00

12 b Reaming 140/150 mm dia pilot bore to

300mm dia bore as directed by the TWADBoard Officer.

i. Upto 60 m depth ending below ground level One metre 206.00

ii From 60 m depth and upto 90 m depth ending

below ground level One metre 219.00

iii From 90 m upto 120 m depth ending below

ground level One metre 234.00

iv From 120 m upto 150 m depth ending below

ground level One metre 237.00

Schedule Rates inItem No.

Description Unit Rupees

Page 231: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 231/275

221

v From 150 m upto 180 m depth ending below

ground level One metre 248.00

vi From 180 m upto 210 m depth ending below

ground level One metre 261.00vii From 210 m upto 240 m depth ending below

ground level One metre 273.00

viii From 240 m upto 270 m depth ending below

ground level One metre 283.00

ix From 270 m upto 300 m depth ending below

ground level One metre 298.00

x From 300 m upto 330 m depth ending below

ground level One metre 310.00

xi From 330 m upto 360 m depth ending below

ground level One metre 321.0012 c Reaming 200 mm dia pilot bore to 350mm dia

bore as directed by the TWAD Board Officer.

i. Upto 60 m depth ending below ground level One metre 232.00

ii From 60 m depth and upto 90 m depth ending

below ground level One metre 245.00

iii From 90 m upto 120 m depth ending below

ground level One metre 261.00

iv From 120 m upto 150 m depth ending below

ground level One metre 269.00

v From 150 m upto 180 m depth ending belowground level One metre 278.00

vi From 180 m upto 210 m depth ending below

ground level One metre 299.00

vii From 210 m upto 240 m depth ending below

ground level One metre 342.00

viii From 240 m upto 270 m depth ending below

ground level One metre 351.00

ix From 270 m upto 300 m depth ending below

ground level One metre 359.00

x From 300 m upto 330 m depth ending belowground level One metre 371.00

xi From 330 m upto 360 m depth ending below

ground level One metre 380.00

12 d Reaming 300 mm dia pilot bore to 400mm/

450mm dia bore as directed by the

TWAD Board Officer.

i. Upto 60 m depth ending below ground level One metre 318.00

Schedule Rates inItem No.

Description Unit Rupees

Page 232: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 232/275

222

ii From 60 m depth and upto 90 m depth ending

below ground level One metre 356.00

iii From 90 m upto 120 m depth ending below

ground level One metre 380.00

iv From 120 m upto 150 m depth ending below

ground level One metre 403.00

v From 150 m upto 180 m depth ending below

ground level One metre 419.00

vi From 180 m upto 210 m depth ending below

ground level One metre 431.00

vii From 210 m upto 240 m depth ending below

ground level One metre 441.00

viii From 240 m upto 270 m depth ending below

ground level One metre 462.00

ix From 270 m upto 300 m depth ending below

ground level One metre 479.00

x From 300 m upto 330 m depth ending below

ground level One metre 503.00

xi From 330 m upto 360 m depth ending below

ground level One metre 520.00

12 e Labour Charges for inserting 150 mm/200mm/

250 mm dia (M.S. Casing pipes assembly with

slots or with out slots) in the drilled holeincluding welding the joints etc., complete and

supplying and packing the annular space with

pebbles of size and quality as approved by the

Executive Engineers of TWAD Board.

i. 150 mm dia Casing Pipes assembly One metre 185.40

ii 200 mm dia Casing Pipes assembly One metre 185.40

iii 250 mm dia Casing Pipes assembly One metre 188.50

13 a Labour Charges for inserting PVC Casing pipes

assembly (with slots or without slots) in the

drilled hole including jointing the pipes with PVC

Couplers with Cement paste etc., complete,

supply and packing the annular space with

pebbles of size and quality as approved by

the executive engineers of TWAD Board

i. 150 mm dia Casing Pipes assembly One metre 179.60

ii 200 mm dia Casing Pipes assembly One metre 185.40

iii 250 mm dia Casing Pipes assembly One metre 185.40

Schedule Rates inItem No.

Description Unit Rupees

Page 233: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 233/275

223

13 b Charges for developing the Borewell with air

compressor of 600 CFM capacity (Minimum

8 Hours) including transportation, labour and One hour 1211.20

fuel charges for compressor as directed byTWAD Officers and conducting yield test by

 ‘V’ notch method.

Note : I) 150 mm dia bore, reaming should be

done upto 300mm dia.

II) 200 mm dia bore, reaming should be done

upto 300mm dia and thereafter 400,450 etc.

14 Drilling of borewell anywhere in Tamilnadu

including transportation from one place to

another place within Tamilnadu in alluvial soil

or sedimentary strata of clay and sand or sand,stone, shale, pebbles, boulders etc., by first

taking a pilot bore of 140 mm/150mm dia and

then enlarging to required dia by direct or

reverse rotatry mud and circulation method

using Contractor’s rig, fuel, labour, drilling,

betonite mud and water required for drilling at

the site shown by the TWAD Officers including

construction of mud pit only Calyx drills are to

be used.

a. Drilling 140 / 150 mm dia Pilot Bore upto 60 mdepth ending below ground level.

One metre 599.00

b. Reaming from 140/150 mm dia pilot bore to

300 mm dia bore as directed by the TWAD One metre 169.00

Board Officers upto 60 m Depth ending from

ground level

c. Labour charges for inserting 150 mm dia

M.S. Casing pipes assembly (With slots or

without slots) in the drilled hole including One metre 152.00

welding the joints and packing annular space

with pebbles of size and quality as approvedby the Executive Engineer / TWAD Board

d. Labour Charges for inserting PVC casing pipes

assembly (with slots or without slots) in the

drilled hole including the jointing the pipes with

PVC couplers with cement paste etc. complete

i. 140 mm OD PVC Casing Pipes Assembly One metre 130.00

ii 165 mm/168 mm dia PVC Casing pipes

Assembly One metre 152.00

Schedule Rates inItem No.

Description Unit Rupees

Page 234: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 234/275

224

e. Charges for developing the borewell with air

compressor of 300 CFM capacity (Minimum 8

Hours) including transportation labour and fuel

charges for compressor as directed by TWADBoard Officers and conducting yield test by

 ‘V’ notch method.

One hour 942.00

f. Drilling of 12" dia vertical borewell so as to

have a finished size of 6" dia borewell in boulder

area to any required depth as decided by the

TWAD Board Officers including Transportation

from one place to anothr place with in

Tamilnadu State by direct or reverse rotary

mud circulation method using Contractor’s rig

tools, fuel, labourers, bentonite mud and water

required for drilling at the site shown by the

TWAD Officers including construction of mud

pit etc. using only calyx rigs.

One metre 1153.00

15 a. Conveyance of Hand Pumps and its accessories

from divisional stores to site of works

i. Conveyance upto 10 Kms Each Hand 372.50

ii Conveyance 10 to 20 Kms Pump and its 467.50

ii Conveyance 20 to 40 Kms accessories 569.75

iv Conveyance above 40 Kms 660.30

Note : i) Conveyance of Filter Point, Handpump

with GI Pipes and its accessories from divisional

stores to site of works. 50% of the rate of 

conveyance of hand pumps, with its

accessories is applicable for this item for the

respective leads as indicated above

ii) If the Mark II hand pump is conveyed in

cart track even for part distance 20 % extra

over the above rate shall be adopted.

b i. Erection of deep well hand pumps upto 40 m Each 612.10

ii Above 40 m Each 698.25

c. Erection of shallow well hand pumps Each 270.15

d. Erection Extra deep well hand pumps Each 790.35e. Removal of deep well hand pumps from borewell

i. Up to 40 m Each 612.10

ii Above 40 m Each 771.35

f) Attending repairs to deep well handpumps for

borewells inclusive of removal of G.I. Pipes,

Plunger rods, Cylinder and re-erection of hand

pumps inclusive of lowering the GI Pipes

Plunger rods cylinder, jointing etc.

Schedule Rates inItem No.

Description Unit Rupees

Page 235: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 235/275

225

i. Upto 30 M Each 650.00

ii) Above 30 M Each 760.00

16 a Erection of filter point with G.I. Pipes of 

32 mm to 65 mm dia. Each 176.70

b Removing the chocked filter point with G.I.

Pipes of 32 mm to 65 mm dia and re-erectingin another place within 1.00 KM radius aftercleaning the filter points G.I. Pipes etc.,

Complete upto 8 m depth

Each 293.60

17a ERECTION OF POWER PUMPSET IN

BORE/OPENWELL

Labour Charges for erection of Horizontal shaft,

centrifugal pumpset (Coupled/Monoblock) in

bore well/Open well including fixing of suctionpipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the requiredlength with valves, pressure gauges upto theexterior wall of pump room and erection of panelboard consisting of TPIC switches starter,Voltmeter, Ammeter, Capacitor single phasingpreventor and laying and jointing the cablesand twin earthing as per IE rules includingproviding bed blocks etc., complete andoperating the pumps and trial run for 10 daysincluding signing of completion of reports as

required by EB authorities.

i. Upto 3 HP Each 3954.35

ii Above 3 HP upto 7.5 HP Each 5090.35

iii Above 7.5 HP to 20 HP Each 5964.45

17 b ERECTION OF POWER PUMPS IN BORE WELL

Erection of power pumps in borewell labour

charges for erection of twin packer duplex type jet pumps in borewells upto 150 mm diaincluding fixing of Suction pipe regulating valveswith jet assembly upto a maximum depth of 30m and delivery pipe valves pressure gauges

upto the exterior wall of pump room anderection of panel board consisting of TPICNswitches starter, Voltmeter, Ammeter, threeindicator lamps capacitor and laying and jointingthe cables and twin earthing as per IE rulesetc., complete and testing the pumps and trialrun for 10 days including signing of completionof reports as required by EB authorities andfinishing the pipe holes including the foundationbolts, nuts and earth pits.

Schedule Rates inItem No.

Description Unit Rupees

Page 236: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 236/275

226

i. Upto 3 HP Each 5290.20

ii Above 3 HP upto 7.5 HP Each 6180.75

iii Beyond 7.5 HP upto 20 HP Each 7067.55

Note : If depth of erection exceeds beyond30 m 10% increase over the basic rate is

allowed

17 c Labour charges for the erection of submersible

pumpset in borewell/openwell including fixing

and jointing submersible cable with proper

clamps upto the starter to required depth and

also fixing of riser pipes to the required depth

valves erection clamps, pressure gauges upto

the exterior wall of pump room and erection of 

panel board consisting of TPICN switches

starter, Voltmeter, Ammeter, three pilot(indicating) lamps capacitor single phasing

preventor, water level guard and laying and

 jointing the cables and twin earthing as per IE

rules etc., complete and testing the pumpset

and trial run for 10 days.

i. Upto 5 HP Each 5377.50

ii) Above 5.00 HP to 10.00 HP Each 6161.80

iii) Above 10.00 HP to 20.00 HP Each 6836.05

17 d Conveyance of power pumpset (centrifugal,

 jet and submersible) and its accessories from

divisional stores to site of works. Each Power

Conveyance upto 10 Kms Pump and its 810.85

Conveyance 10 to 20 Kms accessories 891.15

Conveyance 20 to 40 Kms -do- 1319.20

Conveyance 40 to 60 Kms -do- 1608.50

Conveyance 60 to 80 Kms -do- 2111.10

Conveyance above 80 Kms -do- 2420.90

Note : For item 17 (a), (b) and (c)

i. Removal of centrifugal pumpset/ jet pumps/

submersible pumpsets and its accessories from

borewell/ open well for attending repairs 50%of the rates mentioned under item 17 (a), (b)

and (c) may be allowed for the respective Horse

power.

ii Re-erection of centrifugal pumpsets, jet

pumpsets and its accessories into the borewell/

openwell after attending the repairs 50% of 

the rate mentioned under item 17 (a), (b) and

(c) may be allowed for respective Horse power.

Schedule Rates inItem No.

Description Unit Rupees

Page 237: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 237/275

227

18 Hire charges :

a Sheet piles (Larsen) Per Pile/

Perday 3.10

b Sheet piles (For dingham) Per Pile/

Per day 4.70

c Compartment sheet with Grills (3' - 0" Wide) Per sheet/

Per day 4.70

d Rate for flushing of borewell of 6" dia requiring

less than 4 hours operation using drill rods/hose with required size of pipes for variouscapacity compressor including transportation,labour, and fuel charges for compressors asdirected by the TWAD Officer and conducting

yield test by ‘V’ notch method if required.

i. 600 Cfm ( 100 /150 PSI)1 hour (or)

Part there of 1211.00

ii) 300/250 Cfm (100 PSI)1 hour (or)

Part there of 942.00

ii) 125 Cfm (100 PSI)1 hour (or)

Part there of 863.00

Note : Minimum charges for 8 (eight) hours will

be levied if the air compressor issued for otherdepartmental works or if the air compressor is

hired to other departments.

e Helmet Per day/8 hours 4.70

f Hand test pumpPer day/

8 hours 44.85

g Pile hammerPer day/

8 hours 4.70

h Concrete mixer 5 Cft. With driver Per day/

(Excluding cost of fuel) 8 hours 413.35

i. Concrete mixer 7 Cft. With driver Per day/

(Excluding cost of fuel) 8 hours 623.75

 j Hand operated winch Per day/8 hours 41.70

k Pile cap Per day/

8 hours 11.15

l Hire charges for diesel pumpset upto 3 HP with

fuel and crew charges including transportation Per hour 127.00

m Hire charges for diesel pumpset above 3 HP to

7.5 HP with fuel and crew charges including

transportation Per hour 176.70

Schedule Rates inItem No.

Description Unit Rupees

Page 238: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 238/275

228

19 a Labour for tying barbed wire fencing

horizontally through the holes in RCC posts One metre 4.70

with required tension.

b Labour for tying barbed wire fencing verticallywith required tension

One metre 4.70

20 Labour charges for putting bore holes of size

3" to 4" in river bed in sandy and other loose

soils using hand boring sets including the

cost of hire charges, conveyance charges of One metre 246.85

hand boring sets, collection of soil sample at

frequent intervals and as directed by

TWAD Board Officers.

21 Desilting light or sandysoil or silt from

infiltration wells below water level including

the charges for special T&P and air

compressor etc. complete.

One cu.m. 981.60

Schedule Rates inItem No.

Description Unit Rupees

Page 239: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 239/275

RATES FOR EARTH WORK

EXCAVATION FOR PIPE LAYING

WORKS

Page 240: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 240/275

Page 241: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 241/275

231

Schedule Rates inItem No.

Description Unit Rupees

EARTH WORK EXCAVATION FOR PIPE LAYING WORKS FOR WATER SUPPLY

1 Earth work excavation and depositing on bank

with initial lead of 10 m and lift of 2 M in narrow

trenches for laying of pipes for water supply in

the following type of soils as directed by

Departmental officers

a Sand, silt or other loose soil, wet sand or silt

not under water light black cotton soil, sandy One cubic

loam and ordinary soil. metre 77.00

b Hard stiff clay, stiff black cotton, hard red

earth, shales, murram gravel, stoney earth One cubic

and earth mixed with small size boulders and metre 115.00

hard gravelly soil.

Page 242: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 242/275

232

EARTH WORK EXCAVATION FOR SEWERAGE WORKS

Schedule Rates inItem No.

Description Unit Rupees

II Earthwork excavating and depositing on bankwith an initial lead of 10 meters and initial lift

of 2 metres in1 Sand, silt or other loose soil, wet sand or silt

not under water, light black cotton soil, sandyloam and ordinary soil including excavated earthSS 20 B

2 Slush and silt under water upto 0.75 metredepth requiring the aid of baskets and vesselsSS 20 B

3 Hard stiff clay, stiff black cotton, hard redearth, shales, murram, gravel, stoney earthand earth mixed with small size boulders SS

20B4 Soft disintegrated rock, laterite, soft rock or

kankar, not requiring blasting

5 In loose boulders in excavation of various sizes150mm to 625mm

6 Medium Rock and Dense Medium Rock notrequiring blasting

7 QUARRYING AND BLASTING

a Hard rock measured in solid including blastingand stacking

b Removing hard rock by wedging chiselling andtrimming to proper shape where blasting isprohibited.

c Medium rock and dense medium rock requiringblasting

d Extra for every additional 10 metres lead orpart thereof over the initial lead for blastedmaterials

e Extra for every additional 1 metre lift or partthereof over the initial lift of 2 m for blastedmaterials

f Benching hard rock upto an average 10cm depth

g Drilling holes in hard granite 32mm diameter

h Drilling holes in hard granite 40mm diameter

i Drilling holes in hard granite 45mm diameter

 j Drilling holes in hard granite 50mm diameter

k Drilling holes in hard granite 75mm diameter

Cu.m 30.80

Cu.m 38.50

Cu.m 46.00

Cu.m 68.50

Cu.m 108.50

Cu.m 120.75

Cu.m 326.00

Cu.m 653.00

Cu.m 167.00

Cu.m 4.00

Cu.m 4.15

Sq.m 315.00

RM 90.90

RM 105.90

RM 123.70

RM 147.35

RM 167.35

NOTE: Double the relevant rate will apply in excavation in all the soils and rock classificationsin respect of schedule item No. II only.

Page 243: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 243/275

RATES FOR EARTH WORK

EXCAVATION AND REFILLING FOR 

PIPELINE WORKS ON LINEAR 

MEASUREMENT BASIS

Page 244: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 244/275

Page 245: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 245/275

235

Cost of EWE 115.00Cost of refilling 16.15Cost of loose soil 77.00

CI/ DI/ 80 0.75 1.05 0.79 0.098 0.780 90.85 60.83 12.60

MS 100 0.75 1.05 0.79 0.118 0.777 90.85 60.83 12.55

125 0.75 1.05 0.79 0.144 0.771 90.85 60.83 12.45

150 0.75 1.05 0.79 0.170 0.765 90.85 60.83 12.35

200 0.80 1.10 0.88 0.222 0.841 101.20 67.76 13.58250 0.80 1.20 0.96 0.274 0.901 110.40 73.92 14.55

300 0.80 1.35 1.08 0.326 0.997 124.20 83.16 16.10

350 0.90 1.45 1.31 0.378 1.193 150.65 100.87 19.27

400 0.90 1.55 1.40 0.429 1.251 161.00 107.80 20.20

450 1.00 1.70 1.70 0.480 1.519 195.50 130.90 24.53

500 1.00 1.85 1.85 0.532 1.628 212.75 142.45 26.29

525 1.00 1.85 1.85 0.532 1.628 212.75 142.45 26.29

600 1.10 2.05 2.26 0.635 1.938 259.90 174.02 31.30

700 1.20 2.30 2.76 0.738 2.332 317.40 212.52 37.66

750 1.25 2.45 3.06 0.790 2.573 351.90 235.62 41.55

AC Cl 15 80 0.75 1.05 0.79 0.104 0.779 90.85 60.83 12.58

100 0.75 1.05 0.79 0.124 0.775 90.85 60.83 12.52125 0.75 1.05 0.79 0.151 0.770 90.85 60.83 12.44

150 0.75 1.05 0.79 0.178 0.763 90.85 60.83 12.32

200 0.80 1.10 0.88 0.235 0.837 101.20 67.76 13.52

250 0.80 1.20 0.96 0.286 0.896 110.40 73.92 14.47

300 0.80 1.35 1.08 0.340 0.989 124.20 83.16 15.97

350 0.90 1.45 1.31 0.396 1.162 150.65 100.87 18.77

400 0.90 1.55 1.40 0.452 1.235 161.00 107.80 19.95

450 1.00 1.70 1.70 0.502 1.502 195.50 130.90 24.26

500 1.00 1.85 1.85 0.559 1.605 212.75 142.45 25.92

600 1.10 2.05 2.26 0.658 1.915 259.90 174.02 30.93

AC Cl 10 80 0.75 1.05 0.79 0.104 0.779 90.85 60.83 12.58100 0.75 1.05 0.79 0.124 0.775 90.85 60.83 12.52

125 0.75 1.05 0.79 0.149 0.770 90.85 60.83 12.44

150 0.75 1.05 0.79 0.175 0.763 90.85 60.83 12.32

200 0.80 1.10 0.88 0.229 0.839 101.20 67.76 13.55

250 0.80 1.20 0.96 0.281 0.898 110.40 73.92 14.50

300 0.80 1.35 1.08 0.333 0.993 124.20 83.16 16.04

350 0.90 1.45 1.31 0.389 1.186 150.65 100.87 19.15

400 0.90 1.55 1.40 0.436 1.246 161.00 107.80 20.12

450 1.00 1.70 1.70 0.486 1.515 195.50 130.90 24.47

RATES FOR EARTH WORK EXCAVATION AND REFILLING FOR PIPE LINE WORKS ONLINEAR MEASUREMENT BASIS

Type

Pipesize in

mm

Widthin ‘m’ 

Depthin ‘m’ 

Earthwork

qty. incum/m

Outerdia of pipe in ‘m’ 

RefillingQty/

cum/m

Earthwork

rate forother

thanloosesoil/mRs.

Earthwork

rate forloose

soil/

Rs.

Refillingrate/m

Rs.

Page 246: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 246/275

236

500 1.00 1.85 1.85 0.541 1.620 212.75 142.45 26.16

600 1.10 2.05 2.26 0.648 1.925 259.90 174.02 31.09

PVC/ 40 0.60 1.05 0.63 0.040 0.629 72.45 48.51 10.16

HDPE/ 50 0.60 1.05 0.63 0.050 0.628 72.45 48.51 10.14

GRP 63 0.60 1.05 0.63 0.063 0.627 72.45 48.51 10.13

75 0.60 1.05 0.63 0.075 0.626 72.45 48.51 10.11

90 0.60 1.05 0.63 0.090 0.624 72.45 48.51 10.08

110 0.60 1.05 0.63 0.110 0.621 72.45 48.51 10.03

125 0.60 1.05 0.63 0.125 0.618 72.45 48.51 9.98

140 0.60 1.05 0.63 0.140 0.615 72.45 48.51 9.93160 0.60 1.05 0.63 0.160 0.610 72.45 48.51 9.85

180 0.75 1.05 0.79 0.180 0.760 90.85 60.83 12.27

200 0.80 1.10 0.88 0.200 0.850 101.20 67.76 13.73

PSC/ 350 0.90 1.45 1.31 0.464 1.136 150.65 100.87 18.35

BWSC 400 0.90 1.55 1.40 0.514 1.188 161.00 107.80 19.19

450 1.00 1.70 1.70 0.564 1.450 195.50 130.90 23.42

500 1.00 1.85 1.85 0.614 1.554 212.75 142.45 25.10

600 1.10 2.05 2.26 0.724 1.844 259.90 174.02 29.78

700 1.20 2.30 2.76 0.824 2.227 317.40 212.52 35.97

800 1.25 2.45 3.06 0.934 2.378 351.90 235.62 38.40

900 1.40 2.60 3.64 1.054 2.768 418.60 280.28 44.701000 1.70 2.60 4.42 1.150 3.381 508.30 340.34 54.60

1100 1.80 2.75 4.95 1.250 3.723 569.25 381.15 60.13

1200 1.90 3.00 5.70 1.350 4.269 655.50 438.90 68.94

GI 15 0.75 1.05 0.79 0.020 0.787 90.85 60.83 12.71

20 0.75 1.05 0.79 0.030 0.787 90.85 60.83 12.71

25 0.75 1.05 0.79 0.030 0.787 90.85 60.83 12.71

32 0.75 1.05 0.79 0.040 0.786 90.85 60.83 12.69

40 0.75 1.05 0.79 0.050 0.786 90.85 60.83 12.69

50 0.75 1.05 0.79 0.060 0.786 90.85 60.83 12.69

65 0.75 1.05 0.79 0.070 0.784 90.85 60.83 12.66

80 0.75 1.05 0.79 0.090 0.781 90.85 60.83 12.61

100 0.75 1.05 0.79 0.110 0.778 90.85 60.83 12.56

125 0.75 1.05 0.79 0.140 0.772 90.85 60.83 12.47

150 0.75 1.05 0.79 0.160 0.767 90.85 60.83 12.39

Note:Earth excavation in SDR, DMR,HR etc., the linear measurement rate may be workedout separately and to be approved by the SE concerned after verification of soil classificationsby putting proper trial pits at closer intervals”.( B.P.Ms.No.82 / COM Wing / dt.22.8.2008).

Type

Pipesize in

mm

Widthin ‘m’ 

Depthin ‘m’ 

Earthwork

qty. incum/m

Outerdia of pipe in ‘m’ 

RefillingQty/

cum/m

Earthwork

rate forotherthanloose

soil/mRs.

Earthwork

rate forloosesoil/

Rs.

Refillingrate/m

Rs.

Page 247: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 247/275

RATES FOR EARTH WORK

EXCAVATION OTHER THAN PIPE

LAYING WORKS AND WELLS

Page 248: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 248/275

Page 249: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 249/275

239

Schedule Rates inItem No.

Description Unit Rupees

Earthwork excavating and depositing on

bank with an initial lead of 10 meters and

initial lift of 2 metres in1 Sand, silt or other loose soil, wet sand or

silt not under water, light black cotton soil,

sandy loam and ordinary soil including Cu.m 33.80

excavated earth SS 20 A

2 Sand, silt or other loose soil, wet sand or

silt not under water, light black cotton soil,

sandy loam and ordinary soil including Cu.m 30.80

excavated earth SS 20 B

3 Slush and silt under water upto 0.75 metre

depth requiring the aid of baskets and Cu.m 38.50

vessels SS 20 B4 Trimming the bed and side slope of the bank

in all soils except hard rock upto a thickness

of 7.5 cm and making it ready to receive the Sq.m 7.95

concrete.

4a 7.50 cm to 15cm thick Sq.m 9.65

5 Sectioning during forming bunds when earth

moving machinery, lorries and rollers are used Cu.m 5.90

for consolidation.

6 Hard stiff clay, stiff black cotton, hard red

earth, shales, murram, gravel, stoney earth

and earth mixed with small size boulders Cu.m 49.00

SS 20A7 Hard stiff clay, stiff black cotton, hard red

earth, shales, murram, gravel, stoney earth Cu.m 46.00

and earth mixed with small size boulders

SS 20B

8 Soft disintegrated rock, laterite, soft rock

or kankar, not requiring blasting Cu.m 68.50

9 In loose boulders in excavation of various

sizes 150mm to 625mm Cu.m 108.50

10 Medium Rock and Dense Medium Rock not

requiring blasting Cu.m 120.75

11 Extra for every additional 10 meters lead orpart thereof over the initial lead Cu.m 5.75

12 Extra for every additional 1 meter lift or part

thereof over the initial lift Cu.m 4.60

13 Breaking clods, consolidating and sectioning Cu.m 2.90

14 Breaking clods, consolidating and sectioning

the earth scooped by bull dozers Cu.m 8.65

15 Add relevant TNDSS No.20A, rates for new

tank bunds and closing breaches for extra

watering and consolidation.

EARTH WORK EXCAVATION OTHER THAN PIPE LAYING WORKS AND WELLS

Page 250: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 250/275

240

a) By hand roller Cu.m 9.65

b) By power roller including hire charges Cu.m 16.15

16 Benching old embankment slopes 45cmx45cm Cu.m 1.90

17 Puddle wall work Cu.m 76.5018 Turfing in slopes including watering and fixing

with initial lead upto 50m. Sq.m 16.15

19a Refil ling with excavated sand complying

with standard specification for filling in

foundation and basement Cu.m 14.25

19.b Ref il ling with excavated soi l (other than

sand) complying with the standard specification

 for filling in foundation and basement Cu.m 16.15

The following foot note is applicable for the classifications of soils come under “ Quarryingand blasting” and “Earth Work” Note:

a) Standard specification No.20-A requires breaking clods, ramming and sectioning of spoil bank for which separate rate will not be paid.

b) Standard specification No.20-B does not require breaking clods, ramming andsectioning but requires neat banking in accordance with the standard specifications.

c) Double the relevant rate for standard specification No.20-B will apply to excavationin all the soils and rock classification given above for foundation of buildings, piers,wings and returns of bridges, culverts, sluices, regulators and cross masonry works,retaining walls, toe walls, cut-off walls and body walls of anicuts weirs, retainingwalls of cause ways, road dam, pits for avenue trees, and pits for poles andtowards and catch water pits.

d) An extra 50 percent over the rates for ordinary excavation in all the soils and rockclassification given above shall be allowed for drains, channels, contour trenchesand canals having bed width 1.25 m and below. The extra percentage is applicableany for depth up to 2.00m the depth being measured from the bottom of excavation.

e) An extra 25 percent over the rates for ordinary excavation in all the soils and rockclassification given shall be allowed for drains, channels and canals having bedwidth 1.25m to 2.00m. The extra percentage is applicable only for depth up to2.0m the depth being measured from the bottom of excavation.

f) These rates for earth work do not include baling charge. The baling charges are tobe paid as per actual in case baling is done departmentally or at actual plus 10percent extra in case baling is done by other agencies. However for estimatepurpose baling charges are to be provided at 10 percent of the rates of respectiveitems of excavation in all soils including medium rock and dense medium rock andat 5 percent of the rates for excavation in hard rock.

g) Double the relevant rate for standard specification No.20B for excavation in allsoils and rock classification given above shall be allowed for circular trenches forsoil and moisture conservation having bed width of 0.25m and below with sideslope of 1/2:1 and not less than 0.75 m in depth.

Schedule Rates inItem No.

Description Unit Rupees

Page 251: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 251/275

241

Schedule Rates inItem No.

Description Unit Rupees

Dismandling

Dismantling, clearing away and carefully

stacking materials useful for reuse for any

thickness of walls1 Brick / stone in clay walls under 3 m high cu.m 28.20

2 Brick / stone in clay walls, add for every

additional 3 m or part there of over the initial

height of 3 m cu.m 9.45

3 Mud / sun dried brick walls under 3 m high cu.m 18.95

4 Mud / sun dried brick walls, add for every

additional 3 m or part thereof over the initial

height of 3 m cu.m 5.50

5 Brick / stone masonry in lime mortar walls

under 3 m high cu.m 86.50

6 Brick / stone masonry in lime mortar walls, add

for every additional 3 m or part thereof over cu.m 9.65

the initial height of 3 m

7 Brick or stone masonry in Cement mortar walls

under 3 m high cu.m 106.00

8 Brick or stone masonry in Cement mortar walls,

add for every additional 3 m or part thereof cu.m 11.35

over the initial height of 3 metre

9 Terracing work in roof or floor sqm 28.70

10 Flag stone in roof or floor including lifting sqm 15.25

11 Cut stone slab over culverts upto 3.3.m heightbelow ground level cu.m 440.00

12 Cut stone slab over culverts over 3.3.m height

below ground level cu.m 459.00

13 Removal of cut stone slabs / RCC Cover slabs sqm 192.90

14 Refixing cut stone slabs/ RCC Cover slab sqm 211.00

15 Pantile or Mangalore tiled roof without roof 

timbers sqm 7.55

16 Flat and Pan tiles or Mangalore tiles over flat

tiles, without roof timbers sqm 10.55

17 Asbestos cement sheets roofing without roof 

timbers sqm 6.9018 Corrugated iron sheet roofing over pan tiles,

without roof timbers sqm 11.35

19 Old Thatched roof, including tying materials

into small bundles for reuse sqm 3.40

20 Wrought and put up framed timbers in roofs /

floors cu.m 277.50

21 Doors and windows including removal of frames,

hinges and fastenings sqm 57.35

Page 252: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 252/275

242

22 Drystone apron or revetment, stacking within

40 m lead cu.m 49.30

23 Grouted stones apron or revetment, stacking

within 40 m lead cu.m 57.35

24 Dry stone masonry walls cu.m 41.95

25 *Dismantling lime concrete cu.m 134.30

26 *Dismantling plain cement concrete cu.m 182.10

27 *Dismantling reinforced cement concrete cu.m 2766.00

Note * 1) The rate for dismantling lime

concrete,cement concrete and R.C. concrete

are exclusive of baling charges. The rate is

same in all floors.

2) For dismantling below ground level 25%

extra over the basic rates (i.e. the rates

already available in the schedule of rate) for

dismantling is allowed.

28 Chipping of concrete and roughening

the surface sqm 15.25

29 Pressed tiles & weathering course sqm 17.60

30 One course of pressed tile roof finish in

Cement Mortar sqm 9.75

31 One course of terrace bricks roof finish in

Cement Mortar sqm 11.35

32 Two course of flat tiles roof finish in

Cement Mortar sqm 11.35

33 Mosaic in situ finish in cement mortar in

flooring and in wall surface sqm 23.65

34 Floor finish and dadooing walls in Cement

Mortar with mosaic tiles/ glazed tiles/

cuddapah slabs. sqm 22.85

35 1. Clearing the site

a Clearing Heavy jungle sqm 3.40

b Clearing Light jungle sqm 2.55

c Clearing Scrub jungle sqm 2.35

d Uprooting and removing large palmyrah/

coconut stumps each 66.30

e Uprooting and removing small palmyrah/

coconut stumps each 47.40

f Removing weeds in channel and drain sqm 0.95

g Cleaning juliflora jungle with uprooting sqm 3.80

h Cleaning juliflora jungle without uprooting sqm 2.90

Schedule Rates inItem No.

Description Unit Rupees

Page 253: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 253/275

243

Note : Definition of large and small stumps : The Diameter of Stumps shall be 1/3 of thecircumferance at a point 0.6 m above the highest ground level at the stump or thecircumferance near the top of the stump if the stump is less than 0.60 m in height (The

measurement for circumferance and determination of the diameter will be to the nearestfull centimetre). Only stumps with Circumferance of 30 cm and more will be measured forpayment. The Sl. No d, is for Stumps of Diameter above 30 cm and Sl. No. e is forstumps of diameter 15 to 30 cm.

36   QUARRYING AND BLASTING

a Hard rock measured in solid including blasting

and stackingCu.m 326.00

b Removing hard rock by wedging chiseling and

trimming to proper shape where blasting is prohibited. Cu.m 653.00

c Medium rock and dense medium rock requiring

blastingCu.m 167.00

d Extra for every additional 10 metres lead or

part thereof over the initial lead for blasted Cu.m 4.00

materials

e Extra for every additional 1 metre lift or part

thereof over the initial lift of 2 m for blasted Cu.m 4.15

materials

f Benching hard rock upto an average 10 cm

depth Sq.m 315.00

g Drilling holes in hard granite 40mm diameter RM 105.90

h Drilling holes in hard granite 45mm diameter RM 123.70

I Drilling holes in hard granite 50mm diameter RM 147.35

 j Drilling holes in hard granite 75mm diameter RM 167.35

k Drilling holes in hard granite 32mm diameter RM 90.90

Note : 1) A deduction of 40 percent is to be made for the quantity of voidsand stack measurement and payment is for the lesser of two viz.Solid measurement or stack measurements less 40 percent of stack measurement for voids.

2) The rates for extra lead and lift are on the quantity as per thesolid measurement or stack measurement less 40 percent for voids

whichever is less. These rates are applicable for head load only.

3) Payment for blasting the rock in solid shall be made for the lesserof the two quantities obtained by a) Measurement recorded bylevels or measurement and b) by stack measurement lessdeduction for voids (This foot note is applicable for all items of rock measured in solid)

Schedule Rates inItem No.

Description Unit Rupees

Page 254: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 254/275

244

Schedule Rates inItem No.

Description Unit Rupees

1 Earth work open well excavation, complying with

relevant clauses of T.N.D.S.S. Well sinking andwith lead up to 10 metres in sand, silt or other

loose soil, Wet sand or silt not under water,

light black cotton soil, sandy loam and ordinary

soil - First depth of 2 metres.

2 Earth work open well excavation, complying with

relevant clauses of T.N.D.S.S. Well sinking and

with lead upto 10 metres in Hard stiff clay, stiff 

black cotton soil, hard red earth,

shales,murrams gravel, stoney earth and earthmixed with small size boulders and hard gravelly

soil - First depth of 2 metres

3 Earth work open well excavation, complying with

relevant clauses of T.N.D.S.S. Well sinking and

with lead up to 10 metres in soft disintegrated

rock, laterite, soft rock or kankar, not requiring

blasting - First depth of 2 metres

4 Open well excavation, complying with relevant

clauses of T.N.D.S.S. Well sinking and with leadup to 10m in Medium rock and Dense medium

rock not requiring blasting. First depth of 2

metres

5 Open well excavation complying with relevant

clauses of T.N.D.S.S. well sinking and with lead

up to 10m in Medium rock and Dense medium

rock requiring blasting. First depth of 2 metres

6 Open well excavation complying with relevant

clauses of T.N.D.S.S. well sinking and with leadup to 10m in hard granite measured in solid

including blasting and stacking - First depth of 

2 metres

7 Sinking well in loose soils, light black cotton

soil, sandy loam and ordinary soil under water

including bailing or pumping charges if necessary

etc., complete - First depth of 2 metres

Cu.m 30.80

Cu.m 45.90

Cu.m 70.60

Cu.m 114.80

Cu.m 172.65

Cu.m 334.00

Cu.m 47.65

OPEN WELL EXCAVATION

Page 255: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 255/275

245

Schedule Rates inItem No.

Description Unit Rupees

Note : Open well Excavation

a) Up to 2m diameter of wells, 10 percent excess will be allowed over the basic rates

for open well excavation.

b) The rates do not include baling charges. If the dewatering is to be donedepartmentally, 10 percent of cost of excavation shall be allowed for dewateringfor estimate purposes. Actual or 10 percent whichever is less to be allowed fordewatering charges. For any expenditure above this percentage prior approval of the competent authority should be obtained.

c) Stage depth rates for well excavation” The stage depth for adopting the ratesfrom the schedule of rates should be reckoned from ground level only irrespectiveof the fact, whether there is parapet wall or not.

d) For open well excavation for rates up to 12m depth, the progression would be x,2x, 3x, 4x, 5x, and 6x and rate beyond 12 metre depth, the progression should be

8x, 10x, 12x, 14x and 16x and so on.

8 Sinking well in sand, including bailing or pumping

charges if necessary etc. complete - First depth

of 2 metres

9 Sinking well in hard stiff clay, light black cotton

soil, hard red earth, shales, murram, gravel,

stoney earth and earth mixed with small size

boulders and hard gravelly soil including bailing

or pumping charges if necessary etc. complete

- First depth of 2 metres

Cu.m 66.80

Cu.m 66.80

Page 256: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 256/275

246

RATE FOR EARTH WORK BY DEPLOYING MACHINERIES

Schedule Rates inItem No.

Description Unit Rupees

1 Earth work in all soils except hard rock requiring

blasting and conveying for formation of bundwith lead of 0 to 100 metre deploying earth

moving machineries and tippers including

benching, formation of bunds, breaking clods,

sectioning etc., complete.

1.a. Earth work in all soils except hard rock requiring

blasting and conveying for formation of bund

with an extra lead of every 100 metre or part

thereof deploying earth moving machineries and

tippers including benching, formation of bunds,

breaking clods, sectioning etc., complete.

2 Earth work deploying earth moving machineriesfor desilting channel and forming bund on either

side and depositing the earth on banks including

 jungle clearance etc., complete.

a. Having width upto 3 m

b. Having width of 3 m – 10 m

3 Earth work excavation deploying earth moving

machineries for desilting channel having a width

of more than 10 m and forming bund on either

side and depositing the earth on banks including

 jungle clearance etc., complete.

Lift charges - concrete - Brick or stone

Masonry above or below ground level

Note:  The rate for lime concrete, cement

concrete, reinforced cement concrete, brick

work and stone masonry worked out as per

Standard Data will apply to basement and

foundation up to a depth of 1.50 m below ground

level only (basic rate)

Statement I

a) Concrete above ground level

1 Add to the basic rate for works up to 4.50mheight in ground floor (height to be reckoned

from floor level i.e. plinth level in ground level)

2 Add for works in every upper floor over the

rate of preceding floor

3 Brick or stone masonry above ground level

i. Add to the basic rates for works up to 4.50m

height in ground floor (height to be reckoned

from floor level i.e. plinth level in ground level)

Cu.m 47.55

Cu.m 3.80

Cu.m 28.10

Cu.m 34.25

Cu.m 40.00

Cu.m 49.10

Cu.m 97.90

Cu.m 32.50

Page 257: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 257/275

247

Schedule Rates inItem No.

Description Unit Rupees

ii. Add for works in every upper floor over the

rate of preceeding floor

Note: i) For the works above 4.5m height in individual floor the rate of next

floor may be taken. The extra rates allowed for building works are applicableto irrigation works and road works also. The extra rates may be allowed for

the structures beyond 1.00m above ground level.

ii) The extra rates may be allowed considering the ground level as datum in

respect of service reservoirs (where there is no plinth level)

Statement II

a) Concrete below ground level

1 Add the basic rate for works above 1.5m

depth and upto 4.5m depth below ground level

2 Add the basic rate for works above 4.5m depth

and upto 9.0 m depth below ground level

3 Add extra over the above item 2 for every

additional 4.5m depth beyond 9m depth below

ground level

B) Brick or stone masonry below ground level

1 Add the basic rates for works above 1.5m depth

and up to 4.5m depth below ground level

2 Add the basic rates for works above 4.5m depth

and up to 9.0m depth below ground level

3 Add extra over the above item 2 for every

additional 4.5m depth beyond 9m depth below

ground level

Cu.m 65.30

Cu.m 48.45

Cu.m 97.15

Cu.m 97.15

Cu.m 32.50

Cu.m 65.30

Cu.m 65.30

Note :

1. The above extra rates are applicable for buildings, irrigations, and road works.

2. First Grade stone includes hard granite, trap, etc. second Grade stone includes gneiss, limestone etc.

3. The class of materials to be used should always be defined in the items, description intender schedules, contract schedules etc.

4. For reinforced cement concrete work, only the hardest locally available stone will be used, if it has good bonding surface and is otherwise suitable proportions for concrete are definedin the relevant standard specification.

5. Note under Sl.No.179 to 187 in the standard data book applies to arches over doors andwindows. For large arches in bridges and irrigation works, addition to this rate, extra cost of centering is to be made.

6. For concrete mix

a. Equal mixes (i.e.) 50 percent mortar mixes only should be adopted for plain concrete forfoundation, flooring and RC Concrete for roofs, lintels, etc. wherever cement is used withhard broken stones or brick jelly.

b. 40 percent or 50 percent mortar mixer may be adopted where lime concrete with brickaggregate is used according to the condition at site.

Page 258: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 258/275

248

Schedule Rates inItem No.

Description Unit Rupees

CONCRETE VIBRATORS

1 Where vibrators are specified for consolidationin plain Cement concrete, this rate per cu.m

over and above the provision made in the

standard data book for consolidation with

manual labour may be allowed.

2 Where vibrators are specified for consolidation

in RCC, this rate per cu. m over and above the

provision made in the standard data book for

consolidation with manual labour may be

allowed.

Plastering

1 Clean removal of lime plaster from walls and

racking out joints 20mm deep or from terraced

roofs racking out joints 12mm deep

2 Clean removal of lime plaster from walls

3 Clean removal of cement plaster from walls

4 Clean removal of cement plaster from walls and

racking out joints 20mm deep

White washing and colour washing and distempering

1 Thorough scrapping of old plastered surface

2 Washing of plastered surface with soap, soda

and water( or with soda, lime, brush and water)Painting, Wood Oiling, Tarring, Varnishing, Bee’s Waxing etc

1 Removing old paint from doors and windows by

blow lamp and scrapping, including removal and

refitting of shutters

2 Removing old paint from doors and windows by

scrapping and refitting of shutters

3 Removing paint from doors, windows and wood

works by manual labour

4 Removing old paint from structural steel by

blow lamp or sand paper5 Repolishing the mosaic flooring including

polishing stone and hire charges for polishing

machine but excluding cost of electrical

charges.

6 Scrapping and removing old paint from

structural steel by manual labour

7 Removing old paint from iron surface with sand

paper

Cu.m 28.80

Cu.m 38.75

sq.m 4.00

sq.m 3.10

sq.m 3.35

sq.m 4.35

sq.m 1.85

sq.m. 2.30

sq.m 14.35

sq.m 6.10

sq.m 4.15

sq.m 8.65

sq.m 8.45

sq.m 3.90

sq.m 3.65

Page 259: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 259/275

249

Schedule Rates inItem No.

Description Unit Rupees

Miscellaneous

I. Supplying & filling up the empty Cement gunnybags with sand, stitching them conveying the

same to site and stacking as directed within a

lead of 10m excluding cost of bags, jute,

thread, needle, sand etc. (labour only)

ii. Driving piles upto 15 cm dia in river bed

iii. Pointing the edge and driving bamboo/

casurina/ eucalyptus piles into river bed for the

first 1m depth below ground level

iv. Driving bamboo/ Casurina/ eucalyptus piles into

ground beyond 1m depth from ground level.

For every 1m (or) part thereof 

River Conservancy of Korambu Works

v. Brush wood bundles one metre girth and one

metre long within an initial lead of 1.6 KM

vi. Extra for every additional lead of 1.6 KM (for

the above item)

vii. Driving casurina pi les into bed including

scaffolding etc., complete

viii. Casurina walling pieces 40mm to 50mm diameter

including fixing with nails and tying with ropes.

Labour wrought and put up for Doors, Windows and Ventilators

1 Labour wrought and put up in position of frames

inclusive of fixing holdfasts for doors, windows

and ventilators etc.

2 Labour wrought and put up in position of  

shutters for fully panelled doors (external or

internal) moulded panels including labour

charges for fixing furniture fittings, complying

with standard drawings and standardspecification.

3 Labour wrought and put up in position of  

shutters for fully panelled doors internal five

plywood panels including labour charges for

fixing furniture fittings, complying with standard

drawings and standard specification.

Bag 3.65

RM 11.25

Each 9.65

RM 9.65

One bundle 1.90

One bundle 0.22

RM 4.70

RM 6.45

Cu.m 5625.00

sq.m 635.00

sq.m 528.00

Page 260: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 260/275

250

4 Labour wrought and put up in position of  

shutters for glazed and panelled doors includinglabour charges for fixing furniture fittings,

complying with standard drawings and standard

specification.

5 Labour wrought and put up in position of  

shutters for framed and planked doors including

labour charges for fixing furniture fittings,

complying with standard drawings and standard

specification.

6 Labour wrought and put up in position of 

shutters for ledged and braced and plankeddoors including labour charges for fixing

furniture fittings complying with standard

drawings and standard specification.

7 Labour wrought and put up in position of  

shutters for glazed windows including labour

charges for fixing furniture fittings, complying

with standard drawings and standard

specification.

8 Labour wrought and put up in position of  

shutters for windows panelled including labour

charges for fixing furniture fittings, complying

with standard drawings and standard

specification.

9 Labour wrought and put up in position of  

shutters for windows, ledged, braced and

planked doors including labour charges for fixing

furniture fittings, complying with standard

drawings and standard specification.

10 Labour wrought and put up in position frames,

shutters for ventilators glazed fixed double

frames and with wire netting complete fixed in

position in accordance with standard drawings

and standard specification.

11 Labour wrought and put up in position frames

shutters for swing ventilators and fixed in

position in accordance with standard drawings

and standard specification.

Schedule Rates inItem No.

Description Unit Rupees

sq.m 590.00

sq.m 492.00

sq.m 333.00

sq.m 590.00

sq.m 635.00

sq.m 333.00

sq.m 528.00

sq.m 493.00

Page 261: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 261/275

251

Schedule Rates inItem No.

Description Unit Rupees

12 Labour charges for fixing doors along with frames

in position etc. complete(finished work)13 Labour charges for fixing windows and

ventilators along with frames in position etc.

complete

14 Labour wrought and put up in position flush

shutters for single leaf shutters.

15 Double leaf shutters

16 Labour wrought and put up in position fly proof 

wire gauge shutters for doors, windows and

ventilators17 Labour wrought and put up for providing teak

wood weld mesh screen with frames 3"x3"

(0.075mx0.075m)

Breaking metals

i. Labour charges for breaking 40mm metal from

departmental blasted stones

ii. Labour charges for breaking 20mm metal from

departmental blasted stones

iii. Labour charges for breaking 50mm metal from

departmental blasted stones

Cement Mortar

i. Grinding Mortar (Special Grinding lime)

ii. Grinding Mortar (Ordinary Grinding lime)

iii. Mixing Mortar – Cement by manual

iv. Mixing Mortar- Cement by Machine Mixing

Metal & Iron works

i. Petty iron work for truss, straps etc. (Wrought

& fixed) labour only

ii. Iron works for trusses & record racks (labour

only)

iii. Fixing in position mild steel grills for windows,

ventilators, etc.

iv. Fixing MS rods round/square for windows

v. Fixing iron bars in windows and ventilators

sq.m 94.85

sq.m 118.90

sq.m 88.20

sq.m 136.60

sq.m 316.00

sq.m 440.00

Cu.m 168.25

Cu.m 251.70

Cu.m 100.50

Cu.m 152.70

Cu.m 116.45

Cu.m 47.65

Cu.m 63.35

Kg 22.85

kg 21.15

Kg 13.20

Kg 12.30

Kg 12.30

Page 262: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 262/275

252

Page 263: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 263/275

253

Page 264: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 264/275

254

Page 265: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 265/275

255

Page 266: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 266/275

256

Minutes for Schedule of rates Committee.

TWAD Board-Finalising the Schedule of rates for adoption during the year 2014-

2015.

A committee consisting of the following members was constituted in the meeting

held on 03.09.2014 on common schedule of rates to be adopted by TWAD and CMWSSB,chaired by the Principal Secretary to Government, Finance Department as detailed below:

1.Thiru V.Arun Roy, I.A.S.,Joint Secretary, Finance Department

2.Thiru N.Venkatesh, I.A.S., Deputy Secretary (Budget), Finance Department

3.Er. P.G.Illangovan, Enginnering Director (i/c), TWAD

4.Er. A.Mani, Engineering Director (i/c), CMWSSB.

The committee discussed about the proposals for common standard schedule of 

rates for the year 2014-15 for both TWAD and CMWSSB.

The Committee after detailed discussion has decided to recommend the rate for

items for adoption in TWAD Board Schedule of Rates for 2014-15 as detailed below.

Materials

Sl.No. Description of item % Excess over last year rate

1 P.V.C Rigid pipes The L1 rate of TWAD may be adopted within a

maximum increase of 15.60% over the 2013-14

1st quarter rate. Further, rates for 2nd, 3 rd and 4th

quarter are to be fixed based on the resin price

as practiced

2 HDPE pipes The L1 rate of TWAD may be adopted within a

maximum increase of 19% over the 2013-14 1st

quarter rate. Further, rates for 2nd, 3rd  and 4th

quarter are to be fixed based on the resin price

as practiced

3 CI Spun pipes The L1 rate of TWAD may be adopted which has

average increase of 7.15% for WED and 9.66%

for WOED over 2013-14.4 Ductile Iron socket/spigot

i) K7 pipes The L1 rate of TWAD may be adopted which has

average increase of 9.91% for WED and 7.44%

for WOED over 2013-14.

ii) K9 pipes The L1 rate of TWAD may be adopted which has

average increase of 12.41% for WED and 9.80%

for WOED over 2013-14.

Page 267: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 267/275

257

Sl.No. Description of item % Excess over last year rate

5 D I Flanged pipes K9 (4m) The L1 rate of TWAD may be adopted which has

average increase of 5.55% for WED and 4.63%

for WOED over 2013-14.

D I Flanged pipes K9 (5m) The L1 rate of TWAD may be adopted which has

average increase of 6.39% for WED and 4.84%

for WOED over 2013-14.

i) DI specials(All socket)

ii) DI specials (All flanged) The L1 rate of TWAD may be adopted which has

average increase of 7.57% for WED over 2013-

14.The L1 rate of TWAD may be adopted which has

average increase of 10.02% for WED over 2013-14

6 Salt Glazed Stone Ware

pipe The L1 rate of TWAD may be adopted which hasaverage increase of 10.66% for WOED over 2013-

14.

7 Mechanical joint collars The L1 rate of TWAD may be adopted which has

average increase of 10.00% over 2013-14.

New Item Testing of pipesIn addition to existing data, it was

approved that the rate for testing as applicable to

various sizes in the CMWSSB Schedule of rates will

be adopted. The word testing included with other

items of work found place wherever in the TWAD Bd

schedule of rate may be deleted.

1 General Note As per the PWD Schedule of rates 2014-15.

2 Rates of Labour For labour 13% increase over the PWD schedule of  

rates 2013-14 has been adopted by the PWD for

2014-15 Schedule of rates. The same is adopted by

TWAD Board for the Schedule of Rates 2014-15.

3 Building materials As per the PWD Schedule of rates 2014-15.

4 Electrical items As per the PWD Schedule of rates 2014-15.

5 Other construction materials As per the PWD Schedule of rates 2014-15

6 Rate of works For works 10% increase over 2013-14 schedule of  

rates has been adopted by PWD for 2014-15

schedule of rates. The same is adopted by TWAD

Board for schedule of rates 2014-15.

7 Conveyance of materials For conveyance 9.96 to 10.99% increase over 2013-

14 schedule of rates has been adopted by PWD for

2014-15 schedule of rates. The same is adopted by

TWAD Board for schedule of rates 2014-15.

Page 268: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 268/275

258

Sl.No. Description of item % Excess over last year rate

8 Miscellaneous Items For works 10% increase over 2013-14 schedule of 

rates has been adopted by PWD for 2014-15

schedule of rates. The same is adopted by TWAD

Board for Schedule of rates 2014-15.

9 Earthwork excavation

for pipeline works For works 10% increase over 2013-14 schedule of 

rates has been adopted by PWD for 2014-15

schedule of rates. The same is adopted by TWAD

Board for schedule of rates 2014-15.

10. Rate for Earthworks For works 10% increase over 2013-14 schedule of 

excavation and refilling rates has been adopted by PWD for 2014-15

for pipeline works on Linear schedule of rates. The same is adopted by TWAD

Measurement basis Board for schedule of rates 2014-15.

11 Earthwork excavation For works 10% increase over 2013-14 schedule of other than pipe laying rates has been adopted by PWD for 2014-15

works and wells. schedule of rates. The same is adopted by TWAD

Board for schedule of rates 2014-15.

Rates of materials

1 PVC Casing pipes

2 UPVC pipes

3 PVC specials

4 HDPE specials

When L1 rates arei) Upto +20% over last year rate

= L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year Further, rates

for 2nd, 3rd and 4th quarter are to be fixed based on

the resin price as practiced. Casing pipes of size

300mm is deleted from schedule of rates.

When L1 rates are

i) Upto +20% over last year rate = L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year

When L1 rates are

i) Upto +20% over last year rate = L1 rateii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year

When L1 rates are

i) Upto +20% over last year rate = L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

Page 269: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 269/275

259

Sl.No. Description of item % Excess over last year rate

5 HDPE Jointing

6 A.C. pressure pipes

7 AC Coupler

8 CID Joints

9 CI D/F pipes

10 CI D/F, S&S specials

11 GI pipes (Medium)

12 i) GI specials

13 ii) GI specials & GM valves

14 PSC pipes

15 Bar wrapped steel cylinder

16 GRP pipes

17 M.S. Pipes as per IS -3589

spirally/ longitudinal welded

i) Internal lining with cement

mortar

ii) External coating with cement

mortariii) Internal food grade Epoxy lining

iv) External Epoxy lining

v) Coal Tar Enamel coating

vi) External polyethylene sheathing

vii) Transportation charges

18 M.S. Specials

19 RCC non pressure Pipes with

High Alumina cement lining

12mm thick 

20 Rubber gaskets

21 C.I.D/F sluice valve with ISI

marking. (PN.1)

22 C.I.D/F Reflux valves with ISI

marking

23 CI Double Air valve with ISI

marking

iii) L1 Less than Last Year= Last Year

When L1 rates are

i) Upto +20% over last year rate = L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year

When L1 rates are

i) Upto +20% over last year rate = L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year

When L1 rates are

i) Upto +30% over last year rate = L1 rate

ii) Above 30% excess over last year rate = Last

year rate + 30%

iii) L1 Less than Last Year= Last Year

When L1 rates are

i) Upto +20% over last year rate = L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last YearWhen L1 ratesare

i) Upto +20% over last year rate = L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year

When L1 rates arei) Upto +20% over last year rate

= L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year

Page 270: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 270/275

260

Sl.No. Description of item % Excess over last year rate

24 CI single Air valve with ISI

marking

25 DI Single Chamber Air Release

valve

26 CI Sluice valve PN 1.6

27 CI Butterfly valve

28 CI Non-return valve

29 CI Non-return valve outdoor

use

30 Kinetic Air valve

31 D.I. Gate valve

32 D.I. Butterfly valves

33 OHT flow control valve

34 Sulphate Resistant Cement

35 Fiber Rein forced Concrete

manhole frame & cover

36 Water meter & Dirt box strainer

37 Water meter erection charges

38 Electronic water meter

39 HDPE Tank  

40 Alum

41 MS Kiosk  42 MS Ladder

43 MS Doors, Windows and

 Ventilators

44 Water Disinfection equipment

Silver Ionization

45 Replacement of Electrode for

water disinfection equipment

46 Rate for Electro Chlorinator

47 Fusion Bonded Epoxy coating

without conveyance

48 Jointing of MJ collars

49 Disjointing of GI pipes

50 Welding of GI pipes

51 MS Casing pipe

When L1 rates are

i) Upto +20% over last year rate = L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year

When L1 rates arei) Upto +20% over last year rate = L1 rate

ii) Above 20% excess over last year rate = Last

year rate + 20%

iii) L1 Less than Last Year= Last Year

Page 271: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 271/275

261

New items:

1. Proposals received for inclusion of DI Non-return valve, wafer type Butter fly valve,

Disk Check Valve, Diaphragm valve, Surge Control Valve, Plunger type flow control

valve, FULL BORE ELECTROMAGNETIC FLOW METER and Electro chlorintor, MS Ladder.

The lowest rate quoted for them may be adopted and included in this year schedule of 

rate.

Mechanical and Electrical items:

As per MD/TWAD Proc. No. Mechanical committee/CM II/AE/ 2014 dt. 22.05.2014, the

Committee for finalization of rates for mechanical and electrical items for 2014-15 met

on 01.07.2014 and 02.07.2014 at H.O., Chennai under the Chairmanship of the Joint

Chief Engineer (COM). The quotations received at Head Office, for the Electrical & 

Mechanical items, were scrutinized and local market rates were verified. After careful

study of the rates the committee concluded their recommendations vide their report

dt. 02.07.2014.

Sl.No. Description of item % Excess over last year rate

1 Centrifugal Monobloc To accept L1 rates not exceeding 20% over last

Pumpset without Panel year rate.i.e.,When L1 rates are

Board i) Upto +15% over last year rate = L1 rate

ii) Above 15% excess over last year rate = Last

year rate + 15%

iii) Less than Last Year rate = Last Year rate

2 Single phase submersible To accept L1 rates not exceeding 30 % over last

pumpset without panel year rate.i.e.,When L1 rates are

i) Upto + 30% boardover last year rate = L1 rate

ii) Above 30 % excess over last year rate = Last

year rate + 30 %

3 3 phase submersible To accept L1 rates not exceeding 25% over last

pumpset suitable for year rate.i.e.,When L1 rates are

100 mm dia borewell i) Upto +25% over last year rate = L1 rate

without panel board ii) Above 25% excess over last year rate = Last

year rate + 25%

4 3 phase submersible To accept L1 rates not exceeding 25% over last

pumpset suitable for year rate.i.e.,When L1 rates are

150 mm dia Borewell i) Upto +25% over last year rate = L1 ratewithout panel board ii) Above 25% excess over last year rate = Last

year rate + 25%

iii) Less than Last Year rate = Last Year rate

5 Openwell submersible To accept L1 rates not exceeding 30 % over last

pumpset without panel year rate.i.e.,When L1 rates are

board i) Upto + 30% over last year rate = L1 rate

ii) Above 30 % excess over last year rate = Last

year rate + 30 %

Page 272: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 272/275

262

6 Single phase panel board

with two lewel guard and

auto start The committee recommended to adopt L1 rate

7 3 phase D.O.L panel board The committee recommended to adopt L1 rate

8 3 phase star delta panel To accept L1 rates not exceeding 15% over last

board for installing where year rate.i.e.,When L1 rates arei) Upto +15%

MV panel Board is not over last year rate = L1 rateii) Above 15%

used. excess over last year rate = Last year rate+ 15%

9 HSC Pump 1500RPM To accept L1 rates not exceeding 25% over last

year rate.i.e.,i) Upto +25% over last year rate =

L1 rate ii) Above 25% excess over last year rate

= Last year rate + 25%

10 Horizontal Squirrl cage

Motor 1500RPM The committee recommends to adopt L1 rate

11 Horizontal Squirrl cage

Motor 1000RPM The committee recommends to adopt L1 rate

12 Vertical Turbine pump

for VHS motor 114 items with +18% to +20% over Last year

rate.To accept L1 rates not exceeding 18 % over

last year rate.i.e.,When L1 rates are i) Upto +18

% over last year rate = Quoted rateii) Above +18

% excess over last year rate = Last year rate +

18 %

13 Vertical hollow Shaft

motors for turbine pump

1500 RPM The committee recommends to adopt L1 rate

14 Oil Natural Air Natural i)For11KV/433V

(ONAN) cooled (11KV/ The committee recommends to adopt L1 rate

22KV/11&22KV ) For 22KV/433V

Transformers The committee recommends to adopt L1 rate

For 11KV/22KV/433VThe committee recommends to adopt L1 rate

ii) L1 Less than Last Year rate = Last Year rate

15 Oil Natural Air Natural L1 Less than Last Year rate = Last Year rate

(ONAN) cooled 11 KV /

22KV Transformers

16 FCMA Soft Starter for

LT motor The committee recommends to adopt L1 rate

Sl.No. Description of item % Excess over last year rate

Page 273: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 273/275

263

17 FCMA Soft Starter for

HT motor The committee recommends to adopt L1 rate

18 Fully Auto Star Delta

Starter for installing

where MV panel Board is

used. The committee recommends to adopt L1 rate

19 Fully Automatic ATS

Starter The committee recommends to adopt L1 rate

20 L.T.Cables Rate quoted is +38.80% to +40.50% compared to

2013-14 Schedule of RatesRate quoted is -

22.40% to - 43.70% compared to 2012-13

Schedule of RatesThe committee recommends

to adopt L1 rate Proposed to adopt i) L1 rate

for 3 core cablesii)PWD SOR rates for 2014-15for 3.5 and 4 core cables

21 3 Core Flat Cables Rate quoted is +88.40% to +93.75% compared to

2013-14 Schedule of RatesRate quoted is +5.08

% to +21.35% compared to 2012-13 Schedule of 

RatesThe committee recommends to adopt L1

rate not exceeding 10 % excess over 2012-

13 rate

22 H.T.Cables To accept 25 % over last year rate for all 10

items.

23 Vacumn Pumpset The committee recommends to adopt L1 rate24 Rate for cable joints Cost of cable per meter will be the cost per Joint

including material&labour as adopted in previous years schedule of rates.

25 Rate for laying UG Cable To accept L1 rates not exceeding 20% over last

year rate.i.e., When L1 rates are i) Above 20%

excess over last year rate = Last year rate +

20%

26 Cable clamps To accept L1 rates not exceeding 30% over last

year rate.i.e., When L1 rates are i) Above 30%

excess over last year rate = Last year rate + 30%

27 Capacitor Rs 400 per KVA rate available in 2013-14 Schedule

of rate may be adopted

28 LT Meter Box To accept L1 rates not exceeding 20% over last

year rate.i.e., When L1 rates are i) Above 20%

excess over last year rate = Last year rate + 20%

29 Designing and preparation To accept L1 rates not exceeding 20% over last

of CEIG drawings approval year rate.i.e.,When L1 rates are i) up to 20%

over last year rate = L1 rateii) Above 20% excess

over last year rate = Last year rate + 20%

Sl.No. Description of item % Excess over last year rate

Page 274: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 274/275

264

30 ACB 3 Pole & 4 Pole To accept L1 rates not exceeding 25% over last

year rate.i.e.,When L1 rates are i) Up to +25%

over last year rate = L1 rateii) Above 25% excess

over last year rate = Last year rate + 25%31 MCCB 3 Pole & 4 Pole To accept L1 rates not exceeding 20% over last

year rate.i.e.,When L1 rates are i) Up to +20%

over last year rate = Quoted rateii) Above 20%

excess over last year rate = Last year rate +

20%

32 Safety appliances To accept L1 rates not exceeding 20% over last

year rate.i.e.,When L1 rates are i) Up to +20%

over last year rate = Quoted rateii) Above 20%

excess over last year rate = Last year rate +

20%33 Tools To accept L1 rates not exceeding 20% over last

year rate.i.e.,When L1 rates are i) Up to +20%

over last year rate = Quoted rateii) Above 20%

excess over last year rate = Last year rate +

20%

34 Pumproom wiring To accept L1 rates

35 Twin GI earthing Rate quoted is +566 % to +900% compared to

2013-14 Schedule of RatesRate quoted is +73%

to +116 % compared to 2011-12 Schedule of 

RatesThe committee recommends to adopt 50 %

excess over 2011-12 rates.

36 HOT Crane and i) To accept L1 rates ii) L1 Less than Last Year

Accessories rate = Last Year rate

37 Energy Efficiency

Improvement in HSC

pumps Last year rate may be retained.

38 Energy Efficiency This item may be deleted as mixed flow HSC Pump

Improvement in mixed and Mixed Flow Turbine Pumps is given separately.

flow pumps

39 Energy Efficiency Last year rate may be retained.

Improvement inTurbine pumps

NEW ITEMS

1 Non Clog Submersible The proposal submitted by Cfi.Thanjavur for Non Clog

Pumpsets for Sewage Submersible Pumpsets for Sewage applications along

with applications I 3 quotations and comparative statement may be

I considered for including in 2014-15 Schedule of 

rates.

Sl.No. Description of item % Excess over last year rate

Page 275: TWAD-Schedule of Rates for 2014-2015

7/23/2019 TWAD-Schedule of Rates for 2014-2015

http://slidepdf.com/reader/full/twad-schedule-of-rates-for-2014-2015 275/275

1 Thiru V.Arun Roy, I.A.S.

Sl.No. Name & Designation Signature