jäœehL FoÚ® tofhš thça« ju¥gL¤j¥g£l éiy étu m£ltiz

Transcript of twad 13-14

Page 1: twad 13-14

jäœehL

FoÚ® tofhš thça«ju¥gL¤j¥g£l éiy étu m£ltiz

Page 2: twad 13-14

RATES FOR LABOUR

Page 3: twad 13-14

Schedule Item No.

Description UnitRate inRupees

(2013-14)

1 Driller Day 337.00

2 Assistant Driller Day 277.00

3 Special heavy labour for driving sheet pile Day 337.00

4 Boring Attendant Day 247.00

5 Water Meter Reader Day 235.00

6 Helper for Rig Day 247.00

7 a. Electrician with LEE/DEE and 'C' certificate Day 431.00

b. Electrician with LEE/ DEE Day 412.00

C. Electrician with ITI and 'C' Certificate Day 370.00

d. Electrician with ITI 'and B' Certificate Day 337.00

e. Electrician with ITI Day 337.00

8 a. Pump Operator with ITI Day 337.00

b. Pump Operator without ITI Day 287.00

9 Laboratory Attender SSLC/ 10th Std passed Day 235.00

10 a. Filter Bed Operator with D.M.E. Day 412.00

b. Filter Bed Operator with ITI Day 337.00

c. Filter Bed operator without I.T.I. Day 287.00

TWAD BOARDRATES FOR LABOUR

10

c. Filter Bed operator without I.T.I. Day 287.00

11 Cleaner for Treatment Unit, Pump and vehicles Day 235.00

12 Boring Mechanic for Hand Boring set Day 287.0013 Turn Cock (Experience in pipe line Operation

and maintenance Day 235.0014 Fitter (Pipe laying / Bar bending) I class Day 316.00

15 Fitter (Pipe laying / Bar bending) II class Day 293.00

16 Sewer Cleaner Day 235.00

17 Store Attender SSLC /10th Std Passed Day 235.00

18 Divers and well sinkers Day 431.00

19 Hammer Man (Geophysical survey) Day 235.00

20 Geological Assistant Day 346.00

21 Maintenance Assistant Day 247.0022 Plant Operator, SSLC passed with

3 years experience Day 277.0023 Reverse Osmosis (R.O.) Plant Operator

SSLC passed with 3 years experience Day 337.0024 Mechanic withITI Day 337.00

25 a. Carpenter I class Day 355.00

b. Carpenter II class Day 326.00

26 a. Cleaner I Gr. Day 191.00

b. Cleaner II Gr. Day 180.00

27 a. Fitter I class Day 322.00

b. Fitter II class Day 300.00

28 Floor Polisher Day 281.00

29 Gardener Day 213.00

30 Head Mazdoor for well sinking Day 236.00

10

Page 4: twad 13-14

Schedule Item No.

Description UnitRate inRupees

(2013-14)

31 a. Driver (Light duty) Day 281.00

b. Driver (Heavy duty) Day 300.00

32 Jumper Mazdoor Day 213.00

33 a. Maistry, Road Inspector & Work Inspector Day 271.00b. Maistry, Road Inspector & Work Inspector (Degree holder) Day 300.00

34 a. Mason for Brick work - I class Day 363.00

b. Mason for Brick work - II class Day 326.00

35 a. Mason for stone work - I class Day 363.00

b. Mason for stone work - II class Day 326.00

36 a. Mazdoor Category I Day 228.00

b. Mazdoor Category II Day 206.00

c. Head Mazdoor Day 236.00

37 a. Moplah - I class Day 280.00

a. Moplah - II class Day 258.00

38 a. Painter/Varnisher-I Class Day 293.00

b. Painter/Varnisher-II Class Day 271.00

39 Pile Driver Day 258.00

40 a. Plumber I class Day 316.00

11

40 a. Plumber I class Day 316.00

b. Plumber II class Day 293.00

41 Pump Driver Day 236.00

42 a. Stone cutter- I class Day 280.00

b. Stone cutter- II class Day 258.00

43 a. Welder/ Bracer - I Class Day 280.00

b. Welder/ Bracer - II Class Day 258.00

44 Well sinking Diver working with Helmet(above two metres depth of water)

Day 326.00

Technical Assistant45 a. Technical Assistant Gr.I (BE passed) Day 467.00

b. Technical Assistant- Gr.II (Diploma in Engg. Passed/ B.E. failed/ Degree inGeology for ground water) Day 420.00c. Technical Assistant Gr.III (Diploma in Engg. Failed / ITI (Civil) passed Day 355.00

46 a. Laboratory Assistant. Gr.I (Post Graduate in Science) Day 355.00b. Laboratory Assistant. Gr.II (Degree in Science /Degree in Geology for ground water) Day 326.00

c. Laboratory Assistant Grade III (with Degree qualification to work as works clerk) Day 293.00

47 a. Mazdoor employed for Geological maping Day 228.00b. Mazdoor employed for Pitting, Trenching, Sampling and Drilling works Day 228.00c. Mazdoor employed for Geophysical Investigation works Day 228.00d. Head Mazdoor to supervise exploratory works Day 241.00

11

Page 5: twad 13-14

Schedule Item No.

Description UnitRate inRupees

(2013-14)48 Mixer Operator (including concrete mixer ) Day 248.0049 Mixer Driver Day 236.00

50 Compressor Operator Day 248.00

51 Computer Operatora. Gr.I [B.E. (Computer Science)/ M.Sc (Computer Science)] Day 467.00b. Gr.II [B.Sc., (Computer Science)/Diploma inComputer Science]

Day420.00

52 Stone & Crusher Operator Day 248.00

53 Heavy Mazdoor Day 248.00

54 Wireman Grade I/ Electrician Grade I Day 317.00

55 Wireman Grade II/ Electrician Grade II Day 300.00

56 Electrical Helper Day 226.00

57 Laboratory Attendant Day 202.0058 Electrical Maistry Day 346.00

59 Axe Mazdoor Day 213.00

60 Blacksmith - 1st class Day 281.00

61 Blacksmith - 2nd class Day 258.00

62 Boat Mazdoor Day 236.00

63 Bullocks pair with driver (with bandy) Day 420.00

12

62 Boat Mazdoor Day 236.00

63 Bullocks pair with driver (with bandy) Day 420.00

64 Bullocks single with driver (with bandy) Day 303.00

65 Caulker Day 236.00

66 Ferry Mazdoor Day 236.00

67 Hammer Mazdoor Day 226.00

68 Mechanic - 1st class Day 281.00

69 Mechanic - 2nd class Day 258.00

70 Navagonies or Javali Man - 1st class Day 236.00

71 Sawyer Day 258.00

72 Smith 1st class Day 280.00

73 Smith 2nd class Day 258.00

74 Sprayer Mazdoor (for bitumen, tar etc.,) Day 213.00

75 Syrang-1st class Day 280.00

76 Syrang-2 nd class Day 258.00

77 Thatcher Day 226.00

78 Tinker 1 st class Day 226.00

79 Tinker 2 nd class Day 213.00

80 Turner 1 st class Day 258.00

81 Turner 2 nd class Day 236.00

82 Time Keeper Ist class Day 280.00

83 Time Keeper 2nd class Day 258.00

84 Well Diver for removing silt - 1 st class Day 280.00

85 Well Diver for removing silt - 2nd class Day 258.00

12

Page 6: twad 13-14

Schedule Item No.

Description UnitRate inRupees

(2013-14)

86 Well sinker - 1st class Day 316.00

87 Well sinker - 2nd class Day 293.00

88 Wodder Day 236.00

89 Cinema Operator (ITI Passed) Day 293.00

90 B.Sc., (Agriculture) Passed Day 420.0091 Irrigation Community Organiser Grade I [B.E(Agri)

passed/B.Sc.,(Agri)Passed/PG (Geology) & RuralDevelopment]

Day 450.00

92 Irrigation Community Organiser Grade II [B.E(Agri)failed / B.Sc.,(Agri)failed /Diploma in Agri. Passed)] Day 375.00

93 Heat Master Operator Day 236.00

94 Raker Day 236.00

95 Lift Operator Day 271.0096 Sound Service Operator Day 226.00

1313

Page 7: twad 13-14

RATES FOR MATERIALS

Page 8: twad 13-14

I Quarter II Quarter III Quarter IV QuarterI 4KSC1 63mm Metre 47.502 75mm Metre 66.503 90mm Metre 93.004 110mm Metre 135.505 125mm Metre 175.506 140mm Metre 219.507 160mm Metre 287.008 180mm Metre 366.509 200mm Metre 451.0010 225mm Metre 578.5011 250mm Metre 703.5012 280mm Metre 1014.5013 315mm Metre 1128.50II 6KSC1 50mm Metre 40.502 63mm Metre 66.503 75mm Metre 93.004 90mm Metre 136.005 110mm Metre 194.00

6 125mm Metre 258.007 140mm Metre 318.508 160mm Metre 410.509 180mm Metre 526.0010 200mm Metre 656.0011 225mm Metre 836.5012 250mm Metre 1040.5013 280mm Metre 1307.0014 315mm Metre 1660.00III 10KSC1 50mm Metre 66.002 63mm Metre 103.503 75mm Metre 147.004 90mm Metre 208.505 110mm Metre 310.00

6 125mm Metre 400.507 140mm Metre 502.508 160mm Metre 658.009 180mm Metre 827.0010 200mm Metre 1058.0011 225mm Metre 1344.5012 250mm Metre 1663.0013 280mm Metre 2083.0014 315mm Metre 2636.00

Note : The rates are inclusive of all taxes, duties and transportation charges anywhere in Tamilnadu.

Excise Duty-12.36, VAT-5%.

1.0 PVC PIPE WITH EXCISE DUTY AS PER IS 4985 / 2000

Sl.

NoDescription Unit

Rate for 2013-14 in Rupees

1

Page 9: twad 13-14

I Quarter II Quarter III Quarter IV Quarter

I 4KSC1 63mm Metre 43.002 75mm Metre 59.503 90mm Metre 82.004 110mm Metre 119.505 125mm Metre 154.506 140mm Metre 192.007 160mm Metre 251.508 180mm Metre 322.509 200mm Metre 397.00

10 225mm Metre 510.5011 250mm Metre 622.0012 280mm Metre 785.5013 315mm Metre 996.50II 6KSC

1 50mm Metre 35.002 63mm Metre 60.003 75mm Metre 82.004 90mm Metre 118.005 110mm Metre 170.006 125mm Metre 226.007 140mm Metre 282.008 160mm Metre 363.509 180mm Metre 460.50

10 200mm Metre 578.5011 225mm Metre 740.5012 250mm Metre 921.5013 280mm Metre 1159.5014 315mm Metre 1466.50

III 10KSC1 50mm Metre 58.002 63mm Metre 91.503 75mm Metre 129.504 90mm Metre 184.005 110mm Metre 273.506 125mm Metre 354.507 140mm Metre 441.008 160mm Metre 578.509 180mm Metre 728.50

10 200mm Metre 934.0011 225mm Metre 1186.5012 250mm Metre 1468.0013 280mm Metre 1842.0014 315mm Metre 2329.00

Note : The rates are inclusive of VAT at 5% and transportation charges anywhere in

Tamilnadu. .

1.1 PVC PIPE WITHOUT EXCISE DUTY AS PER IS 4985/2000

Sl.

NoDescription Unit

Rate for 2013-14

in Rupees

2

Page 10: twad 13-14

I Quarter II Quarter III Quarter IV Quarter

1 150mm CS Metre 509.00

2 150mm CM Metre 615.00

3 150mm RS Metre 725.50

4 200mm CS Metre 937.00

5 200mm CM Metre 1120.50

6 200mm RS Metre 1325.50

I Quarter II Quarter III Quarter IV Quarter

1 150mm CS Metre 429.50

2 150mm CM Metre 515.50

3 150mm RS Metre 613.00

4 200mm CS Metre 793.50

5 200mm CM Metre 935.00

6 200mm RS Metre 1122.00

1.2 PVC CASING PIPE with Excise Duty AS PER IS 12818 / 1992

Sl.

NoDescription Unit

Rate for 2013-14

in Rupees

CM - Casing Medium depth

RS - Ribbed screen pipe

1.3 PVC CASING PIPE without Excise Duty AS PER IS 12818 / 1992

Sl.

NoDescription Unit

Rate for 2013-14

in Rupees

CS - Casing Shallow depth

3

Page 11: twad 13-14

With Excise

duty

Without Excise

duty

I SN8-SDR 34(S 16.5)

1 110mm Metre 178.00 163.00

2 125mm Metre 240.00 221.00

3 160mm Metre 381.00 351.00

4 200mm Metre 593.00 548.00

5 250mm Metre 917.00 849.00

6 315mm Metre 1454.00 1344.00

7 400mm Metre 2338.00 2159.00

II SN4-SDR 41(S 20)

1 125mm Metre 205.00 163.00

2 160mm Metre 325.00 221.00

3 200mm Metre 496.00 351.00

4 250mm Metre 781.00 548.00

5 315mm Metre 1223.00 849.00

6 400mm Metre 1971.00 1344.00

III SN2-SDR 51(S 25)

1 160mm Metre 262.00 242.00

2 200mm Metre 403.00 370.00

3 250mm Metre 626.00 578.00

4 315mm Metre 990.00 914.00

5 400mm Metre 1581.00 1461.00

Note: The above rates are inclusive of all taxes , duties and transportation charges

anywhere in Tamilnadu.Excise duty at 12.36% and VAT at 5%.

1.4 UPVC- non pressure pipes as per IS 15328/2003

Sl

No.Description Unit

Rate for 2013-14 in Rupees

4

Page 12: twad 13-14

Sl.No. Description UnitRate for 2013-14 in

Rupees

1 2 3 4

PVC THREADED COUPLER

1 63 mm x 50 mm Each 33.00

2 75 mm x 50 mm Each 53.00

3 90 mm x 80 mm Each 72.00

4 110 mm x 100 mm Each 125.00

5 140 mm x 125 mm Each 181.00

UNEQUAL TEE

1 63 mm x 50 mm Each 53.00

2 75 mm X 50 mm Each 109.00

3 90 mm x 50 mm Each 155.00

4 90 mm x 63 mm Each 155.00

5 90 mm x 75 mm Each 155.00

6 110 mm x 50 mm Each 233.00

7 110mm x 63 mm Each 233.00

8 110 mm x 90mm Each 233.00

9 140mm x 50 mm Each 387.00

10 140 mm x 63 mm Each 387.00

11 140 mm x 90 mm Each 387.00

12 140 mm x 110 mm Each 397.00

13 160 mm x 50 mm Each 473.00

14 160 mm x 63 mm Each 473.00

15 160 mm x 90 mm Each 473.00

16 160 mm x 110mm Each 473.00

17 160 mm x140 mm Each 473.00

PVC REDUCER COUPLER

1 63 mm x 50 mm Each 26.00

2 75 mm x 63 mm Each 36.00

3 90 mm x 63 mm Each 56.00

4 90 mm x 75 mm Each 56.00

5 110 mm x 63 mm Each 75.00

6 110 mm x 75 mm Each 75.00

7 110 mm x 90 mm Each 98.00

8 140 mm x 63 mm Each 112.00

9 140 mm x 90 mm Each 113.00

10 140 mm x 110 mm Each 117.00

11 160 mm x 110 mm Each 183.00

12 160 mm x 140 mm Each 198.00

1.5 PVC SPECIALS AS PER IS

5

Page 13: twad 13-14

Sl.No. Description UnitRate for 2013-14 in

Rupees

PVC REDUCER MULTI STAGE

1 90 mm x 63 mm Each 81.00

2 110 mm x 63 mm Each 157.00

3 110 mm x 75 mm Each 157.00

4 110 mm x 90 mm Each 177.00

5 140 mm x 90 mm Each 179.00

PVC REDUCER FABRICATED

1 75 mm x 63 mm Each 48.00

2 90 mm x 75 mm Each 73.00

3 110 mm x 90 mm Each 112.00

4 140 mm x 110 mm Each 179.00

5 160 mm x 140 mm Each 272.00

SADDLE PIECE

1 63 mm x 20 mm Each 72.00

2 75 mm x 20 mm Each 88.00

3 90 mm x 20 mm Each 100.00

4 110 mm x 20 mm Each 114.00

5 140 mm x 20 mm Each 177.00

6 160 mm x 20 mm Each 231.00

Note: The above rates are inclusive of all taxes, duties and transportation charges anywhere in

Tamilnadu.Excise duty 12.36% and VAT 5%.

6

Page 14: twad 13-14

Sl.N

o.Description

20mm 25mm 32mm 40mm 50mm 63mm 75mm 90mm 110mm140mm 160mm 200mm

1 PVC Couplers fabricated 4 KSC - - - - 10.00 18.00 23.00 30.00 59.00 116.00 147.00 248.00

2 PVC Couplers fabricated 6 KSC - - - - 18.00 23.00 26.00 40.00 61.00 137.00 196.00 402.00

3 PVC Bends fabricated4 KSC - - - - 27.00 38.00 62.00 96.00 122.00 384.00 624.00 1183.00

4 PVC Bends fabricated 6 KSC - - - - 30.00 48.00 85.00 118.00 196.00 515.00 841.00 1703.00

5 PVC Equal Tee Fabricated 4 KSC - - - - 29.00 36.00 38.00 94.00 157.00 224.00 270.00 337.00

6 PVC Equal Tee Fabricated

BIS 10124/1982 PartV 6 KSC

- - - - 39.00 86.00 95.00 156.00 254.00 328.00 351.00 417.00

7 PVC Couplers (Mould) BIS

7834/1975 Part VI

5.00 8.00 9.00 18.00 23.00 40.00 60.00 94.00 131.00 231.00 312.00 482.00

8 PVC Elbow (Mould) BIS

7834/1975 Part VI

8.00 10.00 13.00 25.00 48.00 52.00 77.00 114.00 176.00 295.00 363.00 438.00

9 PVC Equal tee (Mould) BIS

7834/1975

9.00 17.00 25.00 27.00 53.00 96.00 112.00 182.00 290.00 711.00 792.00 988.00

10 PVC Male Threaded Adopter 26.00 29.00 30.00 65.00 113.00 173.00 196.00 317.00

11 PVC End Cap 4.00 5.00 9.00 10.00 12.00 23.00 38.00 55.00 86.00 148.00 209.00 319.00

12 PVC Tail piece without flange

(BIS marks)

29.00 31.00 39.00 57.00 86.00 148.00 213.00 319.00

1.5 PVC SPECIALS AS PER IS cont..

Rate for 2013-14

in Rupees

Note: The above rates are inclusive of all taxes,duties and transportation charges anywhere inTamilnadu.

Excise duty 12.36% and VAT 5%.

7

Page 15: twad 13-14

I Quarter II Quarter III Quarter IV Quarter

1 50 mm metre 55.00

2 63 mm metre 81.00

3 75 mm metre 118.50

4 90 mm metre 165.50

5 110 mm metre 242.00

6 125 mm metre 313.50

7 140 mm metre 395.50

8 160 mm metre 516.00

9 180 mm metre 650.00

10 200 mm metre 801.00

11 225 mm metre 999.50

12 250 mm metre 1248.00

13 280 mm metre 1567.00

14 315 mm metre 1983.00

15 355 mm metre 2513.00

16 400 mm metre 3251.00

17 450 mm metre 4112.00

18 500 mm metre 5083.00

19 560 mm metre 6605.50

20 630 mm metre 8364.50

1 50 mm metre 66.00

2 63 mm metre 104.50

3 75 mm metre 146.50

4 90 mm metre 212.00

5 110 mm metre 313.50

6 125 mm metre 405.50

7 140 mm metre 509.00

8 160 mm metre 663.50

9 180 mm metre 834.00

10 200 mm metre 1031.00

11 225 mm metre 1308.50

12 250 mm metre 1609.50

13 280 mm metre 2019.50

14 315 mm metre 2554.00

15 355 mm metre 3233.00

16 400 mm metre 4189.00

17 450 mm metre 5263.00

18 500 mm metre 6506.50

19 560 mm metre 8530.00

20 630 mm metre 10753.50

PN 6

2.0 HDPE PIPES - PE 100 with excise duty AS PER IS 4984/1995

Sl No Description Unit

Rate for 2013-14

in Rupees

PN 8

8

Page 16: twad 13-14

1 50 mm metre 80.50

2 63 mm metre 127.00

3 75 mm metre 180.00

4 90 mm metre 257.50

5 110 mm metre 379.50

6 125 mm metre 490.00

7 140 mm metre 611.50

8 160 mm metre 799.50

9 180 mm metre 1016.50

10 200 mm metre 1165.00

11 225 mm metre 1579.00

12 250 mm metre 1947.50

13 280 mm metre 2436.50

14 315 mm metre 3089.00

15 355 mm metre 3926.50

16 400 mm metre 5086.00

17 450 mm metre 6418.50

18 500 mm metre 7849.00

19 560 mm metre 10308.50

20 630 mm metre 13063.00

1 50 mm metre 99.50

2 63 mm metre 154.50

3 75 mm metre 221.50

4 90 mm metre 318.00

5 110 mm metre 469.50

6 125 mm metre 605.50

7 140 mm metre 761.00

8 160 mm metre 991.50

9 180 mm metre 1255.50

10 200 mm metre 1550.00

11 225 mm metre 1961.50

12 250 mm metre 2412.50

13 280 mm metre 3025.50

14 315 mm metre 3829.50

15 355 mm metre 4862.50

16 400 mm metre 6304.00

17 450 mm metre 8030.00

18 500 mm metre 10030.00

19 560 mm metre 12406.50

20 630 mm metre 15702.00

PN 10

PN 12.5

9

Page 17: twad 13-14

1 50 mm metre 117.50

2 63 mm metre 188.50

3 75 mm metre 265.50

4 90 mm metre 383.00

5 110 mm metre 568.50

6 125 mm metre 736.50

7 140 mm metre 919.00

8 160 mm metre 1206.00

9 180 mm metre 1522.00

10 200 mm metre 1877.50

11 225 mm metre 2375.50

12 250 mm metre 2931.00

13 280 mm metre 3673.50

14 315 mm metre 4646.00

15 355 mm metre 5891.50

16 400 mm metre 7639.00

17 450 mm metre 9746.00

18 500 mm metre 12336.00

PN 16

Note: The above rates are inclusive of all taxes, duties and transportation charges anywhere

in Tamilnadu.Excise duty 12.36% and VAT 5%.

10

Page 18: twad 13-14

I Quarter II Quarter III Quarter IV Quarter

1 50 mm metre 47.00

2 63 mm metre 74.00

3 75 mm metre 104.50

4 90 mm metre 145.00

5 110 mm metre 214.50

6 125 mm metre 278.00

7 140 mm metre 348.50

8 160 mm metre 454.50

9 180 mm metre 572.00

10 200 mm metre 707.00

11 225 mm metre 897.00

12 250 mm metre 1100.50

13 280 mm metre 1380.00

14 315 mm metre 1747.50

15 355 mm metre 2213.00

16 400 mm metre 2862.00

17 450 mm metre 3620.00

18 500 mm metre 4476.00

19 560 mm metre 5808.50

20 630 mm metre 7354.00

0.00

1 50 mm metre 59.00

2 63 mm metre 92.50

3 75 mm metre 130.00

4 90 mm metre 186.50

5 110 mm metre 278.50

6 125 mm metre 357.50

7 140 mm metre 447.50

8 160 mm metre 585.00

9 180 mm metre 737.50

10 200 mm metre 908.50

11 225 mm metre 1151.50

12 250 mm metre 1418.00

13 280 mm metre 1778.50

14 315 mm metre 2250.50

15 355 mm metre 2847.50

16 400 mm metre 3690.00

17 450 mm metre 4635.00

18 500 mm metre 5729.50

19 560 mm metre 7498.00

20 630 mm metre 9459.00

PN 6

2.1 HDPE PIPES - PE 100 without excise duty AS PER IS 4984/1995

Sl No Description Unit

Rate for 2013-14

in Rupees

PN 8

11

Page 19: twad 13-14

0.00

1 50 mm metre 72.00

2 63 mm metre 111.50

3 75 mm metre 159.50

4 90 mm metre 226.50

5 110 mm metre 335.50

6 125 mm metre 432.00

7 140 mm metre 539.00

8 160 mm metre 705.00

9 180 mm metre 896.00

10 200 mm metre 1027.00

11 225 mm metre 1391.00

12 250 mm metre 1715.00

13 280 mm metre 2148.00

14 315 mm metre 2720.50

15 355 mm metre 3459.50

16 400 mm metre 4479.00

17 450 mm metre 5652.50

18 500 mm metre 6983.00

19 560 mm metre 9066.00

20 630 mm metre 11483.50

0.00

1 50 mm metre 86.00

2 63 mm metre 137.00

3 75 mm metre 192.00

4 90 mm metre 280.50

5 110 mm metre 415.50

6 125 mm metre 533.00

7 140 mm metre 668.00

8 160 mm metre 873.50

9 180 mm metre 1103.00

10 200 mm metre 1361.00

11 225 mm metre 1725.00

12 250 mm metre 2120.00

13 280 mm metre 2661.50

14 315 mm metre 3369.50

15 355 mm metre 4274.50

16 400 mm metre 5543.00

17 450 mm metre 7060.50

18 500 mm metre 8704.50

19 560 mm metre 10909.00

20 630 mm metre 13804.50

PN 10

PN 12.5

12

Page 20: twad 13-14

0.00

1 50 mm metre 104.00

2 63 mm metre 181.00

3 75 mm metre 233.00

4 90 mm metre 336.00

5 110 mm metre 501.50

6 125 mm metre 647.00

7 140 mm metre 810.00

8 160 mm metre 1060.50

9 180 mm metre 1337.50

10 200 mm metre 1650.50

11 225 mm metre 2089.50

12 250 mm metre 2577.50

13 280 mm metre 3230.00

14 315 mm metre 4084.50

15 355 mm metre 5180.50

16 400 mm metre 6717.00

17 450 mm metre 8570.00

18 500 mm metre 10822.00

PN 16

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in

Tamilnadu.

13

Page 21: twad 13-14

90 Degree Bend Equal Tee

1 125 mm each 295.00 325.002 140 mm each 406.00 447.003 160 mm each 588.00 657.004 180 mm each 820.00 933.005 200 mm each 1113.00 1244.006 225 mm each 1529.00 1755.007 250 mm each 2083.00 2386.008 280 mm each 2919.00 3316.009 315 mm each 6258.00 4573.0010 355 mm each 8380.00 6397.0011 400 mm each 11866.00 9355.0012 450 mm each 15742.00 13281.0013 500 mm each 24873.00 25016.0014 560 mm each 30745.00 31270.0015 630 mm each 35637.00 39712.00

1 125 mm each 398.00 488.002 140 mm each 532.00 668.003 160 mm each 757.00 967.004 180 mm each 1058.00 1349.005 200 mm each 1430.00 1802.006 225 mm each 1954.00 2513.007 250 mm each 2629.00 3390.008 280 mm each 3637.00 4685.009 315 mm each 7558.00 6418.0010 355 mm each 10777.00 8928.0011 400 mm each 15731.00 12947.0012 450 mm each 22409.00 18286.0013 500 mm each 30736.00 33075.0014 560 mm each 43194.00 41410.0015 630 mm each 61502.00 52728.00

1 50 mm each 68.00 72.002 63 mm each 109.00 108.003 75 mm each 120.00 177.004 90 mm each 202.00 282.005 110 mm each 324.00 438.006 125 mm each 502.00 653.007 140 mm each 655.00 889.008 160 mm each 926.00 1277.009 180 mm each 1296.00 1767.0010 200 mm each 1743.00 2358.0011 225 mm each 2376.00 3268.0012 250 mm each 3173.00 4393.0013 280 mm each 4356.00 6053.0014 315 mm each 9649.00 8262.0015 355 mm each 12223.00 11460.0016 400 mm each 17932.00 16541.0017 450 mm each 22937.00 23290.0018 500 mm each 30755.00 41135.0019 560 mm each 52215.00 69428.0020 630 mm each 74445.00 98947.00

PN 6

2.2 SPECIALS FOR HDPE PIPES AS PER IS

Sl No Description UnitRate for 2013-14

in Rupees

PN 8

PN 10

14

Page 22: twad 13-14

90 Degree Bend Equal TeeSl No Description Unit

Rate for 2013-14

in Rupees

1 125 mm each 586.00 835.002 140 mm each 818.00 1178.003 160 mm each 1171.00 1754.004 180 mm each 1625.00 2514.005 200 mm each 2174.00 3444.006 225 mm each 3094.00 4532.007 250 mm each 3952.00 6185.008 280 mm each 5656.00 8717.009 315 mm each 11999.00 11445.0010 355 mm each 15876.00 16375.0011 400 mm each 22416.00 21896.0012 450 mm each 32670.00 41443.0013 500 mm each 44776.00 59428.0014 560 mm each 62836.00 83429.0015 630 mm each 89491.00 118773.00

1 50 mm each 111.00 116.002 63 mm each 173.00 170.003 75 mm each 202.00 290.004 90 mm each 311.00 443.005 110 mm each 568.00 806.006 125 mm each 612.00 1014.007 140 mm each 857.00 1427.008 160 mm each 1487.00 2171.009 180 mm each 2007.00 3106.0010 200 mm each 2691.00 4263.0011 225 mm each 3830.00 5607.0012 250 mm each 4898.00 7666.0013 280 mm each 7003.00 10793.0014 315 mm each 14859.00 14768.0015 355 mm each 19670.00 21139.0016 400 mm each 27829.00 36867.0017 450 mm each 39657.00 50197.0018 500 mm each 54365.00 72003.00

PN 12.5

PN 16

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in

Tamilnadu. Excise duty at 12.36%.

15

Page 23: twad 13-14

1 50 mm Joint 45.00

2 63 mm Joint 57.00

3 75 mm Joint 68.00

4 90 mm Joint 81.00

5 110 mm Joint 99.00

6 125 mm Joint 112.00

7 140 mm Joint 127.00

8 160 mm Joint 144.00

9 180 mm Joint 162.00

10 200 mm Joint 180.00

11 225 mm Joint 202.00

12 250 mm Joint 224.00

13 280 mm Joint 252.00

14 315 mm Joint 284.00

15 355 mm Joint 319.00

16 400 mm Joint 360.00

17 450 mm Joint 405.00

18 500 mm Joint 449.00

19 560 mm Joint 635.00

20 630 mm Joint 727.00

2.3 JOINTING OF HDPE PIPES

Sl No Description UnitRate for 2013-14

in Rupees

16

Page 24: twad 13-14

Sl.No Description UnitRate for 2013-14

in Rupees

I Class 15

1 80mm Metre 190.00

2 100mm Metre 251.00

3 125mm Metre 327.00

4 150mm Metre 470.00

5 200mm Metre 805.00

6 250mm Metre 1021.00

7 300mm Metre 1432.00

8 350mm Metre 1796.00

9 400mm Metre 2338.00

10 450mm Metre 2751.00

II Class 20

1 80mm Metre 211.00

2 100mm Metre 318.00

3 125mm Metre 406.00

4 150mm Metre 586.00

5 200mm Metre 1024.00

6 250mm Metre 1312.00

7 300mm Metre 1848.00

8 350mm Metre 2333.00

9 400mm Metre 3046.00

10 450mm Metre 3643.00

3.0 A.C.PRESSURE PIPES AS PER IS 1592 / 2003

(Without Excise Duty)

Note: Excise duty shall be charged extra at 12.36% for non fly ash pipes.

The above rates are inclusive of Vat at 5% and transportation charges

anywhere in Tamilnadu.

17

Page 25: twad 13-14

Sl.No Description UnitRate for 2013-14

in Rupees

I Class 15

1 80mm Each 165.00

2 100mm Each 210.00

3 125mm Each 265.00

4 150mm Each 367.00

5 200mm Each 521.00

6 250mm Each 616.00

7 300mm Each 780.00

8 350mm Each 993.00

9 400mm Each 1432.00

10 450mm Each 1733.00

II Class 20

1 80mm Each 168.00

2 100mm Each 213.00

3 125mm Each 278.00

4 150mm Each 392.00

5 200mm Each 571.00

6 250mm Each 747.00

7 300mm Each 971.00

8 350mm Each 1251.00

9 400mm Each 1818.00

10 450mm Each 2222.00

3.1 A.C. COUPLER AS PER IS 1592 /2003

(Without Excise Duty)

Note: Excise duty shall be charged extra at 12.36% for non fly ash pipes.

The above rates are inclusive of Vat at 5% and transportation charges

anywhere in Tamilnadu.

18

Page 26: twad 13-14

Sl.No Description UnitRate for 2013-14

in Rupees

I Class 15

1 80mm Each 330.00

2 100mm Each 413.00

3 125mm Each 519.00

4 150mm Each 666.00

5 200mm Each 968.00

6 250mm Each 1263.00

7 300mm Each 1520.00

8 350mm Each 2561.00

9 400mm Each 3192.00

10 450mm Each 3835.00

II Class 20

1 80mm Each 337.00

2 100mm Each 417.00

3 125mm Each 560.00

4 150mm Each 674.00

5 200mm Each 1031.00

6 250mm Each 1357.00

7 300mm Each 1324.00

8 350mm Each 2723.00

9 400mm Each 3270.00

10 450mm Each 3862.00

3.2 C.I.D.JOINTS AS PER IS 8794 / 1988

Note: Excise Duty is applicable on CID Joints.

The above rates are inclusive of Vat at 5% and transportation charges

anywhere in Tamilnadu.

19

Page 27: twad 13-14

With

Excise Duty

Without Excise

Duty

I LA Class

1 80mm Metre 1127.00 1040.002 100mm Metre 1366.00 1262.003 125mm Metre 1702.00 1571.004 150mm Metre 2036.00 1880.005 200mm Metre 2970.00 2743.006 250mm Metre 4004.00 3698.007 300mm Metre 5165.00 4771.008 350mm Metre 6641.00 6136.009 400mm Metre 8083.00 7468.0010 450mm Metre 9794.00 9049.0011 500mm Metre 11624.00 10741.0012 600mm Metre 15331.00 14164.0013 700mm Metre 20328.00 18780.0014 750mm Metre 22824.00 21086.00

II A Class1 80mm Metre 1223.00 1129.002 100mm Metre 1502.00 1387.003 125mm Metre 1856.00 1715.004 150mm Metre 2230.00 2060.005 200mm Metre 3226.00 2981.006 250mm Metre 4361.00 4028.007 300mm Metre 5646.00 5216.008 350mm Metre 7204.00 6655.009 400mm Metre 8834.00 8161.0010 450mm Metre 10757.00 9938.0011 500mm Metre 12664.00 11700.0012 600mm Metre 16735.00 15462.0013 700mm Metre 22206.00 20516.0014 750mm Metre 24865.00 22974.00

III B Class1 80mm Metre 1312.00 1213.002 100mm Metre 1597.00 1477.003 125mm Metre 1999.00 1847.004 150mm Metre 2402.00 2220.005 200mm Metre 3488.00 3222.006 250mm Metre 4716.00 4357.007 300mm Metre 6115.00 5651.008 350mm Metre 7810.00 7216.009 400mm Metre 9536.00 8810.0010 450mm Metre 11604.00 10722.0011 500mm Metre 13702.00 12660.0012 600mm Metre 18131.00 16750.0013 700mm Metre 23992.00 22165.0014 750mm Metre 26896.00 24847.00

Note:The above rates are inclusive of VAT at 5% and transportation charges anywhere in

Tamilnadu.Excise duty at 12.36%

4.0 C.I. SPUN PIPES AS PER IS 1536/2001

Sl.No. Size of pipes Unit

Rate for 2013-14

in Rupees

20

Page 28: twad 13-14

With Excise

Duty

Without Excise

duty

I STANDARD

1 80mm to 200mm Kg 67.00 61.00

2 250mm to 400mm Kg 68.00 64.00

3 450mm to 750mm Kg 70.00 65.00

II NON-STANDARD

1 80mm to 200mm Kg 67.00 61.00

2 250mm to 400mm Kg 68.00 64.00

3 450mm to 750mm Kg 70.00 65.00

With Excise

Duty

Without Excise

duty

I

1 80mm to 200mm Kg 67.00 61.00

2 250mm to 400mm Kg 68.00 64.00

3 450mm to 750mm Kg 70.00 65.00

II. NON-STANDARD

1 80mm to 200mm Kg 67.00 61.00

2 250mm to 400mm Kg 68.00 64.00

3 450mm to 750mm Kg 70.00 65.00

4.2 CI D/F SPECIALS & S/S SPECIALS

AS PER IS 1538/1986

4.1 C.I D/F PIPES AS PER IS 7181/1986 & IS 1537

Sl. No Size Unit

Rate for 2013-14

in Rupees

Sl. No Size Unit

Rate for 2013-14

in Rupees

STANDARD

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere

in Tamilnadu.Excise duty at 12.36

21

Page 29: twad 13-14

With Excise Duty Without Excise

Duty

1 15mm metre 78.00 72.000

2 20mm metre 103.00 95.000

3 25mm metre 149.00 138.000

4 32mm metre 188.00 174.000

5 40mm metre 219.00 202.000

6 50mm metre 297.00 275.000

7 65mm metre 380.00 352.000

8 80mm metre 471.00 435.000

9 100mm metre 672.00 620.000

10 125mm metre 964.00 891.000

11 150mm metre 1077.00 996.000

5.0 G I PIPES (MEDIUM) AS PER IS 1239/PART I/90

Sl No Description Unit

Rate for 2013-14 in Rupees

Note: The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu.Excise duty 12.36%.

22

Page 30: twad 13-14

GI REDUCER (HEAVY)

1 100 mm x 80 mm Each 337.00

2 100 mm x 65 mm Each 337.00

3 100 mm x 50 mm Each 337.00

4 80 mm x 65 mm Each 209.00

5 80 mm x 50 mm Each 209.00

6 80 mm x 40 mm Each 209.00

7 80 mm x 32 mm Each 209.00

8 65 mm x 50 mm Each 145.00

9 65 mm x 40 mm Each 145.00

10 65 mm x 32 mm Each 145.00

11 65 mm x 20 mm Each 145.00

12 50 mm x 40 mm Each 79.00

13 50 mm x 32 mm Each 79.00

14 50 mm x 20 mm Each 79.00

15 40 mm x 32 mm Each 53.00

16 40 mm x 20 mm Each 53.00

GI REDUCER (MEDIUM)

1 100 mm x 80 mm Each 243.00

2 100 mm x 65mm Each 243.00

3 100 mm x 50 mm Each 243.00

4 80 mm x 65 mm Each 134.00

5 80 mm x 50 mm Each 102.00

6 80 mm x 40 mm Each 102.00

7 80 mm x 32 mm Each 102.00

8 65 mm x 50 mm Each 76.00

9 65 mm x 40 mm Each 76.00

10 65 mm x 32 mm Each 76.00

11 65 mm x 20 mm Each 76.00

12 50 mm x 40 mm Each 51.00

13 50 mm x 32 mm Each 51.00

14 50 mm x 20 mm Each 51.00

15 40 mm x 32 mm Each 33.00

16 40 mm x 20 mm Each 33.00

G I UNEQUAL TEE (HEAVY)

1 100 mm x 80 mm Each 654.00

2 100 mm x 65mm Each 654.00

3 100 mm x 50 mm Each 654.00

4 80 mm x 65 mm Each 381.00

5 80 mm x 50 mm Each 381.00

6 80 mm x 40 mm Each 381.00

7 80 mm x 32 mm Each 381.00

5.1 G.I. SPECIALS AS PER IS

Sl.No. Description UnitRates for 2013-14

in Rupees

23

Page 31: twad 13-14

Sl.No. Description UnitRates for 2013-14

in Rupees

8 65 mm x 50 mm Each 280.00

9 65 mm x 40 mm Each 280.00

10 65 mm x 32 mm Each 280.00

11 65 mm x 20 mm Each 280.00

12 50 mm x 40 mm Each 167.00

13 50 mm x 32 mm Each 167.00

14 50 mm x 20 mm Each 167.00

15 40 mm x 32 mm Each 105.00

16 40 mm x 20 mm Each 105.00

17 32 mm x 20 mm Each 75.00

G.I UNEQUAL TEE(MEDIUM)

1 100 mm x 80 mm Each 371.00

2 100 mm x 65mm Each 371.00

3 100 mm x 50 mm Each 371.00

4 80 mm x 65 mm Each 183.00

5 80 mm x 50 mm Each 183.00

6 80 mm x 40 mm Each 183.00

7 80 mm x 32 mm Each 183.00

8 65 mm x 50 mm Each 128.00

9 65 mm x 40 mm Each 128.00

10 65 mm x 32 mm Each 128.00

11 65 mm x 20 mm Each 128.00

12 50 mm x 40 mm Each 76.00

13 50 mm x 32 mm Each 76.00

14 50 mm x 20 mm Each 76.00

15 40 mm x 32 mm Each 54.00

16 40 mm x 20 mm Each 54.00

17 32 mm x 20 mm Each 54.00

MS BOLTS AND NUTS

1 16 mm dia x 65 to 90 mm

length fully threaded bolts and

nuts with 2 Nos. Kg. 63.00

2 20mm dia and above x 90mm

to 120mm length fully threaded Kg. 66.00

RUBBER INSERTION SHEET

1 3 Ply R.I. Sheet Kg. 55.00

AC COWL

1 80 mm dia Each 24.00

2 100 mm dia Each 41.00

Note: The above rates are inclusive of all taxes, duties and transportation

charges.Excise duty 12.36% and VAT at 5%.

24

Page 32: twad 13-14

Sl.No. Description

15mm 20mm 25mm 32mm 40mm 50mm 65mm 80mm 100mm

1 G.I. Equal Elbow plain 17.00 22.00 33.00 54.00 68.00 104.00 186.00 274.00 492.00

2 G.I. Equal Tee plain 24.00 30.00 43.00 63.00 93.00 154.00 299.00 344.00 615.00

3 G.I. Coupling 14.00 15.00 20.00 36.00 54.00 81.00 143.00 170.00 341.00

4 G.I. Flange set -- -- -- -- -- 50.00 61.00 68.00 114.00

5 G.I. Cross 37.00 46.00 74.00 120.00 155.00 234.00 376.00 572.00 753.00

6 G.I. Hex Nipple 14.00 25.00 25.00 39.00 51.00 69.00 123.00 169.00 251.00

7 G.I.Three Way Elbow 37.00 48.00 70.00 112.00 147.00 235.00 -- -- --

8 G.I.Plug Dia Head Taper Thread 7.00 13.00 13.00 23.00 23.00 43.00 60.00 85.00 120.00

9 G.I.Bend 15.00 25.00 39.00 48.00 63.00 95.00 176.00 244.00 428.00

10 G.I.Union 45.00 46.00 77.00 108.00 138.00 196.00 385.00 512.00 762.00

11 G.M. Ferrule 238.00 358.00 527.00 -- -- -- -- -- --

12 G.I.stop cock 113.00 151.00 274.00 411.00 611.00 882.00 1168.00 1487.00 2352.00

13 Rubber sheet for Flange set -- -- -- -- -- 9.00 9.00 13.00 --

14 G.I. Reduced Elbow Plain 20.00 22.00 37.00 58.00 77.00 113.00 203.00 305.00 526.00

15 G.I.Reduced Tee Plain 26.00 36.00 53.00 79.00 104.00 153.00 273.00 365.00 688.00

16 G.I. Reduced Socket Plain 15.00 37.00 40.00 47.00 90.00 107.00 153.00 204.00 290.00

17 G.I. Check Nut 9.00 13.00 18.00 27.00 36.00 48.00 84.00 109.00 144.00

18 G.I.Reduced Nipple 14.00 17.00 30.00 70.00 89.00 123.00 256.00 256.00 356.00

19 G.I. Dummy (Heavy) -- -- -- -- 15.00 23.00 30.00 38.00 68.00

20 G.I.Dummy (Medium) -- -- -- -- 13.00 20.00 27.00 33.00 64.00

21 M.S.Saddle Piece -- -- -- -- -- 58.00 64.00 74.00 99.00

22 Waste Not Tap -- 83.00 -- -- -- -- -- -- --

23 C.I.Footvalve with stainer -- -- -- -- -- 266.00 -- 396.00 --

24 M.S.Clampset -- -- -- -- -- -- -- 330.00 --

5.1 G.I. SPECIALS AS PER IS CONTINUED….

Rate for 2013-14 in Rupees

Note: The above rates are inclusive of all taxes , duties and transportation charges anywhere in Tamilnadu

Excise Duty 12.36% and VAT at 5%.

25

Page 33: twad 13-14

Sl.No. Description

15mm 20mm 25mm 32mm 40mm 50mm 65mm 80mm 100mm

1 G.M. Gate valves -- 342.00 461.00 604.00 822.00 1340.00 2089.00 3287.00 5640.00

2 G.M. Non Return valves -- -- -- -- -- 1328.00 1328.00 2132.00 --

5.2 G.M GATE VALVES AS PER IS

Rate for 2013-14 in Rupees

Note: The above rates are inclusive of all taxes , duties and transportation charges anywhere in Tamilnadu

Excise Duty 12.36% and VAT at 5%.

26

Page 34: twad 13-14

With Excise

Duty

Without Excise

Duty

1 100 mm metre 961.00 880.00

2 150 mm metre 1351.00 1237.00

3 200 mm metre 1789.00 1638.00

4 250 mm metre 2354.00 2156.00

5 300 mm metre 3000.00 2747.00

6 350mm metre 3710.00 3397.00

7 400 mm metre 4464.00 4088.00

8 450 mm metre 5277.00 4834.00

9 500 mm metre 6207.00 5684.00

10 600 mm metre 8249.00 7555.00

11 700 mm metre 11249.00 10302.00

12 750 mm metre 13004.00 11910.00

13 800 mm metre 15447.00 14147.00

14 900 mm metre 18354.00 16809.00

15 1000 mm metre 21544.00 19731.00

Note: The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu.Excise duty 12.36%.

6.0 DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS K7

AS PER IS 8329/2000

Sl No Description Unit

Rate for 2013-14

in Rupees

27

Page 35: twad 13-14

With Excise

Duty

Without Excise

Duty

1 100 mm metre1062.00 973.00

2 150 mm metre1494.00 1369.00

3 200 mm metre2090.00 1914.00

4 250 mm metre2796.00 2563.00

5 300 mm metre3547.00 3250.00

6 350mm metre4395.00 4026.00

7 400 mm metre5254.00 4814.00

8 450 mm metre6251.00 5728.00

9 500 mm metre7284.00 6674.00

10 600 mm metre9662.00 8854.00

11 700 mm metre12441.00 11399.00

12 750 mm metre14037.00 12862.00

13 800 mm metre16156.00 14803.00

14 900 mm metre19204.00 17594.00

15 1000 mm metre22545.00 20657.00

6.1 DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS K9

AS PER IS 8329/2000

Sl No Description Unit

Rate for 2013-14

in Rupees

Note: The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu.Excise duty 12.36%.

28

Page 36: twad 13-14

With Excise

Duty

Without Excise

Duty

1 80 mm Each 5288.00 4844.00

2 100 mm Each 7178.00 6575.00

3 150 mm Each 10556.00 9669.00

4 200 mm Each 14620.00 13392.00

5 250 mm Each 19283.00 17663.00

6 300 mm Each 24233.00 22198.00

7 350mm Each 32232.00 29524.00

8 400 mm Each 41039.00 37591.00

9 450 mm Each 49856.00 45667.00

10 500 mm Each 59603.00 54594.00

11 600 mm Each 80512.00 73746.00

12 700 mm Each 100116.00 91704.00

13 750 mm Each 111857.00 102458.00

14 800 mm Each 123598.00 113214.00

15 900 mm Each 148226.00 135771.00

16 1000mm Each 184253.00 168771.00

1 80 mm Each 6117.00 5603.00

2 100 mm Each 8798.00 8060.00

3 150 mm Each 12658.00 11594.00

4 200 mm Each 16915.00 15494.00

5 250 mm Each 22336.00 20460.00

6 300 mm Each 28084.00 25724.00

7 350 mm Each 38974.00 35700.00

8 400 mm Each 47652.00 43686.00

9 450 mm Each 56896.00 52115.00

10 500 mm Each 67909.00 62204.00

11 600 mm Each 92884.00 85080.00

12 700 mm Each 114004.00 104426.00

13 750 mm Each 127386.00 116682.00

14 800 mm Each 140770.00 128941.00

15 900 mm Each 168935.00 154741.00

16 1000 mm Each 209195.00 191618.00

II) 5 m length of pipes

Note: The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu.Excise duty 12.36%.

6.2 DUCTILE IRON CLASS K9 FLANGED PIPES

AS PER IS 8329/2000

Sl No Description Unit

Rate for 2013-14

in Rupees

I) 4 m length of pipes

29

Page 37: twad 13-14

ALL SOCKET

1 100mm - 200 mm dia Kg 97.00

2 250 mm - 300 mm dia Kg 97.00

3 350 mm - 450 mm dia Kg 101.00

4 500 mm - 600 mm dia Kg 108.00

5 700 mm - 750 mm Kg 172.00

6 800mm Kg 172.00

7 900 mm Kg 182.00

8 1000 mm Kg 198.00

ALL FLANGE

1 100mm - 200 mm dia Kg 97.00

2 250 mm - 300 mm dia Kg 97.00

3 350 mm - 450 mm dia Kg 101.00

4 500 mm - 600 mm dia Kg 108.00

5 700 mm - 750 mm Kg 182.00

6 800 mm Kg 182.00

7 900 mm Kg 198.00

8 1000 mm Kg 198.00

Note: The above rates are inclusive of excise duty at 12.36% , VAT at 5%

and transportation charges anywhere in Tamilnadu.

6.3 DUCTILE IRON SPECIALS AS PER IS 9523/2000

Sl No Description Unit

Rate for 2013-14

in Rupees

Note: In respect of flanged and spigot, flanged and socketted type specials,

the rate applicable for flanged type specials is allowed.

30

Page 38: twad 13-14

With Excise

duty

Without Excise

duty

1 2 3 4 5

I. 4 KSC

1 350 mm Metre 1694.00 1565.00

2 400 mm Metre 1882.00 1739.00

3 450 mm Metre 2122.00 1959.00

4 500 mm Metre 2147.00 1982.00

5 600 mm Metre 2559.00 2364.00

6 700 mm Metre 3072.00 2839.00

7 800 mm Metre 3641.00 3364.00

8 900 mm Metre 4564.00 4217.00

9 1000 mm Metre 5209.00 4813.00

10 1100 mm Metre 6360.00 5876.00

11 1200 mm Metre 7613.00 7033.00

II 6 KSC

1 350 mm Metre 1905.00 1760.00

2 400 mm Metre 2090.00 1931.00

3 450 mm Metre 2353.00 2175.00

4 500 mm Metre 2429.00 2243.00

5 600 mm Metre 2831.00 2615.00

6 700 mm Metre 3640.00 3363.00

7 800 mm Metre 4060.00 3752.00

8 900 mm Metre 4961.00 4583.00

9 1000 mm Metre 5917.00 5467.00

10 1100 mm Metre 7033.00 6497.00

11 1200 mm Metre 8574.00 7921.00

III 8 KSC

1 350 mm Metre 1916.00 1770.00

2 400 mm Metre 2148.00 1983.00

3 450 mm Metre 2365.00 2184.00

4 500 mm Metre 2448.00 2261.00

5 600 mm Metre 2912.00 2689.00

6 700 mm Metre 3671.00 3392.00

7 800 mm Metre 4263.00 3938.00

8 900 mm Metre 5060.00 4674.00

9 1000 mm Metre 6077.00 5613.00

10 1100 mm Metre 7205.00 6657.00

11 1200 mm Metre 8753.00 8087.00

IV 10 KSC

1 350 mm Metre 1941.00 1793.00

2 400 mm Metre 2182.00 2017.00

3 450 mm Metre 2408.00 2224.00

4 500 mm Metre 2505.00 2315.00

5 600 mm Metre 2941.00 2717.00

6 700 mm Metre 3721.00 3439.00

7.0 PSC PIPES AS PER IS 784 / 2001

Sl.No. Description Unit

Rate for 2013-14

in Rupees

31

Page 39: twad 13-14

With Excise

duty

Without Excise

duty

Sl.No. Description Unit

Rate for 2013-14

in Rupees

7 800 mm Metre 4362.00 4030.00

8 900 mm Metre 5168.00 4774.00

9 1000 mm Metre 6212.00 5738.00

10 1100 mm Metre 7461.00 6893.00

11 1200 mm Metre 9017.00 8332.00

V 12 KSC

1 350 mm Metre 1981.00 1830.00

2 400 mm Metre 2217.00 2050.00

3 450 mm Metre 2461.00 2273.00

4 500 mm Metre 2568.00 2374.00

5 600 mm Metre 3028.00 2798.00

6 700 mm Metre 3607.00 3332.00

7 800 mm Metre 4487.00 4146.00

8 900 mm Metre 5303.00 4899.00

9 1000 mm Metre 6439.00 5948.00

10 1100 mm Metre 7768.00 7178.00

11 1200 mm Metre 9331.00 8622.00

VI 14 KSC

1 350 mm Metre 2010.00 1856.00

2 400 mm Metre 2268.00 2096.00

3 450 mm Metre 2526.00 2333.00

4 500 mm Metre 2670.00 2466.00

5 600 mm Metre 3152.00 2913.00

6 700 mm Metre 3834.00 3543.00

7 800 mm Metre 4661.00 4306.00

8 900 mm Metre 5613.00 5187.00

9 1000 mm Metre 6780.00 6264.00

10 1100 mm Metre 8066.00 7453.00

11 1200 mm Metre 9690.00 8952.00

VII 16 KSC

1 350 mm Metre 2095.00 1934.00

2 400 mm Metre 2315.00 2139.00

3 450 mm Metre 2589.00 2392.00

4 500 mm Metre 2764.00 2554.00

5 600 mm Metre 3227.00 2981.00

6 700 mm Metre 3890.00 3595.00

7 800 mm Metre 4867.00 4495.00

8 900 mm Metre 5956.00 5501.00

9 1000 mm Metre 7205.00 6657.00

10 1100 mm Metre 8404.00 7765.00

11 1200 mm Metre 10128.00 9359.00

Note: The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu.Excise duty 12.36%.

32

Page 40: twad 13-14

With Excise

Duty

Without Excise

Duty

4 Ksc Pipe

1 350mm Metre 2827.00 2611.00

2 400mm Metre 3126.00 2889.00

3 450mm Metre 3398.00 3138.00

4 500mm Metre 3813.00 3523.00

5 600mm Metre 4930.00 4555.00

6 700mm Metre 5661.00 5229.00

7 800mm Metre 6505.00 6008.00

8 900mm Metre 8432.00 7791.00

9 1000mm Metre 9631.00 8900.00

10 1100mm Metre 12270.00 11336.00

11 1200mm Metre 13385.00 12366.00

12 1300mm Metre 17373.00 16051.00

13 1400mm Metre 18578.00 17162.00

14 1500mm Metre 19190.00 17729.00

6 Ksc Pipe

1 350mm Metre 2850.00 2632.00

2 400mm Metre 3146.00 2906.00

3 450mm Metre 3421.00 3162.00

4 500mm Metre 3841.00 3548.00

5 600mm Metre 4968.00 4591.00

6 700mm Metre 5688.00 5255.00

7 800mm Metre 6533.00 6036.00

8 900mm Metre 8462.00 7819.00

9 1000mm Metre 9839.00 9089.00

10 1100mm Metre 12475.00 11526.00

11 1200mm Metre 13557.00 12524.00

12 1300mm Metre 17404.00 16079.00

13 1400mm Metre 18628.00 17210.00

14 1500mm Metre 19239.00 17774.00

8 Ksc Pipe

1 350mm Metre 2879.00 2660.00

2 400mm Metre 3176.00 2933.00

3 450mm Metre 3448.00 3187.00

4 500mm Metre 3875.00 3579.00

5 600mm Metre 5007.00 4626.00

6 700mm Metre 5718.00 5284.00

7 800mm Metre 6567.00 6067.00

8 900mm Metre 8496.00 7849.00

9 1000mm Metre 10045.00 9280.00

8.0 BAR WRAPPED STEEL CYLINDER PIPES AS PER IS 15155

Sl. No. Description Unit

Rate for 2013-2014

in Rupees

33

Page 41: twad 13-14

With Excise

Duty

Without Excise

Duty

Sl. No. Description Unit

Rate for 2013-2014

in Rupees

10 1100mm Metre 12678.00 11712.00

11 1200mm Metre 13725.00 12680.00

12 1300mm Metre 17443.00 16115.00

13 1400mm Metre 18678.00 17257.00

14 1500mm Metre 19293.00 17823.00

10 Ksc Pipe

1 350mm Metre 2913.00 2690.00

2 400mm Metre 3213.00 2968.00

3 450mm Metre 3484.00 3218.00

4 500mm Metre 3912.00 3615.00

5 600mm Metre 5048.00 4664.00

6 700mm Metre 5757.00 5320.00

7 800mm Metre 6606.00 6103.00

8 900mm Metre 8528.00 7879.00

9 1000mm Metre 10252.00 9472.00

10 1100mm Metre 12881.00 11901.00

11 1200mm Metre 13899.00 12840.00

12 1300mm Metre 17481.00 16149.00

13 1400mm Metre 18767.00 17338.00

14 1500mm Metre 19367.00 17893.00

12 Ksc Pipe

1 350mm Metre 2949.00 2726.00

2 400mm Metre 3257.00 3008.00

3 450mm Metre 3524.00 3254.00

4 500mm Metre 3955.00 3654.00

5 600mm Metre 5095.00 4708.00

6 700mm Metre 5802.00 5361.00

7 800mm Metre 6878.00 6355.00

8 900mm Metre 8572.00 7920.00

9 1000mm Metre 10456.00 9659.00

10 1100mm Metre 13088.00 12092.00

11 1200mm Metre 14069.00 12998.00

12 1300mm Metre 17519.00 16187.00

13 1400mm Metre 18843.00 17409.00

14 1500mm Metre 19443.00 17964.00

14 Ksc Pipe

1 350mm Metre 2998.00 2771.00

2 400mm Metre 3303.00 3051.00

3 450mm Metre 3571.00 3298.00

34

Page 42: twad 13-14

With Excise

Duty

Without Excise

Duty

Sl. No. Description Unit

Rate for 2013-2014

in Rupees

4 500mm Metre 4002.00 3696.00

5 600mm Metre 5147.00 4755.00

6 700mm Metre 6221.00 5748.00

7 800mm Metre 7574.00 6995.00

8 900mm Metre 9308.00 8601.00

9 1000mm Metre 10596.00 9790.00

10 1100mm Metre 13226.00 12220.00

11 1200mm Metre 14507.00 13403.00

12 1300mm Metre 18289.00 16898.00

13 1400mm Metre 20037.00 18513.00

14 1500mm Metre 20494.00 18934.00

16 Ksc Pipe

1 350mm Metre 3050.00 2818.00

2 400mm Metre 3357.00 3102.00

3 450mm Metre 3624.00 3348.00

4 500mm Metre 4089.00 3777.00

5 600mm Metre 5451.00 5037.00

6 700mm Metre 6649.00 6144.00

7 800mm Metre 7968.00 7361.00

8 900mm Metre 9546.00 8818.00

9 1000mm Metre 10735.00 9918.00

10 1100mm Metre 13364.00 12348.00

11 1200mm Metre 14942.00 13804.00

12 1300mm Metre 18930.00 17488.00

13 1400mm Metre 20618.00 19048.00

14 1500mm Metre 21544.00 19905.00

18 Ksc Pipe Metre

1 350mm 3105.00 2868.00

2 400mm Metre 3419.00 3158.00

3 450mm Metre 3722.00 3439.00

4 500mm Metre 4353.00 4022.00

5 600mm Metre 5667.00 5235.00

6 700mm Metre 7174.00 6628.00

7 800mm Metre 8613.00 7958.00

8 900mm Metre 10618.00 9810.00

9 1000mm Metre 13583.00 12550.00

10 1100mm Metre 16211.00 14978.00

11 1200mm Metre 18394.00 16994.00

12 1300mm Metre 19864.00 18351.00

13 1400mm Metre 23226.00 21459.00

14 1500mm Metre 23852.00 22037.00

Note: The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu. Excise duty at 12.36%.

35

Page 43: twad 13-14

With Excise

Duty

Without

Excise Duty

With Excise

Duty

Without

Excise Duty

1 200mm metre 1270.00 1150.00 1427.00 1294.00

2 250mm metre 1801.00 1632.00 1946.00 1762.00

3 300mm metre 2131.00 1930.00 2295.00 2079.00

4 350mm metre 2614.00 2367.00 2841.00 2573.00

5 400mm metre 2827.00 2561.00 3099.00 2807.00

6 450mm metre 3270.00 2962.00 3597.00 3258.00

7 500mm metre 3659.00 3315.00 4098.00 3712.00

8 600mm metre 4906.00 4444.00 5522.00 5002.00

9 700mm metre 6142.00 5563.00 6956.00 6300.00

10 800mm metre 7372.00 6678.00 8420.00 7626.00

11 900mm metre 9349.00 8468.00 10697.00 9689.00

12 1000mm metre 11204.00 10149.00 12847.00 11637.00

13 1100mm metre 13408.00 12143.00 15279.00 13838.00

14 1200mm metre 15249.00 13813.00 17405.00 15764.00

15 1300mm metre 16576.00 15014.00 19308.00 17488.00

16 1400mm metre 20018.00 18131.00 22776.00 20630.00

17 1500mm metre 22704.00 20564.00 25940.00 23496.00

18 1600mm metre 24834.00 22494.00 28540.00 25850.00

19 1700mm metre 27085.00 24533.00 31268.00 28321.00

20 1800mm metre 32885.00 29787.00 37380.00 33956.00

21 1900mm metre 36286.00 32866.00 41412.00 37509.00

22 2000mm metre 38789.00 35133.00 44600.00 40397.00

23 2100mm metre 42465.00 38463.00 48766.00 44171.00

24 2200mm metre 45200.00 40940.00 52201.00 47281.00

25 2300mm metre 49153.00 44519.00 -- --

26 2400mm metre 52134.00 47221.00 -- --

1 200mm metre 1297.00 1174.00 1454.00 1317.00

2 250mm metre 1826.00 1655.00 1972.00 1787.00

3 300mm metre 2171.00 1967.00 2306.00 2089.00

4 350mm metre 2632.00 2384.00 2850.00 2582.00

5 400mm metre 2888.00 2615.00 3108.00 2815.00

6 450mm metre 3297.00 2986.00 3612.00 3271.00

7 500mm metre 3713.00 3363.00 4132.00 3743.00

8 600mm metre 4990.00 4521.00 5531.00 5010.00

9 700mm metre 6233.00 5645.00 6974.00 6316.00

9.0 GRP PIPES AS PER IS 12709 / 1994 (WATER SUPPLY)

Sl .No Description Unit

Rate for 2013-14 in Rupees

Stiffness class

2500N/Sqm

Stiffness class

5000N/Sqm

3 BAR

6 BAR

36

Page 44: twad 13-14

With Excise

Duty

Without

Excise Duty

With Excise

Duty

Without

Excise Duty

Sl .No Description Unit

Rate for 2013-14 in Rupees

Stiffness class

2500N/Sqm

Stiffness class

5000N/Sqm

10 800mm metre 7454.00 6751.00 8442.00 7646.00

11 900mm metre 9440.00 8550.00 10724.00 9712.00

12 1000mm metre 11320.00 10253.00 12869.00 11657.00

13 1100mm metre 13480.00 12209.00 15337.00 13892.00

14 1200mm metre 15279.00 13838.00 17514.00 15863.00

15 1300mm metre 16976.00 15376.00 19342.00 17520.00

16 1400mm metre 20024.00 18137.00 22796.00 20648.00

17 1500mm metre 22830.00 20678.00 25966.00 23519.00

18 1600mm metre 24950.00 22599.00 28555.00 25864.00

19 1700mm metre 27266.00 24696.00 31312.00 28361.00

20 1800mm metre 32951.00 29844.00 37546.00 34009.00

21 1900mm metre 36377.00 32947.00 41434.00 37529.00

22 2000mm metre 38882.00 35217.00 44631.00 40425.00

23 2100mm metre 42586.00 38574.00 48790.00 44192.00

24 2200mm metre 45440.00 41158.00 52294.00 47366.00

25 2300mm metre 49245.00 44604.00 -- --

26 2400mm metre 52228.00 47306.00 -- --

1 200mm metre 1323.00 1197.00 1482.00 1343.00

2 250mm metre 1879.00 1702.00 2001.00 1813.00

3 300mm metre 2218.00 2008.00 2343.00 2122.00

4 350mm metre 2710.00 2455.00 2900.00 2627.00

5 400mm metre 2959.00 2679.00 3203.00 2901.00

6 450mm metre 3422.00 3099.00 3715.00 3365.00

7 500mm metre 3850.00 3486.00 4221.00 3823.00

8 600mm metre 5162.00 4675.00 5624.00 5094.00

9 700mm metre 6462.00 5854.00 7079.00 6411.00

10 800mm metre 7806.00 7071.00 8599.00 7789.00

11 900mm metre 9884.00 8952.00 10856.00 9833.00

12 1000mm metre 11815.00 10701.00 13059.00 11829.00

13 1100mm metre 14027.00 12704.00 15576.00 14109.00

14 1200mm metre 15942.00 14440.00 17838.00 16157.00

15 1300mm metre 17820.00 16140.00 19721.00 17863.00

16 1400mm metre 21061.00 19076.00 23221.00 21032.00

17 1500mm metre 23898.00 21646.00 26515.00 24016.00

18 1600mm metre 26237.00 23765.00 29062.00 26322.00

19 1700mm metre 28717.00 26011.00 32228.00 29191.00

20 1800mm metre 34654.00 31388.00 38516.00 34886.00

9 BAR

37

Page 45: twad 13-14

With Excise

Duty

Without

Excise Duty

With Excise

Duty

Without

Excise Duty

Sl .No Description Unit

Rate for 2013-14 in Rupees

Stiffness class

2500N/Sqm

Stiffness class

5000N/Sqm

21 1900mm metre 38094.00 34504.00 42477.00 38474.00

22 2000mm metre 40875.00 37023.00 45812.00 41495.00

23 2100mm metre 44618.00 40413.00 -- --

24 2200mm metre 47568.00 43085.00 -- --

25 2300mm metre 51589.00 46728.00 -- --

26 2400mm metre 55115.00 49921.00 -- --

1 200mm metre 1350.00 1222.00 1511.00 1369.00

2 250mm metre 1906.00 1726.00 2029.00 1838.00

3 300mm metre 2308.00 2091.00 2375.00 2152.00

4 350mm metre 2808.00 2543.00 2955.00 2677.00

5 400mm metre 3063.00 2776.00 3223.00 2919.00

6 450mm metre 3538.00 3206.00 3779.00 3423.00

7 500mm metre 4031.00 3650.00 4292.00 3887.00

8 600mm metre 5413.00 4903.00 5814.00 5265.00

9 700mm metre 6753.00 6116.00 7343.00 6651.00

10 800mm metre 8137.00 7370.00 8869.00 8034.00

11 900mm metre 10312.00 9340.00 11403.00 10329.00

12 1000mm metre 12384.00 11217.00 13503.00 12231.00

13 1100mm metre 14861.00 13461.00 16314.00 14777.00

14 1200mm metre 16970.00 15371.00 18644.00 16887.00

15 1300mm metre 18634.00 16878.00 20604.00 18662.00

16 1400mm metre 22008.00 19934.00 24299.00 22010.00

17 1500mm metre 25113.00 22746.00 27606.00 25005.00

18 1600mm metre 27533.00 24938.00 30308.00 27452.00

19 1700mm metre 30180.00 27336.00 33348.00 30205.00

20 1800mm metre 36297.00 32876.00 39867.00 36109.00

21 1900mm metre 39830.00 36076.00 43828.00 39698.00

22 2000mm metre 42805.00 38773.00 64388.00 58319.00

23 2100mm metre 46837.00 42423.00 -- --

24 2200mm metre 50096.00 45374.00 -- --

1 200mm metre 1375.00 1245.00 1539.00 1394.00

2 250mm metre 1931.00 1749.00 2058.00 1864.00

3 300mm metre 2387.00 2161.00 2443.00 2212.00

4 350mm metre 2904.00 2630.00 3055.00 2767.00

5 400mm metre 3168.00 2870.00 3351.00 3036.00

6 450mm metre 3705.00 3356.00 3926.00 3556.00

12 BAR

15 BAR

38

Page 46: twad 13-14

With Excise

Duty

Without

Excise Duty

With Excise

Duty

Without

Excise Duty

Sl .No Description Unit

Rate for 2013-14 in Rupees

Stiffness class

2500N/Sqm

Stiffness class

5000N/Sqm

7 500mm metre 4213.00 3816.00 4451.00 4031.00

8 600mm metre 5721.00 5182.00 6054.00 5484.00

9 700mm metre 7150.00 6476.00 7639.00 6919.00

10 800mm metre 8679.00 7861.00 9335.00 8455.00

11 900mm metre 11009.00 9971.00 11821.00 10707.00

12 1000mm metre 13176.00 11935.00 14204.00 12867.00

13 1100mm metre 15836.00 14343.00 17022.00 15418.00

14 1200mm metre 18027.00 16329.00 19546.00 17704.00

15 1300mm metre 19960.00 18079.00 21526.00 19499.00

16 1400mm metre 23506.00 21291.00 25366.00 22976.00

17 1500mm metre 26658.00 24146.00 28828.00 26111.00

18 1600mm metre 29322.00 26560.00 31758.00 28765.00

19 1700mm metre 32560.00 29490.00 34915.00 31624.00

20 1800mm metre 38814.00 35157.00 41616.00 37694.00

21 1900mm metre 42923.00 38877.00 -- --

22 2000mm metre 46148.00 41798.00 -- --

Note: The above rates are inclusive of VAT at 5%, transportation charges anywhere in

Tamilnadu and cost of coupling and specials.Excise duty at 12.36%.

39

Page 47: twad 13-14

1 168.3X2.6 500.00 263.00 439.00 422.00 546.00 470.00 582.00 222.00

2 168.3X3.2 613.00 260.00 439.00 420.00 546.00 470.00 582.00 222.00

3 168.3X4 764.00 257.00 439.00 415.00 546.00 470.00 582.00 222.00

4 168.3X4.5 859.00 256.00 439.00 413.00 546.00 470.00 582.00 222.00

5 219.1X2.6 656.00 344.00 554.00 554.00 710.00 613.00 758.00 222.00

6 219.1X3.6 901.00 341.00 554.00 550.00 710.00 613.00 758.00 222.00

7 219.1X4.5 1123.00 338.00 554.00 545.00 710.00 613.00 758.00 222.00

8 219.1X6.3 1562.00 333.00 554.00 535.00 710.00 613.00 758.00 222.00

9 273X3.6 1128.00 427.00 677.00 690.00 886.00 763.00 944.00 222.00

10 273X4 1251.00 426.00 677.00 689.00 886.00 763.00 944.00 222.00

11 273X5 1557.00 423.00 677.00 683.00 886.00 763.00 944.00 222.00

12 273X6.3 1954.00 419.00 677.00 676.00 886.00 763.00 944.00 222.00

13 323.9X4 1487.00 508.00 793.00 821.00 1013.00 905.00 1121.00 222.00

14 323.9X4.5 1671.00 507.00 793.00 817.00 1013.00 905.00 1121.00 222.00

15 323.9X5.6 2072.00 504.00 793.00 812.00 1013.00 905.00 1121.00 222.00

16 323.9X7.1 2614.00 499.00 793.00 804.00 1013.00 905.00 1121.00 222.00

17 355.6X4 1638.00 559.00 865.00 901.00 1153.00 993.00 1231.00 222.00

18 355.6X5 2039.00 555.00 865.00 898.00 1153.00 993.00 1231.00 222.00

19 355.6X5.6 2279.00 554.00 865.00 893.00 1153.00 993.00 1231.00 222.00

20 355.6X8 3237.00 546.00 865.00 881.00 1153.00 993.00 1231.00 222.00

21 406.4X4 1873.00 641.00 980.00 1033.00 1319.00 1136.00 1406.00 222.00

22 406.4X5 2336.00 637.00 980.00 1028.00 1319.00 1136.00 1406.00 222.00

23 406.4X6.3 2935.00 633.00 980.00 1021.00 1319.00 1136.00 1406.00 222.00

External

Polyethy

line

Sheeting

per

meter

Transporat

ion any

where in

Tamilnadu

per meter

10.0 M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001

WITH INTERNAL LINING AND EXTERNAL COATING (WITH EXCISE DUTY)

Sl.

No.

Dia meter

& thickness

of pipe in

mm

Rate for 2013-14 in Rupees Bare pipe

per meter

CML

Internal

6mm to

12mm

thick per

meter

CMC

external

20mm

thick per

meter

Internal

food grade

epoxy

coating

406

micr.per

meter

External

epoxy

Coating

406

micr.

per

meter

CTE

external

coating &

wrapping

per meter

40

Page 48: twad 13-14

External

Polyethy

line

Sheeting

per

meter

Transporat

ion any

where in

Tamilnadu

per meter

Sl.

No.

Dia meter

& thickness

of pipe in

mm

Rate for 2013-14 in Rupees Bare pipe

per meter

CML

Internal

6mm to

12mm

thick per

meter

CMC

external

20mm

thick per

meter

Internal

food grade

epoxy

coating

406

micr.per

meter

External

epoxy

Coating

406

micr.

per

meter

CTE

external

coating &

wrapping

per meter

24 406.4X8.8 4073.00 625.00 980.00 1009.00 1319.00 1136.00 1406.00 222.00

25 457X4 2109.00 722.00 1001.00 1015.00 1482.00 934.00 1582.00 222.00

26 457X5 2629.00 719.00 1001.00 1010.00 1482.00 934.00 1582.00 222.00

27 457X6.3 3303.00 714.00 1001.00 1004.00 1482.00 934.00 1582.00 222.00

28 457X10 5191.00 704.00 1001.00 988.00 1482.00 934.00 1582.00 222.00

29 508X5 2999.00 801.00 1112.00 1126.00 1648.00 1038.00 1758.00 266.00

30 508X5.6 3338.00 799.00 1112.00 1123.00 1648.00 1038.00 1758.00 266.00

31 508X6.3 3773.00 797.00 1112.00 1120.00 1648.00 1038.00 1758.00 266.00

32 508X11 6530.00 781.00 1112.00 1099.00 1648.00 1038.00 1758.00 266.00

33 610X5.8 4160.00 963.00 1336.00 1352.00 1978.00 1246.00 2111.00 333.00

34 610X6.3 4547.00 961.00 1336.00 1351.00 1978.00 1246.00 2111.00 333.00

35 610X12.5 8900.00 941.00 1336.00 1322.00 1978.00 1246.00 2111.00 333.00

36 711X6.3 5272.00 1124.00 1556.00 1579.00 2305.00 1453.00 2460.00 333.00

37 711X7.1 5950.00 1120.00 1556.00 1576.00 2305.00 1453.00 2460.00 333.00

38 711X14.2 11803.00 1098.00 1556.00 1543.00 2305.00 1453.00 2460.00 333.00

39 813X7.1 6820.00 1285.00 1780.00 1806.00 2638.00 1661.00 2814.00 443.00

40 813X8 7691.00 1282.00 1780.00 1802.00 2638.00 1661.00 2814.00 443.00

41 813X18 17075.00 1251.00 1780.00 1757.00 2638.00 1661.00 2814.00 443.00

42 914X8 8658.00 1444.00 2000.00 2030.00 2965.00 1867.00 3162.00 666.00

43 914X8.8 9481.00 1442.00 2000.00 2027.00 2965.00 1867.00 3162.00 666.00

44 914X10 10787.00 1439.00 2000.00 2021.00 2965.00 1867.00 3162.00 666.00

45 914X17.5 18720.00 1414.00 2000.00 1987.00 2965.00 1867.00 3162.00 666.00

46 1016X8.8 10593.00 1605.00 2224.00 2257.00 3295.00 2076.00 3516.00 1330.00

47 1016X10 11996.00 1602.00 2224.00 2252.00 3295.00 2076.00 3516.00 1330.00

48 1016X20 23750.00 1570.00 2224.00 2207.00 3295.00 2076.00 3516.00 1330.00

41

Page 49: twad 13-14

External

Polyethy

line

Sheeting

per

meter

Transporat

ion any

where in

Tamilnadu

per meter

Sl.

No.

Dia meter

& thickness

of pipe in

mm

Rate for 2013-14 in Rupees Bare pipe

per meter

CML

Internal

6mm to

12mm

thick per

meter

CMC

external

20mm

thick per

meter

Internal

food grade

epoxy

coating

406

micr.per

meter

External

epoxy

Coating

406

micr.

per

meter

CTE

external

coating &

wrapping

per meter

49 1067X8.8 11125.00 1687.00 2335.00 2372.00 3461.00 2180.00 3692.00 1330.00

50 1067X10 12625.00 1684.00 2335.00 2368.00 3461.00 2180.00 3692.00 1330.00

51 1067X11 13834.00 1680.00 2335.00 2363.00 3461.00 2180.00 3692.00 1330.00

52 1118X8.8 11657.00 1769.00 2448.00 2488.00 3628.00 2284.00 3868.00 1330.00

53 1118X10 13205.00 1766.00 2448.00 2483.00 3628.00 2284.00 3868.00 1330.00

54 1118X11 14511.00 1763.00 2448.00 2478.00 3628.00 2284.00 3868.00 1330.00

55 1219X10 14415.00 1929.00 2668.00 2711.00 3955.00 2491.00 4218.00 1330.00

56 1219X11 15866.00 1925.00 2668.00 2706.00 3955.00 2491.00 4218.00 1330.00

57 1219X12.5 17994.00 1920.00 2668.00 2700.00 3955.00 2491.00 4218.00 1330.00

58 1422X12.5 21041.00 2246.00 3112.00 3158.00 4613.00 2905.00 4920.00 1330.00

59 1422X14.2 23847.00 2242.00 3112.00 3151.00 4613.00 2905.00 4920.00 1330.00

60 1626X14.2 27281.00 2569.00 3560.00 3612.00 5275.00 3322.00 5626.00 1596.00

61 1626X16 30716.00 2564.00 3560.00 3604.00 5275.00 3322.00 5626.00 1596.00

62 1829X14.2 30764.00 2896.00 4004.00 4072.00 5933.00 3737.00 6328.00 1596.00

63 1829X16 34585.00 2891.00 4004.00 4063.00 5933.00 3737.00 6328.00 1596.00

64 1829X17.5 37826.00 2886.00 4004.00 4056.00 5933.00 3737.00 6328.00 1596.00

65 2032X16 38455.00 3217.00 4448.00 4522.00 6590.00 4152.00 7031.00 1914.00

66 2032X17.5 42034.00 3212.00 4448.00 4516.00 6590.00 4152.00 7031.00 1914.00

67 2032X20 47984.00 3204.00 4448.00 4504.00 6590.00 4152.00 7031.00 1914.00

68 2235X17.5 46291.00 3539.00 4892.00 4974.00 7250.00 4566.00 7734.00 1914.00

69 2235X20 52869.00 3530.00 4892.00 4963.00 7250.00 4566.00 7734.00 1914.00

70 2235X22.2 58577.00 3523.00 4892.00 4952.00 7250.00 4566.00 7734.00 1914.00

71 2540X20 60125.00 4020.00 5560.00 5652.00 8240.00 5190.00 8789.00 2107.00

72 2540X22.2 66655.00 4013.00 5560.00 5642.00 8240.00 5190.00 8789.00 2107.00

73 2540X25 75023.00 4005.00 5560.00 5630.00 8240.00 5190.00 8789.00 2107.00

Note: The above rates are inclusive of Excise duty at 12.36% and VAT at 5%.

42

Page 50: twad 13-14

1 168.3X2.6 445.00 238.00 398.00 383.00 496.00 426.00 528.00 222.00

2 168.3X3.2 546.00 236.00 398.00 380.00 496.00 426.00 528.00 222.00

3 168.3X4 680.00 234.00 398.00 377.00 496.00 426.00 528.00 222.00

4 168.3X4.5 764.00 233.00 398.00 374.00 496.00 426.00 528.00 222.00

5 219.1X2.6 584.00 312.00 502.00 503.00 644.00 555.00 688.00 222.00

6 219.1X3.6 802.00 309.00 502.00 498.00 644.00 555.00 688.00 222.00

7 219.1X4.5 1000.00 307.00 502.00 494.00 644.00 555.00 688.00 222.00

8 219.1X6.3 1390.00 301.00 502.00 486.00 644.00 555.00 688.00 222.00

9 273X3.6 1004.00 387.00 613.00 625.00 803.00 692.00 856.00 222.00

10 273X4 1113.00 386.00 613.00 624.00 803.00 692.00 856.00 222.00

11 273X5 1386.00 383.00 613.00 619.00 803.00 692.00 856.00 222.00

12 273X6.3 1739.00 380.00 613.00 613.00 803.00 692.00 856.00 222.00

13 323.9X4 1323.00 461.00 718.00 744.00 918.00 821.00 1016.00 222.00

14 323.9X4.5 1487.00 460.00 718.00 742.00 918.00 821.00 1016.00 222.00

15 323.9X5.6 1844.00 457.00 718.00 737.00 918.00 821.00 1016.00 222.00

16 323.9X7.1 2327.00 453.00 718.00 728.00 918.00 821.00 1016.00 222.00

17 355.6X4 1457.00 507.00 784.00 817.00 1046.00 901.00 1116.00 222.00

18 355.6X5 1814.00 503.00 784.00 814.00 1046.00 901.00 1116.00 222.00

19 355.6X5.6 2029.00 502.00 784.00 810.00 1046.00 901.00 1116.00 222.00

20 355.6X8 2881.00 495.00 784.00 799.00 1046.00 901.00 1116.00 222.00

21 406.4X4 1667.00 581.00 888.00 937.00 1195.00 1030.00 1276.00 222.00

22 406.4X5 2079.00 578.00 888.00 932.00 1195.00 1030.00 1276.00 222.00

23 406.4X6.3 2612.00 574.00 888.00 926.00 1195.00 1030.00 1276.00 222.00

24 406.4X8.8 3625.00 567.00 888.00 914.00 1195.00 1030.00 1276.00 222.00

External

Polyethy

line

Sheeting

per meter

Transporati

on any

where in

Tamilnadu

per meter

10.1 M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001

WITH INTERNAL LINING AND EXTERNAL COATING (WITHOUT EXCISE DUTY)

Sl.No

Dia meter &

thickness of

pipe in mm

Rate for 2013-14 in Rupees

Bare pipe

per meter

CML

Internal

6mm to

12mm

thick per

meter

CMC

external

20mm

thick per

meter

Internal

food

grade

epoxy

coating

406

micr.per

meter

External

epoxy

Coating

406 micr.

per

meter

CTE

external

coating &

wrapping

per meter

43

Page 51: twad 13-14

External

Polyethy

line

Sheeting

per meter

Transporati

on any

where in

Tamilnadu

per meter

Sl.No

Dia meter &

thickness of

pipe in mm

Rate for 2013-14 in Rupees

Bare pipe

per meter

CML

Internal

6mm to

12mm

thick per

meter

CMC

external

20mm

thick per

meter

Internal

food

grade

epoxy

coating

406

micr.per

meter

External

epoxy

Coating

406 micr.

per

meter

CTE

external

coating &

wrapping

per meter

25 457X4 1877.00 655.00 906.00 920.00 1344.00 847.00 1434.00 222.00

26 457X5 2339.00 652.00 906.00 916.00 1344.00 847.00 1434.00 222.00

27 457X6.3 2940.00 648.00 906.00 911.00 1344.00 847.00 1434.00 222.00

28 457X10 4620.00 637.00 906.00 895.00 1344.00 847.00 1434.00 222.00

29 508X5 2669.00 727.00 1007.00 1020.00 1494.00 941.00 1594.00 266.00

30 508X5.6 2970.00 725.00 1007.00 1018.00 1494.00 941.00 1594.00 266.00

31 508X6.3 3358.00 722.00 1007.00 1015.00 1494.00 941.00 1594.00 266.00

32 508X11 5812.00 709.00 1007.00 996.00 1494.00 941.00 1594.00 266.00

33 610X5.8 3702.00 873.00 1209.00 1226.00 1793.00 1130.00 1913.00 333.00

34 610X6.3 4047.00 872.00 1209.00 1224.00 1793.00 1130.00 1913.00 333.00

35 610X12.5 7921.00 853.00 1209.00 1199.00 1793.00 1130.00 1913.00 333.00

36 711X6.3 4692.00 1019.00 1409.00 1432.00 2090.00 1318.00 2230.00 333.00

37 711X7.1 5295.00 1015.00 1409.00 1428.00 2090.00 1318.00 2230.00 333.00

38 711X14.2 10504.00 995.00 1409.00 1399.00 2090.00 1318.00 2230.00 333.00

39 813X7.1 6070.00 1166.00 1612.00 1637.00 2392.00 1507.00 2551.00 443.00

40 813X8 6845.00 1162.00 1612.00 1633.00 2392.00 1507.00 2551.00 443.00

41 813X18 15197.00 1134.00 1612.00 1592.00 2392.00 1507.00 2551.00 443.00

42 914X8 7706.00 1309.00 1811.00 1841.00 2688.00 1694.00 2867.00 666.00

43 914X8.8 8438.00 1307.00 1811.00 1837.00 2688.00 1694.00 2867.00 666.00

44 914X10 9556.00 1304.00 1811.00 1832.00 2688.00 1694.00 2867.00 666.00

45 914X17.5 16660.00 1282.00 1811.00 1801.00 2688.00 1694.00 2867.00 666.00

46 1016X8.8 9428.00 1455.00 2014.00 2046.00 2988.00 1883.00 3187.00 1330.00

47 1016X10 10676.00 1452.00 2014.00 2041.00 2988.00 1883.00 3187.00 1330.00

48 1016X20 21138.00 1423.00 2014.00 2000.00 2988.00 1883.00 3187.00 1330.00

49 1067X8.8 9902.00 1530.00 2115.00 2150.00 3138.00 1977.00 3347.00 1330.00

50 1067X10 11236.00 1527.00 2115.00 2146.00 3138.00 1977.00 3347.00 1330.00

51 1067X11 12312.00 1524.00 2115.00 2142.00 3138.00 1977.00 3347.00 1330.00

52 1118X8.8 10375.00 1604.00 2216.00 2255.00 3288.00 2072.00 3506.00 1330.00

53 1118X10 11753.00 1601.00 2216.00 2250.00 3288.00 2072.00 3506.00 1330.00

54 1118X11 12915.00 1599.00 2216.00 2246.00 3288.00 2072.00 3506.00 1330.00

55 1219X10 12829.00 1748.00 2416.00 2458.00 3586.00 2259.00 3824.00 1330.00

44

Page 52: twad 13-14

External

Polyethy

line

Sheeting

per meter

Transporati

on any

where in

Tamilnadu

per meter

Sl.No

Dia meter &

thickness of

pipe in mm

Rate for 2013-14 in Rupees

Bare pipe

per meter

CML

Internal

6mm to

12mm

thick per

meter

CMC

external

20mm

thick per

meter

Internal

food

grade

epoxy

coating

406

micr.per

meter

External

epoxy

Coating

406 micr.

per

meter

CTE

external

coating &

wrapping

per meter

56 1219X11 14120.00 1745.00 2416.00 2453.00 3586.00 2259.00 3824.00 1330.00

57 1219X12.5 16015.00 1741.00 2416.00 2447.00 3586.00 2259.00 3824.00 1330.00

58 1422X12.5 18727.00 2037.00 2818.00 2863.00 4182.00 2635.00 4460.00 1330.00

59 1422X14.2 21224.00 2032.00 2818.00 2856.00 4182.00 2635.00 4460.00 1330.00

60 1626X14.2 24280.00 2329.00 3222.00 3274.00 4782.00 3013.00 5100.00 1596.00

61 1626X16 27337.00 2325.00 3222.00 3266.00 4782.00 3013.00 5100.00 1596.00

62 1829X14.2 27380.00 2625.00 3625.00 3690.00 5378.00 3389.00 5737.00 1596.00

63 1829X16 30781.00 2621.00 3625.00 3683.00 5378.00 3389.00 5737.00 1596.00

64 1829X17.5 33665.00 2617.00 3625.00 3677.00 5378.00 3389.00 5737.00 1596.00

65 2032X16 34225.00 2917.00 4028.00 4099.00 5976.00 3765.00 6374.00 1914.00

66 2032X17.5 37410.00 2913.00 4028.00 4093.00 5976.00 3765.00 6374.00 1914.00

67 2032X20 42706.00 2904.00 4028.00 4082.00 5976.00 3765.00 6374.00 1914.00

68 2235X17.5 41199.00 3209.00 4430.00 4508.00 6574.00 4142.00 7012.00 1914.00

69 2235X20 47054.00 3200.00 4430.00 4499.00 6574.00 4142.00 7012.00 1914.00

70 2235X22.2 52134.00 3194.00 4430.00 4489.00 6574.00 4142.00 7012.00 1914.00

71 2540X20 53511.00 3646.00 5035.00 5124.00 7470.00 4707.00 7975.00 2107.00

72 2540X22.2 59323.00 3638.00 5035.00 5114.00 7470.00 4707.00 7975.00 2107.00

73 2540X25 66771.00 3631.00 5035.00 5102.00 7470.00 4707.00 7975.00 2107.00

Note: The above rates are inclusive of VAT at 5%.

45

Page 53: twad 13-14

Sl.No.Rate for 2013-14

in Rupees1

76.00

268.00

3

71.00

Sl.No.Rate for 2013-14

in Rupees

1 686.00

2 858.00

3 1030.00

Note: The above rates are inclusive of VAT and transportation charges anywhere in

Tamilnadu. Excise duty - 12.36% and VAT - 5%.

100 mm Metre

125 mm Metre

150 mm Metre

Note: The above rates are inclusive of VAT and transportation charges anywhere in

Tamilnadu. Excise duty - 12.36% and VAT - 5%.

10.3 MS CASING PIPE

Description Unit

Supply and delivery of MS Casing

pipes confirming to IS

MS specials without inside lining and

outside coating Kg

MS specials without inside lining and

outside coating but with anti rust

painting.

Kg

10.2 MS SPECIALS AS PER IS 7323

Description Unit

MS specials with inside lining / epoxy

coating and outside coating with

cement mortar 25mm thick.Kg

46

Page 54: twad 13-14

NP2 Class NP3 Class NP4 Class

1 2 3 4 5 6

1 200mm One metre 536.00 549.00 572.00

2 250mm One metre 633.00 666.00 701.00

3 300mm One metre 846.00 880.00 927.00

4 350mm One metre 1132.00 1164.00 1229.00

5 400mm One metre 1457.00 1609.00 1676.00

6 450mm One metre 1889.00 2045.00 2232.00

7 500mm One metre 2288.00 2317.00 2575.00

8 600mm One metre 2449.00 2664.00 2968.00

9 700mm One metre 3604.00 4065.00 4204.00

10 800mm One metre 4196.00 4860.00 5243.00

11 900mm One metre 4629.00 5604.00 6062.00

12 1000mm One metre 5489.00 6201.00 7165.00

13 1100mm One metre 6544.00 8858.00 9864.00

14 1200mm One metre 7509.00 10812.00 11904.00

15 1400mm One metre 8982.00 13383.00 15934.00

16 1500mm One metre 17657.00 18442.00 19300.00

17 1600mm One metre 20539.00 21298.00 22301.00

Note: . The rate is inclusive of VAT at 5 % and transportation charges anywhere in

Tamilnadu.Excise duty at 12.36% extra

11.0 RCC NON PRESSURE SPUN PIPE AS PER IS 458/2003

RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003

manufactured with sulphate resistence cement with 12 mm HI -alumina lining

with rubber ring joints.

Sl. No. Internal Dia. Unit

Rate for 2013-14 in Rupees

47

Page 55: twad 13-14

NP2 NP3 NP4

1 2 3 4 5 6

1 200mm Each 34.00 39.00 46.00

2 250mm Each 39.00 46.00 54.00

3 300mm Each 46.00 54.00 60.00

4 350mm Each 54.00 66.00 72.00

5 400mm Each 60.00 85.00 92.00

6 450mm Each 66.00 100.00 106.00

7 500mm Each 72.00 106.00 112.00

8 600mm Each 119.00 152.00 160.00

9 700mm Each 165.00 192.00 206.00

10 800mm Each 185.00 226.00 232.00

11 900mm Each 226.00 284.00 291.00

12 1000mm Each 291.00 297.00 310.00

13 1100mm Each 324.00 331.00 337.00

14 1200mm Each 337.00 351.00 364.00

15 1400mm Each 489.00 596.00 609.00

16 1500mm Each 767.00 780.00 795.00

17 1600mm Each 846.00 873.00 899.00

Note: The rate is inclusive of Excise duty at 12.36%, VAT at 5% and transportation charges

anywhere in Tamilnadu.

11.1 RUBBER GASKETS AS PER IS 5382/1985

Sl. No. Description UnitRate for 2013-14 in Rupees

48

Page 56: twad 13-14

With Excise Duty Without Excise

Duty

1 2 3 4 5

1 50 mm Each 2927.00 2653.00

2 65mm Each 3523.00 3085.00

3 80mm Each 3688.00 3343.00

4 100mm Each 4915.00 4456.00

5 125mm Each 6154.00 5579.00

6 150mm Each 7411.00 6719.00

7 200mm Each 12938.00 11730.00

8 250mm Each 20645.00 18716.00

9 300mm Each 25722.00 23321.00

10 350mm Each 42829.00 38831.00

11 400mm Each 53534.00 48535.00

12 450mm Each 65556.00 59435.00

13 500mm Each 84457.00 76571.00

14 600mm Each 121056.00 109752.00

15 700mm Each 226380.00 205241.00

16 750mm Each 261125.00 236741.00

17 800mm Each 327118.00 296570.00

18 900mm Each 419531.00 380354.00

19 1000mm Each 527388.00 478140.00

20 1100mm Each 760146.00 689162.00

21 1200mm Each 819623.00 743086.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere

in Tamilnadu.Excise duty at 12.36%.

12.0 CI D/F SLUICE VALVE WITH CAP/ WHEEL

AS PER IS 14846/2000 PN 1.0 WITH ISI MARKING

Sl. No. Description UnitRate for 2013-14 in Rupees

49

Page 57: twad 13-14

With excise

duty

Without excise duty

1 2 3 4 5

1 50 mm Each 2929.00 2656.00

2 65 mm Each 3428.00 3108.00

3 80 mm Each 4160.00 3773.00

4 100 mm Each 5366.00 4866.00

5 125 mm Each 6691.00 6066.00

6 150 mm Each 8137.00 7378.00

7 200 mm Each 16318.00 14794.00

8 250 mm Each 24056.00 21810.00

9 300 mm Each 31442.00 28507.00

10 350 mm Each 49452.00 44834.00

11 400 mm Each 75532.00 68478.00

12 450 mm Each 91073.00 82568.00

13 500 mm Each 131225.00 118970.00

14 600 mm Each 176268.00 159808.00

Note: The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu.Excise duty at 12.36%

12.1 C.I. D/F REFLUX VALVE AS PER I.S. 5312/ PART I/ 84 PN 1.0 WITH

BYE-PASS ARRANGEMENTS WITH ISI MARKING

Sl. No. Description Unit

Rate for 2013-14 in Rupees

50

Page 58: twad 13-14

With excise duty Without excise duty

1 2 3 4 5

1 40 mm Each 4265.00 3866.00

2 50 mm Each 5266.00 4775.00

3 65 mm Each 6041.00 5477.00

4 80 mm Each 7120.00 6455.00

5 100 mm Each 9694.00 8789.00

6 125 mm Each 16813.00 15242.00

7 150mm Each 19430.00 17615.00

8 200mm Each 29413.00 26666.00

With excise duty Without excise duty

1 2 3 4 5

1 15mm Each 843.00 765.00

2 20 mm Each 939.00 853.00

3 25 mm Each 1216.00 1102.00

4 40 mm Each 1519.00 1377.00

5 50 mm Each 1683.00 1526.00

6 65 mm Each 1962.00 1781.00

7 80 mm Each 2253.00 2044.00

8 100 mm Each 2455.00 2225.00

9 125mm Each 4233.00 3837.00

10 150 mm Each 6053.00 5489.00

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in

Tamilnadu.

Excise duty at 12.36%.

12.2 C.I. DOUBLE AIR VALVE AS PER ISI 14845

Sl. No. Description Unit

Rate for 2013-14 in Rupees

Note: The above rates are inclusive of VAT at 5% and transportation charges anywhere in

Tamilnadu.

Excise duty at 12.36%.

12.3 CI SINGLE AIR VALVE AS PER ISI 14845

Sl. No Description Unit

Rate for 2013-14 in Rupees

51

Page 59: twad 13-14

Sl.No. Description UnitRate for 2013-14 in

Rupees

1 50mm each 22812.00

2 80mm each 30434.00

3 100mm each 35532.00

4 150mm each 43256.00

5 200mm each 56074.00

12.4 DI SINGLE CHAMBER AIR RELEASE VALVE

Manufacture, Supply and Delivery of Tamper proof DI single chamber air

release valves with pressure range from PN 1.0 to 2.5 with body and cover

made of Ductile Iron of Grade GGG 40 conforming to IS 1865 with Food

Grade Epoxy Powder coating(EP-P) inside a

Note: The rates are inclusive of Transportation charges.

Excise duty at 12.36% and VAT at 5% extra.

52

Page 60: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1 2 3 4

1 100mm 1No. 6062

2 125mm 1No. 7512

3 150mm 1No. 9753

4 200mm 1No. 16717

5 250mm 1No. 22523

6 300mm 1No. 31086

7 350mm With spur gear arrangements 1No. 50234

8 400mm With spur gear arrangements 1No. 78155

9 450mm With spur gear arrangements 1No. 95685

10 500mm With spur gear arrangements 1No. 105305

11 600mm With spur gear arrangements 1No. 175421

Sl.No. Description UnitRate for 2013-14

in Rupees

1 100mm 1 No 2343.00

2 150mm 1 No 3321.00

3 200mm 1 No 9218.00

4 250mm 1 No 11901.00

5 300mm 1 No 15989.00

12.5       CI SLUICE VALVES NON RAISING SPINDLE TYPES TO PRESSURE RATING

OF 1.6 PN TO BE USED IN PUMP HOUSES (LONG BODY/ LONG FACE TO FACE)

Conforming to IS.

Note: The rate is inclusive of taxes, duties and handling charges.Excise duty at 12.36%

,VAT at 5%

12.6       BUTTERFLY VALVES WITH TOP AND BOTTOM OF S.S. 410 SHAFT,

WAFER LINER/ WITH REDUCTION GEAR UNIT INCLUDING ALL TAXES, DUTIES

AND HANDLING CHARGES (Conforming to BS 5155 & IS

12.6.1     WAFER LINER

53

Page 61: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees1 400mm 1 No 728302 450mm 1 No 763833 500mm 1 No 799354 600mm 1 No 110132

Sl. No. Description UnitRate for 2013-14

in Rupees1 2 3 4

1 100mm 1 No 28262 150mm 1 No 65993 200mm 1 No 115414 250mm 1 No 205545 300mm 1 No 25690

Sl. No. Description UnitRate for 2013-14

in Rupees1 2 3 4

1 400mm 1 No. 640532 450mm 1 No. 805563 500mm 1 No. 884504 600mm 1 No. 107827

Conforming to standard BS 5155 Butterfly valve with Body, Disc and retainer of Cast Iron

Grade F.260 with EDPM rubber sleeve. Internal hardware shall be confirming to AISI 304.

External hardware Carbon Steel shall be confirming to IS 1367. Top and bottom shaft

stainless steel to AISI 410. Body and disc should be tested (Hydro test) to 15 kg/sq.cm.

12.6.2     D/F GEAR OPERATED

12.7 NON RETURN VALVES

12.7.1 WAFER TYPE (DUAL PLATE CHECK VALVE) CONFORMING TO IS

12.7.2 DOUBLE FLANGED (DUAL PLATE CHECK VALVE)

Construction conforming to standard API 594. Body should confirm cast iron Grade FG 260

(IS 210), Disc plates confirming to ASTM A216, hinch pin/ stop pin/ spring should be of SS to

AISI 410/304. Body seat should be of EDPM rubber. The body should be tested to 15 kg/

sq.cm and seat should be tested to 10 kg/ sq.cm

54

Page 62: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1 2 3 4

1 300mm 1 No. 57988

2 350mm 1 No. 85431

3 400mm 1 No. 107379

4 450mm 1 No. 141976

5 500mm 1 No. 171862

6 600mm 1 No. 238293

7 700/750mm 1 No. 373770

8 800mm 1 No. 433915

Sl.No. Description UnitRate for 2013-14

in Rupees

1 50mm 1 No 104282 80mm 1 No 120293 100mm 1 No 148534 150mm 1 No 318705 200mm 1 No 46912

12.8 KINETIC AIR VALVES FOR HANDLING MORE VOLUMES OFAIR IN

PUMPING MAIN, DOUBLE ORIFICE KINETIC AIR VALVE CONFIRMING TO IS

4845 TAMPER PROOF DESIGN (PN-1)

Note: Excise Duty at 12.36%, VAT at 14.5% extra

12.7.3    D/F NON RETURN VALVE (OUT DOOR USE)

CI SINGLE DOOR/ MULTY DOOR NON RETURN VALVE CONFORMING TO IS 5312

TO BE FIXED AFTER WATER METER/ FLOW RECORDER ON PUMPING MAIN NEAR

PUMP HOUSE WITH DASH POT ARRANGEMENT FOR 90% FAST CLOSING & 10%

SLOW CLOSING.

55

Page 63: twad 13-14

Sl.No. Description Unit

1 50mm 1 No

2 80mm 1 No

3 100mm 1 No

4 150mm 1 No

5 200mm 1 No

6 250mm 1 No

7 300mm 1 No

8 350mm 1 No

9 400mm 1 No 217579

12.9 DI D/F GATE VALVES

SUPPLY AND DELIVERY OF DI D/F GATE VALVES (SOFT SEATED) RESILIENT

SEATED SOFT SEALING GATE VALVES (SLUICE VALVES) WITH BODY BONNET OF

DUCTILE CAST IRON OF GRADE GGG40, WEDGE FULLY RU BBER LINED WITH

EPDM, REPLACEABLE SPINDLE NUT, WITHOUT GLAND PACKING AND WITH 3 O-

RING PROTECTION ON THE SHAFT AND SEALS OF NBR AND THE VALVES SHOULD

BE OF VACLUM TIGHT AND 100% LEAK PROOF WITH FACE TO FACE DIMENTIONS

AS EPR BS5163-89/ ISI 4846-2000/ DIN 3202 F 4. ALL THE VALVES SHOULD BE

WITH ELECTROSTATIC POWDER COATING BOTH INSIDE AND OUTSIDE WITH

POCKET LESS STRAIGHT THRO' BODY PASSAGE. ALL LTHE VALVES ARE TO BE

COMPATIBLE FOR BURRIED APPLICATION WITH PRESSURE RATING PN 10/16

Rate for 2013-14

in Rupees

7686

9490

12510

19697

32734

47522

68516

207449

Note: The rates are inclusive of duties, all taxes, transportation charges etc.Excise duty

10.3%, VAT 5%

56

Page 64: twad 13-14

Sl.No. Description Unit

PN 10 PN 20

1 400mm 1 No 121401 166707

2 450mm 1 No 169404 189168

3 500mm 1 No 172061 203098

4 600mm 1 No 225511 271880

5 700mm 1 No 351721 404476

6 800mm 1 No 442975 509420

7 900mm 1 No 553631 636677

8 1000mm 1 No 713049 820371

9 1100mm 1 No 941158 1082332

10 1200mm 1 No 1104554 1107501

Sl. No. Size Unit

a.

40mm (1 lpm to 400lpm

adjustable type

arrangements)

each

b

100mm (20 lpm TO 2000

lpm adjustable type

arrangements)

each

Note: The above rates are inclusive all taxes and transportation charges.

Supply and delivery of the following sizes of OHT flow control valve with female

BSP treaded ends, (20mm length) with Stainless Steel Body as per ANSI 202

Grade, Plug, Flange – Nylon 66, (to be tested at NABL accredited lab.) Triangular

notch type flow control path with opening reference scale arrangements for flow

notch and Upstream & Downstream pressure checking spring loaded mouth

arrangements. Working Pressure 10 KSC, (FCRI, Palgaut pressure test and flow

test to be furnished).

Rate for 2013-14

in Rupees

4,575.00

16,100.00

12.10 DI D/F BUTTERFLY VALVES

SUPPLY AND DELIVERY OF DI D/F BUTTERFLY VALVES WITH GGG 400/12

OR EQUIVALENT GRADE AS PER IS3896 (PART 2) 1985 AND SUBSEQUENT

REVISIONS DOUBLE ECENTRICALLY DISC WITH RENEVABLE SOFT SEAL ON THE

DISC AND BODY SEAT FACE OF STAINLESS STEEL / NICKEL WELD OVERLAY

MICROFINISHED WITH POWDER OR LIQUID EPOXY COATING WITH MINIMUM

THICKNESS OF 250 MICRONS APPLIED ON BOTH BODY AND DISC INSIDE AND

OUTSIDE FACE TO FACE DIMENSIONS AS PER AWWA C 504 OR BS 5155 OR IS

13095

Rate for 2013-14

in Rupees

Note: The rates are inclusive of duties, all taxes, transportation charges

etc.Excise duty 12.36%, VAT 5%

12.11 OHT FLOW CONTROL VALVE

57

Page 65: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1 2 3 4

1 100mm Each 67.00

2 150mm Each 111.00

3 200mm Each 188.00

4 250mm Each 322.00

5 300mm Each 546.00

Sl.No. Description UnitRate for 2013-14

in Rupees

1 2 3 4

1 Sulphate Resistant

Cement as per IS

12330/1988 and as

amended from time to

time.

MT 6660.00

Sl.No. Description UnitRate for 2013-14

in Rupees

1 2 3 4

1 56cm dia heavy duty Each 2281.00

256cm dia extra heavy

dutyEach 2581.00

3 60 cm dia heavy duty Each 2856.00

460 cm dia extra heavy

dutyEach 3161.00

Note: Excise duty 'Nil'. The rate is inclusive of VAT

at 14.5% and transportation charges anywhere in Tamilnadu.

13.0 SALT GLAZED STONEWARE PIPE AS PER IS 651-1992

OF 0.6 M LENGTH

Note: Excise duty 'Nil'. The rate is inclusive of VAT at 5% and transportation

charges anywhere in Tamilnadu.

14.0 SULPHATE RESISTANT CEMENT AS PER IS 12330/1988

Note: The rate is inclusive of duties all taxes and at F.O.R destination

15.0 FIBER REINFORCED CONCRETE FRAME AND COVER

AS PER TYPE HD - 20, IS 12592, PART 1 & 2

58

Page 66: twad 13-14

Water meter Dirt Box Erection Charges

1 2 3 4 5 6

1 15 mm Each 990 - -

2 20mm Each 1250 - -

3 25mm Each 3425 - -

4 40mm Each 6640 - -

5 50mm Each 9548 2437 2213.00

6 80mm Each 12653 4467 2700.00

7 100mm Each 16232 5280 4275.00

8 150mm Each 26496 8045 5475.00

9 200mm Each 29838 9736 6225.00

10 250mm Each 65736 20940 7200.00

11 300mm Each 102795 40608 7238.00

12 400mm Each 177729 70049 7500.00

13 500mm Each 201579 105582 7500.00

16.0 WATER METER CONFORMING TO ISO 4064 &

DIRT BOX STRAINER

Supply and delivery of Woltman model with removal mechanism water meters confirming to

ISO 4064 part I, II,III class B with life cycle test certificate from FCRI or any Govt .

Organisation . The water meters shall have magnetic drivers or mechanical drivers and shall be

versatile for installation in any position . The meters shall be hydrodynamically, hydrostatically

balanced. The runner, runner chamber, pointers of the meter shall be as per ISO 4064 class B

specification. Dry dial excavated counter housing fully protected against flooding ensuring easy

reading in all climates.

Sl.No Description Unit

Rate for 2013-14 in Rupees

Note: 1.Excise Duty' Nil' for Watermeter and Dirtbox Strainer.

2.The rate is inclusive of TNVAT at 5% and transportation charges anywhere in Tamilnadu.

3.Erection charges includes earth work excavation,labour charges, cutting and threading,

conveyance,

59

Page 67: twad 13-14

Sl.No. UnitRate for 2013-14 in

Rupees

1 1 NO.212000.00

2 1 NO.230000.00

3 1 NO.257000.00

Note: The rate includes Excise duty at 12.36%, VAT at 5% handling and installation charges.

16.1       SUPPLY, DELIVERY, FIXING TESTING AND COMMISSIONING OF BEST

EFFICIANT ORIFICE TYPE ELECTRONIC WATER METER USING DIFFERENCIAL

PRESSURE SENSING ELEMENT WITH FLANGE INSERTABLE ORIFICE PLATE

SUITABLE FOR D,D/2 TAPPING AS PER BS 1042 SPECIFICATION.THE METER

SHOULD BE SUITABLE TO BE CONNECTED TO CONVERTOR TO GIVE A REMOTE

INDICATION OF TOTALISATION AND FLOW RATE WITH A OPTION FOR COMPUTER

CONNECTIVITY INCLUDING SENSOR AND TOTALISER INCLUDING ALL TAXES,

DUTIES AND HANDLING CHARGES.

Description

150 to 450mm

475 to 750mm

775 to 1200mm

60

Page 68: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1 Supply and delivery and fixing of HDPE

tank as per IS 12701 / 1996 including

loading, unloading, transportation and

labour charges for fixing of the GI pipes

and specials for pipe connection works

including cutting, threading and fixing

charges etc.,

200 litres 1 No. 1,260

500 litres 1 No. 2,940

1000 litres 1 No. 6,195

Sl. No. Description UnitRate for 2013-14

in Rupees

1 Supply and delivery of MS Kiosk of size

0.75m x 0.45m x 0.75m made up of MS

angle of size 50mm x 50mmx 4mm

alround covered with 16 gauge MS sheet

and kiosk door made up of MS plates of

size 25 mm x 3 mm including cutting,

welding, grinding, locking arrange

1 No 6100.00

21.0 MS KIOSK

19.0 HDPE TANK

61

Page 69: twad 13-14

1 Fabrication,supply, delivery and fixing of

outside M.S. Ladder of 45cm clear wide

made out of 50mm x 50 mm x 6mm

M.S. angle for sides and steps in 16mm

MS plain rods fixed at 30 cm C/C welded

jointed etc., providing with suitable side

supports, clamps and locking

arrangements provided with two coats

of approved enamel paint over one coat

of redoxide paint, for providing access

to roof top of OHT of suitable inclined

length, including bottom anchorage and

transportation and as directed by TWAD

Board officers. The rate includes

concrete bed block in CC 1:2:4 using

20mm HBGS at top and bottom of

suitable size with necessry anchor bolts.

1 No.

10,000 Litres - 16500.00

30,000 litres - 16500.00

60,000 Litres - 18000.00

1,00,000 Litres - 18000.00

Supply and Delivery Fabrication of MS

doors and windows with outer frame

and shutter frame in MS angle of size

40mm x 40mm x 6 mm with MS flat

25mm x 25mm x 6mm and MS sheet of

18 gauge including ventilating

arrangements using 20mm square MS

rods with locking arrangements

including two coats of approved enamel

paint over coat of red oxide including

cost of angles, plates, sheets,

fabrication charges, cost of hold fast

and transportation charges etc.,

complete.i Fully panelled Double leaf - Door 1.00 x 2.50 m 5500.00

ii. Supply and delivery of MS Kiosk of size

0.75m x 0.45m x 0.75m made up of MS

1.00m x2.10 m 4800.00

iii. Fully panelled Double leaf - Door 1.00m x2.00 m 3500.00

iv. Fully panelled Single leaf - Door 0.75 m x2.10 m 2950.00

v Fully panelled Single leaf - Door 0.90 m x 2.00 m 3150.00

vi. Fully panelled Single leaf - Door 0.90 m x 2.10 m 3500.00

vii Fully panelled Single leaf - Door 1.00 m x2.00 m 3282.00

viii Fully panelled Double leaf - Window

( without Ventilator)

1.20 m x0.90 m2600.00

ix Fully panelled Double leaf - Window (

without Ventilator)

0.60 m x 0.90 m1900.00

x Ventilator 0.45 m x0.60 m 1200.00

Sl.No. Description of Work Unit

Rate for

2013-14

in Rupees.

23.0 MS DOOR / WINDOW/VENTILATOR

22.0 MS LADDER

Sl.No. Description Of Work UnitRate for 2013-14

in Rupees.

62

Page 70: twad 13-14

1 1000 each 16,500.00

2 2000 each 19800.00

3 3000 each 43687.00

4 5000 each 45702.00

5 10000 each 82613.00

6 15000 each 88214.00

7 25000 each 177870.00

8 50000 each 326519.00

9 100000 each 443405.00

10 200000 each 863940.00

11 300000 each 1295910.00

12 400000 each 1727880.00

13 500000 each 2159850.00

Note :1. Excise Duty is 'Nil'. The rate is inclusive of transportation and Sales tax etc.,

2.The rate is inclusive of electrodes in-built with equipment.

24.0 Water Disinfection Equipment using Silver-Ionisation process

Specification:Supply,delivery,erection and commissioning of the following capacity of

micro processor based water disinfection equipment using silver ionization process based

on Oligodynamic technology, suitable to provide directly to pumping main, or to sump or

to overhead tank, with by-pass arrangements, controlling valves, micro processor based

control panel, in-built transformer, relay miniature circuit breaker, tool kits, spares etc.

The water chambers are made of corrosion free stainless steel confirm to SS 304

investment casting, capable to withstand a pressure of 10 Ksc with inbuilt electrodes

mounted on powder coated mild steel cabinet of 20gg thickness with universal lock and

key for safety. The control panel should have pump active indication to show that the

water is flowing inside the chamber, electrode OK indication- to show that the

electrode is working, Electrode high indication to show that electrode is clogged and

electrode low indication to show that electrode is nearing completion, for easy

maintenance of the equipment. The silver ions produced by the electrode is totally non toxic at the dosed

levels, as permitted by BIS standard and the residual effect of the disinfectant is long

lasting for more than 2 days.The equipment is powered by a single phase 220V/50Hz

power supply and provided with an on site disinfectant analysing kit with consumables to

do a minimum of 10 tests. The efficacy of the equipment must be proved by the reputed

laboratories like NEERI, Nagpur,ITRC,Luknow.

Sl. No.

Capacity of water

disinfection

equipment

in litres/ hour

unitRate for 2013-14

in Rupees.

63

Page 71: twad 13-14

0.01mg/lt 0.005mg/lt

1 1,000 1882.00

2 2,000 3,137.00

3 3,000 6 12 4,782.00

4 5,000 8 16 5,313.00

5 10,000 9 18 5,844.00

6 15,000 15 30 7,970.00

7 25,000 30 60 21,252.00

8 50,000 60 120 42,504.00

9 1,00,000 120 240 85,008.00

10 2,00,000 240 480 1,70,016.00

11 3,00,000 360 720 2,55,024.00

12 4,00,000 480 960 3,40,032.00

13 5,00,000 600 1,200 4,25,040.00

Sl.No.

1

2

3

4

5

6

7

8

9

10

4,50,000 1,14,944.00

5,00,000 1,16,490.00

The above rates are inclusive of excise duty at 12.36%, VAT at 5% and

transportation charges anywhere in Tamilnadu.

1,00,000 44,562.00

2,50,000 83,270.00

4,00,000

1,50,000 60,500.00

2,00,000 68,740.00

1,08,625.00

3,00,000 92,015.00

3,50,000 1,00,705.00

The above rates are inclusive of VAT at 5% and transportation charges

anywhere in Tamilnadu. Excise Duty 'Nil'

24.2 ELECTRO CHLORINATOR BASED ON COMMON SALT

Capacity in litres per dayRate for 2013-14

in Rupees.

50,000 35,200.00

24.1 REPLACEMENT ELECTRODE FOR WATER DISINFECTION EQUIPME

NT USING SILVER IONIZATION

Specification: Supply and delivery of electrode assembly suitable for water

disinfection equipment using silver ionization process using pure silver metal

electrode and fixed on PVC/Nylon sheets and nuts with electrical leads for the

following capacities. The supply should be with the quality test certificate from

approved organisations.

Sl.No Capapcity LPH

Life of electrodes in

million litre at dosage Rate for 2013-14

in Rupees

64

Page 72: twad 13-14

Sl No. Description unitRate for 2013-14

in Rupees.

Providing Fusion Bonded Epoxy coating not less than

175microns thickness and upto 300 microns to

reinforcement of all diameters as per IS 13620/1993

including testing of coating at plant.The cost is inclusive

of cost on account of careful handling, PVC coated

binding wires, touchup material supplied by coating

agency, repair work, loading, unloading and

strengthening of bent rods etc., complete as per

specification and as directed by the Engineer in charge.

(inclusive of all taxes)

a. for 8mm to 16mm MT 13559.00

b. for 20mm to 32mm MT 9950.00

Note : Transportation charges included.

25.0 PROVIDING EPOXY COATING TO REINFORCEMENT

STEEL BARS

65

Page 73: twad 13-14

Sl No. Description unitRate for 2013-14

in Rupees.

Supply and Delivery of MJ Collars.

1 100mm Each 2205.00

2 150mm Each 3507.00

3 200mm Each 4578.00

4 250mm Each 6374.00

5 300mm Each 8274.00

6 350mm Each 11813.00

7 400mm Each 14070.00

8 450mm Each 16275.00

9 500mm Each 21000.00

10 600mm Each 26513.00

Sl No. Description unitRate for 2013-14

in Rupees.

Labour charges for jointing of

mechanical joint collar, nuts, gasket

and fixing in position as directed by

departmental officers.

1 100mm Joint 57.00

2 150mm Joint 137.00

3 200mm Joint 142.00

4 250mm Joint 210.00

5 400mm Joint 441.00

6 450mm Joint 488.00

7 600mm Joint 966.00

26.0 MECHANICAL JOINT COLLARS

The above rates are inclusive of Excise duty 12.36% and VAT at 5%

26.1 JOINTING OF MECHANICAL JOINT COLLARS

66

Page 74: twad 13-14

Sl No. Description UnitRate for 2013-14

in Rupees.Disjointing of GI pipes as

directed by the departmental

officers

1 Upto 80mm Each 32.00

2 Above 80mm Each 44.00

Sl No. Description unitRate for 2013-14

in Rupees.1 Welding of GI pipes as

directed by the departmental

officers for the sizes

a) Upto 80 mm one welding joint 108.00

b) 100 mm to 150 mm one welding joint 122.00

27.0 DISJOINTING OF GI PIPES

27.1 WELDING OF G.I. PIPES

67

Page 75: twad 13-14

RATES FOR PUMPSETS

For individual specifications for

various items regarding pump sets &

Electrical Equipments, the

specifications already given in the

Manual for Pump sets should be

followed.

Page 76: twad 13-14

Sl.No.

Duty lpm x m

H.P. of Pumpset UnitRate for 2013-14 in

Rupees1 2 3 4 51 100x20 1.5 1 No 7266.002 150x20 1.5 1 No 10704.003 200x20 2 1 No 11123.004 250x20 3 1 No 12310.005 300x20 3 1 No 14231.006 350x20 3 1 No 14231.007 400x20 3 1 No 14766.008 450x20 3 1 No 14766.009 500x20 5 1 No 14766.00

10 700x20 5 1 No 17502.00

11 50x35 1.5 1 No 11553.0012 100x35 3 1 No 13129.00

1.0 CENTRIFUGAL MONOBLOC PUMPSET WITH ISI MARK AS PERIS 9079/1989 WITHOUT PANEL BOARD (3 PHASE)

81

12 100x35 3 1 No 13129.0013 150x35 5 1 No 18260.0014 200x35 5 1 No 20557.0015 250x35 5 1 No 20557.0016 300x35 5 1 No 22822.0017 350x35 7.5 1 No 22822.0018 400x35 7.5 1 No 23933.0019 450x35 7.5 1 No 24055.0020 500x35 7.5 1 No 24055.0021 50x50 5 1 No 20556.0022 100x50 5 1 No 20556.0023 150x50 5 1 No 22409.0024 200x50 7.5 1 No 22409.0025 250x50 7.5 1 No 22409.0026 300x50 7.5 1 No 24651.0027 350x50 10 1 No 28078.0028 400x50 10 1 No 28078.0029 500x60 10 1 No 35141.00

Note: Rates are excluding excise duty and VAT.Excise duty at 6.18% as extraVAT at 5% on Rate +Excise Duty as extra

81

Page 77: twad 13-14

1 2 3 4 5

1 15x40 0.5 1 No 11120.00

2 15x50 0.5 1 No 8809.00

3 15x60 0.5 1 No 11154.00

4 15x70 0.75 1 No 12888.00

5 15x80 1 1 No 12888.00

6 15x90 1 1 No 12888.00

7 15x100 1 1 No 16055.00

8 15x125 1.5 1 No 18239.00

9 15X150 2 1 No 19635.00

10 20x40 0.5 1 No 11154.00

2.0 SINGLE PHASE SUBMERSIBLE PUMPSET AS PER IS 8034 WITHOUTPANEL BOARD WITHOUT PANEL BOARD

Sl. No.Duty

lpm x mH.P. of

PumpsetUnit

Rate for 2013-14 inRupees

10 20x40 0.5 1 No 11154.00

11 20x50 0.5 1 No 8809.00

12 20x60 0.75 1 No 11154.00

13 20x70 0.75 1 No 12888.00

14 20x80 1 1 No 12888.00

15 20x90 1 1 No 14333.00

16 20x100 1 1 No 17094.00

17 20X125 1.5 1 No 18239.00

18 20X150 2 1 No 19520.00Note: Rates are excluding excise duty and VAT

Excise duty at 6.18% as extraVAT at 5% on Rate + excise duty as extra

Page 78: twad 13-14

1 2 3 4 5

1 30x40 0.5 1 No 11546.00

2 30x50 0.75 1 No 11654.00

3 30x60 0.75 1 No 12231.00

4 30x70 0.75 1 No 12888.00

5 30x80 1 1 No 15559.00

6 30x90 1 1 No 16979.00

7 30x100 1.5 1 No 16979.00

8 30x125 2 1 No 18596.00

3.0 3 PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 100MM DIA BOREWELLWITH ISI MARK IS 8034 WITHOUT PANEL BOARD

Sl. No.Duty

lpm x mH.P. of

PumpsetUnit

Rate for 2013-14 inRupees

8 30x125 2 1 No 18596.00

9 40x40 0.75 1 No 11546.00

10 40x50 0.75 1 No 12231.00

11 40x60 1 1 No 12231.00

12 40x70 1 1 No 15998.00

13 40x80 1 1 No 17525.00

14 40x90 1.5 1 No 18649.00

15 40x100 1.5 1 No 18649.00Note:

Rates are excluding excise duty and VAT.Excise duty at 4.12% as extra.VAT at 5% on Rate + excise duty as extra.

Page 79: twad 13-14

1 2 3 4 5

1 50x40 2 1 No 16496.00

2 50x50 2 1 No 17312.00

3 50x60 2 1 No 18162.00

4 50X75 3 1 No 19363.00

5 50x100 3 1 No 26565.00

6 50x125 4 1 No 26591.00

7 50x175 5 1 No 34188.00

8 50x200 6 1 No 37422.00

9 50x225 7 1 No 48187.00

10 50x250 10 1 No 48759.00

3.1 3 PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 150MM DIABOREWELL WITH ISI MARK IS 8034 WITHOUT PANEL BOARD

Sl.No.Duty

lpm x mH.P. of

PumpsetUnit

Rate for 2013-14 inRupees

10 50x250 10 1 No 48759.00

11 50x275 10 1 No 56183.00

12 75x40 2 1 No 16774.00

13 75x50 2 1 No 17312.00

14 75x60 3 1 No 18162.00

15 75x75 3 1 No 20711.00

16 75x100 4 1 No 26565.00

17 75x125 4 1 No 31231.00

18 75x150 5 1 No 33611.00

19 75x175 6 1 No 27531.00

20 75x200 7.5 1 No 36758.00

21 75x225 10 1 No 48673.00

22 75x250 10 1 No 56183.00

23 75x275 10 1 No 54942.00

24 100x30 1.5 1 No 15862.00

25 100x40 2 1 No 16774.00

26 100x50 3 1 No 19257.00

27 100x60 3 1 No 19363.00

28 100x75 3 1 No 23972.00

29 100x100 4 1 No 27583.00

Page 80: twad 13-14

Sl.No.Duty

lpm x mH.P. of

PumpsetUnit

Rate for 2013-14 inRupees

30 100x125 5 1 No 32176.00

31 100x175 7.5 1 No 30681.00

32 100x200 10 1 No 36758.00

33 100x225 10 1 No 48673.00

34 100x250 10 1 No 50368.00

35 125x25 1.5 1 No 15862.00

36 125x40 3 1 No 16774.00

37 125x50 3 1 No 19257.00

38 125x60 3 1 No 21653.00

39 125x75 3 1 No 23175.00

40 125x100 4 1 No 28446.00

41 125x125 6 1 No 33611.00

42 125x200 10 1 No 45246.00

43 125x225 10 1 No 50368.0043 125x225 10 1 No 50368.00

44 150x25 1.5 1 No 15862.00

45 150x40 3 1 No 16774.00

46 150x50 3 1 No 17312.00

47 150x60 3 1 No 21653.00

48 150x75 4 1 No 23175.00

49 150x100 5 1 No 31231.00

50 150x125 6 1 No 33611.00

51 175x40 3 1 No 16774.00

52 175x50 3 1 No 21153.00

53 175x60 3 1 No 21653.00

54 175x75 4 1 No 21653.00

55 175x100 6 1 No 31231.00

56 200x25 2 1 No 15862.00

57 200x40 3 1 No 16774.00

58 200x50 4 1 No 21435.00

59 200x60 5 1 No 23849.00

60 200x75 5 1 No 23972.00

61 200x100 6 1 No 31231.00

62 200x125 7.5 1 No 34709.00

Page 81: twad 13-14

Sl. No.Duty

lpm x mH.P. of

PumpsetUnit

Rate for 2013-14 inRupees

81 700x40 10 1 No 30146.0082 700x60 10 1 No 40604.0083 700x80 10 1 No 40604.0084 700x100 10 1 No 40604.0085 800x40 10 1 No 30146.0086 800x60 10 1 No 40604.0087 800x80 10 1 No 40604.0088 800x100 10 1 No 40604.0089 900x40 10 1 No 40604.0090 900x60 10 1 No 40604.0091 900x80 10 1 No 40604.0092 900x100 10 1 No 40604.0093 1000x40 15 1 No 45980.0094 1000x60 15 1 No 48258.0095 1000x80 20 1 No 54390.0096 1000x100 35 1 No 83050.0097 1250x40 20 1 No 51030.0097 1250x40 20 1 No 51030.0098 1250x60 25 1 No 83050.0099 1250x80 35 1 No 90530.00100 1250x100 35 1 No 87194.00101 1500x40 20 1 No 55770.00102 1500x60 30 1 No 80190.00103 1500x80 40 1 No 93720.00104 1500x100 50 1 No 170941.00105 2000x40 30 1 No 84150.00106 2000x60 45 1 No 93720.00107 2000x80 50 1 No 93720.00108 2000x100 60 1 No 93720.00109 2500x40 35 1 No 93720.00110 2500x60 60 1 No 93720.00111 2500x80 75 1 No 93720.00112 2500x100 90 1 No 93720.00

Note: Rates are excluding excise duty and VAT.Excise duty at 6.18% as extra.VAT at 5% on Rate + excise duty as extra

Page 82: twad 13-14

1 2 3 4 51 50x25 1 1 No 13804.002 50x40 1 1 No 13804.003 50x50 1.5 1 No 16393.004 50x60 2 1 No 20502.005 50x75 4 1 No 29875.006 50x100 5 1 No 36511.007 50x125 6 1 No 44290.008 75x25 1 1 No 13804.009 75x40 1.5 1 No 15684.0010 75x50 2 1 No 17536.0011 75x60 2 1 No 20502.0012 75x75 4 1 No 29875.0013 75x100 5 1 No 36511.0014 75x125 6 1 No 43749.00

4.0 OPENWELL SUBMERSIBLE PUMPSET WITH ISI MARK IS 14220 WITHOUTPANEL BOARD

Sl. No.Duty

lpm x mH.P. of

PumpsetUnit

Rate for 2013-14 inRupees

14 75x125 6 1 No 43749.0015 75x150 7.5 1 No 55882.0016 100x25 1 1 No 14930.0017 100x40 2 1 No 17536.0018 100x50 3 1 No 17556.0019 100x60 4 1 No 29875.0020 100x75 4 1 No 29875.0021 100x100 5 1 No 36511.0022 100x125 6 1 No 44290.0023 125x25 3 1 No 14930.0024 125x40 3 1 No 17556.0025 125x50 3 1 No 22806.0026 125x75 4 1 No 29875.0027 125x100 5 1 No 36511.0028 125x125 6 1 No 44290.0029 150x25 3 1 No 14930.0030 150x40 3 1 No 17556.0031 150x50 3 1 No 17556.0032 150x60 4 1 No 30165.0033 150x75 4 1 No 29875.0034 150x100 5 1 No 36511.0035 150x125 7.5 1 No 55882.0036 175x25 3 1 No 14930.0037 175x40 3 1 No 17556.0038 175x50 3 1 No 22806.00

Page 83: twad 13-14

Sl. No.Duty

lpm x mH.P. of

PumpsetUnit

Rate for 2013-14 inRupees

39 175x60 4 1 No 29875.0040 175x75 5 1 No 29875.0041 175x100 6 1 No 36511.0042 200x25 3 1 No 14930.0043 200x40 4 1 No 17556.0044 200x50 4 1 No 17556.0045 200x60 4 1 No 29875.0046 200x75 6 1 No 29875.0047 200x100 7.5 1 No 36511.0048 200x125 10 1 No 66194.0049 250x25 3 1 No 14930.0050 250x40 4 1 No 17556.0051 250x50 5 1 No 22806.0052 250x60 5 1 No 29875.0053 250x75 7.5 1 No 36511.0054 250x100 7.5 1 No 40604.0055 250x125 10 1 No 81197.0055 250x125 10 1 No 81197.0056 300x25 3 1 No 14930.0057 300x40 5 1 No 17556.0058 300x50 5 1 No 22806.0059 300x60 6 1 No 29875.0060 300x75 10 1 No 36511.0061 300x100 10 1 No 40604.0062 350x25 3 1 No 17556.0063 350x40 5 1 No 25687.0064 350x50 7.5 1 No 22806.0065 350x60 7.5 1 No 29875.0066 350x75 10 1 No 36511.0067 350x100 10 1 No 40604.0068 400x25 3 1 No 17556.0069 400x40 5 1 No 25687.0070 400x50 5 1 No 22806.0071 400x60 7.5 1 No 32256.0072 400x75 10 1 No 40604.0073 500x25 5 1 No 17556.0074 500x40 5 1 No 25687.0075 500x50 5 1 No 22806.0076 500x75 10 1 No 40604.0077 600x25 5 1 No 17556.0078 600x40 7.5 1 No 25687.0079 600x50 7.5 1 No 32256.0080 600x75 10 1 No 40604.00

Page 84: twad 13-14

Sl. No.Duty

lpm x mH.P. of

PumpsetUnit

Rate for 2013-14 inRupees

81 700x40 10 1 No 30146.0082 700x60 10 1 No 40604.0083 700x80 10 1 No 40604.0084 700x100 10 1 No 40604.0085 800x40 10 1 No 30146.0086 800x60 10 1 No 40604.0087 800x80 10 1 No 40604.0088 800x100 10 1 No 40604.0089 900x40 10 1 No 40604.0090 900x60 10 1 No 40604.0091 900x80 10 1 No 40604.0092 900x100 10 1 No 40604.0093 1000x40 15 1 No 45980.0094 1000x60 15 1 No 48258.0095 1000x80 20 1 No 54390.0096 1000x100 35 1 No 83050.0097 1250x40 20 1 No 51030.0097 1250x40 20 1 No 51030.0098 1250x60 25 1 No 83050.0099 1250x80 35 1 No 90530.00100 1250x100 35 1 No 87194.00101 1500x40 20 1 No 55770.00102 1500x60 30 1 No 80190.00103 1500x80 40 1 No 93720.00104 1500x100 50 1 No 170941.00105 2000x40 30 1 No 84150.00106 2000x60 45 1 No 93720.00107 2000x80 50 1 No 93720.00108 2000x100 60 1 No 93720.00109 2500x40 35 1 No 93720.00110 2500x60 60 1 No 93720.00111 2500x80 75 1 No 93720.00112 2500x100 90 1 No 93720.00

Note: Rates are excluding excise duty and VAT.Excise duty at 6.18% as extra.VAT at 5% on Rate + excise duty as extra

Page 85: twad 13-14

25 30 35 40 45 50 55 60 70 80 901 1500 2.04 2.04 2.41 2.41 2.43 3.09 3.13 3.16 3.34 3.34 3.742 2500 2.04 2.04 2.49 2.58 3.13 3.15 3.13 4.04 3.7 3.83 3.833 3000 2.15 2.04 2.58 2.58 2.8 2.9 2.9 4.13 4.13 3.96 3.994 3500 2.04 2.04 2.58 2.58 3.66 3.76 4.18 4.34 4.4 4.79 4.795 4000 2.36 2.36 2.58 2.58 3.34 3.76 4.06 4.13 4.23 4.23 4.236 5000 2.73 2.73 2.73 2.96 3.89 4.28 4.31 4.75 4.93 4.93 4.937 6000 2.58 2.58 3.83 3.89 3.89 4.35 4.67 5.13 5.38 5.38 5.388 7000 3.55 3.68 3.89 3.89 4.26 4.44 4.54 5.13 5.149 8000 3.56 3.39 3.69 4.44 4.44 4.44 4.63 4.76 8.74

10 9000 3.56 3.8 3.83 4.44 4.46 4.45 4.51 4.61 9.3411 10000 3.56 3.9 3.84 4.46 4.74 4.64 4.64 8.49 10.71 10.71 10.7912 15000 4.38 4.53 4.4 5.41 5.41 6.54 7.15 9.34 10.71 10.71 10.7913 20000 4.81 4.9 4.91 11.39 12.53 12.53 12.53 12.53 12.53 12.53 12.5314 25000 12.25 12.53 12.53 12.53 12.53 12.53 12.53 12.53 12.53 12.53 12.5315 30000 12.46 12.94 13.55 13.55 13.55 13.55 13.55 16.25 17.88

Sl.No.

PumpCapacity in

LPM

Rate for 2013-14 in RupeesHead in Metres

Rupees in Lakhs

5. HORIZONTAL SPLIT CASTING CENTRIFUGAL PUMP (1500 RPM)(BRONZE IMPELLER AND SS10 SHAFT)

Note: 1) The rates are inclusive of MS base plate, flexible tyre coupling and foundation bolts. 2) The rates are inclusive of all duties taxes handling charges and at F.O.R. destination. 3) Efficiency may be taken fromRupees in Lakhs

Page 86: twad 13-14

Sl.

NoKW HP

Rate for 2013-14

in Rupees

1 2 3 4

1 9.3 12.5 81563.00

2 11 15 85811.00

3 15 20 106868.00

4 18.5 25 137750.00

5 22 30 151500.00

6 30 40 175363.00

7 37 50 218923.00

8 45 60 282338.00

9 55 75 261250.00

10 75 100 408375.00

11 90 120 430375.00

12 110 150 542625.00

13 125 170 698125.00

14 132 180 739500.00

15 150 200 746750.00

16 160 215 818500.00

17 180 240 871750.00

18 187 250 912250.00

19 200 270 978500.00

20 220 300 1281625.00

21 250 335 1461192.00

22 280 375 2025125.00

23 300 400 2172750.00

Note:

6.HORIZONTAL SQUIRREL CAGE MOTOR 1500 RPM

AC 3 Phase /415 V/ Horizontal SPDP 4 Pole Squirrel cage Induction motor

for HSC Centrifugal pumps

The above rates are inclusive of excise duty, taxes, handling charges

etc.,

Excise duty at 12.36,VAT at 5%

Page 87: twad 13-14

Sl.No KW HPRate for 2013-14 in

Rupees

1 2 3 4

1 9.3 12.5 74534

2 11 15 78320

3 15 20 110379

4 18.5 25 130356

5 22 30 167790

6 30 40 209291

7 37 50 261602

8 45 60 322264

9 55 75 369206

10 75 100 443155

11 90 120 502690

12 110 150 645431

13 125 170 767925

14 132 180 767925

15 150 200 819718

16 160 215 884035

17 180 240 1237200

18 187 250 1256988

19 200 270 1360531

20 220 300 1539083

21 250 335 1723007

7.HORIZONTAL SQUIRREL CAGE MOTOR 1000 RPM

AC 3 Phase /415 V/ Horizontal SPDP 6 Pole Squirrel cage Induction moror

for HSC Centrifugal pumps

Note: The rates are inclusive of excise duty,taxes,

handling charges etc.,

Excise duty at 12.36%,VAT at 5%.

Page 88: twad 13-14

11KV 22 KV 11KV/22KV

1 2 3 4 5

1 160 219600.00 234000.00 261000.00

2 200 243000.00 261000.00 288000.00

3 250 265500.00 288000.00 315000.00

4 315 327600.00 344700.00 378000.00

5 400 392400.00 445500.00 479700.00

11KV/433V 22KV/433V

1 3 4

1 524700.00 564300.00

2 653400.00 693000.00

3 803000.00 882000.00

4 957000.00 1035000.00

Note : Excise duty at 12.36%, TNVAT at 5% and handling charges are extra

750/800

1000

Sl.No. Rating in KVA

Rate for 2013-14 in Rupees

2

500

630

10.1 OIL NATURAL AND AIR NATURAL COOLED COPPER WINDING H.T.

TRANSFORMER CONFORMING TO IS 2026

10.0 IRON CORE OIL COOLED TRANSFORMERS WITH COPPER WINDING

CONFIRMING TO IS 2026

Sl.no Rating in KVA

Rate for 2013-14 in Rupees

Note :- Excise duty at 12.36 % and TNVAT at 5% and handling charges are extra.

Page 89: twad 13-14

Sl. No. HP Unit Rate for 2013-14 in Rupees

1 1 1 No. 4065.00

2 1.5 1 No 4453.00

3 2 1 No 5082.00

Note

Sl. No. HP Unit Rate for 2013-14 in Rupees

1 1 1 No. 9020.00

2 2 1 No 9020.00

3 3 1 No 9020.00

4 4 1 No. 9020.00

5 5 1 No 9020.00

6 6 1 No 9020.00

Note

11.0 SINGLE PHASE PANEL BOARD WITH TWO LEVEL GUARD AND AUTO

START

1) The rate are excluding excise duty and taxes

2) Excise duty Nil and VAT at 5 % extra over the above rate.

3)The above rates are inclusive of two level guard worth

Rs.550/- and auto star facility worth Rs. 400/-

4) Timer is not recommended for this panel board.

2) Panel board should be provided as per specification given in Board

circular No. 23/DCE/QATA/2004/Dt. 23.8.2004

11.1 3 PHASE PANEL BOARD- D.O.L. WITH TWO LEVEL GUARD AND AUTO

START

1) The rate are excluding excise duty and taxes

2) Excise duty Nil and VAT at 5 % extra over the above rate.

3)The above rates are inclusive of two level guard worth

Rs.550/- and auto star facility worth Rs. 400/-

4)For Timer facility if necessoryRs. 4000 may be added as extra.

2) Panel board should be provided as per specification given in Board

circular No. 23/DCE/QATA/2004/Dt. 23.8.2004

Page 90: twad 13-14

Sl. No. HP Unit Rate for 2013-14 in Rupees

1 6 1 No. 10660.00

2 7.5 1 No 12870.00

3 10 1 No 15015.00

4 12.5 1 No. 15675.00

5 15 1 No 15675.00

6 20 1 No 16500.00

7 25 1 No 16500.00

Note

(The above rates are inclusive of all taxes ,duties and handling charges

Excise duty at 10.3 %,VAT 5 %)

11.2 3 PHASE PANEL BOARD-STAR DELTA WITH TWO LEVEL GUARD AND

AUTO START

1) The rate are excluding excise duty and taxes.

2) Excise duty Nil and VAT at 5 % extra over the above rate.

3)The above rates are inclusive of two level guard worth Rs.550/- and auto

star facility worth Rs. 400/-.

4) Timer is not recommended for this panel board.

2) Panel board should be provided as per specification given in Board

circular No. 23/DCE/QATA/2004/Dt. 23.8.2004.

11.3 DOL STARTER WITH SINGLE PHASING PREVNTOR WITH AMMETER

CONFORMING TO IS 13947 WITH AUTO RESTART FACILITY FOR PUMP

HOUSES WHERE PANEL BOARDS ARE AVAILABLE

Up to 10 HP rating Rs. 4416

Page 91: twad 13-14

Sl.

No.Description Unit Rate for 2013-14 in Rupees

1 2 3 4

1 30 to 37 1 No 167600.00

2 38 to 75 1 No 273200.00

3 76 to 135 1 No 409600.00

4 136 to 160 1 No 467000.00

5 161 to 250 1 No 640800.00

6 251 to 300 1 No 758400.00

7 301 to 500 1 No 1170800.00

8 501 to 750 1 No 1512200.00

Sl.

No.Description Unit Rate for 2013-14 in Rupees

1 2 3 4

1 250 1 No 635600.00

2 300 1 No 698900.00

3 350 1 No 741100.00

4 400 1 No 790000.00

5 500 1 No 825500.00

6 600 1 No 931900.00

7 700 1 No 974000.00

8 800 1 No 1016200.00

9 900 1 No 1102400.00

10 1000 1 No 1185000.00

Note:

11.4 FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLE FOR

L.T.SQUIRREL CAGE MOTOR

11.5 FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLE FOR

H.T.SQUIRREL CAGE MOTOR

**

1)The rates are inclusive of excise duty taxes etc.

2) DOL starters are to be adopted up to 6 HP

3) Air break fully automatic star delta starters are suggested for above 6 HP upto

20HP except submersible pumpsets for which fully automatic ATS starters a

4) FCMA soft starter are to be adopted for 100 HP and above.

5)Excise duty at 12.36% VAT at 5%

Page 92: twad 13-14

3 Core 3.5 Core 4 Core1 2 3 4 5 61 4sq.mm metre 42.00 -- 49.002 6sq.mm metre 51.00 -- 56.003 10sq.mm metre 58.00 -- 66.004 16sq.mm metre 61.00 -- 73.005 25sq.mm metre 76.00 89.00 97.006 35sq.mm metre 93.00 108.00 123.007 50sq.mm metre 123.00 140.00 158.008 70sq.mm metre 163.00 195.00 210.009 95sq.mm metre 213.00 240.00 268.0010 120sq.mm metre 256.00 303.00 330.0011 150sq.mm metre 312.00 359.00 403.00

12.0 L.T. CABLES

3,3.5,4 CORE 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR CABLECONFORMING TO IS 1554 PART I WITH ISI MARKING

Sl.NO. Description Unit Rate for 2013-14 in Rupees

11 150sq.mm metre 312.00 359.00 403.0012 185sq.mm metre 385.00 437.00 493.0013 240sq.mm metre 486.00 554.00 625.0014 300sq.mm metre 590.00 675.00 764.0015 400sq.mm metre 755.00 861.00 978.00

With exciseduty

Without exciseduty

1 meter 36.00 32.002 meter 59.00 52.003 meter 85.00 76.004 meter 126.00 113.005 meter 214.00 192.006 meter 330.00 296.00

Note:

16.0 sq.mm

Description

12.1 PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLECONFORMING TO IS 694/1990

Note: Excise duty 12.36% and VAT at 5% are extra

Sl.No.

Excise duty at 12.36% and VAT at 5% are extra.

Rate for 2013-14 in RupeesUnit

1.5 sq.mm2.5 sq.mm4.0 sq.mm6.0 sq.mm10.0 sq.mm

Page 93: twad 13-14

For laying below GL

including earth work

per meter

For laying in trenches

inside the pump room

or in air per meter

1 90.00 60.00

2 130.00 86.00

3 190.00 150.00

Sl.No. UnitRate for 2013-14

in Rupees

1 each 180.00

2 each 220.00

3 each 320.00

Note:

95 to 240 sq.mm

240 to 400 sq.mm

1.For every 3 metre length one set of clamp is to be provided

2.Suitable number of clamps are to be arrived at according to the length

3.Provision for cable trench and delivery pipe ducting are to be provided in

pump house detailed estimate.

up to 95 sq. mm

95 to 240 sq.mm

240 to 400 sq.mm

12.4 CABLE CLAMPS

Description

up to 95 sq. mm

12.2 RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALS AND LABOUR

The cost of cable per meter will be the cost per joint

12.3 CABLE LAYING

Sl.No. Description

Rate for 2013-14 in Rupees

Page 94: twad 13-14

11KV 12KV

1 3 C 240 sq.mm metre 787.00 962.00

2 3 C 185 sq.mm metre 656.00 813.00

3 3 C 150 sq.mm metre 557.00 723.00

4 3 C 120 sq.mm metre 495.00 650.00

5 3 C 95 sq.mm metre 420.00 589.00

6 3 C 70 sq.mm metre 376.00 519.00

H.T. CABLE PVC INSULATED ARMOURED ALUMINIUM CONDUCTOR CABLE

Sl.No. Description UnitRate for 2013-14

in Rupees

Page 95: twad 13-14

Sl.

No.Description Unit

Rate for 2013-14

in Rupees

1 Rate for 5 HP Model/ Rotary type Vaccum

pumpsets (Pumpset + GI Pipes + Fittings +

Starters + Valves + 100 Lr.Tank) including

Transportation, handling charges all taxes and

duties

1 No 212129.00

2 Rate for 10 HP Vaccum pumpset with all above

Accessories 1 No 242077.00

3 150mm dia Pressure Gauge and Vaccum guage

including all accessories as per specification

(For Suction and Delivery to be mounted on

wall on Teak Wood Board)

1 No 3744.00

3POLE 4 POLE

1 32-100 8857.00 11000.00

2 125 10500.00 13000.00

3 160 13000.00 17424.00

4 200 23553.00 24684.00

5 250 23553.00 28314.00

6 320 28500.00 33000.00

7 400 30000.00 34500.00

8 630 33188.00 40000.00

9 800 45000.00 59968.00

10 1000 70000.00 90000.00

11 1250 79000.00 115000.00

12 1600 90000.00 145000.00

1) The rates are inclusive of all taxes, duties and handling charges and F.O.R. destination.

2) The rate for MCB for single phase useage the PWD schedule of rates shall be referred.

3) Add 35% cost of MCCB/ACB/ MCB towards the cost of fabrication other fittings and labour

4) Upto 15 KW distribution box shall be used for more than one outgoing loads and for rates PWD

schedule rates shall be referred.

NOTE:

13.0 VACCUM PUMP SET WITH ACCESSORIES

14.0 MOULDED CASE CIRCUIT BREAKER(MCCB)

Sl.N

o.Range

Rate for 2013-14 in Rupees

Page 96: twad 13-14

Sl.N

o.Description Unit

Rate for 2013-14 in

Rupees

1 Up to 50HP/37 KW (which includes LT meter

panel board 6 Nos. suitable fuse carriers 1 No. 18750.00

2 75 HP/56 KW (which includes LT meter

panel board 6 Nos. suitable fuse carriers 1 No. 24470.00

3 75HP-150HP/56-112 KW (which includes LT

meter panel board 6 Nos. suitable fuse carriers 1 No. 30580.00

4 IN HT supply using LT metering board (Above

150 HP below 200 HP) 112-150 KW 1 No. 50000.00

Note:

a. The rate for mixed Die Electric Capacitor with Test Certificate given as Rs.400/- per KVAR is

inclusive of all taxes and duties and inclusive of Banking charges, such as providing of copper bus

bars with provision for adding atleast 2 capacitors at later date, cable entry box, fabricating charges

etc. complete. This rate is not applicable for replacement of capacitors which do not require banking

and fabrication works.

16.0 LT METERING BOX

15.0 RATE FOR MIXED DIE ELECTRIC CAPACITOR WITH TNEB TEST CERTIFICATE

WITH ACCESSORIES INCLUDING BANKING CONFORM TO IS 2834.

Rs.400/- per KVAR (includign all taxes, duties and handling charges).

Page 97: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1

Designing and preparation of CEIG drawings,

obtaining Approval and safety certificate

including submission of Completion report

and rectification report.

1 No. 50000.00

2

Supply, delivery of 6 pole structure materials

with suitable Size RSJ along with all structure

material are as under.

a For 11 KV Sub station 1 No. 250000.00

b For 22 KV Sub station 1 No. 350000.00

3 Construction of transformer plinth 1 No. 17480.00

4

Chain link fencing with gate including the

TNEB 2 poles Spreading of materials as per

CEIG requirements

1 No. 45000.00

5 Transformer yard earthing

a Upto 250 KVA Transformer sub station 1 No. 25000.00

b Above 250 KVA 1 No. 50000.00

6 Transformer sub station erection charges 1 No. 15890.00

Note:

3POLE 4 POLE

1 1000 138500.00 170400.00

2 1250 146700.00 179700.00

3 1600 162800.00 209400.00

4 2000 203500.00 246400.00

5 2500 245600.00 300300.00

6 3200 311200.00 384100.00

7 4000 385300.00 473000.00

Note:

17.0 TRANSFORMER SUB STATION RELATED WORKS

Provision for cement concrete flooring has to be made at the sub astation yard

17.1 AIR CIRCUIT BREAKER

Sl.No. Range in AMPSRate for 2013-14 in Rupees

The rates are inclusive of all taxes, duties, handling charges and F.O.R. destination.

Page 98: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1

Electrical gloves tested to 11 KV /22 KV with

wooden box dusted with french chalk powder 1 No. 410.00

2 Electrical quality 6mm thick rubber mat 1 No. 590.00

35 kg capacity ISI marked Dry chemical

powder fire extinguisher 1 No. 1650.00

4 Fire Bucket-3 Nos Hooked to MS stand 1 No. 660.00

5 Laminated shock treatment chart 1 No. 500.00

6 Wooden First Aid Box 1 No. 650.00

7Rechargeable Emergency lamp( 600mm

fluorescent lamp) 1 No. 2750.00

H.T. SUPPLY

8 Wooden ladder –3M Ht. 1 No. 990.00

9 Earth Discharge Rod 1 No. 830.00

Note:

18.0 SAFETY APPLIANCES

The rates are inclusive of all taxes,duties, handling charges and F.O.R destination

Page 99: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1 6” Chain wrench best India make 1 No. 500.00

2 8”Chain Wrench Best India Make 1 No. 700.00

3

Connector Screw Driver 901 Taparia Make 1 No. 41.00

4 200mm Screw Driver 825 Taparia Make 1 No. 70.00

5 300mm Screw Driver 829 Taparia Make 1 No. 137.00

6 400mm Screw Driver 930 Taparia Make 1 No. 198.00

7 200mm Cutting Plier Taparia Make 1 No. 250.00

8

800gm Ball Pane Hammer with Handle

Taparia Make 1 No. 300.00

9 Digital Tong Tester CE Make 1 No. 3000.00

10 Digital Multi Meter CE Make 1 No. 1750.00

11 15” Screw Spanner Taparia Make 1 No. 600.00

12 12” Bearing Puller 1 No. 594.00

13 Lever Type Grease Gun 1 No. 487.00

14 12”Screw Spanner 1 No. 422.00

15 Crow Bar 5” 1 No. 430.00

16 1” Cold Chisel 1 No. 144.00

17 Hacksaw Frame with Blade 1 No. 90.00

18 Electrical Air Blower 1 No. 2500.00

19 Digital Tachometer 1 No. 1500.00

20 Hand Crimpling Tool 8” 1 No. 372.00

21 DE Spanner set 6 to 32 Jhalani Make 1 No. 750.00

22 Rings spanner set 6 to 32 Jhalani Make 1 No. 1798.00

23 Pipe Wrench 24” Jhalani Make 1 No. 1080.00

24 Pipe Wrench 14” Jhalani Make 1 No. 450.00

25 12” Flat rough File Scissors Make 1 No. 242.00

26 12” Flat smooth File Scissors Make 1 No. 372.00

27 12”Round File Rough Scissors 1 No. 317.00

28 12” Round File Smooth Scissors Make 1 No. 350.00

29 12”Half Round File Rough Scissors Make 1 No. 540.00

30

12”Half Round File Smooth Scissors Make1 No. 540.00

Note:

19.0 TOOLS

The rates are inclusive of all taxes,duties, handling charges and F.O.R destination

Page 100: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1

Providing lighting wiring using MS conduit

pipes and specials with 2 runs 1.5 sq.mm

PVC copper wire and 1 run 12 swg GI wire

for earthing for light, fans and 5A plug points

including switch box 5A switch sockets

ceiling rose and consumables

1 No. 750.00

2

Supply of portable hand lamp with 100w

bulb, lamp guard and wooden handle and

25M long flexible cable.

1 No. 830.00

3 Supply of pedestal fan 1 No. 2860.00

Note:

Sl.No. Description UnitRate for 2013-14

in Rupees

1 Upto 25 HP installation 1 No. 1500.00

2 Above 25-60 HP 1 No. 2000.00

3 Above 60-150 HP 1 No. 3000.00

4 Above 150 HP 1 No. 5000.00

Note:

1)Add 35% for wiring on the total fittings cost.

2)The above rates are inclusive of all taxes duties handling charges and F.O.R destination.

3)Excise duty at 12.36% VAT 5%.

21.0 TWIN GI EARTHING

In case of collector well the collctor well distance from the bank of the rivr should be

ascertained to find out the weight of GI strip to be usd only in the foot bridge and rate

rate of Rs.47/- per Kg should be adopted for estimation and this amount should be added

with the above rates.

20.0 PUMP ROOM WIRING AND OTHER ITEMS

Page 101: twad 13-14

Sl.No. Description UnitRate for 2013-14

in Rupees

1

2T capacity hand operated over head

Travelling (HOT) crane suitable for a span

upto 6 Mtrs, and travel length upto 10 Mtrs.

with clear lift upto 6 Mtrs. including gear type

chain pulley block and geared Travelling

trolley complete with all accessories.

1 No. 302570.00

22T HOT crane with above specifications upto

8 M Span1 No. 312380.00

32T HOT crane with above specifications upto

10 M Span1 No. 333640.00

4

3T capacity hand operated over head

Travelling (HOT) crane suitable for a span

upto 6 Mtrs, and travel length upto 10 Mtrs.

with clear lift upto 6 M including gear type

chain pulley block and geared Travelling

trolley complete with all accessories.

1 No. 325470.00

53T HOT crane with above specifications upto

8 M Span1 No. 335280.00

63T HOT crane with above specifications upto

10 M Span1 No. 348360.00

7

5T capacity hand operated over head

Travelling (HOT) crane suitable for a span

upto 6 Mtrs, and travel length upto 10 M with

clear lift upto 6 M including gear type chain

pulley block and geared Travelling trolley

complete with all accessories.

1 No. 420320.00

85T HOT crane with above specifications upto

8 M Span1 No. 449760.00

95T HOT crane with above specifications upto

1M Span1 No. 479200.00

Note:

22.0 H.O.T. CRANE AND ACCESSORIES

The rates are inclusive of all taxes,duties, handling charges.

Page 102: twad 13-14

25 30 35 40 45 50 55 60 70 80 90

1 1500 31 31 31 31 31

2 2500 37 37 37 38 39

3 3000 39 39 39 39 39

4 3500 39 39 39 39 40 44 44 44

5 4000 39 39 42 42 44 44 44 44

6 5000 40 44 44 44 44 54 54 54

7 6000 44 44 44 54 54 54 59 59

8 7000 54 59 68 68 72 72 72 72 72 72

9 8000 72 72 72 79 79 79 79 79 79

10 9000 79 79 87 87 87 87 87 87 87

11 10000 87 91 91 91 91 91 91 91 91

12 15000 104 110 110 110 110 110 110 110 110 137 137

13 20000 129 137 137 137 137 137 137 137 137 158 158

14 25000 137 158 158 159 159 159 159 159 159 168 168

15 30000 158 158 161 161 168 168 168 168 168 188 188

Note: The rates for testing and repairs, if any required, for pump sets will be extra.

23.0 CARRYING ENERGY EFFICIANCY IMPROVEMENT JOB BY APPLICATION OF GLASS

FLAK COATING FOR HORIZANDAL SPLIT CASE PUMPS

Rupees in Thousands

Sl.NoCapacity

in LPM

Rate for 2013-14 in Rupees

HEAD IN METRES

Page 103: twad 13-14

Sl.No Capacity in Cum/Hr.

10 15

1 400 40000 40000

2 500 40000 40000

3 600 43000 43000

4 700 45000 45000

5 800 47000 47000

6 900 47000 47000

7 1000 57000 57000

8 1100 57000 57000

9 1200 77000 77000

10 1300 77000 77000

11 1400 98000 98000

12 1500 98000 98000

23.1 CARRYING ENERGY EFFICIENCY IMPROVEMENT JOB BY

APPLICATION OF GLASS FLAK COATING FOR MIXED FLOW PUMPS

Rate for 2013-14 in Rupees

Head in meters

Note:The rates for testing and repairs, if any required, for pump sets will be extra.

Page 104: twad 13-14

15 20 25 30 35 40 45 50 55 60 70 80 90

1 2500 60000 59300 84050 93900 108750 108600

2 3000 60000 59300 84050 108750 123600 178050

3 3500 60000 59300 84050 118650 133500 182950

4 4000 64000 63260 89000 126570 148350 192850

5 5000 64000 63260 89000 126570 148350 192850

6 6000 70000 69200 93900 133500 158250 202750

7 7000 79000 78110 103800 138450 168150 212650

8 8000 88000 86970 113700 148350 178050 222550

9 9000 88000 86970 113700 148350 178050 222550

10 10000 99000 97860 118650 158250 182950 232450

11 15000 109000 107760 133500 168150 192850 242350

12 20000 120000 118650 143400 178050 202750 252550

13 25000 130000 128550 158250 182950 212650 262150

14 30000 140000 138450 168150 192850 222550 272050

Note: The rates for testing and repairs, if any required, for pump sets will be extra.

23.2 CARRYING ENERGY EFFICIANCY IMPROVEMENT JOB BY APPLICATION OF

GLASS FLAK COATING FOR VERTICAL TURBINE PUMPS

Sl.No

Capacity

in LPM

Rate for 2013-14 in Rupees

HEAD IN METERS

Page 105: twad 13-14

RATES FOR BUILDING MATERIALS

Page 106: twad 13-14

1

BUILDING MATERIALS

1. Cement - Rs. 5,500/ – per metric tonne(Rupees Five Thousand and Five Hundred only)

The rate for cement is inclusive of all taxes, freight charges etc., at

Stockyard/ Dealer’s Godown. Necessary lead charges (i.e. excluding loading

and unloading charges) as applicable as per conveyance table, may be

allowed from the Stockyard / Dealer’s Godown to the site of work, if duly

certified by an officer not below the rank of Assistant Executive Engineer.

However, in the case, if the source is specified as “Stockyard” the

same shall be decided and approved by the Superintending Engineers

concerned.

2. Steel Rods of all sizes - Rs.48, 000/- per metric tonne(Rupees Forty Eight thousand only)

The rate for steel is inclusive of all taxes, freight charges, etc., at

Stockyard/ Dealer’s Godown. Necessary lead charges (i.e. excluding loading

and unloading charges) as applicable as per conveyance table, may be

allowed from the Stockyard/ Dealer’s Godown to the site of work, if duly

certified by an officer not below the rank of Assistant Executive Engineer.

However, in the case, if the source is specified as “Stockyard” the

same shall be decided and approved by the Superintending Engineers

concerned.

The above rates for cement and steel are with effect from .06.2013

for adoption in the estimate.

(The above rates are subject to revision as and when revised by the PWD authorities)

Page 107: twad 13-14

Sl.No.

Description Unit Rates in Rupees(2013-14)

3 Bricks-II Class Table Moulded (Chamberburnt)

a. 9” x 4 ½” x 3” 1000 Nos. 5500.00

b. 9” x 4 3/8 ” x 2 ¾” 1000 Nos. 5290.00

4 Bricks-II Class (Ground Moulded ChamberBurnt)

a. 9”x4 ½” x3” 1000 Nos. 4740.00

b. 9”x4 3/8” x 2 ¾” 1000 Nos. 4600.00

5 Bricks-III Class (country bricks, Kilnburnt)

a 22 x 11 x 5 cm (8 ¾” x 4 ¼” x 2”) 1000 Nos. 3005.00

b. 22 x 11 x 5.7 cm (8 ¾” x 4 ¼” x 2 ¼”) 1000 Nos. 3140.00

c. 22 x 11 x 7cm (8 ¾ ” x 4 ¼ ” x 2 ¾”) 1000 Nos. 3985.00

6 Fly Ash bricksa. 230 x 110 x 70mm 1000 Nos. 4600.00

b. 230 x 110 x 75mm 1000 Nos. 4740.00

7 Bricks country (specially moulded for wellsteining)

a. 8 ¾ ”x 4 ¼ ” x 2” 1000 Nos. 1770.00

BUILDING MATERIALS

a. 8 ¾ ”x 4 ¼ ” x 2” 1000 Nos. 1770.00

b. Perforated Bricks 19 x 9 x 9cm 1000 Nos. 2695.00

c. Terrace Bricks 15 x 7.5 x 2.5cm 1000 Nos. 693.00

8 Flat Tilesa. 15cm x 15cm x 12mm 1000 Nos. 652.00

b. 15cm x 15cm x 20mm 1000 Nos. 773.009 Brick Jellya. 40mm Size cu.m. 495.00b. 20mm size cu.m. 550.00

0 Pressed Tiles

a. 20cm x 20cm x 2cm 1000 Nos. 8710.00

b. 23cm x 23cm x 2cm 1000 Nos. 12340.00

11 Pan Tilesa. 23cm x 8cm x 1.7cm 1000 Nos. 339.00

b. 16.5cm x 8cm x 1.7cm 1000 Nos. 282.00

12 Best Mangalore Tilesa. 1

st Class ’A’ 1000 Nos. 8145.00

b. Class ’AA’ 1000 Nos. 8295.00

c. Best Mangalore Ridge Tiles 1000 Nos. 23790.00

d. Best Mangalore Ceiling Tiles 1000 Nos. 5000.00

e. Best Mangalore Glass roofing tiles Each 236.00

f. Best Mangalore Ventilating tiles (single) Each 35.75

g. Best Mangalore Ventilating tiles (double) Each 44.80

Page 108: twad 13-14

Sl.No.

Description Unit Rates in Rupees(2013-14)

13 Mosaic Flooring tiles GREY

a. 25cm x 25cm x 2cm 1000 Nos. 10980.00

b. 20cm x 20cm x 2cm 1000 Nos. 6995.00

14 Mosaic (other colour)a. 25cm x 25cm x 2cm 1000 Nos. 15100.00

b. 20cm x 20cm x 2cm 1000 Nos. 8925.00

c. Mosaic (Green) 20cm x 20cm x 2cm 1000 Nos. 10980.00

d. Mosaic (Green) 25cm x 25cm x 2cm 1000 Nos. 17175.00

e. Mosaic Chequered Tile of Grey coloursize 25 cm x 25 cm x 2 cm 1000 Nos. 13730.00

Stone and Road materials

15 Rough stone for Masonry works (Hard Granite)cu.m. 332.00

16 Rough stone for revetment works cu.m. 288.00

17 Jeddy size for revetment (Hard granite) cu.m. 317.00

18 Cut stone pillar of size 0.15 x 0.15 x 2.1M Each 124.00

19 From boulders without blasting for revetmentcu.m. 85.25

19 From boulders without blasting for revetmentcu.m. 85.25

20 From boulders without blasting for masonry cu.m. 111.00

21 Course Rubble stone for masonry works cu.m. 266.0022 Course Rubble stone for Arch works cu.m. 288.00

a. 70cm x 30cm x 29cm Each 132.00

b. 37cm x 30cm x 29cm Each 119.0024 Hammer dressed stone,a. 37cm x 30cm x 29cm Each 92.00

25 Cut stone fully dressed to size on all faces cu.m. 4735.00

26 Cut stone roughly dressed cu.m. 3265.00

27 Ashlar arch stone fully dressed to size all faces cu.m. 3600.00

28 Flooring stone SS size (not less than 10cmthick)

sq.m. 265.00

29 Stone slab for culvert (3 faces, one linedressed)

a. Above 1.2m cu.m. 3435.00

b. Up to 1.2m cu.m. 3115.00

30 Stone slab for culvert (3 faces, two linedressed) cu.m. 3830.00

31 For lintel coping (3 faces, two line dressed) cu.m. 3830.00

32 Bond stones cu.m. 455.00

33 Kilometre stone 1.65 x 0.45 x 0.15m Each 328.00

34 Hecta metre stone

a. 0.90 x 0.10 x 0.10m Each 92.00

b. 0.75 x 0.23 x 0.10m Each 170.00

23 Chisel dressed stone

Page 109: twad 13-14

Sl.No.

Description Unit Rates in Rupees(2013-14)

35 Demarcation stone (Two line dressed fortop 30cm)

a. 0.75 x 0.15 x 0.15m Each 69.00

b. 0.90 x 0.23 x 0.23m Each 88.50c. 0.75 x 0.23 x 0.23m Each 81.95

d. 0.90 x 0.15 x 0.15m Each 75.90

e. Demarcation Stone with letters cut0.75 x 0.15 x 0.15m Each 92.40

f. Edge stone 0.45 x 0.15 x 0.15m Each 42.35

g. T.R.S. Bench Mark Stone neatly dressed theexposed surface to a height of 15cm includingcutting letters

i) 0.15 x 0.15 x 0.60m Each 106.00

ii) 0.10 x 0.10 x 0.25m Each 77.00

b. Guard stone (Top 0.70m chisel dressed and0.50m bottom roughly dressed) 0.23m x0.23m x 1.20m long (Two line dressed top45cm) 23cm dia 1.0m long

Each 130.00

c. Guard stone (Top 0.70m chisel dressed and0.50m bottom roughly dressed) 0.23m x0.23m x 0.9m long (Two line dressed top45cm) 23cm dia 0.90m long

Each 122.00

36. a. Guard Stone (Two line dressed for 45cm)23cm dia 1.0m long Each 122.00

c. Guard stone (Top 0.70m chisel dressed and0.50m bottom roughly dressed) 0.23m x0.23m x 0.9m long (Two line dressed top45cm) 23cm dia 0.90m long

Each 122.00

d. Guard stone (Top 0.70m chisel dressed and0.50m bottom roughly dressed) 0.15m x0.15m x 0.90m long (Two line dressed top45cm) 23cm dia 0.90m long

Each 85.25

e. Guard stone 90cm long 23cm dia Each 63.25

37 Hard broken Granite stone jelly (I.S.S.)machine crushed / Hand broken.

i. 90mm size cu.m. 319.00

ii. 80mm size cu.m. 358.00iii. 63mm size cu.m. 412.00

iv. 50mm size cu.m. 478.00v. 40mm size cu.m. 742.00vi. 25mm size cu.m. 638.00vii. 20mm size cu.m. 1034.00

viii. 12mm size cu.m. 958.00

ix. 10mm size cu.m. 705.00

x. 6mm size cu.m. 478.00xi. 3mm size cu.m. 431.00

38 Quartz metali. 50mm cu.m. 72.60

ii. 40mm cu.m. 73.70

39 Soft broken stonei. 63mm cu.m. 56.00

ii. 40mm cu.m. 62.7040 Laterite 40mm to 75mm size cu.m. 72.60

Page 110: twad 13-14

Sl.No.

Description Unit Rates in Rupees(2013-14)

41 Kankar 40mm to 75mm size cu.m. 72.60

42.a Soling stones 15cm cube (un blasted) cu.m. 84.70

b. Soling stones 15cm cube (blasted) cu.m. 138.6043.a Gravel cu.m. 130.00

b. Well Gravel cu.m. 107.80

c. Screened Kankar Gravel cu.m. 79.20

44.a Quarry rubbish cu.m. 72.60

b. Stone dust cu.m. 92.40c. Pond Ash (wet /dry) cu.m. 71.50

d Crushed Stone Sand cu.m. 367.00

45 Sand for Mortar cu.m. 110.0046 Sand for Filling cu.m. 110.0047 Clay for puddle and masonry cu.m. 28.60

48. i) Cuddapah slab 50mm thick sq.m 342.00

ii) Cuddapah slab 38mm/40mm thick sq.m 330.00

iii) Cuddapah slab 20mm/30mm thick sq.m 304.00

LIME49 Shell Lime (Slacked and screened) cu.m. 1180.00

50 Freshly Slacked and Screened Burnt LimeStone

cu.m. 869.00

51 Stone Lime or Lime Metal cu.m. 77.00

50 Freshly Slacked and Screened Burnt LimeStone

cu.m. 869.00

51 Stone Lime or Lime Metal cu.m. 77.00

TIMBER AND ROOFING MATERIALS

56 Teakwood planks

i) Over 45cm wide and 12mm thick. cu.m. 102850.00

ii) Over 30cm and up to 45cm wide and 12mmthick cu.m. 95460.00

iii) Over 30cm and up to 45cm wide and 12mm to25mm thick cu.m. 89400.00

iv) Over 30cm and up to 45cm wide and 25mmto 40mm thick cu.m. 85780.00

v) Over 15cm and up to 30cm wide and 12mmthick cu.m. 83490.00

vi) Over 15cm and up to 30cm wide and 12mm to25mm thick cu.m. 79370.00

vii) Over 15cm and upto 30cm wide and 25mm to40mm thick cu.m. 77800.00

viii) Up to 15cm wide and 12mm thick cu.m. 76350.00

ix) Up to 15cm wide and 12mm to 25mm thickcu.m. 76350.00

x) Up to 15cm wide and 25mm to 40mm thickcu.m. 72110.00

83000.00

97400.00

95830.00

93290.00

53 Teakwood scantlings (for tiebeams andprincipal rafters) - Malabar cu.m.

52 Teakwood scantlings (over 3m for joists andrafters) Malabar cu.m.

54 Teakwood scantlings (over 2m and below 3min length) - Malabar

cu.m.

55 Teakwood scantlings(below 2m in length ) –Malabar

cu.m.

Page 111: twad 13-14

Sl.No.

Description Unit Rates in Rupees(2013-14)

57 Teak wood reepers

i) 50mm x 25mm RM 63.80

ii) 50mm x 12mm RM 51.70

58 Country wood Scantlings

i) Up to 4m in length cu.m. 28790.00

ii) Over 4m in length cu.m. 30250.00

59 Country wood scantlings (for tiebeams andprincipal rafters for trusses) cu.m. 30250.00

60 Jack wood Scantlings (up to 4m) cu.m. 31700.00

61 Silver Oak Scantling cu.m. 13060.00

62 Country wood planks

i) 40mm thick- upto 30cm wide cu.m. 33030.00

ii) 25mm thick - up to 30cm wide cu.m. 33030.00

iii) 40mm thick - over 30cm wide cu.m. 33030.00

iv) 25mm thick - over 30cm wide cu.m. 33030.0063.a. Jack wood planks 25 to 40mm thick cu.m. 34600.00

b. Silver Oak plank (40mm thick) cu.m. 14880.00

c. Blue gum plank cu.m. 15240.0064 Country wood reepers64 Country wood reepers

a. 50mm x 25mm RM 29.00b. 50mm x 12mm RM 21.10

65 Mango Plank cu.m. 14150.00

b. Palmyrah leaves 100 Nos. 215.30c. Palmyrah leaves (Labour for cutting) 100 Nos. 33.85

67 Casurina Polesa. 13cm to 15cm diameter RM 27.80b. 10cm to 13cm diameter RM 21.10c. 8cm to 10cm diameter RM 16.25d. 5cm to 8cm diameter RM 13.8568 Eucalyptus Poles

A 13cm to 15cm dia RM 27.80

B 10cm to 13 cm dia RM 19.90

C 8 cm to 10 cm dia RM 16.25

D 5 cm to 8 cm dia RM 13.85E Below 5 cm RM 12.65

69 Eucalyptus Bullies 4cm to 5 cm dia & cross tiesRM 10.20

70 Casurina Bullies 4cm to 5cm dia & cross tiesRM 11.40

71 Bamboo largei) 10cm diameter and above RM 10.20

ii) 7.5cm to 10cm diameter RM 9.00

41.6566.a. Palmyrah rafter (50mm to 60mm wide and

125mm depth) RM

Page 112: twad 13-14

Sl.No.

Description Unit Rates in Rupees(2013-14)

METAL AND IRON WORKS

72 Mild steel plates or sheets BG 10 Kg. 48.00

73 Mild Steel Angles 25mm x 25mm x 3mm Kg. 48.00

74.a) Binding wire (Black 18G) Kg. 48.00

b) Binding wire (Galvanised – 18G) Kg. 48.00

75 G.I. sheets 30cm wide and 1.6mm thick sq.m. 335.0076 Weld meshi) 7.5 x 2.5cm, 10 gauge sq.m. 325.00

ii) 7.5cm x 5cm, 10 gauge sq.m. 292.00

iii) 10cm x 10cm, 10 gauge sq.m. 158.00

77 Chicken Mesh sq.m. 35.00

78 Fly Proof Mesh sq.m. 100.00

79 Supplying mild steel grills for windows,ventilators, etc., including priming coat Kg. 65.00

Note:

1. For Road works, the Schedule of Rates of Highways Department may be adopted, inrespect of materials for which rates are not available in this schedule of rates.

2. For all the materials viz. Bricks and Tile products, Stone Jelly, Gravel, Sand, Lime Stoneetc., necessary incidental charges , loading charges and unloading charges have beenincluded. Hence no separate incidental charges, loading and unloading chrges shall beincluded. Hence no separate incidental charges, loading and unloading chrges shall beallowed for the above materials.

Page 113: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

1 Water proofing compound Kg 42.35

2 Mild Steel Flats of all sizes Kg 48.00

3 Mild Steel Square Rods of all sizes Kg 48.00

4 First Quality Design Ceramic tiles of All colours

i 305 mm x 305 mm x 6 mm Each 50.80

200 mm x 200 mm x 6 mm Each 22.35

iii 200 mm x 100 mm x 6 mm Each 12.10

5 First Quality Plain ceramic tiles of all colours

i 305 mm x 305 mm x 6 mm Each 36.30

RATES OF OTHER CONSTRUCTION MATERIALS

Note: No extra on cost, conveyance charges shall be allowedfor all the items included under this category.

The rates approved therein are applicable at site of work.

i 305 mm x 305 mm x 6 mm Each 36.30

ii 200 mm x 200 mm x 6 mm Each 16.25

iii 200 mm x 100 mm x 6 mm Each 8.45

6 First quality White glazed tiles

i 150 mm x 150 mm x 6 mm Each 8.45

ii 100 mm x 200 mm x 6 mm Each 7.25

7 First quality colour glazed tiles

i 150 mm x 150 mm x 6 mm Each 9.65

ii 100 mm x 200 mm x 6 mm Each 8.45

8 First quality colour glazed tiles with printed design

i 150 mm x 150 mm x 6 mm Each 11.40

ii 100 mm x 200 mm x 6 mm Each 10.25

9 White Cement Kg 23.00

10 Colour Cement (White cement mixed with colouringpigments)

Kg 26.65

11 Multi-colour marble chips of all Grades / Sizes Bag 97.00

12 White Marble slab (Adanga) 18 mm to 20 mm thick

Page 114: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

i 4'0'' x 2'0'' and above sq.m. 935.00

ii 2'0'' x 2'0" or 2'0" x 1'0" or 1'0" x1'0" sq.m. 511.00

13 Granite tiles - (Superfine polished with Machine cutedges) of size 2'0" x 1'0" or 1'0" x 1'0" or 1'0" x0'6", of 10 mm thick

a Jet Black sq.m. 902.00

b Ruby Red, Raw Silk sq.m. 781.00

c Sinthetic Grey, Paradise and Similar varieties. sq.m. 726.00

14 Granite slabs (Super fine polished with machine cutedges) of sizes 4'x2' and above 18mm to 20mmthick.

a Jet Black sq.m. 1815.00

b Ruby Red, Raw Silk sq.m. 1694.00

c Sinthetic Grey, Paradise and Similar varieties. sq.m. 1331.00

15 Polished shahabad stone slabs of 20 mm thick withmachine cut edges of size 2' 0" x 2'0" and above.

sq.m. 363.00

c Sinthetic Grey, Paradise and Similar varieties. sq.m. 1331.00

15 Polished shahabad stone slabs of 20 mm thick withmachine cut edges of size 2' 0" x 2'0" and above.

sq.m. 363.00

16 Polished shahabad stone slabs 20 mm thick withmachine cut edges of size below 2' 0" x 2'0".

sq.m. 302.00

17 Polished Rajasthan Kota stone slabs of 20 mm thickwith machine cut edges of size 2' 0" x 2'0" andabove.

sq.m. 533.00

18 Polished Rajasthan Kota stone slabs of 20 mm thickwith machine cut edges of size below 2' 0" x 2'0".

sq.m. 467.00

19 Dolphur stone slabs - semi polished with machinecut edges of all sizes

a 40 mm thick sq.m. 398.00

b 20 mm thick sq.m. 363.00

20 Aluminium strips of size 40 mm wide x 1.5 mmthick

RM 30.00

21 Brass strips of size 40 mm wide x 1.5 mm thick RM 60.00

22 Glass strips of size 40 mm wide and 4 mm thick RM 15.00

23 Marblex Tiles 3 mm thick sq.m. 605.00

24 Red Oxide - Superior quality for floor finish Kg 127.00

Page 115: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

25 Decorative pressed tiles of 12 mm thick of all sizesand shapes

sq.m. 1027.00

26 Exterior Emulsion Paint - Water based primer(Liquid)

Litre 145.00

27 Alkali Resistant Distemper Primer Litre 145.00

28 Sandtex matt Litre 169.00

29 Vinaratex or equivalent Textured coat sq.m. 218.00

30 Best Lac Polish / French Polish Litre 282.00

31 Varnish Litre 290.00

32 Cotton Waste Kg 9.20

33 Cement based Hydraulically pressed Anti skid tiles(pattern design) - 20 mm thick

sq.m. 484.00

34 Marble Powder Kg 4.80

35 Polishing Stone35 Polishing Stone

i Rough Each 60.50

ii Medium Each 84.70

iii Fine / Nice Each 96.80

36 Oxalic Acid Kg 39.80

37 Turpentine Litre 26.60

38 Mansion polish 400 gram 159.00

39 Poly Sulphide Kg 181.00

40 Primer for expansion joints Kg 162.00

41 Filler material sq.m. 133.00

42 Bond Breaker RM 3.60

43 PVC Water Bar 150mm wide with singel bulb RM 271.00

44 Plain G.I. sheet 0.8mm thick (22 Gauge) sq.m. 332.00

45 Phil Plug Each 4.80

46 G.I. Screws

i 30mm x 6mm Each 1.20

ii 19mm x 6mm Each 0.75

Page 116: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

47 G.I. Limpet / Cup Washers Each 1.75

48 Bitumen washers 15mm dia Each 1.20

49 Asbestos Cement pipe - 100mm dia 3 RM 133.35

50 A.C. shoe - 100mm dia Each 42.40

51 A.C. Bend - 100mm dia Each 48.50

52 A.C. Cylindrical Cowl - 100mm dia Each 72.75

53 C.I. Brackets for A.C. pipe 100mm dia Each 19.95

54 C.I. Grating - 100mm dia Each 29.30

55 Asbestos cement fully corrugated sheet - 6mm thick sq.m. 175.50

56 Asbestos cement plain sheet

i 6mm thick sq.m. 157.60

ii 4mm thick sq.m. 109.10ii 4mm thick sq.m. 109.10

57 Asbestos cement adjustable ridges Pair 181.85

58 G.I. "J" or "L" Bolts with nuts 6mm Dia Each 3.60

59 Steel - special extruded sections for steel windowsand ventilators conforming to I.S.S. 7452 / 1990including Fabrication charges

Kg 63.30

60 CRCA pressed steel Box section 18 Gauge or1.25mm thick for Door frames including providingholes and fixing wooden blocks for fixing furnitureand fittings

a With one coat of Red oxide priming coat. RM 427.00

b With powder coated primer RM 455.00

61 Aluminium extruded sections (for Doors, windows,ventilartors, partitions, false ceiling etc.) includingcharges for Anodising for 15 micron thickness

a Natural colour matt finish. Kg 292.00

b With powder coating of any colours. Kg 312.00

62 Alumninum Extruded Box Section for StaircaseHand Rails including charges for Adnodising for 15micron thickness - Natural colour matt finish

Kg 298.00

Page 117: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

63 Rubber beading for aluminium glazed doors RM 36.30

64 Rubber beading for aluminium glazed windows. RM 27.80

65 PVC / Woollen felt for aluminium doors 6mm thick RM 8.45

66 Pivot for Aluminium Door Set 145.20

67 Hydraulic Door closer of various sizes of approvedquality using Aluminium Extruded section bodytubular type universal hydraulic door closer withdouble speed adjustment like HARDWYN (make)'GAZEL' (or) equivalent (with ISI Monogram)

Each 867.30

68 Hydraulic Floor springs of various sizes double actonhydraulic floor spring of approved quality, brand,manufacture as per BIS standards for doorsincluding cost of cutting floors as required,embedding in to floors and Stainles Steel Coverplates with Aluminium Pivet and single piece M.S.sheet outer box with side plate etc., capable oftaking upto 130 Kg. weight from door shutter, likeHARDWYN make (U-32) or its equivalent with ISImonogram.

Each 2079.0068 Hydraulic Floor springs of various sizes double actonhydraulic floor spring of approved quality, brand,manufacture as per BIS standards for doorsincluding cost of cutting floors as required,embedding in to floors and Stainles Steel Coverplates with Aluminium Pivet and single piece M.S.sheet outer box with side plate etc., capable oftaking upto 130 Kg. weight from door shutter, likeHARDWYN make (U-32) or its equivalent with ISImonogram.

Each 2079.00

69 Lock for Aluminium doors Each 238.70

70 Lock for Aluminium sliding windows Each 59.40

71 Aluminium Grill of standard pattern (diamondshape) - 10mm thick including 'F' (or) 'H' Section.

sq.m. 1870.00

72 Aluminium Grill of standard pattern (diamondshape) - 6mm thick including 'F' (or) 'H'Section.

sq.m. 1512.50

73 Bolts and Nuts 10mm dia for false ceiling Each 5.25

74 Rawl Plugs for false ceiling Each 8.40

75 PVC Roller for sliding windows Each 13.30

76 Synthetic Resin - Fevicol or equivalent (PhenolFormal Dehide based Resin)

Kg 181.50

77 Butt Hinges with nylon washers of various sizes.Length and width (with required screws).

a 125mm x 30mm Each 69.85

b 100mm x 30mm Each 56.10

c 75mm x 30mm Each 38.50

Page 118: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

d 50mm x 30mm Each 31.10

78 Tower Bolts of various lengths and diameter (withrequired screws)

a 400mm long and 12mm dia Each 132.00

b 300mm long and 12mm dia Each 101.60

c 250mm long and 12mm dia Each 76.20

d 200mm long and 12mm dia Each 64.05

e 150mm long and 12mm dia Each 50.60

f 100mm long and 10mm dia Each 44.40

g 75mm long and 10mm dia Each 31.10

79 Aldrops of following lengths and diameter withrequired screws, bolts and nuts.

a 300mm long and 16mm dia Each 183.70a 300mm long and 16mm dia Each 183.70

b 250mm long and 16mm dia Each 158.40

c 200mm long and 16mm dia Each 107.25

d 200mm long and 12mm dia Each 89.10

80 Handles "D" type of various sizes with requiredscrews

a 200mm long Each 56.50

b 150mm long Each 50.60

c 100mm long Each 31.10

81 Ornamental handles of various sizes with requiredscrews

a 200mm long Each 152.35

b 150mm long Each 101.60

c 100mm long Each 56.10

82 Aluminium door stopper with rubber bush withrequired screws

Each 44.40

83 Rubber bush - 40 mm dia and 60 mm long withrequired screws

Each 24.20

84 Mortice Lock-(Godrej or equivalent) with requiredscrews with 3 Keys

a With night latch Each 509.30

Page 119: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

b Without night latch Each 380.60

c Wire nails Kg 60.50

85 Teakwood beading

a 15mm x 12mm RM 14.40

b 35mm x 12mm RM 36.30

86 Teakwood Beading (ordinary)

a 30mm x 12mm RM 30.00

b 25mm x 12mm RM 24.20

87 Teakwood beading - Ornamental / design

a 40mm x 12mm RM 84.70

b 40mm x 15mm RM 96.80

c 25mm x 12mm RM 66.00c 25mm x 12mm RM 66.00

d 15mm x 12mm RM 45.50

88 Medium Density Fibre (MDF) Board - Exterior Grade,Both sides pre-laminated including external lippingwith kiln dried soft wood 35mm thick

sq.m. 1936.00

89 Medium Density Fibre (MDF) Board - exterior Grade -Both sides pre-laminated, 12mm thick

sq.m. 935.00

90 MDF Board exterior Grade - Plain including externallipping with kiln dried soft wood

i 35mm thick sq.m. 1573.00

ii 30mm thick sq.m. 1452.00

91 Medium density fibre (MDF) Board 12 mm thickExterior grade - with melamine finish.

a One side melamine finish sq.m. 995.00

b Both sides melamine finish sq.m. 1116.00

92 Medium density fibre (MDF) board - Exterior grade -Plain - With teak wood external lipping alround

a 35mm thick sq.m. 1694.00

b 30mm thick sq.m. 1512.00

93 Solid core Flush shutters with Teak ply on both sidewith teak wook lipping alround 35 mm thick

sq.m. 1996.00

Page 120: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

94 Solid core Flush shutters with Teak ply on one sideand commercial ply on other side with teak woodlipping alround 35 mm thick

sq.m. 1754.00

95 Solid core Flush shutters with commercial ply onboth side with teak wood lipping alround35 mm thick

sq.m. 1512.00

96 Solid PVC door shutters using 19 Gauge 19mm MSsquare tubes for styles and outer frames.15mm MS square tubes for top, lock and bottomrails. The steel tubes shall be covered with 5mmthick solid PVC sheets. Shutter using 5mm thicksolid PVC sheets for panelling shall rigidly fixed inposition including necessary furniture and fittings.The over all size of styles shall be 50mm x 30mm.The over all size of top rail, Lock rail and bottomrail shall be 75mm x 30mm. The over all size offrames shall be 50mm x 45mm, with suitable rabatefor housing the shutter.

a Solid panel PVC door with frame sq.m. 2875.00

b Solid panel PVC door without frame sq.m. 2425.00b Solid panel PVC door without frame sq.m. 2425.00

97a FRP door Shutter with FRP door frames made out ofFRP Sheets of 3mm thick of over all size65mm x 50mm with rebate suitably reinforced usingMS Angle / Flats, cost of holdfasts and solid coreFRP shutter Panel of 5mm thick and hollow coreframes of 3mm wall thickness for styles and railsetc., of sizes specified by Engineers.

sq.m. 3755.00

b Excluding door frames sq.m. 3115.00

98a PVC panelled door shutters hollow type -200 mm x 20 mm panels with 1 mm wall thicknessfor panels and styles and rails of suitable size with2 mm wall thickness suitably reinforced usingMS Angle / Flat including cost of necessaryAluminium hinges and other furniture fittings.

sq.m. 2055.00

b Excluding door frames sq.m. 1815.00

99 RCC door frame of 100mm x 65mm cross sectionalsize with necessary rebate for housing the shutters,manufactured with cement concrete of grade notless than M20 using 10 mm and below graded stonejelly and using steel reinforcement as per C.E. (B)circular instructions.

RM 290.00

Page 121: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

100 Stainless Steel (Salem Stainless Steel) Door Frame(Box Section using Stainless Steel Plate of 1 mmthick) of size 100 mm x 60 mm with a rebate of30/ 35 mm x 15 mm on one side of the frameincluding supplying and fixing dovetail splayed endstainless steel Hold fast etc.,

RM 908.00

101 Stainless Steel (Salem Stainless Steel) Door Frame(Box Section using Stainless Steel Plate of 1.6mmthick) of size 100mm x 60mm with a rebate of30/ 35mm x 15mm on one side of the frameincluding supplying and fixing dovetail splayed endstainless steel hold fast etc.,

RM 1270.00

102 Supplying and erecting pull and push type rollingshutter with ISI make of approved size and sectionusing 18 GI sheet. The shutter shall be paintedwith one coat of red oxide primer and the rate isinclusive of hood covers, transportation chargesetc.,

A ROLLING SHUTTERS (WITH ISI MONOGRAM)A ROLLING SHUTTERS (WITH ISI MONOGRAM)

a Manually operated (up to 8 m2 area) sq.m. 2430.00

b Gear operated type (from 8 m2 to 12 m2 area) sq.m. 2700.00

c Electrically operated type (exceeding 12m2 area) sq.m. 2940.00

B ROLLING GRILLS (WITH ISI MONOGRAM)

a Manually operated (up to 8 m2 area) sq.m. 2480.00

b Gear operated (from 8 m2 to 12 m2 area) sq.m. 2777.00

c Electrically operated (exceeding 12 m2 area) sq.m. 3090.00

103 Barbed Wire - 10 Gauge - Two ply and four pronged(Galvanised)

1 Kg or 6 RM

69.30

104 Chain link - 2" x 2" using 10 Gauge Galvanised IronWire (of all sizes)

sq.m. 178.50

105 Pin Headed / Fluted / Figured Glass 3mm thick sq.m. 242.00

106 Plain Glass - 4mm thick sq.m. 326.70

107 Plain Sheet Glass - 5.5mm thick sq.m. 387.20

108 Metal screws (for Aluminium Doors, windows etc.)

i 75mm x 8mm Each 2.30

Page 122: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

ii 38mm x 6mm Each 1.65

iii 19mm x 8mm Each 1.15

iv 19mm x 6mm Each 0.85

109 Cement paint (First quality) Kg 53.10

110 Oil Bound Distemper Kg 78.50

111 Acrylic Distemper Kg 90.60

112 Primer for Plastic Emulsion paint Litre 156.75

113 Plastic Emulsion paint (First quality) Litre 315.15

114 Wood Primer Litre 156.75

115 Synthetic Enamel paint for Wood work Litre 254.10

116 Red Oxide primer for Iron work Litre 145.50

117 Synthetic Enamel paint for Iron work Litre 242.55117 Synthetic Enamel paint for Iron work Litre 242.55

118 Brass chromium plated screw down Tap 15 / 12mmDia (Heavy Type)

Each 211.00

119 Chromium plated stop cock 15mm Dia Each 169.00

120 Brass chromium plated pillar Tap (Heavy type)-15/12mm Dia

Each 302.00

121 Brass chromium plated shower Rose - 100mm Dia Each 217.00

122 Wooden plug, clamp and screws Set 12.10

123 Shellac 100 gram 18.15

124 Thread Ball Each 3.60

125 Oriya Type Indian Water closet 580mm x 440mmwith "P" or "S" Trap

i White Set 1089.00

ii Colour Set 1390.00

126 European Water closet with "P" or "S" Trap withDouble Flapped seat and seat cover with BrassHinges and 10 litre capacity PVC low level flusingtank with all internal fittings

i White Set 2785.00

ii Colour Set 3150.00

Page 123: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

127 European water closet with "P" or "S" Trap withDouble falpped seat and seat cover with BrassHinges and 12.5 litre capacity Porcelin low levelflusing tank with all internal fittings

i White Set 3925.00

ii Colour Set 4730.0

128 Wash Hand Basin of size 550mm x 400mm with allaccessories such as cast iron brackets, 32mm diaC.P. waste coupling, rubber plug and chain, 32mmdia 'B' Class G.I. waste pipe, 15mm dia G.M. wheelvalve, 15mm dia nylon connection, 15mm dia brassnipples, 15mm C.P. pillar tap etc.

i White without pedastal Set 1510.00

ii White with pedastal Set 1815.00

iii Colour without pedastal Set 2024.00

iv Colour with pedastal Set 2235.00

129 White Porcelin Sink of size 600mm x 450mm x200mm with 32mm dia 'B' Class G.I. waste waterpipe and 32mm dia C.P. waste coupling.

Set 1936.00129 White Porcelin Sink of size 600mm x 450mm x200mm with 32mm dia 'B' Class G.I. waste waterpipe and 32mm dia C.P. waste coupling.

Set 1936.00

130 Cuddapah Slab Sink of size 600mm x 450mm x200mm with 32mm dia 'B' Class G.I. waste waterpipe & 32mm dia C.P. waste coupling.

Set 663.00

131 Cuddapah Slab Sink of size 600mm x 600mm x200mm with 32mm dia 'B' Class G.I. waste waterpipe & 32mm dia C.P. waste coupling.

Set 877.00

132 Lipped Mouth Porcelin Flat Back Urinal with allaccessories such as 32mm dia Bell mouth PVCconnection, 15mm dia G.M. wheel value, 15mm dia'B' Class G.I. waste water pipe, 15mm dia nylonconnection, 15 mm dia brass nipple etc.,

i White Set 847.00

ii Colour Set 970.00

133 Porcelin soap dish of size 150mm x 150mm x50mm

i White Each 178.00

ii Colour Each 242.00

134 Brass chromium plated soap tray of size150mm x 100mm

Each 149.00

135 Brass chromium plated towel rail 60cm long and20mm dia with brackets

Set 242.00

136 Anodised Aluminium Towel Rail 60cm long and20mm dia with Brackets.

Set 121.00

137 PVC / Fibre Glass framed 5.5mm thick mirror, shelftype with Hard Board Backing

Page 124: twad 13-14

Sl.No.

Name of Material Unit Rate in Rupees

i 600mm x 450mm Each 449.00

ii 500mm x 400mm Each 363.00

138 Stone ware gully trap of size 150mm x 100m withcast Iron Double Gratings

Each 169.00

139 Cast Iron Nahini / Floor Trap with stainless SteelGrating

i 100mm x 75mm Each 277.00

ii 75mm x 50mm Each 217.00

140 PVC Nahini / Floor Trap with PVC Grating

i 100mm x 75mm Each 150.00

ii 75mm x 50mm Each 132.00

141 Spun Yarn Kg 12.00

142 Hemp Yarn Kg 10.80

143 Gunny Tape / Kithan sq.m. 10.80

144 Tar Kg 38.75

145 Bitumen Felt 15 mm thick pad sq.m. 242.00145 Bitumen Felt 15 mm thick pad sq.m. 242.00

146 Supplying, fabricating, erecting and fixing gypboard false ceiling upto a ceiling height of 4.5mfrom floor level.

a Using plain sheets (10mm thick) sq.m. 727.00

b Using perforated sheets (10mm thick) sq.m. 944.00

147 Supplying and laying Glass wool for insulationincluding necessary packing materials.

a Using 50mm thick Glass wool sq.m. 372.00

b Using 25mm thick Glass wool sq.m. 199.00

Page 125: twad 13-14

Rate in Rupees(2013-14)

10 kg. per cm2

WATER SUPPLY AND SANITARY ARRANGEMENTS

148

1

a 15 mm Dia RM 14.40

b 20 mm Dia RM 21.30

c 25 mm Dia RM 36.30

d 32 mm Dia RM 54.20

e 40 mm Dia RM 84.80

Note

149 PVC Specials for water supply arrangements

A Coupler

a 15 mm Dia Each 3.60

(3) For Water Supply arrangement items of works, onlyPVC Pipe of working Pressure of 10 kg. per sq.cm. shallbe adopted.

(1) For Rainwater down fall pipe works, only PVC Pipe ofworking Pressure of 4 kg. per sq.cm. shall be adopted.

(2) For Sanitary arrangement items of works, only PVCPipe of working Pressure of 6 kg. per sq.cm. shall beadopted.

PVC Pipes

Sl.No.

Description of Materials Unit

PVC ITEMS FINOLEX (OR) EQUIVALANT(WITH ISI MONOGRAM)

a 15 mm Dia Each 3.60

b 20 mm Dia Each 4.15

c 25 mm Dia Each 4.80

d 32 mm Dia Each 6.05

e 40 mm Dia Each 9.00

B Elbow

a 15 mm Dia Each 5.35

b 20 mm Dia Each 6.05

c 25 mm Dia Each 8.45

d 32 mm Dia Each 12.10

e 40 mm Dia Each 16.90

C BEND

a 15 mm Dia Each 6.05

b 20 mm Dia Each 7.25

c 25 mm Dia Each 9.65

d 32 mm Dia Each 14.40

e 40 mm Dia Each 19.35

Page 126: twad 13-14

Rate in Rupees(2013-14)

10 kg. per cm2

Sl.No.

Description of Materials Unit

D Tee

a 15 mm Dia Each 7.25

b 20 mm Dia Each 8.45

c 25 mm Dia Each 12.10

d 32 mm Dia Each 14.50

e 40 mm Dia Each 24.20

E End Cap

a 15 mm Dia Each 3.60

F Reducer

a 20 mm x 15 mm Each 4.80

b 25 mm x 20 mm Each 5.35

c 32 mm x 25 mm Each 8.45

d 40 mm x 32 mm Each 11.40

e 50 mm x 40 mm Each 19.35

G Reducer Tee

a 20 mm x 15 mm Each 7.25

b 25 mm x 20 mm Each 8.45

c 32 mm x 25 mm Each 12.10

d 40 mm x 32 mm Each 14.50d 40 mm x 32 mm Each 14.50

e 50 mm x 40 mm Each 24.20

H Reducer Elbow

a 20 mm x 15 mm Each 6.05

b 25 mm x 20 mm Each 7.25

c 32 mm x 25 mm Each 9.65

d 40 mm x 32 mm Each 12.10

e 50 mm x 40 mm Each 18.15

J Jet Nipple

a 25 mm Dia Each 15.70

b 32 mm Dia Each 20.55

Page 127: twad 13-14

"O" RingJointing

By pasting

150 PVC SPECIALS FOR SANITARYARRANGEMENTS FINOLEX (OR)EQUIVALENT (WITH ISI MONOGRAM)

A Elbow

a 75 mm Each66.30 54.20

b 90 mm Each84.80 66.30

c 110 mm Each102.70 84.80

d 160 mm Each114.80 97.00

B Door Elbow

a 75 mm Each84.80 60.60

b 90 mm Each109.10 72.70

c 110 mm Each133.20 114.80

d 160 mm Each157.60 133.30

C Tee

a 75 mm Each90.60 84.80

Rate in Rupees(2013-14)

Sl. No. Description of Materials Unit

a 75 mm Each90.60 84.80

b 90 mm Each114.80 102.70

c 110 mm Each151.20 139.10

d 160 mm Each169.70 151.20

D Tee with Door (Single)

a 75 mm Each114.80 109.10

b 90 mm Each139.10 121.00

c 110 mm Each175.50 163.30

d 160 mm Each211.80 194.00

E Tee with Door (Double)

a 75 mm Each145.50 139.10

b 90 mm Each199.70 181.80

c 110 mm Each242.50 230.30

d 160 mm Each278.80 247.00

F Bend

a 75 mm Each72.70 60.60

b 90 mm Each90.60 72.70

c 110 mm Each109.10 90.60

d 160 mm Each121.10 102.70

G "Y"

a 75 mm Each97.00 90.60

a 75 mm Each97.00 90.60

b 90 mm Each121.10 109.10

Page 128: twad 13-14

"O" RingJointing

By pasting

Rate in Rupees(2013-14)

Sl. No. Description of Materials Unit

c 110 mm Each157.60 145.50

d 160 mm Each175.50 157.60

H "Y" with Door (single)

a 75 mm Each114.80 109.10

b 90 mm Each145.50 127.00

c 110 mm Each194.00 169.70

d 160 mm Each224.00 199.70

I "Y" with Door (Double)

a 75 mm Each157.60 151.20

b 90 mm Each211.80 194.00

c 110 mm Each254.60 242.00

d 160 mm Each308.00 278.60

J Double Tee with Door (Single)

a 75 mm Each199.70 163.30

a 75 mm Each199.70 163.30

b 90 mm Each230.30 187.60

c 110 mm Each271.30 236.10

d 160 mm Each303.10 266.70

K Double "Y" with Door (single)

a 75 mm Each218.20 181.80

b 90 mm Each242.50 206.10

c 110 mm Each278.80 260.30

d 160 mm Each339.50 303.10

L Reducer

a 75 mm x 63 mm Each66.30 54.20

b 110 mm x 63 mm Each84.80 72.70

c 110 mm x 75 mm Each97.00 84.80

d 110 mm x 90 mm Each109.00 97.00

f 160 mm x 110 mm Each127.00 121.00

M Shoe

a 110 mm dia Each72.70

b 160 mm dia Each109.00

N Vent Cowl

a 50 mm dia Each30.00

b 75 mm dia Each48.50

b 75 mm dia Each48.50

c 110 mm dia Each72.70

Page 129: twad 13-14

"O" RingJointing

By pasting

Rate in Rupees(2013-14)

Sl. No. Description of Materials Unit

OTHER ITEMS :

151 PVC screw down tap heavy type 20 mm dia Each78.10

152 PVC screw down tap heavy type 15 mm dia Each60.50

153 PVC Adhesive (solution) 100 gm36.30

154 PVC low level flushing tank with allinternal fittings - (wall mounting type)

a White - 10 litre capacity Set908.00

b White - 7.5 litre capacity Set696.00

c Colour - 10 litre capacity Set1030.00

d Colour - 7.5 litre capacity Set817.00

155 PVC water tank Litre 9.00

Page 130: twad 13-14

Sl.No.

Description of Material UnitRate inRupees.

1 Virtrified Tiles of size 600 x 600 x 8 mmSq.m 900.00

2 Pre-polished concrete anti-skid step tiles of 20 mm thickSq.m 483.00

3 Colour designed glazed tiles 300 x 200 x 6mmEach 28.35

4 Squatting UrinalSet 420.00

5 CI Brackets for fixing the sinkSet 105.00

6 Swan Neck TapEach 236.00

7 Brass Screws (30 x 6 mm)Each 2.10

8 Brass Screws (75 x 10 mm)Each 4.20

9 Special clamp, teak wood plugs and screwsSet 21.00

10 PVC clamp, teak wood plugs and screwsSet 8.40

11 Teak Wood plugEach 1.05

12 Teak Wood plug (50 x 50 x 100 mm)Each 5.25

13 Manhole Cover 60 x 60 cm (heavy duty) with frameEach 1890.00

NEW ITEMS

13 Manhole Cover 60 x 60 cm (heavy duty) with frameEach 1890.00

14 Welding charges

a 50 mmEach 1.55

b 40 mmEach 1.25

15 Add for painting / tarring for Hex NippleEach 2.10

16 Labour charges for fixing cuddapah slab to cup boardSq.m 31.50

17 Hire charges for polishing machineryDay 157.50

18 Electricity chargesUnit 9.00

Page 131: twad 13-14

RATES FOR ELECTRICAL ITEMS

Page 132: twad 13-14

Note

ItemNo.

Description UnitRate

in Rupees

PART-A1 INCANDESCENT BULBS 230V/ 250V GRADE BC/ES

WITH ISIa. 15 Watts Each 11.0

b 25 Watts Each 11.0

c. 40 Watts Each 11.00

d. 60 Watts Each 11.00

e 100 Watts Each 11.00

f. 200 Watts Each 22.00

2 INCANDESCENT BULB 230V/250V GRADE BC/ ES

Colour 15 Watts Each 13.50

3 Blended lamp 160 Watts Each 266.00

ELECTRICAL ITEMS OF WORKS

ELECTRICAL LAMPS, FITTINGS AND CONNECTED ACCESSORIESNo extra on cost, conveyance charges shall be allowed for all the items included under this category.The rates approved therein are applicable at site of work.

3 Blended lamp 160 Watts Each 266.00

3 a) PL LAMP (PHILIPS/ OSRAM)

a. 9 Watts Each 82.50

b 11 Watts Each 88.00

c. 18 Watts Each 138.50

d. 36 Watts Each 154.00

4 FLUORESCENT TUBULAR LAMPS WITH ISI MARK

a. Cool Day light 2 Ft. 20 Watts Each 41.50

b Cool Day light 4 Ft. 40 Watts Each 41.50

c. Cool Day light 4 Ft. 36 Watts Each 40.50

5 MERCURY VAPOUR DISCHARGE LAMP 230V GRADE3 PIN BC

a. 80 Watts Each 191.00

b. 125 Watts Each 200.00

c. 250 Watts Each 489.00

d. 400 Watts Each 689.00

6 BOX TYPE SINGLE FLUORESCENT FITTING WITHCOPPER CHOKE AND CONDENSOR COMPLETE WITHISI MARK

a. 4 Ft. 40 Watts with ballast Each 353.00

b. 4 Ft. 40 Watts Box type with Ballast (Philips/ Crompton/Wipro)

Each 519.00b. 4 Ft. 40 Watts Box type with Ballast (Philips/ Crompton/Wipro)

Each 519.00

Page 133: twad 13-14

ItemNo.

Description UnitRate

in Rupees

7 BOX TYPE TWIN FLUORESCENT FITTING WITHCOPPER CHOKE AND CONDENSOR[HPF] COMPLETEWITH ISI MARK

a. 4 Ft. 40 Watts Each 663.00

b. 4 Ft. 40 Watts Box type (Philips/ Crompton ) WithBallast

Each 865.00

8 INDUSTRIAL TYPE FLUORESCENT FITTING STOVEENAMELLED WITH COPPER CHOKE AND CONDENSOR(HPF) 4 ft. 40W

a. Single type suitable for 1 No. tube Each 975.00

b. Twin type suitable for 2 Nos. tube Each 1,200.00

9 DECORATIVE AND SINGLE FLUORESCENT TYPEFITTING WITH COPPER CHOKE AND CONDENSOR(HPF) COMPLETE SUITABLE FOR ONE NUMBERFLUORESCENT TUBE WITH ISI MARK

a. 4 Ft. 40 Watts with Perspex Deleted

10 DECORATIVE TWIN FLUORESCENT TYPE FITTINGWITH COPPER CHOKE AND CONDENSOR COMPLETESUITABLE FOR 2 NUMBERS FLUORESCENT TUBES

10 DECORATIVE TWIN FLUORESCENT TYPE FITTINGWITH COPPER CHOKE AND CONDENSOR COMPLETESUITABLE FOR 2 NUMBERS FLUORESCENT TUBES

a. 4 Ft. 40W Twin Mirror optic Recessed mounting fitting Each 1,680.00

b. 4 Ft. 40W Twin Mirror optic Suspension type fitting. (Philips/Crompton /Wipro)

Each 3,030.00

c. 4 Ft 40W Twin Mirror Optic Recessed mounting typefitting(Philips/ Crompton/ Wipro)

Each 2,220.00

11 SINGLE TYPE STREET LIGHT FLUORESCENT FITTINGSUITABLE FOR THE ONE NO. FLUORESCENT TUBEWITH COPPER CHOKE AND CONDENSOR COMPLETE

a. 4 Ft. 40 Watts type Each 740.00

12 TWIN TYPE STREET LIGHTS FLUORESCENT FITTINGSUITABLE FOR 2 Nos. FLUORESCENT TUBES WITHCOPPER CHOKE AND CONDENSOR COMPLETE

a 4 Ft. 40 Watts type Each 995.00

Page 134: twad 13-14

ItemNo.

Description UnitRate

in Rupees

13 POST TOP LANTERN FITTING OF (INTEGRAL TYPE)WITH COPPER CHOKE AND CONDENSOR &NECESSARY ACCESSORIES (PHILIPS/ CROMPTONGREAVES/WIPRO)(SPHERICAL / RIBBED /CONICALACRYLIC COVER)

a. Suitable for 125 Watts M.V lamp Each 3,580.00

b. Suitable for 70 Watts S.V. Lamp Each 3,770.00

c. Post top lantern fitting with SC holder suitable for160 W blended lamp/ incandescent lamp

Each 2,060.00

14 STARTERS FOR FLUORESCENT TUBES

a Starters of capacity 20 Watts Each 11.00

b. Starters of capacity 40 Watts Each 11.00

15 POLYSTER FILLED COPPER CHOKE 250V/ 50 HZGRADE SUITABLE FOR (PHILIPS/CROMPTON /WIPRO)

a. 20 Watts fluorescent tube Each 196.00a. 20 Watts fluorescent tube Each 196.00

b. 40 Watts fluorescent tube Each 196.00

c. 36/40W Electronic ballast for flu. Tube(Philips/ Crompton ) Each 324.00

d. 36/40W Electronic ballast for flu. Tube (Indo Asean/Equivalent)

Each 264.00

16 CONDENSOR FOR S.V/ M.V LAMP

a. 8 Mfd for 80 Watts Bulb Each 124.50

b. 10 Mfd for 125 watts Bulb Each 148.30

c. 15 Mfd for 250 Watts Bulb Each 198.00

d. 20 Mfd for 400 watts Bulb Each 273.00

17 Battern type Bakelite holder for lamp Each 19.80

18 Water tight bulk head fitting suitable for 100/60 watts lampwith guard heavy type (PHILIPS/ BAJAJ/ CROMPTONGREAVES)

Each 330.00

19 Ceiling Rose Each 16.50

20a.

Ceiling fixtures 250/300mm complete with Gallery etc. Clearglass opac/ crystal suitable for 40/60 Watts Bulb

Each 195.00

(FOR ITEMS 6 TO 13, 20 & 22 , THE RATES AREEXCLUSIVE OF COST OF TUBES AND LAMPS)

1,230.00

Each

b. Ceiling luminaire with mirror optics suitable for 2 Nos. 9Watts/11 Watts (Philips/Crompton/Bajaj)

Each

21 Fan clamp (dia 12mm) with 6mm MS side plates & 45 cmcross arm

132.00 Each21 Fan clamp (dia 12mm) with 6mm MS side plates & 45 cmcross arm

132.00

Page 135: twad 13-14

ItemNo.

Description UnitRate

in Rupees

22 CALL BELLS

a. Call bell/ Buzzar 6mm suitable for AC/DC Each 49.50

b. Push bell Each 19.80

c. Gong bell 9” size suitable for 250 V Each 495.00

d. Gong bell 12” size suitable for 250V Each 716.00

23 WATER HEATER WITH ISI MARK

a. Automatic Electrical Water Heater with Copper container withGlass Wool/ Puf insulation with MS powder coated shellsuitable for 25 Litres capacity 230V/1000W

Each 5,770.00

b. Automatic Electrical Water Heater with copper container withGlass Wool/ Puf insulation with MS powder coated shellsuitable for 25 Litres capacity 230V/1000W(Venus/Racold)

Each 7,790.00

c. Automatic Electrical Water Heater with Copper containerwith Glass Wool/ Puf insulation with MS powder coated shellsuitable for 35 litres capacity 230V/1000W

Each 6,690.00

d. Automatic Electrical Water Heater with Copper containerwith Glass Wool/ Puf insulation with MS powder coated shellsuitable for 35 litres capacity 230V/1000W(Venus/Racold)

Each 8,950.00

PART ‘B’

d. Automatic Electrical Water Heater with Copper containerwith Glass Wool/ Puf insulation with MS powder coated shellsuitable for 35 litres capacity 230V/1000W(Venus/Racold)

Each 8,950.00

1 FANS – CONFORMING TO ISS 374 / 1979

a. AC Ceiling fan complete 1200mm (48”) sweep with 300mmDown rod.(without regulator)

Each 1,320.00

b. AC Ceiling fan complete 1400mm (56”) sweep with 300mmDown rod. (Without regulator)

Each 1,415.00

c. Stepped electronic 300W/450W square type fan regulator(Anchor Deluxe/Equivalent)

Each 224.00

d. Dimmer type electronic 300W/450W square type fanregulator (Anchor Deluxe/Equivalent)

Each 179.00

e. AC Ceiling fan complete 1200mm (48”) sweep with 300mmDown rod.(without regulator) (Crompton make)

Each 1,495.00

f. AC Ceiling fan complete 1400mm (56”) sweep with 300mmDown rod (Without regulator) (Crompton make)

Each 1,615.00

II EXHAUST FANS

a. AC Exhaust fan 225 mm (9”) sweep (Light duty) Each 1,220.00

b. AC Exhaust fan 300 mm (12”) sweep (Light duty) Each 1,395.00

c. AC Exhaust fan 375 mm (15”) sweep (Light duty) Each 1,440.00

PART ‘B’

c. AC Exhaust fan 375 mm (15”) sweep (Light duty) Each 1,440.00

d. AC Exhaust fan 450 mm (18”) sweep (Light duty) Each 2,020.00

Page 136: twad 13-14

ItemNo.

Description UnitRate

in Rupees

e AC Exhaust fan 375 mm (15”) sweep (Heavy duty) Each 2,650.00

f AC Exhaust fan 450 mm (18”) sweep (Heavy duty) Each 3,300.00

III LOUVER SHUTTERS ARRANGEMENTS

a. MS/Fibre Louvers shutters arrangements for 300mm ACExhaust fan

Each 264.00

b. MS/Fibre Louvers shutters arrangements for 375mm ACExhaust fan

Each 280.00

c. MS/Fibre Louvers shutters arrangements for 450mm ACExhaust fan

Each 313.00

I SWITCHESa. 5 Amps (Flush type) Dozen 203.00

b. 5 Amps (Flush type stair case) Dozen 253.00

II DOUBLE POLE SWITCHES(GEM / HPL / HAVELLS/EQUIVALENT)

a. 16 Amps DP switch with metal clad (front handle) Each 476.00

PART ‘C’

a. 16 Amps DP switch with metal clad (front handle) Each 476.00

b. 32 Amps DP switch with metal clad (front handle) Each 975.00

c. 16 Amps DP switch with metal clad (side handle) Each 394.00

d. 32Amps DP switch with metal clad (side handle) Each 885.00

III TRIPLE POLE SWITCHES (SIDE HANDLE) (STANDARD/HPL/HAVELLS/ EQUIVALENT)

a. 100 Amps TPN switch with HRC fuses sheet steel doublebreak

Each 6,690.00

b. 125 Amps TPN switch with HRC fuses sheet steel doublebreak

Each 7,330.00

c. 200 Amps TPN switch with HRC fuses sheet steel doublebreak

Each 9,470.00

d. 315 Amps TPN switch with HRC fuses sheet steel doublebreak

Each 13,500.00

e 400 Amps TPN switch with HRC fuses sheet steel doublebreak

Each 17,300.00

f 16 Amps TPN metal clad switch with rewirable fuse units Each 1,015.00

g 32 Amps TPN metal clad switch with rewirable fuse units Each 1,500.00

h 63 Amps TPN metal clad switch with rewirable fuse units Each 3,270.00

I 100 Amps metal clad switch with rewirable fuse units Each 6,430.00I 100 Amps metal clad switch with rewirable fuse units Each 6,430.00

Page 137: twad 13-14

ItemNo.

Description UnitRate

in Rupees

j 200 Amps metal clad switch with rewirable fuse units Each 9,750.00

IVA

SWITCH DISCONNECTOR FUSE UNITS IN SHEETSTEEL ENCLOSURE (SDF) (L&T/SIEMENS)

1 63 A TPN switch disconnector fuse units in sheet steelenclosure with HRC fuses double break

Each 4,130.00

2 100 A TPN switch disconnnector fuse units in sheet steelenclosure with HRC fuses double break

Each 6,950.00

3 125 A TPN switch disconnnector fuse units in sheet steelenclosure with HRC fuses double break.

Each 8,200.00

4 200 A TPN switch disconnnector fuse units in sheet steelenclosure with HRC fuses double break

Each 10,300.00

5 250 A TPN switch disconnnector fuse units in sheet steelenclosure with HRC fuses double break

Each 12,850.00

6 315 A TPN switch disconnnector fuse units in sheet steelenclosure with HRC fuses double break

Each 15,400.00

7 400 A TPN switch disconnnector fuse units in sheet steelenclosure with HRC fuses double break

Each 17,700.00

IVB

SWITCH DISCONNECTOR FUSE UNITS IN OPENEXECUTION (INTERIOR FOR CUBICAL)(L&T/SIEMENS)

IVB

SWITCH DISCONNECTOR FUSE UNITS IN OPENEXECUTION (INTERIOR FOR CUBICAL)(L&T/SIEMENS)

1 63A TPN Switch disconnector fuse units interior only withHRC fuses double break

Each 2,730.00

2 100 A TPN switch disconnnector fuse units interior only withHRC fuses double break.

Each 4,970.00

3 125 A TPN switch disconnector fuse units interior only withHRC fuses double break.

Each 6,770.00

4 200 A TPN switch disconnector fuse units interior only withHRC fuses double break.

Each 8,740.00

5 250 A TPN switch disconnector fuse units interior only withHRC fuses double break.

Each 11,400.00

6 315 A TPN switch disconnector fuse units interior only withHRC fuses double break.

Each 14,300.00

7 400 A TPN switch disconnector fuse units interior only withHRC fuses double break.

Each 16,900.00

V FUSE UNITS (ANCHOR /EQUIVALENT)

a. 16 Amps Porcelain fuse unit (500v) Each 55.00

b. 32 Amps Porcelain fuse unit (500v) Each 97.50

c. 63 Amps Porcelain fuse unit (500v) Each 218.00

d. 100 Amps Porcelain fuse unit (500v) Each 392.00

c. 63 Amps Porcelain fuse unit (500v) Each 218.00

d. 100 Amps Porcelain fuse unit (500v) Each 392.00

e. 200 Amps Porcelain fuse unit (500v) Each 634.00

Page 138: twad 13-14

ItemNo.

Description UnitRate

in Rupees

VI SINGLE PHASE DBS (GEM /EQUIVALENT)a. 4 way DB 16 Amps /way with fuse & neutral Each (250v) Each 529.00

b. 6 way DB 16 Amps /way with fuse & neutral Each (250v) Each 719.00

c. 8 way DB 16 Amps /way with fuse & neutral Each (250v) Each 892.00

VII THREE PHASE DBS(GEM /EQUIVALENT)a. 4 way TPDB 16A/way with fuse & neutral link Each 2,085.00

b. 6 way TPDB 16A/way with fuse & neutral link Each 2,860.00

c. 8 way TPDB 16A/way with fuse & neutral link Each 3,460.00

d. 4 way TPDB 32A/way with fuse & neutral link Each 2,640.00

e. 6 way TPDB 32A/way with fuse & neutral link Each 3,520.00

f. 8 way TPDB 32A/way with fuse & neutral link Each 4,460.00

g. 4 way TPDB 63A/way with fuse & neutral link Each 6,160.00

h. 6 way TPDB 63A/way with fuse & neutral link Each 7,930.00

VIII CHANGE OVER SWITCHES(GEM /HAVELLS /HPL/STANDARD /EQUIVALENT)

VIII CHANGE OVER SWITCHES(GEM /HAVELLS /HPL/STANDARD /EQUIVALENT)

a. 16 Amps three phase 500 V 4 pole change over switch Each 1,440.00

b. 32 Amps three phase 500 V 4 pole change over switch Each 1,700.00

c. 63 Amps three phase 500 V 4 pole change over switch Each 3,710.00

d. 100 Amps three phase 500 V 4 pole change over switch Each 5,900.00

e. 200 Amps three phase 500 V 4 pole change over switch Each 11,100.00

PART 'D'I a 5 Amps 3 pin and 2 pin combined flush type wall socket

only. Each 27.70

b. 5 Amps /15 amps.3 pin flush type wall socket only. Each 62.30

c. 5 Amps 3 pin top Each 39.20

d. 15 Amps 3 pin top Each 55.40

e. 15 Amps flush type switch Each 64.60

f. 10 Amps M.C plug with 3 pin top Each 207.00

g. 20 Amps M.C plug with 3 pin top Each 236.00

Page 139: twad 13-14

ItemNo.

Description UnitRate

in Rupees

II A SINGLE PHASE WATT HOUR METERS[HPL/EQUIVALENT)

a. AC single phase 230v/250v/50 HZ 5 Amps Watt Hour Meter Each 1,100.00

b. AC single phase 230v/250v/50 HZ 10 Amps Watt Hour meter Each 1,100.00

c. AC single phase 230v/250v/50 HZ 20 Amps Watt Hour meter Each 1,100.00

II.B THREE PHASE WATT HOUR METERS (ANCHOR /EQUIVALENT)

a. AC 3 phase 400v 50 HZ unbalanced load 4 wire 10 Ampswatt hour meter

Each 2,270.00

b. AC 3 phase 400v 50 HZ unbalanced load 4 wire 25 Ampswatt hour meter

Each 2,270.00

c. AC 3 phase 400v 50 HZ unbalanced load 4 wire 50 Ampswatt hour meter

Each 2,880.00

PART ‘E’

I SERVICE CONNECTION ACCESSORIES LT. 1100V PVCALUMINIUM CONDUCTOR ARMOURED UNDERGROUND CABLE WITH ISI MARK

I SERVICE CONNECTION ACCESSORIES LT. 1100V PVCALUMINIUM CONDUCTOR ARMOURED UNDERGROUND CABLE WITH ISI MARK

a. 2 Core 6 sq.mm PVC armoured UG cable Metre 97.30

b. 2 Core 10 sq.mm PVC armoured UG cable Metre 118.50

c. 2 Core 16 sq.mm PVC armoured UG cable Metre 128.50

d. 2 Core 25 sq.mm PVC armoured UG cable Metre 146.00

II PVC INSULATED SINGLE CORE MULTI STRAND FIRERETARDANT FLEXIBLE COPPER CABLE WITH ISIMARK CONFORMING TO IS 694/ 1990

a. 14/0.3 ( 1.0sq.mm ) Metre 8.95

b. 22/0.3 ( 1.5 sq.mm ) Metre 14.05

c. 36/0.3 ( 2.5 sq.mm ) Metre 21.80

d. 56/0.3 ( 4.0 sq.mm ) Metre 34.60

e. 84/0.3 ( 6.0sq.mm ) Metre 51.20

f. 140/0.3 ( 10.0 sq.mm ) Metre 76.80

g. 101/0.45 ( 16.0 sq.mm ) Metre 125.50

h. 168/0.45 ( 25.0 sq.mm ) Metre 277.00

III CONDUCTOR

a. Hard drawn copper conductor(Gauge No.8 & 6) KG 519.00a. Hard drawn copper conductor(Gauge No.8 & 6) KG 519.00

b. 14 SWG TC wire KG 531.00

Page 140: twad 13-14

ItemNo.

Description UnitRate

in Rupees

c. GI No.8 wire and No. 6 wire KG 88.00

IV CABLE GLANDS

a Cable gland suitable for 2 core 4 sq.mm UG cable Each 19.50

b Cable gland suitable for 2 core 6 sq.mm UG cable Each 24.20

c Cable gland suitable for 2 core 10 sq.mm UG cable Each 28.80

d Cable gland suitable for 2 core 16 sq.mm UG cable Each 42.60

e Cable gland suitable for 2 core 25 sq.mm UG cable Each 50.80

f Cable gland suitable for 3½ core 25 sq.mm UG cable Each 50.80

g Cable gland suitable for 3½ core 35 sq.mm UG cable Each 64.60

h Cable gland suitable for 3½ core 50 sq.mm UG cable Each 64.60

I. Cable gland suitable for 3½ core 70 sq.mm UG cable Each 79.60

j. Cable gland suitable for 3½ core 95 sq.mm UG cable Each 97.00

k. Cable gland suitable for 3½ core 120 sq.mm UG cable Each 123.50

l. Cable gland suitable for 3½ core 150 sq.mm UGcable Each 162.50

m. Cable gland suitable for 3½ core 185 sq.mm UGCable Each 192.50

l. Cable gland suitable for 3½ core 150 sq.mm UGcable Each 162.50

m. Cable gland suitable for 3½ core 185 sq.mm UGCable Each 192.50

n. Cable gland suitable for 3½ core 240 sq.mm UG cable Each 192.50

o. Cable gland suitable for 3½ core 300 sq.mm UGcable Each 230.00

p. Cable gland suitable for 3 ½ core 400 sq.mm UGcable Each 328.00

q. Cable gland suitable for 3 ½ core 500 sq.mm UG cable Each 382.00

r. Cable gland suitable for 4 core 6 sq.mm UG cable Each 24.20

s. Cable gland suitable for 4 core 10 sq.mm UG cable Each 28.80

t. Cable gland suitable for 4 core 25 sq.mm UG cable Each 50.80

V FUSE WIRE(COPPER)

a. 5 Amps fuse wire Kg 519.00

b. 10 Amps fuse wire Kg 519.00

c. 20 Amps fuse wire Kg 519.00

VI NEUTRAL LINK 15 AMPS

a 4 way Neutral Link Each 26.50

b 6 way Neutral Link Each 39.30

c 8 way Neutral Link Each 49.00

d 12 way Neutral Link Each 71.00

Page 141: twad 13-14

ItemNo.

Description UnitRate

in Rupees

M.S. BOX WITH PAINTING (16 SWG)

a M.S Box of Size (100 x 100 x 75mm) Each 48.50

b M.S Box of Size (150 x 100 x 75mm) Each 67.00

c M.S Box of Size (200 x 150 x 75mm) Each 109.00

d M.S Box complete with lock & key arrangements withpainting of size (300 x 200 x 100 mm)

Each 330.00

I MS ANGLES

a 1½ " x 1½" x 1/4" (37.5 x 37.5 x 6.24 mm)(1M= 3.25 Kg)

KG 50.40

b 1½"x 1½" x ½" (37.5 x 37.5 x 12.5mm) KG 50.40

c 2" x 2" x ½" (50 x 50 x 12.5 mm) KG 50.40

II ALUMINIUM FLAT

PART " G "

PART " F "

II ALUMINIUM FLAT

a Aluminium Flat (1"x 1/4") (25x 6.25 mm) KG 192.00

b Aluminium Flat ( 1"x1/8") KG 192.00

III COPPER FLAT

a Copper Flat (25 x 3 mm) KG 519.00

b Copper Flat (25 x 6 mm) KG 519.00

c Copper Flat (33 x 6 mm) KG 519.00

d Copper Flat (50 x 6 mm) KG 519.00

IV POWER CAPACITORa Power capacitor for power factor improvement with oil filled

with discharge resistance 3 phase 415/440V 50 HZconforming to ISS:2384 with ISI marking

KVAR 363.00

PART- HI CONDUIT MATERIALS 16 Gauge

a Conduit pipe 16 mm (5/8") Heavy Gauge Metre 33.00

b Conduit pipe 19 mm (3/4") Heavy Gauge Metre 34.10

c Conduit pipe 25 mm (1") Heavy Gauge Metre 41.90

d Conduit pipe 32 mm (1¼") Heavy Gauge Metre 55.00d Conduit pipe 32 mm (1¼") Heavy Gauge Metre 55.00

e Conduit pipe 38 mm (1½") Heavy Gauge Metre 65.00

Page 142: twad 13-14

ItemNo.

Description UnitRate

in Rupees

II CONDUIT TEE BENDS

a Conduit Tee bends 16 mm (5/8") Dozen 93.00

b Conduit Tee bends 19 mm (3/4") Dozen 94.00

c Conduit Tee bends 25 mm (1") Dozen 112.00

d Conduit Tee bends 32 mm (1¼") Dozen 116.00

e Conduit Tee bends 38 mm (1½") Dozen 145.00

f Conduit Tee bends 50 mm (2") Dozen 181.00

III CONDUIT BENDS 16 Gaugea Conduit solid bends 16 mm (5/8") Dozen 88.00

b Conduit solid bends 19 mm (3/4") Dozen 98.00

c Conduit solid bends 25 mm (1") Dozen 115.00

d Conduit solid bends 32 mm (1¼") Dozen 136.00

e Conduit solid bends 38 mm (1½") Dozen 193.00

f Conduit solid bends 50 mm (2") Dozen 236.00f Conduit solid bends 50 mm (2") Dozen 236.00

IV CONDUIT INSPECTION BEND 16 Gauge

a Conduit Inspection bends 16 mm (5/8") Dozen 88.00

b Conduit Inspection bends 19 mm (3/4") Dozen 91.00

c Conduit Inspection bends 25 mm (1") Dozen 116.00

d Conduit Inspection bends 32 mm (1 ¼") Dozen 140.00

e Conduit Inspection bends 38mm (1½") Dozen 181.00

f Conduit Inspection bends 50mm (2") Dozen 205.00

g. Conduit Inspection bends 65mm (2½") Dozen 264.00

PART `I'

I

a PVC rigid pipes 16mm (5/8") Metre 14.20

b PVC rigid pipes 20mm (3/4") Metre 20.40

c PVC rigid pipes 25mm (1") Metre 30.30

d PVC rigid pipes 32mm (1¼") Metre 45.90

e PVC rigid pipes 40mm (1½") Metre 65.40

f PVC rigid pipes 50mm (2") Metre 98.00

PVC (RIGID) PIPES (1.8 MM THICK)WITH ISI MARK

Page 143: twad 13-14

ItemNo.

Description UnitRate

in Rupees

II PVC RIGID BENDS

a PVC rigid bends 16mm (5/8") Each 3.30

b PVC rigid bends 20mm (3/4") Each 3.30

c PVC rigid bends 25mm (1") Each 4.50

d PVC rigid bends 32mm (1¼") Each 7.95

e PVC rigid bends 40mm (1½") Each 19.80

f PVC rigid bends 50mm (2") Each 24.10

III PVC COUPLES

a PVC Couples 16mm (5/8") Dozen 14.20

b PVC Couples 19mm (3/4") Dozen 14.20

c PVC Couples 25mm (1") Dozen 27.50

d PVC Couples 32mm (1¼") Dozen 62.70

e PVC Couples 38mm (1½") Dozen 135.00e PVC Couples 38mm (1½") Dozen 135.00

f PVC Couples 50mm (2") Dozen 141.00

IV PVC TEES

a PVC Tees 16mm (5/8") Dozen 14.20

b PVC Tees 19mm (3/4") Dozen 16.40

c PVC Tees 25mm (1") Dozen 20.90

d PVC Tees 32mm (1¼") Dozen 93.60

e PVC Tees 38mm (1½") Dozen 301.00

f PVC Tees 50mm (2") Dozen 330.00

V PVC Saddles

a PVC Saddles 16 mm (5/8") Dozen 3.30

b PVC Saddles 19mm (3/4") Dozen 3.80

c PVC Saddles 25mm (1") Dozen 4.40

d PVC Saddles 32mm (1¼") Dozen 5.50

e PVC Saddles 38mm (1½") Dozen 6.60

f PVC Saddles 50mm (2") Dozen 13.20

e PVC Saddles 38mm (1½") Dozen 6.60

f PVC Saddles 50mm (2") Dozen 13.20

Page 144: twad 13-14

ItemNo.

Description UnitRate

in Rupees

VI PVC JUNCTION BOXES

a Junction boxes 1,2,3 & 4 way 16 mm (5/8") Dozen 44.00

b Junction boxes 1,2,3 & 4 way 19 mm (3/4") Dozen 44.00

c Junction boxes 1,2,3 & 4 way 25 mm (1") Dozen 51.70

d Junction boxes 1,2,3 & 4 way 32 mm (1¼") Dozen 115.00

e Junction boxes 1,2,3 & 4 way 38 mm (1½") Dozen 137.00

VII PVC Hylem sheets

a Hylem sheet 3 mm thick Sq.m 672.00

VIII Insulation Tape PVC

a PVC Insulation Tape (19mm) Roll/10 mts 16.40

b Empire Tape (12 mm) Roll/10 mts 22.00

c Empire Tape (19 mm) Roll/10 mts 26.40

PART `J'TEAK WOOD MATERIALS

T.W. BOX CONCEALED TYPE

a T.W. Box concealed type 12"x8"x3" Each 82.60

b T.W.Box concealed type 8"x6"x3" Each 44.00

c T.W. Box concealed type 6"x4"x3” Each 19.80

d T.W. Box concealed type 4"x4"x3” Each 16.40

e T.W. plugs 1½" x 1" x2" 1000 Nos. 341.00

f T.W. Round blocks 100 Nos. 660.00

PART`K'I

Size Aluminium Copper

a 4.0 Sq.mm each 1.60 4.60

b 6.0 Sq.mm each 1.80 4.60

c 10.0 Sq.mm each 2.30 5.75

d 16.0 Sq.mm each 2.30 6.90

e 25.0 Sq.mm each 3.45 11.55

f 35.0 Sq.mm each 4.60 12.65

g 50.0 Sq.mm each 6.90 14.95

h 70.0 Sq.mm each 9.20 24.20

I. 95.0 Sq.mm each 10.40 30.00

j 120.0 Sq.mm each 13.85 41.50

CRIMPING LUGS SUITABLE FOR THE FOLLOWING SIZES

j 120.0 Sq.mm each 13.85 41.50

k 150.0 Sq.mm each 18.45 53.10

l 185.0 Sq.mm each 24.20 80.80

Page 145: twad 13-14

ItemNo.

Description UnitRate

in Rupees

m 225.0 Sq.mm each 35.80 115.00

n 240.0 Sq.mm each 39.25 115.00

o 300.0 Sq.mm each 54.25 155.80

p 400.0 Sq.mm each 80.80 236.00

II CABLE ROUTE INDICATORa Cable route indicator for L.T/ cable Each box 77.00b Cable route indicator for H.T/ cable Each box 77.00

PART`L'I. BRASS SCREWS

a Brass Screws (20mm) ¾" No.6 Gross 71.50b Brass Screws (25mm) 1" No.6 Gross 77.00c Brass Screws (40mm) 1½" No.6 Gross 82.50d Brass Screws (20mm) 3/4" No.8 Gross 71.50e Brass Screws (25mm) 1" No.8 Gross 77.00f Brass Screws (50mm)2" No.10 Gross 159.00g Brass screws (75mm)3" No.10 Gross 236.00II Coach screws 2"x¼" (50 x 6.25mm) Dozen 14.25II Coach screws 2"x¼" (50 x 6.25mm) Dozen 14.25III CONDUIT SADDLES

a Conduit Saddles 16mm (5/8") Gross 44.00b Conduit Saddles 19mm (3/4") Gross 46.80c Conduit Saddles 25mm (1") Gross 55.00d Conduit Saddles 32mm (1¼") Gross 71.50e Conduit Saddles 38mm (1½") Gross 88.00f Conduit Saddles 50mm (2") Gross 99.00g Conduit Saddles 65mm (2½") Gross 113.00IV SODIUM VAPOUR FITTINGS & LAMP

(For External Electrification & Campus lighting)a 250 Watts Sodium Vapour fittings Each 3490.00b 250 Watts Sodium Vapour lamp Each 770.00c 150 Watts Sodium Vapour fittings Each 3440.00d 150 Watts Sodium Vapour lamp Each 660.00e 70 Watts Sodium Vapour fittings Each 2780.00f 70 Watts Sodium Vapour lamp Each 440.00V SODIUM VAPOUR LAMP FITTING SINGLE PIECE DIE

CAST ALUMINIUM HOUSING & LAMP FOR HEAVYTRAFFIC ROADS (PHILIPS/ CROMPTON CREAVES/WIPRO/BAJAJ)

a 400 Watts sodium vapour fittings Each 10460.00b 400 Watts sodium vapour lamp Each 1080.00c 250 Watts sodium vapour fittings Each 7100.00c 250 Watts sodium vapour fittings Each 7100.00d 250 Watts sodium vapour lamp Each 880.00e 150 Watts sodium vapour fittings Each 6670.00

Page 146: twad 13-14

ItemNo.

Description UnitRate

in Rupees

f 150 Watts sodium vapour lamp Each 716.00g 70 Watts sodium vapour fittings Each 2860.00h 70 Watts sodium vapour lamps Each 495.00VI MINIATURE CIRCUIT BREAKERS 240 V/415 V 50HZ

AC SUPPLY SUITABLE FOR BOTH LIGHTING ANDMOTOR CIRCUITS.

“Legrand”/Hager

All other ISImakes with ISI

(Std.)/ HPL/Havells/

equivalent)

a Single pole 6A to 32A,10 KA Each 202.50 148.00

b Single pole 40A , 10 KA Each 412.50 308.50

c Single pole & Neutral 6A to 32A, 10 KA Each 588.00 446.00

d Single pole & Neutral 40A, 10 KA Each 953.00 617.00

e Double pole 6A to 32A, 10 KA Each 588.00 490.00

f Double pole 40A, 10 KA Each 953.00 670.00

g Triple pole 6A to 32A, 10 KA Each 946.00 738.00g Triple pole 6A to 32A, 10 KA Each 946.00 738.00

h Triple pole 63A , 10 KA Each 1450.00 1185.00

I Triple pole & Neutral 6A to 32A, 10 KA Each 1250.00 963.00

j Triple pole & Neutral 63A, 10 KA Each 1870.00 1490.00

k Four pole 6A to 32A, 10 KA Each 1250.00 1030.00

l Four pole 63A, 10 KA Each 1870.00 1580.00

VII MCB ISOLATORS

DP TP FP DP TP FPa 32A each 310.00 517.00 592.00 - -b 40 A each 428.00 740.00 950.00 297.00 544.00 664.00c 63 A each 573.00 860.00 1040.00 376.00 592.00 693.00d 100 A each -- 687.00 1100.00 486.00 773.00 845.00

VIII PLUG AND SOCKETS IN SHEET STEEL ENCLOSUREWITHOUT MCBS

Legrand(MDS)/

Hager (L&T)

All other Makeswith ISI (Std)/HPL/ Havels/

equivalent)

a. 10A single Pole Each 974.00 580.00b. 20A Single pole Each 1045.00 585.00c. 20A Double Pole Each 1130.00 --d 20A Triple Pole Each 1920.00 1110.00e 32A Triple Pole Each 2280.00 1500.00

Legrand(MDS)/Hager(L&T) All other Makes with ISI(Standard)/HPL/Havells/equivalent)

e 32A Triple Pole Each 2280.00 1500.00f 63A triple pole Each 9270.00 -

Page 147: twad 13-14

ItemNo.

Description UnitRate

in Rupees

IX-1 RCCB/ ELCB Legrand(MDS)/

Hager (L&T)

All other ISImakes with ISI

(Std.)/ HPL/Havells/

equivalent)

a 10 Amps 30 MA DP Each 2750.00 2020.00

b 25 Amps 30 MA DP Each 2270.00 1740.00

c 40 Amps 30 MA DP Each 2510.00 1840.00

IX-2 RCCB/ELCB (FOUR POLE)a 25 Amps 30 MA Each 3120.00 2140.00

b 40 Amps 30 MA Each 3160.00 2190.00

c 63 Amps 30 MA Each 3650.00 2490.00

X HRC FUSESa 16 Amps Each 64.60 34.60

b 32 Amps Each 66.90 57.70b 32 Amps Each 66.90 57.70

c 63 Amps Each 138.00 72.50

d 125 Amps Each 323.00 161.00

e 160 Amps Each 403.00 217.00

f 200 Amps Each 415.00 217.00

g 250 Amps Each 577.00 321.00

Page 148: twad 13-14

DescriptionNo. of ways

incomerMCB/Isolator

No. of waysincomer

ELCB/RCD

No.ofoutgoing

ways

Legrand(MDS)

/HAGER ( L & T)

Rate in Rs.4 Ways 3 Phase DB 4 4 12 5360/-8 Ways 3 Phase DB 4 4 24 6620/-12 Ways 3 Phase DB 4 4 36 9630/-

XI VERTICAL THREE PHASE DISTRIBUTION BOARD WITH MCBS

All othermakes withISI (Std /HPL/ Havells/equivalent)( Rate inRupees)

5220/-6350/-

II.TPMCB DB WITH METAL/ACRYLIC DOOR COVER WITH IP 42 PROTECTION

4 Way / 8 way / 12 Way Vertical TPMCB sheet steel distribution boards Flushtype/Surface type fitted with Bus bars and Neutral links with single / Three phaseMCB out goings and separate 4 way provision for accommodating one No. 4 poleincoming MCB / Isolator and another separate 4 way provision for accommodatingone No. 4 pole ELCB/ RCD with label holder and provisions for taking up cable for sizenot less than 35 sq.mm

All other makes with ISI(Std/ HPL / Havells /

equivalent)Rate in Rs.

3900/-

I MODULE TYPE WITH IP 20 PROTECTION

No. of waysincomerELCB/RCD

No.ofoutgoing

ways

Legrand (MDS)/ HAGER(L&T)

DescriptionNo. of ways

incomerMCB/Isolator

With metalDoor (Rate inRupees)

WithACRYLICdoor(Rates inRupees)

4 Ways 3 Phase DB 4 4 12 6220/- 7500/- 5110/-8 Ways 3 Phase DB 4 4 24 7880/- 9550/- 6290/-12 Ways 3 Phase DB 4 4 36 10500/- 12700/- 7730/-

No. of waysincomer

ELCB/RCD

4 Ways 3 Phase DB 4 4 128 Ways 3 Phase DB 4 4 2412 Ways 3 Phase DB 4 4 36

Legrand (MDS) /HAGER( L & T) Rate in Rs.

11600/-14000/-18800/-

All othermakes withISI (Std /HPL/ Havells/equivalent)( Rate inRupees)

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION

DescriptionNo. of waysincomerMCB/Isolator

No. of waysincomerELCB/RCD

No.ofoutgoing

ways

Legrand (MDS)/ HAGER(L&T)

DescriptionNo. of ways

incomerMCB/Isolator

No.ofoutgoingways

Page 149: twad 13-14

No. of waysincomer

Legrand(MDS)/HAGER

ELCB/RCD ( L & T) Ratein Rs.

4 Ways 3 Phase DB 4 4 12 1920/-

6 Ways 3 Phase DB 4 4 18 2380/-

8 Ways 3 Phase DB 4 4 24 2830/-

12 Ways 3 Phase DB 4 4 36 4230/-

DescriptionNo. of ways

incomerMCB/Isolator

No. of waysincomerELCB/RCD

No.ofoutgoing

ways

Legrand (MDS)/ HAGER(L&T)

All othermakes withISI (Std)/HPL/Havells/equivalent) (Rate inRupees)

II.TPMCB DB WITH METAL / ACRYLIC DOOR COVER WITH IP 42 PROTECTION

Rate in Rs.

1510/-

1830/-

No.ofoutgoingways

2500/-

XII HORIZONTAL THREE PHASE DISTRIBUTION BOARD WITH MCBS

4 way / 6 way / 8 way / 12 way TPMCB sheet steel distribution boards Flush type / Surface typefitted with Bus bars and Neutral links with single/ Three phase MCB outgoings and separate 4 wayprovision for accommodating one No. 4 pole incoming MCB / Isolator and another separate 4 wayprovision for accommodating one No. 4 pole ELCB / RCD with label holder and provisions fortaking up cable for size not less than 35 sq.mm

I MODULE TYPE WITH IP 20 PROTECTION

DescriptionNo. of waysincomerMCB/Isolator

All other makes with ISI(Std) / HPL

/Havells/equivalent )

1200/-

With metalDoor (Rate inRupees)

WithACRYLICdoor(Rates inRupees)

4 Ways 3 Phase DB 4 4 12 2600/- 3030/- 2060/-6 Ways 3 Phase DB 4 4 18 3210/- 3720/- 2610/-8 Ways 3 Phase DB 4 4 24 3850/- 4440/- 3200/-12 Ways 3 Phase DB 4 4 36 5680/- 6760/- 4140/-

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION

DescriptionNo. of waysincomerMCB/Isolator

No.of waysincomerELCB/RCD

No.ofoutgoingways

4 Ways 3 Phase DB 4 4 126 Ways 3 Phase DB 4 4 188 Ways 3 Phase DB 4 4 2412 Ways 3 Phase DB 4 4 36

DescriptionNo. of ways

incomerMCB/Isolator

No. of waysincomerELCB/RCD

No.ofoutgoing

ways

7340/- 8840/-

13400/-

Legrand (MDS)/ HAGER(L&T)

All othermakes withISI (Std)/HPL/Havells/equivalent) (Rate inRupees)

Legrand (MDS) /HAGER( L & T) Rate in Rs.

9650/-

Page 150: twad 13-14

No. of waysincomer

ELCB/RCD4 Ways 3 Phase DB 4 4 12 126 Ways 3 Phase DB 4 4 12 188 Ways 3 Phase DB 4 4 12 2412 Ways 3 Phase DB 4 4 12 36

1.                  MODULE TYPE WITH IP 20 PROTECTION

DescriptionNo. of waysincomerMCB/Isolator

No.of Subincomers

No. of outgoing ways

Legrand (MDS)/HAGER

II.TPMCB DB WITH METAL /ACRYLIC DOOR COVER WITH IP 42 PROTECTION

5780/- 6200/- 6580/- 7590/-

XIII 7 SEGMENT (3 TIER) 3 PHASE DISTRIBUTION BOARD WITH MCB

DescriptionNo. of waysincomerMCB/Isolator

No.of Subincomers

No. of outgoing ways

Legrand (MDS)/HAGER

( L & T) Rate in Rs.

4 Way/6 way/8 way/12 Way TPMCB sheet steel distribution boards Flush type/Surface type fittedwith Bus bars and Neutral links with single /Three phase MCB out goings and separate 4 wayprovision for accommodating one No. 4 pole incoming MCB /Isolator and another separate 4 wayprovision for accommodating one No. 4 pole ELCB/RCD (Totally 8 ways in one segment)(3 x 4ways in each segment) and separate provision for MCB /Isolator)(Totally 12 Nos. ) for subincomers in 3 segments with label holder and provisions for taking up cable for size not less than35 sq.mm

No. of waysincomer

ELCB/RCD4 Ways 3 Phase DB 4 4 12 126 Ways 3 Phase DB 4 4 12 188 Ways 3 Phase DB 4 4 12 2412 Ways 3 Phase DB 4 4 12 36

No.of waysincomer

Legrand(MDS)/HAGER

ELCB/RCD ( L & T) Ratein Rs.

4 Ways 3 Phase DB 2 2 4 705.004 Ways 3 Phase DB 2 2 8 880.004 Ways 3 Phase DB 2 2 12 1,045.00

383.00 485.00 664.00

XIV SINGLE PHASE DISTRIBUTION BOARD WITH MCBS

4 Way/8 way/12 Way Vertical SPMCB sheet steel distribution boards Flush type/Surface type fittedwith Bus bars and Neutral links with single phase MCB out goings and separate 2 way provisionfor accommodating one No. 2 pole incoming MCB /Isolator and another separate 2 way provisionfor accommodating one No, 2 pole ELCB/RCD with label holder and provisions for taking up cablefor size not less than 35 sq.mm

6140/- 6900/- 7700/- 9800/-

I MODULE TYPE WITH IP 20 PROTECTION

DescriptionNo. of waysincomerMCB/Isolator

No.ofoutgoingways

All other makes with ISI(STD) /HPL/Havells/

equivalent)

Rate in Rs.

DescriptionNo. of waysincomerMCB/Isolator

No.of Subincomers

No. of outgoing ways

Legrand (MDS)/HAGER

( L & T) Rate in Rs.

Page 151: twad 13-14

No. of waysincomer

ELCB/RCDWith metalDoor (Rate inRupees)

WithACRYLICdoor(Rates inRupees)

4 Ways 3 Phase DB 2 2 4 1025/- 1210/- 670/-4 Ways 3 Phase DB 2 2 8 1280/- 1430/- 915/-4 Ways 3 Phase DB 2 2 12 1540/- 1730/- 1180/-

No. of waysincomer

ELCB/RCD

DescriptionNo. of waysincomerMCB/Isolator

No.ofoutgoingways

Legrand (MDS)/ HAGER(L&T)

II. SPMCB DB WITH METAL/ACRYLIC DOOR COVER WITH IP 42 PROTECTION

All othermakes withISI (Std)with metaldoor/ HPL/Havell's /equivalent(Rate inRupees)

3080/-

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION.

DescriptionNo. of waysincomerMCB/Isolator

No.ofoutgoingways

Legrand (MDS) /HAGER

( L & T) Rate in Rs.

No. of waysincomer

ELCB/RCD4 Ways 3 Phase DB 2 2 44 Ways 3 Phase DB 2 2 84 Ways 3 Phase DB 2 2 12

3080/-3610/-4160/-

DescriptionNo. of waysincomerMCB/Isolator

No.ofoutgoingways

Legrand (MDS) /HAGER

( L & T) Rate in Rs.

Page 152: twad 13-14

RATES FOR WORKS

Page 153: twad 13-14

ScheduleItem No.

Description Unit RateRs.

1 Earthwork excavation above water level in light orsandy or clayey soils for manhole wells, infiltrationwells, suction wells etc. including levelling the sitewith an initial lead of 10 metres.First depth of 2 metres One Cubic

metre39.00

Second depth of 2 metres One Cubicmetre

61.00

Third depth of 2 metres One Cubicmetre

88.00

Fourth depth of 2 m One Cubicmetre

123.00

2 Erection of Ring well below water level including allincidental charges using special tools and plantssuch as air compressor helmet etc. complete andincluding bailing out water.

a. For 0.90 metre dia Ring well (internal)First depth of 2 metres One metre 312.00

Second depth of 2 m One metre 574.00

INFILTRATION WORKS

Second depth of 2 m One metre 574.00

Third depth of 2 m One metre 1205.00

Fourth depth of 2 m One metre 2406.00

Fifth depth of 2 m One metre 4739.00

Sixth depth of 2 m One metre 9485.00

b. For 1.2 metre dia Ring well (internal)

First depth of 2 metres One metre 346.00

Second depth of 2 m One metre 692.00

Third depth of 2 m One metre 1378.00

Fourth depth of 2 m One metre 2582.00

Fifth depth of 2 m One metre 4792.00

Sixth depth of 2 m One metre 9572.00

c. For 1.50 metre dia Ring well (internal)

First depth of 2 metres One metre 400.00

Second depth of 2 m One metre 794.00

Third depth of 2 m One metre 1570.00

Fourth depth of 2 m One metre 3128.00

Fifth depth of 2 m One metre 6247.00

Sixth depth of 2 m One metre 12440.00

Page 154: twad 13-14

ScheduleItem No.

Description Unit

Ordinarysoil (or)

loose soilsandy soil

Silt (or) claypocket

3 Sinking well below water levelincluding all incidental charges usingspecial tools and plants such as aircompressor, helmet etc., completeand including baling out water.

a. For 1.0 metre dia (internal)

First depth of 2 metres One metre 455.00 656.00

Second depth of 2 m One metre 765.00 1202.00

Third depth of 2 m One metre 1529.00 2401.00

Fourth depth of 2 m One metre 3018.00 4794.00

Fifth depth of 2 m One metre 5745.00 9002.00

Sixth depth of 2 m One metre 10787.00 16848.00

Seventh depth of 2 m One metre 15828.00 22902.00

Rate Rs.

Seventh depth of 2 m One metre 15828.00 22902.00

Eighth depth of 2 m One metre 20871.00 28955.00

Nineth depth of 2 m One metre 25909.00 35006.00

Tenth depth of 2 m One metre 30951.00 41060.00

b. For 1.25 metre dia (internal)

First depth of 2 metres One metre 594.00 900.00

Second depth of 2 m One metre 1189.00 1802.00

Third depth of 2 m One metre 2372.00 3644.00

Fourth depth of 2 m One metre 4253.00 6549.00

Fifth depth of 2 m One metre 7517.00 11618.00

Sixth depth of 2 m One metre 13574.00 21032.00

Seventh depth of 2 m One metre 19625.00 30450.00

Eighth depth of 2 m One metre 25680.00 39865.00

Nineth depth of 2 m One metre 31738.00 49283.00

Tenth depth of 2 m One metre 37791.00 58700.00

c. For 2.0 metre dia (internal)

First depth of 2 metres One metre 923.00 1484.00

Second depth of 2 m One metre 1840.00 2967.00

Third depth of 2 m One metre 3671.00 5924.00

Fourth depth of 2 m One metre 5868.00 10857.00

Page 155: twad 13-14

ScheduleItem No.

Description Unit

Ordinarysoil (or)

loose soilsandy soil

Silt (or) claypocket

Rate Rs.

Fifth depth of 2 m One metre 11471.00 19743.00

Sixth depth of 2 m One metre 22937.00 36881.00

Seventh depth of 2 m One metre 34401.00 54035.00

Eighth depth of 2 m One metre 45866.00 71183.00

Nineth depth of 2 m One metre 57332.00 88329.00

Tenth depth of 2 m One metre 68795.00 105475.00

d. For 2.5 metre dia (internal)

First depth of 2 metres One metre 1164.00 1935.00

Second depth of 2 m One metre 2420.00 3805.00

Third depth of 2 m One metre 4836.00 7580.00

Fourth depth of 2 m One metre 9007.00 14086.00

Fifth depth of 2 m One metre 16769.00 26050.00Fifth depth of 2 m One metre 16769.00 26050.00

Sixth depth of 2 m One metre 32385.00 48784.00

Seventh depth of 2 m One metre 47997.00 71513.00

Eighth depth of 2 m One metre 63612.00 94244.00

Nineth depth of 2 m One metre 79224.00 116974.00

Tenth depth of 2 m One metre 94841.00 139704.00

e. For 3.00 metre dia (internal)

First depth of 2 metres One metre 1504.00 2619.00

Second depth of 2 m One metre 2980.00 5092.00

Third depth of 2 m One metre 5953.00 10187.00

Fourth depth of 2 m One metre 11489.00 19132.00

Fifth depth of 2 m One metre 21473.00 35727.00

Sixth depth of 2 m One metre 40700.00 62294.00

Seventh depth of 2 m One metre 59925.00 88824.00

Eighth depth of 2 m One metre 79151.00 115374.00

Nineth depth of 2 m One metre 98376.00 141925.00

Tenth depth of 2 m One metre 117604.00 168478.00

f. For 3.50 metre dia (internal)

First depth of 2 metres One metre 1913.00 3068.00

Second depth of 2 m One metre 3719.00 6022.00

Page 156: twad 13-14

ScheduleItem No.

Description Unit

Ordinarysoil (or)

loose soilsandy soil

Silt (or) claypocket

Rate Rs.

Third depth of 2 m One metre 7422.00 12015.00

Fourth depth of 2 m One metre 13896.00 22521.00

Fifth depth of 2 m One metre 25962.00 42820.00

Sixth depth of 2 m One metre 49190.00 79486.00

Seventh depth of 2 m One metre 72416.00 116155.00

Eighth depth of 2 m One metre 95647.00 152818.00

Nineth depth of 2 m One metre 118875.00 189485.00

Tenth depth of 2 m One metre 142104.00 226153.00

g. For 4.00 metre dia (internal)

First depth of 2 metres One metre 2186.00 3681.00

Second depth of 2 m One metre 4210.00 7047.00

Third depth of 2 m One metre 8389.00 14081.00Third depth of 2 m One metre 8389.00 14081.00

Fourth depth of 2 m One metre 15756.00 26382.00

Fifth depth of 2 m One metre 29468.00 49198.00

Sixth depth of 2 m One metre 55870.00 93124.00

Seventh depth of 2 m One metre 82272.00 137048.00

Eighth depth of 2 m One metre 108672.00 180976.00

Nineth depth of 2 m One metre 135091.00 224599.00

Tenth depth of 2 m One metre 161477.00 265432.00

h. For 4.50 metre dia (internal)

First depth of 2 metres One metre 2611.00 4403.00

Second depth of 2 m One metre 5119.00 8756.00

Third depth of 2 m One metre 10276.00 17475.00

Fourth depth of 2 m One metre 17872.00 32771.00

Fifth depth of 2 m One metre 30978.00 61280.00

Sixth depth of 2 m One metre 57615.00 102109.00

Seventh depth of 2 m One metre 84343.00 142939.00

Eighth depth of 2 m One metre 111029.00 183768.00

Nineth depth of 2 m One metre 137710.00 224903.00

Tenth depth of 2 m One metre 164393.00 268828.00

Page 157: twad 13-14

ScheduleItem No.

Description Unit

Ordinarysoil (or)

loose soilsandy soil

Silt (or) claypocket

Rate Rs.

i. For 5.00 metre dia (internal)

First depth of 2 metres One metre 3238.00 5461.00

Second depth of 2 m One metre 6318.00 10134.00

Third depth of 2 m One metre 12568.00 20235.00

Fourth depth of 2 m One metre 23584.00 39627.00

Fifth depth of 2 m One metre 42584.00 74050.00

Sixth depth of 2 m One metre 83271.00 140309.00

Seventh depth of 2 m One metre 123957.00 206568.00

Eighth depth of 2 m One metre 164642.00 272827.00

Nineth depth of 2 m One metre 205331.00 339087.00

Tenth depth of 2 m One metre 246019.00 405347.00

j. For 6.00 metre dia (internal)j. For 6.00 metre dia (internal)

First depth of 2 metres One metre 4654.00 7611.00

Second depth of 2 m One metre 9022.00 14718.00

Third depth of 2 m One metre 17137.00 29421.00

Fourth depth of 2 m One metre 33772.00 55125.00

Fifth depth of 2 m One metre 63124.00 102824.00

Sixth depth of 2 m One metre 119656.00 194550.00

Seventh depth of 2 m One metre 176196.00 286275.00

Eighth depth of 2 m One metre 232730.00 378001.00

Nineth depth of 2 m One metre 289266.00 469725.00

Tenth depth of 2 m One metre 345800.00 561450.00

NOTE:

15% extra

20% extra

Where water table is 2.00m, below bed level andupto 4.00 mWhere water table is beyond 4.00m and upto6.00m

In case the water table is met with at depth of 2.00 m and below, from the bedlevel, an extra percentage as under may be allowed over the existing rates foritems 3(a) to 3 (j) for the extra lift involved.

Page 158: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

4a. Earthwork excavation above water level inlight or sandy soil for infiltration gallery,syphon or connecting pipeline andconnected works including refillingcomplete.First depth of 2 m One cubic

metre44.60

Second depth of 2 m One cubicmetre

63.90

Third depth of 2 m One cubicmetre

92.90

Fourth depth of 2 m One cubicmetre

124.30

b. Earthwork excavation below water level inlight or sandy soil for infiltration gallery,syphon or connecting pipe line andconnected works including shoring andstrutting and charges for special tools andplants for bailing/ pumping etc., such as aircompressor and helmet.

b. Earthwork excavation below water level inlight or sandy soil for infiltration gallery,syphon or connecting pipe line andconnected works including shoring andstrutting and charges for special tools andplants for bailing/ pumping etc., such as aircompressor and helmet.

First depth of 2 m One cubicmetre

829.00

Second depth of 2 m One cubicmetre

1172.00

Third depth of 2 m One cubicmetre

1757.50

Fourth depth of 2 m One cubicmetre

2550.00

c Earthwork excavation below water level inclayey soil for infiltration gallery for layingsyphon pipe line or connecting pipe andconnected works, shoring and strutting andcharges for special tools and plants forbailing/pumping etc., such as air compressorand helmet.

First depth of 2 m One cubicmetre

1378.50

Second depth of 2 m One cubicmetre

1915.50

Third depth of 2 m One cubicmetre

2991.50

Fourth depth of 2 m One cubicmetre

4478.00

Page 159: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

d Earthwork excavation below water level insoft disintegrated rock for infiltration gallery,laying syphone pipe line/ connecting pipesetc., including shoring, strutting and chargesfor special tools and plants.

First depth of 2 m One cubicmetre

964.00

Second depth of 2 m One cubicmetre

1284.50

Third depth of 2 m One cubicmetre

2000.00

Fourth depth of 2 m One cubicmetre

3458.00

NOTE (i) For sinking wells in soil mixed with pebblesboulder of size 80 mm to 600 mm mixedwith clay and silt below water level, includingbailing/ pumping water and charges forspecial tools and plants etc., complete, anextra 20% (Twenty perentage) over therates for items 2,3b,3c & 3d in the scheduleof rates is allowed.

NOTE (i) For sinking wells in soil mixed with pebblesboulder of size 80 mm to 600 mm mixedwith clay and silt below water level, includingbailing/ pumping water and charges forspecial tools and plants etc., complete, anextra 20% (Twenty perentage) over therates for items 2,3b,3c & 3d in the scheduleof rates is allowed.

ii In case the water table is met with at adepth of 2.00m and below from the bedlevel, an extra percentage as under may beallowed over the existing rates for items4(b), 4(c) and 4(d) above the extra liftinvolved

Where water table is 2.00m below bed leveland upto 4.00m.

10% extra

Where water table is beyond 4.00m andupto 6.00m

15% extra

Pipe laying works5a Laying stoneware pipes and open joint with

fillet in the infliltration gallery excluding costof pipes but including charges of specialtools and plant etc., such as air compressorand helmet.

I 200 mm dia stoneware pipes One metre 132.50

ii 225 mm dia stoneware pipes One metre 162.50

iii 300 mm dia stoneware pipes One metre 190.00

Page 160: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

iv 350 mm dia stoneware pipes One metre 220.50

v 375 mm dia stoneware pipes One metre 273.50

vi 450 mm dia stoneware pipes One metre 282.00

Laying and jointing PVC slotted pipes in theinflitration gallery excluding cost of pipes butincluding charges for special tools and plantsetc., complete such as air compressor andhelmet.200 mm dia (OD) PVC pipes One metre 98.50315 mm dia (OD) PVC pipes One metre 150.50

c Refilling gallery trench and filter basins withclean excavated sand free from silt and clay One cubic

metre10.50

6 Labour charges for laying filter media belowwater level in all depths as per specfificationfor infiltration gallery works includingscreening cleaning and charges for specialtools and plant complete such as aircompressor, helmets, sheet piles

b

6 Labour charges for laying filter media belowwater level in all depths as per specfificationfor infiltration gallery works includingscreening cleaning and charges for specialtools and plant complete such as aircompressor, helmets, sheet piles

a Granite metal 6mm to 40mm One cubicmetre

137.00

b Coarse sand passing through a sieve of fourmeshes to 2.5 centimetres and retained in asieve of ten meshes to 2.5 centimetres andfilling it under water

One cubicmetre

679.50

c Coarse sand passing through a sieve of tenmeshes to 2.5 centimetres and retained in asieve of 200 meshes to 2.5 centimetres andfilling it under water

One cubicmetre

258.00

d. Cost of coarse sand D-10 and D-20 for layinggallery media for a lead not exceeding 200mfrom the source to the place of stackingincluding stacking etc., complete.

One cubicmetre

175.50

e. Cost of hard granite metal of size (B.S.S.) 6mm to 12 mm filter media (machinecrushed)

One cubicmetre

923.00

Page 161: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

(I) NOTE: For 6(a),(b) and (c):

The above rates are labour charges forlaying the filter media including screening,cleaning etc., for a lead not exceeding 200metres from the place of stacking to thepoint of laying the media. The cost ofmaterials and the lead from the source tothe place of stacking are to be paid forseparately.

(ii) NOTE: FOR 6(d):

The above rates are applicable to caseswhere the screened materials is not lessthan 10% of the collected material. Inspecific cases where the screened material isless than 10% of the collected material priororders of the superintending Engineer,TWAD Board are to be obtained in specificcases for increased rate of labour required.

The above rates are applicable to caseswhere the screened materials is not lessthan 10% of the collected material. Inspecific cases where the screened material isless than 10% of the collected material priororders of the superintending Engineer,TWAD Board are to be obtained in specificcases for increased rate of labour required.

(iii) NOTE: FOR 6(e)

The above rates are applicable to caseswhere the screened materials is not lessthan 20% of the collected materials. In casewhere the screened materials is less than20% of the collected material, prior orders ofthe Superintending Engineer, TWAD are tobe obtained in specific cases for increasedrate of labour required.

Page 162: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

7a Lowering of C.I/ D.I Pipes and specials in the trenchesand laying to proper grade and alignment and asdirected by the TWAD Officers.

For depth upto 2m80 mm dia C.I/ D.I Pipes and Specials One metre 7.25100 mm dia C.I/ D.I Pipes and Specials One metre 8.40125 mm dia C.I/ D.I Pipes and Specials One metre 10.80150 mm dia C.I/ D.I Pipes and Specials One metre 14.45200 mm dia C.I/ D.I Pipes and Specials One metre 18.05250 mm dia C.I/ D.I Pipes and Specials One metre 22.85300 mm dia C.I/ D.I Pipes and Specials One metre 25.30350 mm dia C.I/ D.I pipes and specials One metre 31.40400 mm dia C.I/ D.I pipes and specials One metre 36.20450 mm dia C.I/ D.I pipes and specials One metre 42.20500 mm dia C.I/ D.I pipes and specials One metre 45.85600 mm dia C.I/ D.I pipes and specials One metre 56.70700 mm dia C.I/ D.I pipes and specials One metre 71.15750 mm dia C.I/ D.I pipes and specials One metre 79.70800 mm dia C.I/ D.I pipes and specials One metre 92.90900 mm dia C.I/ D.I pipes and specials One metre 107.40

NOTE: i) For depth between 2m & 4m 10% over basicrates and for 4m to 6m 20% over basic rate allowedNOTE: i) For depth between 2m & 4m 10% over basicrates and for 4m to 6m 20% over basic rate allowed

ii) For work of laying CI connecting pipe/ syphon basicpipe below water, double the above rates shall beallowed.

iii) For laying pipes in sewer line except pumping main10% more is allowed.

b Lowering GI pipes and specials in the trenches andlaying to proper grade and alignment and as directed bythe TWAD Officers

15mm to 40mm dia One metre 7.2550mm to 65mm dia One metre 7.2580mm to 100mm dia One metre 9.65125mm to 150mm dia One metre 9.65

c Disjointing C.I. Tyton S/S pipes and specials, and liftingC.I. Pipes from the trenches and stacking at placesshown by the departmental officers.

For depth upto 2 m80 mm dia C.I. Pipes and specials One metre 7.25100mm dia C.I. Pipes and specials One metre 8.40125 mm dia C.I. Pipes and specials One metre 9.65150 mm dia C.I. Pipes and specials One metre 13.20200 mm dia C.I. Pipes and specials One metre 14.45250 mm dia C.I. Pipes and specials One metre 22.85300 mm dia C.I. Pipes and specials One metre 24.15350 mm dia C.I. Pipes and specials One metre 31.40400 mm dia C.I. Pipes and specials One metre 33.80

Page 163: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

450 mm dia C.I. Pipes and specials One metre 39.75500 mm dia C.I.pipes and specials One metre 43.45600 mm dia C.I.pipes and specials One metre 53.10700 mm dia C.I.pipes and specials One metre 61.50800 mm dia C.I.pipes and specials One metre 67.60825 mm dia C.I.pipes and specials One metre 77.25900 mm dia C.I.pipes and specials One metre 85.65NOTE: For depth between % excess

allowed overbasic rate

2m to 4m 10%

4m to 6m 20%d. Lowering of M.S pipes and specials into the trenches and

laying to proper grade and alignment and as directed bythe TWAD officers.

Up to 350mm dia One metre 22.85400 mm Dia One metre 28.95450 mm Dia One metre 31.40500 mm Dia One metre 33.80600 mm Dia One metre 42.20700 mm Dia One metre 54.25700 mm Dia One metre 54.25900 mm Dia One metre 77.251000 mm Dia One metre 96.601050 mm Dia One metre 101.401100 mm Dia One metre 106.251200 mm Dia One metre 115.901400 mm Dia One metre 170.201600 mm Dia One metre 220.80NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 10%4m to 6m 20%

8a Jointing the C.I/ D.I - S/S pipes and specials with moltenlead and Yarn including caulking the joints and testing tothe required pressure with water. (Including cost ofjointing materials)

For depth upto 2m80 mm dia C.I/ D.I - S/S pipes and specials Each Joint 243.90100 mm dia C.I/ D.I - S/S pipes and specials Each Joint 297.05125 mm dia C.I/ D.I - S/S pipes and specials Each Joint 391.20150 mm dia C.I/ D.I - S/S pipes and specials Each Joint 458.85200 mm dia C.I/ D.I - S/S pipes and specials Each Joint 621.80250 mm dia C.I/ D.I - S/S pipes and specials Each Joint 885.00300 mm dia C.I/ D.I - S/S pipes and specials Each Joint 959.90350 mm dia C.I/ D.I - S/S pipes and specials Each Joint 1185.75400 mm dia C.I/ D.I - S/S pipes and specials Each Joint 1445.30450 mm dia C.I/ D.I - S/S pipes and specials Each Joint 2161.40500 mm dia C.I/ D.I - S/S pipes and specials Each Joint 2427.05600 mm dia C.I/ D.I - S/S pipes and specials Each Joint 2899.15700 mm dia C.I/ D.I - S/S pipes and specials Each Joint 3273.45

Page 164: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

750 mm dia C.I/ D.I - S/S pipes and specials Each Joint 3925.50NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 10%4m to 6m 15%

8b Jointing C.I/ D.I-S/S pipes and specials with rubbergaskets (tyton joint) including cost of lubricants, testingto the required pressure with water (including cost ofjointing materials)

For depth upto 2m80 mm dia C.I/ D.I-S/S pipes and specials Each Joint 25.30100 mm dia C.I/ D.I-S/S pipes and specials Each Joint 31.40125 mm dia C.I/ D.I-S/S pipes and specials Each Joint 31.40150 mm dia C.I/ D.I-S/S pipes and specials Each Joint 32.55200 mm dia C.I/ D.I-S/S pipes and specials Each Joint 57.95250 mm dia C.I/ D.I-S/S pipes and specials Each Joint 79.70300 mm dia C.I/ D.I-S/S pipes and specials Each Joint 95.30350 mm dia C.I/ D.I-S/S pipes and specials Each Joint 103.85400 mm dia C.I/ D.I-S/S pipes and specials Each Joint 135.20450 mm dia C.I/ D.I-S/S pipes and specials Each Joint 190.75500 mm dia C.I/ D.I-S/S pipes and specials Each Joint 235.40500 mm dia C.I/ D.I-S/S pipes and specials Each Joint 235.40600 mm dia C.I/ D.I-S/S pipes and specials Each Joint 319.90700 mm dia C.I/ D.I-S/S pipes and specials Each Joint 428.60750 mm dia C.I/ D.I-S/S pipes and specials Each Joint 534.85800 mm dia C.I/ D.I-S/S pipes and specials Each Joint 690.65900 mm dia C.I/ D.I-S/S pipes and specials Each Joint 906.75NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 10%4m to 6m 20%

8c Jointing the C.I/ D.I Double flanged pipes and specialswith rubber insertion to the required specifications withM.S. bolts and nuts, complete and testing the pipes tothe required pressure with water (including cost ofjointing materials)

For depth upto 2mFor works above water level80 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 77.25100 mm dia CI Double flanged pipes and specials Each Joint 133.95125 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 141.20

150 mm dia CI Double flanged pipes and specials Each Joint 231.80

200 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 254.70

250 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 364.60

300 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 402.00

350 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 524.05

400 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 787.25

450 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 874.20

500 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 1073.40

600 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 1468.30

Page 165: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

700 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 1544.30

750 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 1581.80

800 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 1621.60

900 mm dia C.I/ D.I Double flanged pipes and specials Each Joint 1842.65NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 10%4m to 6m 15%

8d Jointing C.I/ D.I double flanged pipes and specials withrubber insertion or any equivalent to the requiredspecifications with M.S. bolts and nuts etc., completeand testing the pipes to the required pressure includingcharges for special tools and plants such as aircompressor and helmets and sheet piles. etc (includingcost of jointing materials)For depth upto 2m

For works below water level

80 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 162.95

100 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 242.65100 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 242.65

125 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 270.45

150 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 386.40

200 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 445.50

250 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 608.55

300 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 671.35

350 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 831.90

400 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 1143.45

450 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 1272.70

500 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 1494.90

600 mm dia C.I/ D.I Double flanged Pipes and specials Each Joint 2104.60NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 10%4m to 6m 15%

8e Jointing the C.I/ D.I-S/S pipes and specials with neatcement or cement mortar and spun yarn includingcaulking the joints curing and testing to the requiredpressure with water (including cost of jointing materials)

For depth upto 2m

80mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 59.10

100mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 61.50

125mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 79.70

150mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 80.35

200mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 141.20

Page 166: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

250mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 164.20

300mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 200.45

350mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 232.95

400mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 275.30

450mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 328.40

500mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 382.70

600mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 469.65

700mm dia C.I/ D.I-S/S Pipes and Specials Each Joint 513.10

NOTE: For depth between Percentageexcess allowedover basic rate

2m to 4m 10%4m to 6m 15%

9 Lowering RCC pipes and specials into the trenches andlaying to proper grade and alignment

For depth upto 2m150mm dia R.C.C. Pipes and Specials One metre 21.70

200mm dia R.C.C. Pipes and Specials One metre 22.85

250mm dia R.C.C. Pipes and Specials One metre 28.95250mm dia R.C.C. Pipes and Specials One metre 28.95

300mm dia R.C.C. Pipes and Specials One metre 33.80

350mm dia R.C.C. Pipes and Specials One metre 42.20

400mm dia R.C.C. Pipes and Specials One metre 45.85

450mm dia R.C.C. Pipes and Specials One metre 53.10

500mm dia R.C.C. Pipes and Specials One metre 61.50

600mm dia R.C.C. Pipes and Specials One metre 71.15

700mm dia R.C.C. Pipes and Specials One metre 79.70

750mm dia R.C.C. Pipes and Specials One metre 83.25

800mm dia R.C.C. Pipes and Specials One metre 101.40

900mm dia R.C.C. Pipes and Specials One metre 119.45

1000mm dia R.C.C. Pipes and Specials One metre 137.65

1100mm dia R.C.C. Pipes and Specials One metre 160.50

1200mm dia R.C.C. Pipes and Specials One metre 178.70

1300mm dia R.C.C. Pipes and Specials One metre 196.75

NOTE: For depth between % excessallowed over

basic rate2m to 4m 10%4m to 6m 15%

i) Each Collar joint is to be treated as one joint only

ii) For laying RCC pipes in sewage lines, except pumpingmain, 5% more is allowed

Page 167: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

10a Jointing RCC pipes with cement using necessary collarsand testing to the required pressure including the cost ofjointing materials and conveyance of water for filling thepipes during testing

For depth upto 2m150mm dia R.C.C. Pipes and Specials Each Joint 117.05

200mm dia R.C.C. Pipes and Specials Each Joint 143.60

250mm dia R.C.C. Pipes and Specials Each Joint 176.30

300mm dia R.C.C. Pipes and Specials Each Joint 198.00

350mm dia R.C.C. Pipes and Specials Each Joint 212.50

400mm dia R.C.C. Pipes and Specials Each Joint 229.40

450mm dia R.C.C. Pipes and Specials Each Joint 269.20

500mm dia R.C.C. Pipes and Specials Each Joint 297.05

600mm dia R.C.C. Pipes and Specials Each Joint 353.70

700mm dia R.C.C. Pipes and Specials Each Joint 411.70

750mm dia R.C.C. Pipes and Specials Each Joint 434.70

800mm dia R.C.C. Pipes and Specials Each Joint 451.60800mm dia R.C.C. Pipes and Specials Each Joint 451.60

900mm dia R.C.C. Pipes and Specials Each Joint 513.10

1000mm dia R.C.C. Pipes and Specials Each Joint 525.20

1100mm dia R.C.C. Pipes and Specials Each Joint 574.75

1200mm dia R.C.C. Pipes and Specials Each Joint 637.55

1300mm dia R.C.C. Pipes and Specials Each Joint 705.15

NOTE: For depth between % excessallowed over

basic rate2m to 4m 10%4m to 6m 15%Each collar joint is to be treated as one joint only.

10b Jointing RCC pipes with lead and hemp yarn using steelcollars and testing to the required pressure including thecost of jointing materials but including caulking the jointsand conveyance of water for filling the pipes duringtesting

For depth upto 2m150mm dia R.C.C. Pipes Each steel collar 124.30

200mm dia R.C.C. Pipes Each steel collar 155.70

250mm dia R.C.C. Pipes Each steel collar 184.65

300mm dia R.C.C. Pipes Each steel collar 213.65

350mm dia R.C.C. Pipes Each steel collar 242.65

400mm dia R.C.C. Pipes Each steel collar 252.30

450mm dia R.C.C. Pipes Each steel collar 316.35

Page 168: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

500mm dia R.C.C. Pipes Each steel collar 353.70

600mm dia R.C.C. Pipes Each steel collar 422.60

700mm dia R.C.C. Pipes Each steel collar 504.70

800mm dia R.C.C. Pipes Each steel collar 621.80

NOTE: For depth between Percentageexcess allowedover basic rate

2m to 4m 10%4m to 6m 15%

11a Lowering AC/ GRP pipes and specials into the trenchcarefully, laying to proper grade and alignment jointingof A.C/ GRP pipes with simplex joints with rubber ringsor with C.I. detachable joints or with M.S. couplers andtesting to the required pressure including conveyance ofwater for filling during testing.

For depth upto 2m80mm dia AC/ GRP Pipes One metre 10.80100mm dia AC/ GRP Pipes One metre 14.45125mm dia AC/ GRP Pipes One metre 21.70150mm dia AC/ GRP Pipes One metre 24.15150mm dia AC/ GRP Pipes One metre 24.15200mm dia AC/ GRP Pipes One metre 32.55250mm dia AC/ GRP Pipes One metre 39.75300mm dia AC/ GRP Pipes One metre 50.70350mm dia AC/ GRP Pipes One metre 56.70400mm dia AC/ GRP Pipes One metre 65.20450mm dia AC/ GRP Pipes One metre 76.00500mm dia AC/ GRP Pipes One metre 90.50600mm dia AC/ GRP Pipes One metre 108.65700mm dia AC/ GRP Pipes One metre 133.95NOTE: For depth between % excess

allowed overbasic rate

2m to 4m 15%4m to 6m 30%

11b Lowering PVC rigid/ HDPE pipes and specials to trenchand laying to proper grade and alignment jointing withPVC couplers with cement paste and testing to therequired pressure including conveyance of water forfilling during testing.For depth upto 2mUpto 40mm dia (OD) PVC/ HDPE pipe One metre 4.2550mm to 75mm dia (OD) PVC/ HDPE pipe One metre 7.2590mm to 110mm dia (OD) PVC/ HDPE pipe One metre 7.25125mm to 160mm dia (OD) PVC/ HDPE pipe One metre 10.10180mm to 250mm dia (OD) PVC/ HDPE pipe One metre 13.00Over 250mm to 315mm dia (OD) PVC/ HDPE pipe One metre 18.85NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 15%4m to 6m 30%

Page 169: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

11c Lowering PSC/ BWSC pipes and specials into the trenchand laying to proper grade and alignment and Jointingwith rubber gaskets and testing to the required pressureincluding the cost of conveyance of water for fillingduring testing.

Page 170: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

For depth upto 2mUpto 350mm diameter One metre 56.70400mm diameter One metre 66.35450mm diameter One metre 77.25500mm diameter One metre 90.50600mm diameter One metre 109.80700mm diameter One metre 123.15800mm diameter One metre 133.95900mm diameter One metre 146.051000mm diameter One metre 159.351100mm diameter One metre 171.451200mm diameter One metre 198.001300mm diameter One metre 219.751400mm diameter One metre 252.301500mm diameter One metre 280.10NOTE: For depth between Percentage

excess allowedover basic rate

2m to 4m 15%4m to 6m 30%

11d Lowering CI collars with flange into the trench and layingto proper grade and alignment and jointing PSC pipeswith 2 Nos of conical rubber rings and MS bolts and nutstesting to the required pressure including the cost ofconveyance of water for filling during testing butexcluding the cost of jointing materials

11d Lowering CI collars with flange into the trench and layingto proper grade and alignment and jointing PSC pipeswith 2 Nos of conical rubber rings and MS bolts and nutstesting to the required pressure including the cost ofconveyance of water for filling during testing butexcluding the cost of jointing materials

For depth upto 2m

Upto 350mm diameter Each collar 602.45

400mm diameter Each collar 705.15

450mm diameter Each collar 807.75

500mm diameter Each collar 909.15

600mm diameter Each collar 1108.45

700mm diameter Each collar 1410.35

800mm diameter Each collar 1515.35

900mm diameter Each collar 1717.05

1000mm diameter Each collar 2016.50

1100mm diameter Each collar 2220.50

1200mm diameter Each collar 2523.65

1300mm diameter Each collar 2830.35

NOTE: For depth between % excessallowed over

basic rate2m to 4m 15%4m to 6m 30%

Page 171: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

12a Cutting C.I. Pipes true to axis and filing smoothly andfinishing the ends complete

80mm dia CI pipes Each cutting 21.70

100mm dia CI pipes Each cutting 24.15

125mm dia CI pipes Each cutting 30.10

150mm dia CI pipes Each cutting 33.80

175mm dia CI pipes Each cutting 39.75

200mm dia CI pipes Each cutting 54.25

250mm dia CI pipes Each cutting 68.75

300mm dia CI pipes Each cutting 77.25

350mm dia CI pipes Each cutting 97.75

375mm dia CI pipes Each cutting 120.75

400mm dia CI pipes Each cutting 126.70

450mm dia CI pipes Each cutting 136.35

500mm dia CI pipes Each cutting 150.85

525mm dia CI pipes Each cutting 182.25

600mm dia CI pipes Each cutting 185.95600mm dia CI pipes Each cutting 185.95

675mm dia CI pipes Each cutting 222.15

700mm dia CI pipes Each cutting 234.25

750mm dia CI pipes Each cutting 241.50

800mm dia CI pipes Each cutting 253.55

825mm dia CI pipes Each cutting 276.45

850mm dia CI pipes Each cutting 289.80

900mm dia CI pipes Each cutting 297.05

12b Cutting A.C. Pipes true to axis and finishing the endscomplete80mm dia AC pipes Each cutting 8.40

100mm dia AC pipes Each cutting 9.65

125mm dia AC pipes Each cutting 10.80

150mm dia AC pipes Each cutting 13.20

200mm dia AC pipes Each cutting 18.05

250mm dia AC pipes Each cutting 28.95

300mm dia AC pipes Each cutting 30.10

350mm dia AC pipes Each cutting 36.20

400mm dia AC pipes Each cutting 44.60

450mm dia AC pipes Each cutting 50.70

500mm dia AC pipes Each cutting 57.95

600mm dia AC pipes Each cutting 66.35

700mm dia AC pipes Each cutting 73.60

Page 172: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

12c Cutting P.V.C. rigid pipes and specials true to axis andfinishing the ends complete

Upto 75mm dia (OD) PVC pipe Each cutting 2.85

90mm dia PVC pipes Each cutting 4.25

110mm dia PVC pipes Each cutting 4.25

125mm dia PVC pipes Each cutting 4.25

140mm dia PVC pipes Each cutting 4.25

160mm dia PVC pipes Each cutting 7.25

180mm dia PVC pipes Each cutting 8.60

200mm dia PVC pipes Each cutting 8.60

250mm dia PVC pipes Each cutting 10.10

315mm dia PVC pipes Each cutting 11.50

12d. Cutting and threading of GI pipes

a.i 15mm dia GI pipe, Cutting Each 3.60

ii. 15mm dia GI pipe, Threading Each 5.05

b.i 20mm dia GI pipe, Cutting Each 3.60

ii. 20mm dia GI pipe, Threading Each 5.25ii. 20mm dia GI pipe, Threading Each 5.25

c.i 25mm dia GI pipe, Cutting Each 4.40

ii. 25mm dia GI pipe, Threading Each 10.55

d.i 32mm dia GI pipe, Cutting Each 5.25

ii 32mm dia GI pipe, Threading Each 14.25

e.i 40mm dia GI pipe, Cutting Each 6.95

ii 40mm dia GI pipe, Threading Each 16.00

f.i 50mm dia GI pipe, Cutting Each 8.90

ii. 50mm dia GI pipe, Threading Each 17.85

g.i 65mm dia GI pipe, Cutting Each 9.65

ii 65mm dia GI pipe, Threading Each 21.45

h.i 80mm dia GI pipe, Cutting Each 12.50

ii. 80mm dia GI pipe, Threading Each 26.95

i.i 100mm dia GI pipe, Cutting Each 17.85

ii. 100mm dia GI pipe, Threading Each 35.70

j.i. 125mm dia GI pipe, Cutting Each 19.20

j.ii. 125mm dia GI pipe, Threading Each 38.50

13 Cutting R.C.C. Pipes true to axis and finishing the endscomplete150mm dia R.C.C. Pipes Each cutting 30.10

200mm dia R.C.C. Pipes Each cutting 33.80

250mm dia R.C.C. Pipes Each cutting 43.45

300mm dia R.C.C. Pipes Each cutting 56.70

350mm dia R.C.C. Pipes Each cutting 59.10

Page 173: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

400mm dia R.C.C. Pipes Each cutting 76.00

450mm dia R.C.C. Pipes Each cutting 83.25

500mm dia R.C.C. Pipes Each cutting 92.90

600mm dia R.C.C. Pipes Each cutting 103.85

650mm dia R.C.C. Pipes Each cutting 108.65

700mm dia R.C.C. Pipes Each cutting 119.45

750mm dia R.C.C. Pipes Each cutting 123.15

800mm dia R.C.C. Pipes Each cutting 135.20

900mm dia R.C.C. Pipes Each cutting 143.60

1000mm dia R.C.C. Pipes Each cutting 154.55

1100mm dia R.C.C. Pipes Each cutting 165.35

1200mm dia R.C.C. Pipes Each cutting 177.45

1300mm dia R.C.C. Pipes Each cutting 184.65

14a Removing the burst C.I. pipes from the pipe line andremoval of slushy soil and baling out water andreplacing the pipeline with sound pipe includingjointing and cost of refilling the pipeline with waterfor retesting the pipe line etc complete. (excluding costof sound pipe and jointing materials and earth work) andas directed by the TWAD Board officers.

14a Removing the burst C.I. pipes from the pipe line andremoval of slushy soil and baling out water andreplacing the pipeline with sound pipe includingjointing and cost of refilling the pipeline with waterfor retesting the pipe line etc complete. (excluding costof sound pipe and jointing materials and earth work) andas directed by the TWAD Board officers.

For depth upto 2m80mm dia C.I. Pipes Each 559.00

100mm dia C.I. Pipes Each 701.50

125mm dia C.I. Pipes Each 916.40

150mm dia C.I. Pipes Each 1155.50

200mm dia C.I. Pipes Each 1611.95

250mm dia C.I. Pipes Each 2215.70

300mm dia C.I. Pipes Each 2819.45

350mm dia C.I. Pipes Each 3192.60

400mm dia C.I. Pipes Each 4078.90

450mm dia C.I. Pipes Each 4443.60

500mm dia C.I. Pipes Each 4985.70

600mm dia C.I. Pipes Each 6100.25

700mm dia C.I. Pipes Each 6659.30

750mm dia C.I. Pipes Each 7642.20

800mm dia C.I. Pipes Each 8631.20

825mm dia C.I. Pipes Each 10235.90

900mm dia C.I. Pipes Each 12487.95

NOTE: For depth between Percentageexcess allowedover basic rate

Page 174: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

2m to 4m 15%4m to 6m 30%

Page 175: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

14b Removing the burst A.C. Pipes from the pipe line andremoval of slushy soil and baling out water and replacingthe pipe line with sound pipe including jointing and costof refilling the pipe line with water for retesting the pipeline etc complete (excluding cost of sound pipe andjointing materials and earth work) and as directed by theTWAD Board officersFor depth upto 2m80mm dia AC. Pipes Each 323.60

100mm dia AC. Pipes Each 382.70

125mm dia AC. Pipes Each 481.70

150mm dia AC. Pipes Each 616.95

200mm dia AC. Pipes Each 865.70

250mm dia AC. Pipes Each 1107.20

300mm dia AC. Pipes Each 1378.95

350mm dia AC. Pipes Each 1514.20

375mm dia AC. Pipes Each 1703.70

400mm dia AC. Pipes Each 1804.00

450mm dia AC. Pipes Each 1842.65450mm dia AC. Pipes Each 1842.65

500mm dia AC. Pipes Each 2023.75

600mm dia AC. Pipes Each 2355.75

700mm dia AC. Pipes Each 2901.55

NOTE: For depth between % excessallowed over

basic rate2m to 4m 15%4m to 6m 30%

14c Removing the burst P.V.C. Pipes from the pipe line andremoval of slushy soil and baling out water and replacingthe pipe line with sound pipe including jointing and costof refilling the pipe line with water for retesting the pipeline etc complete (excluding cost of sound pipe andjointing materials and earth work) and as directed by theTWAD Board officersUpto 63mm dia (OD) PVC Pipes Each 165.35

75mm dia (OD) PVC Pipes Each 207.65

90mm dia (OD) PVC Pipes Each 276.45

110mm dia (OD) PVC Pipes Each 335.65

125mm dia (OD) PVC Pipes Each 398.45

140mm dia to 160mm dia (OD) PVC Pipes Each 491.45

180mm dia to 200mm dia (OD) PVC Pipes Each 753.00

250mm dia to 280mm dia (OD) PVC Pipes Each 917.70

315mm dia (OD) PVC Pipes Each 1022.70

Page 176: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

NOTE: For depth between Percentageexcess allowedover basic rate

2m to 4m 15%4m to 6m 30%

14d Removing the burst R.C.C. pipes from the pipe line andremoval of slushy soil and baling out water and replacingthe pipe line with sound pipe including jointing and costof refilling the pipe line with water for retesting the pipeline etc complete. (excluding cost of sound pipe andjointing materials and earth work) and as directed by theTWAD Board officersFor depth upto 2m150mm dia RCC Pipes Each 898.35

200mm dia RCC Pipes Each 1263.05

250mm dia RCC Pipes Each 1569.75

300mm dia RCC Pipes Each 1864.35

350mm dia RCC Pipes Each 2207.30

375mm dia RCC Pipes Each 2622.65

400mm dia RCC Pipes Each 2821.25400mm dia RCC Pipes Each 2821.25

450mm dia RCC Pipes Each 3157.55

500mm dia RCC Pipes Each 3513.80

525mm dia RCC Pipes Each 3999.20

600mm dia RCC Pipes Each 4107.90

650mm dia RCC Pipes Each 4583.65

700mm dia RCC Pipes Each 4675.40

800mm dia RCC Pipes Each 5159.55

900mm dia RCC Pipes Each 5699.40

1000mm dia RCC Pipes Each 6230.70

1100mm dia RCC Pipes Each 6788.55

1200mm dia RCC Pipes Each 7327.10

1300mm dia RCC Pipes Each 7686.95

NOTE: For depth between Percentageexcess allowedover basic rate

2m to 4m 15%4m to 6m 30%For sewerline works (Except pumping main) 5% extraover the above rate may be adopted.

14e Charges for fixing MS Stepped split up collar in positionin the spigot and socket ends of the PSC pipe carefullyand caulking the sides of the collar using hemp yarncement and hard crete and pouring the cement slurrymixed with use of hard crete in the stepped collarincluding cost of materials etc. complete but excludingcost of stepped collar as directed by the TWAD Boardofficers

Page 177: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

Upto 1500mm dia PSC pipes Each 5910.65

Upto 1000mm dia PSC pipes Each 4724.85

Upto 800mm dia PSC pipes Each 2755.50

Upto 700mm dia PSC pipes Each 2720.40

Upto 600mm dia PSC pipes Each 2687.90

Upto 500mm dia PSC pipes Each 2604.50

Note: For lighting arrangements during night works due toemergency actual expenditure incurred based on needfor lighting may be given extra as certified by theExecutive Engineer incharge of work at site

14f Charges for lowering, positioning and fixing MS stepscollars in AC pipe line carefully and caulking the sides ofcollar using hemp yarn, cement and hard crete into thestepped collar including cost of jointing materials such ascement, yarn, bolt and nuts, MS washers, RI sheet andhard crete etc. but excluding cost of step collar and asdirected by TWAD Officers

For 500mm dia AC pipe Each 1969.35For 600mm dia AC pipe Each 2164.95For 600mm dia AC pipe Each 2164.95For 700mm dia AC pipe Each 2462.00

i) For removing the burst pipe in the maintenance workswhen burst occurs and replacing it with sound pipesincluding the cost of refilling the trench and the removalof slushy soil etc., Complete (Pipes and special jointingmaterials will be supplied with in 200m lead and at therespective TWAD Board divisional stores free of cost).2times ordinary rate allowed for the works are during daytime since the works are done in confined reaches.

ii) If the works are done in odd hours (i.e) 8.00 P.M. to8.00 A.M. of the next day, 3 times of ordinary rate isallowed since the works are done in the confinedreaches.

Slow Sand / Rapid Sand Filter Works15 a.i) Labour for filling with broken stone of all sizes well

washed and cleaned, to be free from impurities,including stacking and laying in bed

One cubic metre 63.90

ii) Labour for filling the coarse sand passing through a sieveof 10 meshes to 2.5 cm and retained in 20 meshes to 2.5cm well washed and cleaned to be free from impuritiesincluding stacking

One cubic metre 120.75

iii) Labour for filling with fine sand passing through a sieveof ten meshes to 2.5cm and retained in a sieve of 40meshes to 2.5 cm well washed and cleaned to be freefrom impurities including stacking

One cubic metre 10.55

Page 178: twad 13-14

ScheduleItem No.

Description Unit Rate in Rupees.

15 b Labour for scraping and removing silt only from thesurface and sides of the filter basin carrying the same toa distance not exceeding 200 metres

One cubic metre 11.95

15c Labour for removing dirty sand in layer of 25 mmuniform thickness from the slow sand filter, conveying,dropping the sand in a hopper with a lift of notexceeding 3 metres within a distance of 30 metres anddelivering the washed sand in filter bed includ

One squaremetre

14.45

16 Laying and jointing with cement mortar stoneware pipesand specials in dry condition and testing with water

100mm diameter stoneware pipes One metre

150mm diameter stoneware pipes One metre

200mm diameter stoneware pipes One metre

225mm diameter stoneware pipes One metre

250mm diameter stoneware pipes One metre

DRAINAGE WORKS

250mm diameter stoneware pipes One metre

300mm diameter stoneware pipes One metre

375mm diameter stoneware pipes One metre

450mm diameter stoneware pipes One metre

NOTE : The rates to be worked out vide standard dataappended as Item 17

Page 179: twad 13-14

Mas

on I

Cla

ss

Fitt

er I

I Cl

ass

Maz

door

Cat

egor

y I

Maz

door

Cat

egor

y II

Labour forLaying and

jointing

Dia

met

er (

in m

m)

Leng

th o

f ea

ch p

ipe

in c

m

Wei

ght

of S

.W p

ipes

for

30m

Qua

ntity

of

cem

ent

in K

g fo

r 50

join

ts

Cost

of

cem

ent

requ

ired

for

50

join

ts (

Rs.)

Cost

of

Labo

ur f

or a

leng

th o

f 30

m o

f S

W p

ipes

(To

tal N

o. o

f co

lum

n 11

,12,

13 &

14)

(Rs.

P.)

Tota

l cos

t of

layi

ng 4

join

ts s

tone

war

e pi

pes

com

plet

e fo

r 1

met

re (

Rs.

P )

Tota

l cos

t of

mat

eria

l and

cos

t of

Lab

our

for

30 m

ts. (

Tota

l No.

of

Colu

mn

10 &

15)

( R

s.P

)

Qua

ntity

of

sand

in c

ubic

met

ers

for

50 m

orta

r jo

ints

Cost

of

sand

req

uire

d fo

r 50

mor

tar

join

ts a

t Rs

. Per

cum

Qua

ntity

of

spun

of

tarr

ed y

arn

in K

g

Cost

of

yarn

at

Rs. /

Kg

Tota

l cos

t of

mat

eria

ls (

Tota

l of

colu

mns

5,7

,& 9

)

STANDARD DATA (RATES FOR ITEM No.16) ITEM No.17. LAYING AND JOINTING STONE WARE PIPES FOR ONE RUNNING METRE

Conv

eyan

ce o

f pi

pes

from

Div

isio

nal S

tore

sto

site

of

wor

k

Test

ing

char

ges

incl

udin

g co

nvey

ance

of

wat

er t

ools

and

pla

nts

etc.

( R

s.)

Tota

l cos

t of

layi

ng a

nd jo

intin

g SW

pip

esw

ith C

M a

nd p

acki

ng w

ith s

pun

or t

arre

dya

rn e

tc. c

ompl

ete

for

30m

leng

th (

Rs. P

)

Mas

on I

Cla

ss

Fitt

er I

I Cl

ass

Maz

door

Cat

egor

y I

Maz

door

Cat

egor

y II

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20100mm 60 - 45 - 0.04 - 3.63 - - 2 1 5 2 - - - 172.00 - -150mm 60 - 68 - 0.07 - 5.45 - - 3 2 6 3 - - - 233.00 - -200mm 60 - 98 - 0.08 - 6.9 - - 4 2 6 3 - - - 236.00 - -225mm 60 - 104 - 0.1 - 8.17 - - 5 3 7 5 - - - 272.00 - -250mm 60 - 115 - 0.11 - 8.35 - - 5 3 7 5 - - - 282.00 - -300mm 60 - 150 - 0.15 - 11.34 - - 6 3 12 6 - - - 359.00 - -375mm 60 - 318 - 0.28 - 18.14 - - 7 3 14 7 - - - 402.00 - -450mm 60 - 454 - 0.34 - 27.22 - - 8 3 16 8 - - - 495.00 - -

Note : 1. For other diametre of pipes now manufactured the rates will be fixed in due course after observing data.2. The rates arrived at adopting the data appended to this schedule of Rates is for works done in the first 2.00m depth extra percentage 5% for 2m to 3m,10% for 3m to 4m, 20% for above 4m depth over basic rates are allowed.3. The above data does not include baling charges, baling charges to be added as extra as per rates given in the relevant PWD Schedule of Rates or as peractuals.

Dia

met

er (

in m

m)

Leng

th o

f ea

ch p

ipe

in c

m

Wei

ght

of S

.W p

ipes

for

30m

Qua

ntity

of

cem

ent

in K

g fo

r 50

join

ts

Cost

of

cem

ent

requ

ired

for

50

join

ts (

Rs.)

Cost

of

Labo

ur f

or a

leng

th o

f 30

m o

f S

W p

ipes

(To

tal N

o. o

f co

lum

n 11

,12,

13 &

14)

(Rs.

P.)

Tota

l cos

t of

layi

ng 4

join

ts s

tone

war

e pi

pes

com

plet

e fo

r 1

met

re (

Rs.

P )

Tota

l cos

t of

mat

eria

l and

cos

t of

Lab

our

for

30 m

ts. (

Tota

l No.

of

Colu

mn

10 &

15)

( R

s.P

)

Qua

ntity

of

sand

in c

ubic

met

ers

for

50 m

orta

r jo

ints

Cost

of

sand

req

uire

d fo

r 50

mor

tar

join

ts a

t Rs

. Per

cum

Qua

ntity

of

spun

of

tarr

ed y

arn

in K

g

Cost

of

yarn

at

Rs. /

Kg

Tota

l cos

t of

mat

eria

ls (

Tota

l of

colu

mns

5,7

,& 9

)

Conv

eyan

ce o

f pi

pes

from

Div

isio

nal S

tore

sto

site

of

wor

k

Test

ing

char

ges

incl

udin

g co

nvey

ance

of

wat

er t

ools

and

pla

nts

etc.

( R

s.)

Tota

l cos

t of

layi

ng a

nd jo

intin

g SW

pip

esw

ith C

M a

nd p

acki

ng w

ith s

pun

or t

arre

dya

rn e

tc. c

ompl

ete

for

30m

leng

th (

Rs. P

)

Page 180: twad 13-14

RATES FOR CONVEYANCE OFMATERIALS

Page 181: twad 13-14

Sl.N

o

Dis

tanc

e in

Kilo

met

re

Cem

ent

and

Stee

l(O

ne m

etric

ton

ne)

Lim

esto

ne, L

atrit

e,Br

ickj

elly

, woo

d w

ork,

Pond

ash

(w

et/d

ry),

ston

e du

st(O

ne C

ubic

Met

re)

Roug

h St

one,

Bon

d St

one,

Cut

Sto

ne, B

roke

n St

one

jelly

, San

d, G

rave

l, Su

rki,

Eart

h, C

rush

ed s

tone

san

d

(One

Cub

ic M

etre

)

Third

Cla

ss C

ount

ry B

ricks

(

Kiln

Bur

nt)

(10

00 N

os.)

Man

galo

re t

iles

(100

0 N

os.)

M

achi

ne P

ress

ed T

iles

(200

0 N

os.)

Hyd

raul

ical

ly p

ress

ed M

osai

c Fl

oorin

g T

iles

(15

00 N

os.)

Bric

ks

II c

lass

Cha

mbe

r bu

rnt

Bric

ks(T

able

Mou

lded

/G

roun

d M

ould

ed)

, Fly

Ash

Bric

ks

(100

0 N

os.)

1 2 3 4 5 6 7 8

a 0 to 10 kms 9.80 10.80 15.60 13.20 17.60 22.00

b 10 to 20 kms 8.40 9.30 13.40 11.30 15.20 18.50

8 a) Rates for Conveyance of Materials by Road in Hills

1 Add for every extra 1KM and part there of

b 10 to 20 kms 8.40 9.30 13.40 11.30 15.20 18.50

c 20 to 40 kms 7.40 8.20 11.80 10.00 13.40 16.70

d 40 to 80 kms 6.20 6.90 9.90 8.40 11.20 14.00

e Above 80kms 5.70 6.20 9.00 7.50 10.10 12.60

1

2

3

4

5

6

The quantity for Payment towards conveyance of earth in coloumn (5) is for the pit measured quantity at thesite of excavation only.

NoteThe above rates do not include stacking charges [as per Circular Memo No.230Wks.IV(2)/62-3 dated16.06.1962 of Chief Engineer (General)]

For Conveyance of Materials on cart track, allow 20% extra over the above rates excluding loading andunloading charges.

For Sandy and Slushy soil tracks, add 50% extra over the above rates excluding loading and unloadingcharges

For all materails which finds place in column 3,4,5,6,7 & 8 above, necessary incidental charges, loadingcharges and unloading charges have been included already under their cost furnished below the head "Ratesof Materials" itself. Hence, no separate incidental charges, loading and unloading charges shall be allowedfor the above materials.

For conveyance of laterite, broken stone jelly, etc., through lorries, the rates provided are for the volume withvoids.

Page 182: twad 13-14

Cem

ent

and

Stee

l(O

ne m

etric

ton

ne)

Lim

esto

ne, L

ater

ite, B

rickj

elly

, woo

dw

ork,

Pon

d As

h (w

et /

dry)

Sto

ne D

ust

(One

Cub

ic M

etre

)

Roug

h St

one,

Bond

sto

ne, C

ut

Ston

e,Br

oken

Sto

ne je

lly, S

and,

Gra

vel,

Surk

i,Ea

rth,

Cru

shed

sto

ne s

and

(O

ne C

ubic

Met

re)

Third

Cla

ss C

ount

ry B

ricks

(Kiln

Bur

nt)

(100

0 N

os.)

Man

galo

re T

iles

(100

0 N

os.)

Mac

hine

Pres

sed

Tile

s(20

00 N

os.)

Hyd

raul

ical

lyPr

esse

d M

osai

c Fl

oorin

g Ti

les

(150

0 N

os.)

Bric

ks I

I cl

ass

Cha

mbe

r bu

rnt

Bric

ks(T

able

Mou

lded

/ G

roun

dM

ould

ed),

Fly

Ash

Bric

ks

(100

0 N

os.)

1 2 3 4 5 6 7 8

1 Co efficient 1.00 1.10 1.60 1.35 1.80 2.252 Add for every extra

1KM and part there of

a 0 to 10 kms 4.90 5.40 7.80 6.60 8.80 11.00

b 10 to 20 kms 4.20 4.65 6.70 5.65 7.60 9.25

c 20 to 40 kms 3.70 4.10 5.90 5.00 6.70 8.35

d 40 to 80 kms 3.10 3.45 4.95 4.20 5.60 7.00

Rate in Rupees

8 b) Rates for Conveyance of Materials by Road in plains

S.N

o

Dis

tanc

e in

Ki

lom

etre

d 40 to 80 kms 3.10 3.45 4.95 4.20 5.60 7.00

e Above 80kms 2.85 3.10 4.50 3.75 5.05 6.30

3 Loading Charges 73.10 34.90 23.90 34.35 34.35 34.35

4 UnLoading Charges 73.10 34.90 23.90 34.35 34.35 34.35

5Add above extra forinter state works

14.55 16.00 23.25 19.60 26.15 32.70

1

2

3

4

5

6

For conveyance of Lateriate, Broken stone jelly, etc. through lorries, the rates provided are for the volumewith voids.

Note:

For all materails which finds place in coloumn 3,4,5,6,7 & 8 above, necessary incidental charges, loadingcharges and unloading charges have been included already under their cost furnished below the head "Ratesof materials" itself. Hence, no separate incidental charges, loading and unloading charges shall be allowedfor the above materials.

The above rates do not include stacking charges [as per Circular Memo No.230Wks.IV(2)/62-3 dated16.6.1962 of Chief Engineer (General)]For Conveyance of Materials on cart track, allow 20% extra over the above rates excluding loading andunloading charges.For Sandy and Slushy soil tracks, add 50% extra over the above rates excluding loading and unloadingcharges

The quantity for Payment towards conveyance of earth in coloumn (5) is for the pit measured quantity at thesite of excavation only.

Page 183: twad 13-14

LIFT

Above10m and

upto100m

Add extrafor everyadditional100m or

partthereof

Add extra forevery 1m

height or partthereof for

more than 2mlift

1 2 3 4 5 6

1Rough Stone, Broken Stone Jelly, Cut Stone, RCCSlab, Sand - Cement Block, Wooden Scantling,Wooden plank

cu.m 50.40 20.95 5.50

2Lime, Lime Stone, Laterite, Brick Jelly,Earth, Sand,Gravel, Surki, Pond Ash (wet/dry),Crushed Stone Sand, Stone Dust

cu.m 26.85 20.95 4.10

3 a) Mangalore Tiles 1000 Nos. 54.60 27.45 6.95

b) Machine Pressed Tiles 2000 Nos. 54.60 27.45 6.95

c) Hydraulic Pressed Mosaic Flooring Tiles 1500 Nos. 54.60 27.45 6.95

9) Rates for Conveyance of materials by Head load

LEAD

S.No Description of material Unit

Rate in Rupees

c) Hydraulic Pressed Mosaic Flooring Tiles 1500 Nos. 54.60 27.45 6.95

d) Terrace Bricks, Flat Tiles and Pan Tiles 2500 Nos. 54.60 27.45 6.95

e) Bricks 1000 Nos. 54.60 27.45 6.95

4Cement, A.C. Sheet, Bitumen, Asphalt,Tar

M.T 50.40 27.45 5.50

5 Steel M.T 84.10 33.60 6.95

Note:

1

2

3

Fraction of 100 metres to be rounded off to the nearest 100 metres

The rates indicated in the table shall be applicable only to inaccessible places (i.e) the placesWherever the Bullock- Carts cannot move [Chief Engineer (General) Memo No.CTO(A) / 38153 / 89 /dated 03.02.1989]

For an initial lead of 10m and initial lift of 2m, no charge towards head load is allowable.

Page 184: twad 13-14

RATES FOR MISCELLANEOUS ITEMS

Page 185: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

PLUMBING1. A Laying of G.I. Pipes and specials to proper line and level

including jointing but excluding cost of pipes and jointingmaterials for plumbing works for providing water supplyand sanitary works in the premises of the building

6 mm to 32 mm dia One metre 8.70

40 mm to 50 mm dia One metre 8.7065 mm to 150 mm dia One metre 11.60

b Bore cap using M.S. Flat of size 1 cm x 3 mm and M.S.sheet on top with bolting arrangements for securing thecap in position (Bore caps with M.S. Couplings need notbe made)

5" Casing Pipes Each 265.65

6" Casing Pipes Each 281.508 " Casing Pipes Each 309.45

MISCELLANEOUS

8 " Casing Pipes Each 309.452 Labour for cutting open road for laying water mains or

sewer.

a. B.T. Roads (or) Maccadam road One cubic metre 354.55

b. Concrete Roads One cubic metre 496.65

3 Labour for drilling, cutting, Threading and Fixing Ferrulesin distribution pipes.

10 mm dia Each 37.15

15 mm dia Each 46.45

20mm dia Each 58.4025 mm dia Each 69.00

4 Labour charges for Painting TWAD Board Emblem inaccordance with the size and specifications as approvedby the Board on the service reservoirs including cost ofall consumables.

Sqm 1302.25

5 Drilling holes in C.I/G.I. DummyFlanges.

12 mm dia Each 13.05

15 mm dia Each 26.20

20 mm dia Each 37.95

22 mm dia Each 51.05

25 mm dia Each 64.15

6 Labour for refilling with sand the socket hollows of pipesincluding conveyance and stacking

One cubic metre 13.05

Page 186: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

NOTE : 1) For depth between Percentageescess allowedover basic rate

2 m to 4 m 15%

4 m to 6 m 30%

7 Lifting and positioning of C.I / G.I Pipes in verticaldirection for service reservoir pipe connection

0 to 2 m Qtl 110.152 to 4 m Qtl 165.954 to 6 m Qtl 260.256 m to 8 m Qtl 359.958 m to 10 m Qtl 459.5010 m to 12 m Qtl 557.8512 m to 14 m Qtl 660.1014 m to 16 m Qtl 751.9516 m to 18 m Qtl 851.3516 m to 18 m Qtl 851.3518 m to 20 m Qtl 950.9020 m to 22 m Qtl 1048.0022 m to 24 m Qtl 1146.20

DRILLING WORKSUsing Hand Bore set

8.a Drilling of borewells of size 4" to 5" dia in Sedimentaryformation using hand boresets including insertion ofcasing pipes and removal of casing pipes etc., includingsupplying and packing of pebbles and conveyance ofhand Boreset including loading and unloading

One metre 415.70

b Drilling of borewells of size 6" to 8" dia in sedimentaryformation using hand boreset including insertion ofcasing pipe etc., and supplying and packing of pebbles(Conveyance of hand bore set including loading andunloading to be done by the contractor

One metre 488.75

Page 187: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

c Using Hand Bore set (For Investigation purpose)

I Drilling of borewells of size 4" to 5" dia in sedimentaryformation using hand boresets including insertion ofcasing pipes and removal of casing pipes etc., includingcollection of samples as directed by the TWAD BoardOfficers.

One metre 309.45

ii Drilling of borewells of size 6" to 8" dia in sedimentaryformation using hand boresets including insertion ofcasing pipes and removal of casing pipes etc., includingcollection of samples as directed by the TWAD BoardOfficers.

One metre 362.60

Using calyx Drill

d Drilling of 4 1/2" diameter borewell by using calyx Drillincluding transporting charges and insertion of casingpipes (excluding cost of casing pipe)

i. For Hilly terrain area One metre 1555.35i. For Hilly terrain area One metre 1555.35ii. For Plain area One metre 1285.70e Drilling 4 1/2" dia meter bores by using in-well rigs in

hilly areas One metre 654.80

f Reaming from 6" Pilot bore to 12" size bore as directedby the TWAD Board Officers One metre 171.35

g Labour charges for inserting casing pipes assembly (Withslot or without slot) in the drilled hole including weldingthe joint etc., complete and supplying and packing theannular space with pebbles of size and quality asapproved by the Executive Engineer

One metre 163.30

9 a Driving sheet piles for one metre length of gallery eachside in sandy soil

i. First depth of 2 m One metre 322.65ii Second depth of 2 m One metre 492.75iii Third depth of 2 m One metre 925.75b Removing sheet piles from one metre length of gallery

on each side including stacking the sheets piles properly

i. First depth of 2 m One metre 50.35

ii Second depth of 2m One metre 76.90iii Third depth of 2 m One metre 111.55

10 Drilling of borwell inside well 115mm dia

a) vertical One metre 357.30

b) horizontal One metre 391.80

Page 188: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

11 Drilling of borewell inside well 150mm dia

a) vertical One metre 447.55

b) horizontal One metre 472.75

12 Drilling of Borewells anywhere in Tamilnadu includingtransportation from one place to another with inTamilnadu in alluvial soil sedimentary strata of clay andsand stone shale pebbles boulders etc. By first taking apilot bore of 140 mm/150mm dia and then enlarging torequired dia direct or reverse rotary mud circulationmethod using rotary rigs fuel, labour and drillingbentonite and water required for drilling at site( Site willbe shown by the TWAD Board officers) includingconstruction of mud pit.

P.S. to M.D.S.S.Special

Specifications.

a. Drilling of 140/150 mm pilot bore

i. Upto 60 m Depth ending below ground levelOne metre 747.70

ii From 60 m Upto 90 m Depth ending from ground levelOne metre 808.90

ii From 60 m Upto 90 m Depth ending from ground levelOne metre 808.90

iii From 90 m upto 120 m Depth ending from ground levelOne metre 857.90

iv From 120 m upto 150 m Depth ending from ground levelOne metre 903.20

v From 150 m upto 180 m Depth ending from ground levelOne metre 917.70

vi From 180 m upto 210 m Depth ending from ground levelOne metre 947.00

vii From 210 m upto 240 m Depth ending from ground levelOne metre 974.85

viii From 240 m upto 270 m Depth ending from ground levelOne metre 1008.05

ix From 270 m upto 300 m Depth ending from ground levelOne metre 1030.60

x From 300 m upto 330 m Depth ending from ground levelOne metre 1055.90

xi From 330 m upto 360 m Depth ending from ground levelOne metre 1077.20

Page 189: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

12 b Reaming 140/150 mm dia pilot bore to 300mm dia boreas directed by the TWAD Board Officer.

i.Upto 60 m depth ending below ground level One metre 187.20

ii From 60 m depth and upto 90 mt depth ending belowground level

One metre 199.15

iiiFrom 90 m upto 120 mt depth ending below ground level One metre 212.50

iv From 120 m upto 150 mt depth ending below groundlevel

One metre 215.15

v From 150 m upto 180 mt depth ending below groundlevel

One metre 225.75

vi From 180 m upto 210 mt depth ending below groundlevel

One metre 237.70

vii From 210 m upto 240 mt depth ending below groundlevel

One metre 248.25

viii From 240 m upto 270 mt depth ending below groundlevel

One metre 257.60viii From 240 m upto 270 mt depth ending below ground

levelOne metre 257.60

ix From 270 m upto 300 mt depth ending below groundlevel

One metre 270.90

x From 300 m upto 330 mt depth ending below groundlevel

One metre 281.50

xi From 330 m upto 360 mt depth ending below groundlevel

One metre 292.10

12 c Reaming 200 mm dia pilot bore to 350mm dia bore asdirected by the TWAD Board Officer.

i. Upto 60 m depth ending below ground level One metre 211.10

ii From 60 m depth and upto 90 mt depth ending belowground level

One metre 223.10

iii From 90 m upto 120 m depth ending below ground levelOne metre 237.70

iv From 120 m upto 150 m depth ending below groundlevel One metre 244.35

v From 150 m upto 180 m depth ending below groundlevel One metre 252.30

vi From 180 m upto 210 m depth ending below groundlevel One metre 272.20

vii From 210 m upto 240 m depth ending below groundlevel One metre 310.70

viii From 240 m upto 270 m depth ending below groundlevel One metre 318.75

ix From 270 m upto 300 m depth ending below groundlevel One metre 326.60

Page 190: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

xi From 330 m upto 360 m depth ending below groundlevel One metre 345.35

12 d Reaming 300 mm dia pilot bore to 400mm/ 450mm diabore as directed by the TWAD Board Officer.

i. Upto 60 m depth ending below ground level One metre 289.45

ii From 60 m depth and upto 90 m depth ending belowground level

One metre 324.05

iiiFrom 90 m upto 120 m depth ending below ground level One metre 345.35

iv From 120 m upto 150 m depth ending below groundlevel

One metre 366.50

v From 150 m upto 180 m depth ending below groundlevel

One metre 381.10

vi From 180 m upto 210 m depth ending below groundlevel

One metre 391.80

vii From 210 m upto 240 m depth ending below groundlevel

One metre 401.10vii From 210 m upto 240 m depth ending below ground

levelOne metre 401.10

viii From 240 m upto 270 m depth ending below groundlevel

One metre 419.60

ix From 270 m upto 300 m depth ending below groundlevel

One metre 435.60

x From 300 m upto 330 m depth ending below groundlevel

One metre 456.90

xi From 330 m upto 360 m depth ending below groundlevel

One metre 472.65

12e

Labour Charges for inserting 150 mm/200mm/250 mmdia (M.S. Casing pipes assembly with slots or with outslots) in the drilled hole including welding the joints etc.,complete and supplying and packing the annular spacewith pebbles of size and quality as approved by theExecutive Engineers of TWAD Board.

i. 150 mm dia Casing Pipes assembly One metre 168.55

ii 200 mm dia Casing Pipes assembly One metre 168.55iii 250 mm dia Casing Pipes assembly One metre 171.35

Page 191: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

13a

Labour Charges for inserting PVC Casing pipes assembly(with slots or without slots) in the drilled hole includingjointing the pipes with PVC Couplers with Cement pasteetc., complete supply and packing the annular spacewith pebbles of size and quality as approved by theexecutive engineers of TWAD Board

i. 150 mm dia Casing Pipes assembly One metre 163.30ii 200 mm dia Casing Pipes assembly One metre 168.55

iii 250 mm dia Casing Pipes assembly One metre 168.5513b

Charges for developing the Borewell with air compressorof 600 CFM capacity (Minimum 8 Hours) includingtransportation, labour and fuel charges for compressoras directed by TWAD Officers and conducting yield testby 'V' notch method.

One hour 1101.10

Note :I) 150 mm dia bore, reaming should be done upto300mm dia.II) 200 mm dia bore, reaming should be done upto300mm dia and thereafter 400,450 etc.

Note :I) 150 mm dia bore, reaming should be done upto300mm dia.II) 200 mm dia bore, reaming should be done upto300mm dia and thereafter 400,450 etc.

14 Drilling of borewell anywhere in Tamilnadu includingtransportation from one place to another place withinTamilnadu in alluvial soil or sedimentary strata of clayand sand or sand, stone, shale, pebbles, boulders etc.,by first taking a pilot bore of 140 mm/150mm dia andthen enlarging to required dia by direct or reverse rotatrymud and circulation method using contractor's rig, fuel,labour, drilling, betonite mud and water required fordrilling at the site shown by the TWAD officers includingconstruction of mud pit only calyx drills are to be used.

a. Drilling 140 / 150 mm dia Pilot Bore upto 60 m depthending below ground level. One metre 544.50

b. Reaming from 140/150 mm dia pilot bore to 300 mm diabore as directed by the TWAD Board Officers upto 60 mDepth ending from ground level

One metre 153.95

c. Labour charges for inserting 150 mm dia M.S. Casingpipes assembly (With slots or without slots) in the drilledhole including welding the joints and packing annularspace with pebbles of size and quality as approved bythe Executive Engineer / TWAD

One metre 138.00

d. Labour Charges for inserting PVC casing pipes assembly(with slots or without slots) in the drilled hole includingthe jointing the pipes with PVC couplers with cementpaste etc. complete

i. 140 mm OD PVC Casing Pipes Assembly One metre 118.20

Page 192: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

e. Charges for developing the borewell with air compressorof 300 cfm capacity (Minimum 8 Hours) includingtransportation labour and fuel charges for compressor asdirected by TWAD Board officers and conducting yieldtest by 'V' notch method.

One metre 856.60

f. Drilling of 12" dia vertical borewell so as to have afinished size of 6" dia borewell in boulder area to anyrequired depth as decided by the TWAD Board officersincluding Transportation from one place to anothr placewith in Tamilnadu State by direct or reverse rotary mudcirculation method using contractor's rig tools, fuellabourers, bentonite mud and water required for drillingat the site shown by the TWAD Officers includingconstruction of mud pit etc. using only calyx rigs.

One metre 1048.00

15 a. Conveyance of handpumps and its accessories fromdivisional stores to site of works

i. Conveyance upto 10 Kms 338.65Each handpump

and itsaccessories

i. Conveyance upto 10 Kms 338.65

ii Conveyance 10 to 20 Kms 425.00ii Conveyance 20 to 40 Kms 517.95

iv Conveyance above 40 Kms 600.30Note : i) Conveyance of Filter Point, Handpump with GIPipes and its accessories from divisional stores to site ofworks. 50% of the rate of conveyance of hand pumps,with its accessories is applicable for this item for therespective leads as indicated above

ii) If the Mark II hand pump is conveyed in carttrack even for part distance 20 % extra over the aboverate shall be adopted.

b i. Erection of deep well hand pumps upto 40 m Each 556.45ii Above 40 m Each 634.80

c. Erection of shallow well hand pumps Each 245.60d. Erection Extra deep well hand pumps Each 718.50e. Removal of deep well hand pumps from borewell

i. Up to 40 m Each 556.45

ii Above 40 m Each 701.25

f) Attending repairs to deep well handpumps for borewellsinclusive of removal of G.I. Pipes, Plunger rods, Cylinderand re-erection of hand pumps inclusive of lowering theGI Pipes Plunger rods cylinder, jointing etc.

i. Upto 30 M Each 590.95

Each handpumpand its

accessories

Page 193: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

16a

Erection of filter point with G.I. Pipes of 32 mm to 65mm dia Each 160.65

b Removing the chocked filter point with G.I. Pipes of 32mm to 65 mm dia and re-erecting in another place within1.00 KM radius after cleaning the filter points G.I. Pipesetc., Complete upto 8.00 m depth

Each 266.90

17(a) ERECTION OF POWER PUMPSET IN BORE/OPENWELL

Labour Charges for erection of Horizontal shaft,centrifugal pumpset (Coupled/Monoblock) in borewell/Open well including fixing of suction pipe and footvalve upto a maximum depth of 7 metres and deliverypipes to the required length with valves, pressuregauges upto the exterior wall of pump room and erectionof panel Board consisting of TPIC switches starter,voltmeter, Ammeter, Capacitor single phasing preventorand laying and jointing the cables and twin earthing asper IE rules including providing bed blocks etc., completeand operating the pumps and trial run for 10 daysincluding signing of completion of reports as required byEB authorities.

Labour Charges for erection of Horizontal shaft,centrifugal pumpset (Coupled/Monoblock) in borewell/Open well including fixing of suction pipe and footvalve upto a maximum depth of 7 metres and deliverypipes to the required length with valves, pressuregauges upto the exterior wall of pump room and erectionof panel Board consisting of TPIC switches starter,voltmeter, Ammeter, Capacitor single phasing preventorand laying and jointing the cables and twin earthing asper IE rules including providing bed blocks etc., completeand operating the pumps and trial run for 10 daysincluding signing of completion of reports as required byEB authorities.

i.Upto 3 HP Each 3594.90

ii Above 3 HP upto 7.5 HP Each 4627.60iii Above 7.5 HP to 20 HP Each 5422.2517b

ERECTION OF POWER PUMPS IN BORE WELLErection of power pumps in borewell labour charges forerection of twin packer duplex type jet pumps inborewells upto 150 mm dia including fixing of Suctionpipe regulating valves with jet assembly upto amaximum depth of 30 m and delivery pipe valvespressure gauges upto the exterior wall of pump roomand erection of panel board consisting of TPICN switchesstarter, voltmeter, Ammeter, three indicator lampscapacitor and laying and jointing the cables and twinearthing as per IE rules etc., complete and testing thepumps and trail run for 10 days including signing ofcompletion of reports as required by EB authorities andfinishing the pipe holes including the foundation bolts,nuts and earth pits.

i. Upto 3 HP Each 4809.30ii Above 3 HP upto 7.5 HP Each 5618.90

iii Beyond 7.5 HP upto 20 HP Each 6425.05

Note : If depth of erection exceeds beyond 30 m 10%increase over the basic rate is allowed

Page 194: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

17c

Labour charges for the erection of submersible pumpsetin borewell/openwell including fixing and jointingsubmersible cable withproper clamps upto the starter torequired depth and also fixing of riser pipes to therequired depth valves erection clamps, pressure gaugesupto the exterior wall of pump room and erection ofpanel board consisting of TPICN switches starter,voltmeter, Ammeter, three pilot (indicating) lampscapacitor single phasing preventor, water level guardand laying and jointing the cables and twin earthing asper IE rules etc., complete and testing the pumpset andtrail run for 10 days.

i. Upto 5 HP Each 4888.65

ii) Above 5.00 HP to 10.00 HP Each 5601.65iii) Above 10.00 HP to 20.00 HP Each 6214.6017d

Conveyance of power pumpset (centrifugal jet andsubmersible) and its accessories from divisional stores tosite of works.

Each PowerPump and itsaccessories

-do--do--do--do--do-

17d

Conveyance of power pumpset (centrifugal jet andsubmersible) and its accessories from divisional stores tosite of works.

Conveyance upto 10 Kms 737.15Conveyance 10 to 20 Kms 810.15Conveyance 20 to 40 Kms 1199.30

Conveyance 40 to 60 Kms 1462.30Conveyance 60 to 80 Kms 1919.20Conveyance above 80 Kms 2200.85

Note : For item 17 (a) (b) and (c)i. Removal of centrifugal pumpset/ jet pumps/ submersible

pumpsets and its accessories from borewell/ open wellfor attending repairs 50% of the rates mentioned underitem 17 (a) (b) and (c) may be allowed for the respectiveHorse power.

ii Re-erection of centrifugal pumpsets, jet pumpsets and itsaccessories into the borewell/ openwell after attendingthe repairs 50% of the rate mentioned under item 17 (a)(b) and (c) may be allowed for respective Horse power.

18 Hire charges :a Sheet piles (Larsen) Per Pile/Per day 2.85

b Sheet piles (For dingham) Per Pile/Per day 4.30

c Compartment sheet with Grills (3' -0" Wide) Per sheet/Per day 4.30

d Rate for flushing of borewell of 6" dia requiring less than4 hours operation using drill rods/ hose with requiredsize of pipes for various capacity compressor includingtransportation, labour, and fuel charges for compressorsas directed by the TWAD Officer and conducting yieldtest by 'V' notch method if required.

Each PowerPump and itsaccessories

-do--do--do--do--do-

Page 195: twad 13-14

Sche-duleItemNo.

Description UnitRate inRupees

i. 600 Cfm ( 100 /150 PSI) 1 hour (or) Partthere of

1101.00

ii) 300/250 Cfm (100 PSI) 1 hour (or) Partthere of

856.60

ii) 125 Cfm (100 PSI) 1 hour (or) Partthere of

784.95

Note : Minimum charges for 8 (eight) hours will be leviedif the air compressor issued for other departmental worksor if the air compressor is hired to other departments.

e Helmet Per day/8 hours 4.30

f Hand test pump Per day/8 hours 40.80

g Pile hammer Per day/8 hours 4.30h Concrete mixer 5 Cft. With driver

(Excluding cost of fuel)Per day/8 hours 375.80

i. Concrete mixer 7 Cft. With driver(Excluding cost of fuel)

Per day/8 hours 567.05

j Hand operated winch Per day/8 hours 37.95j Hand operated winch Per day/8 hours 37.95k Pile cap Per day/8 hours 10.15l Hire charges for diesel pumpset upto 3 HP with fuel and

crew charges including transportation Per hour 115.45

m Hire charges for diesel pumpset above 3 HP to 7.5 HP Per hour 160.65

19 a Labour for tying barbed wire fencing horizontally throughthe holes in RCC posts with required tension. One metre 4.30

b Labour for tying barbed wire fencing vertically withrequired tension

One metre 4.30

20 Labour charges for putting bore holes of size 3" to 4" inriver bed in sandy and other loose soils using handboring sets including the cost of hire charges,conveyance charges of hand boring sets, collection ofsoil sample at frequent intervals and as directed byTWAD Board Officers.

One metre 224.45

21 Desilting light or sandysoil or silt from infiltration wellsbelow water level including the charges for special T&Pand air compressor etc. complete. One cubic metre 892.40

Page 196: twad 13-14

RATES FOR EARTHWORK EXCAVATION FOR PIPE

LAYING WORKS

Page 197: twad 13-14

ScheduleitemNo

Description UnitRate inRupees

1 Earth work excavation and depositing on bank with initiallead of 10 m and lift of 2 M in narrow trenches for layingof pipes for water supply and sewerage works in thefollowing type of soils as directed by Departmentalofficers

a Sand, silt or other loose soil, wet sand or silt not underwater light black cotton soil, sandy loam and ordinarysoil.

One cubicmetre

70.00

b Hard stiff clay, stiff black cotton, hard red earth, shales,murram gravel, stoney earth and earth mixed with smallsize boulders and hard gravelly soil.

One cubicmetre

104.63

DismantlingII Dismantling, clearing away and carefully stacking

materials useful for reuse for any thickness of walls

Brick / stone in clay walls under 3 m high cu.m 25.65

2 Brick / stone in clay walls, add for every additional3 m or part there of over the initial height of 3 m cu.m 8.60

3 Mud / sun dried brick walls under 3 m high cu.m 17.25

4 Mud / sun dried brick walls, add for every additional3 m or part thereof over the initial height of 3 m cu.m 5.05

EARTH WORK EXCAVATION FOR PIPE LAYING WORKS

4 Mud / sun dried brick walls, add for every additional3 m or part thereof over the initial height of 3 m cu.m 5.05

5 Brick / stone masonry in lime mortar walls under3 m high cu.m 78.65

6 Brick / stone masonry in lime mortar walls, add for everyadditional 3 m or part thereof over the initial height of 3m

cu.m 8.80

7 Brick or stone masonry in Cement mortar walls under3 m high cu.m 96.40

8 Brick or stone masonry in Cement mortar walls,add forevery additional 3 m or part thereof over the initialheight of 3 metre

cu.m 10.35

9 Terracing work in roof or floor sqm 26.10

10 Flag stone in roof or floor including lifting sqm 13.90

11 Cut stone slab over culverts upto 3.3.m height belowground level cu.m 400.80

12 Cut stone slab over culverts over 3.3.m height belowground level cu.m 417.80

13 Removal of cut stone slab / RCC Cover slab sqm 176.30

14 Refixing cut stone slabs/ RCC Cover slab sqm 192.00

15 Pantile or Mangalore tiled roof without roof timbers sqm 6.90

16 Flat and Pan tiles or Mangalore tiles over flat tiles,without roof timbers sqm 9.60

17 Asbestos cement sheets roofing without roof timbers sqm 6.30

17 Asbestos cement sheets roofing without roof timbers sqm 6.30

18 Corrugated iron sheet roofing over pan tiles, withoutroof timbers sqm 10.35

Page 198: twad 13-14

ScheduleitemNo

Description UnitRate inRupees

19 Old Thatched roof, including tying materials into smallbundles for reuse sqm 3.10

20 Wrought and put up framed timbers in roofs / floorscu.m 252.30

21 Doors and windows including removal of frames, hingesand fastenings sqm 52.15

22 Drystone apron or revetment, stacking within 40 m leadcu.m 44.85

23 Grouted stones apron or revetment, stacking within 40m lead cu.m 52.15

24 Dry stone masonry walls cu.m 38.15

25 *Dismantling lime concrete cu.m 122.1026 *Dismantling plain cement concrete cu.m 165.60

27 *Dismantling reinforced cement concrete cu.m 2515.00

Note * 1) The rate for dismantling lime concrete, cementconcrete and R.C. concrete are exclusive of balingcharges. The rate is same in all floors.2) For dismantling below ground level 25% extra overthe basic rates (i.e. the rates already available in theschedule of rate) for dismantling is allowed.

Note * 1) The rate for dismantling lime concrete, cementconcrete and R.C. concrete are exclusive of balingcharges. The rate is same in all floors.2) For dismantling below ground level 25% extra overthe basic rates (i.e. the rates already available in theschedule of rate) for dismantling is allowed.

28 Chipping of concrete and roughening the surface sqm 13.90

29 Pressed tiles & weathering course sqm 16.00

30 One course of pressed tile roof finish in Cement Mortar sqm 8.90

31 One course of terrace bricks roof finish in Cement Mortar sqm 10.35

32 Two course of flat tiles roof finish in Cement Mortar sqm 10.35

33 Mosaic in situ finish in cement mortar in flooring and inwall surface sqm 21.50

34 Floor finish and dadooing walls in Cement Mortar withmosaic tiles/ glazed tiles/ cuddapah slabs. sqm 20.80

35 1. Clearing the site

a Clearing Heavy jungle sqm 3.10

b Clearing Light jungle sqm 2.35

c Clearing Scrub jungle sqm 2.15

d Uprooting and removing large palmyrah/ coconutstumps each 60.30

e Uprooting and removing small palmyrah/ coconutstumps each 43.10

f Removing weeds in channel and drain sqm 0.90

g Cleaning juliflora jungle with uprooting sqm 3.45

h Cleaning juliflora jungle without uprooting sqm 2.65h Cleaning juliflora jungle without uprooting sqm 2.65

Page 199: twad 13-14

RATES FOR EARTH WORKEXCAVATION AND REFILLING FOR

PIPELINE WORKS ON LINEARMEASUREMENT BASIS

Page 200: twad 13-14

ScheduleitemNo

Description UnitRate inRupees

36 QUARRYING AND BLASTING

a Hard rock measured in solid including blasting andstacking Cu.m 297.00

b Removing hard rock by wedging chiselling and trimmingto proper shape where blasting is prohibited. Cu.m 594.00

c Medium rock and dense medium rock requiring blastingCu.m 152.00

d Extra for every additional 10 metres lead or part thereofover the initial lead for blasted materials Cu.m 3.65

e Extra for every additional 1 metre lift or part thereof overthe initial lift of 2 m for blasted materials Cu.m 3.80

f Benching hard rock upto an average 10cm depth Sq.m 287.00

g Drilling holes in hard granite 40mm diameter RM 96.30

Note : Definition of large and small stumps : The Diameter of Stumps shall be 1/3 of thecircumferance at a point 0.6 m above the highest ground level at the stump or thecircumferance near the top of the stump if the stump is less than 0.60 m in height (Themeasurement for circumferance and determination of the diameter will be to the nearest fullcentimetre). Only stumps with Circumferance of 30 cm and more will be measured forpayment. The Sl. No d, is for Stumps of Diameter above 30 cm and Sl. No. e is for stumpsof diameter 15 to 30 cm.

g Drilling holes in hard granite 40mm diameter RM 96.30

h Drilling holes in hard granite 45mm diameter RM 112.45I Drilling holes in hard granite 50mm diameter RM 133.95j Drilling holes in hard granite 75mm diameter RM 152.15

k Drilling holes in hard granite 32mm diameter RM 82.65

Note :1) A deduction of 40 percent is to be made for the quantity of voids and stackmeasurement and payment is for the lesser of two viz. Solid measurement or stackmeasurements less 40 percent of stack measurement for voids.2) The rates for extra lead and lift are on the quantity as per the solid measurementor stack measurement less 40 percent for voids whichever is less. These rates areapplicable for headload only.3) Payment for blasting the rock in solid shall be made for the lesser of the twoquantities obtained by a) Measurement recorded by levels or measurement and b)by stack measurement less deduction for voids (This foot note is applicable for allitems of rock measured in solid)

Page 201: twad 13-14

RATES FOR EARTH WORKEXCAVATION OTHER THAN PIPE

LAYING AND WELLS

Page 202: twad 13-14

Type Pipesize inmm

Widthin ‘m’

Depthin ‘m’

Earthworkqty. incum/m

Outer diaof pipe in‘m’

RefillingQty/cum/m

Earthwork ratefor otherthanloosesoil/m Rs.

Earthwork ratefor loosesoil/m

Rs.

Refillingrate/m

Rs.

CI/ DI/MS

80 0.75 1.05 0.79 0.098 0.780 82.66 55.30 11.47

100 0.75 1.05 0.79 0.118 0.777 82.66 55.30 11.42125 0.75 1.05 0.79 0.144 0.771 82.66 55.30 11.33150 0.75 1.05 0.79 0.170 0.765 82.66 55.30 11.25200 0.80 1.10 0.88 0.222 0.841 92.07 61.60 12.36250 0.80 1.20 0.96 0.274 0.901 100.44 67.20 13.24300 0.80 1.35 1.08 0.326 0.997 113.00 75.60 14.66350 0.90 1.45 1.31 0.378 1.193 137.07 91.70 17.54400 0.90 1.55 1.40 0.429 1.251 146.48 98.00 18.39450 1.00 1.70 1.70 0.480 1.519 177.87 119.00 22.33500 1.00 1.85 1.85 0.532 1.628 193.57 129.50 23.93525 1.00 1.85 1.85 0.532 1.628 193.57 129.50 23.93600 1.10 2.05 2.26 0.635 1.938 236.46 158.20 28.49

WORKS ON LINEAR MEASUREMENT BASISRATES FOR EARTH WORK EXCAVATION AND REFILLING FOR PIPE LINE

Cost of EWE 104.63Cost of refilling 14.70Cost of loose soil 70.00

600 1.10 2.05 2.26 0.635 1.938 236.46 158.20 28.49700 1.20 2.30 2.76 0.738 2.332 288.78 193.20 34.28750 1.25 2.45 3.06 0.790 2.573 320.17 214.20 37.82

AC Cl 15 80 0.75 1.05 0.79 0.104 0.779 82.66 55.30 11.45

100 0.75 1.05 0.79 0.124 0.775 82.66 55.30 11.39125 0.75 1.05 0.79 0.151 0.770 82.66 55.30 11.32150 0.75 1.05 0.79 0.178 0.763 82.66 55.30 11.22200 0.80 1.10 0.88 0.235 0.837 92.07 61.60 12.30250 0.80 1.20 0.96 0.286 0.896 100.44 67.20 13.17300 0.80 1.35 1.08 0.340 0.989 113.00 75.60 14.54350 0.90 1.45 1.31 0.396 1.162 137.07 91.70 17.08400 0.90 1.55 1.40 0.452 1.235 146.48 98.00 18.15450 1.00 1.70 1.70 0.502 1.502 177.87 119.00 22.08500 1.00 1.85 1.85 0.559 1.605 193.57 129.50 23.59600 1.10 2.05 2.26 0.658 1.915 236.46 158.20 28.15

ACCl 10

80 0.75 1.05 0.79 0.104 0.779 82.66 55.30 11.45

100 0.75 1.05 0.79 0.124 0.775 82.66 55.30 11.39125 0.75 1.05 0.79 0.149 0.770 82.66 55.30 11.32150 0.75 1.05 0.79 0.175 0.763 82.66 55.30 11.22200 0.80 1.10 0.88 0.229 0.839 92.07 61.60 12.33250 0.80 1.20 0.96 0.281 0.898 100.44 67.20 13.20300 0.80 1.35 1.08 0.333 0.993 113.00 75.60 14.60350 0.90 1.45 1.31 0.389 1.186 137.07 91.70 17.43

400 0.90 1.55 1.40 0.436 1.246 146.48 98.00 18.32

Page 203: twad 13-14

Type Pipesize inmm

Widthin ‘m’

Depthin ‘m’

Earthworkqty. incum/m

Outer diaof pipe in‘m’

RefillingQty/cum/m

Earthwork ratefor otherthanloosesoil/m Rs.

Earthwork ratefor loosesoil/m

Rs.

Refillingrate/m

Rs.

450 1.00 1.70 1.70 0.486 1.515 177.87 119.00 22.27

500 1.00 1.85 1.85 0.541 1.620 193.57 129.50 23.81600 1.10 2.05 2.26 0.648 1.925 236.46 158.20 28.30

PVC/HDPE/GRP

40 0.60 1.05 0.63 0.040 0.629 65.92 44.10 9.25

50 0.60 1.05 0.63 0.050 0.628 65.92 44.10 9.2363 0.60 1.05 0.63 0.063 0.627 65.92 44.10 9.2275 0.60 1.05 0.63 0.075 0.626 65.92 44.10 9.20

90 0.60 1.05 0.63 0.090 0.624 65.92 44.10 9.17

110 0.60 1.05 0.63 0.110 0.621 65.92 44.10 9.13125 0.60 1.05 0.63 0.125 0.618 65.92 44.10 9.08140 0.60 1.05 0.63 0.140 0.615 65.92 44.10 9.04160 0.60 1.05 0.63 0.160 0.610 65.92 44.10 8.97180 0.75 1.05 0.79 0.180 0.760 82.66 55.30 11.17200 0.80 1.10 0.88 0.200 0.850 92.07 61.60 12.50

PSC/BWSC

350 0.90 1.45 1.31 0.464 1.136 137.07 91.70 16.70PSC/BWSC

350 0.90 1.45 1.31 0.464 1.136 137.07 91.70 16.70

400 0.90 1.55 1.40 0.514 1.188 146.48 98.00 17.46450 1.00 1.70 1.70 0.564 1.450 177.87 119.00 21.32500 1.00 1.85 1.85 0.614 1.554 193.57 129.50 22.84600 1.10 2.05 2.26 0.724 1.844 236.46 158.20 27.11700 1.20 2.30 2.76 0.824 2.227 288.78 193.20 32.74800 1.25 2.45 3.06 0.934 2.378 320.17 214.20 34.96900 1.40 2.60 3.64 1.054 2.768 380.85 254.80 40.691000 1.70 2.60 4.42 1.150 3.381 462.46 309.40 49.701100 1.80 2.75 4.95 1.250 3.723 517.92 346.50 54.731200 1.90 3.00 5.70 1.350 4.269 596.39 399.00 62.75

GI 15 0.75 1.05 0.790 0.020 0.787 82.66 55.30 11.5720 0.75 1.05 0.790 0.030 0.787 82.66 55.30 11.5725 0.75 1.05 0.790 0.030 0.787 82.66 55.30 11.5732 0.75 1.05 0.790 0.040 0.786 82.66 55.30 11.5540 0.75 1.05 0.790 0.050 0.786 82.66 55.30 11.5550 0.75 1.05 0.790 0.060 0.786 82.66 55.30 11.5565 0.75 1.05 0.790 0.070 0.784 82.66 55.30 11.5280 0.75 1.05 0.790 0.090 0.781 82.66 55.30 11.48100 0.75 1.05 0.790 0.110 0.778 82.66 55.30 11.44125 0.75 1.05 0.790 0.140 0.772 82.66 55.30 11.35150 0.75 1.05 0.790 0.160 0.767 82.66 55.30 11.27

0.00 0.00 0.00Note:Earth excavation in SDR, DMR,HR etc., the linear measurement rate may be worked outseparately and to be approved by the SE concerned after verification of soil classifications byputting proper trial pits at closer intervals".( B.P.Ms.No.82/COM Wing/dt.22.8.2008).

Page 204: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

Earthwork excavating and depositing on bank with aninitial lead of 10 meters and initial lift of 2 metres in

1Sand, silt or other loose soil, wet sand or silt not underwater, light black cotton soil sandy loam and ordinarysoil including excavated earth SS 20 B

Cu.m 28.00

2Slush and silt under water upto 0.75 metre depthrequiring the aid of baskets and vessels SS 20 B

Cu.m 35.00

3Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed withsmall size boulders SS 20B

Cu.m 41.85

4Soft disintegrated rock, laterite, soft rock or kankar, notrequiring blasting

Cu.m 62.30

5In loose boulders in excavation of various sizes 150mmto 625mm

Cu.m 98.65

6Medium rock and dense medium rock not requiringblasting

Cu.m 109.80

EARTH WORK EXCAVATION FOR SEWERAGE WORKS

6Medium rock and dense medium rock not requiringblasting

Cu.m 109.80

QUARRYING AND BLASTING

aHard rock measured in solid including blasting andstacking

Cu.m 297.00

bRemoving hard rock by wedging chiselling and trimmingto proper shape where blasting is prohibited.

Cu.m 594.00

c Medium rock and dense medium rock requiring blasting Cu.m 152.00

dExtra for every additional 10 metres lead or part thereofover the initial lead for blasted materials

Cu.m 3.65

eExtra for every additional 1 metre lift or part thereofover the initial lift of 2 m for blasted materials

Cu.m 3.80

f Benching hard rock upto an average 10cm depth Sq.m 287.00

g Drilling holes in hard granite 32mm diameter RM 82.65

h Drilling holes in hard granite 40mm diameter RM 96.30

i Drilling holes in hard granite 45mm diameter RM 112.45

j Drilling holes in hard granite 50mm diameter RM 133.95

k Drilling holes in hard granite 75mm diameter RM 152.15

NOTE:

Double the relevant rate will apply in excavation in all the soils and rock classifications.

Page 205: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

Earthwork excavating and depositing on bank with aninitial lead of 10 meters and initial lift of 2 metres in

1Sand, silt or other loose soil, wet sand or silt not underwater, light black cotton soil sandy loam and ordinary soilincluding excavated earth SS 20 A

Cu.m 30.75

2Sand, silt or other loose soil, wet sand or silt not underwater, light black cotton soil sandy loam and ordinary soilincluding excavated earth SS 20 B

Cu.m 28.00

3Slush and silt under water upto 0.75 metre depthrequiring the aid of baskets and vessels SS 20 B

Cu.m 35.00

4Trimming the bed and side slope of the bank in all soilsexcept hard rock upto a thickness of 7.5 cm and makingit ready to receive the concrete.

Sq.m 7.25

4a 7.50 cm to 15cm thick Sq.m 8.80

5Sectioning during forming bunds when earth movingmachinery, lorries and rollers are used for consolidation.

Cu.m 5.40

6Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with smallsize boulders SS 20A

Cu.m 44.60

EARTH WORK EXCAVATION OTHER THAN PIPE LAYING WORKSAND WELLS

6Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with smallsize boulders SS 20A

Cu.m 44.60

7Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with smallsize boulders SS 20B

Cu.m 41.85

8Soft disintegrated rock, laterite, soft rock or kankar, notrequiring blasting

Cu.m 62.30

9In loose boulders in excavation of various sizes 150mmto 625mm

Cu.m 98.65

10Medium Rock and Dense Medium Rock not requiringblasting

Cu.m 109.80

11Extra for every additional 10 meters lead or part thereofover the initial lead

Cu.m 5.25

12Extra for every additional 1 meters lift or part thereofover the initial lift

Cu.m 4.25

13 Breaking clods, consolidating and sectioning Cu.m 2.65

14Breaking clods, consolidating and sectioning the earthscooped by bull dozers

Cu.m 7.90

15Add relevant TNDSS No.20A, rates for new tank bundsand closing breaches for extra watering andconsolidation.

a) By hand roller Cu.m 8.80

b) By power roller including hire charges Cu.m 14.70

16 Benching old embankment slopes 45cm x 45cm Cu.m 1.75

17 Puddle wall work Cu.m 69.55

18Turfing in slopes including watering and fixing with initiallead upto 50m.

Sq.m 14.7018Turfing in slopes including watering and fixing with initiallead upto 50m.

Sq.m 14.70

Page 206: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

19aRefilling with excavated sand complying with standardspecification for filing in foundation and basement

Cu.m 13.00

19.bRefilling with excavated soil (other than sand) complyingwith the standard specification for filing in foundation andbasement

Cu.m 14.70

Note:a) Standard specification No.20-A requires breaking clods, ramming and sectioningof spoil bank for which separate rate will not be paid.

b) Standard specification No.20/B does not require breaking clods, ramming andsectioning but requires neat banking in accordance with the standard specifications.

c) Double the relevant rate for standard specification No.20-B will apply to excavation inall the soils and rock classification given above for foundation of buildings, piers, wingsand returns of bridges, culverts, sluices, regulators and cross masonry works, retainingwalls, toe walls, cut-off walls and body walls of anicuts weirs, retaining walls of causeways, road dam, pits for avenue trees, and pits for poles and towards and catch waterpits.

d) An extra 50 percent over the rates for ordinary excavation in all the soils and rockclassification given above shall be allowed for drains, channels, contour trenches andcanals having bed width 1.25 m and below. The extra percentage is applicable any fordepth up to 2.00m the depth being measured from the bottom of excavation.

e) An extra 25 percent over the rates for ordinary excavation in all the soils and rockclassification given shall be allowed for drains, channels and canals having bed width1.25m to 2.00m. The extra percentage is applicable only for depth up to 2.0m the depthbeing measured from the bottom of excavation.

The following foot note is applicable for the classifications of soils come under" Quarrying and blasting" and "Earth Work"

f) These rates for earth work do not include baling charge. The baling charges are to bepaid as per actual in case baling is done departmentally or at actual plus 10 percentextra in case baling is done by other agencies. However for estimate purpose balingcharges are to be provided at 10 percent of the rates of respective items of excavationin all soils including medium rock and dense medium rock and at 5 percent of the ratesfor excavation in hard rock.

g) Double the relevant rate for standard specification No.20B for excavation in all soilsand rock classification given above shall be allowed for circular trenches for soil andmoisture conservation having bed width of 0.25m and below with side slope of 1/2:1and not less than 0.75 m in depth.

e) An extra 25 percent over the rates for ordinary excavation in all the soils and rockclassification given shall be allowed for drains, channels and canals having bed width1.25m to 2.00m. The extra percentage is applicable only for depth up to 2.0m the depthbeing measured from the bottom of excavation.

Page 207: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

1

Earth work open well excavation, complying with relevant clausesof T.N.D.S.S. Well sinking and with lead up to 10 metres in sand,silt or other loose soil, Wet sand or silt not under water, light blackcotton soil, sandy loam and ordinary soil - First depth of 2 metres.

Cu.m 28.00

2

Earth work open well excavation, complying with relevant clausesof T.N.D.S.S. Well sinking and with lead upto 10 metres in Hardstiff clay, stiff black cotton soil, hard red earth, shales murramsgravel, stoney earth and earth mixed with small size boulders andhard gravelly soil - First depth of 2 metres

Cu.m 41.75

3

Earth work open well excavation, complying with relevant clausesof T.N.D.S.S. Well sinking and with lead up to 10 metres in softdisintegrated rock, laterite, soft rock or kankar, not requiringblasting - First depth of 2 metres

Cu.m 64.20

4

Open well excavation, complying with relevant clauses ofT.N.D.S.S. Well sinking and with lead up to 10m in Medium rockand Dense medium rock not requiring blasting.First depth of 2 metres

Cu.m 104.40

5

Open well excavation complying with relevant clauses of T.N.D.S.S.well sinking and with lead up to 10m in Medium rock and Densemedium rock requiring blasting. First depth of 2 metres Cu.m 156.95

OPEN WELL EXCAVATION

5

Open well excavation complying with relevant clauses of T.N.D.S.S.well sinking and with lead up to 10m in Medium rock and Densemedium rock requiring blasting. First depth of 2 metres Cu.m 156.95

6

Open well excavation complying with relevant clauses of T.N.D.S.S.well sinking and with lead up to 10m in hard granite measured insolid including blasting and stacking - First depth of 2 metres Cu.m 304.25

7

Sinking well in loose soils, light black cotton soil, sandy loam andordinary soil under water including bailing or pumping charges ifnecessary etc., complete - First depth of 2 metres

Cu.m 43.35

8Sinking well in sand, including bailing or pumping charges ifnecessary etc. complete - First depth of 2 metres Cu.m 60.75

9

Sinking well in hard stiff clay, light black cotton soil, hard redearth, shales, murram, gravel, stoney earth and earth mixed withsmall size boulders and hard gravelly soil including bailing orpumping charges if necessary etc. complete - First depth of 2metres

Cu.m 60.75

Note : Open well Excavation

d) For open well excavation for rates up to 12m depth the progression would be x, 2x, 3x, 4x, 5x, and6x and rate beyond 12 metre depth the progression should be 8x, 10x, 12x, 14x and 16x and so on.

a) Up to 2m diameter of wells 10 percent excess will be allowed over the basic rates for open wellexcavation.b) The rates do not include baling charges. If the dewatering is to be done departmentally, 10 percentof cost of excavation shall be allowed for dewatering for estimate purposes. Actual or 10 percentwhichever is less to be allowed for dewatering charges. For any expenditure above this percentageprior approval of the competent authority should be obtained.c) Stage depth rates for well excavation" The stage depth for adopting the rates from the schedule ofrates should be reckoned from ground level only irrespective of the fact, whether there is parapetwall or not.

Page 208: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

1 Earth work in all soils except hard rock requiring blasting andconveying for formation of bund with lead of 0 to 100 metredeploying earth moving machineries and tippers includingbenching, formation of bunds, breaking clods, sectioning etc.,complete.

Cu.m 45.30

1.a. Earth work in all soils except hard rock requiring blasting andconveying for formation of bund with an extra lead of every100 metre or part thereof deploying earth moving machineriesand tippers including benching, formation of bunds, breakingclods, sectioning etc., complete.

Cu.m 3.65

2 Earth work deploying earth moving machineries for desiltingchannel and forming bund on either side and depositing theearth on banks including jungle clearance etc., complete.

a. Having width up to 3 m Cu.m 26.80

b. Having width up to 3 m – 10 m Cu.m 32.65

3 Earth work excavation deploying earth moving machineries fordesilting channel having a width of more than 10 m andforming bund on either side and depositing the earth on banksincluding jungle clearance etc., complete.

Cu.m 38.10

Lift charges - concrete - Brick or stone Masonry above orbelow ground levelNote: The rate for lime concrete, cement concrete, reinforcedcement concrete, brick work and stone masonry worked out asper Standard Data will apply to basement and foundation up toa depth of 1.50 m below ground level only (basic rate)

RATE FOR EARTH WORK BY DEPLOYING MACHINERIES

Note: The rate for lime concrete, cement concrete, reinforcedcement concrete, brick work and stone masonry worked out asper Standard Data will apply to basement and foundation up toa depth of 1.50 m below ground level only (basic rate)

Statement I

a) Concrete above ground level

1 Add to the basic rate for works up to 4.50m height in groundfloor (height to be reckoned from floor level i.e. plinth level inground level)

Cu.m 44.65

2 Add for works in every upper floor over the rate of precedingfloor

Cu.m 89.00

3 Brick or stone masonry above ground level

i. Add to the basic rate for works up to 4.50m height in groundfloor (height to be reckoned from floor level i.e. plinth level inground level)

Cu.m 29.55

ii. Add for works in every upper floor over the rate of precedingfloor

Cu.m 59.40

Note: i) For the works above 4.5m height in individual floor the rate of next floormay be taken. The extra rates allowed for building works are applicable toirrigation works and road works also. The extra rates may be allowed for thestructures beyond 1.00m above ground level.

ii) The extra rates may be allowed considering the ground level as datum in respectof service reservoirs (where there is no plinth level)

Page 209: twad 13-14

ScheduleItem No.

Description Unit Rate inRupees

Statement II

a) Concrete below ground level

1 Add the basic rate for works above 1.5m depth and up-to 4.5mdepth below ground level

Cu.m 44.05

2 Add the basic rate for works above 4.5m depth and up-to 9.0 mdepth below ground level

Cu.m 88.35

3 Add extra over the above item 2 for every additional 4.5mdepth beyond 9m depth below ground level

Cu.m 88.35

B) Brick or stone masonry below ground level

1 Add the basic rates for works above 1.5m depth and up to4.5m depth below ground level

Cu.m 29.55

2 Add the basic rates for works above 4.5m depth and up to9.0m depth below ground level

Cu.m 59.40

3 Add extra over the above item 2 for every additional 4.5mdepth beyond 9m depth below ground level

Cu.m 59.40

Note :1. The above extra rates are applicable for buildings, irrigations, and road works.

2. First Grade stone includes hard granite, trap, etc. second Grade stone includes gneiss, limestone etc.

3. The class of materials to be used should always be defined in the items, description intender schedules, contract schedules etc.

4. For reinforced cement concrete work, only the hardest locally available stone will be used, ifit has good bonding surface and is otherwise suitable proportions for concrete are defined inthe relevant standard specification.

5. Note under Sl.No.179 to 187 in the standard data book applies to arches over doors andwindows. For large arches in bridges and irrigation works, addition to this rate extra cost ofcentering is to be made.

6. For concrete mix

a. Equal mixes (i.e.) 50 percent mortar mixes only should be adopted for plain concrete forfoundation, flooring and RC Concrete for roofs, lintels, etc. wherever cement is used with hardbroken stones or brick jelly.

3. The class of materials to be used should always be defined in the items, description intender schedules, contract schedules etc.

b. 40 percent or 50 percent mortar mixer may be adopted where lime concrete with brickaggregate is used according to the condition at site.

4. For reinforced cement concrete work, only the hardest locally available stone will be used, ifit has good bonding surface and is otherwise suitable proportions for concrete are defined inthe relevant standard specification.

Page 210: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

CONCRETE VIBRATORS

1

Where vibrators are specified for consolidation in plain Cementconcrete, this rate per cu.m over and above the provision madein the standard data book for consolidation with manual labourmay be allowed.

Cu.m 26.20

2

Where vibrators are specified for consolidation in RCC this rateper cu. m over and above the provision made in the standarddata book for consolidation with manual labour may beallowed.

Cu.m 35.25

1 Clean removal of lime plaster from walls and racking out joints20mm deep or from terraced roofs racking out joints 12mmdeep

sq.m 3.65

2 Clean removal of lime plaster from walls sq.m 2.85

3 Clean removal of cement plaster from walls sq.m 3.054 Clean removal of cement plaster from walls and racking out

joints 20mm deep sq.m 3.95

1 Thorough scrapping of old plastered surface sq.m 1.70

2Washing of plastered surface with soap, soda and water( orwith soda, lime, brush and water)

sq.m 2.10

1Removing old paints from doors and windows by blow lamp andscrapping, including removal and refitting of shutters

sq.m 13.05

Plastering

White washing and colour washing and distempering

Painting, Wood Oiling, Tarring, Varnishing, Bee's Waxing etc

1Removing old paints from doors and windows by blow lamp andscrapping, including removal and refitting of shutters

sq.m 13.05

2Removing old paints from doors and windows by scrapping andrefitting of shutters

sq.m 5.55

3Removing paints from doors, windows and wood work bymanual labour

sq.m 3.80

4Removing old paint from structural steel by blow lamp or sandpaper

sq.m 7.90

5Re-polishing the mosaic flooring including polishing stone andhire charges for polishing machine but excluding cost ofelectrical charges.

sq.m 7.70

6Scrapping and removing old paint from structural steel bymanual labour

sq.m 3.55

7 Removing old paint from iron surface with sand paper sq.m 3.35

Page 211: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

I.

Supplying & filling up the empty cement gunny bag with sand,stitching them conveying the same to site – and stacking asdirected with in a lead of 10m excluding cost of bags, jute,thread, needle, sand etc. (labour only)

bag 3.35

ii. Driving piles upto 15 cm dia in river bed RM 10.25

iii.Pointing the edge and driving bamboo/ casuarinas/ eucalyptuspiles into river bed for the first 1m depth below ground level

Each 8.80

iv.Driving bamboo/ Casuarinas/ Eucalyptus piles into groundbeyond 1m depth from ground level. For every 1m (or) partthereof

RM 8.80

River Conservancy of Korambu Works

v.Brush wood bundles one metre girth and one metre long withinan initial lead of 1.6 KM

Onebundle

1.75

vi. Extra for every additional lead of 1.6 KM (for the above item)One

bundle0.20

vii.Driving casuarinas piles into bed including scaffolding etc.,complete

RM 4.30

viii.Casuarinas walling pieces 40mm to 50mm diameter includingfixing with nails and tying with ropes.

RM 5.90

Labour wrought and put up for doors windows and ventilators

Miscellaneous

1Labour wrought and put up in position of frames inclusive offixing hold fast for doors, windows and ventilators etc.

Cu.m 5117.00

2

Labour wrought and put up in position of shutters for fullypaneled doors (external or internal) moulded panels includinglabour charges for fixing furniture fittings, complying withstandard drawings and standard specifications.

sq.m 577.30

3

Labour wrought and put up in position of shutters for fullypaneled doors internal five plywood panels including labourcharges for fixing furniture fittings, complying with standarddrawings and standard specifications

sq.m 480.70

4

Labour wrought and put up in position of shutters for glazedand paneled doors including labour charges for fixing furniturefittings, complying with standard drawings and standardspecifications.

sq.m 537.00

5

Labour wrought and put up in position of shutters for framedand planked doors including labour charges for fixing furniturefittings, complying with standard drawings and standardspecifications

sq.m 447.35

6

Labour wrought and put up in position of shutters for ledgedand braced and planked doors including labour charges forfixing furniture fittings complying with standard drawings andstandard specifications

sq.m 303.60

7Labour wrought and put up in position of shutters for glazedwindows including labour charges for fixing furniture fittings,complying with standard drawings and standard specifications

sq.m 537.00

8Labour wrought and put up in position of shutters for windowspanelled including labour charges for fixing furniture fittings,complying with standard drawings and standard specifications

sq.m 577.30

Labour wrought and put up for doors windows and ventilators

Page 212: twad 13-14

ScheduleItem No.

Description UnitRate inRupees

9

Labour wrought and put up in position of shutters for windows,ledged braced and planked doors including labour charges forfixing furniture fittings, complying with standard drawings andstandard specifications

sq.m 303.60

10

Labour wrought and put up in position frames, shutters forventilators glazed fixed double frames and with wire nettingcomplete fixed in position in accordance with standard drawingand standard specifications.

sq.m 480.70

11Labour wrought and put up in position frames shutters forswing ventilators and fixed in position in accordance standarddrawing and standard specifications.

sq.m 448.50

12Labour charges for fixing doors along with frames in positionetc. complete(finished work)

sq.m 86.25

13Labour charges for fixing windows and ventilators along withframes in position etc. complete

sq.m 108.10

14Labour wrought and put up in position flush shutters for singleleaf shutters.

sq.m 80.20

15 Double leaf shutters sq.m 124.20

16Labour wrought and put up in position fly proof wire gaugeshutters for doors and windows and ventilators

sq.m 287.5016Labour wrought and put up in position fly proof wire gaugeshutters for doors and windows and ventilators

sq.m 287.50

17Labour wrought and put up for providing teak wood weld meshscreen with frames 3"x3" (0.075mx0.075m)

sq.m 400.00

Breaking metals

i.Labour charges for breaking 40mm metal from departmentalblasted stones

Cu.m 152.95

ii.Labour charges for breaking 20mm metal from departmentalblasted stones

Cu.m 228.85

iii.Labour charges for breaking 50mm metal from departmentalblasted stones

Cu.m 91.40

Cement Mortar

i. Grinding Mortar (Special Grinding lime) Cu.m 138.85

ii. Grinding Mortar (Ordinary Grinding lime) Cu.m 105.90

iii. Mixing Mortar – Cement by manual Cu.m 43.35

iv. Mixing Mortar- Cement by Machine Mixing Cu.m 57.60

Metal & Iron works

i.Petty ironwork for truss, straps etc. (Wrought & fixed) labouronly

Kg 20.80

ii. Iron works for trusses & record racks (labour only) kg 19.25

iii. Fixing mild steel grills for windows, ventilators, etc. Kg 12.00

iv. Fixing MS rods round/square for windows Kg 11.20

v. Fixing iron bars in windows and ventilators Kg 11.20