TERMINOLOGY for UNDERGROUND STRUCTURES

Adit.....................................galeri Tunnel................................tünel Subway..............................metro Shaft...................................baca Chamber............................oda Portal.................................ana giriş veya çıkış Pilot adit.............................yan galeri, pilot galerisi Centre................................merkez, eksen Face...................................ayna Wall ~ site..........................yan, kenar, duvar Floor...................................taban Roof...................................tavan

Page 3: Tunnels

Overbreak.............................aşırı sökülme Excavated profile..................kazı profili Natural archling....................doğal kemerlenme Load......................................yük Support.................................destek, iksa Failure...................................yenilme, çökme Gentle failure........................yavaş yenilme Rock burst............................kaya patlaması Squeezing ground................sıkışan zemin Swelling ground....................şişen zemin Clay-filled joint.......................kil dolgulu eklem Long term stability.................uzun süreli duraylılık Ground treatment..................zemin iyileştirmesi Support before excavation....kazı öncesi destekleme

Page 4: Tunnels

Jet grouted roof cover..............jet grouting ile iyileştirilmiş tavan örtüsü

Shotcrete initial lining..............püskürtme beton başlangıç çizgisi

Jet grouted floor cover............jet grouting ile iyileştirilmiş döşeme

Top heading............................kalot (Crown) Invert.......................................stros (Bottom excavation) Bench......................................üzengi çizgisi Final concrete lining................sonuncu beton kaplama

(nihai beton kaplama çizgisi) SHIELD tunnelling method..............KALKAN Yöntemi CUT & COVER tunnelling method....AÇ-KAPA Yöntemi TBM (Full face ~ Total Boring Machine).....TÜM KESİT

KAZI MAKİNASI

Page 5: Tunnels

TERMINOLOGY for EXCAVATIONS of ROCKS & SOILS

DRILLING....................Sondalama Hardness.........................Sertlik Toughness.......................Dayanım – direnç Abrasiveness...................Aşındırıcılık Structure..........................Jeolojik yapı Drilkling fluids..................Sondaj sıvısı

AUGERING..................Burgulama MACHINE BORING.....Mekanize tünel açma

Total Boring Machine (TBM) Full face excavation

BLASTING...................Patlatma

Page 6: Tunnels

SCRAPING...................Kazıma (makinayla) RIPPING.......................Kırarak kazıma DIGGING......................Kazma GROUND WATER........yeraltısuyu

Control of groundwater Groundwater flow Rate of flow Volume of flow Boundaries

Page 7: Tunnels

TUNNEL DESCRIPTION

1. Made into natural material (rocks)

2. Empty inside

3. Carry the loads itself

4. Both ends are open to atmosphere

5. Generally horizontal

6. Thick walled structure looks like cylinder

Page 8: Tunnels
Page 9: Tunnels

1- Kilit (anahtar) taşı........................Key stone

2- Kemer...........................................Arch

3- Ayak (duvar)................................Wall

4- Taban...........................................Floor

5- Üzengi..........................................Bench

6- Üzengi çizgisi (düzeyi)...............Bench line or plane

7- Kalot............................................Top heading

8- Stros............................................Invert

9- Ano..............................................Ano (unit)

Page 10: Tunnels

Tunnel Section for Swelling Ground

1- Digging section

2- Support

3- Swelling section

4- Pressurized area

5- Flow direction of water

Page 11: Tunnels

SURFACE EXCAVATIONS

Deformation & failure

Page 12: Tunnels

UNDERGROUND EXCAVATIONS In Rock In Sediment

Stability & Arching Water

Dry tunnel...............above water table Wet tunnel..............below water table

Gases Carbon dioxide (CO2) Carbon monoxide (CO) Methane (CH4)

Hydrogen sulphide (H2S) Other gases

Page 13: Tunnels

Gas bursts......................gaz patlaması Rock falls........................kaya düşmesi Rock bursts....................kaya fırlaması Squeezing ground..........şişen – kabaran zemin Temperature Subsidence

Page 14: Tunnels

EXPLORATION & INVESTIGATIONS RELATED of SLOPE STABILITY

Geomorphologic maping and preparation of longitudinal & cross sections

Geological maping & surveyings (aerial photographs)

Geophysical surveyings Underground explorations, boreholes Ground water surveyings Laboratory tests Model studies

Page 15: Tunnels

SURFACE EXCAVATIONS

Permanent Short term excavations

Page 16: Tunnels

SUBSURFACE EXCAVATIONS

1. GEOLOGY1. Soil profile or hard rock geology

2. Structure

3. Ground water (hydrogeology)

4. Stability

Page 17: Tunnels

2. INVESTIGATIONS1. Mapping (Topographic, geologic, etc...)

2. Geophysical surveying (especially seismic velocity of rocks)

3. Trial pits & boreholes

4. General and local stability analysis

5. Decide to excavation method

Page 18: Tunnels
Page 19: Tunnels

UNDERGROUND EXCAVATIONS

Adit, shaft, incline, large chamber Tunnel Subway ~ metro Underpass Shelter Power house Ware house, store, mining ...etc

Page 20: Tunnels

GASES (can be lethal or burst)

Carbon monoxide (CO) 0.97 of air Carbon dioxide (CO2) 1.53 of air Methane (CH4) 0.55 of air

(Highly explosive with air) marsh gas

Hydrogene sulphide (H2S) 1.19 of air (Highly toxic and explosive)

Sulphur dioxide (SO2)

Page 21: Tunnels

ROCK FALL

SQUEEZING GROUND (sand, silt, shale, clay)

ROCK BURST

BULKING (Increase in volume, 10-40%)

Page 22: Tunnels

FACTORS EFFECTING EXCAVATION of ROCKS

Mineralogical composition of rocks Texture & fabric Petrographic features Structure Rock mass Strike & dip of beds in relation to face of

excavation Intensity of tectonic disturbances Degreee of weathering

Page 23: Tunnels

RESISTANCE of ROCKS to EXCAVATION

Loose soils Soil easy to spade (bel ile kazmak) Soil easy to dig Crumbling weak rocks (ufalamak) Rocks easy to blast Rocks difficult to blast Rocks very difficult to blast

Page 24: Tunnels

TUNNELLING METHODS

Page 25: Tunnels

SHIELD TUNNELLING METHOD

This method involves the use of shield machine to drive the tunnels below the ground.

After completion of a work shaft, the shield machine is lowered into the shaft and assembled there before excavation and construction of the tunnels using precast concrete lining segments of about 1.2 meter width.

This construction method causes minimal disruption to traffic and the environment because all the work takes place below ground and the ground level environment is unaffected.

Page 26: Tunnels
Page 27: Tunnels

CUT and COVER TUNNELLING METHOD

This construction method, whereby the site is fully excavated, the structure built and then covered over, uses diaphragm walls as temporary retaining walls within the site area.

Step one :Construction of diaphragm walls, pin piles, and decking.

Step two :Excavation within the diaphragm walls, installing struts as work progresses.

Step three :Construction of permanent floor slabs and walls.

Step four : Fitting out the internal structures, backfilling, and reinstating the surface structures.

Page 28: Tunnels
Page 29: Tunnels

TBM (Tunnel Boring Machine)

1. Mechanical-support TBM

2. Compressed-air TBM

3. Slurry shield TBM

4. Earth pressure balance machine

5. Mixed-face shield TBM

Page 30: Tunnels

1- Mechanical Support TBM

A mechanical-support TBM has a full-face cutterhead which provides face support by constantly pushing the excavated material ahead of the cutterhead against the surrounding ground.

Page 31: Tunnels

2- Compressed-Air TBM

A compressed-air TBM can have either a full-face cutterhead or excavating arms. Confinement is achieved by pressurizing the air in the cutter chamber.

Page 32: Tunnels

3- Slurry Shield TBM

A slurry shield TBM has a full-face cutterhead. Confinement is achieved by pressurizing boring fluid inside the cutterhead chamber.

Page 33: Tunnels

4- Earth Pressure Balance Machine

An earth pressure balance machine has a full-face cutterhead. Confinement is achieved by pressurizing the excavated material in the cutterhead chamber.

Page 34: Tunnels

5- Mix-Face Shield TBM

Mix-face shield TBMs have full-face cutterheads and can work inclosed or open mode and with different confinement techniques.

Page 35: Tunnels

EFFECT of GEOLOGICAL STRUCTURES to TUNNEL EXCAVATION

Effect of soil layers: horizontal, vertical and inclined layers have different kinds of loading conditions for tunnels.

Page 36: Tunnels

Effect of faults: the relation between the fault slope direction and the tunnel direction, width of the fault zone, type and thickness of the fill material and the hydrostatic pressures in both sides of the fault are some problems in the tunnelling.

Relation between the fault zone and the tunnel

Page 37: Tunnels

Tunnel excavations in the slopes: the discontinuities (layers, fissures) inclined inside or outside of the slope are very important regarding the stress and strength of the tunnel.

Page 38: Tunnels

Effect of the folds: While tunnel is excavated in an area that contains folded rocks, different stresses and conditions may occur depending on the fold type.

Fold axis and the tunnel direction is vertical

Fold axis and the tunnel direction is parallel

Page 39: Tunnels

CLASSIFICATION of ROCKS for TUNNELING

PURPOSES

Page 40: Tunnels

Classification of rocks for engineering purposes is needed in analyzing the project costs and to obtain an economic and reliable solution.

The classification of the rocks, that the tunnel will be constructed in, is first done by Terzaghi. But, it is too general and gives qualitative results.

Page 41: Tunnels

TUNNEL ROCK CLASSIFICATION by TERZAGHI

Page 42: Tunnels

Laufer classified tunnel rocks to 7 groups according to stand-up time

Page 43: Tunnels

Rock classification and determination of unsupported span

Page 44: Tunnels

URFA IRRIGATION TUNNEL

Page 45: Tunnels
Page 46: Tunnels

ONE of the LONGEST IRRIGATION TUNNELS in the WORLD

Page 47: Tunnels

Consist of two concrete lined tunnels each of which is 7.62 m in diameter and