TransPORTing Light to the Nation - bantenport.co.id eng/brosur eng.pdf · be useful to the life...

10
One of the purposes of human life, is to be useful to others, so does a company, since it was founded, it has a purpose to grow and be useful to the life around the society, and the nation. Port of Ciwandan is one of PT. Pelabuhan Indonesia II (Persero) branches has a commitment to share through management of a preferred partner for reliable, best in class port and logistic service by creating an exciting enterprise for people and contributing to national growth. PORT OF BANTEN PT. Pelabuhan Indonesia II (Persero) Port of Banten Branch Jl. Raya Pelabuhan No. 1, Ciwandan, Cilegon 42166 Phone : +62 254 601417, Fax : +62 254 601419 Customer Service : 08111250111 Website : www.bantenport.co.id E-mail : [email protected] Facebook : Ipc Banten Twitter : @IPC_Banten TransPORTing Light to the Nation

Transcript of TransPORTing Light to the Nation - bantenport.co.id eng/brosur eng.pdf · be useful to the life...

One of the purposes of human life, is to be useful to others, so does a company, since it was founded, it has a purpose to grow and be useful to the life around the society, and the nation.

Port of Ciwandan is one ofPT. Pelabuhan Indonesia II (Persero) brancheshas a commitment to share throughmanagement of a preferred partner for reliable,best in class port and logistic service by creating an exciting enterprise for people and contributing to national growth.

PORT OF BANTEN PT. Pelabuhan Indonesia II (Persero)Port of Banten Branch Jl. Raya Pelabuhan No. 1, Ciwandan, Cilegon 42166Phone : +62 254 601417, Fax : +62 254 601419

Customer Service : 08111250111Website : www.bantenport.co.idE-mail : [email protected] : Ipc Banten Twitter : @IPC_Banten

TransPORTing Light to

the Nation

5a

1

4

3

76

2

5c

a

b

c

d

e

a f

f

gh

i

j

kl

mn

o

l

l

p

q

rs

t

u

v w

5b

BERTH 4BERTH 1

BERTH 3

BERTH 2

Berth 1 is the first berth build, it has122 m length and 11 m width. The

bearing capacity is up to 2.5 tons/m2,

and it is equipped with two units of

This berth is located at the backside

and covered by two mainland on both

Its bearing capacity is up to 3 tons/m2,

each length is 26 m. This berth has up

This berth is located between berth 1

length and 19 m width and has bearingcapacity up to 3 tons/m2. It is also

equipped with one unit of 17 m long

is up to -7 m LWS, designed for dry

bulk nonfood.

DERMAGA 6

BERTH 5

BERTH 7

Berth 5 is consist of 3 parts, berth 5a,

berth 5b, and berth 5c as listed bellow :

- - Berth 5a (403 m long, 33 m wide,

-14 m LWS).

-16 m LWS

Berth 6 is specifically constructed withsolid soil and stone pavement. Concrete construction is built to support ramp

door for the ship. Designed to handle

RORO, the size of this berth is 10 m a

wide and 25 m long with -5 LWS. It is

located at the U lower left corner of the

port and looks similarly like a beach.

Berth 7 has 38 m long and 19 m wide and

-7 m LWS water depth. It has 3 tons/m2

m2 bearing capacity. This wharf is very

strategic, it is at the U lower left of the port.

It has 26 m long and 10 m wide berth

with up to 3 tons/m2 bearing capacity

and equipped with two units of 77 m

Breasting Dolphin on both side, left and

t

a. PT. Indorama Petrochemicals

b. Gardu Induk PLN

c. PT. Sari Agrotama Persada

d. PT. Aditya Wahana Nusa

e. PT. Sawit Tunggal Arta Raya

f. PT. Taruna Bina Sarana

g. Pilot Station

h. Warehouse 001

i. PT. Aneka Kimia Raya

j. PT. Asphal Bangun Sarana

k. Warehouse & Office

l. Stacking Yard

m. IPC Office

n. Mosque

o. Satelindo Tower

p. PT. Semen Gresik

q. PT. Semen Padang

r. Gate

s. IPC Electrical Substation

t. Weight Station

u. RF ( )

v. PT. Sadikun NMR

w. PT. Holcim

TUG BOAT

MPAX- 01 Yanmar 4

TNE 98 G1A2 X 47 HP

YD 5207 Pitch Propeller 23 7 14.72

Ship’s Name

Main EngineME

Aux. Engine AE

ID Spesification GT Netto Ship’s Name LOA (M)

PILOTAGE BOAT

SRP(Streerable

Rudder Properller)

KT. TIRTAYASA III-216

Yanmar 8 N21A-SV

2 X 1600 HP

Caterpilar 2 X 253 HP

C9YDA 4827

SRP(Streerable

Rudder Properller)

296

KT. TIRTAYASA IV-216

Niigata 6L26 HLX2 X 1600 HP

Caterpilar 2 X 253 HP

C9YDA 4867

SRP(Streerable

Rudder Properller)

296

KT. TIRTAYASA V-208

Yanmar 6AYM-ETE2 X 800 HP

Caterpilar C4.42 X 94 HP

Twin Screw (Fix Propeller)YDB 4008 128

KT. TIRTAYASA VI-208

Yanmar 6AYM-ETE2 X 800 HP

Caterpilar C4.42 X 94 HP

YDB 4009Twin Screw

(Fix Propeller) 128

KT. TIRTAYASAI-212

Yanmar 6 N21A-SV

2 X 1200 HP

Caterpilar 2 X 253 HP

C9YDA 4801

SRP(Streerable

Rudder Properller)

296

YDB 4849KT. TIRTAYASA

II-212

Yanmar 6 N21A-SV

2 X 1200 HP

Caterpilar 2 X 253 HP

C9296

89 30.20

89 30.20

39 23.68

39 23 .68

89

89 30.20

30.20

Main EngineME

Aux. EngineAE

ID Spesification GT Netto LOA (M)

MPAX- 02 Yanmar 4

TNE 98 G1A2 X 47 HP

YD 5208 Pitch Propeller 23 7 14.72

Reception Facilities

Yanmar 6 CHSX-UTE X YX71-4

2 X 255 HP

Yanmar 6 CHSX-UTE X YX71-4

2 X 255 HP

Breasting Dolphin on both left and

right side with each length is 30 m.

The water depth on this berth is up

to -10 m LWS, designed forMultipurpose

side, left side and right side. The length

and width of this berth is 38 m and 17 m.

equipped with two units of Breasting

Dolphin on both left and right side with

to -7 m LWS water depth, designed for

dry bulk nonfood.

(multipurpose) and berth 7. It has 38 m

Breasting Dolphin. The water depth

right side. Berth 4 handles liquid bulk

by tankers.

- - Berth 5b (300 m long, 44 m wide,

-16 m LWS).

- - Berth 5c (300 m long, 44 m wide,

Designed for multipurpose, dry bulk food and nonfood, this berth has bearing

capacity is up to 3-5 tons/m2.

This berth designed for dry bulk nonfood.

hinterland development plan. Banten Port evidently shows and

for the concept of port development which is aligned with

PT Pelabuhan Indonesia II

(Persero) Branch of Banten,

was established on

August 27, 1988 known as

Banten Port and located in

Banten Province,

Ciwandan Sub-district.

PORT OF BANTEN

Banten Port is a chain of ports

that are connected to a long

logistics chain. It has a strategic role

to support the swift flow of goods/products

which influence the selling price of a products. Efficient

management is created to make roducts passed through

the port become more competitive.

Banten Port takes a lot of initiatives to strengthen between

hinterland and ports. It is done by collaborating various parties

for the concept of port development which is aligned with

proves to have good reputation and able to provide an

outstanding customer service in logistics and ports.

OUR SERVICES

Ship services :

Cargo Services :

Miscellaneous business services:

1. 1. Pilotage and tug services

2. Mooring and anchoring services

3. Ship water services

1. Berth services/loading and unloading

2. Warehouse services/field stacking

1. Water and electricity services

2. Land uses cooperation

3.

4. Scales Services

5. Mechanical Services

6.

Reception Facilities

Trucking

· Experience in managing and operating ports for more than

26 years

The biggest dry bulk terminal in Indonesia

Supported by professional and competent human resources

ISO certified 9001:2008

ISPS Code implemented

Trusted reputation

Services productivity and performance guarantee (SLA/SLG)

Quick and timeliness of mooring and loading/unloading

· Able to handle goods more than 8 million tons.

· Competitive rate

· The best service quality

· Good relationship with stakeholders

· Trusted by national, regional, and international service users

· Accuracy of scales

Committed to grow together with partners and customers

to meet their needs and desires

Provides ship and goods consultation services

Customs area

WHY US ?

Zero Accident

Certified

Member of

UTAMAKAN KESEHATAN DAN KESELAMATAN KERJA

V I S I O N

M I S I O N

To be the preferred partner for reliable, best in class port & logistics services by creating an exciting enterprise for our people and

contributing to national growth

Ensure the quality of port services

with excellent logistic network to meet the expectations

workers, partners, and regulators).

Ensure the swiftness and safety flow

of ships and goods for logistics costs efficiency

in order to pace the national economic

growth.

Ensure productivity sufficiency to meet

·the dynamics of customer needs.

of main stakeholders (customers, shareholders,

IPC CORPORATE VALUES

Exciting and safe workplace, prioritizing diversity,

and high performance culture.

PEOPLE FIRST

Trust, honesty, professionalism, and compliance

to the code of business ethics at work.

INTEGRITY

CUSTOMER CENTRIC

The clarity of customers' needs, long-termrela�onship with customers, and interna�onal standards customer services.

SUSTAINABILITY

The agility in dealing with customer and market

change and nurturing high performing leaders.

QUALITY

International standards process, services, and

technologies.

IPC WAY

Nur

turin

g H

igh

Perfor

min

g

Lead

ers

Ener

gizi

ng N

atio

nal G

row

th w

hile

Mai

ntai

ning

an

Inte

rnat

iona

l Out

look

Forg

ing

Agi

le O

rgan

izat

ion

Dev

elop

ing

a G

reat

Pla

ce to

Wor

k

for O

ur P

eopl

e

IPC GOALS

Strengthen people Capability

Continue thresholdgrowth of 20%

Standardize andStabilize coreoperations

Consistent customer service experience

Set best standardsfor other portsin Indonesia

Continue thresholdgrowth of 20%

Start to buildan integrated logistic bussiness

Become a Holding Company with atLeast 3 Subsidiarieslisted

Able to Impact

Index for Indonesia (below 20)

Reduce the Tranship Loss to a Single

Digit

Completion of The New Priok Development

SuccessfullyComplete OurTalent Journey

2013

20142015

Wave 1 : Laying theFoundation (year ofOperational Exellence)

Wave 2 : Delivering Exceptional CustomerExperience

WAVE 3 : Taking The Quantum Leap

CompleteSubstantial partof the new priok

Logistic Performance

Indonesia National InterestPartners and Customers

Society and Environment around the Port

Members

of the Company

Create an open, clean, comfortable, and pollution-free work environment

Physical Environment

Increase company performanceprofessionally and drive bothlocal and national economicgrowth

Provide employment, reduce unemployment rate, andalleviate poverty

Encourage the cooperative societyto synergize with each other andhave sense of belonging

Involve society's participation inport management by creating employment for the society

Help society to grow throughpartnership program and communitydevelopment

Care for the society throughCSR program

Create faithful, high-quality,optimist, serving andfriendly human resourcesthat are proud of theirculture and company and ableto bring prosperity and satisfaction

Increase commitment andmotivation of the entiremembers to achieve thethe company's mission

Preferred Partner Reliable Services Exciting Work Environment Contribution to National Growth

Provide and operate reliable and best in class port services.

THE COMPANY'S COMMITMENT

MASTER PLAN

Long-term Development Plan 2024 - 2033

Medium-term Development Plan2019 - 2023

Short-term Development Planuntil 2018

- Land clearing, land restoration, and land

expansion

- Dry bulk stacking yard/warehouse and

general cargo

- Dry bulk food warehouse

-

- Improving and strengthening the port road

- Equipment productivity optimization

- Development and Extending the berth length

- Port area lighting optimization

- Increase loading/unloading and mechanical equipment

- Structuring and sterilizing line 1

- Dedicated terminal for dry bulk, food, noon food,liquid bulk, general cargo/break bulk

-

Land clearing and land function development

Dry bulk stacking yard/warehouse and general

cargo development

- Berth construction and development

- Growing an integrated logistics business

- Equipment productivity optimization

Development and reinforcement

of integrated logistics business

Reception facilities

Green Port

EQUIPMENT AND FACILITIES

Gantry Luffing Crane

Multipurpose Gantry Crane

Wheel Loader

Excavator

Hopper

Grab

PILOT BOAT

Harbour Mobile Crane

Rampdoor

TUG BOAT

STACKING YARD

STORAGE

Fire Brigade Truck (5000 L)

CCTV

GANTRY LUFFING CRANE 01 - 04

MULTIPURPOSE GANTRY CRANE

HARBOUR MOBILE CRANE 01

T/G/H(TON)

EFFECTIVE TIME (HOURS)

Productivity

OUTPUT/DAY (TON)

40360 21 7.560

35340 21 7.140

HARBOUR MOBILE CRANE 02

80400 21 8.400

80400 21 8.400

SWL (TON)

EXCAVATOR 01

EXCAVATOR 02

EXCAVATOR 03

EXCAVATOR 04

EXCAVATOR 05

150

150

150

150

150

21

21

21

21

21

3.150

3.150

3.150

3.150

3.150

WHEEL LOADER 01

WHEEL LOADER 02

270

270

21

21

5.670

5.670

-

-

-

-

-

-

-

4

1

2

2

5

2

8

6

2

6

67.979

1.534.71

1

13

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

M2

M2

UNIT

UNIT

LOADING/UNLOADING EQUIPMENT Volume Unit