INFRASTRUTURE DEVELOPMENT IN MOZAMBIQUENEEDS AND CHALLANGES
MINISTÉRIO DOS TRANSPORTES E COMUNICAÇÕES
INVESTMENT ROUNDTABLE DIALOGUELONDON, 7 JUNE 2012
Paulo Zucula
![Page 2: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/2.jpg)
1 CONTEXT
The genesis and frame of existing transport infrastruture
Changes in transport system world wide NEED TO CATCH UP (over 50
years of backwardness)
Desenv. Econ/Social Nacional
Integração Regional
Globalização
To serve hinterland countries
Adjusted for militar strategy and logistics
Moz as a services economy
From horizontal industrial production system
To Core Business and Outsourcing
Revolução logistic and transport systems.
![Page 3: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/3.jpg)
3
Intergated Rational Use of each mode of transport (Invertion of the present situation) in order to reduce and contain transaction costs.
Bringin in the whole vision of the logistics chain.
Promote National Development unlocking mining, agriculture and tourism potential
GOAL
BUILDING A VISION ON INTEGRATED TRANSPORT INFRASTRUTURE DEVELOPMENT
Bring in the multi and intermode interactions;
![Page 4: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/4.jpg)
4
Reabilitation/improvement of existing rail infratrutures
Expansion and construction of new rail infrastrutures.
Expansion and construction of new ports
CHALLANGES TO MATERIALIZE THE “NEW” VISION
Reabilitation/improvement of existing ports
Reabilitation and improvement of new airports;
Expansion and construction of new airports.
![Page 5: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/5.jpg)
2 UNPACKING THE VISION
EFFICIENT USE OF TRANSPORT MODES.
CONFIGURAÇÃO GEOGRAFICA DE MOÇAMBIQUE
Road transport not efficient for distances greater thatn 500 Kms..
Rail and Hydro transport better for longer distances.
Distances above 500 Kms occurre in the North South orientation.
Bellow 500 Kms in east-west orintation.
![Page 6: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/6.jpg)
MAPUTO
RICHARDS BAY
DURBAN
BEIRA
Quelimane
NACALA
HARARE
JOHANNESBURG
PRETORIA
GABARONE
Livingstone
LUSAKA
Ndola
LUMBAMBASHI
Pemba
Mocimboa da Praia
Mtwara
BLANTYRE
LILONGWE
Tete
Mutare
Pietersburg
Nelspruit
MBABANE
MASERUBloemfontein
EAST LONDON
PORT ELIZABETH
Lobatse
Inhambane
Bulawayo
3.13.1 INFRASTRUTURE FOR INFRASTRUTURE FOR INTEGRATION:INTEGRATION:
Ports and AirportsPorts and Airports
Sea Transport; Rail Sea Transport; Rail Transport; Transport;
Road and River Road and River Transport. Transport.
Energy Energy
Densification to achieve synergies and economies of scale Densification to achieve synergies and economies of scale (Foundations for Sustainability)(Foundations for Sustainability)
Strategic Investments in Mining, Agriculture, Strategic Investments in Mining, Agriculture, Tourism, etc. Tourism, etc.
3 THE DEVELOPMENTO CORRIDOR CONCEPT.
![Page 7: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/7.jpg)
3.2 THE PLANNED DEVELOPMENT CORRIDORS
Corredor de Desenvolvimento de Maputo
Corredor de Desenvolvimento do Limpopo
Corredor de Desenvolvimento de Massangena
Corredor de Desenvolvimento de Dondo
Corredor de Desenvolvimento da Beira
Corredor de Desenvolvimento de Mutuali
Corredor de Desenvolvimento de Cuamba
Corredor de Desenvolvimento de Lichinga
Corredor de Desenvolvimento de Nacala
Corredor de Desenvolvimento de Mueda
Corredor de Desenvolvimento do Sena
Corredor de Desenvolvimento da Zambézia
Corredor de Desenvolvimento de Nampula
Corredor de Desenvolvimento de Tetchobanine
![Page 8: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/8.jpg)
3.3 PLANNING METHODOLOGY
• GIS based planning• Scoping and Scaning Potential;• Looking for Development Drivers;• Building PPP and CPPP• Debotlenecking• Feasibility Studies;• Unpacking for Second Generations of Projects
8
![Page 9: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/9.jpg)
4 WHERE WE ARE NOW?
4.1 Reabilitation
4.1.1 SENA DEVELOPMENT CORRRIDOR
• Sena Line operational for 3m t/year.
• By September will reach 6m t/year.
• By first quarter 2013 will reach 12 m t/year (Aditional financing required – about USD 120 m
• Scaning of agricultural projects
• Timber production in expansions
![Page 10: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/10.jpg)
10
4 WHERE WE ARE NOW?
![Page 11: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/11.jpg)
11
4 WHERE WE ARE NOW?
4.1.3 NACALA DEVELOP. CORRIDOR
Linha de Nacala• Reabilitation to start by August
for 30 m t/year.
• Work to be concluded by 2016
• Phosphate project;
• Banana production project
• Pro-Savana Initiative
![Page 12: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/12.jpg)
12
4 WHERE WE ARE NOW?
4.1.4 LICHINGA-CUAMBA DEVELOPCORRIDOR
Rail Reab to start in August
Under implantation of different forestprojects;
Mining prospections on-going
![Page 13: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/13.jpg)
13
4 WHERE WE ARE NOW?
4.2. NEW DEVELOPMENT CORRIDORS
![Page 14: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/14.jpg)
MUTUALI DEVELOP CORRIDORMUTUALI DEVELOP CORRIDOR
Pre-feasibility study concluded.
![Page 15: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/15.jpg)
MUTUALI DEVELOP CORRIDORMUTUALI DEVELOP CORRIDOR
On-going GIS Maping ofpotentialities
![Page 16: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/16.jpg)
NAMPULA DEVELOP CORRIDORNAMPULA DEVELOP CORRIDOR
Preliminar studies of railwayconcessioning.
![Page 17: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/17.jpg)
NAMPULA DEVELOP CORRIDORNAMPULA DEVELOP CORRIDOR
On-going GIS Maping ofpotentialities
![Page 18: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/18.jpg)
MACUZI DEVELOP CORRIDORMACUZI DEVELOP CORRIDOR
Preliminar studies concluded
Data-base for GIS maping initiated
![Page 19: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/19.jpg)
MUEDA DEVELOPMENT CORRIDORMUEDA DEVELOPMENT CORRIDOR
![Page 20: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/20.jpg)
MUEDA DEVELOPMENT CORRIDORMUEDA DEVELOPMENT CORRIDOR
![Page 21: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/21.jpg)
MASSANGENA DEVELOP CORRIDORMASSANGENA DEVELOP CORRIDOR
![Page 22: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/22.jpg)
MASSANGENA DEVELOP CORRIDORMASSANGENA DEVELOP CORRIDOR
![Page 23: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/23.jpg)
DONDO DEVELOP CORRIDORDONDO DEVELOP CORRIDOR
![Page 24: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/24.jpg)
DONDO DEVELOP CORRIDORDONDO DEVELOP CORRIDOR
![Page 25: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/25.jpg)
TETCHOBANINE DEVELOP CORRIDORTETCHOBANINE DEVELOP CORRIDOR
Em negociação Contracto deConsessão
![Page 26: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/26.jpg)
TETCHOBANINE DEVELOP CORRIDORTETCHOBANINE DEVELOP CORRIDOR
![Page 27: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/27.jpg)
4.3 PORTS
Porto Tetchobanine
Porto Maputo
Porto Beira
Porto Quelimane
Porto Savane
Porto Nacala
Porto Palma
Porto Macuzi?
Porto Pemba
![Page 28: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/28.jpg)
28
EMERGENCY SOLUTION
![Page 29: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/29.jpg)
29
PEMBA PORT: LONG TERM
![Page 30: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/30.jpg)
3 PORTOS
Porto Tetchobanine
Porto Maputo
Porto Beira
Porto Quelimane
Porto Savane
Porto Nacala
Porto Palma
Porto Macuzi?
Porto Pemba
![Page 31: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/31.jpg)
31
COAL TERMINAL IN BEIRA
![Page 32: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/32.jpg)
32
COAL TERMINAL IN BEIRA
![Page 33: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/33.jpg)
CORREDORES DE DESENVOLVIMENTO: VISUALIZAÇÃO CONJUNTA
Corredor de Desenvolvimento de Maputo
Corredor de Desenvolvimento do Limpopo
Corredor de Desenvolvimento de Massangena
Corredor de Desenvolvimento de Dondo
Corredor de Desenvolvimento da Beira
Corredor de Desenvolvimento de Mutuali
Corredor de Desenvolvimento de Cuamba
Corredor de Desenvolvimento de Lichinga
Corredor de Desenvolvimento de Nacala
Corredor de Desenvolvimento de Mueda
Corredor de Desenvolvimento do Sena
Corredor de Desenvolvimento da Zambézia
Corredor de Desenvolvimento de Nampula
Corredor de Desenvolvimento de Tetchobanine
Porto Tetchobanine
Porto Maputo
Porto Beira
Porto Quelimane
Porto Savane
Porto Nacala
Porto Palma
Porto Macuzi?
![Page 34: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/34.jpg)
34
4.4 AIRPORTS
4.4.1. MAPUTO INTERNATIONAL
•Concluded international terminal
•Domestic terminal under construction.
![Page 35: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/35.jpg)
35
![Page 36: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/36.jpg)
36
![Page 37: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/37.jpg)
37
![Page 38: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/38.jpg)
38
4 AIRPORTS
4.4.2. VILANCULO
•Terminal revamped and concluded
•On-going sutudies for land strip•(Need financing)
![Page 39: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/39.jpg)
39
4 AIRPORTS
4.4.3. TETE
•Minor improvements
•New airport needed. Translocation•studies on-going. para outro local
![Page 40: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/40.jpg)
40
4 AIRPORTS
4.4.4. PEMBA INTERNATIONAL
•Minor improvements in the terminal;
•Concluded translocation studies;
•Need financing and operation for a newairport.
![Page 41: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/41.jpg)
41
4 AIRPORTS
4.4.5. NACALA INTERNATIONAL
•Under construction;
•Operator needed;
•Negotiations with airlines
![Page 42: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/42.jpg)
4.4 ARLINE
![Page 43: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/43.jpg)
AIR TRANSPORT
Towards liberalization
SEGURANÇA
LINHAS AÉREAS DE BANDEIRA
Improve regulation framework
Intensive and massive training
Modernization
Expantion of domestic and regional routes
Establish a new airline for internation routes under PPP arrangement
Consolidation of LAM
![Page 44: Transport and Communications Presentation](https://reader034.fdocuments.in/reader034/viewer/2022052522/5486ccc3b4af9fe8108b4915/html5/thumbnails/44.jpg)
44
MUITO OBRIGADO