Transit Oriented Chicago: A Prototype CTA to Metra Rail Transit Connection Corridor
-
Upload
ryan-lawber -
Category
Documents
-
view
219 -
download
3
description
Transcript of Transit Oriented Chicago: A Prototype CTA to Metra Rail Transit Connection Corridor
TRANSIT ORIENTED CHICAGO: A PROTOTYPE CTA TO METRA
RAIL TRANSIT CONNECTION CORRIDOR
BY
RYAN LAWBER
Submitted in partial fulfillment of the requirements for the degree of
Master of Architecture in the Graduate College of the Illinois Institute of Technology
Approved _________________________________ Adviser
Chicago, Illinois
July 2008
ii
iii
ACKNOWLEDGMENT
I would like to thank everyone who gave me the chance to complete this thesis.
First, a great amount of thanks to the Regional Transit Authority of Chicago. Without
them, this project couldn’t happen. Second, I owe a huge thank you to the Morgenstern
family for giving me the opportunity to continue my education. Also, a thank you to Prof.
George Schipporeit, who has guided, encouraged, and kept me on the right track during
the development of this thesis. I owe much thanks to the professors at Southern Illinois
University Carbondale and the Illinois Institute of Technology who have aided my
research. Most importantly, I’d like to thank my wife Erinn who has supported and
understood my thoughts and ideas through this work better than I could. Thank you.
iv
TABLE OF CONTENTS
Page ACKNOWLEDGMENT…………………………………………………………… iii LIST OF FIGURES…………………………………………………………………. vi LIST OF DRAWINGS……………………………………………………………….. viii LIST OF RENDERINGS…………………………………………………………….. ix ABSTRACT…………………………………………………………………………. x CHAPTER 1. INTRODUCTION…………………………………………………… 1 1.1 Chicago Urban Design…………………………………………… 1 1.2 Issues with Vehicles in Urban Environments……………………. 2 2. SITE DEVELOPMENT ISSUES………………………………………. 8 2.1 Current Transit Coverage in Chicago……………………………….. 8 2.2 Site Location and Phasing Plans…………………………………… 9 2.3 CTA Station…………………………………………………………. 13 2.4 Metra Station……………………………………………………… 13 3. DESIGN PARAMETERS..…………….………………………………. 16 3.1 Rail Transit Oriented City………………………………………….. 16 3.2 CTA Station…………………………………………………………. 18 3.3 Metra Station……………………………………………………… 19 3.4 Plaza Design……………………………………………………….. 20 3.5 Connection Corridor……………………………………………….. 23 3.6 Road and Alley Redesign………………………………………… 25 4. DESIGN IMAGERY…………………………………………………… 29 4.1 Chicago Site Analysis……………………………………………… 29 4.2 Western Avenue Site Analysis……………………………………… 30 4.3 Design Figures and Drawings……………………………………… 30 5. CONCLUSION……………………………………………………….. 65 5.1 Summary…………………………………………………………… 65 5.2 Conclusion………………………………………………………… 66
v
BIBLIOGRAPHY…………………………………………………………………… 67
vi
LIST OF FIGURES Figure Page 1.1 Typical Chicago Street Grid Divisions…….………………………………. 1 1.2 Oil Usage Comparisons Between Countries……………………………… 3 2.1 Areas of Chicago Inaccessible by Rail Transit .…………….……………… 9 2.2 Site Location on Western Avenue…………………………………………… 10 2.3 Site of the Proposed CTA Green Line Station at Lake St. and Western Ave ………………………………………………… 14 2.4 November 2007 Ridership by Line………………………………………… 15 2.5 Current Western Avenue Metra Station…………………………………….. 15 3.1 Density Graph Showing Units per Acre Radiating from the Station Node…………………………………………… 16 3.2 A New City Density………………………………………………………… 17 3.3 A Transit City Density Based on the Half-mile Grid……………………… 18 3.4 Sketch of Land Use and Development of a Gridded Transit Area…………. 18 3.5 Pedestrian Bridge to Building Typical Connection………………………… 24 3.6 Chicago Green Alley Plan………………………………………………… 27 4.1 Chicago Boundaries………………………………………………………… 32 4.2 CTA Rail Line Locations…………………………………………………… 33 4.3 CTA Rail Station Locations…………………………………………………. 34 4.4 Metra Rail Line Locations………………………………………………… 35 4.5 Metra Rail Station Locations………………………………………………. 36 4.6 Areas Without CTA and Metra Rail Transit………………………………… 37 4.7 Areas Without CTA Rail Transit…………………………………………….. 38
vii
4.8 Half-mile Pedestrian Grid Overlay…………………………………………. 39 4.9 Density Map from 1990 Census…………………………………………….. 40 4.10 Density Map and Areas Without CTA Rail Transit……………………….. 41 4.11 Density Map and Half-mile Pedestrian Grid Overlay…………………….. 42 4.12 High Density Areas…………………………………………………………. 43 4.13 Proposed CTA Rail Station Locations……………………………………… 44 4.14 Site of Western Avenue Enlarged…………………………………………… 45 4.15 Western Avenue Site Analysis………………………………………………. 46
viii
LIST OF DRAWINGS
Drawing Page 4.1 Street Level Floor Plan of CTA Station.…………………………………… 47 4.2 Mezzanine Level Floor Plan of CTA Station………………………………… 48 4.3 Platform Level Floor Plan of CTA Station ……………………………….… 49 4.4 Section Through CTA Station Looking North………………………………. 50 4.5 Section Through CTA Station Looking West……………………………… 51 4.6 East Elevation of CTA Station…………………………………………….. 52 4.7 Roof Plan of Metra Station………………………………………………….. 53 4.8 Pedestrian Level Floor Plan of Metra Station……………………………… 54 4.9 Section Through Metra Station Looking West……………………………… 55 4.10 Section Through Metra Station Plaza and Sub-level Parking……………… 56 4.11 Section Through Western Avenue, Phase I of Street Design……………… 57 4.12 Section Through Western Avenue, Phase II of Street Design……………… 57 4.13 Section Through Western Avenue, Phase III of Street Design……………… 57 4.14 Section Through Pedestrian Bridge/Building Connection………………….. 58 4.15 Plan of Pedestrian Connection Near CTA Station…………………………. 59 4.16 Plan of Pedestrian Connection Near Metra Station……………………….. 60 4.17 Typical Plan of Pedestrian Bridge………………………………………….. 61
ix
LIST OF RENDERINGS
Rendering Page 4.1 View from the Surface of the Pedestrian Bridge…………………………… 62 4.2 View from Below the Elevated Pedestrian Bridge………………………… 63 4.3 View of a Typical Middle Section of Elevated Pedestrian Bridge………… 64
x
ABSTRACT
This project will examine a creation and composition of a prototype pedestrian infrastructure connecting two rail transit stations on an example site of Western Avenue. Nodal development of the proposed CTA and Metra stations and a connecting interior/exterior corridor will define the two areas, allowing Western Avenue to be explored as a unifying element in this development. The proposal will look at a high population residency, as well as parks, markets, pedestrian paths, playgrounds, communal areas, civic spaces, quiet areas, etc. all to create a positive relation to society. This development has a responsibility to the environment by minimizing vehicular traffic in the area and promoting a local density and community.
The site will be divided into three phases of development. The first phase is what can currently be realized in 2008. The second phase is the plan for 2050 and the third phase is a development plan for 2100. With the first phase of development, the site will be developed with a new CTA Green Line stop on Western Avenue and the initial plan of a pedestrian connection to the redeveloped Metra station. The second phase includes a reduced vehicular traffic flow on Western Avenue and a greater pedestrian presence in the area. In this phase, a pedestrian connection between the two train station nodes will be explored. This is the phase that will primarily be covered in this thesis. The third phase of development is based around a car-less Chicago around the year 2100, and the results necessitated from this: tram lines run on main streets, and a very dense development is produced. These phases will be described in more detail in their appropriate sections.
1
CHAPTER 1
INTRODUCTION
1.1 Chicago Urban Design The Chicago street grid is based on a rectangular delineation of areas of the city
into manageable one mile blocks. These mile blocks are surrounded by heavily trafficked
streets. Dividing these blocks in half is a grid of secondary streets that typically are not as
heavily trafficked. The outcome of this grid is that every half mile alternates with a major
and secondary traffic street, and smaller tertiary streets are typically reserved for
residential developments and divide the half mile grid into manageable lot sizes. Each
mile block is divided into eight equal sections equivalent to a furlong. One furlong unit
sections typically divide the block by eight in one direction and 16 half furlong divisions
the perpendicular direction. This creates a grid of 330 feet by 660 feet that each block is
subdivided. These small blocks are in turn divided lengthwise in half by alleys for access
to carriage houses, vehicular parking, maintenance vehicles, and trash pickup.
Figure 1.1. Typical Chicago Street Grid Divisions.
2
Additionally, the streets placed in this grid are based on the rod measurement, where the
alleys are one rod (16.5 feet) in width and the small blocks bounded by streets that are
two rods in width (33 feet). The main and secondary arterial streets differ in width
between 50 and 80 feet in width, depending on the traffic flow.
Historically, Western Avenue was the western boundary of the city of Chicago
during the middle of the 19th century. At 23.5 miles in length, it is one of the longest
continuous north-south streets that exist in Chicago. Because of this uninterrupted
distance, it has become a congested artery of four-lane traffic passing through the west
side neighborhoods of the city. Western Avenue has grown into a freight truck highway,
as it tends to act as a ring road for motorists not wanting to take the expressways
downtown. Crossing Western Avenue by foot or cycle can become impossible and
dangerous if at a crosswalk not at a traffic signal. In addition to this, the speeds of traffic
on this road frequently reach illegal speeds much greater than the posted limits.
The gridded automobile infrastructure of Chicago was created for rapid expansion
of the city and has been a great success regarding the development compared to the
timeline of the city. However, the thought behind this vehicular development needs to be
redesigned to incorporate possibilities of a reduced vehicle traffic flow and an increased
pedestrian/transit oriented community.
1.2 Issues with Vehicles and Rail in Urban Environments
Without question, motor vehicles dominate urban areas, and most of the roadways
currently in use were planned when oil was limitless and inexpensive. But, now that we
are realizing the extinction of one of the planet’s most valuable materials, we are also
recognizing that long commutes, driving, and large expanses of concrete roadways are
n
ce
ev
em
V
so
ot beneficial
ells, hydroge
ven zero em
mission redu
Vehicles have
ociety that h
l to anyone.
en, or other a
mission autom
ucing vehicle
e no place in
has been crea
Figure 1.2
It can be ass
alternative fu
mobiles. How
e, the autom
n an urban en
ated establish
. Oil Usage
sumed that e
fuel sources,
wever, even
mobile would
nvironment,
hes a dimini
Comparison
emerging tec
will soon cr
if technolog
d still be terri
as our curre
shed sense o
ns Between C
chnologies, w
reate vehicle
gy were to pr
ible for use i
ent automobi
of communit
Countries.
whether with
es that are low
roduce an
in cities.
ile-centric
ty, where
3
h fuel
w or
4
communications between people are reduced to honking battles between metal boxes.
City streets, expanded to accommodate increased traffic flows, have become impassible
divisions and hazardous to pedestrians and cyclists susceptible to being struck by the
vehicles using the road. As a solution, urban population densities need to be raised around
rail transit nodes to facilitate mass transit commuting, without the need for personal
automobiles.
The United States has one of the safest driving records regarding deaths per mile
driven, but this record still caused 41,471 deaths related to automobiles in 1998. Data
shows that “5,157 pedestrians were killed on the nation’s streets in 1996” with 69% of
those deaths occurring on smaller residential streets. The amount of deaths in automobile
accidents during an average three month period is approximately equal to the amount of
deaths within the past 100 years for railroad incidents (Crawford 70-71).
There is a great power struggle between pedestrians/cyclists and motorists, and
due to the sheer size and armor of vehicles, they regularly maintain their peak status in
the hierarchy of the road. Both pedestrians and cyclists are at the mercy of drivers.
Bicycle lanes are typically placed between a row of parked cars and the fast moving
traffic of the roadway. In this position, cyclists need to be aware of the motorists passing
from behind, doors opening into the bicycle lane from parked cars, and pedestrians
walking between the parked cars and emerging into the bicycle lane. The infrastructure
cannot be considered successful unless both children and the elderly can feel safe using
the system.
Pedestrian traffic has a similar power struggle. Pedestrians are forced to walk to
block corners to cross the flow of vehicle traffic. This creates a linear division between
both sides of streets. While visually connected, locations on opposite sides of the street
5
are legally inaccessible via the shortest natural route. This oftentimes leads to people
dangerously crossing the roadways mid-block.
Additionally, vehicles require large amounts of space. A single lane of traffic can
transport only 2,000 cars in an hour. With a typical occupancy load of 1.5 passengers per
vehicle, this translates to just 2500 people per hour, per lane of traffic (about 10-15 feet in
width). Increasing the amount of automobile traffic lanes reduces the amount of usable
land within the city, decreases population density, and promotes sprawl. If these lanes
were to allow only bicycles, over twice the amount of commuters (approximately 6000)
could operate on the same amount of roadway (assuming 13.5 square feet per cyclist, one
cyclist per bike, with room for movement). Furthermore, rail based systems can transport
50,000 passengers per hour on a single track 4 feet 8.5 inches wide (Crawford 39).
Additionally, these motorists require large amounts of parking spaces that should be
better utilized and increase population density (Crawford 76). It should be realized that
some people will require cars for transport, and small amounts of parking placed
throughout the city should be included in the design. Examples of persons who may need
automobiles include the elderly, ill, disabled, and emergency vehicles such as
ambulances, and fire trucks.
It should be noted, though, that replacing the current traffic situation with bicycle
traffic does not fix the issue with pedestrians. Although this is a step in a better direction,
streets would still be divided by a mass of cyclists, and become nearly as impassable as
they are with vehicles.
Because of the traffic problems created by an increasing amount of motorists, the
current bus transit system in Chicago has become unreliable. Buses in Chicago currently
run on the same roadways as car traffic. Bus arrival times at stops are varied with a
6
schedule that is not adhered, since buses are subjected to the same road blocks and traffic
jams that motorists endure (which are oftentimes caused by the motorists themselves). A
successful bus route needs to be on time and reliable, and to accomplish this, a designated
bus lane is necessary at least during rush periods. A bus route needs to be able to travel
faster than the other vehicles on the road to give people incentive to ride.
The typical dwell time for a Chicago bus with on-board fare collection is 3
seconds per passenger. With an off-vehicle fare collection system, dwell time is reduced
to 0.4 seconds to 2.5 seconds per passenger depending on the amount of doors available
on the vehicle and the curb to bus step height of the bus (a curb at-level with the floor of
the bus allows for a quicker boarding time) (Regina 42). Problems with bus stops arise
when there are no buses for a prolonged period of time. If the wait is too long, perhaps 10
minutes with no notification of the next transport, people may find an alternate route (e.g.
taxis), decreasing transit ridership. When customers can have access to accurate
information about the transit routes and service, they can eliminate the uncertainty of
when the next bus will arrive, and are more likely to use the transit regularly (Regina
122). To do this, simple technologies will need to be implemented. Successful bus
systems need to utilize technology to gather a greater ridership. Straightforward GPS
tracking that can track the locations of all routes needs to be included on all buses, and
can be sent to bus stops and relayed onto a display, showing the estimated arrival times of
the next buses. This is currently being implemented around the city of Chicago, and also
includes the option of accessing the information online.
However, adding an additional lane of pavement to increase bus transit reliablilty
does not aid in the proposition to increase density and reduce paved areas. Buses are
relatively unreliable pieces of machinery, with diesel engine buses typically lasting 10-15
7
years, while a train/rail car will last 30-40 years and not have as many maintenance
upkeep costs. Buses also tend to diminish the quality of life on the streets with the noise
and exhaust produced (Crawford 185). These aspects of design are especially important
to consider in a pedestrian oriented development. To develop the city as a livable area,
rail-based transit offers the best positions for increasing population density, reducing
personal vehicle transport, and maintaining a humanized development. Improved bus
transit should only be a temporary fix and eventually be phased out for a complete rail-
based system. A tram system would require the installation of rail for along the length of
Western Avenue and would replace the number 49 and X49 bus routes. The station stops
would remain the same as the current bus stops, but the curb heights will be raised to the
level of the tram, reducing dwell time of the service. Also, station stops at major
intersections or stops with a high ridership will have contained waiting shelters with
updated GPS information regarding the tram service and waiting times.
8
CHAPTER 2
SITE DEVELOPMENT ISSUES
2.1 Current Transit Coverage in Chicago
The two primary rail transit infrastructures in the city of Chicago are the Chicago
Transit Authority (CTA) and Metra. The CTA is the urban rail that provides coverage
within the boundaries of Chicago, although it does travel to the suburbs of Evanston,
Skokie, Oak Park, and Cicero. The CTA operates eight rail lines around the city, two of
which run 24 hours a day. The 222 miles of track runs almost entirely elevated, except for
a few parts of the system that run at grade and the Dearborn and State Street subways that
run below the city (Chicago Transit Authority Website, www.transitchicago.com).
The Metra suburban rail infrastructure runs 12 rail lines radiating from the
Chicago Loop. Each route departs from one of four downtown Chicago stations
(Millenium, Ogilvie, LaSalle, and Union) and serves the counties of Cook, DuPage,
Lake, Will, McHenry, and Kane along its 495 miles of track (Metra Web Site,
www.metrarail.com).
At this time, combined rail transit coverage between the CTA and Metra is
satisfactory, but there are many areas of the city unreachable by rail and require
transferring to bus transport. Figure 2.1 displays the areas of Chicago inaccessible by
current rail transport (both CTA and Metra) with the propsed site location marked with in
red. This project is exploring these inaccessible areas and developing methods of making
them accessible. One of these sites is on Western Avenue approximately between
Madison Street and Grand Avenue.
9
Figure 2.1. Areas of Chicago Inaccessible by Rail Transit.
2.2 Site Location and Phasing Plans The site of this proposal is located on Western Avenue with an approximate
boundary of Madison Street to the south and Grand Avenue to the north, with the
inclusion and development of the periphery (Figure 2.2). The site is the located within of
one of Chicago's manufacturing strips, the "Kinzie Industrial Corridor." This corridor is
approximately 675 acres of land and is currently declining in value as businesses that
were established by the freight rail in this location have moved further out from the city.
A connection between commuter rail transportation will be much more beneficial in
10
developing the area rather than a constant band of decaying industry. The site consists of
many abandoned industrial buildings from this industrial corridor, and will be defined in
the project and aimed toward adaptive reuse.
This project will examine a creation and composition of a pedestrian/bicycling
infrastructure, with growth built around a human scale, nodal development of the
proposed CTA and Metra stations, and a connecting interior/exterior corridor defining the
Madison Street
Grand Avenue
Wes
tern
Ave
nue
Figure 2.2. Site Location on Western Avenue.
11
two. While the elimination of Western Avenue from the site would be too ambitious, it
will be materialized with regard to current and future conditions and circumstances.
Currently, Western Avenue acts as a defining barrier slicing the proposed site in two, but
will be explored as a unifying element in this development. The proposal will look at a
high population residency, as well as parks, markets, pedestrian paths, playgrounds,
communal areas, civic spaces, quiet areas, etc. all to create a positive relation to society.
This development has a responsibility to the environment and community by minimizing
vehicular traffic in the area and promoting a local density and community.
The project will be divided into three general phases of development. The first
phase is what can currently be realized in the year 2008. The second phase is the plan for
the year 2050 and the third phase is a development plan for the year 2100.
With the first phase of development, the site can be developed with a new CTA
Green Line stop on Western Avenue and the initial plan of a pedestrian connection to the
redeveloped Metra station.
The second phase includes a reduced vehicular traffic flow on Western Avenue,
caused by outside effectors, and a greater pedestrian presence in the area. The
development in the second phase will include a more integrated pedestrian connection
between the Metra and CTA Green Line tracks with the implementation of a second level
pedestrian corridor. This second level will create an additional level of commercial/retail
business available to pedestrians on the elevated walkway, while still providing for the
first level of commercial/retail below and creating a greater density in the area within a
smaller architectural footprint. Additionally, above the commercial can be several stories
of commercial/business office locations and above this can be residential apartments and
condominiums. This high density would primarily be in the quarter mile radius
12
surrounding the stations, gradate toward medium density between the quarter mile and
half mile radius, and outward to typical Chicago greystones and walk-ups. Past this,
outside the walkable radius, can be single family housing and large parks, as mentioned
previously. Phase two also includes a reduced automobile usage with vehicles only
travelling on the primary or secondary roadways outside of the half-mile walkable radius
from the transit stations. This is the phase that will be looked at into further depth within
the rest of the thesis.
The third phase of development is based around a car-less Chicago, and the
results necessitated from this; tram lines run on main streets, and a very dense, walkable
city is produced. Freight rail will need to be implemented to transfer large cargo
throughout the city, and alternative methods of transportation put into operation.
As stated, a CTA station stop at Western Avenue on the CTA Green Line has been
proposed. This will be examined with a pedestrian link to the current Western Avenue
Metra station on the Milwaukee District West Line and a proposed coupling of the Union
Pacific West Line at the same location, allowing the connection between the local and
suburban rail transit to define the origins of the residential development. The division
between the east and west sides of Western Avenue will be remedied by the raising of a
pedestrian street, allowing for human scale articulation on top of the vehicular artery and
a second level of development accessed by the pedestrian traffic above. Areas within one-
half mile of the rail stations will be developed to the greatest extent to allow for
pedestrian oriented growth, putting the more specific boundaries of the site at Grand
Avenue to the north, Leavitt Street to the east, Madison Street to the south, and Rockwell
Street to the west. By placing limits at a half mile radius from the transit centers,
everyone is within a 10 minute walk to the rail station. The furthest a person would have
13
to walk in a city with this structure would be 1 mile (typically 20 minutes) from starting
location to destination within the walkable radius mentioned in 3.1 Rail Transit Oriented
City. This pedestrian oriented infrastructure will allow for a greater density and more
comfortable community network while maintaining a link to existing neighboring
locations along each of the functioning rail transit systems.
2.3 CTA Station
The CTA Green Line in the city of Chicago currently serves the west side of the
city along Lake Street to Oak Park and the south side of the city approximately along
Wabash Avenue south to 63rd Street. The average ridership in 2006 for the Lake Street
branch of the Green Line was nearly 23,000 people per weekday (Chicago Transit
Authority, www.transitchicago.com).
Station stops on the Green Line are typically one half to one mile apart. However,
the distance between the Ashland and California stations (the stations on the East and
West of this site) measures 1.5 miles. This distance makes the area unsuitable for a
pedestrian oriented development. This plan is proposing station stops at half-mile
increments to promote a dense community, integrating stations on the primary and/or
secondary roadways throughout the city. On this site, the station placement is on Western
Avenue, which also allows for a quarter-mile transfer to Metra rail to travel to/from the
suburbs. Additionally, this station location at Western Avenue allows for an approximate
travel time of 6-8 minutes to the loop on rail.
2.4 Metra Station The Metra suburban rail service currently serves the suburbs of Chicago and has
al
su
M
si
C
12
T
W
A
m
il
a
lo
lso been reco
uburban rail
Management
ite: the Milw
Central Servi
2,6%, and 5
Transportatio
West Line do
Avenue. This
making for ea
llustrates the
The M
basic structu
ocation is no
Figure 2.3.
ording an in
was at 80.0
System, ww
waukee Distr
ce, and the U
.2% respecti
on Asset Man
es not stop a
proposal is
asier transfer
ese ridership
Metra Station
ure and does
ot pedestrian
Site of the P
creasing ride
million peo
ww.rtams.org
rict North Li
Union Pacifi
ively from N
nagement Sy
at Western, b
consolidatin
rs to differen
numbers of
n currently n
s not allow f
oriented as
Proposed CT
ership within
ople in 2006
g). Specifica
ine, the Milw
ic West Line
November 20
ystem, www
but rather a m
ng the Kedzi
nt Metra rail
f the four rail
near Western
for the rail se
a person wa
TA Green Lin
n the past 10
(Regional T
ally, the bran
waukee Distr
e have seen i
006 to Novem
.rtams.org).
mile west on
ie Station int
l lines and C
l lines.
Avenue at 4
ervice to bec
alking to the
ne Station at
0 years. Ride
Transportatio
ches that pas
rict West Lin
ncreases of
mber 2007 (
Currently, th
n the track ne
to the Wester
TA service.
420 North Ar
come a destin
station is req
t Lake St. an
ership for the
n Asset
ss through th
ne, the North
6.4%, 4.5%,
(Regional
he Union Pa
ear Kedzie
rn Station,
Figure 2.4
rtesian Aven
nation. The
quired to pa
nd Western A
14
e
he
h
,
acific
nue is
ss
Ave.
th
cu
E
hrough the p
urrently und
Express, #49
arking lot on
derutilized, a
Western, an
Figu
Figure
n the site bef
although it is
nd #65 Grand
ure 2.4. Nov
e 2.5. Curren
fore arriving
served by th
d).
vember 2007
nt Western A
g at the platfo
hree bus rou
7 Ridership b
Avenue Metr
form. The ex
utes (#33 Ma
by Line.
ra Station.
xisting station
agnificent M
15
n is
Mile
3
tr
co
ca
h
re
to
la
ra
in
.1 Rail T To ach
ransit system
ourse, it is im
an be used a
alf mile ring
elative to dis
owards areas
arge wholesa
ail transit, th
nterior roads
Figure 3.1.
Transit Orie
hieve the gre
m, half-mile w
mpossible to
as ancillary s
gs would be t
stance from t
s that are les
ale stores (se
he roads at th
s need to be c
. Density Gr
DESI
ented City
eatest possib
walkable rad
o not leave g
spaces to sup
the densest w
the central n
s dense and
ee Figure 3.1
he edges of th
closed to thr
raph Showin
CHAPTER
IGN PARAM
ble density w
dii should be
aps between
pplement the
with the talle
node. Popula
suitable for
1). In the tran
he radii coul
rough traffic
g Units per A
R 3
METERS
with the least
e packed as c
n circles with
e areas. The l
est structure
ation density
large parks,
nsition perio
ld be used fo
to minimize
Acre Radiati
t amount of o
closely as po
hout overlap
locations at
s, with densi
would grad
low density
ods from per
or motorists;
e the impact
ing from the
overlap in a
ossible. Of
pping, but the
the center of
ity decreasin
date outward
y housing, or
sonal vehicl
; however, m
of cars in th
e Station Nod
16
ese
f the
ng
r
le to
most
he
de.
ci
ti
d
sh
C
or
im
h
st
cr
tr
bu
ity. Figure 3
ightly as pos
esign, as the
hows a gridd
Chicago grid
Many
riented city
mplemented
alf-mile incr
tations are p
reate a walk
raveling outs
uses can be
.2 shows a c
ssible with no
e transportati
ded system w
(described i
y major cities
shown in Fig
into the exis
rements whi
laced minim
able distanc
side the radiu
replaced wit
compact latti
o redundanc
ion paths can
with larger g
in 1.1 Chicag
s, including,
gure 3.3. Th
sting urban g
ch coincide
mum on every
e from all lo
us, or transfe
th light rail s
Figure
ice of radii c
cy. This wou
n be manipu
gaps between
go Urban De
Chicago hav
he linear appr
grid; primary
with the hal
y primary or
ocations, and
erring to an
systems as th
3.2. A New C
creating the h
ld be best im
ulated around
n the radii. T
esign).
ve the ideal
roach makes
y and second
f-mile pedes
r every secon
d be able to t
alternate rail
he infrastruc
City Density
half-mile ped
mplemented
d these diago
This is based
layout to im
s it suitable t
dary roadwa
strian radius
ndary block,
transfer to bu
l line. These
cture progres
y
destrian radi
in a new city
onals. Figure
on the half-
mplement a tr
to be
ays alternate
. If transit
, the system
us transit if
e connection
sses.
17
ius as
y
e 3.3
mile
ransit
on
will
3
ac
li
m
w
st
Figure
.2 CTA S The C
ccommodate
ines). These
monitored by
with no unpai
tairs and elev
Figure 3.3. A
3.4. Sketch
Station
CTA station r
e eight car tr
platforms ne
y a CTA stati
id guests allo
vator access
A Transit Ci
of Land Us
requires plat
rains (the cur
eed to servic
on attendant
owed past th
to the oppo
ty Density B
e and Devel
form lengths
rrent length
ce both the in
t. All CTA st
he turnstiles.
site side.
Based on the
opment of a
s of approxim
of rush hour
nbound and
tations have
. This station
e Half-mile G
Gridded Tra
mately 425 f
r trains on m
outbound tra
secured turn
n has one sec
Grid
ansit Area.
feet to
most of the C
acks, and be
nstile ticketin
cured entry w
18
TA
e
ng
with
19
The proposed station makes use of the surroundings and allows the circulation to
be integrated into the adjacent buildings. The station includes a ground level entrance at
the corner of Lake Street and Western Avenue, as well as an elevated entrance at the
elevation of the serviced tracks. This will facilitate a simpler access to the transit, and
allow for transit users to have immediate access to the second level retail. The transition
from the pedestrian connection to the station is discussed in Section 3.6 Connection
Corridor.
The design mimics the glass roof of the Metra station (discussed in 3.4 Metra
Station) to give the station a grand feel. Most stations on the Green Line are barebones
structures, redesigned in the 1990’s with a white steel structure, concrete platforms and
corrugated metal roofing. Developing this station (and future stations) with a unique style
could increase ridership along the stations as they become destinations, rather than
simplistic stations.
This station is designed as an integration into an “existing” building. This
building is not currently on the site, or anywhere in Chicago, but has been given a
generalized column grid and design to facilitate design guidelines. An actual building
produced on site would, of course, change the design of the proposed CTA station in
order to adapt to the column grid and design of the building created.
3.3 Metra Station The Metra rail station requires a platform length of approximately 600 feet to
accommodate the suburban rail service. Platforms connecting both the inbound and
outbound tracks of all accessed Metra lines (MD-W, MD-N, NCS, UP-W) are also
required for this station to function. Although there is onboard ticketing on the Metra
20
trains, the inclusion of a ticket agent booth is incorporated into the design since the
station is servicing the inbound and outbound tracks of four rail lines. Unlike the CTA,
public access is allowed on the station property, but not aboard the trains. This allows for
the design of the station to become an extension and terminus of the pedestrian
concourse.
Like the CTA station, this station would allow for straightforward access to trains
from the elevated pedestrian concourse, which branches off into the station and connects
to the trains below with stairs and elevators. The station would be a long span steel
structure with a glass canopy. This can be utilized as a retail center with kiosks for small
stores and larger businesses annexed in existing neighboring buildings. With future
development and financing, the station could expand to the west with room for
apartments and condominiums built over the large rail yard adjacent to the station, the A2
interlocker, and further develop the node into a neighborhood. This area can be developed
with air rights development as was done over the rail lines in downtown Chicago.
3.4 Plaza Design
The Plaza proposed for the southern entrance to the suburban rail station (Metra)
is designed to be a lively, energetic pedestrian area. Using the public data from the
Regional Transit Authority of the Chicagoland region, we can see that on average 676
passengers alight at the Western station currently, and with the proposed Union Pacific
West station included in the design we need to add an average of 42 passengers alighting
during the morning commute. Assuming that these people return to the station to
commute home, this would lead to a group of 718 passengers in the initial development
of the area. This is a relatively low number; however, rail ridership on the Metra has been
21
steadily increasing. Within the past three years ridership on the Milwaukee District-North
line has increased 5% on average per year, 4.8% average per year on the Milwaukee
District-West line, 8.5% on the North Central Service, and 5.2% on the Union Pacific
West line. Taking this increased ridership trend, we can assume that in ten years, the
passengers alighting at the Western station will be up to approximately 6000 passengers
during the morning and evening commute. This is assuming a constant increase in
ridership and a constant level of personal vehicle commuters, as well without taking into
consideration outside factors such as fuel prices, automobile maintenance, bicycle
ridership, and train ticket costs.
By utilizing Alexander's Pedestrian Density pattern (Alexander, 123), a target
square footage per person between 150 and 300 is encouraged. This allows for the plaza
to be visually active and encouraging others to become engaged with the space as well.
We could calculate the area of the public plaza in ten years (2018) with 150 square feet
per person will need to be 750,000 square feet. However, this is clearly too large for the
location and not feasible for a walkable public plaza. It is also assuming that every
passenger will be utilizing the plaza and not passing though the shortest route to their
destination. The Piazza San Marco in Venice, one of the most well used public spaces in
the world, is only approximately 164,000 square feet in area (including the Piazzetta San
Marco). Additionally, the proposed location for the site would only allow for a plaza of
220,000 square feet at the largest.
For the plaza, I am proposing an initial usable space of approximately 100,000
square feet. After given the chance to develop, the area will be more vibrant and the plaza
utilized more by commuters and the local population. When needed, the plaza can be
expanded to the east and west up to a maximum of 220,000 square feet, although it
22
should only be opened to a maximum of about 150,000 square feet, keeping the area
tightly scaled to human proportion. Taking into consideration Chicago's harsh winter
season, the area needs to be developed to minimize cold winter winds from the
southwest, but allowing for the cool summer breezes from the west.
The plaza also needs a method of identity from a distance. Kevin Lynch organizes
this as a landmark in his Image of the City (Lynch 80). By giving a landmark "spatial
prominence" and making the landmark visible from one-half of a mile away, the identity
of the area and its surroundings will be easily trekked by the local population and visiting
commuters. For this, I am proposing a redevelopment of the 1946 glass and steel
structure on the site which is currently used in metals recycling and processing. This will
act as a way finding device around the area, much as the Sears Tower does for the overall
city of Chicago. The structure can act as a beacon, lit up at night, as well as used for
multiple purposes such as Weekend markets, neighborhood sales, community organized
events, etc and become an attraction for the area and in turn define the character of the
locale.
The plaza will be paved with the building material collected from the demolition
of structures currently on the site. This material (alternate shades of yellow and red brick)
can be placed in a concrete mixture and sanded down, much like a terrazzo. Drainage
from the surface will funnel into a bio-swale on the western section of land and return to
the water table naturally. Underneath the plaza will be a minimal amount of parking,
accessed from Western Avenue. By keeping the parking underground, the effects of
vehicles on the area are kept minimal and non-invasive.
23
3.5 Connection Corridor The connection corridor between the Metra and CTA station is elevated at the
same height as the elevated tracks of the rail systems above Western Avenue. This allows
for transit riders to alight from the trains and be at the same level as the connection
corridor, creating a simple connection to a new upper level retail between the stations,
and serving as a dual layer density for the area. The ground level of Western Avenue will
serve as a lower access to the storefronts, but main access should be accessible from the
upper level. Because the stores will be on multiple levels, they wouldn’t be required to be
as wide to maintain the same amount of square footage, and would allow for more
storefront access along the pedestrian route.
The building to bridge connection would act as a transition between structures.
What is produced for this project is similar to what is currently in place at the
Merchandise Mart CTA station, which utilizes a second level entrance to the retail stores
directly from the station. This connection uses the elevated track columns and adds steel
supports to the extended landing. A concrete slab is then attached to this bracing for the
pedestrian level. In the case of this connection corridor, wood decking will be placed on
top of the concrete slab to maintain a uniform appearance along the storefronts. Figure
3.5 demonstrates this transition.
While most of the corridor and storefront access will be overlaid with wood,
along the length of the elevated route alternate paving materials need to be utilized to
define areas of different use. As mentioned, most of the connection bridge will be clad
with wood decking. Wood decking has a very pedestrian-friendly feel, is softer than a
hard-paved surface underfoot, and is lightweight to minimize the steel underneath. This
24
decking will also be simple to replace and repair if a retail store decides to add or remove
their second level entrance. Other areas, for example, the high traffic areas around both
the CTA and Metra station entrances will need to be paved in a stone tile paver that will
wear better in high traffic than the wood decking on the rest of the pedestrian bridge.
Additional examples of different paving defining areas include a concrete paved area to
encourage skateboarding to occur in the defined areas, and grassy areas to encourage a
park-like setting.
Elaborating on this park-like definition, areas along this pedestrian route should
be heavily planted and shaded with trees and trellises. An elevated forest where people
can shop, work, live, and play is what needs to result for this connection to be successful.
Figure 3.5. Bridge to Building Connection
25
Trees can be placed in planters and given at least 4 feet of necessary soil to grow. These
planters should have seating built in to allow for people to rest, read, or watch other
people stroll by.
From Alexander’s Pattern Language, this promenade should be a place for staying
in, not just passing through (Alexander 590). The faceted wooden decking is to allow a
slight undulation underfoot. This sloped surface would never reach a slope greater than
1:20 to prevent the promenade from becoming cluttered with guardrails and handrails.
The structure of this connection corridor mimics the CTA elevated rail, with steel
columns on either side of the roadway, and connected by large steel girders. Because of
the long distance of Western Avenue, and the placement of a park-like setting on the
elevated concourse, supporting columns need to be placed in the median of Western
Avenue, as well.
3.6 Road and Alley Redesign
Vehicular travel within cities is at its worst. Currently, streets in Chicago are
congested with traffic that impedes both pedestrians, cyclists, and other vehicles from
utilizing the roadway to its full potential. The answer many civil engineers would give is
to incorporate additional lanes into the design, but this only exacerbates the problem by
creating more lanes of traffic to cross and, usually, less sidewalk area for pedestrians. The
failure of streets can be heard through the honking of its vehicles.
Roadways have been implemented to get vehicles from point A to point B as
quickly as possible. However, this system is failing, and this proposal is acknowledging a
reduced personal vehicle usage/elimination of the personal vehicle from the city design.
Rail based transport is one of the most efficient forms of mass transport (aside from
26
water-based transport) to be developed (Crawford 118).
A good roadway will differ according to environment. A major road such as
Western Avenue needs to have (by Phase II of the design) a set lane for freight vehicles, a
bus or tram line, bicycle lanes, and parking only if necessary. Street-side parking is very
dangerous for drivers and passengers of the vehicle, and to cyclists vulnerable to the
opening doors of the vehicle. This space would be much better utilized for the designated
bus lane or tram line on Western Avenue.
Smaller neighborhood roads should be closed to vehicle traffic by Phase II.
Granted, emergency vehicles, moving vans, and few other vehicles will be able to enter
when necessary. This eliminated traffic flow will create a much closer neighborhood with
people encouraged to interact with neighbors in the street to the front. Typically, these
smaller streets with parking on the sides are 42 feet in width, giving each Chicago block
approximately 11,550 to 25,200 extra square feet to use. This extra space can become a
cobbled area to walk, a playground for children, a grassy area to relax, or any number of
different things, allowing for a greater interaction among residents.
The alleys of Chicago will remain intact, as they are necessary for garbage,
recycling, and compost pickup as well as emergency vehicle access. However, the alleys
need to be redesigned to recharge the underground water table and produce a more
aesthetic backyard. The city of Chicago currently has proposed the idea of making "green
alleys" throughout the city's 1,900 miles of public alleys. This design includes a
permeable, high albedo, recycled pavement, dark sky lighting, and native vegetation
(City of Chicago 10). This design needs to be implemented on this site, and the rest of the
city, to the furthest extent. The coach houses typical to Chicago back yards adjacent the
alley and currently used for vehicle parking can be redeveloped as small apartments or
st
an
to
(E
(S
C
2
tr
E
av
co
ar
an
on
torage for re
Addit
nd out of the
o the south) c
Eisenhower
Stevenson E
Chicago Rive
7,000 cars (
rucks) on the
Expressway,
verage (Illin
onsumption
re harmful to
nalyze possi
ne day dimin
Many
F
esidents.
ionally, Chic
e city. The 90
covers most
Expressway
xpressway)
er. According
17,000 truck
e Eisenhowe
and 17,000 (
nois Departm
and decreas
o a city’s sus
ibilities of w
nish.
y initial react
Figure 3.6. C
cago has sev
0/94 (Kenne
of the north
y) brings traf
travels south
g to the Illin
ks) travel on
er Expresswa
(18,100 truc
ment of Trans
sing availabil
stainable, wa
what these lar
tions to recla
Chicago Gre
veral express
edy Expressw
hwest and so
ffic in from a
hwest out fro
ois Departm
the Kennedy
ay, 24,000 (1
ks) on the S
sportation, 2
lity of oil an
alkable, livab
rge roads can
aimed space
een Alley Pla
sways directi
way to the no
outh areas of
and out to th
om the city a
ment of Trans
y Expresswa
16,500 truck
tevenson Ex
2006). Howe
nd, and the re
ble urban en
n become as
in urban env
an (City of C
ing large tra
orth, Dan Ry
f Chicago. Th
he west side,
along the sou
sportation, ap
ay, 20,000 ca
ks) on the Da
xpressway pe
ver, with inc
ealization th
nvironment,
suming that
vironments a
Chicago, 200
affic flows in
yan Expressw
he 290
and the 55
uth branch o
pproximatel
ars (12,000
an Ryan
er day on
creasing
at automobi
we need to
this traffic w
are to create
07).
27
nto
way
of the
ly
les
will
28
large parks in the area. While this is feasible, we need to be careful at what the park will
do for the neighborhoods. Currently, the expressways are only for vehicle transport, and
there is no way for a pedestrian to gain access to the expressways as they are either
elevated, below grade, or fenced off. Because of this, the established parks would need to
have specific access points for entering and exiting. This leads to a confined space that
may not become very inviting. Without a lot of site work I feel as this could be a terrible
mistake for the city, as a park system like this is sure to fail (Jacobs, 57). For these linear
sites, I am proposing freight train lines into and out of the city, as well as express trains to
specific destinations (e.g. O’Hare and Midway airports). The freight lines would stop
approximately every mile to deliver local supplies which would then be carried by
specific postal car rail transit running on the LRT rail to centers where packages are
delivered by hand cart or bike. All of this will work seamlessly if scheduled with
precision. Freight trains can meet the postal carriers at the same moment and deliver
freight between the two services, and not causing any delay within the transit system.
These freight lines on the reclaimed expressways can be bordered by bike paths to
create faster access for cyclists to downtown. This will help to alleviate any overflow of
the capacities of the rail transit systems.
29
CHAPTER 4
DESIGN IMAGERY 4.1 Chicago Site Analysis The following images illustrate the development of the site analysis. The city of
Chicago has been analyzed with the development of a city-wide rail connection realized
through the use of the existing system as a base. All references for these figures are from
April 2008. Figure 4.1 displays the existing boundaries of the city of Chicago. Figure 4.2
illustrates the existing CTA rail lines in the city, with the proposed “circle line” shown
dashed in red. This line would connect most of the current lines in a large loop and
increase the service of the rail lines. Figure 4.3 shows the existing CTA rail stations.
Figures 4.4 and 4.5 illustrate the existing Metra lines and stations. Subtracting the entire
collection of CTA and Metra stations from the existing Chicago boundaries is shown in
Figure 4.6, and that same result without Metra stations is shown in the next figure. With
Figure 4.8, a half-mile walkable radius is overlaid onto the city. This grid is not entirely
accurate, as the entire area of locations like O’Hare and Midway Airports do not need to
be covered with CTA stations. One station will suffice. Figure 4.9 displays a density map
from the 1990 census. Red and orange areas are the densest with 7,491.63 – 33,850.46
and 4,049.19 – 7,491.62 people per square kilometer respectively. Yellow and green areas
are 1,987.90 – 4,049.18 and 3.21 – 1,987.89 people per square kilometer respectively.
Granted, this is the 1990 census and many areas have developed dramatically since then.
For instance, the South Loop is shown in green, when it has been seeing a great increase
in population with new residential towers built within the past few years. Figure 4.10
shows this same density map with the areas transited by the CTA removed. By overlaying
30
the half-mile pedestrian grid, we can see approximately how many stations will be
necessary in Figure 4.11. Figure 4.12 is analyzing only the densest areas of the density
map and produces a visual of the areas needing the initial development of the transit
system. Figure 4.13 is displaying 71 additional stations needed (in blue) along with the
existing stations (green) overlaid onto the density map. These 71 new stations would be
created, for the most part, by extending existing CTA lines and branching off or looping
around at the current terminals.
4.2 Western Avenue Site Analysis
The site is located on Western Avenue between Grand Avenue and Lake Street and
is shown in Figure 4.14. Figure 1.15 is displaying the current primary streets (orange),
secondary streets (yellow) and tertiary streets (dark red) with the CTA rail line on the
southern portion of the map (green) and the Metra rail lines shown on the north portion of
the site (blue). The one way streets on the site are shown with arrows in their direction of
flow.
4.3 Design Figures and Drawings
The remaining images are the design produced and described in the previous
chapters and sections. Drawing 4.1 shows the ground level plan of the CTA station, and
drawing 4.2 shows the mezzanine level plan of the station. Drawing 4.3 displays the
platform level floor plan. This level acts as a connection between the CTA and the
pedestrian bridge. The station includes retail accessible from inside the turnstiles.
Drawing 4.4 is a section through the track and exterior portion of the station, looking
north. Drawing 4.5 is a section through the interior area of the station, looking west. The
31
east elevation is shown in Drawing 4.6, and also cuts through the elevated pedestrian
bridge. The pedestrian bridge crosses at the same level as the tracks in this drawing. This
is done by removing the third rail that carries the electricity for the train in this section
and letting the train act as a conductor across the gap. Drawings 4.7 and 4.8 show the roof
and pedestrian level plans of the Metra station. This has been designed as a long span,
glass and steel structure. Drawing 4.9 is a section looking west through the glass and steel
canopy of the Metra station. The Plaza, acting as both a gathering place and an transition
from the elevated pedestrian level to ground level is shown in Drawing 4.10. Drawings
4.11, 12, and 13 show the transitions between phases I,II, and III by gradually removing
cars from the design of the area. Drawing 4.14 displays the typical bridge to building
connection that will occur along the length of the pedestrian bridge. Drawing 4.15
illustrates the pedestrian bridge plan near the CTA station, and Drawing 4.16 shows the
pedestrian bridge plan near the Metra station. Drawing 4.17is displaying the typical
middle section plan of the pedestrian bridge, and also shows the typical bridge to building
connections (direct, inset, court, arcade, and ramp).
The remaining images (Renderings 4.1-4.4) display several views of the
pedestrian bridge and areas around the connection.
32
Figure 4.1. Chicago Boundaries.
33
Figure 4.2. CTA Rail Line Locations.
34
Figure 4.3. CTA Rail Station Locations.
35
Figure 4.4. Metra Rail Line Locations.
36
Figure 4.5. Metra Rail Station Locations.
37
Figure 4.6. Areas Without CTA and Metra Rail Transit.
38
Figure 4.7. Areas Without CTA Rail Transit.
39
Figure 4.8. Half-mile Pedestrian Grid Overlay.
40
Figure 4.9. Density Map from 1990 Census.
41
Figure 4.10. Density Map and Areas Without CTA Rail Transit.
42
Figure 4.11. Density Map and Half-mile Pedestrian Grid Overlay.
43
Figure 4.12. High Density Areas.
44
Figure 4.13. Proposed CTA Rail Station Locations (in blue).
45
Figure 4.14. Site of Western Avenue Enlarged.
46
Figure 4.15. Western Avenue Site Analysis.
47
Drawing 4.1. Street Level Floor Plan of CTA Station (el: +0′).
48
Drawing 4.2. Mezzanine Level Floor Plan of CTA Station (el: +12′).
49
Drawing 4.3. Platform Level Floor Plan of CTA Station (elevations as noted).
+24′
+24′
+20′+24′
50
Dra
win
g 4.
4. S
ectio
n Th
roug
h C
TA S
tatio
n Lo
okin
g N
orth
.
ra
il cr
ossi
ng:
+20′
plat
form
: +
24′
grad
e:
+0′
51
Dra
win
g 4.
5. S
ectio
n Th
roug
h C
TA S
tatio
n Lo
okin
g W
est.
grad
e:
+0′
mez
z:
+12′
plat
: +
24′
52
Dra
win
g 4.
6. E
ast E
leva
tion
of C
TA S
tatio
n.
grad
e:
+0′
rail
cros
sing
: +
20′
plat
: +
24′
53
Drawing 4.7. Roof Plan of Metra Station.
54
Drawing 4.8. Pedestrian Level Floor Plan of Metra Station.
55
Dra
win
g 4.
9. S
ectio
n Th
roug
h M
etra
Sta
tion
Look
ing
Wes
t.
plat
form
: +
30′
grad
e:
+0′
track
: +
9′
56
Dra
win
g 4.
10. S
ectio
n Th
roug
h M
etra
Sta
tion
Plaz
a an
d Su
b-le
vel P
arki
ng.
plat
form
: +
30′
grad
e:
+0′
track
: +
9′
57
Drawing 4.11. Section Through Western Avenue, Phase I of Street Design.
Drawing 4.12. Section Through Western Avenue, Phase II of Street Design.
Drawing 4.13. Section Through Western Avenue, Phase III of Street Design.
+24′
+0′
+24′
+0′
+24′
+0′
58
Drawing 4.14. Section Through Pedestrian Bridge/Building Connection.
el: +24′
el: +0′
59
Dra
win
g 4.
15. P
lan
of P
edes
trian
Con
nect
ion
Nea
r CTA
Sta
tion.
60
Dra
win
g 4.
16. P
lan
of P
edes
trian
Con
nect
ion
Nea
r Met
ra S
tatio
n.
61
Dra
win
g 4.
17. T
ypic
al P
lan
of P
edes
trian
Brid
ge.
62
Ren
derin
g 4.
1. V
iew
from
the
Surf
ace
of th
e Pe
dest
rian
Brid
ge.
63
Ren
derin
g 4.
2. V
iew
from
Bel
ow th
e El
evat
ed P
edes
trian
Brid
ge.
64
Rendering 4.3. View of a Typical Middle Section of Elevated Pedestrian Bridge.
65
CHAPTER 5
CONCLUSION
5.1 Summary
With the prices of fuel steadily rising, there is an emerging shift in urban
demographics favoring higher densities. From this, we need to analyze at what population
density should a new CTA station be placed, and at what level they are most successful.
This proposal is meant to serve as an exemplary device for other possible rail
connections, as well. An additional example of where this type of connection could occur
is at the CTA Green line terminus at 63rd/Cottage Grove with a connection to the Metra
Electric and South Shore Lines. This location is currently vacant land that could benefit
both the CTA and Metra and the community in this location. Also, between the Red and
Green CTA lines and the Rock Island District and Southwest Service Metra lines at 35th
street could be developed similarly. The IIT campus could play a unique development in
this instance. A pedestrian connection at Roosevelt between the Red, Orange, and Green
CTA lines and the Metra Electric and South Shore Lines would give the growing south
loop a great pedestrian development. This could be expanded upon once the proposed
Circle Line is implemented. Another area that could be built up in this fashion is at either
the Western or Pulaski stations on the Pink Line, with a connection to the BNSF Metra
rail line. The current station at Western Avenue on the BNSF line is in need of
improvement, and developing it with a pedestrian oriented connection could improve the
community as well. Lastly, with an extension added to the CTA Brown line, there could
be a pedestrian connection between it and the Blue line (O’Hare Branch) and the
Milwaukee District- North Metra Line.
66
5.2 Conclusion
One issue with trying to analyze and construct a car-less city is that we attempt to
substitute our current means of transport with something that tries to mimic our current
standards and usually ends up as a second-rate system. For Chicago, or any city, to
become a successful, densely populated, car-less city, we need to be innovative and
rethink the way we live and the way we can live. Car-less cities need to function as
conveniently as current vehicle-centric cities, but without the danger and inefficiency of
them. By no means is this project concluded; this will be a work in progress for a very
long time, eventually emerging into a practical solution.
67
BIBLIOGRAPHY
Alexander, C., Ishikawa, S., & Silverstein, M. (1977). A Pattern Language. New York:
Oxford University Press. Chicago Transit Authority. (2008). Website. Retrieved March 3, 2008 from
www.transitchicago.com.? Regina Webster & Associates. (2005). Toolbox for Intersection Design: Elements to
Enhance Express Bus Service. PDF, Retrieved February 25, 2008 from http://www.transitchicago.com.
Ching, F. (2008). Building Construction Illustrated. New Jersey: John Wiley & Sons, Inc. City of Chicago. (2008) The Chicago Green Alley Handbook: An Action Guide to Create
a Greener, Environmentally Sustainable Chicago. PDF, Retrieved February 22, 2008 from http://www.cityofchicago.org.
Crawford, J. H. (2002). Carfree Cities. Utrecht, the Netherlands: International Books. Dittmar, H., & Ohland, G. (2004). The New Transit Town. Washington D.C.: Island Press. Jacobs, J. (1961). The Death and Life of Great American Cities. New York: Vintage
Books. Lynch, K. (1972). The Image of the City. Cambridge, Massachusetts: MIT Press. Ramsey, C. G., & Sleeper, H. R. (2000). Architectural Graphic Standards (10th Edition ed.). (J. R. Hoke, Ed.) New York: John Wiley & Sons. Regional Transportation Asset Management Program. (2007). Assets and Services.
Website. Retrieved February 28, 2008 from: http://www.rtams.org.