Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September...
-
Upload
thomasine-arnold -
Category
Documents
-
view
214 -
download
1
Transcript of Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September...
![Page 1: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/1.jpg)
Training Day 2Inventory, Orders and Production Control
RecipeManager©
User TrainingSeptember 2014
Recipe Manager Vydata Systems Training Presentation
![Page 2: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/2.jpg)
•Inventory Introduction review of Day 1 – Q&A/Recap•Inventory Stock Level Targets: PAR, MIN, and MAX•Reordering Stock: Purchase Orders Overview•Mid-Day Workshop •MenuWriter Intoduction•The Master Menu•Production Menus•End-of-Day Workshop
Day 2 Training Agenda
![Page 3: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/3.jpg)
Yesterday we covered…
Inventory Review
Any questions before we move on?
•Introduction, System Info, and Logging into RM Enterprise•System Overview and Finding Data•Configuration – Entering or Adjusting Lists•Inventory Introduction•Inventory Purchases•Inventory Conversions•Recipes: Intro, Reporting and Labeling•Production Scheduling Overview
![Page 4: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/4.jpg)
Inventory“Target Levels”: Important System Stock Level Markers
PAR Level – the “re-order” point (defines when stock is considered “low”)
MIN Quantity – the minimum order quantity allowed from vendor
MAX Quantity – the maximum order quantity allowed from vendor
NOTE: The MIN Quantity and PAR can be adjusted based on order delivery time to ensure stock is filled to the required levels
These define when and how much to re-order when stock is low!
![Page 5: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/5.jpg)
•PAR Level for this item is based on a PAR schedule
•MIN/MAX level for this item controls what is ordered to replenish stock
InventoryItem Quantity Tab: where these targets are…
![Page 6: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/6.jpg)
•Set Schedule for each day, specific days, weekly, monthly, etc.
•Set Quantity (defining the LOW stock measure)
•Set Unit (which will define the unit of measure of how the item is tracked
InventoryThe PAR Level: Set a PAR Schedule as needed
![Page 7: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/7.jpg)
• Must enter Locations
Why? Because we need to know exactly where the stock is physically counted or tracked within the site (for example: a freezer)
• Must enter Physical UnitsWhy? Because we need to define what we’re tracking (for example: tracking by the case, package, or pound)
• Must post a zero count if you don’t physically count it
Why? Because we need a period starting point (calculating a theoretical stock level for today requires a starting point for some point in the past)
InventoryImportant things to consider for all inventory items…
![Page 8: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/8.jpg)
Inventory Re-Orders (Vendor PO’s)Reordering Low Stock…
• Find items with a low stock FLAG
• Right-click (or use ORDERS button) to place an order
• The MIN/MAX target levels will be evaluated for determining what is ordered
![Page 9: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/9.jpg)
Inventory Re-Orders (Vendor PO’s)Low Stock Re-Order Options
PROCESS: From low stock list, simply right-click and select ORDER STOCK.
![Page 10: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/10.jpg)
• REQUEST
• ORDER
• BACK-ORDER
• RECEIVED
Initially, you may want a REQUEST (requisition) for an ORDER
It will then be later APPROVED into a purchase ORDER
Inventory Re-Orders (Vendor PO’s)
![Page 11: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/11.jpg)
Purchase Orders / Requisitions
• Open the vendor
• Right-click and select Open/Edit Vendor Purchase Orders
To re-open existing orders…
![Page 12: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/12.jpg)
Purchase Orders / Requisitions
• Double-click to open the order or requisition
The order we just placed is there…
![Page 13: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/13.jpg)
Purchase Orders / Requisitions
• Click SCHEDULE
• The order will be placed in your Outlook Calendar and notify you when it is close to arrival!
Order Scheduling (in MS Outlook)…
![Page 14: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/14.jpg)
Once a PO is created, it can be received later to replenish stock levels
Inventory Re-Orders (Vendor PO’s)
![Page 15: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/15.jpg)
Workshop
• Configure an item for stock level tracking• Make a change to force it to be flagged LOW using
a PAR level with MIN/MAX adjustments• Place a Vendor PO and receive it to replenish
stock
Suggestions for your Workshop…
![Page 16: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/16.jpg)
Day 1 mentioned this application’s duel focus…
MenuWriter – the Application
Final Product Menu Recipe cost changes based on
Inventory price changes Analysis of those changes Full Training on Day 4
Production of Meal Plans Production Scheduling Waste Sheets Virtual movement of inventory
from ingredient to meal Building process for Purchase
Orders Full Training on day 4
The Master Menu Production Menus
NOTE: access this application by clicking the MENU button in RM
![Page 17: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/17.jpg)
•Organize your Products Menu•Price updates reflect on Menu
MenuWriterThe Master Menu
![Page 18: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/18.jpg)
• Products organized by categories• “Saleable” sub-recipe inventory only• Final production items – end products• Products that are highlighted have recent price/cost changes
MenuWriterThe Master Menu – Usage
![Page 19: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/19.jpg)
• Design your “Master Menu” by adding sections and products within those sections with the ADD TO button
MenuWriterThe Master Menu – Setup
![Page 20: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/20.jpg)
• The ANALYZE button shows you what changed in your products on the Master Menu – simply “Acknowledge” those changes
MenuWriterThe Master Menu – Tracking Price/Cost Changes
![Page 21: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/21.jpg)
• A printed Master Menu is generally designed for customer viewing
MenuWriterThe Master Menu – Printing a “Menu”
![Page 22: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/22.jpg)
Workshop
• Set up a Master Menu• Make design changes on your Master Menu• Add/remove items on your Master Menu• Make some price updates and analyze• Generate a printed Menu
Suggestions for your Workshop…
![Page 23: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/23.jpg)
MenuWriterThe Production Menus
• Food production can be driven by sales orders, forecasting, or manual entry
![Page 24: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/24.jpg)
• Products that must be prepared or “produced”• Based on “production runs” from a “production schedule” (menu)• Menus can be scheduled by period (date) or event• PRE-PREP Check can be used to analyze stock levels first• PREPARE will deduct raw materials and create final products
MenuWriterThe Production Menus – Usage
![Page 25: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/25.jpg)
• Design your Production Menu the same way as the Master Menu
MenuWriterThe Production Menus – Setup
![Page 26: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/26.jpg)
• Analyze each ingredient to see if we have stock to cover the menu
MenuWriterThe Production Menus – PRE-PREP Check
![Page 27: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/27.jpg)
• Enter how much “actual prep” and “waste”, then run production• Recipes are all scaled and production causes raw inventory deduction
MenuWriterThe Production Menus – Preparing Food
![Page 28: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/28.jpg)
• Schedule a recurring “date” production run or a single “event”• Scheduling is done in MS Outlook Calendar
MenuWriterThe Production Menus – Scheduling
![Page 29: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/29.jpg)
• Waste sheets record product waste during the production process• Waste is calculated in different ways depending on “when” it happens
MenuWriterThe Production Menus – Waste
![Page 30: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/30.jpg)
• Entering your production notes is important to track “the details”
MenuWriterThe Production Menus – Notes
![Page 31: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/31.jpg)
• A printed production menu is for internal viewing
MenuWriterThe Production Menus – Reporting / Analysis
![Page 32: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/32.jpg)
• NOTE: we can view stock affected and place purchase orders
Revisiting Purchase OrdersAfter Production – Do we need more stock?
![Page 33: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/33.jpg)
• NOTE: the LOW STOCK flag from Inventory will display all low items
Revisiting Purchase OrdersAfter Production – Checking Stock Levels
![Page 34: Training Day 2 Inventory, Orders and Production Control Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.](https://reader035.fdocuments.in/reader035/viewer/2022070403/56649f2f5503460f94c4958e/html5/thumbnails/34.jpg)
Workshop
• Set up a new Production Menu• Make design changes on your Production Menu• Add/remove items on your Production Menu• Schedule a catered event menu• Run the catered event menu production• Evaluate the inventory changes after production• Generate some production menu reports and analyze
Suggestions for your Workshop…