TRACECA PROJECT EVALUATION

Transcript of TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN...

Page 1: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

TRACECA PROJECT EVALUATION

Page 2: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

Tg. Mures – Iasi - UngheniMotorway section

PROJECT PROPOSAL IN TRACECA CONTEXTPROJECT PROPOSAL IN TRACECA CONTEXT

Page 3: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

Urzic e ni

ILIA

E7 9

TUSNAD

C AREI

Nusfa la u

M ARG HITA

Virfurile

NUC ET

HUNEDO ARA

Sa rm isege tuza

BAILE HERC ULANE

BAIA DE ARAM A

C a ra so va

58

O RAVITA

M O LDO VA NO UA

Bozo vic i

Po je ja na57ASo c o l

E7 0

Na id a s57

G ra d ina ri57

57B

To p leta

O RSO VA

57

Berze a sc a

56B

E7 7 1

Ia b la nita

57B

ANINA

67D

76 Dra gestiLe s

NADLAC

Biled

C a rp inis

SINNIC O LAU

59B

59C

M ARE

J IM BO LIA

Lo vrin6

C e na d

E6 87

E68C a prutaLIPO VA69

58B

M O RAVITA

DETA

E70

Voite g

59

Berzo via

BO C SA

TIM ISO ARA

E671

59A

O rtiso a ra

Vinga

LUG O J

C ARANSEBES

OTELU RO SU

58Sa c eni

RESITA

58A

68

E673

Sa virsin

Fa ge t

68A C o sa va

7

Ina na

SALO NTA

C HISINEU-C RIS79A

ARAD

E671

Na da b

Turnu

Pa ulis

79A

VARSAND

79

E671

79A

INEU

G ura hontE79

VASC AU

76

E79

C o pa c e niPo c o la

BEIUS

E6 0BO RS

Sa c ue ni

Ba ile Fe lix

Biha ria

O RADEA1

19

ALESD E60

1H

de Ba c a uSup ia c u

19B

Va le a lui M iha i

191F

C a ta lo iIa nc aBUZAUVerne stiVALENIISc hituDom ne stilui Ne a g

22D73C67A

PLO IESTI

DE M UNTE

OTO PENI

Ad una tii-C o pa c e ni

C a luga reni

41

64

O C NELE

Dob ro te a sa

Ba be niM ARI

DRAG ASANI

C ARAC AL

Brinc o ve niBALSE79

56

C ALAFAT Ra st

M a g la vit

C e ta te

56A

E79

55ADa bule ni

Bec he t 54A

55

Ro do va n

C RAIO VA

6Le u

Bumb esti-

Sc oa rta

Pe ste a na -J iuM OTRU

Broste ni

TURNU SEVERIN

VINJ U M ARE

67A

Sim ia n 6

Flore sti

DRO BETA

67

STREHAIA

FILIASI

Runc u

Pie p ta ni

67D67

67

TIRG U J IURO VINARI

J iu

66

Ba lc e stiTinta re ni

E7065C

Hure za ni67B

G a ne a sa

G iule sti

HO REZU

M a lda resti

G ra d iste a

TIRG U C ARBUNESTI

C im pu M a re

67B

Benge sti

Po lo vra c iNO VAC I

G O VO RA

65C 64

BAILE67

64

C le ja ni

DE VEDE

TURNU M AG URELE

RO SIO RII

52

54

C O RABIA

E70Sto e ne sti

54

Da nea sa

65A

6

65A

G IURG IUSm ird ioa sa

ZIM NIC EA

51

51AE8 5

E7 05C

G him pa ti

ALEXANDRIA

Dra ga nesti Vla sc a

6

E705B

Da iaE85

5

661

Dra gom iresti

72A

C e rbuVede a67B

Unghe ni

SLATINA

65

E574

C O STESTI

Re de a65A

E70

C URTEA DE ARG ES

E817C

RIMNIC UVILC EA

Buda u

73C

PITESTI

73

7

E574

G o le sti

E60

Bilda na

C ringa si

C re ve d ia M a re

TITU

G AESTI

7

A1

BUFTEA1

TIRG O VISTE

I.L.C a ra g ia le

72 71

FIENI

1A

72

C IM PINA

1

A2

213Vla d Te pe s C uza

Budesti

O LTENITAG re a c a

4

M ina stire a 3B

C ALARASI

O strov

Voda

31

Ba nea sa

C o rvin3

C ilib ia

Po goa ne le

2A

Fund ulea

E85

Bra ne stiPa sa re a

E602

3

G a raLe hliu

Le hliu

URZIC ENIE60

M a lu

C o ste sti

M IZIL

1D

Albe sti

1B

E85

2C

2B

3A

SLO BO ZIA

Dra jna

TANDAREI

21Dra ga lina

Ste fa n Vo da

3A

Am a ra

2C

FETESTI

Fa c a eni3B

Insura te i

G rivita

FAUREI

G IURG ENI21A

E577

2B 21

22C

C O NSTANTA

EFO RIE NO RD

NEPTUNJ UPITER

M ANG ALIA

C O STINESTIEFO RIE SUD

Va m a Ve c he

E8 7

E675

O vid iu

C o ba d in

Am za c e a

Neg ru voda38

Pie treni

Ba sa ra b i

E87VENUSSATURN

Ag ige a

39

BABADAG

C a pul M id iaNAVO DARI

M iha i Sc ra iu

C ERNAVO DAKoga lnic ea nu

M iha il

2A

E60

22

22B

E87

Vite a zu

22D

HoriaNa lb a nt

C iuc uro va

Ro hm a n22A

To po lo g

C e rna

E87

C a uga g ia

22D

2222A

C im puluiVa rful

C ra c a o a ni

Pra xia

Ta rc a u

G him e s-Fa get

M IERC UREA C IUC

C O M ANESTI

INTO RSATURABUZAULUI

Ungure niM a nec iu-

E85

29A

15E576 BO RSECDed aZim ba r

VESTEM

BUC URESTI

TIRNAVENI

M EDIAS

Bla je l

Axe nte Se ve rC O PSA M IC AC risc io r 14B74

SEBES

7APETRO SANI

Pui

HATEG

URIC ANI

C im pu

C irnesti E79

66

66A

SIM ERIA

C ALAN

68BDEVA

76

So im us

O RASTIE

ZLATNA

7

Ta lm a c iu

O b irsia Lo truluiVoinea sa

BREZO I7A

M a la ia

7

E81

E81

Suga g

57CE68

1/7

SIBIU

14

ALBA IULIA

Buru

Alba c

BRAD74

Buc e s

Ariese ni

C IM PENI

Buc ium

ABRUD

Lupsa 75

HUEDIN

1 1G

1F

C IM PIA TURZIITURDA

BLAJ

Te ius1

14B

AIUDM ira sla u

E81

14A

Ie rnut

C LUJ NAPO C A

Ap a hida

E60

Ra sc ruc i

Dim bu

C a m a ra su16

Hoghiz

RUPEA

Se rc a ia

73A

Bilea La c

Po ie na ri

7C

C IM PULUNG

Ruc a rE574

Voila

C irtiso a ra1

Avrig

FAG ARAS

Sinc aVec he

1

10BRA SO V

PREDEAL

SINAIA

C O M ARNICM o ro e ni

71

E60

RISNO V

Bra n73A73

1A

C he ia

SAC ELE

G HEO RG HESFINTU

E68 C O DLEA

E574

Re c iC hic his

Pre jm e r

11

SEC UIESC12

TIRG U

13A

TO PLITA

O DO RHEIUSEC UIESC

C o rund13AM URES Pra id

SIG HISO ARA

Singe o rg iu

DUM BRAVENI

13

14

Ba la useriLupe ni

TIRG U

REG HIN16

15

15

SO VATA

BAILE TUSNAD

VLAHITA

Sinm a rtinC o zm eni

11B

Sindo m inic

G HEO RG HIENIJ oseni13B 12

12

Ditra u

12A

BIC AZ

La c u Rosu

12C

VISEU DE SUS

Ro m uli

M ARM ATIEIPe teaLiva da SIG HETU

1C

O AS

So m c ul M a re

Surd uc

Sinm iha iu Alm a sului

Sa rm a sa g

Ro m a na si

ZALAU

SIM LEUSILVANIEI

Tiha u

J IBO U1H

1H

Supuru de jo s

SATU M ARE

Ardud

E81

19A

Doro lf

E671

Sa tulungE671

1CSe ini

1C

Va m a

17C

G HERLA

1C

DEJ

G ilga u

Ra sto c i

E576

C o sbuc

17D

Fe re sti

BAIA SPRIEBAIA M ARE

18M a ra

Sa c el

18

E8 1 /E5 8HALM EU

M a reTa rna

19Sa p inta

de SusVic o vu

RADAUTI

DO RNEIVATRA

Ia c obe niRo dna

Prundu Birga ului

SING EO RZ-BAI

17C

BISTRITA

NASAUD

BorsaM o isei

17D 18

C irliba ba

C hiril

Broste ni

17B

Borc a15B

Po ia na La rgului

15

M O LDO VENESCC IM PULUNG

G URA HUM O RULUI

M o ldo viteiVa tra

Va m a

Suc e vita

17AIlise sti

M a rg ine a

SIRET

E8 5

Ra lo s29C

E5 8 1RO M AN15D

26

HUSI

Fa lc iu

O a nc ea

Fo lte sti

Sm irda n

Tuluc e sti

E581Bretc u

FO C SANI

M ARASESTI

2D

Neho iu

C isla uC iuta

Siriu

RIMNIC U SARAT

10

2D Le psaVid ra

25

Indep ende nta

Ba lta Alba22

2

Se ndre ni

Sa ra t

BRAILA

Tra ia n

La c u M o vila M ire sii

2B

G ALATI

G a ra Be rhec i

TEC UC I

E85

24

Ha nu C o na c hi

BAC AU

Se c uie ni

15D

2G Sc orte ni

Sa ndule ni

TIRG UO C NA

O ituz11

SLANICM O LDO VA

12B

Da rm a nesti

M O INESTI

11A

O NESTI

E574 E85

PIATRA NEAM T

BUHUSI

15

Sirb i

BIRLAD

ADJ UD

Po du Turc u11A24A

26M urge ni

Zorleni

E581

VASLUI

Vulture sti15D

Dra gom iresti2F

NEG RESTI

24B

C ra sna

ALBITA24B

ISAC C EA

G a rva n

M AC IN22

2B

E87

24A

E5 8 3 /E5 8

Sta nc a29B

E583

Ste fa ne sti

TIRG U FRUM O S

Nic o la e Ba lc e sc u

M ic la use ni

PA SC ANI

Sa ba o a ni

TIRG UNEAM T

Dob re ni15C

15C M o toc

Strung a

28

Rug inoa sa28A

BOTO SANI

SUC EAVA

FALTIC ENI

29C

29 Ruta niE58

HIRLAU

28B

29D

SC ULENI

Vina to ri

BUC IUMIASI

28Po du Ilo a ie iE58

24 28

PrutRa d a uti

DARABANI

G e orge Enesc u

DO RO HO I

29AM a nole a sa

SAVENIUngure ni

29

TULC EA

HIRSO VASERBIA SI M

UNTENEGRU

Proposed TEN – T projectsExisting TEN – T projectsIntermodal interchange

The section is going to be part of the extended TEN – T and in the same time part of traceca corridor

– Romania has got a strategyc position, linking Europe with

TRACECA countries.

Tg. Mures – Iasi – Ungheni

Page 4: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

Regional Criteria• Network description

The motorway section Targu Mures – Iasi - Ungheni/ border with Republic of Moldova:

– is placed in the North - eastern part of Romania, connecting the central part of the country with the Romanian/ Moldavian border;

– the section is also connecting 2 Pan–European Corridors no. IV and no. IX, having the following indirect benefits: connects Bulgaria to Hungary (Partly through Pan – European Corridor no IX and partly through Transilvania motorway) and in the same time with the existing national infrastructure;

– it is also considered to be an exit to Ukraine, using the national road infrastructure;

Pan – European Corridor no. IX

Pan – European Corridor no. IV

Connection with Transilvania motorway

Tg. Mures – Iasi –Ungheni

Page 5: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

• How is interoperability and connection with other infrastructures handled?

– Having a direct link to Moldavian Border will be the main reason to attract the traffic flow from Bulgaria, to Romania and further to the Republic of Moldova or to Hungary, route which will be fully operational after finalizing the Corridor no. IV – Nadlac (Hu/ Ro cross border) – Arad – Timisoara – Lugoj – Deva – Orastie – Sibiu – Pitesti – Bucuresti – Cernavoda – Constanta, the Pan – European Corridor no IX and Transilvania motorway.

– The location of the future motorway sections is also a benefit for the regional development along the Moldavian/ Romanian cross-border, the economic environment could be stimulated and eligible for European Regional Funds.

Tg. Mures – Iasi –Ungheni

Page 6: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

– Technical DescriptionDesign speed: 130 km/hLength: aprox. 310 kmMotorway cross-section:platform – 26.00 m; carriageway - 4 x 3.75 m; middle lane – 3.00 m; Emergency lane - 2x2.50 m; shoulders - 2 x 0.50 m; employment bands - 4x 0.50 m; parapets space (outside the platform) – 0.75 mCross-section for link roads:carriageway - 2 x 3.50 m; shoulders - 2 x 1.00 m, out of which: employment bands - 2 x 0.50 m; platform - 10.00 m.

– Land acquisition:Estimated area of expropriation for the entire highway route - represents terrain and built settlements.

Page 7: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

Regional Development

Turistical opportunities to see the national and international

patrimony of the area: churches, castles, monuments

Mountain sports

Page 8: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

EconomicDevelopment

Stimulate the development of : Wood & Ceramics Manufacture,

Agriculture, Wine industry, others

Page 9: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

Economic Criteria• Estimated project repayment time - At 10 years to cover the initial costs• Forecast years

– At least 3 years for construction, based on the experience of similar contracts; the length will be divided into 3 sectors: Tg. Mures – Ditrau – Tg. Neamt - Ungheni

• Investment costs – 6. 096 mil. Euros- costs for development of design documentation (feasibility study, feasibility study, engineering design, details of execution);- expenses for consultancy and technical assistance;- Costs associated with obtaining necessary approvals and agreements in principle for the investment;- Expenses for training documents on the procedure for awarding the contract;- construction costs

Tg. Mures

Ditrau

Tg. Neamt

Ungheni

Tg. Mures – Iasi –Ungheni

Page 10: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

• Financial Rate of Return of the Investment and the cost break down – will be established after the Feasibility Study will be finished.

• Private investors interest in the project – until now, during the bilateral meetings at high level, a lot of investors from European and Asian countries had shown interest for this project implementation.

• PPP laws – Romania has recently approved the Law which rules the PPP project.

Page 11: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

Technical Criteria

• Link or node or upgrade? – The present alternative considered to be viable is the national road network, which goes toward the cross

border point with the Republic of Moldova, national road considered not to be able to comply with present traffic needs.

– By implementing this project, there will be offered to the road users a better level of accesibility, speed, traffic safety, confort because of the auxiliary services offered by a motorway

• Intermodality– The quickest link to the Eastern border with the Republic of Moldova, and further on to Hungary through

Transilvania Motorway and to Bulgaria through a part of Transilvania Motorways and a part of Pan European Corridor no. IX.

– The link, through the motorway network, existing or future, with Constanta Multimodal Terminal– The link with the integrated transport system (Danube river)

• Modal shift – there is currently available the RO-LA technology, in the multi modal links: Tg. Mures, Iasi and Ungheni.

• Safety– the technical requirements, starting from the design stage, will impose the safety geometrical elements, in line

with best design & technologies;

• Travel cost saving – the motorway section will have high standards, according to TEM motorway standard – modern, European,

economical, for the same price, which is the Romanian vignette

• Travel time savings– the travel distance is reduced with 25% and travel time with 30%

Page 12: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

Environmental Criteria

• Pollution

Reducing the noise & gas emission

• Energy consumption – will be reduced due to the continuous flows of traffic, to the decrease of the travel time and the time spent in the cross border point

• Diversion from sensible areas (living areas, preserving natural resources, others)

The traffic flow will be taken out of cities – Greener transport

• Creating eco ducts in order to protect the fauna

Page 13: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

Political Criteria• When to start?

– after the Feasibility Study is finished (1st Semester of 2012) and the financing resources necessary for the construction will be identified.

• Government Support– The project is included into Romanian transport strategy for PPP projects– Part of the Romanian Master Plan, Fiscal Strategy for the next 5 years.

• Dependance on other step/project– No dependency

Page 14: TRACECA PROJECT EVALUATION. Tg. Mures – Iasi - Ungheni Motorway section PROJECT PROPOSAL IN TRACECA CONTEXT.

• Thank you for the attention!

• ROMANIAN TRACECA NATIONAL [email protected]

National Secretary – mr. Ionut LACUSTA

LET’S SHAKE HANDS FOR TRACECA DEVELOPMENT!