TPCA (TOYOTA PEUGEOT CITROËN AUTOMOBILE) SIX YEARS OF SUCCESS.

10
TPCA (TOYOTA PEUGEOT CITROËN AUTOMOBILE) SIX YEARS OF SUCCESS

Transcript of TPCA (TOYOTA PEUGEOT CITROËN AUTOMOBILE) SIX YEARS OF SUCCESS.

TPCA (TOYOTA PEUGEOT CITROËN AUTOMOBILE)

SIX YEARS OF SUCCESS

TPCA JOINT-VENTURE

Capital

JOINT-VENTURE

50 %50 % 50 %50 %

Manufacturing

ToyotaProduction

System

ToyotaProduction

System

PartsParts

J-V RESPONSIBILITIES

Selection of suppliersPurchasing

Selection of suppliersPurchasing

DevelopmentProduction

DevelopmentProduction

BASIC FACTS

BASIC FACTS

Location: Kolin, Czech Republic Established: 2002 Investment: EUR 650 million Start of Production: March 2005 Exports: 99,5 % Employees: approx. 3,500 (+ indirect 7,000 jobs) Shifts: 2 shifts / 3 teams Turnover 2007: EUR 1 926 million Average production: 580 cars a shift Capacity: 320,000 cars a year

TPCA is a member of:Automotive Industry Association

Size: length / width / height: 3410 / 1615 / 1465

Body: 3- & 5- door

Engines: SI, 3-cylinder, 1.0 l, Toyota Diesel, 4-cylinder, 1.4 l, PSA Peugeot Citroën

Gearbox: MT & MMT

Fuel consumption:

4.6 l / 100 km (gasoline) and 4.1 l / 100 km (Diesel)

PRODUCED MODELSPRODUCTION : 1/3 Toyota Aygo, 1/3 Peugeot 107, 1/3 Citroën C1

City cars between A and B segments

Modern and dynamic design

Top level safety, equipment and performance

EMISSIONS:

109 g CO2/kmEMISSIONS

:

109 g CO2/km

TPCA ORGANIZATION STRUCTURE

President (JP)

Final Assembly

Production Control

Accounting & Finance

Information Systems

HR&GAPaint &

EnvironmentQuality Control

Executive Vice President (FR)

Body Manufacturing

Production Vice President (CZ)

Production

ORGANIZATION

Production Vice

President

PresidentExecutive Vice

President

Operation

Management

Dev elopment

section

Material Handling

& Purchasing

section

Assembly Engineering

section

Applications systems section

Infrastructure section

Health & Safety section

Plant manager

Manpow er Planning section

Human Resources

Dev elopment

section

Cost Management

section

Tax, Audit & Treasury section

Corporate Affairs section

Accounting section

Stamping section

Welding section

Welding Engineering

section

Paint section

Paint Engineering

& Env ironment

section

Body Manufacturing

Department

Paint & Environment Department

Final Assembly

Department

Information Systems

Department

Quality Control

Department

Logistic section

Production Control

Department

Human Resources &

General Affairs

Department

Accounting & Finance

Department

Assembly section

Quality Control Inspection

section

Production Planning section

Quality Control Engineering

section

Parts Ordering & Logistics

section

Employee Relation section

HRGA ORGANIZATION STRUCTURE

-E x ternal

c om m unic at ion

-S erv ic es

-Com pany ev ents , P lant

tours

-Corporate planning

-M anpower P lanning

-O rganiz at ion s truc ture

-Rec ruitm ent

-Cooperat ion w ith

s c hools

-J ob c las s if ic at ion &

G rades

-A pprais al & P rom otion

-HR Dev elopm ent

-T raining

-Q CC

-Internal c om m unic at ion

-S alaries & B enef its

-W ork ing regulat ions

-A wards & Correc t iv e

ac t ions

-T rade Union

-HS s y s tem s

-S hop f loor s afety

-E m ploy ees health

-O c c upat ional health

c are

Human Resources & General Affairs

Employee Relation (ER)

Corporate Affairs (CA)

Manpower plannig (MP)

Health & Safety (HS)

HR Development (HRD)