CITROËN / PEUGEOT / TOYOTA€¦ · CITROËN / PEUGEOT / TOYOTA ... d
TPCA (TOYOTA PEUGEOT CITROËN AUTOMOBILE) SIX YEARS OF SUCCESS
description
Transcript of TPCA (TOYOTA PEUGEOT CITROËN AUTOMOBILE) SIX YEARS OF SUCCESS
TPCA (TOYOTA PEUGEOT CITROËN AUTOMOBILE)
SIX YEARS OF SUCCESS
TPCA JOINT-VENTURE
Capital
JOINT-VENTURE
50 %50 % 50 %50 %
Manufacturing
ToyotaProduction
System
ToyotaProduction
System
PartsParts
J-V RESPONSIBILITIES
Selection of suppliersPurchasing
Selection of suppliersPurchasing
DevelopmentProduction
DevelopmentProduction
BASIC FACTS
BASIC FACTS
Location: Kolin, Czech Republic Established: 2002 Investment: EUR 650 million Start of Production: March 2005 Exports: 99,5 % Employees: approx. 3,500 (+ indirect 7,000 jobs) Shifts: 2 shifts / 3 teams Turnover 2007: EUR 1 926 million Average production: 580 cars a shift Capacity: 320,000 cars a year
TPCA is a member of:Automotive Industry Association
Size: length / width / height: 3410 / 1615 / 1465
Body: 3- & 5- door
Engines: SI, 3-cylinder, 1.0 l, Toyota Diesel, 4-cylinder, 1.4 l, PSA Peugeot Citroën
Gearbox: MT & MMT
Fuel consumption:
4.6 l / 100 km (gasoline) and 4.1 l / 100 km (Diesel)
PRODUCED MODELSPRODUCTION : 1/3 Toyota Aygo, 1/3 Peugeot 107, 1/3 Citroën C1
City cars between A and B segments
Modern and dynamic design
Top level safety, equipment and performance
EMISSIONS:
109 g CO2/kmEMISSIONS
:
109 g CO2/km
TPCA ORGANIZATION STRUCTURE
President (JP)
Final Assembly
Production Control
Accounting & Finance
Information Systems
HR&GAPaint &
EnvironmentQuality Control
Executive Vice President (FR)
Body Manufacturing
Production Vice President (CZ)
Production
ORGANIZATION
Production Vice
President
PresidentExecutive Vice
President
Operation
Management
Dev elopment
section
Material Handling
& Purchasing
section
Assembly Engineering
section
Applications systems section
Infrastructure section
Health & Safety section
Plant manager
Manpow er Planning section
Human Resources
Dev elopment
section
Cost Management
section
Tax, Audit & Treasury section
Corporate Affairs section
Accounting section
Stamping section
Welding section
Welding Engineering
section
Paint section
Paint Engineering
& Env ironment
section
Body Manufacturing
Department
Paint & Environment Department
Final Assembly
Department
Information Systems
Department
Quality Control
Department
Logistic section
Production Control
Department
Human Resources &
General Affairs
Department
Accounting & Finance
Department
Assembly section
Quality Control Inspection
section
Production Planning section
Quality Control Engineering
section
Parts Ordering & Logistics
section
Employee Relation section
HRGA ORGANIZATION STRUCTURE
-E x ternal
c om m unic at ion
-S erv ic es
-Com pany ev ents , P lant
tours
-Corporate planning
-M anpower P lanning
-O rganiz at ion s truc ture
-Rec ruitm ent
-Cooperat ion w ith
s c hools
-J ob c las s if ic at ion &
G rades
-A pprais al & P rom otion
-HR Dev elopm ent
-T raining
-Q CC
-Internal c om m unic at ion
-S alaries & B enef its
-W ork ing regulat ions
-A wards & Correc t iv e
ac t ions
-T rade Union
-HS s y s tem s
-S hop f loor s afety
-E m ploy ees health
-O c c upat ional health
c are
Human Resources & General Affairs
Employee Relation (ER)
Corporate Affairs (CA)
Manpower plannig (MP)
Health & Safety (HS)
HR Development (HRD)