TOTAL 2 5 7 LEYTE 2
Transcript of TOTAL 2 5 7 LEYTE 2
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
SUPPORT TO OPERATIONS
B. Forest Management Service
1. Forest Land Use Planning (FLUP)FLUP Finalized and endorsed by the Regional Director to
FMB/CO (no.)TOTAL 2 5 7
a. FLUP formulation phase (Year 1) LEYTE 2 2
CENRO Palo 1 1
Tacloban City 1 1
Conducted the data gathering in the barangays
with forest and forestland areas in Tacloban City as
one of the targeted LGUs for this year's FLUP
formulation.
June 8 to 11, 2021, barangays of Abucay, Utap,
Apitong, and Caibaan. June 15 to 18, 2021,
barangays of Diit, Anibong, Naga-naga, Tigbao,
and Basper.
CENRO Ormoc 1 1
Capoocan 1 1The drafting of the FLUP of Capoocan, Leyte's
FLUP is still on-going on.
BILIRAN 1 1
Almeria 1 1Milestone Activity: MOA for the Joint Formulation of
FLUP of LGU Almeria
SAMAR 1 1
CENRO Sta. Rita 1 1
Talalora 1 1
Milestone Activity: A letter of intent (LOI) was already
sent to this end by LGU-Talalora. In response, this
office had already conducted an initial meeting with
the department heads of LGU Talalora who shall
from part of the Municipal Technical Working Group
(MTWG) to assist in the preparation of the draft and
other FLUP-related activities. Conducted on
Orientation/ writeshop with the stakeholders and
the Municipal Technical Working Group for the
FLUP formulation of the Municipality of Talalora on
June 01-03, 2021 at the Municipal Hall, Talalora,
Samar. With MOA.
E. SAMAR 1 1
CENRO Borongan 1 1
Balangiga 1 1
CENRO Borongan FLUP Team conducted
Orientation and Workshop on the formulation of
FLUP of Balangiga. Data gathering is now on-
going.
N. SAMAR 2 2
CENRO Catarman 1 1
Mondragon 1 1
Attached LOI, thematic maps, MOA, conducted
Orientation and Workshop on FLUP formulation.
On May 13-14, 2021 together with the MPDO, a
workshop was conducted on the preparation of the
FLUP.
CENRO Pambujan 1 1
San Roque 1 1Attached LOI, SB Resolution, subscribed MOA, and
on-going data gathering,
b. LGU adoption of FLUP Phase (Year )FLUP adopted through Sangguniang Bayan/Panglungsod
Resolution (no.)TOTAL 15 15 3 3 3
Regional Office 2 2 1 1 1
Balangkayan 1 1 1 1 1
Pambujan 1 1
LEYTE 5 5 2 2 2
Babatngon 1 1
With the PENRO OIC, Chief MSD, For. Loreta
Baldonaza, and the FLUP Team, headed by FLUP
Coordinator, Paulino Masan Jr., everyone headed
to Babatngon, Leyte to present the FLUP of the
municipality. The committee meeting was
conducted in response to the request of Babtngon,
Leyte Vice-Mayor Hon. Eleonor B. Lugnasin to
discuss the FLUP first with the committee
members, before it will be deliberated to the SB
members for adoption. It was agreed that on May
27, 2021, another committee meeting will be
conducted.Calubian 1 1
Adopted last June 14, 2021 thru the Sangguniang
Bayan of Calubian, Leyte
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Javier 1 1 1 1 1Still lacking of the Final Draft FLUP incorporating
the comments from the RTRC.
La Paz 1 1 1 1 1Still lacking of the Final Draft FLUP incorporating
the comments from the RTRC.
Mahaplag 1 1Adopted last June 7, 2021 thru the Sangguniang
Bayan of Mahaplag, Leyte
SAMAR 2 2
Jiabong 1 1
FLUP Draft for the Municipality of Villareal, Samar is
scheduled for presentation and critiquing of the
Sangguniang Bayan Members on July 2021. With
SB resolution.Villareal 1 1
E. SAMAR 2 2
Llorente 1 1
San Policarpo 1 1
N. SAMAR 4 4
Lope de Vega 1 1
Rosario 1 1
San Jose 1 1
Silvino Lobos 1 1
Presented FLUP comments from DENR Region
VIII to the Municipal Council of Silvino Lubos and
solicited their feedback and also asked the
Municipal Mayor his FLUP forewored. With SB
resolution and JMOA.
2. Simplified Community Resource Management Framework
(CRMF) including Map and 5-year workplan
a. Preparation of simplified Community Resource
Management Framework (CRMF) including Map and 5-year
workplan
CRMF, 5YWP and generated with CSW approved and endorsed
to USEC Field Operation for affirmation (no.)TOTAL 9 15 24
Regional Office
CRMF,5YWP and generated with CSW reviewed and endorsed
to Regional Office (no.)LEYTE 1 1
CENRO Baybay
- BUSFFA
BILIRAN 1 1
- Mamanwa Tribe
Association (MTA)
Preparation of final CRMF and 5-year workplan
subject for ratification with the MTA and other
stakeholders that includes Community PO Profile,
SWOC Analysis of CBFM PO, and formulation of 25-
year strategies.
SO. LEYTE 3 3 6
CENRO Maasin
- PO HIDAFASubject for orientation workshop on CRMF
Formulation
- PO PIFORSubject for orientation workshop on CRMF
Formulation
- PO CEFAFormulation and ratification done. For
consolidation and integration of data.
- PO SCFFAFormulation and ratification done. For
consolidation and integration of data.
- PO CFAFormulation and ratification done. For
consolidation and integration of data.
- PO NSFPASubject for orientation workshop on CRMF
Formulation
SAMAR 7 7
CENRO Sta.Rita 7 7
Conducted initial consultation meeting with CBFM
POs and orientation workshop on CRMF
Formulation
E. SAMAR 3 3
CENRO Borongan 3 3
Conducted preparatory and planning activities
which include situational analysis, community
mapping and SWOC analysis, defining VMGO;
Vision Mapping and Formulation of strategies and
objectives .
N. SAMAR 3 3 6
CENRO Catarman
CENRO Pambujan
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
b. Updating of simplified Community Resource Management
Framework (CRMF) including mapand 5-year workplanTOTAL 1 1 2
CRMF,5YWP and generated with CSW approved and endorsed
to USEC Field Operation for affirmation (no.)Regional Office 1 1 2
CRMF,5YWP and generated with CSW reviewed and endorsed
to Regional Office (no.)SO. LEYTE 1 1 2
Milestone Activities:
1. Coordination with PO re updating of CRMF
2. Assisted the PO CUFAI for the creation of
planning team
3. Conducted orientation of the PO planning team
for CRMF updatingCENRO San Juan
- PO CAFSUD 1 1
- PO PFAI 1 1
3. Forest Products Utilization and Price Monitoirng
- Price Monitoring of forest products TOTAL 19 19 19 19 76 19 18 37 -1
Price data summary report consolidated with monthly
breakdown forwarded to FMB (no.)Regional Office 3 3 3 3 12 3 2 5 -1
Price data summary report prepared and submitted quarterly to
Regional Office with monthly breakdown (no.)LEYTE 3 3 3 3 12 3 3 6
BILIRAN 1 1 1 1 4 1 1 2
SO. LEYTE 3 3 3 3 12 3 3 6
SAMAR 3 3 3 3 12 3 3 6
E. SAMAR 3 3 3 3 12 3 3 6
N. SAMAR 3 3 3 3 12 3 3 6
C. Land Management Service
3. Monitoring of ongoing big leases Annual Payment monitored Total 1 1 1 3 -1
Regional Office 1 1 1 3 -1
NATURAL RESOURCES ENFORCEMENT AND REGULATORY
PROGRAM
1. Issuance of Tenure Instrument / Management Arrangement
1.a.Processing of Applications of Tenurial Instruments
(IFMA/SIFMA/FLGMA/FLAG/FLAGT/SLUP/CBFMA)100% of target untenured areas placed under appropriate
management arrangement/tenurial instrumentTOTAL 4 4
BILIRAN 1 1
SO. LEYTE 2 2
CENRO San Juan 2 2
N. SAMAR 1 1
TOTAL
Tenurial instruments processed and endorsed to FMB (no.) Regional Office 4 4
Tenurial instruments evaluated, processed and endorsed to
Regional Office with categorical recommendation, otherwise,
returns to CENRO concerned with comments for further action
(no.)
BILIRAN (FLAGT or
SLUP)1 1
SO. LEYTE (CBFMA) 2 2
N. SAMAR (FLAGT or
SLUP)1 1
1.b. Issuance of cutting/ harvesting permits and WPP100% of areas applied for cutting/ harvesting permits
inspected/ validated with report submittedTOTAL 2 2
Application documents reviewed/evaluated and endorsed to
CO/OUFO with recommendations for approval, otherwise,
returned to PENRO concerned with comments for further action
(no.)Application documents reviewed/endorsed to the RD
concerned with recommendations for approval, otherwise,
returned to CENRO concerned with comments for further action
(no.).
SO. LEYTE 2 2
CENRO Maasin 1 1
CENRO San Juan 1 1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
2. Compliance Monitoring of tenure or permit holders
100 % tenure/ permit holders monitored in compliance to terms
and conditions of the permit and forestry laws, rules and
regulations
TOTAL 35 58 52 29 174 45 75 120 27
No. of tenure/ permit holders monitored with recommendations
of C/PENRO reviewed/analyzed/implemented, and endorsed to
FMB
Regional Office
LEYTE (CBFM-33; other TI-5)
No. of tenure/ permit holders monitored with recommendations
of CENRO reviewed/analyzed and endorsed to RO for action
(no.)
LEYTE 10 12 10 6 38 13 17 30 8
CENRO Palo 4 4 4 2 14 7 8 15 7
CENRO Ormoc 3 4 3 2 12 3 4 7
CENRO Baybay 3 4 3 2 12 3 5 8 1
BILIRAN (CBFM-9; other TI-3) BILIRAN 3 4 4 1 12 3 5 8 1
SO. LEYTE (CBFM-29; SLUP - 1) SO. LEYTE 8 8 8 6 30 7 12 19 3
CENRO Maasin 6 6 6 5 23 5 10 15 3
CENRO San Juan 2 2 2 1 7 2 2 4
SAMAR (CBFM-30; other TI -4) SAMAR 17 13 4 34 8 13 21 4
CENRO Catbalogan 9 7 2 18 2 8 10 1
CENRO Sta. Rita 8 6 2 16 6 5 11 3
E. SAMAR (CBFM-19; other Ti-2) E. SAMAR 5 7 7 2 21 5 11 16 4
CENRO Borongan 3 4 4 11 3 8 11 4
CENRO Dolores 2 3 3 2 10 2 3 5
N. SAMAR (CBFM-39) N. SAMAR 9 10 10 10 39 9 17 26 7
CENRO Catarman 3 4 4 4 15 4 7 11 4
CENRO Pambujan 6 6 6 6 24 5 10 15 3
- Forest revenue collection intensified Forest revenue collected (in Php) with Official Receipts TOTAL 525 582 606 574 2,287 561 1,352 1,913 806
LEYTE 100 125 150 125 500 274 157 431 206
BILIRAN 40 40 40 40 160 85 117 201 121
SO. LEYTE 127 153 153 152 585 137 255 392 112
SAMAR 130 135 134 130 529 17 412 429 164
E. SAMAR 26 26 26 25 103 11 398 409 357
N. SAMAR 102 103 103 102 410 37 13 49 -156
3. Assessment of CSCs (devolved CSCs) Including expired,
expiring, outside CBFMA
CSC area assessed and development therein indicated in the
map
TOTAL 190 291 293 188 962 176 363 440 -41
CSC assessed with report submitted to FMB indicating
categorical recommendationRegional Office -
CSC assessed with report submitted to RO indicating
categorical recommendation (renewal/cancellation/ for re-
evaluation) (no.)
LEYTE 50 90 92 37 269 56 85 141 1
CENRO Palo 20 24 21 14 79 22 27 22 -22
CENRO Ormoc 20 31 37 12 100 22 31 22 -29
CENRO Baybay 10 35 34 11 90 12 27 12 -33
BILIRAN 5 15 15 35 5 15 20
SO. LEYTE 35 56 56 39 186 26 47 73 -18
CENRO Maasin 17 28 28 20 93 17 19 17 -28
CENRO San Juan 18 28 28 19 93 9 28 9 -37
SAMAR 30 50 50 42 172 50 75 125 45
CENRO Catbalogan 30 50 50 42 172 50 75 50 -30
CENRO Sta. Rita
E. SAMAR 40 40 40 30 150 30 42 72 -8
CENRO Borongan 20 20 20 15 75 10 27 10 -30
CENRO Dolores 20 20 20 15 75 20 15 20 -20
N. SAMAR 30 40 40 40 150 9 99 9 -61
CENRO Catarman 15 20 20 20 75 1 51 1 -34
CENRO Pambujan 15 20 20 20 75 8 48 8 -27
1.1 Procurement of Equipment and Gadgets
a. Procurement of Technical and Scientific Equiptment Technical and Scientific Equiptment procured (for errata) TOTAL 12 12
Acquisition of Close Circuit TV
LEYTE 3 3
BILIRAN 1 1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
SO. LEYTE 2 2
SAMAR 2 2
E. SAMAR 2 2
N. SAMAR 2 2
1.3 Acquisition of vehicles TOTAL 26 26 19 19 -7
Regional Office 2 2 -2
LEYTE 6 6 9 9 3
BILIRAN 2 2 2 2
SO. LEYTE 4 4 -4
SAMAR 4 4 4 4
E. SAMAR 4 4 4 4
N. SAMAR 4 4 -4
a. Acquisition of motorcycles Motorcycles purchased (no) TOTAL 24 24 19 19 -5
LEYTE 6 6 9 9 3
BILIRAN 2 2 2 2
SO. LEYTE 4 4 -4
SAMAR 4 4 4 4
E. SAMAR 4 4 4 4
N. SAMAR 4 4 -4
b. Acquisition of Vehicles Vehicles purchased (no) TOTAL 1 1 -1
Regional Office 1 1 -1Failed Bidding. Subject for Negotiated Bidding.
Request for revision of target to 4th qtr
Minitruck/Light Cargo Truck purchased (no) TOTAL 1 1 -1
Regional Office 1 1 -1Failed Bidding. Subject for Negotiated Bidding.
Request for revision of target to 4th qtr
1.4 Maintenance of acquired equipment TOTAL 10 10 10 10 10 6 6 -4
Regional Office
LEYTE
BILIRAN 2 2 2 2 2 2 2
SO. LEYTE
SAMAR
E. SAMAR 4 4 4 4 4 4 4
N. SAMAR 4 4 4 4 4 -4
a. Motorcycles Vehicles maintained (no) TOTAL 10 10 10 10 10 6 6 6 -4
Regional Office
LEYTE
BILIRAN 2 2 2 2 2 2 2 2
SO. LEYTE
SAMAR
E. SAMAR 4 4 4 4 4 4 4 4
N. SAMAR 4 4 4 4 4 -4
1.6 Logistical Support TOTAL
Regional Office
LEYTE
BILIRAN
SO. LEYTE
SAMAR
E. SAMAR
N. SAMAR
a. Geotagging devices Geotagging device procured (no) TOTAL 2 10 12 11 11 9
Regional Office
LEYTE 3 3 3 3 3
BILIRAN 1 1 3 3 3
SO. LEYTE 2 2 5 5 5
SAMAR 2 2
E. SAMAR 2 2 -2
N. SAMAR 2 2
Menu 5.
Sustain a well-planned Information,
Education and Communications campaign
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
region-wide down to CENRO level
5.1 Involvement of Forest Communities in forest protection
worksmeetings conducted with report submitted (no) TOTAL 6 8 7 4 25 9 16 25 11
Regional Office 1 1 2 2 1
LEYTE 3 3 3 3 12 3 6 9 3
BILIRAN 1 1 2 1 1
SO. LEYTE 1 1 1 1 4 1 5 6 4
SAMAR 1 1 2 3 3 2
E. SAMAR 2 2 2 2
N. SAMAR 1 1 2 1 1 2 1
5.2 IEC Campaign, CENRO level meetings, consultations,
orientations, seminars, symposiumIEC campaign conducted (no) TOTAL 4 5 5 4 18 6 9 15 6
Consultation, orientation, seminars, module with costing
prepared & implemented (no)LEYTE 3 3 3 3 12 5 5 10 4
CENRO Palo 1 1 1 1 4 3 3 1
CENRO Ormoc 1 1 1 1 4 1 1 2
CENRO Baybay 1 1 1 1 4 1 4 5 3
SO. LEYTE 1 1 1 1 4 1 2 3 1
SAMAR 1 1 2 2 2 1
E. SAMAR
N. SAMAR
Menu 6.
Consistent apprehension and mandatory
administrative adjudication and confiscation
of apprehended forest products including
conveyances and other implements
6.1 Apprehension of undocumented forest products including
NTFPs, vehicles,quipment and other implements thru proper
channels
volume (bd.ft.) of apprehended undocumented forest products
including NTFPs with incidence reports submitted to
FMB/Regional Office
TOTAL 7,850 7,900 7,900 7,850 31,500 24,539 58,085 82,624 66,874
Regional Office 750 750 750 750 3,000 2,556 2,556 1,056
LEYTE 2,400 2,400 2,400 2,400 9,600 7,098 9,157 16,255 11,455
CENRO Palo 800 800 800 800 3,200 1,072 3,939 5,011 3,411
CENRO Ormoc 800 800 800 800 3,200 306 3,582 3,888 2,288
CENRO Baybay 800 800 800 800 3,200 5,720 1,636 7,356 5,756
BILIRAN 1,000 1,000 1,000 1,000 4,000 1,476 915 2,391 391
SO. LEYTE 750 750 750 750 3,000 608 3,785 4,393 2,893
CENRO Maasin 375 375 375 375 1,500 405 1,632 2,037 1,287
CENRO San Juan 375 375 375 375 1,500 203 2,153 2,356 1,606
SAMAR 200 250 250 200 900 3,364 19,502 22,866 22,416
CENRO Catbalogan 100 125 125 100 450 2,598 1,895 4,493 4,268
CENRO Sta. Rita 100 125 125 100 450 766 17,607 18,373 18,148
E. SAMAR 1,500 1,500 1,500 1,500 6,000 2,583 5,733 8,316 5,316
CENRO Borongan 750 750 750 750 3,000 958 3,329 4,287 2,787
CENRO Dolores 750 750 750 750 3,000 1,625 2,404 4,029 2,529
N. SAMAR 1,250 1,250 1,250 1,250 5,000 9,410 16,436 25,846 23,346
CENRO Catarman 625 625 625 625 2,500 7,590 9,385 16,975 15,725
CENRO Pambujan 625 625 625 625 2,500 1,820 7,051 8,871 7,621
number of vehicles, equipment and other implements
apprehended thru proper channels with incidence reportsTOTAL 6 10 9 5 30 29 29 58 42
Regional Office 1 1 1 3 1 1 -1
submitted to PENRO/Regional Office LEYTE 2 3 3 2 10 3 10 13 8
CENRO Palo 1 1 1 1 4 2 7 9 7
CENRO Ormoc 1 1 1 1 4 2 2
CENRO Baybay 1 1 2 1 1 2 1
BILIRAN 1 1 1 1 4 6 6 12 10
SO. LEYTE 1 1 1 1 4 3 3 1
CENRO Maasin 1 1 1
CENRO San Juan 2 2 2
SAMAR 2 2 4 7 6 13 11
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
CENRO Catbalogan 1 1 2 2 1 3 2
CENRO Sta. Rita 1 1 2 5 5 10 9
E. SAMAR 1 1 1 3 7 7 5
CENRO Borongan 4 4 4
CENRO Dolores 3 3 3
N. SAMAR 1 1 2 3 6 9 8
CENRO Catarman 1 1 3 4 7 6
CENRO Pambujan 1 1 2 2 2
6.2 Hauling of apprehended forest products and
vehicles/implements to CENR Office or any nearest
Government Office
number of apprehended undocument forest products hauled
thru proper channels with incidence reports submitted to
FMB/Regional Office
TOTAL 7,850 7,900 7,900 7,850 31,500 20,287 56,461 76,748 60,998
Regional Office 750 750 750 750 3,000 2,747 2,747 1,247
LEYTE 2,400 2,400 2,400 2,400 9,600 2,846 8,085 10,931 6,131
CENRO Palo 800 800 800 800 3,200 900 3,939 4,839 3,239
CENRO Ormoc 800 800 800 800 3,200 3,582 3,582 1,982
CENRO Baybay 800 800 800 800 3,200 1,946 564 2,510 910
BILIRAN 1,000 1,000 1,000 1,000 4,000 1,476 915 2,391 391
SO. LEYTE 750 750 750 750 3,000 608 3,043 3,651 2,151
CENRO Maasin 375 375 375 375 1,500 405 1,632 2,037 1,287
CENRO San Juan 375 375 375 375 1,500 203 1,411 1,614 864
SAMAR 200 250 250 200 900 3,364 19,502 22,866 22,416
CENRO Catbalogan 100 125 125 100 450 2,598 1,895 4,493 4,268
CENRO Sta. Rita 100 125 125 100 450 766 17,607 18,373 18,148
E. SAMAR 1,500 1,500 1,500 1,500 6,000 2,583 5,733 8,316 5,316
CENRO Borongan 750 750 750 750 3,000 958 3,329 4,287 2,787
CENRO Dolores 750 750 750 750 3,000 1,625 2,404 4,029 2,529
N. SAMAR 1,250 1,250 1,250 1,250 5,000 9,410 16,436 25,846 23,346
CENRO Catarman 625 625 625 625 2,500 7,590 9,385 16,975 15,725
CENRO Pambujan 625 625 625 625 2,500 1,820 7,051 8,871 7,621
number of apprehended vehicles, equipment and other
implements hauled thru propoer channels with incidence
reports submitted to PENRO/Regional Office
TOTAL 6 10 9 5 30 29 29 58 42
Regional Office 1 1 1 3 1 1 -1
LEYTE 2 3 3 2 10 3 10 13 8
CENRO Palo 2 7 9 9
CENRO Ormoc 2 2 2
CENRO Baybay 1 1 2 2
BILIRAN 1 1 1 1 4 6 6 12 10
SO. LEYTE 1 1 1 1 4 3 3 1
CENRO Maasin 1 1 1
CENRO San Juan 2 2 2
SAMAR 2 2 4 7 6 13 11
CENRO Catbalogan 2 1 3 3
CENRO Sta. Rita 5 5 10 10
E. SAMAR 1 1 1 3 7 7 5
CENRO Borongan 4 4 4
CENRO Dolores 3 3 3
N. SAMAR 1 1 2 3 6 9 8
CENRO Catarman 3 4 7 7
CENRO Pambujan 2 2 2
Menu 7.Provision of institutional support in investigation, filing of
information and/or criminal complaints and prosecution of
forestry cases
7.2 Hiring of Lawyers/Legal Researchers (for augmentation) Legal Officers hired (no) TOTAL 11 11 11 11 11 9 11 11
investigation conducted with report submitted (no.)
a. Attorney III LEYTE 3 3 3 3 3 3 3 3
CENRO Palo 1 1 1 1 1 1 1 1
CENRO Ormoc 1 1 1 1 1 1 1 1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
CENRO Baybay 1 1 1 1 1 1 1 1
SO. LEYTE 1 1 1 1 1 1 1 1
b. Legal Officer I BILIRAN 1 1 1 1 1 1 1
SAMAR 2 2 2 2 2 2 2 2
CENRO Catbalogan 1 1 1 1 1 1 1 1
CENRO Sta. Rita 1 1 1 1 1 1 1 1
E. SAMAR 2 2 2 2 2 1 2 2
CENRO Borongan 1 1 1 1 1 1 1 1
CENRO Dolores 1 1 1 1 1 1 1
N. SAMAR 2 2 2 2 2 2 2 2
CENRO Catarman 1 1 1 1 1 1 1 1
CENRO Pambujan 1 1 1 1 1 1 1 1
Menu 10.
Sustainable implementation of the Lawin
Forest and Biodiversity Protection System
10.1 Support to Full Operationalization of Lawin System
b. Hiring of FPOsReports submitted with at least 75% of the observed threats
had actions taken (no.)TOTAL 99 99 99 99 396 117 164 287 89
Quarterly Patrol Plan endorsed to FMB (no.) Regional Office 3 3 6 6
LEYTE 18 18 18 18 72 21 19 40 4
CENRO Palo 6 6 6 6 24 6 8 14 2
CENRO Ormoc 6 6 6 6 24 9 5 14 2
CENRO Baybay 6 6 6 6 24 6 6 12
BILIRAN 9 9 9 9 36 16 11 27 9
SO. LEYTE 18 18 18 18 72 21 24 45 9
CENRO Maasin 9 9 9 9 36 11 12 23 5
CENRO San Juan 9 9 9 9 36 10 12 22 4
SAMAR 18 18 18 18 72 18 44 62 26
CENRO Catbalogan 9 9 9 9 36 9 26 35 17
CENRO Sta. Rita 9 9 9 9 36 9 18 27 9
E. SAMAR 18 18 18 18 72 24 39 63 27
CENRO Borongan 9 9 9 9 36 15 19 34 16
CENRO Dolores 9 9 9 9 36 9 20 29 11
N. SAMAR 18 18 18 18 72 17 27 44 8
CENRO Catarman 9 9 9 9 36 9 11 20 2
CENRO Pambujan 9 9 9 9 36 8 16 24 6
Distance Patrolled (km) Reports submitted with at least 75% of
the observed threats had actions taken (no.)TOTAL 1,030 1,030 1,030 1,030 4,120 1,496 2,185 3,681 1,621
Accomplishments for the Central Office-Based
Funds and lateral downloading of SINP targets to
PENROs Northern Samar and Eastern Samar are
inlcuded with the synced patrolled distance in the
LAWIN system for the regular target. The targets for
distance patrolling and hiring of FPOs are reflected
in the latter part of this document.
Regional Office 40 40 40 40 160 53 56 109 29
LEYTE 180 180 180 180 720 249 345 594 234
CENRO Palo 60 60 60 60 240 85 164 249 129
CENRO Ormoc 60 60 60 60 240 87 90 178 58
CENRO Baybay 60 60 60 60 240 77 91 167 47
BILIRAN 90 90 90 90 360 96 116 212 32
SO. LEYTE 180 180 180 180 720 279 356 636 276
CENRO Maasin 90 90 90 90 360 159 259 418 238
CENRO San Juan 90 90 90 90 360 120 98 218 38
SAMAR 180 180 180 180 720 298 445 744 384
CENRO Catbalogan 90 90 90 90 360 188 274 463 283
CENRO Sta. Rita 90 90 90 90 360 110 171 281 101
E. SAMAR 180 180 180 180 720 278 434 712 352
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
CENRO Borongan 90 90 90 90 360 126 91 216 36
CENRO Dolores 90 90 90 90 360 152 344 496 316
N. SAMAR 180 180 180 180 720 243 432 675 315
CENRO Catarman 90 90 90 90 360 97 158 255 75
CENRO Pambujan 90 90 90 90 360 146 274 420 240
Number of teams to conduct patrolling (Lawin) TOTAL 29 29 29 29 29 19 28 28 -1
Regional Office 2 2 2 2 2 2 2 2
LEYTE 6 6 6 6 6 5 7 7 1
CENRO Palo 2 2 2 2 2 1 2 2
CENRO Ormoc 2 2 2 2 2 2 3 3 1
CENRO Baybay 2 2 2 2 2 2 2 2
BILIRAN 1 1 1 1 1 1 1 1
SO. LEYTE 6 6 6 6 6 6 6
CENRO Maasin 3 3 3 3 3 3 3
CENRO San Juan 3 3 3 3 3 3 3
SAMAR 5 5 5 5 5 3 3 3 -2
CENRO Catbalogan 3 3 3 3 3 2 2 2 -1
CENRO Sta. Rita 2 2 2 2 2 1 1 1 -1
E. SAMAR 3 3 3 3 3 3 3 3
CENRO Borongan 1 1 1 1 1 1 1 1
CENRO Dolores 2 2 2 2 2 2 2 2
N. SAMAR 6 6 6 6 6 5 6 6
CENRO Catarman 3 3 3 3 3 3 3 3
CENRO Pambujan 3 3 3 3 3 2 3 3
Forest Protection Officers Hired (no.) TOTAL 14 14 14 14 14 14 14 14
LEYTE 6 6 6 6 6 6 6 6
(Corresponding Budget for 3 FPOs is charge to PADM) SO. LEYTE 4 4 4 4 4 4 4 4
PENRO Southern Leyte 2 2 2 2 2 2 1 2
CENRO Maasin 1 1 1 1 1 1 1 1
CENRO San Juan 1 1 1 1 1 1 2 1
SAMAR 2 2 2 2 2 2 2 2
CENRO Catbalogan 1 1 1 1 1 1 1 1
CENRO Sta. Rita 1 1 1 1 1 1 1 1
E. SAMAR 2 2 2 2 2 2 2 2
CENRO Borongan 1 1 1 1 1 1 1 1
CENRO Dolores 1 1 1 1 1 1 1 1
Delineation of production (for potential investment purposes)
and protection forests
kilometers of production forest for potential investment
purposes delineated on the ground with corresponding
shapefiles (km.)
Regional Office 150 300 300 200 950 203 295 499 49
Stakes installed (no.) 874 1,547 2,421 2,421
LAND MANAGEMENT SECTOR1. Appraisal of Foreshore Leases or Permits, Friar Lands,
Patrimonial Properties and Other Government Assets and
Properties
1.1 Appraisal of foreshore leases or permitsAppraisal Report reviewed with CSW and complete documents
endorsed to LMB/ Regional Office (no.)(Downloaded by Regional Office to PENROs) TOTAL 14 19 17 50 -14
Regional Office 19 19 19
Accomplishment reported for the month were the
reports that were not counted as accomplishments
last CY 2020 due to stamp released dated in CY
2021. Only accomplishments with released dated
in CY 2020 were considered.
LEYTE 5 5 5 15 -5
BILIRAN 2 1 3
SO. LEYTE 3 3 3 9 -3
SAMAR 2 3 3 8 -2
E. SAMAR 2 3 1 6 -2
N. SAMAR 2 3 4 9 -2
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
2. Re-appraisal of Foreshore Leases or Permits, Friar Lands,
Patrimonial Properties and Other Government Assets and
Properties
2.1 Re- appraisal of foreshore leases or permitsRe-appraisal Report reviewed with CSW and complete
documents endorsed to LMB/ Regional Office(no.)TOTAL 10 10 20 5 5 5
Regional Office 3 3 3
Accomplishment reported for the month were the
reports that were not counted as accomplishments
last CY 2020 due to stamp released dated in CY
2021. Only accomplishments with released dated
in CY 2020 were considered.
LEYTE 3 3 6
BILIRAN 1 1
SO. LEYTE 2 2 4
SAMAR 2 1 3
E. SAMAR 1 1 2
N. SAMAR 2 2 4 2 2 2
3. Collection of Revenues Notice of bills/demand letters issued to lessees (no.) TOTAL 537 1,058 1,361 995 3,951 1,413 3,872 5,286 3,691
Revenues collected (P'000) LEYTE 100 500 800 450 1,850 469 2,251 2,720 2,120
Revenues deposited (P'000) CENRO Palo 30 150 250 100 530 284 130 414 234
CENRO Ormoc 35 175 275 175 660 175 2,117 2,293 2,083
CENRO Baybay 35 175 275 175 660 9 5 14 -196
BILIRAN 40 40 40 40 160 59 28 87 7
SO. LEYTE 167 178 179 176 700 174 317 491 146
CENRO Maasin 117 128 129 126 500 113 284 397 152
CENRO San Juan 50 50 50 50 200 61 33 94 -6
SAMAR 50 160 160 150 520 302 255 556 346
CENRO Catbalogan 25 80 80 75 260 302 255 556 451
CENRO Sta. Rita 25 80 80 75 260 -105
E. SAMAR 25 25 26 25 101 291 333 625 575
CENRO Borongan 13 12 13 13 51 198 184 382 357
CENRO Dolores 12 13 13 12 50 94 149 243 218
N. SAMAR 155 155 156 154 620 119 688 807 497
CENRO Catarman 131 131 132 131 525 119 635 753 491
CENRO Pambujan 24 24 24 23 95 1 53 54 6
ENFORCEMENT OF PA, WILDLIFE,
AND CAVE LAWS, COASTAL AND MARINE RULES
AND REGULATIONS
1. Processing/Issuance and Monitoring of CITES permits and
other wildlife permits/certificates
Wildlife permit applications acted upon within the number of
days as prescribed by the law (no. )TOTAL 4 11 9 6 30 11 9 20 5
- LTP: 1-2 days Regional Office 2 8 6 4 20 3 7 10
- CWR: 7 days LTP SO. LEYTE 2 3 3 2 10 8 2 10 5
- WFP: 24 days
- WSUP (for show): 7 days
- Non-CITES Permit: 5 days
- CITES Permit: 2-3 days (BMB)
- GP: 7 days
100% of the holders of Wildlife Farm Permit (WFP) in the
Region monitored relative to their compliance with the terms
and conditions of the wildlife permit
Regional Office 5 5 5 5 5 5 5 5
Database of WFP updated
100% of the holders of Certificate of Wildlife Registration (CWR)
in the Region monitored relative to their compliance with the
terms and conditions of the wildlife permit
Regional Office 5 5
Database of WFP and CWR
Holders updated
2. Mobilization of Wildlife Enforcement Officers (WEO) WEOs deputized/mobilized (no.) Regional Office 1 1 1 1 4 1 1
Deputation activity on Wildlife Enforcement Officer
(WEO) was conducted last April 12-13, 2021 in
Hinundayan and Libagon, Southern Leyte. ED-CMS
staff still working on the Regional Special Order for
WEO.
Monthly Consolidated WEO reports submitted to BMB (no.) Regional Office 3 3 3 3 12 3 3 6
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
3. Revenue Collection Revenues collected (P'000) TOTAL 425 676 644 625 2,370 105 2,560 2,665 1,564
Revenues deposited (P'000)
LEYTE 100 300 300 300 1,000 21 1,718 1,739 1,339
CENRO Palo 10 30 30 30 100 21 47 68 28
CENRO Ormoc 80 240 240 240 800 1,671 1,671 1,351
CENRO Baybay 10 30 30 30 100 -40
SAMAR 300 350 318 300 1,268 84 837 920 270
CENRO Catbalogan 75 95 80 75 325 6 249 255 85
CENRO Sta. Rita 225 255 238 225 943 77 588 665 185
N. SAMAR 25 26 26 25 102 1 5 6 -45
CENRO Catarman
OPERATIONS AGAINST ILLEGAL ENVIRONMENT
AND NATURAL RESOURCES ACTIVITIES
a. Conduct of orientation for DENR Personnel on ENR Laws,
rules and regulationtraining conducted (no.)
- Wildlife Trafficking Monitoring Unit (WTMU) Mobilized (no.) training conducted (no.) Regional Office 2 2 2 2
WTMUs mobilized (no.) Regional Office 5 5 1 1 -4
Hilongos Port, Leyte, Ormoc Port, Leyte, Tacloban Port, LEYTE 1 1 -1
Tacloban City, DZR Airport, Tacloban City
Maasin Port, Southern Leyte, Port of Liloan, So. Leyte SO. LEYTE 1 1 -1
Calbayog Port, Samar and Catbalogan Port, Samar SAMAR 1 1 1 1
Port of Borongan and Port of Guiuan, Eastern Samar E. SAMAR 1 1 -1
Port of Allen, Northern samar N. SAMAR 1 1 -1
WTMU Monitoring Reports endorsed to BMB (no.) Regional Office 3 3 3 3 12 2 4 6
Hilongos Port, Leyte, Ormoc Port, Leyte, Tacloban Port, LEYTE 3 3 3 3 12 -6
Tacloban City, DZR Airport, Tacloban City
Maasin Port, Southern Leyte, Port of Liloan, So. Leyte SO. LEYTE 3 3 3 3 12 -6
Calbayog Port, Samar and Catbalogan Port, Samar SAMAR 3 3 3 3 12 3 3 6
Port of Borongan and Port of Guiuan, Eastern Samar E. SAMAR 3 3 3 3 12 -6
Port of Allen, Northern samar N. SAMAR 3 3 3 3 12 -6
RWMC conducted (no.) Regional Office 1 1 2 -1
- Training on Regional Anti-illegal Logging Task Force (based
on EO23) Operationalizedtraining conducted (no.) Regional Office 1 1 1 1
NATURAL RESOURCES CONSERVATION
AND DEVELOPMENT PROGRAM
I. FOR THE REMAINING INITIAL COMPONENTS OF THE
NIPAS1. Protected Area Suitability Assessment No. of PASA conducted
2. Protected Area Establishment No. of Proclamation drafted
with complete attachments
II. FOR PROCLAIMED AND LEGISLATED PAs
1. Delineation of Boundaries for Proclaimed PAs - No. of corners of boundary relocated/established
-No. of stakes installed
2. Demarcation of Boundaries for Legislated PAs - No. of corners of boundary TOTAL -
relocated/established Regional Office -
Cuatro Islas Protected Landscape and Seascape (CIPLS) - No. of monument installed LEYTE -
Lake Danao Natural Park (LDNP) - No. of signage installed BILIRAN -
Mahagnao Vulcano Natural Park (MVNP) SO. LEYTE -
Calbayog Pan-as Hayiban Protected Landscape (CPHPL) SAMAR -
Samar Island Natural Park (SINP) E. SAMAR -
Guiuan Marine Reserve Protected Landscape Seascape
(GMRPLS)N. SAMAR -
Biri Larosa Protected Landscape Seascape (BLPLS)
- Preparatory Activities TOTAL 11 11 4 3 7 -4
a. Team Organization LEYTE 5 5 4 1 5
b. Procurement of Supplies and Materials - CIPLS 2 2 2 2
c. CEPA - LDNP 1 1 1 1
- MVNP 2 2 1 1 2
SAMAR 1 1 1 1
- CPHPL
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
E. SAMAR 1 1 1 1
- GMRPLS
N. SAMAR 4 4 -4
Conducted reconnaissance survey last March 10,
2021 in preparation of the actual demarcation and
installation of monuments - BLPLS
- Inspection,Verification and Approval of Surveys (IVAS) TOTAL 327 327
LEYTE 153 153
(15 corners for IVAS) -CIPLS 15 15
(95 corners for IVAS) -LDNP 95 95
(43 corners for IVAS) -MVNP 43 43
(73 corners for IVAS) SAMAR - CPHPL 73 73
(35 corners for IVAS) E. SAMAR - GMRPLS 35 35
(66 corners for IVAS) N. SAMAR - BLPLS 66 66
- No. of monument installed TOTAL 95 237 332 28 28 -67
Regional Office
LEYTE
-CIPLS 4 4
Based on the reconaissance survey conducted,
installation of bouys is not possible in CIPLS due
to depthness as follows:
Corner 1- 160-190 meters
Corner 2-1600m- 2000m
Corner 3- 6000m
Corner 4- 70-100m
-LDNP 95 95
Conducted reconnaissance survey in preparation
for the installation of the ninety-five (95) boundary
markers. Already purchased materials and
equipments needed for the activity.
-MVNP 43 43
On-going preparatory activities for the installation of
the monuments. Conducted preparatory activities
for the installation of the monuments such as
reconaissance survey at Brgys. Pilar , Macatingog
and Cag-anahaw. It was conducted to determine
the necessary routes and topographic conditions of
the survey area.
BILIRAN
SO. LEYTE
SAMAR - CPHPL 43 30 73 28 28 -15
E. SAMAR - GMRPLS 17 30 47 -17On-going preparatory activities for the installation of
the monuments
N. SAMAR - BLPLS 35 35 70 -35
On-going preparatory activities for the installation of
the monuments. Installation of bouys is not
feasible.
- No. of signage installed TOTAL 151 167 199 517 10 10 -141
Regional Office
LEYTE
-CIPLS 5 5
Based on the reconaissance survey conducted,
installation of bouys is not possible in CIPLS due
to its depth as follows:
Corner 1- 160-190 meters
Corner 2-1600m- 2000m
Corner 3- 6000m
Corner 4- 70-100m
-LDNP 55 55On-going preparatory activities for the installation of
the signages
-MVNP 35 35On-going preparatory activities for the installation of
the signagesBILIRAN
SO. LEYTE
SAMAR - CPHPL 80 57 137 10 10 -70A total of 10 signanges were installed at Brgy. Cag-
anahaw, Calbayog City, Samar
E. SAMAR - GMRPLS 50 50 44 144 -50On-going preparatory activities for the installation of
the signages
8,000 per Signages for (35.3) Kms. N. SAMAR - BLPLS 21 60 60 141 -21On-going preparatory activities for the installation of
the signages
3. Survey and Registration of PA Occupants (SRPAO) - No. of barangays within
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
the PA 100% surveyed Regional Office
LEYTE
Meetings, hiring of enumerators, BILIRAN
supplies and materials, equipment, SO. LEYTE
Writeshops, Consultations (Survey, FGD, KII and community
mapping)SAMAR
E. SAMAR
N. SAMAR
TOTAL 1 1 1 1
- Consolidated Report of SRPAO (Attachment 3) with Regional Office
complete inputs especially the economic activity
- Photocopy of Accomplished Summary per Barangay
(Forms 2) and Summary per Municipality (Form 3)
- Certified photocopy of the Official List of Tenured
Migrants
- For IPs (Form 6), if applicable
- PA map showing the relative location of houses
farmlots (include geo-tagged photos)
-No of certificate of recognition issued and submitted to
DENR CO thru BMB
Brgys. surveyed (100%) in PA using SRPAO Forms LEYTE 1 1 1 1
- SRPAO Questionnaire (Form 1) - LDNP (Brgy. Bagong) 1 1 1 1
- Summary per Barangay (Form 2)
- Summary per Municipality (Form 3)
- Initial List of Tenured Migrant (Form 5)
- For IPs (Form 6), if applicable
- PA map showing the relative location of houses
farmlots (include geo-tagged photos)
-No of certificate of recognition issued and submitted
to Regional Office
4. PA Management Planning
A. Biodiversity Assessment and Monitoring (BAMS) 2-km transect assessed and TOTAL 3 3
- Terrestrial PAs established and Regional Office 3 3
- Inland Wetlands within Terrestrial 2-Ha Permanent Biodiversity- Mahagnao Lake
(MVNP)1 1
Creation of Composite Team who will conduct
BAMS in MVNP. The team is composed of PAMO
Staff, representative from DENR RO-8-CDD, CDS
Focal of PENRO Leyte, representative from the
academe, and LGU Burauen, Leyte.
- Caves Monitoring Area assessed and - Lake Danao (MVNP) 1 1
- On-site cave validation and secondary data
gathering
- Established 2-Ha transect line around the lake
- Established three (3) monitoring stations and
sampling sites
- Plants inside the transect line were sampled
and identified
I. Assessment and Establishment of 2-km transect established (PBMA) - Sohoton Cave (SINP) 1 1
- Conducted FGD w/ the brgy. council of Brgy.
Inuntan, Basey, Samar
- On-site cave validation and conducted secondary
data gathering
- Established 2-Ha transect line w/n the vicinity of
Sohoton Cave and surveyed and mapped the area.
- Fourty-six (46) stations identified and installed
markers in each station
and 2-Ha PBMA: Flora and fauna monitoring
1,300,000/PA conducted within the 2-Ha
II. Flora and Fauna Monitoring within PBMA: PBMA conducted (conducted
200,000/PA (every 3 years) every 3 years)
*For Wetlands: Additional 150,000/wetland type
*For Caves: Additional 150,000/Cave
B. PA Mangement Zones Ground Delineation
Length of PA Management zones Length of PA Management zones TOTAL 5 20 2 27 10.47 9.00 19.47 -6
delineated on the ground or delineated on the ground or Regional Office
marked based on the PAMP marked based on the PAMP LEYTE - LDNP 5 20 2 27 10.47 9.00 19.47 -6
(length in kilometers) (length in kilometers)
C. Preparation or Updating of PA
Management Plans
I. Preparation new PAMP:
<5000 has.: 620,000
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
5000 to 30000 has.: 720,000
30000 to 55000 has.: 770,000
55000 to 80000 has.: 830,000
80000 to 105000 has.: 850,000
105000 and above has.: 1,000,000 TOTAL 1 1
Updated PAMP endorsed to Secretary thru BMB for affirmation
(no)Regional Office
Conducted consultation-workshop with LGUs
covering SINP on 13 April 2021 at Lucas Wharf,
Catbalogan City, SamarII. Review and updating of PAMP 500,000/PA Updated PAMP endorsed to RO - SINP 1 1
A. Biodiversity Monitoring System (BMS) BMS transects monitored quarterly
TOTAL 8 8 16 8 8
BMS Report with analysis and summary Regional Office 1 1 2 1 1
submitted to BMB (no)
Database developed/maintained
BMS Reports reviewed and database LEYTE 3 3 6 3 3
developed/ maintained - CIPLS
- MVNP
- LDNP
SAMAR 2 2 4 2 2
- CPHPL
- SINP
E. SAMAR 1 1 2 1 1
- GMRPLS
N. SAMAR 1 1 2 1 1
- BLPLS
C. Communication, Education and Public Awareness (CEPA)
No. of Communication Plan prepared TOTAL 3 1 4 1 1 -2
Regional Office
LEYTE 3 3 1 1 -2
- CIPLS 1 1 -1Prepared draft Communication Plan for review of
Regional Office; for revision. - MVNP 1 1 1 1
- LDNP 1 1 -1Submitted draft Communication Plan for reviewof
RO; for revision.BILIRAN
SO. LEYTE
SAMAR
E. SAMAR 1 1
- GMRPLS 1
No. of interpretive signs installed TOTAL 156 60 216 18 18 18
Regional Office
LEYTE 72 60 132 6 6 6
- CIPLS 24 20 44
- MVNP 24 20 44 6 6 6
- LDNP 24 20 44
BILIRAN
SO. LEYTE
SAMAR 18 18 12 12 12
- CPHPL 6 6
- SINP 12 12 12 12 12
E. SAMAR -GMRPLS 30 30
N. SAMAR -BLPLS 36 36
No. of CEPA materials developed/produced and
distributed/disseminated (print, video, etc)TOTAL 400 500 1,500 2,400 2,134 2,134 1,734
LEYTE 1,500 1,500 1,234 1,234 1,234
- CIPLS 500 500 2 2 2
- MVNP 500 500 327 327 327
- LDNP 500 500 905 905 905
BILIRAN
SO. LEYTE
SAMAR 100 300 400 400 400 300
E. SAMAR 300 200 500 500 500 200
N. SAMAR
6. PAMB Operationalization
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Cuatro Islas Protected Landscape and Seascape (CIPLS)
Lake Danao Natural Park (LDNP)
Mahagnao Vulcano Natural Park (MVNP)
Calbayog Pan-as Hayiban Protected Landscape (CPHPL)
Samar Island Natural Park (SINP)
Guiuan Marine Reserve Protected Landscape Seascape
(GMRPLS)Biri Larosa Protected Landscape Seascape (BLPLS)
A. Capacity Building No. of trainings/learning TOTAL 1 1 3 3 3
events conducted Regional Office 1 1 3 3 3
Feb. 2, 2021: Conducted Levelling-off with the
PASus
March 4, 2021: Conducted orientation on PA
Boundary w/ the PASUs and SMD
June 14-17, 2021: BMS Training w/ CENROs LEYTE
BILIRAN
SO. LEYTE
SAMAR
E. SAMAR
N. SAMAR
B. PAMB Meetings No. of approved PAMB Resolutions with TOTAL
minutes of meetings Regional Office
<5000 has.: 368,000 LEYTE
5000-30000 has.: 532,000
30000-55000 has.: 549,000
55000-80000 has.: 1,263,000 SAMAR
80,000-105,000 has.:1,450,000 E. SAMAR
>105,000 has.: 1,746,000 N. SAMAR
Note: Costing based on actual no. of PAMB members; TOTAL 7 7 7 7 28 6 10 16 2
Costing is dependent on the number of PAMB membersSigned PAMB Resolutions with minutes of meeting endorsed to
the Sec thru BMBRegional Office
PAMB Meetings conducted (no.) LEYTE 3 3 3 3 12 3 5 8 2
- LDNP 1 1 1 1 4 1 2 3 1
- MVNP 1 1 1 1 4 1 1 2
- CIPLS 1 1 1 1 4 1 2 3 1
SAMAR 2 2 2 2 8 1 3 4
- CPHPL 1 1 1 1 4 2 2
- SINP 1 1 1 1 4 1 1 2
E. SAMAR 1 1 1 1 4 1 1 2
- GMRPLS 1 1 1 1 4 1 1 2
N. SAMAR 1 1 1 1 4 1 1 2
- BLPLS 1 1 1 1 4 1 1 2
Draft PAMB Resolutions with signed minutes of meeting
endorsed to ROLEYTE 3 3 3 3 12 3 15 18 12
- LDNP 1 1 1 1 4 1 13 14 12
- MVNP 1 1 1 1 4 1 1 -1
- CIPLS 1 1 1 1 4 1 2 3 1
SAMAR 2 2 2 2 8 1 11 12 8
- CPHPL 1 1 1 1 4 10 10 8
- SINP 1 1 1 1 4 1 1 2
E. SAMAR 1 1 1 1 4 1 1 2
- GMRPLS 1 1 1 1 4 1 1 2
N. SAMAR 1 1 1 1 4 1 4 5 3
- BLPLS 1 1 1 1 4 1 4 5 3
C. Management Effectiveness Assessment No. of MEA conducted following BMB TB No. 2018-05 TOTAL 3 3 -3
Baseline: 30,000/PA LEYTE 2 2 -2
Suceeding: to be conducted during the regular - LDNP 1 1 -1Conducted MEA on June 9, 2021; on-going report
preparation. Included in the revision of target
PAMB meeting - MVNP 1 1 -1Conducted MEA on June 9, 2021; on-going report
preparation. Included in the revision of target
SAMAR 1 1 -1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
- CPHPL 1 1 -1Submitted draft MEA report to RO for review.
Included in the revision of target
7.Protected Area Management Office (PAMO)
Operationalization
<5,000 has: 500,000/PA
5,000 to 30,000 has: 750,000/PA
30,000 to 55,000 has: 1,000,000/PA
>55,000 has: 1,250,000/PA
Cuatro Islas Protected Landscape and Seascape (CIPLS)
Lake Danao Natural Park (LDNP)
Mahagnao Vulcano Natural Park (MVNP) No. of PAMO staff/JOs hired PMS Regional Office
Calbayog Pan-as Hayiban Protected Landscape (CPHPL) LEYTE 6 6 6 6 6 6 6 6
Samar Island Natural Park (SINP) - MVNP 3 3 3 3 3 3 2 2 -1
Guiuan Marine Reserve Protected Landscape Seascape
(GMRPLS) - LDNP 3 3 3 3 3 3 2 2 -1
Biri Larosa Protected Landscape Seascape (BLPLS) - CIPLS 2 2 2
SAMAR 9 9 9 9 9 9 9 9
- CPHPL 3 3 3 3 3 3 3 3
- SINP 6 6 6 6 6 6 6 6
E. SAMAR 3 3 3 3 3 3 3 3
- GMRPLS 3 3 3 3 3 3 3 3
N. SAMAR 4 4 4 4 4 4 4 4
- BLPLS 4 4 4 4 4 4 4 4
TOTAL 18 18 18 18 72 18 18 36
M&E report on programs and activities of PAs endorsed to BMB Regional Office
Monthly accomplishment report based on TOR of the staff hired LEYTE 6 6 6 6 24 6 6 12
- LDNP (2,193 has) 3 3 3 3 12 3 3 6
M&E report on programs and activities of PAs submitted to RO - MVNP (635 has) 3 3 3 3 12 3 3 6
SAMAR 6 6 6 6 24 6 6 12
- CPHPL (5,132 has) 3 3 3 3 12 3 3 6
- SINP (333,300 has) 3 3 3 3 12 3 3 6
E. SAMAR 3 3 3 3 12 3 3 6
- GMRPLS (33,492 has) 3 3 3 3 12 3 3 6
N. SAMAR 3 3 3 3 12 3 3 6
- BLPLS (32,284.14
has)3 3 3 3 12 3 3 6
8. Ecotourism Program and Impact Monitoring Program and impact monitoring conducted
Impact Monitoring: P200,000/year/site
Maintenance: P150,000/year/facility
REC meeting: 100,000/year
TOTAL 5 5 10 6 6 1
M&E report endorsed to BMB Regional Office 1 1 2 2 2 1
- REC Meeting
M&E report validated and endorsed to RO LEYTE 3 3 6 3 3
SAMAR 1 1 2 1 1
- Construction of PA Facilities facilities constructied (no.) Regional Office 2 2
- GMRPLS (Info center) 1 1
- CPHPL (view deck) 1 1
- Maintenance of PA Facilities facilities maintained (no.) TOTAL 20 20 20 20 20 20 20 20
LEYTE 3 3 3 3 3 3 3 3
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Eco lodge - LDNP 1 1 1 1 1 1 1 1
Eco lodge - MVNP 1 1 1 1 1 1 1 1
Eco lodge - CIPLS 1 1 1 1 1 1 1 1
SAMAR 15 15 15 15 15 15 15 15
- CPHPL 6 6 6 6 6 6 6 6
- SINP 9 9 9 9 9 9 9 9
E. SAMAR 1 1 1 1 1 1 1 1
- GMRPLS 1 1 1 1 1 1 1 1
Ecolodge N. SAMAR 1 1 1 1 1 1 1 1
- BLPLS 1 1 1 1 1 1 1 1
- Impact Monitoring Impact monitoring conducted (no.) TOTAL 1 2 3 1 1
LEYTE 2 2
- CIPLS 1 1
- LDNP 1 1
SAMAR 1 1 1 1
- SINP 1 1 1 1
9. Community-Based Program (CBP) No. of PACBRMA issued
No. of POs (with TM members) organized
I. Linkaging the community to other
stakeholders,IEC, Identification of CB Areas,
PO Formation,
Application and processing: 250,000 (Y1)
II. CRMP Preparation, Capacity building
and M&E: 420,000 (Y2)
TOTAL 20 20 2 2 2
III. Capacity building: 600,000 (Y3) PACBRMA application with complete supporting SAMAR 20 20 2 2 2
documents* reviewed and endorsed to the - SINP 20 20 2 2 2
Secretary thru the BMB
CRMP reviewed and affirmed by the RED
Periodic monitoring and evaluation on the
implementation of CBP conducted and biannual
reports submitted to the Secretary thru the BMB.
PACBRMA application with complete supporting
documents* reviewed and endorsed to the PENRO
CRMP reviewed and endorsed to the RED for affirmation.
PROTECTED AREA AND DEVELOPMENT MANAGEMENT
/LOCAL CONSERVATION AREA
1. PA Habitat Protection
A. Biodiversity Monitoring System (BMS) BMS transects monitored quarterly SO. LEYTE 1 1 2 1 1
BMS Reports reviewed and database developed/maintained
(no.)
BMS conducted and report presented to Steering Committee
(no.)
B. Patrolling Hiring of Forest Protection Officers (no.) SO. LEYTE 3 3 3 3 3 3 3 3Included in the reported HIRING OF FPOs under
LAWIN patrolling.
Support to LAWIN under the Natural Resources Management
Arrangement/Agreement and Permit Issuance
2. Communication, Education and Public Awareness (CEPA)No. of CEPA materials developed/produced and
distributed/disseminated (print, video, etc)SO. LEYTE 1 1 1 1
3. LCA Steering Committee MeetingDraft LCA Resolutions with signed minutes of meeting
endorsed to Regional OfficeSO. LEYTE 1 1 1 1 4 4 4 2
No. of trainings/learning events conducted 1 1 1 1
4. Cave assessment report with recommended classification
with map
Cave assessment report with recommended classification with
map (no.)SO. LEYTE 2 2 1 1 1
PROTECTION AND CONSERVATION OF WILDLIFE
1. Conservation of Threated Species
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
b. Population & habitat monitoring and protection of priority
threatened species
- Philippine Eagle Consolidated monitoring report submitted to TOTAL 1 1 1 1 4 1 2 3 1
-Mobilization of Regional Eagle Watch BMB, indicating the ff: Regional Office 1 1 1 1 4 1 2 3 1
Teams with members from concerned - Number of Philippine Eagle observed/no. of
CENRO/PENRO where eagles are found sightings per specific location
-Organization of community monitoring - Number of nesting sites/breeding pairs
groups (CMG) - Status and no. of habitat sites outside PAs
-Monitoring of Philippine eagle population managed through various approaches
by REWTs (to include coordinates & geotagged photos)
-Implementation of community-based
protection scheme
-Participation in the celebration of the
Philippine Eagle Week
-Updating of distribution map
- Marine Turtles Consolidated activity/monitoring report, indicating TOTAL 2 3 3 2 10 2 2 4 -1
-Rescue, rehabilitation, tagging and release the ff. information, submitted to BMB: Regional Office 2 3 3 2 10 2 2 4 -1
-Nesting site monitoring and protection - Number of turtles rescued, rehabilitated, tagged
-Hatchery establishment/management (as and released
needed) - Supporting documents:
- Partnerships for community-based Accomplished Turtle Tagging Data
protection scheme of nesting habitats Sheets, Photo-documentation
- CEPA activities conducted - Number of nesting sites monitored/managed
- Number of hatchery established/manage
- CEPA activities conducted
- Philippine Cockatoo (Red-vented) consolidated quarterly Reports, including TOTAL 1 1 1 1
-population surveys and monitoring photo-documentation submitted to BMB: Regional Office 1 1 1 1
-implement community-based habitat - Population count (no.)
protection scheme in habitats outside PAs - CEPA activities conducted
CEPA activities
- Bats (flying foxes) Consolidated Reports, including photo-documentation TOTAL 1 1 1 1 4 1 1 2
-Identification of roosting sites and conduct submitted to BMB: Regional Office 1 1 1 1 4 1 1 2
of population counts - Population count (no.)
-Establish management scheme of roosting - CEPA activities conducted
sites located outside PAs CEPA activites -habitats managed
Asian Waterbird Census (AWC)
Waterbird count conducted in migratory bird sites Consolidated AWC Count Report Map of monitored sites TOTAL 1 1 1 1
Regional Office 1 1 1 1
Waterbird Monitoring (no.) TOTAL 1 1 1 1
Regional Office 1 1 1 1
2. Establishment/Management of Wildlife Rescue Centers
(WRCs)- WRC Maintained/established (no.)
- Animals rescued and rehabilitated (no.)
- No. of rehabilitated animalsreleased back to
the wild
- Wildlife Rescue Centers (WRC) facilities
improved (no.)
Quarterly Status Report submitted to BMB with TOTAL 6 6 6 6 24 6 6 12
attached specific reports, as follows:
- Report/s on rescued wild animals LEYTE 1 1 1 1 4 1 1 2
- Report/s on animal releases BILIRAN 1 1 1 1 4 1 1 2
- Information on wildlife facility improvement SO. LEYTE 1 1 1 1 4 1 1 2
- Updated Animal Inventory Report including health status SAMAR 1 1 1 1 4 1 1 2
E. SAMAR 1 1 1 1 4 1 1 2
- Mortality/Natality Reports N. SAMAR 1 1 1 1 4 1 1 2
- Wildlife disposition instrument/s
- other WRC-related reports copy of MOA submitted to BMB
SCALING UP COASTAL AND MARINE MANAGEMENT
1. MPA Management, strengthening and Networking
a. Monitoring of corals, mangroves, and no. of PAs monitored
seagrass per PA Regional Office 3 3 3 3 3
- CIPLS
- GMRPLS
- BLPLS
LEYTE 1 1 1 1 1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
- CIPLS (a,&c)
E. SAMAR 1 1 1 1 1
- GMRPLS (a,b,&c)
N. SAMAR 1 1 1 1 1
- BLPLS (a,b,&c)
b. Water Quality Monitoring within Legislated NIPAS PA/ Total
actual pollution load on coastal and marine ecosystems
within PA
no. of PAs assessed/ monitored on water quality parameters TOTAL 3 3 6 -3
LEYTE 1 1 2 -1
Conducted WQMA last June 21-23 , 2021. The
activity was delayed due to the unavailability of
WQM instrument. - CIPLS 2
E. SAMAR 1 1 2 -1
On-going WQMA from June 30-July 3, 2021. The
activity was delayed due to the unavailability of
WQM instrument. - GMRPLS 2
N. SAMAR 1 1 2 -1Conducted WQMA last June 16-17, 2021. On-going
data analysis and report preparation. - BLPLS 2
c. Marine Protected Areas Networking (NIPAS- locally
managed, NIPAS-NIPAS)
No. of MPAs Network established, strengthened and/ or
operationalizedTOTAL 1 1
(downloaded to E. Samar) E.Samar 1 1Identified connectivity linkages and conducted
consultation among potential network members.
- GMRPLS
d. Maintenance and protection of coastal and marine
ecosystems
MPA habitats regularly monitored, surveyed and MPA regular
operational activities conductedTOTAL 3 3 3 3 3 3 3 3
(e.g. reduction of threats and pressures identified,
enforcement, etc.)LEYTE 1 1 1 1 1 1 1 1
- CIPLS
E. SAMAR 1 1 1 1 1 1 1 1
- GMRPLS
N. SAMAR 1 1 1 1 1 1 1 1
- BLPLS (32,284.14
has)
2. Biodiversity-Friendly Social Enterprises (BDFE)
DevelopmentNo. of POs enhanced Regional Office 2 2 1 5 4 4 2
(downloaded) - CIPLS 1 1
(downloaded) - BLPLS 2 2 4 4 4 2
3. Capacity Building
a. Attendance to Enhancement Trainings onno. of participants that completing the scheduled annual
trainingTOTAL 8 8 -8
NIPAS MPA Capacity Building Program Regional Office - 2 Pax 2 2 -2
BMB sent a Memorandum to all Regional Offices
dated May 24, 2021 entitled " Guidance to
Accomplish the Attendance to Enhancement
Trainings on NIPAS MPA Capacity Building
Program indicator under Capacity Building
Component of CMEMP" for the postponement of
the face-to-face cluster trainings hosted by BMB
and instructed the Regional Offices to conduct the
training instead.
Further, an activity proposal is needed should the
RO deem the budget indicated in the WFP
insufficient, which is the case in the region. Thus,
the revision of target to 3rd quarter to facilitate the
(e.g. Fundamentals of MPA Management, Marine LEYTE - 2 Pax 2 2 -2
eceosystems and Ocean Processes, Sustainable E. SAMAR - 2 Pax 2 2 -2
Tourism, Cliamte Change, Marine Spatial N. SAMAR - 2 Pax 2 2 -2
Planning, Damage Assessment, Restore,
Rehabilitate and Monitor)
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
b. Conduct of trainings for CMEMP implementation
enhancementno. of trainings conducted TOTAL 3 2 5 4 4 1
The 3 MPAs conducted the SCUBA Training on May
24-28, 2021 at Padre Burgos, Southern Leyte to
capacitate their staff in Self-Contained Underwater
Breathing Apparatus (SCUBA). The skill is
significant especially in the conduct of underwater
habitat assessment
The concerned office is still writing the
narrative/documentation report of the training
conducted. The said report will be endorsed to
BMB once reviewed and received by the Regional
Office.
(e.g. Diving Training/ Refresher, habitat assessment/ LEYTE 1 1 1 1
Conducted Open-Water SCUBA Training last May
24-28, 2021 in Padre Burgos, Southern Leyte to
capacitate their staff in Self-Contained Underwater
Breathing Apparatus (SCUBA). The skill is
significant especially in the conduct of underwater
habitat assessment.
monitoring (BAMS) Social Marketing Trainings, E. SAMAR 1 1 2 1 1
Conducted Open-Water SCUBA Training last May
24-28, 2021 in Padre Burgos, Southern Leyte to
capacitate their staff in Self-Contained Underwater
Breathing Apparatus (SCUBA). The skill is
significant especially in the conduct of underwater
habitat assessment.
KMS, WQ, MPAN, and database, law enforcement N. SAMAR 1 1 2 2 2 1
Conducted the following trainings:
1. Open-Water SCUBA Training last May 24-28,
2021 in Padre Burgos, Southern Leyte
2. PA Enforcers Deputation and Environmental
Laws Orientation in Catarman, Northern Samarand other coastal and Marine related trainings)
4. Technical Assistance Component
a. Mainstreaming of ICM to the CLUP and CDP of the No. of LGUs provided with tehcnical TOTAL 1 1 2
LGU within the major watershed (river systems) assistance towards mainstreaming of Regional Office 1 1 2
On-going inventory and mapping of municipalities
w/n the major watershed contributing to the NIPAS
MPA
contributing to the NIPAS MPAs ICM to their existing CLUPs and CDPs- CIPLS (Hindang &
Inopacan)- GMRPLS (Guiuan)
b. TA to LGUs on coastal and no. LGUs / NGOs/ Stakeholders TOTAL 4 4
marine related concerns Assisted Regional Office -
(assessment., emergency response, LEYTE 2 2
facilitation, citizen science, -CIPLS (2LGU)
validation investigation of
reports/ complaints etc,) N. SAMAR 2 2
-BLPLS (1LGU)
5. Knowledge Management
Maintenance of Regional Database with (regular population
of data to the database)Database updated/maintained (no) TOTAL 1 1 1 1 1 1 1 1
Regional Office 1 1 1 1 1 1 1 1
Monthly maintenance and updating of Coastal and
Marine Ecosystems Management System
(CMEMS)
6. Social Marketing and Mobilization/Communication,
Education and Public Awareness (CEPA)
a. Conduct of CEPA activities using the developed flagship
campaigns for improvement of KAPAssist in the conduct of CEPA activities per PA TOTAL 1 1 1 3 -1
-technical assistance, serve as Resource Regional Office 1 1 1 3 -1 Request for revision of target to 3rd and 4th qtr
Speaker , Support to the printing and - CIPLS 1
distribution of CEPA materials to - GMRPLS 1
all field offices as necessary - BLPLS 1
b. Conduct of Regular Special Events related to coastal and
marine protection, conservation and managementNumber of special events conducted with report submitted TOTAL 1 2 1 4 2 2 4 1
Regional Office 1 2 1 4 2 2 4 1
- World Wetlands Day
- Month of the Ocean
- Coral Triangle Day
- International Coastal Clean-up
7. Monitoring and Evaluation
a. Regular monitoring and validation of all activities including
on CMEMPTOTAL 4 4 4 4 16 4 4 4
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Quarterly submission of monitoring report/updates on CMEMP
accomplishment reports per PA consolidated into one Report
submitted to BMB/CO
Regional Office 1 1 1 1 4 1 1 1
Quarterly submission of monitoring report/ updates on CMEMP
accomplishment Report submitted to ROLEYTE 1 1 1 1 4 1 1 1
E. SAMAR 1 1 1 1 4 1 1 1
N. SAMAR 1 1 1 1 4 1 1 1
b. Management Effectiveness Assessment TOTAL 1 1 -1
Food Allowance (no. of"PAMB+5*800*2days) MEA results endorsed the Central Office thru the BMB
Database developed/maintained (no.)
MEA results endorsed to Regional Office LEYTE 1 1 -1
- CIPLS 1 1 -1
Conducted MEA last May 27-28, 2021 in Tourism
Information Center, Inopacan, Leyte. On-going
report preparation.BILIRAN -
SO. LEYTE -
SAMAR -
E. SAMAR -
N. SAMAR -
9. Project Support and Management
- Hiring of CMEMP Extension Officers No. of Coastal Extension Officers hired TOTAL 5 5 5 5 5 5 5 5
Regional Office 2 2 2 2 2 2 2 2
LEYTE 1 1 1 1 1 1 1 1
-CIPLS
E. SAMAR 1 1 1 1 1 1 1 1
- GMRPLS
N. SAMAR 1 1 1 1 1 1 1 1
- BLPLS
Land Management
1. Land Survey, Disposition and Records Management
1.1 Land Disposition/Distribution and Survey
a. Residential Free Patent disposed under Republic Act No.
10023
- Conduct of Survey Lot surveyed and approved (no.) TOTAL 478 1,000 1,000 300 2,778 324 476 800 -678
Regional Office 478 1,000 1,000 300 2,778 324 476 800 -678
- Patent Processing and Issuance Patents approved and transmitted to the TOTAL 160 642 808 548 2,158 229 788 1,017 215
Registry of Deeds (ROD) (no.) (has)
LEYTE 80 260 110 450 55 256 311 231
(has.)
CENRO Palo 26 87 37 150 6 84 90 64
(has.)
CENRO Ormoc 27 86 37 150 22 99 121 94
(has.)
CENRO Baybay 27 87 36 150 27 73 100 73
(has.)
BILIRAN 16 15 30 20 81 10 54 64 33
(has.)
SO. LEYTE 30 120 121 80 351 36 101 137 -13
(has.)
CENRO Maasin 15 60 61 40 176 26 62 88 13
(has.)
CENRO San Juan 15 60 60 40 175 10 39 49 -26
(has.)
SAMAR 152 102 46 300 26 72 98 -54
(has.)
CENRO Catbalogan 76 51 23 150 19 17 36 -40
(has.)
CENRO Sta. Rita 76 51 23 150 7 55 62 -14
(has.)
E. SAMAR 54 100 120 120 394 40 105 145 -9
(has.)
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
CENRO Borongan 27 50 60 60 197 15 54 69 -8
(has.)
CENRO Dolores 27 50 60 60 197 25 51 76 -1
(has.)
N. SAMAR 60 175 175 172 582 62 200 262 27
(has.)
CENRO Catarman 20 55 55 52 182 22 59 81 6
(has.)
CENRO Pambujan 40 120 120 120 400 40 141 181 21
(has.)
b. Agricultural Areas Public Land Survey approved (per lot) TOTAL 150 200 200 50 600 68 82 150 -200
Regional Office 150 200 200 50 600 68 82 150 -200
Patents approved and transmitted to the TOTAL 179 179 329 358 687 508
Registry of Deeds (ROD) (no.) (has)
LEYTE 64 64 99 167 266 202
(has.)
CENRO Palo 22 22 54 61 115 93
(has.)
CENRO Ormoc 21 21 31 74 105 84
(has.)
CENRO Baybay 21 21 14 32 46 25
(has.)
BILIRAN 25 25 32 24 56 31
(has.)
SO. LEYTE 20 20 88 59 147 127
(has.)
CENRO Maasin 10 10 30 30 20
(has.)
CENRO San Juan 10 10 58 59 117 107
(has.)
SAMAR 12 12 39 25 64 52
(has.)
CENRO Catbalogan 6 6 36 12 48 42
(has.)
CENRO Sta. Rita 6 6 3 13 16 10
(has.)
E. SAMAR 20 20 34 81 115 95
(has.)
CENRO Borongan 10 10 29 76 105 95
(has.)
CENRO Dolores 10 10 5 5 10
(has.)
N. SAMAR 38 38 37 2 39 1
(has.)
CENRO Catarman 16 16 17 17 1
(has.)
CENRO Pambujan 22 22 20 2 22
(has.)
c. Titling of Government lands for public and quasi-public use
c.1 Special Patents under Section 4 of RA10023Application reviewed and special patent Tenure Appraisal
issued (no.)TOTAL 6 19 18 5 48 17 29 46 21
Coverage: Regional Office
-DAO 2015-01 Guidelines for the processing and LEYTE 2 3 3 2 10 2 7 9 4
issuance of Special Patents for Public School Sites CENRO Palo 2 1 1 1 5 2 1 3
under RA 10023 CENRO Ormoc 1 1 1 3 4 4 3
-DAO 2016-21 Guidelines governing the processing CENRO Baybay 1 1 2 2 2 1
request for proclamation and issuance of Special
Patents over Agricultural Lands BILIRAN 1 1 2 1 2 3 2
SO. LEYTE 2 6 6 2 16 7 11 18 10
CENRO Maasin 1 3 3 1 8 1 7 8 4
CENRO San Juan 1 3 3 1 8 6 4 10 6
SAMAR 2 2 4 3 3 1
CENRO Catbalogan 1 1 2 2 2 1
CENRO Sta. Rita 1 1 2 1 1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
E. SAMAR 2 4 4 10 7 2 9 3
CENRO Borongan 1 2 2 5 2 2 4 1
CENRO Dolores 1 2 2 5 5 5 2
N. SAMAR 3 2 1 6 4 4 1
CENRO Catarman 1 1 2 3 3 2
CENRO Pambujan 2 1 1 4 1 1 -1
2. Acceleration of of land titling through Rapid Land Tenure
Appraisal
- Strengthening partnership with Local Government Regional Office 1 1 -1
Unit on public land titling (Tanauan,Leyte) Regional Office 1 1 -1 Request for revision of target to 4th qtr
- Cascading
2. Management of foreshore Areas through Issuance of
permits/lease contracts of permits/lease contractsApplication with CSW and complete documents
processed and endorsed to Region (no.) Regional Office 20 20 15 55 -20
(ha.) LEYTE
Permit issued (no.) BILIRAN
SO. LEYTE
SAMAR
E. SAMAR
N. SAMAR
3. Resolution of Land Cases with Claims and Conflicts
Cases
Conduct of Alternative Dispute Resolution (ADR) proceedings
ADR proceedings conducted with report submitted (no.) Regional Office
Land cases settled amicably (no.)
ADR proceedings conducted with report submitted (no.)
Land cases settled amicably (no.) LEYTE 2 3 3 1 9 6 7 13 8
CENRO Palo 2 1 3 5 2 7 4
CENRO Ormoc 1 2 3 1 2 3 2
CENRO Baybay 1 1 1 3 3 3 2
BILIRAN 1 1 2 1 1
SO. LEYTE 2 2 4 2 10 1 5 6 2
CENRO Maasin 1 1 2 1 5 2 2
CENRO San Juan 1 1 2 1 5 1 3 4 2
SAMAR 3 2 5 2 2 -1
CENRO Catbalogan 2 1 3 2 2
CENRO Sta. Rita 1 1 2 -1
E. SAMAR 2 2 2 4 10 2 3 5 1
CENRO Borongan 1 1 1 2 5 1 1 2
CENRO Dolores 1 1 1 2 5 1 2 3 1
N. SAMAR 3 3
CENRO Catarman
CENRO Pambujan
4. Inspection, Verification and Approval of Surveys (IVAS)
through LAMSapproved survey plans through LAMS (no.) TOTAL 100 500 700 700 2,000 483 609 1,092 492
Regional Office 100 500 700 700 2,000 483 609 1,092 492
IVAS using LAMS (Isolated) Survey plans approved (no.) 483 609 1,092 1,092
SRs 461 554 1,015 1,015
Lots 5,294 4,095 9,389 9,389
Hectares 484 625 1,109 1,109
5. Land Records Management
Regional Office
5.1 Digital Cadastral Database (DCDB) Cleansing for survey
records
Datasets of cities and municipalities from LAMS verified and
corrected (no.)TOTAL 1 1 2 1 5 2 2
Regional Office 1 1 2 1 5 2 2
5.2 Hiring of Geodetic Engineers/GIS Specialist Geodetic Engineers hired (no.) TOTAL 2 2 2 2 2 2 2 2
Regional Office 2 2 2 2 2 2 2 2
5.3 Land Records Maintenance
Regional LAMS database maintained (no.) Regional Office 1 1 1 1 1 1 1 1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
New survey records scanned and encoded (no.) 110 550 770 770 2,200 322 744 1,066 406
Forest and Watershed Management
Forest Development, Rehabilitation, Maintenance
and Protection
Enhance National Greening Program
1. Survey, Mapping and Planning site validated/assessed (ha.) TOTAL 7,929 5,050 441 272 13,692 12,600.8 12,600.8 -378
- conduct of community consultation/IEC imlpementing PENRO
- conduct of site assessment LEYTE 949 950 1,899 1,967 1,967 68
- geotagging and perimeter surveying of plantable areas BILIRAN 300 272 572 -300
- preparation of GIS based maps SO. LEYTE 360 360 720 365 365 -355
- identification of fire prone areas SAMAR 1,185 1,180 2,365 2,619 2,619 254
- formulation of PO specific site plan E. SAMAR 3,435 3,435 3,558 3,558 123
N. SAMAR 2,000 2,260 441 4,701 4,091.8 4,091.8 -168
3. COMPREHENSIVE SITE DEVELOPMENT
a. Seedling Production Seedling produced (no.) TOTAL 1,104,261 7,537,056 8,641,317 9,562,845 9,562,845 921,528
LEYTE 1,498,741 1,498,741 1,804,936 1,804,936 306,195
BILIRAN 62,105 62,105 68,316 68,316 6,211
SO. LEYTE 378,958 378,958 416,832 416,832 37,874
SAMAR 2,528,338 2,528,338 2,680,824 2,680,824 152,486
E. SAMAR 1,463,914 1,463,914 1,610,268 1,610,268 146,354
N. SAMAR 1,104,261 1,605,000 2,709,261 2,981,669 2,981,669 272,408
a.1 Other Fruit Trees Seedling produced (no.) TOTAL 338,595 2,013,886 2,352,481 2,607,142 2,607,142 254,661
LEYTE 136,550 136,550 164,643 164,643 28,093
CENRO Palo 36,500 36,500 43,800 43,800 7,300
Tacloban City 21,490 21,490 25,800 25,800 4,310
Burauen 15,010 15,010 18,000 18,000 2,990
CENRO Ormoc 50,040 50,040 60,048 60,048 10,008
Albuera 25,000 25,000 18,000 18,000 -7,000
Leyte 12,520 12,520 27,000 27,000 14,480
Ormoc City 12,520 12,520 15,048 15,048 2,528
CENRO Baybay 50,010 50,010 60,795 60,795 10,785
Abuyog 25,000 25,000 -25,000
Javier 12,510 12,510 15,450 15,450 2,940
Mahaplag 12,500 12,500 24,012 24,012 11,512
Inopacan 15,133 15,133
Hindang 6,200 6,200
BILIRAN 5,040 5,040 5,544 5,544 504
Culaba 5,040 5,040 5,544 5,544 504
SO. LEYTE 142,520 142,520 156,750 156,750 14,230
CENRO Maasin 75,000 75,000 82,500 82,500 7,500
Maasin 10,000 10,000 11,000 11,000 1,000
Malitbog 25,000 25,000 16,500 16,500 -8,500
Sogod 25,000 25,000 27,500 27,500 2,500
Tomas Oppus 15,000 15,000 -15,000
Bontoc 27,500 27,500
CENRO San Juan 67,520 67,520 74,250 74,250 6,730
Anahawan 5,020 5,020 5,500 5,500 480
Hinunangan 12,490 12,490 13,750 13,750 1,260
Lilo-an 10,000 10,000 11,000 11,000 1,000
St. Bernard 15,000 15,000 16,500 16,500 1,500
San Francisco 10,010 10,010 11,000 11,000 990
San Ricardo 7,500 7,500 8,250 8,250 750
Silago 7,500 7,500 8,250 8,250 750
SAMAR 450,190 450,190 497,687 497,687 47,497
CENRO Catbalogan 225,170 225,170 247,687 247,687 22,517
Calbayog 100,030 100,030 110,033 110,033 10,003
Gandara 50,000 50,000 55,000 55,000 5,000
Matuguinao 10,000 10,000 11,000 11,000 1,000
San Jorge 12,570 12,570 13,827 13,827 1,257
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Sta. Margarita 12,570 12,570 13,827 13,827 1,257
San Jose De Buan 20,000 20,000 22,000 22,000 2,000
Motiong 20,000 20,000 22,000 22,000 2,000
CENRO Sta. Rita 225,020 225,020 250,000 250,000 24,980
Calbiga 75,020 75,020 82,500 82,500 7,480
Hinabangan 50,000 50,000 55,000 55,000 5,000
Pinabacdao 50,000 50,000 56,000 56,000 6,000
Sta. Rita 25,000 25,000 29,000 29,000 4,000
Villareal 25,000 25,000 27,500 27,500 2,500
E. SAMAR 745,586 745,586 820,135 820,135 74,549
CENRO Borongan 382,508 382,508 420,750 420,750 38,242
Balangiga 62,460 62,460 68,750 68,750 6,290
Balangkayan 7,520 7,520 8,250 8,250 730
Borongan 100,018 100,018 110,000 110,000 9,982
Llorente 50,000 50,000 55,000 55,000 5,000
Maydolong 75,000 75,000 82,500 82,500 7,500
Quinapundan 87,510 87,510 96,250 96,250 8,740
CENRO Dolores 363,078 363,078 399,385 399,385 36,307
Arteche 50,000 50,000 55,000 55,000 5,000
Can-avid 12,490 12,490 13,750 13,750 1,260
Dolores 25,000 25,000 33,550 33,550 8,550
Jipapad 50,570 50,570 55,000 55,000 4,430
Maslog 25,000 25,000 37,950 37,950 12,950
Oras 150,018 150,018 148,585 148,585 -1,433
San Julian 25,000 25,000 28,050 28,050 3,050
Taft 25,000 25,000 27,500 27,500 2,500
N. SAMAR 338,595 534,000 872,595 962,383 962,383 89,788
CENRO Catarman 139,075 197,000 336,075 372,233 372,233 36,158
Bobon 20,000 30,000 50,000 55,100 55,100 5,100
Catarman 6,000 20,000 26,000 49,883 49,883 23,883
Lope de Vega 8,000 20,000 28,000 30,850 30,850 2,850
Rosario 10,000 17,000 27,000 29,800 29,800 2,800
San Isidro 20,000 30,000 50,000 54,850 54,850 4,850
Mondragon 75,075 80,000 155,075 119,850 119,850 -35,225
Victoria 11,550
Lavezares 11,550
San Jose 8,800
CENRO Pambujan 199,520 337,000 536,520 590,150 590,150 53,630
Catubig 40,000 57,000 97,000 82,500 82,500 -14,500
San Roque 11,505 30,000 41,505 45,650 45,650 4,145
Las Navas 6,000 20,000 26,000 -26,000
Silvino Lobos 5,500 20,000 25,500 28,050 28,050 2,550
Laoang 29,500 30,000 59,500 56,650 56,650 -2,850
Mapanas 57,000 80,000 137,000 179,300 179,300 42,300
Gamay 50,015 100,000 150,015 165,000 165,000 14,985
Palapag 33,000
a.2 Timber Seedling produced (no.) TOTAL 715,978 3,472,376 4,188,354 4,543,907 4,543,907 355,553
LEYTE 413,168 413,168 496,009 496,009 82,841
CENRO Baybay 413,168 413,168 496,009 496,009 82,841
Abuyog 413,168 413,168 441,823 441,823 28,655
Inopacan 20,200 20,200
Hindang 33,986 33,986
SO. LEYTE 8,330 8,330 9,163 9,163 833
CENRO Maasin 8,330 8,330 9,163 9,163 833
Libagon 8,330 8,330 9,163 9,163 833
SAMAR 1,879,308 1,879,308 1,964,257 1,964,257 84,949
CENRO Catbalogan 1,087,948 1,087,948 1,196,742 1,196,742 108,794
Calbayog 166,600 166,600 183,260 183,260 16,660
Catbalogan 123,284 123,284 135,612 135,612 12,328
Gandara 166,600 166,600 183,260 183,260 16,660
Jiabong 83,350 83,350 91,685 91,685 8,335
Motiong 83,300 83,300 91,630 91,630 8,330
Paranas 166,600 166,600 183,260 183,260 16,660
San Jorge 83,300 83,300 91,630 91,630 8,330
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
San Jose De Buan 126,616 126,616 139,278 139,278 12,662
Sta. Margarita 88,298 88,298 97,127 97,127 8,829
CENRO Sta. Rita 791,360 791,360 767,515 767,515 -23,845
Basey 209,916 209,916 229,573 229,573 19,657
Calbiga 164,944 164,944 186,400 186,400 21,456
Hinabangan 166,600 166,600 183,260 183,260 16,660
Marabut 83,300 83,300 91,630 91,630 8,330
Pinabacdao 166,600 166,600 76,652 76,652 -89,948
E. SAMAR 181,570 181,570 199,753 199,753 18,183
CENRO Borongan 39,960 39,960 43,982 43,982 4,022
Llorente 39,960 39,960 43,982 43,982 4,022
CENRO Dolores 141,610 141,610 155,771 155,771 14,161
Arteche 24,990 24,990 -24,990
Can-avid 49,980 49,980 -49,980
Maslog 41,650 41,650 -41,650
San Julian 16,660 16,660 18,326 18,326 1,666
San Policarpio 8,330 8,330 -8,330
Taft 45,815 45,815
Oras 91,630 91,630
N. SAMAR 715,978 990,000 1,705,978 1,874,725 1,874,725 168,747
CENRO Catarman 441,232 630,000 1,071,232 1,176,504 1,176,504 105,272
Bobon 88,258 100,000 188,258 207,078 207,078 18,820
Rosario 113,228 150,000 263,228 289,548 289,548 26,320
San Isidro 101,566 150,000 251,566 274,884 274,884 23,318
Victoria 118,200 200,000 318,200 311,534 311,534 -6,666
Mondragon 19,980 30,000 49,980 58,641 58,641 8,661
San Jose 34,819
CENRO Pambujan 274,746 360,000 634,746 698,221 698,221 63,475
Pambujan 129,888 150,000 279,888 -279,888
Las Navas 53,280 80,000 133,280 -133,280
Palapag 38,294 60,000 98,294 108,123 108,123 9,829
Gamay 53,284 70,000 123,284 135,612 135,612 12,328
Catubig 307,878 307,878
Mapanas 146,608 146,608
a.3 Rattan Seedlings produced (no.) TOTAL 662,000 662,000 728,356 728,356 66,356
BILIRAN 37,000 37,000 40,700 40,700 3,700
Culaba 19,500 19,500 21,450 21,450 1,950
Kawayan 17,500 17,500 19,250 19,250 1,750
SO. LEYTE 205,000 205,000 225,500 225,500 20,500
CENRO Maasin 135,000 135,000 148,500 148,500 13,500
Maasin 25,000 25,000 60,500 60,500 35,500
Malitbog 20,000 20,000 -20,000
Sogod 90,000 90,000 45,650 45,650 -44,350
Bontoc 35,750
Macrohon 6,600
CENRO San Juan 70,000 70,000 77,000 77,000 7,000
Liloan 30,000 30,000 33,000 33,000 3,000
Pintuyan 10,000 10,000 11,000 11,000 1,000
St. Bernard 30,000 30,000 33,000 33,000 3,000
SAMAR 175,000 175,000 192,656 192,656 17,656
CENRO Catbalogan 87,500 87,500 96,250 96,250 8,750
Calbayog 17,500 17,500 19,250 19,250 1,750
Gandara 17,500 17,500 19,250 19,250 1,750
Matuguinao 25,000 25,000 27,500 27,500 2,500
Paranas 17,500 17,500 19,250 19,250 1,750
San Jorge 10,000 10,000 11,000 11,000 1,000
CENRO Sta. Rita 87,500 87,500 96,406 96,406 8,906
Basey 10,000 10,000 11,000 11,000 1,000
Calbiga 25,000 25,000 27,500 27,500 2,500
Hinabangan 20,000 20,000 22,000 22,000 2,000
Marabut 20,000 20,000 22,000 22,000 2,000
Sta. Rita 12,500 12,500 13,906 13,906 1,406
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
E. SAMAR 245,000 245,000 269,500 269,500 24,500
CENRO Borongan 122,500 122,500 134,750 134,750 12,250
Borongan 20,000 20,000 22,000 22,000 2,000
Gen. MacArthur 35,000 35,000 38,500 38,500 3,500
Llorente 35,000 35,000 38,500 38,500 3,500
Maydolong 32,500 32,500 35,750 35,750 3,250
CENRO Dolores 122,500 122,500 134,750 134,750 12,250
Can-avid 22,500 22,500 24,750 24,750 2,250
Dolores 25,000 25,000 38,500 38,500 13,500
Maslog 25,000 25,000 16,500 16,500 -8,500
San Julian 25,000 25,000 27,500 27,500 2,500
Taft 25,000 25,000 27,500 27,500 2,500
a.4 Indigenous Seedlings produced (no.) TOTAL 25,000 991,870 1,016,870 1,210,792 1,210,792 193,922
LEYTE 864,370 864,370 1,042,240 1,042,240 177,870
CENRO Palo 306,250 306,250 367,500 367,500 61,250
Burauen 81,250 81,250 52,500 52,500 -28,750
Carigara 93,750 93,750 112,500 112,500 18,750
Jaro 31,250 31,250 37,500 37,500 6,250
La Paz 18,750 18,750 22,500 22,500 3,750
Tacloban City 31,250 31,250 37,500 37,500 6,250
San Miguel 50,000 50,000 60,000 60,000 10,000
MacArthur 45,000 45,000
CENRO Ormoc 363,750 363,750 436,500 436,500 72,750
Albuera 88,750 88,750 108,000 108,000 19,250
Capoocan 106,250 106,250 121,500 121,500 15,250
Leyte 43,750 43,750 54,000 54,000 10,250
Ormoc City 125,000 125,000 108,000 108,000 -17,000
Villaba 45,000 45,000
CENRO Baybay 194,370 194,370 238,240 238,240 43,870
Abuyog 163,120 163,120 121,740 121,740 -41,380
Javier 31,250 31,250 37,500 37,500 6,250
Inopacan 55,500 55,500
Hindang 23,500 23,500
SO. LEYTE 12,500 12,500 13,750 13,750 1,250
CENRO Maasin 3,120 3,120 3,437 3,437 317
Maasin 3,120 3,120 3,437 3,437 317
CENRO San Juan 9,380 9,380 10,313 10,313 933
St. Bernard 6,250 6,250 -6,250
Silago 3,130 3,130 -3,130
San Francisco 10,313 10,313
E. SAMAR 75,000 75,000 82,501 82,501 7,501
CENRO Borongan 37,500 37,500 41,250 41,250 3,750
Balangkayan 37,500 37,500 41,250 41,250 3,750
CENRO Dolores 37,500 37,500 41,251 41,251 3,751
Dolores 12,500 12,500 -12,500
Taft 25,000 25,000 10,313 10,313 -14,687
Maslog 30,938
N. SAMAR 25,000 40,000 65,000 72,301 72,301 7,301
CENRO Catarman 8,750 10,000 18,750 21,426 21,426 2,676
Mondragon 8,750 10,000 18,750 21,426 21,426 2,676
CENRO Pambujan 16,250 30,000 46,250 50,875 50,875 4,625
Gamay 16,250 30,000 46,250 50,875 50,875 4,625
a.5 Cacao Seedlings produced (no.) TOTAL 20,065 20,065 22,072 22,072 2,007
BILIRAN 20,065 20,065 22,072 22,072 2,007
Naval 20,065 20,065 -20,065
Culaba 22,072
a.6 Bamboo Culm produced (no.) TOTAL 24,688 226,809 251,497 285,576 285,576 34,079
LEYTE 84,653 84,653 102,044 102,044 17,391
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
CENRO Palo 40,823 40,823 48,960 48,960 8,137
Burauen 18,360 18,360 21,052 21,052 2,692
Dulag 5,327 5,327 3,917 3,917 -1,410
Julita 2,856 2,856 11,016 11,016 8,160
La Paz 8,160 8,160 490 490 -7,670
Mayorga 6,120 6,120 2,448 2,448 -3,672
MacArthur 10,037
CENRO Ormoc 15,270 15,270 18,324 18,324 3,054
Capoocan 10,200 10,200 -10,200
Villaba 5,070 5,070 6,642 6,642 1,572
Merida 5,040
Ormoc 6,642
CENRO Baybay 28,560 28,560 34,760 34,760 6,200
Abuyog 28,560 28,560 21,053 21,053 -7,507
Inopacan 11,504
Baybay 2,203
SO. LEYTE 10,608 10,608 11,669 11,669 1,061
CENRO San Juan 10,608 10,608 11,669 11,669 1,061
Hinunangan 408 408 2,693 2,693 2,285
Pintuyan 3,060 3,060 3,366 3,366 306
San Ricardo 3,060 3,060 3,366 3,366 306
Silago 4,080 4,080 2,244 2,244 -1,836
SAMAR 23,840 23,840 26,224 26,224 2,384
CENRO Catbalogan 23,840 23,840 26,224 26,224 2,384
Gandara 6,120 6,120 6,732 6,732 612
San Jorge 9,560 9,560 10,516 10,516 956
Jiabong 6,120 6,120 6,732 6,732 612
Motiong 2,040 2,040 2,244 2,244 204
E. SAMAR 66,708 66,708 73,379 73,379 6,671
CENRO Borongan 33,456 33,456 36,802 36,802 3,346
Balangiga 10,200 10,200 11,220 11,220 1,020
Balangkayan 8,976 8,976 9,874 9,874 898
Borongan 7,140 7,140 7,854 7,854 714
Maydolong 7,140 7,140 7,854 7,854 714
CENRO Dolores 33,252 33,252 36,577 36,577 3,325
Can-avid 6,120 6,120 6,732 6,732 612
Dolores 6,732 6,732 12,342 12,342 5,610
Maslog 10,200 10,200 9,649 9,649 -551
Oras 10,200 10,200 7,854 7,854 -2,346
N. SAMAR 24,688 41,000 65,688 72,260 72,260 6,572
CENRO Catarman 14,800 26,000 40,800 44,884 44,884 4,084
Lope de Vega 7,400 13,000 20,400 22,442 22,442 2,042
San Isidro 7,400 13,000 20,400 22,442 22,442 2,042
CENRO Pambujan 9,888 15,000 24,888 27,376 27,376 2,488
Silvino Lobos 3,568 12,752 16,320 17,949 17,949 1,629
Gamay 6,320 2,248 8,568 9,427 9,427 859
a.7 Nipa Seedlings produced (no.) TOTAL 150,050 150,050 165,000 165,000 14,950
E. SAMAR 150,050 150,050 165,000 165,000 14,950
CENRO Borongan 75,050 75,050 82,500 82,500 7,450
Gen. MacArthur 75,050 75,050 82,500 82,500 7,450
CENRO Dolores 75,000 75,000 82,500 82,500 7,500
San Julian 25,000 25,000 -25,000
San Policarpio 25,000 25,000 27,500 27,500 2,500
Taft 25,000 25,000 27,500 27,500 2,500
Can-avid 16,500
Dolores 11,000
4. Plantation Establishment
Area planted (has.) TOTAL 11,502 11,502 50 50 50
a. Brushing
b. Hole digging LEYTE 2,319 2,319 50 50 50
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
c. Staking BILIRAN 123 123
d. Hauling of seedlings SO. LEYTE 772 772
e. Outplanting SAMAR 2,495 2,495
f. Application of fertilizer E. SAMAR 2,597 2,597
g. Replanting N. SAMAR 3,196 3,196
h. Establishment of fireline
Area planted (has.) LEYTE 2,319 2,319 50 50 50
CENRO Palo 737 737
Burauen 250 250
Carigara 150 150
Jaro 50 50
Julita 14 14
La Paz 70 70
Mayorga 30 30
San Miguel 80 80
Tacloban City 93 93
CENRO Ormoc 783 783 50 50 50
Albuera 192 192
Capoocan 220 220
Dulag 26 26
Leyte 95 95 30 30 30
Ormoc City 225 225
Villaba 25 25 20 20 20
CENRO Baybay 799 799
Abuyog 699 699
Javier 75 75
Mahaplag 25 25
BILIRAN 123 123
Culaba 48 48
Naval 40 40
Kawayan 35 35
SO. LEYTE 772 772
CENRO Maasin 430 430
Libagon 5 5
Maasin 75 75
Malitbog 90 90
Sogod 230 230
Tomas Oppus 30 30
CENRO San Juan 342 342
Anahawan 10 10
Hinunangan 27 27
Lilo-an 80 80
Pintuyan 35 35
St. Bernard 100 100
San Francisco 20 20
San Ricardo 30 30
Silago 40 40
SAMAR 2,495 2,495
CENRO Catbalogan 1,395 1,395
Calbayog 335 335
Catbalogan 74 74
Gandara 265 265
Jiabong 80 80
Motiong 100 100
Matuguinao 70 70
Paranas 135 135
San Jorge 142 142
San Jose De Buan 116 116
Sta. Margarita 78 78
CENRO Sta. Rita 1,100 1,100
Basey 146 146
Calbiga 299 299
Hinabangan 240 240
Marabut 90 90
Pinabacdao 200 200
Sta. Rita 75 75
Villareal 50 50
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
E. SAMAR 2,597 2,597
CENRO Borongan 1,288 1,288
Balangiga 175 175
Balangkayan 119 119
Borongan 275 275
Gen. MacArthur 100 100
Llorente 194 194
Maydolong 250 250
Quinapundan 175 175
CENRO Dolores 1,309 1,309
Arteche 115 115
Can-avid 130 130
Dolores 153 153
Jipapad 101 101
Maslog 175 175
Oras 350 350
San Julian 120 120
San Policarpio 15 15
Taft 150 150
N. SAMAR 3,196 3,196
CENRO Catarman 1,545 1,545
Bobon 213 213
Catarman 52 52
Lope de Vega 156 156
Rosario 212 212
San Isidro 351 351
Victoria 191 191
Mondragon 370 370
CENRO Pambujan 1,651 1,651
Catubig 194 194
Gamay 490 490
Laoang 119 119
Las Navas 132 132
Mapanas 274 274
Palapag 59 59
Pambujan 168 168
San Roque 84 84
Silvino Lobos 131 131
5. Maintenance and ProtectionArea effectively maintained and protected with atleast 85%
survivalTOTAL 5,793 5,793 5,793 17,295 17,295 5,793 5,586 5,586 -207
LEYTE 2,319 2,319
BILIRAN 123 123
SO. LEYTE 772 772
SAMAR 3,447 3,447 3,447 5,942 5,942 3,447 3,447 3,447
E. SAMAR 905 905 905 3,502 3,502 905 698 698 -207
N. SAMAR 1,441 1,441 1,441 4,637 4,637 1,441 1,441 1,441
Year 1 Area maintained and protected (has.) TOTAL 11,502 11,502
LEYTE 2,319 2,319
BILIRAN 123 123
SO. LEYTE 772 772
SAMAR 2,495 2,495
E. SAMAR 2,597 2,597
N. SAMAR 3,196 3,196
Area maintained and protected (has.) LEYTE 2,319 2,319
CENRO Palo 737 737
Burauen 250 250
Carigara 150 150
Jaro 50 50
Julita 14 14
La Paz 70 70
Mayorga 30 30
San Miguel 80 80
Tacloban City 93 93
CENRO Ormoc 783 783
Albuera 192 192
Capoocan 220 220
Dulag 26 26
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Leyte 95 95
Ormoc City 225 225
Villaba 25 25
CENRO Baybay 799 799
Abuyog 699 699
Javier 75 75
Mahaplag 25 25
BILIRAN 123 123
Culaba 48 48
Naval 40 40
Kawayan 35 35
SO. LEYTE 772 772
CENRO Maasin 430 430
Libagon 5 5
Maasin 75 75
Malitbog 90 90
Sogod 230 230
Tomas Oppus 30 30
CENRO San Juan 342 342
Anahawan 10 10
Hinunangan 27 27
Lilo-an 80 80
Pintuyan 35 35
St. Bernard 100 100
San Francisco 20 20
San Ricardo 30 30
Silago 40 40
SAMAR 2,495 2,495
CENRO Catbalogan 1,395 1,395
Calbayog 335 335
Catbalogan 74 74
Gandara 265 265
Jiabong 80 80
Motiong 100 100
Matuguinao 70 70
Paranas 135 135
San Jorge 142 142
San Jose De Buan 116 116
Sta. Margarita 78 78
CENRO Sta. Rita 1,100 1,100
Basey 146 146
Calbiga 299 299
Hinabangan 240 240
Marabut 90 90
Pinabacdao 200 200
Sta. Rita 75 75
Villareal 50 50
E. SAMAR 2,597 2,597
CENRO Borongan 1,288 1,288
Balangiga 175 175
Balangkayan 119 119
Borongan 275 275
Gen. MacArthur 100 100
Llorente 194 194
Maydolong 250 250
Quinapundan 175 175
CENRO Dolores 1,309 1,309
Arteche 115 115
Can-avid 130 130
Dolores 153 153
Jipapad 101 101
Maslog 175 175
Oras 350 350
San Julian 120 120
San Policarpio 15 15
Taft 150 150
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
N. SAMAR 3,196 3,196
CENRO Catarman 1,545 1,545
Bobon 213 213
Ctarman 52 52
Lope de Vega 156 156
Rosario 212 212
San Isidro 351 351
Victoria 191 191
Mondragon 370 370
CENRO Pambujan 1,651 1,651
Catubig 194 194
Gamay 490 490
Laoang 119 119
Las Navas 132 132
Mapanas 274 274
Palapag 59 59
Pambujan 168 168
San Roque 84 84
Silvino Lobos 131 131
Year 2 Area maintained and protected (has.) TOTAL 3,756 3,756 3,756 3,756 3,756 3,756 3,549 3,549 -207
SAMAR 2,070 2,070 2,070 2,070 2,070 2,070 2,070 2,070
E. SAMAR 905 905 905 905 905 905 698 698 -207
N. SAMAR 781 781 781 781 781 781 781 781
Area maintained and protected (has.) SAMAR 2,070 2,070 2,070 2,070 2,070 2,070 2,070 2,070
CENRO Catbalogan 1,106 1,106 1,106 1,106 1,106 1,106 1,106 1,106
Calbayog 303 303 303 303 303 158 158 158 -145
Gandara 210 210 210 210 210 340 340 340 130
Jiabong 130 130 130 130 130 95 95 95 -35
Matuguinao 130 130 130 130 130 90 90 90 -40
Motiong 50 50 50 50 50 50 50 50
Paranas 160 160 160 160 160 180 180 180 20
San Jorge 93 93 93 93 93 110 110 110 17
Sta. Margarita 30 30 30 30 30 15 15 15 -15
Catbalogan 25 25 25 25
Tarangnan 43 43 43 43
CENRO Sta. Rita 964 964 964 964 964 964 964 964
Basey 84 84 84 84 84 84 84 84
Calbiga 45 45 45 45 45 45 45 45
Hinabangan 129 129 129 129 129 129 129 129
Marabut 156 156 156 156 156 156 156 156
Pinabacdao 225 225 225 225 225 225 225 225
Sta. Rita 173 173 173 173 173 173 173 173
Talalora 60 60 60 60 60 60 60 60
Villareal 92 92 92 92 92 92 92 92
E. SAMAR 905 905 905 905 905 905 698 698 -207
CENRO Borongan 453 453 453 453 453 453 453 453
Balangiga 50 50 50 50 50 50 50 50
Balangkayan 7 7 7 7 7 7 7 7
Borongan 45 45 45 45 45 45 45 45
Gen. MacArthur 60 60 60 60 60 60 60 60
Llorente 100 100 100 100 100 100 100 100
Maydolong 166 166 166 166 166 166 166 166
Quinapundan 25 25 25 25 25 25 25 25
CENRO Dolores 452 452 452 452 452 452 245 245 -207
Can-avid 200 200 200 200 200 200 75 75 -125
Dolores 74 74 74 74 74 74 -74
Jipapad 20 20 20 20 20 20 20 20
Maslog 50 50 50 50 50 50 50 50
Oras 50 50 50 50 50 50 50 50
San Policarpio 8 8 8 8 8 8 -8
Taft 50 50 50 50 50 50 50 50
N. SAMAR 781 781 781 781 781 781 781 781
CENRO Catarman 391 391 391 391 391 391 391 391
Bobon 53 53 53 53 53 -53
Catarman 50 50 50 50 50 60 60 60 10
Rosario 50 50 50 50 50 35 35 35 -15
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
San Isidro 100 100 100 100 100 90 90 90 -10
Victoria 64 64 64 64 64 30 30 30 -34
Mondragon 74 74 74 74 74 105 105 105 31
Lavezares 56 56 56 56
San Jose 15 15 15 15
CENRO Pambujan 390 390 390 390 390 390 390 390
Catubig 38 38 38 38 38 38 38 38
Pambujan 50 50 50 50 50 50 50 50
Las Navas 124 124 124 124 124 124 124 124
Laoang 90 90 90 90 90 90 90 90
Palapag 88 88 88 88 88 88 88 88
Year 3 Area maintained and protected (has.) TOTAL 2,037 2,037 2,037 2,037 2,037 2,037 2,037 2,037
SAMAR 1,377 1,377 1,377 1,377 1,377 1,377 1,377 1,377
N. SAMAR 660 660 660 660 660 660 660 660
Area maintained and protected (has.) SAMAR 1,377 1,377 1,377 1,377 1,377 1,377 1,377 1,377
CENRO Catbalogan 914 914 914 914 914 914 914 914
Calbayog 160 160 160 160 160 160 160 160
Catbalogan 105 105 105 105 105 105 105 105
Gandara 30 30 30 30 30 30 30 30
Paranas 260 260 260 260 260 235 235 235 -25
San Jorge 124 124 124 124 124 124 124 124
Sta. Margarita 90 90 90 90 90 90 90 90
Tarangnan 60 60 60 60 60 60 60 60
Jiabong 55 55 55 55 55 55 55 55
Motiong 30 30 30 30 30 30 30 30
Daram 25 25 25 25
CENRO Sta. Rita 463 463 463 463 463 463 463 463
Pinabacdao 240 240 240 240 240 240 240 240
Sta. Rita 223 223 223 223 223 223 223 223
N. SAMAR 660 660 660 660 660 660 660 660
CENRO Catarman 660 660 660 660 660 660 660 660
Biri 77 77 77 77 77 67 67 67 -10
Bobon 20 20 20 20 20 20 20 20
Catarman 100 100 100 100 100 80 80 80 -20
Lavezares 50 50 50 50 50 60 60 60 10
Lope de Vega 30 30 30 30 30 30 30 30
Rosario 40 40 40 40 40 40 40 40
San Isidro 148 148 148 148 148 168 168 168 20
San Jose 100 100 100 100 100 100 100 100
Mondragon 95 95 95 95 95 95 95 95
6. Hiring of Extension Officers (EOs) and Project Support Staff Project Support Staff hired (no.) TOTAL 121 121 121 121 121 121 121 121
Forest Extension Officer hired (no.) Regional Office 10 10 10 10 10 10 10 10
LEYTE 15 15 15 15 15 15 15 15
PENRO Leyte 3 3 3 3 3 3 3 3
CENRO Palo 4 4 4 4 4 4 4 4
CENRO Ormoc 4 4 4 4 4 4 4 4
CENRO Baybay 4 4 4 4 4 4 4 4
BILIRAN 2 2 2 2 2 2 2 2
SO. LEYTE 7 7 7 7 7 7 7 7
PENRO Southern Leyte 1 1 1 1 1 1 1 1
CENRO Maasin 3 3 3 3 3 3 3 3
CENRO San Juan 3 3 3 3 3 3 3 3
SAMAR 33 33 33 33 33 33 33 33
PENRO Samar 6 6 6 6 6 6 5 6
CENRO Catbalogan 15 15 15 15 15 15 16 15
CENRO Sta. Rita 12 12 12 12 12 12 12 12
E. SAMAR 30 30 30 30 30 30 30 30
PENRO Eastern Samar 6 6 6 6 6 6 6 6
CENRO Catbalogan 13 13 13 13 13 13 13 13
CENRO Sta. Rita 11 11 11 11 11 11 11 11
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
N. SAMAR 24 24 24 24 24 24 24 24
PENRO Northern
Samar6 6 6 6 6 6 6 6
CENRO Catarman 10 10 10 10 10 10 10 10
CENRO Pambujan 8 8 8 8 8 8 8 8
7. Maintenance of Seed Production Areas/IPTs SPA/IPT maintained with seeds collected TOTAL 6 6 6 6 6 6 6 6
LEYTE 1 1 1 1 1 1 1 1
BILIRAN 1 1 1 1 1 1 1 1
SO. LEYTE 1 1 1 1 1 1 1 1
SAMAR 1 1 1 1 1 1 1 1
E. SAMAR 1 1 1 1 1 1 1 1
N. SAMAR 1 1 1 1 1 1 1 1
8. Maintenance of Clonal Nurseriesclonal nursery maintained with quality Planting Material
produced (no.)TOTAL 1 1 1 1 1 1 1 1
Regional Office 1 1 1 1 1 1 1 1
10. Procurement of Drone and Ipad TOTAL 72 72 41 19 60 -12
Regional Office 4 4 4 4
LEYTE 16 16 1 15 16
BILIRAN 4 4 4 4
SO. LEYTE 12 12 -12
SAMAR 12 12 12 12
E. SAMAR 12 12 12 12
N. SAMAR 12 12 12 12
Geotagging Equipment (no.) TOTAL 72 72 41 19 60 -12
Regional Office 4 4 4 4
LEYTE 16 16 1 15 16
BILIRAN 4 4 4 4
SO. LEYTE 12 12 -12
The supplier declared that the order were already
phase out. Looking for units with the same
specificationsSAMAR 12 12 12 12
E. SAMAR 12 12 12 12
N. SAMAR 12 12 12 12
11. Risk Resiliency Program TOTAL -
Regional Office -
LEYTE -
BILIRAN -
SO. LEYTE -
SAMAR -
E. SAMAR -
N. SAMAR -
a. Seedling Production
TOTAL 4,183,642 4,183,642 3,577,288 3,577,288 -606,354
SO. LEYTE 87,618 87,618 96,178 96,178 8,560
SAMAR 432,308 432,308 475,839 475,839 43,531
E. SAMAR 3,663,716 3,663,716 3,005,271 3,005,271 -658,445
11.a.1 Other Fruit Trees Seedling produced (no.) TOTAL 269,510 269,510 440,700 440,700 171,190
SO. LEYTE 47,510 47,510 52,250 52,250 4,740
CENRO Maasin 15,000 15,000 16,500 16,500 1,500
Libagon 15,000 15,000 16,500 16,500 1,500
CENRO San Juan 32,510 32,510 35,750 35,750 3,240
Hinundayan 15,000 15,000 16,500 16,500 1,500
St. Bernard 17,510 17,510 19,250 19,250 1,740
SAMAR 222,000 222,000 244,500 244,500 22,500
CENRO Catbalogan 147,000 147,000 161,700 161,700 14,700
Calbayog 97,000 97,000 106,700 106,700 9,700
Matuguinao 50,000 50,000 55,000 55,000 5,000
CENRO Catbalogan 75,000 75,000 82,800 82,800 7,800
Basey 75,000 75,000 82,800 82,800 7,800
E. SAMAR 143,950 143,950
CENRO Borongan 143,950 143,950
Quinapondan 34,100 34,100
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Balangiga 10,100 10,100
Hernani 8,450 8,450
Salcedo 8,800 8,800
Guiuan 66,000 66,000
Lawaan 16,500 16,500
11.a.2 Timber Seedling produced (no.) TOTAL 749,700 749,700 824,671 824,671 74,971
SAMAR 166,600 166,600 183,261 183,261 16,661
CENRO Sta. Rita 166,600 166,600 183,261 183,261 16,661
Basey 166,600 166,600 183,261 183,261 16,661
E. SAMAR 583,100 583,100 641,410 641,410 58,310
CENRO Borongan 583,100 583,100 458,150 458,150 -124,950
Borongan 208,250 208,250 229,075 229,075 20,825
Maydolong 208,250 208,250 229,075 229,075 20,825
Quinapundan 166,600 166,600 -166,600
CENRO Dolores 183,260 183,260
Oras 109,956 109,956
Jipapad 10,996 10,996
San Julian 62,308 62,308
11.a.4 Indigenous Seedlings produced (no.) TOTAL 884,380 884,380 972,814 972,814 88,434
SO. LEYTE 9,380 9,380 10,313 10,313 933
CENRO Maasin 3,760 3,760 4,125 4,125 365
Maasin 1,880 1,880 2,062 2,062 182
Sogod 1,880 1,880 2,063 2,063 183
CENRO San Juan 5,620 5,620 6,188 6,188 568
Hinunangan 1,870 1,870 2,062 2,062 192
Lilo-an 1,870 1,870 2,063 2,063 193
St. Bernard 1,880 1,880 2,063 2,063 183
E. SAMAR 875,000 875,000 962,501 962,501 87,501
CENRO Borongan 500,000 500,000 550,001 550,001 50,001
Balangiga 93,750 93,750 103,125 103,125 9,375
Borongan 156,250 156,250 171,876 171,876 15,626
Maydolong 156,250 156,250 171,875 171,875 15,625
Lawaan 93,750 93,750 103,125 103,125 9,375
CENRO Dolores 375,000 375,000 412,500 412,500 37,500
Can-avid 125,000 125,000 114,812 114,812 -10,188
Dolores 31,250 31,250 34,375 34,375 3,125
Jipapad 62,500 62,500 68,750 68,750 6,250
Oras 31,250 31,250 44,688 44,688 13,438
San Julian 62,500 62,500 68,750 68,750 6,250
Sulat 31,250 31,250 34,375 34,375 3,125
Taft 31,250 31,250 46,750 46,750 15,500
11.a.6 Bamboo Culm produced (no.) TOTAL 39,736 39,736 43,743 43,743 4,007
SO. LEYTE 3,028 3,028 3,365 3,365 337
CENRO Maasin 1,228 1,228 1,346 1,346 118
Maasin 600 600 673 673 73
Sogod 628 628 673 673 45
CENRO San Juan 1,800 1,800 2,019 2,019 219
Hinunangan 600 600 673 673 73
Liloan 600 600 673 673 73
St. Bernard 600 600 673 673 73
SAMAR 6,108 6,108 6,718 6,718 610
CENRO Catbalogan 6,108 6,108 6,718 6,718 610
Jiabong 4,080 4,080 4,488 4,488 408
Motiong 2,028 2,028 2,230 2,230 202
E. SAMAR 30,600 30,600 33,660 33,660 3,060
CENRO Borongan 20,400 20,400 22,440 22,440 2,040
Balangiga 10,200 10,200 11,220 11,220 1,020
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Lawaan 10,200 10,200 11,220 11,220 1,020
CENRO Dolores 10,200 10,200 11,220 11,220 1,020
Oras 10,200 10,200 11,220 11,220 1,020
11.a.9 Mangrove (Propagule) Seedlings produced (no.) TOTAL 2,240,316 2,240,316 1,295,360 1,295,360 -944,956
SO. LEYTE 27,700 27,700 30,250 30,250 2,550
CENRO Maasin 12,700 12,700 13,750 13,750 1,050
Macrohon 12,700 12,700 13,750 13,750 1,050
CENRO San Juan 15,000 15,000 16,500 16,500 1,500
St. Bernard 15,000 15,000 16,500 16,500 1,500
SAMAR 37,600 37,600 41,360 41,360 3,760
CENRO Catbalogan 17,600 17,600 19,360 19,360 1,760
Calbayog 17,600 17,600 19,360 19,360 1,760
CENRO Sta. Rita 20,000 20,000 22,000 22,000 2,000
Sta. Rita 20,000 20,000 -20,000
Calbiga 22,000 22,000
E. SAMAR 2,175,016 2,175,016 1,223,750 1,223,750 -951,266
CENRO Borongan 1,375,016 1,375,016 343,750 343,750 -1,031,266
Balangiga 125,000 125,000 55,000 55,000 -70,000
Giporlos 62,350 62,350 68,750 68,750 6,400
Guiuan 500,000 500,000 -500,000
Hernani 62,666 62,666 -62,666
Lawaan 125,000 125,000 -125,000
Quinapundan 250,000 250,000 -250,000
Salcedo 250,000 250,000 220,000 220,000 -30,000
CENRO Dolores 800,000 800,000 880,000 880,000 80,000
Arteche 125,000 125,000 385,000 385,000 260,000
Oras 125,000 125,000 -125,000
San Julian 50,000 50,000 -50,000
San Policarpio 375,000 375,000 412,500 412,500 37,500
Sulat 125,000 125,000 -125,000
Dolores 49,500 49,500
Can-avid 33,000 33,000
11.b Plantation Establishment Area planted (has.) TOTAL 3,495 3,495
a. Brushing
b. Hole digging SO. LEYTE 136 136
c. Staking
d. Hauling of seedlings CENRO Maasin 47 47
e. Outplanting Libagon 30 30
f. Application of fertilizer Maasin 6 6
g. Replanting Macrohon 5 5
h. Establishment of fireline Sogod 6 6
CENRO San Juan 89 89
Hinunangan 6 6
Hinundayan 30 30
Lilo-an 6 6
St. Bernard 47 47
SAMAR 589 589
CENRO Catbalogan 301 301
Calbayog 201 201
Matuguinao 100 100
CENRO Sta. Rita 288 288
Basey 250 250
Jiabong 20 20
Motiong 10 10
Sta. Rita 8 8
E. SAMAR 2,770 2,770
CENRO Borongan 1,800 1,800
Balangiga 250 250
Borongan 375 375
Giporlos 25 25
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
Guiuan 200 200
Hernani 25 25
Lawaan 250 250
Maydolong 375 375
Quinapundan 200 200
Salcedo 100 100
CENRO Dolores 970 970
Arteche 50 50
Can-avid 200 200
Dolores 50 50
Jipapad 100 100
Oras 150 150
San Julian 120 120
San Policarpio 150 150
Sulat 100 100
Taft 50 50
11.c Maintenance and ProtectionArea effectively maintained and protected with atleast 85%
survivalTOTAL 265 265 265 3,760 3,760 -530
SO. LEYTE 136 136
SAMAR 265 265 265 854 854 -530
E. SAMAR 2,770 2,770
Year 1 Area maintained and protected (has.) TOTAL 3,495 3,495
SO. LEYTE 136 136
CENRO Maasin 47 47
Libagon 30 30
Maasin 6 6
Macrohon 5 5
Sogod 6 6
CENRO San Juan 89 89
Hinunangan 6 6
Hinundayan 30 30
Liloan 6 6
St. Bernard 47 47
SAMAR 589 589
CENRO Catbalogan 301 301
Calbayog 201 201
Matuguinao 100 100
CENRO Sta. Rita 288 288
Basey 250 250
Jiabong 20 20
Motiong 10 10
Sta. Rita 8 8
E. SAMAR 2,770 2,770
CENRO Borongan 1,800 1,800
Balangiga 250 250
Borongan 375 375
Giporlos 25 25
Guiuan 200 200
Hernani 25 25
Lawaan 250 250
Maydolong 375 375
Quinapundan 200 200
Salcedo 100 100
CENRO Dolores 970 970
Arteche 50 50
Can-avid 200 200
Dolores 50 50
Jipapad 100 100
Oras 150 150
San Julian 120 120
San Policarpio 150 150
Sulat 100 100
Taft 50 50
Year 2 Area maintained and protected (has.) TOTAL 265 265 265 265 265 265 265
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
SAMAR 265 265 265 265 265 265 265
CENRO Catbalogan 135 135 135 135 135 160 160 25
Calbayog 130 130 130
Catbalogan 120 120 120 120 120 15 15 -105
Matuguinao 15 15 15 15 15 -15
Sta.Margarita 15 15 15
CENRO Sta. Rita 130 130 130 130 130 105 105 -25
Basey 80 80 80 80 80 80 80
Calbiga 50 50 50 50 50 25 25 -25
Watershed Management Planning
1.1 Updating of Integrated Watershed Management TOTAL 2 2
Plan (IWMP)IWMP finalized compliant to existing guidelines and served as
guidein the effective management of the areaRegional Office - -
LEYTE 2 2
Mainit 1 1 - Conducted levelling-off meeting
Salug 1 1
- Coordination and orientation of the MLGU
Hilongos, Leyte re formulation of IWMP
- Coordination and linkaging with twenty-two (22)
barangays within Salug Watershed
2. Activities on Water Resource Utilization Section (WRUS)
WPA verified/validated (no.) TOTAL 12 12 12 10 46 10 16 26 2
Regional Office 12 12 12 10 46 10 16 26 2
Water users inventoried (no.) TOTAL 9 9 9 9 36 8 13 21 3
Regional Office 9 9 9 9 36 8 13 21 3
Water resources identified and mapped (no.) TOTAL 9 9 9 9 36 8 13 21 3
Regional Office 9 9 9 9 36 8 13 21 3
Data Encoder hired (no.) TOTAL 1 1 1 1 1 1 1 1
Regional Office 1 1 1 1 1 1 1 1
3. Operationalization Maintenance of Watershed
Instrumentation
3.1 Database access subscription Database access subscription procured and installed (no.) TOTAL 1 1 1 1 1 1 1 1
a. Zentra Cloud for Automated Weather Station and CTD
Groundwater SensorRegional Office 1 1 1 1 1 1 1 1
b. Hydrosphere for AWLS
3.1 Maintenance and protection of the Professional Services TOTAL 1 1 1 1 1 1 1 1
monitoring System (Lab Analysis, Services, etc.) Regional Office 1 1 1 1 1 1 1 1 -1
3.2 Hiring of Database Manager for Instrumentation Database Manager hired (no.) TOTAL 1 1 1 1 1 1 1 1 -1
(Information System Analyst with GIS background) Regional Office 1 1 1 1 1 1 1 1 -1
4. Sustainable Operationalization of River Basin Organization
4.1 Conduct of Execom/Council MeetingsNo. of proceedings/minutes of the meeting/approved
resolutions submittedTOTAL 2 2 4 -2
-Cluster V Regional Office 2 2 4 -2
Milestone Activity: Initial coordination with PENRO
Northern Samar, CENRO Catarman and
Pambujan, and LGUs re popularization on Climate
Change-Responsive Integrated River Basin
Management and Development Master Plan
(CCRIRBMDMP) of Cluster 6 river basin.
-Cluster VI
The office was not able to convene the members
of the Execom due to the lockdown in Northern
Samar caused by rising COVID-19 cases.
4.2 Conduct of TWG/Committee Meeting No. of proceedings/approved minutes of the meeting conducted TOTAL 1 1 2 -1
Regional Office 1 1 2 -1
The office was not able to convene the members
of the Execom due to the lockdown in Northern
Samar caused by rising COVID-19 cases.
5. Strengthening of RBPMOs at the Regional Level
- Hiring of Support Staff Contract of Service hired (no.) TOTAL 1 1 1 1 1 1 1 1
Regional Office 1 1 1 1 1 1 1 1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
ADAPTIVE CAPACITIES OF HUMAN COMMUNITIES AND
NATURAL SYSTEM IMPROVED
ENVIRONMENT AND NATURAL RESOURCES RESILLIENCY
PROGRAM
A. Natural Resource Assessment
1. Watershed Characterization with Vulnerbility Assessment Watershed Characterization with VA report (no.)
Small Watershed (<10,000has.)
Medium watershed (>10,000-50,000has.)
Reviewed and finalized the watershed characterization with
vulnerability assessment and endorsed to Central Office-FMB
(no.)
Regional Office 1 1
Large watershed (>50,000has.)
Drafted the watershed characterization with vulnerability
assessment as member of the IWMP (TWG) created by
Regional Office (no. and total area/ha)
LEYTE 1 1
- Magun-Bucan
Milestone Activities:
- Coordinated with stakeholders for the conduct of
inter-agency meetings and workshops
- Continued consolidation and analysis of the
socio-economic, demographic, and adapative
capacity data
- Conducted water quality assessments using the
multiparameter meter
- Acquisition of soil analysis results
- Second measurement of streamflow velocity
available
BILIRAN 1 1
- Caray-Caray 4,574.38
ha
Activities:
- Morphometric Analysis for three (3) aspects
accomplished
- Laboratory result of the water quality assessment
was released
- Conducted Focus Group Discussion (FGD) and
CEPA (Tayo ang Kalikasan) to five (5) barangays
covered by CRW to analyze the degree of
vulnerability to various hazards using the ERDB
questionnaire.
2. Updating of Watershed Characterization with Vulnerability
AssessmentWatershed Characterization with VA report (no.)
Reviewed and finalized the watershed characterization with VA
and endorsed to Central Office-FMB (no.)Regional Office 1 1
Drafted the watershed charaterization with vulnerability
assessment as member of the IWMP (TWG) created by
Regional Office (no. and total area/ha)
LEYTE 1 1
- Conducted clustered orientation and IEC in
fourteen (14) barangays in Barugo, Leyte
- Collected soil samples for laboratory analysis - Pongo River
PROGRAM BENEFICIARIES DEVELOPMENT (PBD) IN CBFM
AREAS (CBFM-CARP)1. Rationalize and ensure climate resilient of ARBs Physical,
Social, Environmental and Economic Support
1.1 Agroforestry Development and Livelihood in CBFM Areas area (ha) covered to be developed TOTAL 164
LEYTE 12
CENRO Ormoc 12
- Bulaknong
Kapunungan Nga Nag-
amuma sa Kakahuyan
(BUKANA)
12
BILIRAN 13
- Mamanwa Tribe
Association (MTA)13
So.LEYTE 66
CENRO Maasin 66
- Basak Farmers
Association (BFA)10
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
- Liberty Farmers and
Forest Developer's
Association (LIFFODA)
56
SAMAR 73
CENRO Sta. Rita 73 - Caranas, Hinicaa,
Calapi Forest Planters
Association, Inc.
(CHCFPAI)
23
- Casandig Upland
Farmers Association30
- Brgy. Tagalag
Fisherfolks and
Farmers Association
20
No. of sites/PO supported with agroforestry and livelihood TOTAL 7
As of now six (6) CNFM-POs have produced 37,
345 seedlings (8,948 forest tree seedlings, 23, 906
fruit tree seedlings and 4,500 rattan seedlings).
LEYTE 1
CENRO Ormoc 1
- Bulaknong
Kapunungan Nga Nag-
amuma sa Kakahuyan
(BUKANA)
1Procured of planting crops particularly on
agricrops.
BILIRAN 1
- Mamanwa Tribe
Association (MTA)1
So.LEYTE 2
CENRO Maasin 2
- Basak Farmers
Association (BFA)1
- Liberty Farmers and
Forest Developer's
Association (LIFFODA)
1Procured of planting crops particularly on
agricrops.
SAMAR 3
CENRO Sta. Rita 3 - Caranas, Hinicaa,
Calapi Forest Planters
Association, Inc.
(CHCFPAI)
1
- Casandig Upland
Farmers Association1
- Brgy. Tagalag
Fisherfolks and
Farmers Association
1
Socio Economic Environmental Baselining (SEEB) TOTAL 7
LEYTE 1
CENRO Ormoc 1
- Bulaknong
Kapunungan Nga Nag-
amuma sa Kakahuyan
(BUKANA)
1
Milestone Activity: conducted socio and economic
profile of the respondents, flora and fauna
assessment, soil sample collection and photo
documentation of infrastructures
BILIRAN 1
- Mamanwa Tribe
Association (MTA)1
Milestone Activity: conducted socio and economic
profile of the respondents, flora and fauna
assessment, soil sample collection and photo
documentation of infrastructures
So.LEYTE 2
CENRO Maasin 2
- Basak Farmers
Association (BFA)1
- Liberty Farmers and
Forest Developer's
Association (LIFFODA)
1
1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL 1ST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER TOTAL
-1 -2 -3 -4 -5 -6 -7 -8 -9 -10 -11 -12 -13 -14 -15 -16
BAR No. 1
QUARTERLY PHYSICAL REPORT OF OPERATION
As of 2nd QUARTER 2021
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Current Year Appropriations
REMARKS
REGION 8 Supplemental Appropriations
Continuing Appropriations
Off-Budget Account
PARTICULARS PERFORMANCE INDICATORUACS
CODE
PHYSICAL TARGETS PHYSICAL ACCOMPLISHMENTSVARIANCE AS
OF JUNE
PROVINCE/
MUNICIPALITY
SAMAR 3
CENRO Sta. Rita 3 - Caranas, Hinicaa,
Calapi Forest Planters
Association, Inc.
(CHCFPAI)
1
- Casandig Upland
Farmers Association1
- Brgy. Tagalag
Fisherfolks and
Farmers Association
1
Milestone Activity: conducted socio and economic
profile of the respondents, flora and fauna
assessment, soil sample collection and photo
documentation of infrastructures
Impact Assessment No of project assessed with report TOTAL 7
LEYTE 1
CENRO Ormoc 1
- Bulaknong
Kapunungan Nga Nag-
amuma sa Kakahuyan
(BUKANA)
1
BILIRAN 1
- Mamanwa Tribe
Association (MTA)1
So.LEYTE 2
CENRO Maasin 2
- Basak Farmers
Association (BFA)1
- Liberty Farmers and
Forest Developer's
Association (LIFFODA)
1
SAMAR 3
CENRO Sta. Rita 3 - Caranas, Hinicaa,
Calapi Forest Planters
Association, Inc.
(CHCFPAI)
1
- Casandig Upland
Farmers Association1
- Brgy. Tagalag
Fisherfolks and
Farmers Association
1
BUILD and ENHANCE THE CAPACITIES OF ARBs and THEIR
ORGANIZATIONS THROOUGH DIFFERENTIATED and
CUSTOMIZED INTERVENTION1. Organizational development skills enhancement No of training conducted TOTAL 2
Regional Office 2
No of PO/members trained TOTAL 90
Regional Office 90
Prepared by: Recommended by: Approved by:
MARIA TERESA N. PATINDOL SONIA Q. MEJIDO ARTURO N. SALAZAR, D.M., CESO IV JOSE ELMER BASCOS TIRSO P. PARIAN, JR., CESO IV
Chief, Planning and Management Division OIC-Chief, Finance Division ARD for Management Services OIC-ARD for Technical Services OIC, Regional Executive Director