Project Introduction
• Frederick G. Gardiner Expressway– Elevated freeway through downtown Toronto
• Lower Don Lands– Former industrial land redeveloped into
residential and commercial uses• Gardiner is seen as a barrier to the
redeveloped LDL– Investigate solutions
![Page 3: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/3.jpg)
Project Introduction
• Joint Clients– City of Toronto and Waterfront Toronto– City owns the Gardiner– Waterfront Toronto is charged with revitalisation
of the waterfront• Sensitive Project
![Page 4: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/4.jpg)
Project Scope and Goals
• $6M Planning and Design Study– Sub to Dillon Consulting– ~$300k Microsimulation budget
• Investigate four design options for treatments east of Jarvis Street– Do Nothing, Ameliorate, Remove, Submerge– Five construction staging models
• Goal is to investigate ways of reconnecting the redeveloped Lower Don Lands to the City
![Page 5: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/5.jpg)
Microsimulation Model Area
• 5 mi2 (13 km2)• Dense, urban development
SPAD
INA
DUNDAS
WOODB
INE
![Page 6: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/6.jpg)
Methodology
• Create existing conditions– Road selection– Zone system creation– Include transit and pedestrians
• Matrix Estimation• Calibration / Validation• Alternative Testing• Construction Staging
![Page 7: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/7.jpg)
Existing Conditions
• Most roadways in study area– Arterial and up, some collectors, and few locals
• Coding issues with Lake Shore Boulevard
![Page 8: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/8.jpg)
Existing Conditions
• Arup Model as a starting point• Approximately double model area
ARUPJACOBS
![Page 9: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/9.jpg)
Zone System
• Layout zones on paper
![Page 10: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/10.jpg)
Zone System• Simple one zone
per block with access to all roads
• Simplifies creation and coding
• Makes for very difficult matrix estimation
![Page 11: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/11.jpg)
Zone System• One zone per
connector on each block face
• Allows maximum control
• Model becomes unwieldy with so many zones
![Page 12: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/12.jpg)
Existing Conditions
• Transit– Streetcars
• Spadina and Queens Quay – Median-running• Other streets – In mixed traffic
– Buses– Subway
• Not included in our model
• Pedestrians– Taken only from Arup model, no new ped work
![Page 13: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/13.jpg)
Streetcar Coding
• Spadina and Queens Quay– Median-running
• Median Lane Operation– Paramics limitation that similar
movements must be in adjacent lanes– This is an issue where the transit
vehicle through lane is adjacent to a left-turn lane
– Fortunately, coding the through movement in the transit lane as ‘barred’ works perfectly• Transit vehicle moves with normal
traffic ‘through’ green
![Page 14: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/14.jpg)
Streetcar Coding
• Remainder of Streetcar network is in mixed traffic– Typically runs in the left-hand
lane of a two-lane per direction facility
• Congestion issues due to frequent stops– Both lanes in the streetcar travel
direction must stop when loading/unloading passengers
– New feature built into Paramics
STOP
![Page 15: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/15.jpg)
Matrix Estimation
• Counts• Travel Demand Model O/D data• Screenlines
![Page 16: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/16.jpg)
Matrix Estimation
• Issues– Estimation of congested conditions• Counts at congested locations are less useful• Use counts upstream of issues to help estimate
demand– Grid network adds to the challenge• Many parallel routes and relatively short blocks
![Page 17: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/17.jpg)
Calibration / Validation• Counts• Travel Times• Screenlines• Major Queue
Locations– Gardiner and
on/off ramps
![Page 18: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/18.jpg)
Calibration/Validation
• Issues– Major queues on Gardiner• WB in PM, EB in AM• Replication of WB queue may require network
extension or link speed modification at external station
STUDYAREA
CONGESTIONSOURCE
![Page 19: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/19.jpg)
Future Alternatives
• Do Nothing• Ameliorate
JARVIS
EASTERN
• Remove (bring to ground)• Submerge
![Page 20: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/20.jpg)
Construction Staging
• With a preferred alternative selected– Build a series of 5 incremental networks that take
the geometry to the final design– Stages given to us for analysis
• Provide results and recommendations
![Page 21: Toronto: Gardiner Expressway Study](https://reader033.fdocuments.in/reader033/viewer/2022061615/568163d5550346895dd5229b/html5/thumbnails/21.jpg)
Conclusions
• Most challenging work will be: – Matrix Estimation– Calibration / Validation
• Questions or Comments?– Adam Lanigan [email protected]