DMI021-PDF-EnG Design Strategy at Samsung Electronics Becoming a Company Top Tier
Top Photovoltaic Solutions (Eng)
-
Upload
gestamp-renewables -
Category
Documents
-
view
243 -
download
0
description
Transcript of Top Photovoltaic Solutions (Eng)
Gestamp Solar
20
11
09
SO
L_T
RI_
EN
_to
p
Economic viability and fi nancing.
A project of this magnitude requires a
huge investment. There is usually a need
to seek for a strong fi nancial partner in
order to canalize investment and minimize
risks. Gestamp Solar brings the fi nancial
strength and expertise collected after
many years in the PV business, with over
300MW PV fi nished and over 2300MW
currently in advanced development.
Legality
Regulations in renewable energies’ fi eld
are constantly changing, sometimes
even while a project is in construction.
Gestamp Solar legal experts have strongly
contributed towards project’s success,
merging previous experiences with
Corporación Gestamp seriousness and
countries’ strategic weight as a global
player with production facilities in over 25
countries with over 27.000 employees.
Technical challenge
Project implementation must happen
without disturbing the normal day to
day activity in the factory/plant. It is
necessary to deal with important technical
constraints, respect distances and space
requirements to ensure proper access
to both trucks and transport vehicles as
well as to emergency and safety units.
The optimization of the available surface
in order to achieve the maximum nominal
installed capacity is always a challenge
for Gestamp Solar’s engineers.
RENAULT 55MW240.000 modules placed over parking
shelters, constitute the biggest roof-top
project in the world. The specially designed
structure brings special protection for
brand-new cars and nigh-lightning. During
module installation, the paving and ground
lines painting were renewed.
SEAT 12MWIn mid 2011 Gestamp Solar fi nished
implementation of “SEAT al sol”
photovoltaic Project, that allows clean
electricity generation in SEAT’s factory
in Martorell, Barcelona. This project,
consisting in parking shelters and rooftop
PV installations, is SEAT’s strong bet for CO2
emissions reduction and environmental care,
profi ting of photovoltaic great advantages
and light-speed reducing installation costs.
NEVADA 3MWGreen energy project developed and
constructed for Nevada´s Army National
Guard, built in 3 phases located in Las Vegas
(2) and Carson City (1) over parking shelters
in a surface of 40.000 square meters.
LAMBORGHINI 1MWOne of the photovoltaic pioneer roof tops in
Europe, mounted over Lamborghini’s facilities
in Bologna, Italy. It is part of the company’s
strategic objectives to contribute, towards
environmental protection and become a
“green manufacturer”.
Some factsThis type of projects represents a challenge in three major fi elds:
A company of
Gestamp Renewables
NEVADA ARMYNational Guard
3 MW
LAMBORGHINI
1 MW
SEAT
12 MW
RENAULT
55 MW
Youtube
Flickr
Issuu
The conversation continues at:
Spain
+34 91 177 00 10
India
+91 2240907268
France +33 561 239 733
Italy +39 068412640
USA +14 152305601
Southafrica
+27794879551
www.gestampsolar.comwww.gestampren.com
Top Photovoltaic Solutions
Gestamp Solar
20
11
09
SO
L_T
RI_
EN
_to
p
Economic viability and fi nancing.
A project of this magnitude requires a
huge investment. There is usually a need
to seek for a strong fi nancial partner in
order to canalize investment and minimize
risks. Gestamp Solar brings the fi nancial
strength and expertise collected after
many years in the PV business, with over
300MW PV fi nished and over 2300MW
currently in advanced development.
Legality
Regulations in renewable energies’ fi eld
are constantly changing, sometimes
even while a project is in construction.
Gestamp Solar legal experts have strongly
contributed towards project’s success,
merging previous experiences with
Corporación Gestamp seriousness and
countries’ strategic weight as a global
player with production facilities in over 25
countries with over 27.000 employees.
Technical challenge
Project implementation must happen
without disturbing the normal day to
day activity in the factory/plant. It is
necessary to deal with important technical
constraints, respect distances and space
requirements to ensure proper access
to both trucks and transport vehicles as
well as to emergency and safety units.
The optimization of the available surface
in order to achieve the maximum nominal
installed capacity is always a challenge
for Gestamp Solar’s engineers.
RENAULT 55MW240.000 modules placed over parking
shelters, constitute the biggest roof-top
project in the world. The specially designed
structure brings special protection for
brand-new cars and nigh-lightning. During
module installation, the paving and ground
lines painting were renewed.
SEAT 12MWIn mid 2011 Gestamp Solar fi nished
implementation of “SEAT al sol”
photovoltaic Project, that allows clean
electricity generation in SEAT’s factory
in Martorell, Barcelona. This project,
consisting in parking shelters and rooftop
PV installations, is SEAT’s strong bet for CO2
emissions reduction and environmental care,
profi ting of photovoltaic great advantages
and light-speed reducing installation costs.
NEVADA 3MWGreen energy project developed and
constructed for Nevada´s Army National
Guard, built in 3 phases located in Las Vegas
(2) and Carson City (1) over parking shelters
in a surface of 40.000 square meters.
LAMBORGHINI 1MWOne of the photovoltaic pioneer roof tops in
Europe, mounted over Lamborghini’s facilities
in Bologna, Italy. It is part of the company’s
strategic objectives to contribute, towards
environmental protection and become a
“green manufacturer”.
Some factsThis type of projects represents a challenge in three major fi elds:
A company of
Gestamp Renewables
NEVADA ARMYNational Guard
3 MW
LAMBORGHINI
1 MW
SEAT
12 MW
RENAULT
55 MW
Youtube
Flickr
Issuu
The conversation continues at:
Spain
+34 91 177 00 10
India
+91 2240907268
France +33 561 239 733
Italy +39 068412640
USA +14 152305601
Southafrica
+27794879551
www.gestampsolar.comwww.gestampren.com
Top Photovoltaic Solutions
31
Renault and Gestamp Solar have recently launched a
55 MW solar photovoltaic roof project (parking shelters)
through an innovative partnership. Gestamp Solar
prepares and adapts Renault facilities in order to install
solar modules over the awnings that shelter brand-new
cars outside 5 factories in France. The total area to be
covered this way is about 370,000 square meters,
which will result in 55 MW of nominal power generating
capacity. The facilities hosting PV generation plants are
Douai, Maubeuge, Flins, Batilly and Sandouville.
The solar panels will cover the areas corresponding to
new cars’ delivery and dispatch in the facilities of Douai,
Maubeuge, Flins Batilly and Sandouville as well as the
staff car parkings in Maubeuge. They will decrease the
CO2 emissions in 9,000 tons every year, delivering the
annual electricity consumed by 13,000 households.
With this achievement Gestamp Solar settles its position
as world leader in park shelter and roof top projects.
Renault’s installation is the largest project ever carried
out in France in terms of megawatts, contributing to the
reduction of CO2 emissions and giving a true ecological
image to the automotive industry.
According to this plan, Renault is aiming to cut its carbon
footprint by 10% by 2013, and then by another 10% by
2016. The construction of parking shelters installations
started in June 2011, while completion will be achieved
in February 2012.
1 Vehicle and material protection against meteorological elements
2 Cost reduction in insurances
3 Infrastructure improvements
4 Ecological and green image
5 Availability of electricity
Gestamp Solar
71 MW in large roof tops...and 120 MW projected, mostly on parking shelters. Gestamp
Solar has installed 71 MW of PV electricity generation facilities
of some of the most important automobile makers in the world.
Financial Strength
Industrial Capacity
Global Presence
R&DQuality
SCM
parking shelters
roof top
Corporación Gestamp is a european,
multinational leader in steel service centers,
automotive components and renewable
energy.
Comprised of three large divisions – Gonvarri
Steel Industries, Gestamp Automoción and
Gestamp Renewables – the holding has a
strong global presence, with nearly of hundred
industrial plants in more than 25 countries
worldwide and global business revenues in
excess of €5,5 billion annually.
Our eff orts are focused on providing our clients
integrated solutions customized to their
needs.
The Gestamp Corporation centers its industrial activity in three business lines:
With the objective of supporting sustainable
growth within the Corporation, quality and
conservation management of the environment
is the strategic focus of our business. Our plants
are certifi ed under regulation ISO 9.001 and
regulation ISO 14.001.
A professional team in the industrial sector of
more than 27,000 employees worldwide is
the fundamental pillar which makes our future
growth possible.
Gestamp Solar is built upon on the strength of
Corporación Gestamp, and photovoltaic solar
energy is our hope for the future.
Renewables energiesSteel Service Centers Components for the
automotive industry
Corporación Gestamp
The strength of a Business Group
Europe
57 Industrial Plants
17 Commercial Offi ces
20.200 Employees
Asia
17 Industrial Plants
2 Commercial Offi ces
2.200 EmployeesAfrica
Commercial Offi ces
South America
12 Industrial Plants
2 Commercial Offi ces
3.000 Employees
North America
9 Industrial Plants
4 Commercial Offi ces
1.200 Employees
Global presence
Gestamp Solar Commercial Offi ces
Countries with Gestamp Solar Projects
Industrial Plants of Corporación Gestamp
Countries with a Corporación Gestamp presence
Largest parking shelter facility in the world
31
Renault and Gestamp Solar have recently launched a
55 MW solar photovoltaic roof project (parking shelters)
through an innovative partnership. Gestamp Solar
prepares and adapts Renault facilities in order to install
solar modules over the awnings that shelter brand-new
cars outside 5 factories in France. The total area to be
covered this way is about 370,000 square meters,
which will result in 55 MW of nominal power generating
capacity. The facilities hosting PV generation plants are
Douai, Maubeuge, Flins, Batilly and Sandouville.
The solar panels will cover the areas corresponding to
new cars’ delivery and dispatch in the facilities of Douai,
Maubeuge, Flins Batilly and Sandouville as well as the
staff car parkings in Maubeuge. They will decrease the
CO2 emissions in 9,000 tons every year, delivering the
annual electricity consumed by 13,000 households.
With this achievement Gestamp Solar settles its position
as world leader in park shelter and roof top projects.
Renault’s installation is the largest project ever carried
out in France in terms of megawatts, contributing to the
reduction of CO2 emissions and giving a true ecological
image to the automotive industry.
According to this plan, Renault is aiming to cut its carbon
footprint by 10% by 2013, and then by another 10% by
2016. The construction of parking shelters installations
started in June 2011, while completion will be achieved
in February 2012.
1 Vehicle and material protection against meteorological elements
2 Cost reduction in insurances
3 Infrastructure improvements
4 Ecological and green image
5 Availability of electricity
Gestamp Solar
71 MW in large roof tops...and 120 MW projected, mostly on parking shelters. Gestamp
Solar has installed 71 MW of PV electricity generation facilities
of some of the most important automobile makers in the world.
Financial Strength
Industrial Capacity
Global Presence
R&DQuality
SCM
parking shelters
roof top
Corporación Gestamp is a european,
multinational leader in steel service centers,
automotive components and renewable
energy.
Comprised of three large divisions – Gonvarri
Steel Industries, Gestamp Automoción and
Gestamp Renewables – the holding has a
strong global presence, with nearly of hundred
industrial plants in more than 25 countries
worldwide and global business revenues in
excess of €5,5 billion annually.
Our eff orts are focused on providing our clients
integrated solutions customized to their
needs.
The Gestamp Corporation centers its industrial activity in three business lines:
With the objective of supporting sustainable
growth within the Corporation, quality and
conservation management of the environment
is the strategic focus of our business. Our plants
are certifi ed under regulation ISO 9.001 and
regulation ISO 14.001.
A professional team in the industrial sector of
more than 27,000 employees worldwide is
the fundamental pillar which makes our future
growth possible.
Gestamp Solar is built upon on the strength of
Corporación Gestamp, and photovoltaic solar
energy is our hope for the future.
Renewables energiesSteel Service Centers Components for the
automotive industry
Corporación Gestamp
The strength of a Business Group
Europe
57 Industrial Plants
17 Commercial Offi ces
20.200 Employees
Asia
17 Industrial Plants
2 Commercial Offi ces
2.200 EmployeesAfrica
Commercial Offi ces
South America
12 Industrial Plants
2 Commercial Offi ces
3.000 Employees
North America
9 Industrial Plants
4 Commercial Offi ces
1.200 Employees
Global presence
Gestamp Solar Commercial Offi ces
Countries with Gestamp Solar Projects
Industrial Plants of Corporación Gestamp
Countries with a Corporación Gestamp presence
Largest parking shelter facility in the world
31
Renault and Gestamp Solar have recently launched a
55 MW solar photovoltaic roof project (parking shelters)
through an innovative partnership. Gestamp Solar
prepares and adapts Renault facilities in order to install
solar modules over the awnings that shelter brand-new
cars outside 5 factories in France. The total area to be
covered this way is about 370,000 square meters,
which will result in 55 MW of nominal power generating
capacity. The facilities hosting PV generation plants are
Douai, Maubeuge, Flins, Batilly and Sandouville.
The solar panels will cover the areas corresponding to
new cars’ delivery and dispatch in the facilities of Douai,
Maubeuge, Flins Batilly and Sandouville as well as the
staff car parkings in Maubeuge. They will decrease the
CO2 emissions in 9,000 tons every year, delivering the
annual electricity consumed by 13,000 households.
With this achievement Gestamp Solar settles its position
as world leader in park shelter and roof top projects.
Renault’s installation is the largest project ever carried
out in France in terms of megawatts, contributing to the
reduction of CO2 emissions and giving a true ecological
image to the automotive industry.
According to this plan, Renault is aiming to cut its carbon
footprint by 10% by 2013, and then by another 10% by
2016. The construction of parking shelters installations
started in June 2011, while completion will be achieved
in February 2012.
1 Vehicle and material protection against meteorological elements
2 Cost reduction in insurances
3 Infrastructure improvements
4 Ecological and green image
5 Availability of electricity
Gestamp Solar
71 MW in large roof tops...and 120 MW projected, mostly on parking shelters. Gestamp
Solar has installed 71 MW of PV electricity generation facilities
of some of the most important automobile makers in the world.
Financial Strength
Industrial Capacity
Global Presence
R&DQuality
SCM
parking shelters
roof top
Corporación Gestamp is a european,
multinational leader in steel service centers,
automotive components and renewable
energy.
Comprised of three large divisions – Gonvarri
Steel Industries, Gestamp Automoción and
Gestamp Renewables – the holding has a
strong global presence, with nearly of hundred
industrial plants in more than 25 countries
worldwide and global business revenues in
excess of €5,5 billion annually.
Our eff orts are focused on providing our clients
integrated solutions customized to their
needs.
The Gestamp Corporation centers its industrial activity in three business lines:
With the objective of supporting sustainable
growth within the Corporation, quality and
conservation management of the environment
is the strategic focus of our business. Our plants
are certifi ed under regulation ISO 9.001 and
regulation ISO 14.001.
A professional team in the industrial sector of
more than 27,000 employees worldwide is
the fundamental pillar which makes our future
growth possible.
Gestamp Solar is built upon on the strength of
Corporación Gestamp, and photovoltaic solar
energy is our hope for the future.
Renewables energiesSteel Service Centers Components for the
automotive industry
Corporación Gestamp
The strength of a Business Group
Europe
57 Industrial Plants
17 Commercial Offi ces
20.200 Employees
Asia
17 Industrial Plants
2 Commercial Offi ces
2.200 EmployeesAfrica
Commercial Offi ces
South America
12 Industrial Plants
2 Commercial Offi ces
3.000 Employees
North America
9 Industrial Plants
4 Commercial Offi ces
1.200 Employees
Global presence
Gestamp Solar Commercial Offi ces
Countries with Gestamp Solar Projects
Industrial Plants of Corporación Gestamp
Countries with a Corporación Gestamp presence
Largest parking shelter facility in the world
Gestamp Solar
20
11
09
SO
L_T
RI_
EN
_to
p
Economic viability and fi nancing.
A project of this magnitude requires a
huge investment. There is usually a need
to seek for a strong fi nancial partner in
order to canalize investment and minimize
risks. Gestamp Solar brings the fi nancial
strength and expertise collected after
many years in the PV business, with over
300MW PV fi nished and over 2300MW
currently in advanced development.
Legality
Regulations in renewable energies’ fi eld
are constantly changing, sometimes
even while a project is in construction.
Gestamp Solar legal experts have strongly
contributed towards project’s success,
merging previous experiences with
Corporación Gestamp seriousness and
countries’ strategic weight as a global
player with production facilities in over 25
countries with over 27.000 employees.
Technical challenge
Project implementation must happen
without disturbing the normal day to
day activity in the factory/plant. It is
necessary to deal with important technical
constraints, respect distances and space
requirements to ensure proper access
to both trucks and transport vehicles as
well as to emergency and safety units.
The optimization of the available surface
in order to achieve the maximum nominal
installed capacity is always a challenge
for Gestamp Solar’s engineers.
RENAULT 55MW240.000 modules placed over parking
shelters, constitute the biggest roof-top
project in the world. The specially designed
structure brings special protection for
brand-new cars and nigh-lightning. During
module installation, the paving and ground
lines painting were renewed.
SEAT 12MWIn mid 2011 Gestamp Solar fi nished
implementation of “SEAT al sol”
photovoltaic Project, that allows clean
electricity generation in SEAT’s factory
in Martorell, Barcelona. This project,
consisting in parking shelters and rooftop
PV installations, is SEAT’s strong bet for CO2
emissions reduction and environmental care,
profi ting of photovoltaic great advantages
and light-speed reducing installation costs.
NEVADA 3MWGreen energy project developed and
constructed for Nevada´s Army National
Guard, built in 3 phases located in Las Vegas
(2) and Carson City (1) over parking shelters
in a surface of 40.000 square meters.
LAMBORGHINI 1MWOne of the photovoltaic pioneer roof tops in
Europe, mounted over Lamborghini’s facilities
in Bologna, Italy. It is part of the company’s
strategic objectives to contribute, towards
environmental protection and become a
“green manufacturer”.
Some factsThis type of projects represents a challenge in three major fi elds:
A company of
Gestamp Renewables
NEVADA ARMYNational Guard
3 MW
LAMBORGHINI
1 MW
SEAT
12 MW
RENAULT
55 MW
Youtube
Flickr
Issuu
The conversation continues at:
Spain
+34 91 177 00 10
India
+91 2240907268
France +33 561 239 733
Italy +39 068412640
USA +14 152305601
Southafrica
+27794879551
www.gestampsolar.comwww.gestampren.com
Top Photovoltaic Solutions