TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day....

8
TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. rod frames/day. Shipments (40 rod frames/shipment) started from Shipments (40 rod frames/shipment) started from Helsinki to CERN. Helsinki to CERN.

Transcript of TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day....

Page 1: TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

TOB Production - January 2004

80 of 688 rod frames ready. Production rate 3-4 rod frames/day.80 of 688 rod frames ready. Production rate 3-4 rod frames/day.Shipments (40 rod frames/shipment) started from Helsinki to CERN.Shipments (40 rod frames/shipment) started from Helsinki to CERN.

Page 2: TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

TOB Production - January 2004

Rod frame quality control measurementsResults for the first 10 production rods:Results for the first 10 production rods:

Co-planarity of module supports: < 50 Co-planarity of module supports: < 50 mmLocation of module dowel pins: < 40 Location of module dowel pins: < 40 mmCooling contacts ok.Cooling contacts ok.

24 module supports / rod

12 dowel pins / rod

Page 3: TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

TOB Production - January 2004

Rod cabling stand at CERN

Page 4: TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

TOB Production - January 2004

Final rod quality and acceptance tests with radioactive source

in a ‘XY-table’

Place for 3 rodsinside a box

Cobalt source guided by linear moving arms

Scintillator for trigger

Page 5: TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

TOB Production - January 2004

TOB Carbon-fiber support Wheel production on-going at Plyform, ItalyDisk laminate plates (photo) and cylinder molding tools ready.

Page 6: TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

TOB Production - January 2004

TOB Assembly and Cabling Mock-upHalf disk of the TOB for cabling exercises

Final TOB assembly, transportation, and insertion tooling

Tracker support tube mock-up

Supports for TIB/TID insertion exercises

Page 7: TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

TOB Production - January 2004

TOB Cooling tests: Modules and Rods

From testing of single and double modulesto testing of complete rods

• Tests performed in –20 °C. Tmax = 10 °C between silicon and coolant.• Equal cooling in all module positions along the rod.

Page 8: TOB Production - January 2004 80 of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.

TOB Production - January 2004

TOB Cooling tests: System tests

A complete TOB cooling segment with 19 “rods”installed and tested in the tracker cold-room

• Tests in room temperature and –25 °C.• Successful and simple filling and draining.• Equal cooling performance in all parallel rods.

12 m