Tmsm Oim Fpso Overview June 2012

15

Click here to load reader

Transcript of Tmsm Oim Fpso Overview June 2012

Page 1: Tmsm Oim Fpso Overview June 2012

TRELLEBORG OFFSHORE INTEGRATED

MOORING PRESENTATION

Page 2: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

2

TRELLEBORG MARINE SYSTEMS INTRODUCTION

Trelleborg Marine Systems provides safe berthing and

mooring solutions for demanding marine environments

History

Harbour Marine Engineering was established in 1971

Focus on onshore and offshore mooring equipment (since 1980)

Incorporated into Trelleborg in 2006

Technical capabilities

Proven ability to integrate complex solutions -70% of LNG jetties

worldwide

World leader in the supply of quick release hooks

Complete Design Control

Mechanical, electrical, instrumentation and software in-house design,

procurement, manufacturing, QA, project management and after sale

service

Page 3: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

3 October 2, 2008

FPSO Systems

FPSO Tandem Mooring and Offloading Systems

Spread Mooring and Chain Tensioning Systems

Trelleborg Marine Systems: Offshore Integrated Mooring

Offshore Mooring and Docking System

Agenda

Page 4: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

FPSO TANDEM MOORING & OFFLOADING

Hawser hook with load

monitoring and remote

release

Hawser reeler (vertical or

horizontal) with hawser

Trelleborg hose and hose

reeler

Certified by world

classification trade bodies:

(ie. DNV, ABS, Rina, Lloyds,

BV)

4

Page 5: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

VERTICAL HAWSER REEL

Never disconnect the

chafe chain from the

hawser hook

Store entire hawser

assembly onto drum

Compact layout

Load monitoring

Remote release

Page 6: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

HORIZONTAL HAWSER REEL

Three section drum

Transfer of chafe chain from

hawser hook to drum

Entire hawser assembly is

stored on drum

Remote release and load

monitoring

Single section drum

Never disconnect chafe chain

from hawser hook

Chafe chain stored outboard

Remote release and load

monitoring

Page 7: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

OFFLOADING HOSE REELER

7

16 inch or 20 inch hose

Up to 1,115 feet/ 340 meter hose

Compact layout

Optimized weight

Shared HPU with hawser reel

Emergency reel handling winch

Page 8: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

8

FPSO Tandem Mooring

Spread Mooring and Chain Tensioning System

Trelleborg Marine Systems: Offshore Integrated Mooring

Offshore Mooring and Docking System

Agenda

Page 9: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

Spread Mooring and Tensioning Systems

Vertical chain stopper for spread

mooring Designed to the MBL of the chain or design load

Proof load to SWL

Optional load monitoring

Optional fairlead in front of chain stopper

To suit up to 114mm R4 chain

Local and remote control unit in

CCR

150T chain tensioning winch with

load monitoring 1 winch on the bow and 1 winch on the stern

Suitable for hazardous area

Certified by Marine Classification

Societies (DnV, ABS, RINA and BV)

9

Page 10: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

Spread Mooring and Tensioning Systems

10

(left) Chain stopper with load

monitoring, remote release, chain

tensioning

(bottom left) Horizontal chain

stoppers with integrated fairlead

with no remote release and load

monitoring

(bottom centre) Chain tensioning

jack

(bottom right) Load monitoring

display

Page 11: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

11 October 2, 2008

FPSO Tandem Mooring

Spread Mooring and Chain Tensioning Systems

Trelleborg Marine Systems: Offshore Mooring and Docking

System

Agenda

Page 12: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

INTEGRATION OF MONITORING SYSTEMS

Integration of sub-systems is

common in modern FPSO

(Load Monitoring Systems,

Remote Release, Mooring

and Docking, Environmental

and Reporting)

Integrated system design

implemented by Trelleborg is

based on proven techniques

and interface methodologies

12

Page 13: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

INTEGRATION OF MONITORING SYSTEMS

Main advantages of

integrated systems are: Common operator workstation to display,

monitor and report

Common portable display units for all sub-

systems

Efficient sharing of information between

sub-systems

Information can be easily shared with third

party systems i.e. DCS

Substantial cost / performance benefits

Single point responsibility for

complete system design,

manufacturing,

commissioning, warranty and

training

13

Page 14: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

Conclusion

Trelleborg Marine Systems provides safe berthing and mooring

solutions for demanding marine environments

Over 40 years of experience in developing customized

berthing and mooring solutions

In-house technical expertise with a proven track record in

complex system integration

Bringing our expertise for onshore LNG terminal berthing

solutions together with our offshore FPSO/FSO mooring

know-how to provide the safest berthing and mooring

solutions

14

Page 15: Tmsm Oim Fpso Overview June 2012

TRELLEBORG GROUP

15

www.trelleborg.com