![Page 1: TITLE: Cellar Slab and Security Room CONTRACT: TO ... with or update reason code and cost; provide comments/detailed explanation/justification as needed. To be completed by SCA-AE](https://reader034.fdocuments.in/reader034/viewer/2022051722/5aa4678b7f8b9afa758bdfec/html5/thumbnails/1.jpg)
Architecture and EngineeringBULLETIN 00004
03/11/16
Design Change Process TransmittalFor SCA Internal Use Only
Do not demo around 336 SF of cellar slab and do not demo security room door to keep landlord access to those areas.See drawings attached.
PROJECT:TITLE:TO: DESIGN NO:
REQUIRED: 03/18/16
REMARKS:
ISSUE: CI0004
PS909X01 - Reno to ExistingCellar Slab and Security RoomAttn: Tatyana AmusinaSCA - Construction Management30-30 Thomson AvenueLong Island City, NY 11101Phone: 718-572-5746
CONTRACT:070954C000014132
Total: ($4,999.99)
Date:Gabriel KirshnerMacrae-Gibson Architects, P.C.
03/11/16Reported By:
10-13-15 f_01bul_02_both
![Page 2: TITLE: Cellar Slab and Security Room CONTRACT: TO ... with or update reason code and cost; provide comments/detailed explanation/justification as needed. To be completed by SCA-AE](https://reader034.fdocuments.in/reader034/viewer/2022051722/5aa4678b7f8b9afa758bdfec/html5/thumbnails/2.jpg)
Architecture and EngineeringBULLETIN 00004
03/11/16
Design Change Process TransmittalFor SCA Internal Use Only
Approvals as necessary
Date03/23/16
STEP 3
Cleveland MorrisonDM
Required for all Change Processes
Concur with or update reason code and cost; provide comments/detailed explanation/justification as needed.To be completed by SCA-AE DPM and provided to SCA-AE DM
Description as above.Field ConditionCredit <$5,000.
Prepared by Date03/23/16
STEP 2
Ciara RogersDPM
PROJECT:TITLE:CONTRACT:SCA PO:
ISSUE:Phone: 718-572-5746
PS909X01 - Reno to Existing DESIGN NO:Cellar Slab and Security Room REQUIRED:C000014132 REF RFI:Tatyana Amusina
Cell: 917 417-8922CI0004
07095403/18/1600014Field ConditionsREASON CODE:
COST:
STATUS: Approved
($4,999.99)COST RANGE: ($2,000) to ($4,999)
REASON CODE CLASSIFICATION (If multiple, select predominant code.)
Asbestos (LAP) Additional asbestos-containing materials identified on site (Lead, Asbestos, PCB)Criterion Revision needed to comply with regulatory changes enacted after date of bidDesign Error Mistake made by designer discovered after fabrication or constructionField Conditions Condition could not reasonably have been anticipated or discovered in design-phase field investigationsGen Contractr Condition Services required to correct or accept-in-place, contractor created conditionDesign Omission Item required to complete project but not contained in contract documentsProgram Change Initiated inside or outside SCA including phasing changesSub-Soil Same as Field Condition but relating to ground water, unsuitable soil, rock and hazardous substancesSubstitution Issued to document acceptance of substitution proposed by general contractorContract Allowance Issued to increase/decrease contract scope and/or value resulting from inclusion of a contract allowance or provision
To be completed by AEoR and emailed to SCA-AE DPM
It was previously unknown that the NYPD security room was located in the room under stair B and as a result thedoor was called for to be demolished and a new wall constructed in its place to keep the 2HR rating in thatstairwell. Now that it is known that the security room needs to be kept available to the other tennants, the doorand the slab in that area have to remain. Additionally, the bike storage room needs to be redesigned toaccommodate access to the security room. See attached drawings for revised demo and floor plans.
Prepared by Date03/11/16
STEP 1
Gabriel KrishnerAEoR
Provide reason code detailed explanation/justification.
10-13-15 f_01bul_02_both
![Page 3: TITLE: Cellar Slab and Security Room CONTRACT: TO ... with or update reason code and cost; provide comments/detailed explanation/justification as needed. To be completed by SCA-AE](https://reader034.fdocuments.in/reader034/viewer/2022051722/5aa4678b7f8b9afa758bdfec/html5/thumbnails/3.jpg)
UP
UP
1 5/8" / 1'-0"
1 5/8" / 1'-0"
C
1
2
3
4
5
6
T.O.S 2' - 1"4'
- 0"
7' - 1
0 1/2"
4' - 0"
HOLE FOR 4'-0"X4'-0"X6'-0"DEEP OPENING FOR SEWAGE
EJECTOR PUMP
HOLE FOR 4'-0"X4'-0"X6'-0" DEEPOPENING FOR SEWAGE EJECTOR
PUMP
HOLE FOR 9'-0"X 7'-5"X5'-0"DEEP OPENING FORELEVATOR SHAFT
± 7'
- 9"
2' - 0
"2'
- 0"
9' - 0"
HOLE FOR 4'-0"X4'-0"X6'-0"DEEP OPENING FORSEWAGE EJECTOR PUMP
HOLE FOR 4'-0"X4'-0"X5'-0"DEEP OPENING FOR SEWAGEEJECTOR PUMP
4' - 0"
4' - 0
"7'
- 11 1
/4"
EXISTING 1 STORY ADJACENT BUILDING
EXIS
TING
2 ST
ORY
ADJA
CENT
BUI
LDIN
G
1
3' - 3
3/4"
7' - 9
"
4' - 0" 4' - 0"
4' - 0
"4'
- 0"
4' - 5 3/8" 4' - 0"
4' - 0
"
ELEVATOR PIT SUMPPUMP-2'X2'X2' DEEP
2
31
31
31
31
21
21
16
20
20
21
21
20
20
4
4
4 8
7
15
EXISTING C.M.UWALL TO REMAIN
LINE OF EXISTINGFOOTING
LINE OF EXISTINGFOOTING
16
T.O.S ± 0"
EXISTING DOMESTIC WATER& SPRINKLER SERVICE TOREMAIN
LINE OF EXISTINGFOOTING
3
111
3
3
14
3
3
15
3
14
3
15
4' - 1
1 7/8 "
3 ' - 0
"±
4' - 0
"
87
27
27
AED B
D.3D.2 B.1
8' - 0 1/8"
15
8
32
32
STAIR A
STAI
R B
CLOF NEWOPENING
3' - 7
3/4"
31
31
4' - 0
"
5' - 0
"
P.L=PROPERTY LINE
REMOVE DOOR
REMOVE WALL
DEMOLISH AND REMOVE4" CONCRETE SLAB.COORDINATE W/ S-100
EXCAVATION FOR EJECTORPUMP PIT - VARIOUS DEPTHSSEE NOTE
EXCAVATION FORELEVATOR SHAFT - SEESTRUCTURAL DWG. 1/S200
EXISTING WALL TO REMAIN
1. FOR STRUCTURAL DEMOLITION AND REMOVALS SEE STRUCTURALDRAWINGS S-001-S-702.
2. FOR MEP DEMOLITION AND REMOVALS SEE MEP DRAWINGS M051-M056,P061-P063, SP061-SP063, E061-E063.
3. ALL CMU WALLS TO BE SAW CUT.
1 DEMOLISH EXISTING 4" CONCRETE SLAB AND EXCAVATE 6" DOWN BELOW SLAB (5" BYFOOTINGS)
REMOVE CHANNEL WITH GYPSUM WALL BOARD
REMOVE GYPSUM WALL BOARD AND FRAMED WALL
REMOVE FRAMED WALL
NOT USED
NOT USED
REMOVE PORTION OF EXISTING WALL NECESSARY FOR NEW OPENING
REMOVE DOOR AND FRAME
NOT USED
NOT USED
NOT USED
NOT USED
NOT USED
EXCAVATION FOR NEW 9'-0"X7'-5"X5'-0" DEEP ELEVATOR SHAFT COORDINATE W/ S-100
EXCAVATION FOR NEW EJECTOR PUMP- VARIOUS DEPTHS- COORDINATE W/ S-100
REMOVE EXISTING CONCRETE RAMP
NOT USED
NOT USED
NOT USED
REMOVE WOOD FRAMED WALL
REMOVE WOOD FRAMED WALL WITH GYPSUM WALL BOARD
NOT USED
NOT USED
NOT USED
NOT USED
NOT USED
REMOVE EXIT LIGHT
NOT USED
NOT USED
FLOOR TO REMAIN
DOOR TO REMAIN
NOT USED
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
30
31
32
33
28
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
MACRAE-GIBSON ARCHITECTS, P.C.450 Seventh Avenue, Suite 2406
NEW YORK, NY 10123(212) 294-2940 / fax: (212) 294-2941
Chancellor Carmen Fariña, ChairpersonCurtis A. HarrisEmily A. Youssouf
President & CEOLorraine Grillo
NOTE: Drawing may be printed at reduced scale
Architect:
SCA Design Manager:
LLW No.: Facility Code: Date:
Project:
1
Sheets in DOB Set:
Drawing No.:
Drawing Title:
Address:
Designer:
Checked by:
Drawn by:
Project Architect/Engineer:
DateNo.
Discipline Lead:
Sheets in Contract Set:
2
3
4
5
6
7
Consultants:
Key Plan:
Block : 2924 Lot : 20
IT IS A VIOLATION OF THE STATE EDUCATION LAW SECTION 7209 (2) FOR ANY PERSONTO ALTER AN ITEM IN ANY WAY UNLESS SUCH PERSON IS ACTING UNDER THE DIRECTIONOF A LICENSED PROFESSIONAL ENGINEER, AND THE ENGINEER STAMPS SUCH CHANGES
Board of Trustees
Architecture & Engineering
E. Bruce Barrett, R.A. LEED A.P., Vice PresidentElan R. Abneri, P.E., Director, Design Consultant ManagementStanley Dahir, R.A., Director, Quality Control & Construction SupportMaría A. Gómez, P.E., LEED A.P., Director, A&E In-House DesignGeorge D. Roussey, P.E., LEED A.P., Director, Technical StandardsStacey Spann-Thom, Director, Operations Support
ScaleProject number
8
CLEVELAND MORRISON, P.E.
X909
Structural:SEVERUD ASSOCIATES469 Seventh AvenueNew York, NY 10018(212) 986-3700
Mechanical:DVL CONSULTING ENGINEERS, INC.375 Main StreetHackensack, NJ 07601(201) 678-2224
Elevator:AB CONSULTING35 Scandia RoadCongers, NY 10920(845) 268-0170
Description
070954
of
of
E. TREMONT AVE .
3RD AVENUE
BATHGATE AVE.
D75 @ EASTTRMONT AVE.
3/11
/201
6 11
:44:
58 A
M
As indicated
D75 @ EAST TREMONTAVENUE
A061
CELLAR SELECTIVE REMOVALSPLAN
500.105
DAEYOUNG CHOI
DAEYOUNG CHOI
03/11/16 BULLETIN# 4 - BIKE STORAGE ROOM REVISION
.00
516 EAST TREMONT AVENUE, BRONX, NY10457
GAVIN MACRAE-GIBSON, R.A.
07/15/15 TURNOVER
20
20
249
191
GAVIN MACRAE-GIBSON, R.A.GAVIN MACRAE-GIBSON, R.A.
7/15/15
SCALE: 1/8" = 1'-0" 1 EXISTING BASEMENT FLOOR
LEGEND
KEY NOTES
GENERAL NOTES
SCALE :
0" 2' 8'
1/8"=1'-0"
4' 16' 32'
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
1
1
![Page 4: TITLE: Cellar Slab and Security Room CONTRACT: TO ... with or update reason code and cost; provide comments/detailed explanation/justification as needed. To be completed by SCA-AE](https://reader034.fdocuments.in/reader034/viewer/2022051722/5aa4678b7f8b9afa758bdfec/html5/thumbnails/4.jpg)
FD
UP
UP
UP
DN
DN
A2011
A201
2
C
1
2
3
4
5
6
F.E.
C
F.E.
C
F.E.C
BUILDING WATERSERVICE ROOM
BUILDING GAS/ELECTRIC ROOM
3RD AVENUE
E. TREMONT STREET
FIRERESCUEAREA
4' - 0"
4' - 0
"
457 SFWARMING PANTRYC11
-G
1014 SFMULTI PURPOSEC13
50G
153 SFBIKE STORAGEC10
-B-2
188 SFCUSTODIANS OFFICEC14
2G
77 SFMECHANICALC13B
1G
99 SF
CUSTODIANSSTORAGEC14B
1G
62 SFCUSTODIAN LOCKERC14A
-G
70 SF
ADULT BATHROOMW/ SHOWERC16
0G
41 SFJCC04
-G
91 SFEMRC03
-D-2
542 SFFURNITURE ST.C07
3B-1
784 SFMECHANICAL ROOMC01
3D-2
271 SF
GAS BOOSTERROOMC02
1D-2
235 SFREFUSE/ RECYCLEC05
3B-2
517 SFMDF ROOMC06
2D-2
177 SFGENERAL STORAGEC08
1B-2
416 SFBOOK STORAGEC09
3B-1
I2
I2
E1
E1I2
E1D0
E1
Q0
I2I2
H0
E1
E1
E1
E1 E1
E1
I2
K2
I2
E1
E1
D0
H0 E1
D0
Q0
E1E1
D0
D0E1J0
J0
E1
E1
E1 E1
E1
Q0
D0
D0 D0
I2I2
E1
E1
I2
H0
J0
H0
J0
Q0E1
F1 F1I2
M0I1
I2
D0E1
H0
C06
C02
C10CRC1A
C11
C11A
C11B
C13 C13D
C13A C13B C13C
C16
C15
C03
C04
C01
C01B
C08
C07
C12
C14B
C14
1080 SFCELLAR CORRIDORCRC1
-G
C17
C18
4' - 0"
4' - 0
"
C05
615 SFSERVICE CORRIDORCRC2
-GA601
1
-BOYS BATHROOMC13C
0G
-GIRLS BATHROOMC13A
0G
M0
A3097
.
-PANTRY LOCKERC11A
-G
-PANTRY STORAGEC11B
-B-2
E1
SLOPE: 1" / 1'-0"
SLOPE: 1" / 1'-0"
CRC2D
C09
1' - 4" 5' - 9 5/8"
3' - 0
"
6" MECHANICAL CONC.PAD SEE STRUCTURALDWG S300.00
STAIR A
STAI
R B
STAIR C
AED B
74 SFGENERAL STORAGEC12
1B-2
7' - 9
1/2"
12' -
11"
7' - 9
1/2"
3 1/8"
12' -
7 7/8"
17' -
3 7/8"
10' -
6 5/8"
6' - 4 1/4" 4 7/8" 20' - 9 1/8" 2' - 6 1/8"2'
- 8 5/
8"19
' - 6"
5' - 1
7/8"
6' - 4
1/2"
6' - 4
1/8"
6' - 1 3/4" 6' - 3 7/8" 23' - 3 1/4"
17' - 3 3/8" 10' -
10 1/
4"5 1
/4"5'
- 4"
5' - 9
3/8"
2' - 6
"
9' - 0"8' - 0 3/8"
6' - 1
1 3/8"
39' -
5 1/8"
1' - 9
7/8"
6' - 1
1"1'
- 8 7/
8"
3' - 1
"
14' -
8 1/4"
7 1/8" 7' - 7 3/4" 9' - 5 7/8" 11 1/2" 8' - 10 1/2"
4 1/8" 12' - 6 3/8"
6' - 0
"5'
- 8"
9"17
' - 5 1
/4"13
' - 3 7
/8"5'
- 11 1
/2"4'
- 6 5/
8"5'
- 10 1
/4"
5' - 0
"
7' - 3 1/2" 6' - 10 3/8"11' - 8"
3' - 0
"4'
- 6"
D.3D.2 B.1
F0 I2
P1
I2
I2
E1
E1
E0
E0
H0
E1
I2
I2
Q0
5A307
15' -
3 5/8"
S2002
.
S2002
.
S2002
.
A3061
A3071
RAMP 1
RAMP2J0
J0
F.E.
B
9' - 0"7' - 9
"
ELEVATOR PIT SUMPPUMP, COORDINATEWITH STRUCTURALDRAWING 1/S200,PLUMBING DRAWINGP100 AND ELECTRICALDRAWING E201
2' - 1"25' - 0"
2' - 1" 25' - 0"
LOCKABLE36"x36"x24"A.F.F.ACCESS DOOR
I2
E1
H0
S2002
.
A30910
.
A30910
.
A3099
.
A3099
.
A3099
.
I2
E1 G2
G2
G2G2
BIKE RACKSFOR 9 BIKES
PROVIDE BASEPLATE FOREXPANSION BOLTMOUNTING OF BIKE RACKTO CONCRETE SLAB
M0
A2021
A202
2
CRC2C
CRC2B
CRC2A
4' - 0"
4' - 0
"
4' - 0
"
4' - 0"
11 1/2"
4' - 1
0 1/4"
6' - 2
1/4"
5' - 2
5/8"
I1I1
OPENING REQUIRED IN EXISTINGWALL, SEE MECHANICAL DRAWING
M101 AND M501 FOR WALLPENETRATINON
1 OPENINGS REQUIRED INEXISTING WALL, SEE
MECHANICAL DRAWINGM101 AND M501 FOR WALL
PENETRATINON
10' - 7 3/8"
12' - 10 5/8"
8' - 0 1/8" 11 1/2" 8' - 6 3/4"
5' - 10 1/8"
1' - 4
1/4"
21' -
10 3/
4"
11" 2' - 8 1/2"
7"11
' - 2 1
/2"
8' - 4"6"
4"6"
6"
6"
1' - 1"
4"4"
2' - 0"
5 1/2"
4"
1' - 0"
4"4"4"
H0
H0
I2
H0H0H0H0
H0
H0
H0
H0
H0
H0
H0
H0
H0H0 H0
H0
H0
H0
J0
J0
J0
131 SFGENERAL STORAGEC15
1B-2
2' - 0
"
4' - 5 1/4" 2' - 0
"
EXISTING BASE BUILDINGELEVATOR MACHINE ROOM
EXISTING BASE BUILDINGSTORAGE ROOM TO BESEALED UP
F.E.B
V.I.F.
± 2' - 8"
V.I.F
± 2' - 8"
1' - 7"
6"
A30910
.
A30910
.
A30910
.
2HR RATED ENCLOSURE,SEE DETAIL 1/A309
2HR RATED ENCLOSURE,SEE DETAIL 1/A309
A101 2
INSTALL WASTE HANDLING EQUIPMENTPER SPEC SECTION 11172
1' - 7"
CRC1B
6"
I1
4' - 0"
2' - 0"
BASE BUILDING AREA - NOT IN SCOPE
BASE BUILDING AREA - WORK REQUIRED IN THESEAREAS AS INDICATED IN THIS SET OF DRAWINGS
DETECTABLE WARNING STRIPS
EJECTOR PIT GRATE COVER
1ST FL0' - 0"
RAISED CELLAR FL-9' - 4"
5
OPENING REQUIRED INEXISTING WALL, SEEMECHANICAL DRAWINGM101 AND M501 FOR WALLPENETRATINON
4' - 0"
2' - 3
"
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
MACRAE-GIBSON ARCHITECTS, P.C.450 Seventh Avenue, Suite 2406
NEW YORK, NY 10123(212) 294-2940 / fax: (212) 294-2941
Chancellor Carmen Fariña, ChairpersonCurtis A. HarrisEmily A. Youssouf
President & CEOLorraine Grillo
NOTE: Drawing may be printed at reduced scale
Architect:
SCA Design Manager:
LLW No.: Facility Code: Date:
Project:
1
Sheets in DOB Set:
Drawing No.:
Drawing Title:
Address:
Designer:
Checked by:
Drawn by:
Project Architect/Engineer:
DateNo.
Discipline Lead:
Sheets in Contract Set:
2
3
4
5
6
7
Consultants:
Key Plan:
Block : 2924 Lot : 20
IT IS A VIOLATION OF THE STATE EDUCATION LAW SECTION 7209 (2) FOR ANY PERSONTO ALTER AN ITEM IN ANY WAY UNLESS SUCH PERSON IS ACTING UNDER THE DIRECTIONOF A LICENSED PROFESSIONAL ENGINEER, AND THE ENGINEER STAMPS SUCH CHANGES
Board of Trustees
Architecture & Engineering
E. Bruce Barrett, R.A. LEED A.P., Vice PresidentElan R. Abneri, P.E., Director, Design Consultant ManagementStanley Dahir, R.A., Director, Quality Control & Construction SupportMaría A. Gómez, P.E., LEED A.P., Director, A&E In-House DesignGeorge D. Roussey, P.E., LEED A.P., Director, Technical StandardsStacey Spann-Thom, Director, Operations Support
ScaleProject number
8
CLEVELAND MORRISON, P.E.
X909
Structural:SEVERUD ASSOCIATES469 Seventh AvenueNew York, NY 10018(212) 986-3700
Mechanical:DVL CONSULTING ENGINEERS, INC.375 Main StreetHackensack, NJ 07601(201) 678-2224
Elevator:AB CONSULTING35 Scandia RoadCongers, NY 10920(845) 268-0170
Description
070954
of
of
E. TREMONT AVE .
3RD AVENUE
BATHGATE AVE.
D75 @ EASTTRMONT AVE.
3/11
/201
6 11
:45:
12 A
M
As indicated
D75 @ EAST TREMONTAVENUE
A101
CELLAR FLOOR PLAN
500.105
GABRIEL KIRSHNER
GABRIEL KIRSHNER
03/11/16 BULLETIN# 4 - BIKE STORAGE ROOM REVISION
.00
516 EAST TREMONT AVENUE, BRONX, NY10457
GAVIN MACRAE-GIBSON, R.A.
07/15/15 TURNOVER
29
29
249
191
GAVIN MACRAE-GIBSON, R.A.GAVIN MACRAE-GIBSON, R.A.
7/15/15
SCALE: 1/8" = 1'-0" 1 CELLAR FLOOR PLAN
SCALE :
0" 2' 8'
1/8"=1'-0"
4' 16' 32'
LEGEND
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
NOTE: SEE STRUCTURAL DRAWING 2/S-200 FOR EJECTOR PIT DETAILS
SCALE: 1/4" = 1'-0" 2 BOILER ROOM ELEVATION
1
1
![Page 5: TITLE: Cellar Slab and Security Room CONTRACT: TO ... with or update reason code and cost; provide comments/detailed explanation/justification as needed. To be completed by SCA-AE](https://reader034.fdocuments.in/reader034/viewer/2022051722/5aa4678b7f8b9afa758bdfec/html5/thumbnails/5.jpg)
C
1
2
3
4
5
6
457 SFWARMING PANTRYC11
-G
1014 SFMULTI PURPOSEC13
50G
153 SFBIKE STORAGEC10
-B-2
188 SFCUSTODIANS OFFICEC14
2G
77 SFMECHANICALC13B
1G
99 SF
CUSTODIANSSTORAGEC14B
1G
62 SFCUSTODIAN LOCKERC14A
-G
70 SF
ADULT BATHROOMW/ SHOWERC16
0G
41 SFJCC04
-G
91 SFEMRC03
-D-2
542 SFFURNITURE ST.C07
3B-1
784 SFMECHANICAL ROOMC01
3D-2
271 SF
GAS BOOSTERROOMC02
1D-2
235 SFREFUSE/ RECYCLEC05
3B-2
517 SFMDF ROOMC06
2D-2
177 SFGENERAL STORAGEC08
1B-2
416 SFBOOK STORAGEC09
3B-1
74 SFGENERAL STORAGEC12
1B-2
1080 SFCELLAR CORRIDORCRC1
-G
615 SFSERVICE CORRIDORCRC2
-G
8' - 3"
8' - 0"
8' - 0"
8' - 0"
8' - 3"7' - 6"8' - 6"
8' - 3"
8' - 3" 8' - 0"
B2 B2
B2
F2EF2
B2
F2
B2 B2
C2
D3E
T1XT1X
T1XT1X
2HR RATED CEILING
C2 C2T1
T2
T2
D3E D3
-GIRLS BATHROOMC13A
0G
-BOYS BATHROOMC13C
0G
T2T2
T1
T1
M2E
-PANTRY LOCKERC11A
-G
-PANTRY STORAGEC11B
-B-2
BUILDING WATERSERVICE ROOM
BUILDING GAS/ELECTRIC ROOM
6' - 10"
6' - 10"
7' - 9"
7' - 9"
6' - 10"
7' - 9"
7' - 9"
HEIGHT AT B.O.BAR JOISTS
HEIGHT AT B.O.W24X76 GIRDER
HEIGHT AT B.O.W24X76 GIRDER
HEIGHT AT B.O.BAR JOISTS
HEIGHT AT B.O.BAR JOISTS
EXP.
EXP.
EXP.
EXP.
EXP.
EXP.
EXP.
EXP.EXP.
EXP.
B.O. GIRDER 5' - 8"
B.O. BAR JOISTS 7' - 9"
B.O. GIRDER 6' - 10"
7' - 3 1/4"
D4E
7' - 3 1/4"
T1
T1E
T1ET1E
AED B
D.3D.2 B.1
T2E T2E T2E
T2ET2E
T2ET2E
T1 T1
D4ED4E
D4
D4
D4E
D4ED4E
D4
D4E
T2
T1E T1E T1E
T1E
T1E T1E
T1E T1E
H1E
T2
T2
T2 T2
T2
T2
OC
OCOC
OC
OC
8' - 3"A2EA2E
B2E B2E B2E
B2E B2E B2E
B2E B2E B2E
T1E
3' - 0
"5'
- 0"
5' - 0
"
6' - 0"6' - 0"
6' - 0"7' - 8"7' - 8"
4' - 0
"2' - 0"
7' - 6
"
EQEQ
2' - 6"
2' - 3"
4' - 6" 4' - 6"
2' - 1
0"
EQ EQ
EQ EQ
EQEQ
EQEQ
9' - 0
"9'
- 0"
9' - 0
"
6' - 10"
7' - 9"
EQEQ
EQ EQ
EQ
EQEQ
EQEQ
EQEQ
2' - 0"
EQEQ
EQ
EQEQ 4' - 0"
4' - 6
"
6' - 0"10' - 0"
10' - 0"
7' - 6
"
1' - 6"
7' - 0
"7'
- 0"
3' - 6
"
EQ EQ
4' - 0
"
4' - 6" 6' - 0" 6' - 0"
2' - 0
"
3' - 0"
6' - 0
"
EQ EQ
2' - 0
"
2' - 0"
2HR RATED ENCLOSURE,SEE DETAIL 1/A309
2HR RATED ENCLOSURE,SEE DETAIL 1/A309
8"
EQEQ
EQEQ
8' - 0"
EQEQ
EQ EQ
D2
D2
D2
EQEQ
EQ EQ
3' - 0
"
EQ
2' - 0"
2' - 0
"
EXP.
5' - 0"
T2
T2
T2
3' - 8
"
8' - 0"
C.H. IS MEASUREDFROM RAISED FL.
C.H. ISMEASUREDFROM RAISEDFL.
8' - 0"
8' - 4"
8' - 3"
8' - 4"7' - 8 3/4"
1' - 1
0"
8' - 10"
5' - 0
"
4' - 0"D2D2E
D3E D3D3E
D3E
D3 D3E
D2
F2E
H1E
F2 F2E
B3ED2ED2
4' - 0"
3' - 8"
10' -
6"
8' - 0
"7'
- 0"
10' - 0"
6' - 6
"
EQEQ
EQ
EQEQ
4' - 0
"4'
- 0"
5' - 0"
14' - 0"
D2E
D2E
D2E
D2E
D2E
8' - 3"
8' - 3"
3' - 5"
OC
T1E 12' - 6"
BASE BUILDING AREA - NOT IN SCOPE
BASE BUILDING AREA - WORK REQUIRED IN THESEAREAS AS INDICATED IN THIS SET OF DRAWINGS
DETECTABLE WARNING STRIPS
METAL PAN CEILING
STARTING POINT OF CEILING GRID
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
MACRAE-GIBSON ARCHITECTS, P.C.450 Seventh Avenue, Suite 2406
NEW YORK, NY 10123(212) 294-2940 / fax: (212) 294-2941
Chancellor Carmen Fariña, ChairpersonCurtis A. HarrisEmily A. Youssouf
President & CEOLorraine Grillo
NOTE: Drawing may be printed at reduced scale
Architect:
SCA Design Manager:
LLW No.: Facility Code: Date:
Project:
1
Sheets in DOB Set:
Drawing No.:
Drawing Title:
Address:
Designer:
Checked by:
Drawn by:
Project Architect/Engineer:
DateNo.
Discipline Lead:
Sheets in Contract Set:
2
3
4
5
6
7
Consultants:
Key Plan:
Block : 2924 Lot : 20
IT IS A VIOLATION OF THE STATE EDUCATION LAW SECTION 7209 (2) FOR ANY PERSONTO ALTER AN ITEM IN ANY WAY UNLESS SUCH PERSON IS ACTING UNDER THE DIRECTIONOF A LICENSED PROFESSIONAL ENGINEER, AND THE ENGINEER STAMPS SUCH CHANGES
Board of Trustees
Architecture & Engineering
E. Bruce Barrett, R.A. LEED A.P., Vice PresidentElan R. Abneri, P.E., Director, Design Consultant ManagementStanley Dahir, R.A., Director, Quality Control & Construction SupportMaría A. Gómez, P.E., LEED A.P., Director, A&E In-House DesignGeorge D. Roussey, P.E., LEED A.P., Director, Technical StandardsStacey Spann-Thom, Director, Operations Support
ScaleProject number
8
CLEVELAND MORRISON, P.E.
X909
Structural:SEVERUD ASSOCIATES469 Seventh AvenueNew York, NY 10018(212) 986-3700
Mechanical:DVL CONSULTING ENGINEERS, INC.375 Main StreetHackensack, NJ 07601(201) 678-2224
Elevator:AB CONSULTING35 Scandia RoadCongers, NY 10920(845) 268-0170
Description
070954
of
of
E. TREMONT AVE .
3RD AVENUE
BATHGATE AVE.
D75 @ EASTTRMONT AVE.
3/11
/201
6 11
:46:
47 A
M
As indicated
D75 @ EAST TREMONTAVENUE
A801
CELLAR REFLECTED CEILINGPLAN
500.105
RUTING LI
RUTING LI
03/11/16 BULLETIN# 4 - BIKE STORAGE ROOM REVISION
.00
516 EAST TREMONT AVENUE, BRONX, NY10457
GAVIN MACRAE-GIBSON, R.A.
07/15/15 TURNOVER
70
70
249
191
GAVIN MACRAE-GIBSON, R.A.GAVIN MACRAE-GIBSON, R.A.
7/15/15
SCALE: 1/8" = 1'-0" 1 CELLAR REFLECTED CEILING PLAN
SCALE :
0" 2' 8'
1/8"=1'-0"
4' 16' 32'
LEGEND
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
1
1
![Page 6: TITLE: Cellar Slab and Security Room CONTRACT: TO ... with or update reason code and cost; provide comments/detailed explanation/justification as needed. To be completed by SCA-AE](https://reader034.fdocuments.in/reader034/viewer/2022051722/5aa4678b7f8b9afa758bdfec/html5/thumbnails/6.jpg)
FD
UP
UP
UP
DN
DN
C
1
2
3
4
5
6
457 SFWARMING PANTRYC11
-G
1014 SFMULTI PURPOSEC13
50G
153 SFBIKE STORAGEC10
-B-2
188 SFCUSTODIANS OFFICEC14
2G
77 SFMECHANICALC13B
1G
99 SF
CUSTODIANSSTORAGEC14B
1G
62 SFCUSTODIAN LOCKERC14A
-G
70 SF
ADULT BATHROOMW/ SHOWERC16
0G
41 SFJCC04
-G
91 SFEMRC03
-D-2
542 SFFURNITURE ST.C07
3B-1
271 SF
GAS BOOSTERROOMC02
1D-2
235 SFREFUSE/ RECYCLEC05
3B-2
784 SFMECHANICAL ROOMC01
3D-2
517 SFMDF ROOMC06
2D-2
177 SFGENERAL STORAGEC08
1B-2
416 SFBOOK STORAGEC09
3B-1
74 SFGENERAL STORAGEC12
1B-2
1080 SFCELLAR CORRIDORCRC1
-G
615 SFSERVICE CORRIDORCRC2
-G-
GIRLS BATHROOMC13A0G
-BOYS BATHROOMC13C
0G
FBWWcC
VCTRB
SG-P-
AcT
FBWWcC
QTQT
GCT-
MP
FBWWcC
VCTRB
SG-P-
EXP
FBWWcC
VCTRB
SG-P-
EXP
FBWWcC
SCRB
SG-P-
EXP
FBWWcC
VCTRB
SG-P-
EXP
FBWWcC
VCTRB
SG-P-
EXP
FBWWcC
QTQT
GCT-
MP
FBWWcC
FAFFAFSG-P
-EXP
FBWWcC
MCTGCTSG-PGCTSG-P
FBWWcC
MCTGCTSG-PGCTSG-P
FBWWcC
VCTRB
SG-P-
AcT
FBWWcC
VCTRB
SG-P-
AcT
FBWWcC
VCTRB
SG-P-
AcT
FBWWcC
VCTGCTSG-PGCTAcT
FBWWcC
MCTGCTSG-PGCTSG-P
FBWWcC
SCRB
SG-P-
EXP
FBWWcC
MCTGCTGCT
-EXP
FBWWcC
VCTRB
SG-P-
EXP
-PANTRY LOCKERC11A
-G
-PANTRY STORAGEC11B
-B-2
FBWWcC
VCTGCTGCT
-SG-P
FBWWcC
VCTRB
SG-P-
AcT
STAIR A
STAI
R B
STAIR C
AED B
D.3D.2 B.1
BUILDING WATERSERVICE ROOM
BUILDING GAS/ELECTRIC ROOM
FBWWcC
VCTGCTSG-PGCTEXP
FBWWcC
VCTRB
SG-P-
ACT
FBWWcC
SCRB
SG-P-
AcT
FBWWcC
SCRB
SG-P-
EXP
NOTE: FAF FLOORING SHOULD BEBROUGHT UP 4" ONTO ALL WALLS
FBWWcC
SCRB
SG-P-
EXP
131 SFGENERAL STORAGEC15
1B-2
BASE BUILDING AREA - NOT IN SCOPE
BASE BUILDING AREA - WORK REQUIRED IN THESEAREAS AS INDICATED IN THIS SET OF DRAWINGS
DETECTABLE WARNING STRIPS
EJECTOR PIT GRATE COVER
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
MACRAE-GIBSON ARCHITECTS, P.C.450 Seventh Avenue, Suite 2406
NEW YORK, NY 10123(212) 294-2940 / fax: (212) 294-2941
Chancellor Carmen Fariña, ChairpersonCurtis A. HarrisEmily A. Youssouf
President & CEOLorraine Grillo
NOTE: Drawing may be printed at reduced scale
Architect:
SCA Design Manager:
LLW No.: Facility Code: Date:
Project:
1
Sheets in DOB Set:
Drawing No.:
Drawing Title:
Address:
Designer:
Checked by:
Drawn by:
Project Architect/Engineer:
DateNo.
Discipline Lead:
Sheets in Contract Set:
2
3
4
5
6
7
Consultants:
Key Plan:
Block : 2924 Lot : 20
IT IS A VIOLATION OF THE STATE EDUCATION LAW SECTION 7209 (2) FOR ANY PERSONTO ALTER AN ITEM IN ANY WAY UNLESS SUCH PERSON IS ACTING UNDER THE DIRECTIONOF A LICENSED PROFESSIONAL ENGINEER, AND THE ENGINEER STAMPS SUCH CHANGES
Board of Trustees
Architecture & Engineering
E. Bruce Barrett, R.A. LEED A.P., Vice PresidentElan R. Abneri, P.E., Director, Design Consultant ManagementStanley Dahir, R.A., Director, Quality Control & Construction SupportMaría A. Gómez, P.E., LEED A.P., Director, A&E In-House DesignGeorge D. Roussey, P.E., LEED A.P., Director, Technical StandardsStacey Spann-Thom, Director, Operations Support
ScaleProject number
8
CLEVELAND MORRISON, P.E.
X909
Structural:SEVERUD ASSOCIATES469 Seventh AvenueNew York, NY 10018(212) 986-3700
Mechanical:DVL CONSULTING ENGINEERS, INC.375 Main StreetHackensack, NJ 07601(201) 678-2224
Elevator:AB CONSULTING35 Scandia RoadCongers, NY 10920(845) 268-0170
Description
070954
of
of
E. TREMONT AVE .
3RD AVENUE
BATHGATE AVE.
D75 @ EASTTRMONT AVE.
3/11
/201
6 11
:47:
01 A
M
As indicated
D75 @ EAST TREMONTAVENUE
A901
CELLAR FINISH PLAN
500.105
RUTING LI
RUTING LI
03/11/16 BULLETIN# 4 - BIKE STORAGE ROOM REVISION
.00
516 EAST TREMONT AVENUE, BRONX, NY10457
GAVIN MACRAE-GIBSON, R.A.
07/15/15 TURNOVER
74
74
249
191
GAVIN MACRAE-GIBSON, R.A.GAVIN MACRAE-GIBSON, R.A.
7/15/15
SCALE :
0" 2' 8'
1/8"=1'-0"
4' 16' 32'
SCALE: 1/8" = 1'-0" 1 CELLAR FINISH PLAN
LEGEND
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
1
1
![Page 7: TITLE: Cellar Slab and Security Room CONTRACT: TO ... with or update reason code and cost; provide comments/detailed explanation/justification as needed. To be completed by SCA-AE](https://reader034.fdocuments.in/reader034/viewer/2022051722/5aa4678b7f8b9afa758bdfec/html5/thumbnails/7.jpg)
FD
UP
UP
UP
DN
UPDN
C
1
2
3
4
5
6
F.E.C
F.E.
CF.E.C
BUILDING WATERSERVICE ROOM
BUILDING GAS/ELECTRIC ROOM
DN
3RD AVENUE
E. TREMONT STREET
FIRERESCUEAREA
FF1241
FF1231
457 SFWARMING PANTRYC11
-G
1014 SFMULTI PURPOSEC13
50G
153 SFBIKE STORAGEC10
-B-2
188 SFCUSTODIANS OFFICEC14
2G
-MECHANICALC13B
1G
99 SF
CUSTODIANSSTORAGEC14B
1G
62 SFCUSTODIAN LOCKERC14A
-G
70 SF
ADULT BATHROOMW/ SHOWERC16
0G
41 SFJCC04
-G
91 SFEMRC03
-D-2
542 SFFURNITURE ST.C07
3B-1
271 SF
GAS BOOSTERROOMC02
1D-2
235 SFREFUSE/ RECYCLEC05
3B-2
784 SFMECHANICAL ROOMC01
3D-2
517 SFMDF ROOMC06
2D-2
177 SFGENERAL STORAGEC08
1B-2
416 SFBOOK STORAGEC09
3B-1
74 SFGENERAL STORAGEC12
1B-2
FF1252
FF1253
1080 SFCELLAR CORRIDORCRC1
-G
615 SFSERVICE CORRIDORCRC2
-G
FF1261
-BOYS BATHROOMC13C
0G
-GIRLS BATHROOMC13A
0G
FF2011
-PANTRY STORAGEC11B
-B-2
-PANTRY LOCKERC11A
-G
STAIR A
STAI
R B
STAIR C
AED B
D.3D.2 B.1
F.E.
C
131 SFGENERAL STORAGEC15
1B-2
SK-11
BASE BUILDING AREA - NOT IN SCOPE
BASE BUILDING AREA - WORK REQUIRED IN THESEAREAS AS INDICATED IN THIS SET OF DRAWINGS
DETECTABLE WARNING STRIPS
EJECTOR PIT GRATE COVER
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
MACRAE-GIBSON ARCHITECTS, P.C.450 Seventh Avenue, Suite 2406
NEW YORK, NY 10123(212) 294-2940 / fax: (212) 294-2941
Chancellor Carmen Fariña, ChairpersonCurtis A. HarrisEmily A. Youssouf
President & CEOLorraine Grillo
NOTE: Drawing may be printed at reduced scale
Architect:
SCA Design Manager:
LLW No.: Facility Code: Date:
Project:
1
Sheets in DOB Set:
Drawing No.:
Drawing Title:
Address:
Designer:
Checked by:
Drawn by:
Project Architect/Engineer:
DateNo.
Discipline Lead:
Sheets in Contract Set:
2
3
4
5
6
7
Consultants:
Key Plan:
Block : 2924 Lot : 20
IT IS A VIOLATION OF THE STATE EDUCATION LAW SECTION 7209 (2) FOR ANY PERSONTO ALTER AN ITEM IN ANY WAY UNLESS SUCH PERSON IS ACTING UNDER THE DIRECTIONOF A LICENSED PROFESSIONAL ENGINEER, AND THE ENGINEER STAMPS SUCH CHANGES
Board of Trustees
Architecture & Engineering
E. Bruce Barrett, R.A. LEED A.P., Vice PresidentElan R. Abneri, P.E., Director, Design Consultant ManagementStanley Dahir, R.A., Director, Quality Control & Construction SupportMaría A. Gómez, P.E., LEED A.P., Director, A&E In-House DesignGeorge D. Roussey, P.E., LEED A.P., Director, Technical StandardsStacey Spann-Thom, Director, Operations Support
ScaleProject number
8
CLEVELAND MORRISON, P.E.
X909
Structural:SEVERUD ASSOCIATES469 Seventh AvenueNew York, NY 10018(212) 986-3700
Mechanical:DVL CONSULTING ENGINEERS, INC.375 Main StreetHackensack, NJ 07601(201) 678-2224
Elevator:AB CONSULTING35 Scandia RoadCongers, NY 10920(845) 268-0170
Description
070954
of
of
E. TREMONT AVE .
3RD AVENUE
BATHGATE AVE.
D75 @ EASTTRMONT AVE.
3/11
/201
6 11
:47:
23 A
M
As indicated
D75 @ EAST TREMONTAVENUE
FF101
CELLAR FURNITURE PLAN
500.105
RUTING LI
RUTING LI
03/11/16 BULLETIN# 4 - BIKE STORAGE ROOM REVISION
.00
516 EAST TREMONT AVENUE, BRONX, NY10457
GAVIN MACRAE-GIBSON, R.A.
07/15/15 TURNOVER
86
86
249
191
GAVIN MACRAE-GIBSON, R.A.GAVIN MACRAE-GIBSON, R.A.
7/15/15
SCALE: 1/8" = 1'-0" 1 CELLAR FURNITURE PLAN
SCALE :
0" 2' 8'
1/8"=1'-0"
4' 16' 32'
LEGEND
PROJ
E CT
NORT
H
TRUE NORTH
ES
W
1
1