TIP PROJECT No. U-4424 - NCDOT

1
C A C A C A C A C A C A C A C A C A C A C A C A C A C A C A 3 0 E X I S T . E X I S T . E X I S T . 9 4 . 5 3 -L- POT Sta. 10+00.00 -L- PC Sta. 10+13.43 -L- PC Sta. 33+79.45 -L- PT Sta. 35+66.11 -L- TS Sta. 45+51.35 -L- SC Sta. 47+51.35 -L- CS Sta. 52+47.25 -L- ST Sta. 54+47.25 -L- POT Sta. 25+61.29= -Y2- POT Sta. 12+01.65 -Y2- POT Sta. 10+00.00 -Y4- POT Sta. 12+52.13 - Y 3 - P T S t a . 11 + 14 . 80 -Y3- PC Sta. 10+42.27 - Y 4 - P O T S t a . 10 + 00 . 00 - L - P O T S t a . 36 + 33 . 79 = -Y1- POT Sta. 10+00.00 -Y- POT Sta. 10+00.00 -L- POC Sta. 13+73.49 = -Y- PT Sta. 14+12.93 -Y- POT Sta. 14+44.64 -L- POT Sta. 97+24.94 = -Y5- POT Sta. 12+03.06 -Y5- POT Sta. 10+00.00 -Y5- PC Sta. 10+32.07 -Y5- PT Sta. 10+92.58 -Y2- STA. 11+11.55 -Y1- POT Sta. 14+55.21 BEGIN CONSTRUCTION -Y4- STA. 11+04.71 END CONSTRUCTION -Y3- POT Sta. 10+00.00 BEGIN CONSTRUCTION -Y3- POT Sta. 12+01.00 -L- POT Sta. 36+29.08= -Y3- STA. 10+98.00 -L- PT Sta. 14+80.18 -Y- PC Sta. 13+09.30 - L - P O C S t a . 1 0 4 + 68 . 35 = -Y7- POT Sta. 12+41.09 -L- POC Sta. 108+46.53 = -Y8- POT Sta. 10+00.00 -Y6- POT Sta. 12+00.86 -L- POT Sta. 117+96.34 = -Y8- POT Sta. 14+34.20 BEGIN CONSTRUCTION -Y5- STA. 11+03.35 -Y6- STA. 11+30.00 END CONSTRUCTION -Y7- STA. 11+39.18 BEGIN CONSTRUCTION -DR1- POT Sta. 10+00.00 -L- TS Sta. 97+75.72 - L - C S S t a . 111 + 39 . 09 - L - S T S t a . 113 + 3 9 . 0 9 -L- PC Sta. 118+43.36 -L- POT Sta. 139+78.42 - Y 6 - P O T S t a . 9 + 98 . 97 -DR1- POT Sta. 11+96.67 -L- Sta. 123+76.69 = -Y7- PT Sta. 11+14.75 -Y7- PC Sta. 10+12.05 -Y7- POT Sta. 10+00.00 -L- POT Sta. 134+31.19 = -Y9- POC Sta. 15+01.57 -L- PT Sta. 134+06.13 -Y9- PT Sta. 20+57.50 -Y9- PC Sta. 16+29.62 -Y9- PT Sta. 15+61.86 -Y9- POT Sta. 10+00.00 -L- SC Sta. 99+75.72 PUBLIC MEETING MAP DESIGN DATA FUNCTIONAL CLASS. DESIGN SPEED MAX. SUPERELEVATION TIP PROJECT No. U-4424 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS = 50 MPH UTILITY INFORMATION UTILITY EASEMENTS, ARE PRELIMINARY AND ARE SUBJECT TO CHANGE. POTENTIAL UTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, INCLUDING SHOWN ON THESE MAPS IS LIMITED TO LOCATIONS OF MAJOR EXISTING AND NOT SHOWN ON THESE MAPS OR ON OTHER DISPLAYS. THE UTILITY INFORMATION TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED UTILITIES ARE DRIVEWAY NOTE DRIVEWAYS LOCATIONS WILL BE FINALIZED AT A LATER DATE. PRELIMINARY PLANS AND ARE SUBJECT TO CHANGE. DRIVEWAYS ARE SHOWN; HOWEVER, AS MAPS ARE BASED ON EDGECOMBE COUNTY HPB ORTHOPHOTO DATA = MINOR ARTERIAL = 0.04 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION STATE PROJECT No. 39062.1.2 DATE OF MEETING: MAY 2019 NC ONEMAP GEOSPATIAL DATA ORTHOPHOTOGRAPHY FROM 2017 0’ 100’ 200’ 50’ 100’ (ENGLISH) HPB DESIGN DATA FUNCTIONAL CLASS. DESIGN SPEED MAX. SUPERELEVATION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS = 50 MPH UTILITY INFORMATION UTILITY EASEMENTS, ARE PRELIMINARY AND ARE SUBJECT TO CHANGE. POTENTIAL UTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, INCLUDING SHOWN ON THESE MAPS IS LIMITED TO LOCATIONS OF MAJOR EXISTING AND NOT SHOWN ON THESE MAPS OR ON OTHER DISPLAYS. THE UTILITY INFORMATION TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED UTILITIES ARE DRIVEWAY NOTE DRIVEWAYS LOCATIONS WILL BE FINALIZED AT A LATER DATE. PRELIMINARY PLANS AND ARE SUBJECT TO CHANGE. DRIVEWAYS ARE SHOWN; HOWEVER, AS MAPS ARE BASED ON ORTHOPHOTO DATA = MINOR ARTERIAL = 0.04 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION NC ONEMAP GEOSPATIAL DATA ORTHOPHOTOGRAPHY FROM 2017 0’ 100’ 200’ 50’ 100’ (ENGLISH) (MAPS 1 OF 1) NC 111 (WILSON ROAD) FROM NC 122 (McNAIR ROAD) TO US 64 ALTERNATE (WESTERN BOULEVARD) P U B L I C M EET I NG M A P T I P P ROJ E C T No . U - 4424 E DGE C OM B E C OUNT Y S T A TE P ROJ E C T No . 39062 . 1 . 2 DA TE OF M EET I NG: M AY 2019 ( M A PS 1OF 1 ) NC 111( W I L S ON ROAD )F ROM NC 122 ( M c NA I R R OAD ) T O U S 64 A LTE RNA TE ( W E S TE RN B OU LE VA RD ) P U B L I C M EET I NG M A P T I P P ROJ E C T No . U - 4424 E DGE C OM B E C OUNT Y S T A TE P ROJ E C T No . 39062 . 1 . 2 DA TE OF M EET I NG: M AY 2019 ( M A PS 1OF 1 ) NC 111( W I L S ON ROAD )F ROM NC 122 ( M c NA I R ROAD ) T O U S 64 A LTE RNA TE ( W E S TE RN B OU LE VA RD ) C A HPB HPB C A HPB HPB C A ADT 2018 TRAFFIC DIAGRAM NC 122 NC 111 NC 111 2045 5,600 6,400 2,700 3,000 5,300 6,000 7,800 9,000 SARA LEE RD 3000 3,500 1,300 1,500 300 300 1,100 1,300 ADT 2018 TRAFFIC DIAGRAM NC 111 NC 111 2045 2,400 2,600 5,900 6,800 5,500 6,200 EDGECOMBE COMMUNITY COLLEGE RD 1,400 1,600 1,000 1,000 30 " RC P 3 6 " RC P 3 6 " C M P D I D I C -L- 12’ 12’ 8’ 12’ 2’ 14’-6" PATH MULTI-USE 10’ 2’ 2’-6" VAR 22’ +/- L WILSON ST. -L- 2’-6" C -L- 12’ 12’ 8’ 12’ 2’ 14’-6" PATH MULTI-USE 10’ 2’ 2’-6" VAR 22’ +/- L WILSON ST. -L- 2’-6" ADT 2018 TRAFFIC DIAGRAM NC 111 NC 111 2045 1,900 2,200 9,100 10,400 7,600 8,600 SR 1351 BARLOW RD 200 200 1,700 2,000 ADT 2018 TRAFFIC DIAGRAM NC 111 NC 111 2045 17,000 19,200 18,000 20,400 8,900 10,200 9,100 10,400 US 64 ALT 2,200 2,500 2,700 3,100 2,600 3,000 3,300 3,800 F F F F F F F C C F F F F F F F F F F F F F F F F F C C F C C F F F C F C C C F F F F C C C F F C C F F F C F F C C F C C F F C F C C C C F C F C F F C F F F C F C F F C C F C F C F C F C F C C F F C C F F C F C C F F F F F F F F F F F F PI Sta 12+46.81 D L = 466.76’ T = 233.38’ R = 30,000.00’ -L- CURVE DATA P I S t a1 3 + 6 1 . 14 D L= 10 3 . 63 T = 5 1 . 84 R = 1 , 5 00 . 00 -Y- CURVE DATA e = NC D = 50 MPH s PI Sta 34+72.78 D L = 186.66’ T = 93.33’ R = 40,000.00’ -L- CURVE DATA e = NC Ds = 50 MPH PIs Sta 46+84.69 F Ls = 200.00’ LT = 133.34’ ST = 66.67’ PI Sta 49+99.84 D L = 495.90’ T = 248.49’ R = 3,061.00’ -L- CURVE DATA e = 3% Ds = 50 MPH PI Sta 10+78.59 D L = 72.53’ T = 36.33’ R = 500.00’ -Y3- CURVE DATA PI Sta 34+72.78 D L = 186.66’ T = 93.33’ R = 40,000.00’ e = NC Ds = 50 MPH PI Sta 49+99.84 D L = 495.90’ T = 248.49’ R = 3,061.00’ PIs Sta 53+13.92 F Ls = 200.00’ LT = 133.34’ ST = 66.67’ -L- CURVE DATA e = 3% Ds = 50 MPH -Y5- CURVE DATA PI Sta 10+62.33 D L = 60.50’ T = 30.26’ R = 1,000.00’ -L- CURVE DATA -L- CURVE DATA -L- CURVE DATA e = 3% Ds = 50 MPH e = 3% Ds = 50 MPH e = 2.5% Ds = 50 MPH RunOff = 75’ -Y7- CURVE DATA P I S t a1 0 + 64 . 20 D L = 102.71’ T = 52.15’ R = 240 . 0 0 P I S t a15 + 31 . 64 D L = 60.45’ T = 30.23’ R = 2 , 500 . 00 PI Sta 18+44.23 D L = 427.89’ T = 214.61’ R = 2,220.00’ -Y9- CURVE DATA e = 2.5% Ds = 50 MPH RunOff = 75’ P I S t a126 + 29 . 8 4 D L= 1 , 5 6 2 . 7 7 T = 7 8 6 . 49 R = 5 , 605 . 00 P I sS t a99 + 09 . 06 F L s= 200 . 00 LT = 133 . 34 S T = 66 . 67 PI Sta 105+64.93 D L = 1,163.37’ T = 589.21’ R = 2,975.00’ P I S t a105 + 6 4 . 93 D L = 1,163.37’ T = 589.21’ R = 2,975.00’ P I sS t a112 + 05 . 76 F Ls = 200.00’ LT = 133.34’ ST = 66.67’ P I S t a126 + 29 . 84 D L= 1 , 562 . 77 T = 786 . 49 R = 5 , 605 . 00 E D S T I T H H E I R S NO D EE D R E F E R E N C E F O UND P A U L I N E J O N E S L I LL I E MAYO E A R L I N E R E I D E D WA R D S L O R ELL DA WS ON e t a l MI C H A EL L e t a l A ND E R S ON J R LE S TE R D U BC O L . L . C . D B 1547 P G 1091 D U BC O L . L . C . D B 1547 P G 1091 T R A N SP O R T A T I O N N C D E P A R T ME N T O F C O MMON S L . L . C . T A RB O R O C O MMON S L . L . C . T A RB O R O V E R ON I C A WI LL A R D J O R DAN & C O MMON S L . L . C . T A R B O R O C O MMON S L . L . C . T A RB O R O C O MMON S L . L . C . T A RB O R O C O MMON S L . L . C . T A R B O R O COM M ONS L . L . C. T ARBORO COMM ONS L . L . C. T ARBORO P OOL AS S OC. S W I M M I NG SP E NCE RS W OODS C O MMON S L . L . C . T A RB O R O C O MMON S L . L . C . T A RB O R O E D D I E MANN I N G E D WA R D H E TE R & C O MMON S L . L . C . T A RB O R O C O MP AN Y I N C P I E D MON T NA T U R A L GA S C O MMUN I T Y C O LLE G E E DG E C O MB E T A RB O R O T O WN O F B I LL Y W T R E VA T H AN e t a l B I LL Y W T R E VA T HAN e t a l L I F E G I V I NG C H R I S T I AN C H U RC H I N C R E N T A L S LL C A I N S LE Y T R E VA T HAN B I LL Y & J E AN S AVAG E S Y L V I A HA RR Y & P ETT A WAY J O G E NA T R E VA T H A N B I LL Y & J E A N R E N T A L S LL C A I N S L E Y L AN C A S TE R S AND R A C L A R K MA R T H A DAV I S YO L ANDA MO RR I S & MI L D R E D DAV I S YO L ANDA T R E VA T HAN B I LL Y & J E AN T R E VA T H AN B I LL Y & J E AN V E R I V E C A T H E R I N E B U R G E S S , J R . WI LL I E E A R L K I NG J E SS I E K I N G R E N T A L S L L C A I N S L E Y A I N S L E Y e t a l C HA R L E S J O N E S S AND R A P I PP E N e t a l C L AY T ON TE RE S A P T I LLE RY WI LL I A M HA R T L I F E E S T A TE J A ME S BR O WN M I CHAEL RE NE HART e t a l L I F E E S T T AY L O R MA R Y ANN WE BB G E N E R O B E R T WE B B R O B E R T G DO L B E RR Y L I NDA H DA WK I N S J E AN B A R B A R A e t a l MY E R S ADA M J O S HUA T A R B O R O T O WN O F J A ME S I N EZ D P A R K E R e t a l A R A B ELL L I F E E S T e t a l MO S E S WO R S LE Y MO S S J UD I T H L J UD I T H L MO S S C H U R C H E P I S C O P A L Z I O N MET HOD I S T D I S T R I C T A F R I C AN E P I S C O P A L C A R O L I N A E A S T E R N NO R T H T R U S T E E S F O R T U E K E LL I A J O N E S C H E RR Y MA RC I A V WE BB R O B E R T G J ON E S E A R L D E AN e t a l WI LL I A M A S C O T T e t a l L O R E N Z O T Y S ON MO S S J UD I T H L e t a l HO LL O MAN E D WA R D W e t a l B E N J A C K I E S T R O MA I N S U MME R L I N S A MU EL HA R P E R EL I Z A B E T H J MO SS J UD I T H L e t a l R OUN T R E E MEL V I N J A RR E TT K O L TE N B L YO N S L A T I F AH S e t a l R AD F O R D J R K E R MI T R OG E R C H R I S T I NA C H E RR Y KN I GH T L I MI TE D P A R T N E R S H I P T A R B O R O S Q UA R E G L A SS e t a l L A MON T DONN I E J AN I E B B A TTLE T OU ME Y e t a l R O S E MA R Y E P AY T O N C EL I A H E I R S e t a l J AN I E B B A T TLE AND TELE G R A P H C O C A R O L I N A TELE P H O N E P L A T I A LL C H I L MA LL C A U D R E Y L O C K E S H E A R I N LL C H I L MA L L C H I L MA G R E E N S LL C E A S TE R N P R I D E LL C CR E D I T U N I ON S T A T E E MP L OY E E S T A R B O R O T O WN O F R E E S E e t a l T O MMY BR O WN B I R T H L e t a l DAV I D I R A LL C e t a l A ME R I C AN e t a l S E S S O MS F R EE MAN DA V I D T A R B O R O T O WN O F J A ME S B I LL Y R AY B AK E R e t a l J ET T A KN I GH T e t a l HU SS E Y HO R A C E B P A T N E R S H I P L I MI TE D C O MP A NY T H E BR Y ANNA P R O P E R T I E S L L C C OA S T A L P L A I N S MA R I T A L T R U S T T R U S TEE O F A U D R E Y L S H E A R I N P OOL AS S OC. S W I M M I NG SP E NCE RS W OODS F I R E T O WE R C O MMUN I T Y C O LLE G E E DG E C O MB E C O MMUN I T Y C O LLE G E E DG E C O MB E C O MMI SS I ON P U B L I C WO R K S N C S T A TE H WY & C O MMI SS I ON P U B L I C WO R K S N C S T A TE H WY & MA I N TE NAN C E E DG E C O MB E O R G . E N T R E P R E N E U R E DG E C O MB E A P A R T ME N T S E DG E WOO D P L A C E C HU RC H D EL I V E R AN C E S A L VA T I ON A N D G E N E R A L DO LL A R HA R D EE S K F C G A S S T A T I ON S H EL L T O WN O F T A RB O R O K E I H I N C A R O L I NA S Y S TE M TE C HNO L OGY I N C TE C HNO L OGY I N C K E I H I N C A R O L I NA S Y S TE M GA S C O M P ANY I N C P I E D M ON T NA T U R A L C E ME T E R Y S T . L U K E C E METE R Y WI L S O N S T R EET 10 1 5 2 0 2 5 30 35 10 4 0 4 5 50 5 5 60 65 7 0 75 80 90 85 95 100 1 05 110 11 5 12 0 125 130 135 1 0 10 1 0 15 20 10 LEGEND AND GUTTER PROPOSED STRUCTURES, ISLAND, CURB PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY EXISTING ROADWAY TO BE REMOVED PROPERTY LINES BUILDINGS EXISTING RIGHT OF WAY LAKES, RIVER, STREAMS AND PONDS EXISTING CONTROL OF ACCESS PROPOSED TRAFFIC SIGNAL PROPOSED RIGHT OF WAY EXISTING STRUCTURES, ISLAND, CURB TO BE REMOVED TO BE RETAINED EXISTING STRUCTURES, ISLAND, CURB AND GUTTER AND GUTTER EXISTING UTILITY EASEMENT CEMETERIES HISTORIC PROPERTY BOUNDARY CONSTRUCTION AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, EXISTING TRAFFIC SIGNAL LEGEND AND GUTTER PROPOSED STRUCTURES, ISLAND, CURB PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY EXISTING ROADWAY TO BE REMOVED PROPERTY LINES BUILDINGS EXISTING RIGHT OF WAY LAKES, RIVER, STREAMS AND PONDS EXISTING CONTROL OF ACCESS PROPOSED TRAFFIC SIGNAL PROPOSED RIGHT OF WAY EXISTING STRUCTURES, ISLAND, CURB TO BE REMOVED TO BE RETAINED EXISTING STRUCTURES, ISLAND, CURB AND GUTTER AND GUTTER EXISTING UTILITY EASEMENT CEMETERIES HISTORIC PROPERTY BOUNDARY CONSTRUCTION AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, EXISTING TRAFFIC SIGNAL LEGEND AND GUTTER PROPOSED STRUCTURES, ISLAND, CURB PROPOSED ROADWAY EXISTING ROADWAY TO BE RESURFACED EXISTING ROADWAY EXISTING ROADWAY TO BE REMOVED PROPERTY LINES BUILDINGS EXISTING RIGHT OF WAY LAKES, RIVER, STREAMS AND PONDS EXISTING CONTROL OF ACCESS PROPOSED TRAFFIC SIGNAL PROPOSED RIGHT OF WAY EXISTING STRUCTURES, ISLAND, CURB TO BE REMOVED TO BE RETAINED EXISTING STRUCTURES, ISLAND, CURB AND GUTTER AND GUTTER EXISTING UTILITY EASEMENT CEMETERIES HISTORIC PROPERTY BOUNDARY CONSTRUCTION AND UTILITY) PROPOSED EASEMENTS (DRAINAGE, EXISTING TRAFFIC SIGNAL B E G I N C ON S T R U C T I ON - Y 8 - S T A . 12 + 57 . 84 T O S A R A T OGA T O T A RB O R O - L - - L - - L - - Y 1 - - Y - - Y 2 - - Y 3 - - Y 4 - - L - - L - - L - - L - - L - - L - - Y 5 - - Y 6 - - Y 7 - - L - - L - - L - - Y 8 - - Y 9 - - Y 9 - 111 122 111 111 111 111 111 64 64 64 A LT 64 A LT 111 1 1 1 111 111 111 SP E N C E R D R W I L S ON S T . W I L S ON S T LE I GH S C T T A NN E R C T Z A C HA R Y L N C O MM E RC E C E N T E R D R . W I L S ON S T W I L S O N S T W I L S ON S T S I M PS ON D R W I L S ON S T P R E S T O N D R M c M I LL AN D R B E N S O N D R . B A R L O W R D . S R 1351 W E S TE R N B L VD W E S T E R N B L VD W I L S ON S T W I L S ON S T W I L S ON S T -L- STA. 133+98.83 END STATE PROJECT U-4424 - L - S T A . 13 + 90 . 00 B E G I N S T A TE P R O J E C T U - 4424 12 12 12 18 18 1 2 12 1 2 18 1 8 12 1 2 12 1 8 18 12 12 12 18 18 12 12 12 18 18 12 12 1 2 18 18 2 1 15 13 12 1 2 12 18 18 12 1 2 1 2 1 8 18 12 1 2 1 2 1 8 18 30 3 0 30 1 2 1 2 1 2 1 8 1 8 3 0 18 30 12 1 2 1 2 1 2 12 12 12 12 18 1 2 1 2 1 2 1 2 24 45 27 3 6 74’ W I L S ON S T W I L S ON S T M c NA I R R D S A R A LEE R D

Transcript of TIP PROJECT No. U-4424 - NCDOT

C

A

C

A

C

A

CA

C A

C

A

CA

CA

CA

CA

CA

CA

CA

CA

CA

30’

EXIST. EXIST.

EXIST.

94.53

-L- POT Sta. 10+00.00

-L- PC Sta. 10+13.43

-L- PC Sta. 33+79.45

-L- PT Sta. 35+66.11

-L- TS Sta. 45+51.35 -L- SC Sta. 47+51.35

-L- CS Sta. 52+47.25

-L- ST Sta. 54+47.25

-L- POT Sta. 25+61.29=

-Y2- POT Sta. 12+01.65

-Y2- POT Sta. 10+00.00

-Y4- POT Sta. 12+52.13

-Y3- PT Sta. 11+14.80

-Y3- PC Sta. 10+42.27

-Y4- POT Sta. 10+00.00

-L- POT Sta. 36+33.79 =

-Y1- POT Sta. 10+00.00

-Y- POT Sta. 10+00.00

-L- POC Sta. 13+73.49 =

-Y- PT Sta. 14+12.93

-Y- POT Sta. 14+44.64

-L- POT Sta. 97+24.94 =

-Y5- POT Sta. 12+03.06

-Y5- POT Sta. 10+00.00

-Y5- PC Sta. 10+32.07

-Y5- PT Sta. 10+92.58

-Y2- STA. 11+11.55

-Y1- POT Sta. 14+55.21

BEGIN CONSTRUCTION

-Y4- STA. 11+04.71

END CONSTRUCTION

-Y3- POT Sta. 10+00.00

BEGIN CONSTRUCTION

-Y3- POT Sta. 12+01.00

-L- POT Sta. 36+29.08=

-Y3- STA. 10+98.00

-L- PT Sta. 14+80.18

-Y- PC Sta. 13+09.30

-L- POC Sta. 104+68.35 =

-Y7- POT Sta. 12+41.09

-L- POC Sta. 108+46.53 =-Y8- POT Sta. 10+00.00

-Y6- POT Sta. 12+00.86

-L- POT Sta. 117+96.34 =

-Y8- POT Sta. 14+34.20

BEGIN CONSTRUCTION

-Y5- STA. 11+03.35

-Y6- STA. 11+30.00

END CONSTRUCTION

-Y7- STA. 11+39.18

BEGIN CONSTRUCTION

-DR1- POT Sta. 10+00.00

-L- TS Sta. 97+75.72

-L- CS Sta. 111+39.09

-L- ST Sta. 113+39.09

-L- PC Sta. 118+43.36

-L- POT Sta. 139+78.42

-Y6- POT Sta. 9+98.97

-DR1- POT Sta. 11+96.67

-L- Sta. 123+76.69 =

-Y7- PT Sta. 11+14.75

-Y7- PC Sta. 10+12.05

-Y7- POT Sta. 10+00.00

-L- POT Sta. 134+31.19 =

-Y9- POC Sta. 15+01.57

-L- PT Sta. 134+06.13

-Y9- PT Sta. 20+57.50

-Y9- PC Sta. 16+29.62

-Y9- PT Sta. 15+61.86

-Y9- POT Sta. 10+00.00

-L- SC Sta. 99+75.72

PUBLIC MEETING MAP

DESIGN DATA

FUNCTIONAL CLASS.

DESIGN SPEED

MAX. SUPERELEVATION

TIP PROJECT No. U-4424

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

= 50 MPH

UTILITY INFORMATION

UTILITY EASEMENTS, ARE PRELIMINARY AND ARE SUBJECT TO CHANGE.

POTENTIAL UTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, INCLUDING

SHOWN ON THESE MAPS IS LIMITED TO LOCATIONS OF MAJOR EXISTING AND

NOT SHOWN ON THESE MAPS OR ON OTHER DISPLAYS. THE UTILITY INFORMATION

TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED UTILITIES ARE

DRIVEWAY NOTE

DRIVEWAYS LOCATIONS WILL BE FINALIZED AT A LATER DATE.

PRELIMINARY PLANS AND ARE SUBJECT TO CHANGE.

DRIVEWAYS ARE SHOWN; HOWEVER, AS MAPS ARE BASED ON

EDGECOMBE COUNTY

HPB

ORTHOPHOTO DATA

= MINOR ARTERIAL

= 0.04

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

STATE PROJECT No. 39062.1.2

DATE OF MEETING: MAY 2019

NC ONEMAP GEOSPATIAL DATAORTHOPHOTOGRAPHY FROM 2017

0’ 100’ 200’

50’

100’

(ENGLISH)

HPB

DESIGN DATA

FUNCTIONAL CLASS.

DESIGN SPEED

MAX. SUPERELEVATION

DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS

= 50 MPH

UTILITY INFORMATION

UTILITY EASEMENTS, ARE PRELIMINARY AND ARE SUBJECT TO CHANGE.

POTENTIAL UTILITY EASEMENTS. THE DESIGNS SHOWN ON THESE MAPS, INCLUDING

SHOWN ON THESE MAPS IS LIMITED TO LOCATIONS OF MAJOR EXISTING AND

NOT SHOWN ON THESE MAPS OR ON OTHER DISPLAYS. THE UTILITY INFORMATION

TO PROVIDE GREATER VISUAL CLARITY, EXISTING AND PROPOSED UTILITIES ARE

DRIVEWAY NOTE

DRIVEWAYS LOCATIONS WILL BE FINALIZED AT A LATER DATE.

PRELIMINARY PLANS AND ARE SUBJECT TO CHANGE.

DRIVEWAYS ARE SHOWN; HOWEVER, AS MAPS ARE BASED ON

ORTHOPHOTO DATA

= MINOR ARTERIAL

= 0.04

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

NC ONEMAP GEOSPATIAL DATAORTHOPHOTOGRAPHY FROM 2017

0’ 100’ 200’

50’

100’

(ENGLISH)

(MAPS 1 OF 1)

NC 111 (WILSON ROAD) FROM NC 122 (McNAIR ROAD)TO US 64 ALTERNATE (WESTERN BOULEVARD)

PU

BLIC

ME

ETIN

G

MA

PTIP P

ROJE

CT

No. U-4424

ED

GE

CO

MB

E

CO

UN

TY

ST

AT

E P

ROJE

CT

No. 39062.1.2

DA

TE

OF

ME

ETIN

G:

MA

Y 2019

(MA

PS 1

OF 1)

NC 11

1 (W

ILS

ON

RO

AD)

FR

OM

NC 12

2 (M

cN

AIR

RO

AD)

TO

US 64 A

LT

ER

NA

TE (W

ES

TE

RN

BO

UL

EV

AR

D)

PU

BLIC

ME

ETIN

G

MA

PTIP P

ROJE

CT

No. U-4424

ED

GE

CO

MB

E

CO

UN

TY

ST

AT

E P

ROJE

CT

No. 39062.1.2

DA

TE

OF

ME

ETIN

G:

MA

Y 2019

(MA

PS 1

OF 1)

NC 11

1 (W

ILS

ON

RO

AD)

FR

OM

NC 12

2 (M

cN

AIR

RO

AD)

TO

US 64 A

LT

ER

NA

TE (W

ES

TE

RN

BO

UL

EV

AR

D)

C

A

HPB

HPB

C

A

HPB

HPB

C

A

ADT2018

TRAFFIC DIAGRAM

NC 122

NC 111 NC 111

2045

5,600

6,400

2,700

3,000

5,300

6,000

7,800

9,000

SARA LEE RD

3000

3,500

1,300

1,500

300

300

1,100

1,300

ADT2018

TRAFFIC DIAGRAM

NC 111 NC 111

2045

2,400

2,600

5,900

6,800

5,500

6,200

EDGECOMBE COMMUNITY COLLEGE RD

1,400

1,600

1,000

1,000

30" RCP

36" RCP

36" CMP

DI

DI

C -L-

12’ 12’8’ 12’

2’

14’-6"

PATHMULTI-USE

10’ 2’

2’-6"

VAR 22’ +/-

L

WILSON ST. -L-2’-6"

C -L-

12’ 12’8’ 12’

2’

14’-6"

PATHMULTI-USE

10’ 2’

2’-6"

VAR 22’ +/-

L

WILSON ST. -L-2’-6"

ADT2018

TRAFFIC DIAGRAM

NC 111 NC 111

20451,900

2,200

9,100

10,400

7,600

8,600

SR 1351 BARLOW RD

200

200

1,700

2,000

ADT2018

TRAFFIC DIAGRAM

NC 111 NC 111

2045

17,000

19,200

18,000

20,400

8,900

10,200

9,100

10,400

US 64 ALT

2,200

2,500

2,700

3,100

2,600

3,000

3,300

3,800

F

F

FF

F

F

F

C

C

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F

FC

CF

CC

F

F

F

C

F

CC

C

F

F

F

FC

C

C

F

FC

CF

F

F CF

F

CC

FC

C

F

F

C

F

C

CC

C

F

C

F

C

FF

CF

F

F

C

FC

F

FC

C

F

CF

CF

C FC

F

C

C

F

F

C

C

F

F

CF

CC

F

F

F

F

F

F

F

F

FF

F

F

PI Sta 12+46.81

D

L = 466.76’

T = 233.38’

R = 30,000.00’

-L- CURVE DATA

PI Sta 13+61.14

D

L = 103.63’

T = 51.84’

R = 1,500.00’

-Y- CURVE DATA

e = NC

D = 50 MPHs

PI Sta 34+72.78

D

L = 186.66’

T = 93.33’

R = 40,000.00’

-L- CURVE DATA

e = NC

Ds = 50 MPH

PIs Sta 46+84.69

F

Ls = 200.00’

LT = 133.34’

ST = 66.67’

PI Sta 49+99.84

D

L = 495.90’

T = 248.49’

R = 3,061.00’

-L- CURVE DATA

e = 3%

Ds = 50 MPH

PI Sta 10+78.59

D

L = 72.53’

T = 36.33’

R = 500.00’

-Y3- CURVE DATA

PI Sta 34+72.78

D

L = 186.66’

T = 93.33’

R = 40,000.00’

e = NC

Ds = 50 MPH

PI Sta 49+99.84

D

L = 495.90’

T = 248.49’

R = 3,061.00’

PIs Sta 53+13.92

F

Ls = 200.00’

LT = 133.34’

ST = 66.67’

-L- CURVE DATA

e = 3%

Ds = 50 MPH

-Y5- CURVE DATA

PI Sta 10+62.33

D

L = 60.50’

T = 30.26’

R = 1,000.00’

-L- CURVE DATA

-L- CURVE DATA

-L- CURVE DATA

e = 3%

Ds = 50 MPH

e = 3%

Ds = 50 MPH

e = 2.5%

Ds = 50 MPH

RunOff = 75’

-Y7- CURVE DATA

PI Sta 10+64.20D

L = 102.71’T = 52.15’R = 240.00’

PI Sta 15+31.64D

L = 60.45’T = 30.23’R = 2,500.00’

PI Sta 18+44.23

D

L = 427.89’

T = 214.61’

R = 2,220.00’

-Y9- CURVE DATA

e = 2.5%

Ds = 50 MPH

RunOff = 75’

PI Sta 126+29.84D

L = 1,562.77’T = 786.49’R = 5,605.00’

PIs Sta 99+09.06

F

Ls = 200.00’

LT = 133.34’

ST = 66.67’

PI Sta 105+64.93

D

L = 1,163.37’

T = 589.21’

R = 2,975.00’

PI Sta 105+64.93D

L = 1,163.37’T = 589.21’R = 2,975.00’

PIs Sta 112+05.76F

Ls = 200.00’LT = 133.34’ST = 66.67’

PI Sta 126+29.84

D

L = 1,562.77’

T = 786.49’

R = 5,605.00’

ED STITH HEIRS

NO DEED REFERENCE FOUND

PAULINE JONES

LILLIE MAYO

EARLINE REID

EDWARDS

LORELL

DAWSON et al

MICHAEL L

et al

ANDERSON JR

LESTER

DUBCO L.L.C.DB 1547 PG 1091 DUBCO L.L.C.DB 1547 PG 1091

TRANSPORTATION

NC DEPARTMENT OF

COMMONS L.L.C.

TARBORO

COMMONS L.L.C.

TARBORO

VERONICA WILLARD

JORDAN &

COMMONS L.L.C.

TARBORO

COMMONS L.L.C.

TARBORO

COMMONS L.L.C.

TARBORO

COMMONS L.L.C.

TARBORO

CO

MM

ON

S

L.L.C.

TA

RB

OR

O

CO

MM

ON

S L.L.C.

TA

RB

OR

O

PO

OL

ASS

OC.

SWIM

MIN

G

SP

EN

CE

R’S

WO

OD

S

COMMONS L.L.C.

TARBORO

COMMONS L.L.C.

TARBORO EDDIE MANNING

EDWARD HETER &

COMMONS L.L.C.

TARBORO

COMPANY INC

PIEDMONT NATURAL GAS

COMMUNITY COLLEGE

EDGECOMBE

TARBORO

TOWN OF

BILLY W TREVATHAN et al

BILLY W TREVATHAN et al

LIFE GIVIN

G CHRISTIAN CHURCH IN

C

RENTALS LLCAINSLEY

TREVATHANBILLY & JEAN

SAVAGESYLVIAHARRY &

PETTAWAYJOGENA

TREVATHANBILLY & JEAN

RENTALS LLCAINSLEY

LANCASTERSANDRACLARKMARTHA

DAVISYOLANDAMORRIS &

MILDRED DAVISYOLANDA

TREVATHANBILLY & JEAN

TREVATHANBILLY & JEAN

VERIVECATHERINE

BURGESS, JR.WILL

IE

EARL KING

JESSIE KIN

G

RENTALS LLCAINSLEY

AINSLEY et alCHARLES

JONESSANDRA

PIPPEN et al CLAYTON

TE

RES

A

PTIL

LE

RY

WILLIAM HART LIF

E ESTATE

JAMES BROWN

MIC

HA

EL

RE

NE

HA

RT et al

LIFE EST

TAYLORMARY ANNWEBB GENEROBERT

WEBB ROBERT G

DOLBERRY LINDA HDAWKINS JEANBARBARA

et alMYERSADAMJOSHUA

TARBOROTOWN OF

JAMES INEZ D

PARKER et alARABELL

LIFE EST e

t alMOSES WORSLEY

MOSS JUDITH L

JUDITH L MOSS

CHURCHEPISCOPAL ZION METHODIST DISTRICT AFRICAN EPISCOPAL CAROLINA EASTERN NORTH TRUSTEES FOR

TUEKELLIA JONES

CHERRY MARCIA VWEBB ROBERT G

JONES EARL DEANet al

WILLIAM ASCOTT

et alLORENZOTYSON MOSS JUDITH L

et alHOLLOMANEDWARD W

et alBEN JACKIEST ROMAIN

SUMMERLIN SAMUELHARPER ELIZABETH J

MOSS JUDITH L

et alROUNTREEMELVIN

JARRETT KOLTEN B

LYONS

LATIFAH S

et al

RADFORD JR

KERMIT ROGER

CHRISTINA CHERRY KNIGHT

LIMITED PARTNERSHIP

TARBORO SQUARE

GLASS et al

LAMONT

DONNIE

JANIE B BATTLE

TOUMEY et al

ROSEMARY E

PAYTON CELIA HEIRS et al

JANIE B BATTLE

AND TELEGRAPH CO

CAROLINA TELEPHONE

PLATIA LLC HILMA LLC

AUDREY LOCKE SHEARIN LLC

HILMA LLCHILMA GREENS LLC

EASTERN PRIDE LLC

CREDIT UNION

STATE EMPLOYEES’

TARBORO

TOWN OF

REESE et al

TOMMY

BROWN

BIRTH L et alDAVID

IRA LLC et a

lAMERICAN

et alSESSOMSFREEMANDAVID

TARBOROTOWN OF

JAMES BILLY RAY

BAKER et alJETTA KNIGHTet al

HUSSEYHORACE B

PATNERSHIP

LIMITED

COMPANY

THE BRYANNA

PROPERTIES LLC

COASTAL PLAINS

MARITAL TRUST

TRUSTEE OF

AUDREY L

SHEARIN

PO

OL

ASS

OC.

SWIM

MIN

G

SP

EN

CE

R’S

WO

OD

S

FIRE TOWER

COMMUNITY COLLEGEEDGECOMBE COMMUNITY COLLEGE

EDGECOMBE

COMMISSION PUBLIC WORKS

NC STATE H

WY & COMMISSION PUBLIC WORKS

NC STATE H

WY &

MAINTENANCEEDGECOMBE

ORG.ENTREPRENEUREDGECOMBE

APARTMENTS

EDGEWOOD PLACE

CHURCH

DELIVERANCE

SALVATION AND

GENERAL

DOLLAR

HARDEES

KFC

GAS STATION

SHELLTOWN OF TARBORO

KEIHIN CAROLINA SYSTEM TECHNOLOGY INC

TECHNOLOGY INC

KEIHIN CAROLINA SYSTEM

GAS COMPANY INC

PIEDMONT NATURAL

CEMETERY

ST. LUKE

CEMETERY

WILSON STREET

10

15

20

25

30

35

10

40

45

50

55

60

65

70

75

80

90

85

95

100

105

110

115

120

125

130

135

10

10

10

15

20

10

LEGEND

AND GUTTERPROPOSED STRUCTURES, ISLAND, CURB

PROPOSED ROADWAY

EXISTING ROADWAY TO BE RESURFACED

EXISTING ROADWAY

EXISTING ROADWAY

TO BE REMOVED

PROPERTY LINES

BUILDINGS

EXISTING RIGHT OF WAY

LAKES, RIVER, STREAMS AND PONDS

EXISTING CONTROL OF ACCESS

PROPOSED TRAFFIC SIGNAL

PROPOSED RIGHT OF WAY

EXISTING STRUCTURES, ISLAND, CURBTO BE REMOVED

TO BE RETAINEDEXISTING STRUCTURES, ISLAND, CURBAND GUTTER

AND GUTTER

EXISTING UTILITY EASEMENT

CEMETERIES

HISTORIC PROPERTY BOUNDARY

CONSTRUCTION AND UTILITY)PROPOSED EASEMENTS (DRAINAGE,

EXISTING TRAFFIC SIGNAL

LEGEND

AND GUTTERPROPOSED STRUCTURES, ISLAND, CURB

PROPOSED ROADWAY

EXISTING ROADWAY TO BE RESURFACED

EXISTING ROADWAY

EXISTING ROADWAY

TO BE REMOVED

PROPERTY LINES

BUILDINGS

EXISTING RIGHT OF WAY

LAKES, RIVER, STREAMS AND PONDS

EXISTING CONTROL OF ACCESS

PROPOSED TRAFFIC SIGNAL

PROPOSED RIGHT OF WAY

EXISTING STRUCTURES, ISLAND, CURBTO BE REMOVED

TO BE RETAINEDEXISTING STRUCTURES, ISLAND, CURBAND GUTTER

AND GUTTER

EXISTING UTILITY EASEMENT

CEMETERIES

HISTORIC PROPERTY BOUNDARY

CONSTRUCTION AND UTILITY)PROPOSED EASEMENTS (DRAINAGE,

EXISTING TRAFFIC SIGNAL

LEGEND

AND GUTTERPROPOSED STRUCTURES, ISLAND, CURB

PROPOSED ROADWAY

EXISTING ROADWAY TO BE RESURFACED

EXISTING ROADWAY

EXISTING ROADWAY

TO BE REMOVED

PROPERTY LINES

BUILDINGS

EXISTING RIGHT OF WAY

LAKES, RIVER, STREAMS AND PONDS

EXISTING CONTROL OF ACCESS

PROPOSED TRAFFIC SIGNAL

PROPOSED RIGHT OF WAY

EXISTING STRUCTURES, ISLAND, CURBTO BE REMOVED

TO BE RETAINEDEXISTING STRUCTURES, ISLAND, CURBAND GUTTER

AND GUTTER

EXISTING UTILITY EASEMENT

CEMETERIES

HISTORIC PROPERTY BOUNDARY

CONSTRUCTION AND UTILITY)PROPOSED EASEMENTS (DRAINAGE,

EXISTING TRAFFIC SIGNAL

BEGIN CONSTRUCTION-Y8- STA. 12+57.84

TO SARATOGA

TO TARBORO-L-

-L-

-L-

-Y1-

-Y-

-Y2-

-Y3-

-Y4-

-L-

-L-

-L-

-L-

-L-

-L-

-Y5-

-Y6-

-Y7-

-L-

-L-

-L-

-Y8-

-Y9-

-Y9-

111

122

111

111

111

111

111

64

64

64

ALT

64

ALT

111

111

111

111

111

SP

EN

CE

R

DR

WILSON ST.

WILSON ST

LEIGH’S CT

TANNER CT

ZA

CH

AR

Y

LN

CO

MM

ER

CE

CE

NT

ER

DR.

WILSON ST

WILSON ST

WILSON ST

SI

MPS

ON

DR

WILSON ST PRESTON DR

Mc

MI

LL

AN

DR

BE

NS

ON

DR.

BA

RL

OW

RD.

SR 1351

WES

TE

RN

BL

VD

WES

TE

RN

BL

VD

WILSON ST

WILSON ST

WILSON ST

-L- STA. 133+98.83

END STATE PROJECT U-4424

-L- STA. 13+90.00

BEGIN STATE PROJECT U-4424

12’

12’

12’

18’

18’

12’

12’

12’

18’

18’

12’

12’

12’

18’

18’

12’

12’

12’

18’

18’

12’

12’

12’

18’

18’

12’

12’

12’

18’

18’

21’15’13’

12’

12’

12’

18’

18’

12’

12’

12’

18’

18’

12’

12’

12’

18’

18’

30’

30’

30’

12’

12’

12’

18’

18’

30’

18’

30’

12’

12’

12’

12’

12’

12’

12’

12’

18’

12’

12’

12’

12’ 24’

45’

27’

36’

74’

WILSON ST

WILSON ST

Mc

NAI

R

RD

SA

RA

LE

E

RD