Tillary and Adams Street Capital Project Update
1September 2011 Presentation to CB2 Transportation Committee
Outline
• Review of Project Background C it P ti i ti P• Community Participation Process
• Conceptual PlansC it l P j t St t• Capital Project Status
2
Tillary and Adams Timeline
1954 Downtown section of Brooklyn-Queens Expressway Opens
Mid 80 B kl B id P d t d d t Till StMid-80s Brooklyn Bridge Promenade extended to Tillary St.
1998 Planted medians and bike lanes installed on Adams St. south of Tillary Stsouth of Tillary St.
2001 Widened medians at Adams St. Intersection2005 Protected Bicycle Lane Implemented between Clinton St.
and Adams Stand Adams St. 2005 Improved pedestrian signal timing at Tillary St. and Adams
St.S f S S2008 Safety Project at Tillary St. and Adams St. eliminated two left-turns
2011 Repaved Adams Street and improved bike lane configuration
3
configuration2011 Pedestrian Countdown Clocks Implemented
Recent ImprovementsPedestrian
Countdown Clocks on Tillary Street
Reconfigured Adams Reconfigured Adams Street bike lane =
fewer cars blocking
4
fewer cars blocking lane
Community Participation
Two Community WorkshopsJanuary 2009
June 2009
5
Workshop #1 – Format
• 56 attendees at St. Francis College – 1/27/09DOT P P i t P t ti• DOT Power Point Presentation• Tillary St/Adams St Background• Capital Reconstruction Process• Capital Reconstruction Process • Examples of Similar Projects
• Small Group Breakout SessionsSmall Group Breakout Sessions• Existing conditions maps available • Identified issues and suggestionsgg• Presented discussion results to large group
6
Workshop #1 – Issues Identified
Parking in Bicycle Lanes Pedestrian Safety“Highway” Design Creates Barrier
7
Permit Parking Long CrossingsCyclist Safety
Workshop #1 – Suggestions
Eliminate or Reduce Size of Adams Widen Existing Medians for Pedestrian and
Bike Use and LandscapingSt Service Roads
Add 2nd Southbound Left Turn Lane at Tillary/Adams
Add Neckdownsat a y/ da s
134’
Enhance/Expand Tillary
134’134
126’Bike Lanes Reduce Number of Vehicle Lanes on
Tillary Street Shortening Crosswalks
8
Workshop #2 – Format
• 35 attendees at Borough Hall – 6/23/09D ft C t l D i P t d b DOT• Draft Conceptual Design Presented by DOT
• Questions and Answers SessionI f l R i /Di i f C t l Pl• Informal Review/Discussion of Conceptual Plans
• Evaluation Forms
9
Workshop #2 – Conceptual Plan
10
Workshop #2 – Conceptual Plan
Existing
Proposedp
11
Workshop #2 Participant EvaluationParticipant Evaluation
Existing“How well does plan address
Proposed
issues identified from workshop #1”
Average Score pIssue 1=Very Well 5=Not well
1.0-1.9
2.0-2.9
3.0-3.9
4.0-5.01.9 2.9 3.9 5.0
“Highway” Design creates barriers XPedestrian Safety XWid R d /L C lk X
1’ 6’ 7’ 7’
Wide Roadway/Long Crosswalks XTurning Conflicts XParking in Bicycle lanes X
12
6’ 1’Cyclist Safety XToo Much Permit Parking X
Workshop #2 Participant EvaluationParticipant Evaluation
Existing“How well does plan address
Proposed
psuggestions made at workshop #1”
Average Score pIssue 1=Very Well 5=Not well
1.0-1.9
2.0-2.9
3.0-3.9
4.0-5.01.9 2.9 3.9 5.0
Widen Existing Medians XEnhance/Expand Protected Bike Paths XN kd X
1’ 6’ 7’ 7’
Neckdowns XAdditional Landscaping XReduce Number of Lanes X
13
6’ 1’Eliminate/Reduce Size of Service Roads XAdd 2nd SB Adams Left-turn Lane X
Workshop #2 Additional FeedbackAdditional Feedback
Existing• Many expressions of support S ti i t d b t t ffi
Proposed
• Some participants concerned about traffic operations/capacity on Adams Street (SB and NB) pNB)
• Many small-scale design suggestions (e.g., bike lane extensions signal timing additionallane extensions, signal timing, additional neckdowns)
1’ 6’ 7’ 7’
14
6’ 1’
Workshop #2 Follow up
• Met with Concord Village Representatives Onsite to discuss specific concernsOnsite to discuss specific concerns• Configuration of service road on Adams Street
northbound • 2-way bicycle path proposed for Tillary Street
between Jay Street and Adams Streetf• Accommodating deliveries of the supermarket at Jay
and Tillary Street
• Refined Conceptual Plans based on Workshop #2 and Site Visit Comments
15
Conceptual Plans Tillary & AdamsTillary & Adams
Existing Proposedosed
16
Conceptual Plans Tillary Street WestTillary Street West
Existing
Proposed
17
Conceptual Plans Tillary - Jay St to Flatbush AveTillary Jay St to Flatbush Ave
Existing
Existing
Proposed
Existing
Proposed
18
Project Implementation FundingFunding
• Additional federal funding securedD i f ll f d d• Design now fully funded
• Construction shortfall remains ($18.6)Ph d t ti h lik l• Phased construction approach likely
19
Project Implementation TimelineTimeline
DDC E ti t d Ti liDDC Estimated Timeline 2012 Preliminary Design 2013 Fi l D i2013 Final Design2014 Construction (Phase 1)
*Phase 2 Construction*Phase 2 Construction dependent upon future funding
20
Tillary and Adams Street Capital Project UpdateCapital Project Update
Q estions and21
Questions and Comments?