Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for...

26
Thursday, Novembe r 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London On behalf of the CALICE-ECAL Collaboration
  • date post

    22-Dec-2015
  • Category

    Documents

  • view

    216
  • download

    1

Transcript of Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for...

Page 1: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1

CALICESummary of 2006 testbeam for the

ECALAnne-Marie MAGNAN

Imperial College London

On behalf of the CALICE-ECAL Collaboration

Page 2: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 2

Content

1. IntroductionBriefly, what does the ECAL look like ??The three 2006 test beam periods and their objectives

2. Data taken> 5 TBytes on disk, 65 million physics events

3. Electron and hadron eventsA few event displays.

4. Noise issuesA perfect detector would be amazing !

5. ConclusionA successful experience

Page 3: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 3

200mm

360mm

360mm

The Electromagnetic Calorimeter prototype

• ECAL prototype:•30 layers of variable thickness of Tungsten•Active silicon layers interleved•Front end chip and readout on PCB board•Signals sent to DAQ

•W layers wrapped in carbon fibre• 3 modules with different tungstene thickness, total = 24 X0.•PCB+Si layers:8.5 mm

62 mm

62

mm

•6x6 1x1cm2 Si pads•Conductively glued to PCB

Active area of 12*18 cm2 now completed for 30 layersLast year : only 14 layers

Last 1/3rd expected in May 2007.

Page 4: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 4

Overall objective of 2006 beam test for ECAL

• Characterize detector performances.• Test and tune the simulation. Once we trust

the simulation optimisation of the ILC detector.

• Identify hardware problems to correct them before building the whole so-called EUDET module.

• Test particle flow algorithms.

Page 5: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 5

2006 beam test periods

Installation @ DESY . First cosmic events in the “tent”.Feb

May DESY TB area, 1-6 GeV electron beams, with only 24 layers .14 days in total.

July 27thAug 8th

ECAL CERN period : cancelled !! No beam, SPS fault, not ours....

AHCAL+TCMT period : transformed into 5 days ECAL+5 days AHCAL stand alone+ 3 days, courtesy of ATLAS, for ECAL stand alone.

Combined ECAL+AHCAL + TCMT , with ECAL-AHCAL @ 6cm

Aug 25thSept 6th

Oct 11thOct 30th

500 pedestal events

Data taking structure:

500 calibration

events

10k beam events500

pedestal events

...etc...

Page 6: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 6

Tracker: 4 drift chambersECAL: 24 layers, 5184 channels

First tests of ECAL-HCAL combined acquisition

DESY TB setup

ECAL at 0° : 3 position pointsAngle scan : 2 position points and angles studied : 10 °, 20°, 30°, 45°

For each point : energy scan with 1, 1.5, 2, 3, 4, 5, 6 GeV

Aiming at 100k events per sample

Page 7: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 7

DESY Data Samples

Shower fully contained

Garbage and empty events

Multi-particle events

Energy (mip) per event

Energy and angle scan completed, with ~200k events or more per point.

Page 8: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 8

CERN installation

Particle ID: Cherenkov counter, 1bit signal Tracker : 3 XY proportional chambers (MWPC) Calorimeters : • ECAL: 30 layers, 6480 channels• HCAL: 15 modules, 3240 channels• TCMT: 8 modules, 160 channels

Page 9: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 9

CERN- August period in figures

+ 30 Millions of Muon events for calibration.

Page 10: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 10

A few hadron runs combined with AHCAL and TCMT

Page 11: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 11

CERN October period

• Add another 27 Million physics events !+ 42M of muons for calibration+ 14M only for HCAL calibration+ 3.5 M of HCAL only runs+ 1.2 M “only” dedicated to beam tuning

• Detail of the 27 M:- Another 3.8 M dedicated to electron studies between

6 and 50 GeV- And 23 M of hadronic events between 6 and 80 GeV

Page 12: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 12

Electron runs

One point overlap with DESY TB at 6 GeV.

Electron combined runs

E (GeV)

e+ (kEvts)

e- (kEvts)

6 208 128

8 218

10 152 172

12 211

15 476 124

16 310

18 303 231

20 390 210

30 409

50 305

Page 13: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 13

Combined pion runs

E (GeV) π+ (kEvts) π- (kEvts)

6 480 1800

8 1800

10 960 1800

12 1600

15 720 1600

18 1700

20 770 1600

30 3300

40 1400

50 1500

80 1800

Hadron runs

With ECAL and HCAL at 6cm from each other this time !

EHCAL vs EECAL (mip)

Page 14: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 14

Summary of events

Size on disk: ~ 40 kB/evt 65M events = 2.5 TB for CERN Physics runs + 70 M = 3 TB for muon calibration runs

August period

October periodSept. break

μ calib. runs

μ calib.

See Roman’s Talkon Wednesday.

Page 15: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 15

Electron showering in the ECAL

Page 16: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 16

An hadronic event

10 GeV pion event, taken Oct 16th 2006

Page 17: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 17

A few problems, “of course”

1. Pedestal instabilities : results in “noisy” layers, with a correlated noise over a whole PCB of up to 50% of a MIP !!! – Not understood yet ! Currently investigating on an

hardware point of view.– A preliminary procedure to correct this effect event by

event is applied in the data reconstruction, but need further studies.

– the pedestals are measured at periods throughout the run so this effect can be tracked.

– This concerns only less than 3 PCBs over 30.

2. “Square events” : appearence of hits around some wafers, in the guard ring zone.

Page 18: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 18

Pedestal instabilities ...

Ex: Muon run (ECAL threshold : 0.5 MIP)Noise

Noise

A Good PCB

A PCB with unstable pedestals

Page 19: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 19

“Square” events ...

Proportion of events concerned :• high energy data (electrons 45 GeV) : ~4%• low energy data (electrons 3 GeV) : < 10-3.

Page 20: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 20

Conclusion

• A successful experience !!• Lots of data taken, stable detector running, people

on-site to solve the problems as soon as they appeared.

• Electron data samples from 1 to 50 GeV ready for analysis.

• Further plans : TB in May-June next year (currently in negotiation with CERN) with possibility to rotate both ECAL and HCAL+TCMT.

• + Fermilab with AHCAL in fall 2007, and DHCAL in winter 07/08.

Page 21: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 21

Thank you for your attention.

Page 22: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 22

CERN installation

Muon 1 Muon 2

400 m

beam

Beam instrumentation:1) ~500 m beam line after Be trg = magnets, collimators, secondary trg, abs2) Cherenkov detector for e/ separation < 40 GeV3) 3 x/y pairs of Multi Wires Proportional Chambers (MWPC) with double readout, multi-hit capability4) veto counter, r/o analog amplitude, to separate multi-particle events5) trigger system 2) 3) 4) 5) are integrated in the DAQ and read out event by event

3x3

10x10 trigger

11000

* all in mm

π event

Page 23: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 23

DESY installation

Page 24: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 24

View of an ECAL board

Page 25: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 25

Beam quality issues @ DESY

Page 26: Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 26

The data taken

CERF period: parasitic muonhigh intensity, wide distribution Very important for calibration !!!

All what was collected in the ECAL run:60 GeV secondary beam, tested e 10-45 GeV and 30-80 GeV.

Combined run, goal: ECAL EM program - e 10-45 GeV, from 50 GeV beam, with 0,10,20,30 deg - small samples of 30-80 GeV too large distance ECAL-AHCAL

AHCAL stand alone, ECAL removed- 1 day @ 10 GeV secondary beam tested / e 6,10,15,20 GeV- 3 days @ 50 GeV secondary beam e 10-45 GeV and p 30-80 GeV

!!! large fraction of time invested in beam tuning !!!

3 additional days “courtesy” of ATLAS: AHCAL and TCMT out of beam line, ECALre-installed for high statistics low energy runs (thanks to all voluntary shifters)

up to 10 million events in one day!