Theory of constraints

47
Welcome Group – Scarlet Group – Scarlet

description

TOC- summary of chapter 5

Transcript of Theory of constraints

Page 1: Theory of constraints

Welcome Group – ScarletGroup – Scarlet

Page 2: Theory of constraints

Group Members

• Sharmin Nahar 14054• Tanha Rashid 14062• Jumi Pal 14082• Shehrin Saleh 14085• Israt Zahan 14151

Page 3: Theory of constraints

THE THEORY OF CONSTRAINTS AND THROUGHPUT ACCOUNTING

Page 4: Theory of constraints

Constraint & its Strategic Implications:

• Constraint: Anything that limits an organization from moving toward or achieving its goal.

Page 5: Theory of constraints

Theory Of Constraint (TOC):

• A systems management philosophy Developed by Eliyahu Goldratt in the mid 1980’s with his business

• novel The Goal.

• Looks at the entire supply chain and synchronizes the chain to• achieve ultimate performance.

• Based on two assumptions: – Every organization has a set of processes working together to achieve

a common goal.– Every process has a [single] constraint that limits it from higher

performance

• Assumes current constraints cannot be changed in the short-run-What should be produced now, with current resources, to maximize

profits?

Page 6: Theory of constraints

Theory Of Constraint (TOC): is a way to manage constrained processes in order to maximize profits by increasing system throughput.

Throughput= Sales Revenue – Direct Materials

Page 7: Theory of constraints

Constraints & Quality, Cost & Time:

Page 8: Theory of constraints

Strategic Position of TOC:

Page 9: Theory of constraints

TOC linkage to product strategy:

• Step 1 :Product strategy defines the market segments The firm will sell in , the specific products to be produced for those markets and the profits expected.

Page 10: Theory of constraints

Product Concept and feasibility:

• Step- 2Translate product and profit plans into specific products concepts. Feasibility is determined by making preliminary estimates of life cycle costs, evaluating required investment in technology, training and estimating capacity needs.

Page 11: Theory of constraints

Product / process design and development:

• Step -3Detailed specifications for manufacturing and assembly are developed at this stage for physical goods.

Page 12: Theory of constraints

Production and logistics:

• Physical process of creating goods and services.

Page 13: Theory of constraints

• TOC at product development stages:Assures that daily activities produce the proper product and services to satisfy customer demand and profitability

• TOC at production stages:Provides information about managing capacity optimally.

Page 14: Theory of constraints

• Assure efficient use of existing capacity.

• Identifies processes that need immediate additional resources.

• Searches areas where customer are waiting ( bottlenecked area)

• Assist efficient production.

Page 15: Theory of constraints

Drums, buffers , ropes:

Page 16: Theory of constraints

Drums:

• Sets the pace of the work of the plant and is particularly useful for downstream operations (operations after the bottleneck) to help anticipate working process inventory output flow from the bottleneck.

Page 17: Theory of constraints

Buffers:

• A minimal of inventory kept in front of bottleneck keeps it running at full capacity.

Page 18: Theory of constraints

ROPES:

• Restraints the upstream operations (operations before the bottleneck) from overloading the bottleneck with too much work in process inventory input flow.

Page 19: Theory of constraints

Bank Load Process

Page 20: Theory of constraints

Production Data:

Work Center

Work description

1Assemble Case

2Insert board

3Insert Cards

4Mount Drives

5Check quality

Minutes per hour 60 60 60 60 60÷12 ÷ 8 ÷ 20 ÷ 16 ÷ 4

5 7.5 3.0 3.75 15 X 8 x 8 x 8 x 8 x 840 60 24 30 120

Minutes per unit

Units per hour

Production hour per day

Maximum Units per day

Page 21: Theory of constraints

TOC Management of Work processes

TOC Based Schedule 1 2 3 4 5

Balanced units per day 24 24 24 24 24

Capacity Used 60% 40% 100% 80% 20%

Work -in- progress inventory 0 3 0 0 0

Page 22: Theory of constraints

Developing a TOC Operation:

• TOC defines profit in terms of throughput. Organization using TOC will do three things to maximize throughput.

1) establish sales price > total variable costs2) focus on providing goods and services that have

the largest difference between totally variable cost and price.

3) minimize the time between spending money to produce and receiving money from selling goods and services.

Page 23: Theory of constraints

The Five-Step TOC Process

• Step 1. Identify the system's constraint(s).• Step 2. Decide how to exploit the system's

constraint(s).• Step 3. Subordinate everything else to the

above decision.• Step 4. Elevate the constraint(s).• Step 5. If a constraint has been broken, go

back to step 1.

Page 24: Theory of constraints
Page 25: Theory of constraints

Constraints

Internal External

MaterialProcess Policy Market

Step-1 Identify the system’s constraints

Page 26: Theory of constraints

Process Constraints

• Occur when a given process or operation in the company has insufficient capacity to fully satisfy market demand.

• Example: Example: the loan officer is physically unable to perform the three steps on all loans requested in the allotted time.

Page 27: Theory of constraints

Policy Constraints:

• Occurs when management or employee unions enforce a rule that limits an organization’s operating abilities or restricts its flexibility.

• Example: Example: bank requires every loan to go through a formal process regardless of size, or nature of customer.

Page 28: Theory of constraints

EXTERNAL:

• Material constraints: occurs when outside source of material becomes restricted.

• ExampleExample: : the bank lacks sufficient load fund to satisfy the number of loans approved.

Page 29: Theory of constraints

• Market constraints:Market demand does not fully utilize a company's capacity to make the product.

• Example: Example: bank customers are not demeaning as many loans as the bank is able and willing to supply.

Page 30: Theory of constraints

Step-2: Decide how to exploit the systems constraints:

• Once a bottleneck is unidentified the organization must effectively maximize the money making capacity of the bottleneck by calculating the throughput yield per unit of constrained resources.

• Example: Example: Officer’s inability to process loan – Accountant could measure the loan revenue potential of each hour spent approving loans.

Page 31: Theory of constraints

Step-3 :Subordinate everything else to the preceding decision:

• Constraints other than exploited constraints are secondary. The goal is to coordinate production efforts at non-bottleneck operations to keep the constraints operating at optimal capacity.

Page 32: Theory of constraints

Step-4: Elevate the constraints:

• Involve offloading some of the processing work to non-bottleneck operation despite their less efficient product capability.

• Example: Example: in the loan approval process assign much of the packet assembly and credit check work to less experienced bankers.

Page 33: Theory of constraints

Step-5 • If a constraint is broken go back to step 1• In this step, the objective is to ensure that the Five Focusing

Steps are not implemented as a one-off improvement project. Instead, they should be implemented as a continuous improvement process.

• If the constraint has been broken (the normal case), recognize that there is a new constraint. Finding and eliminating the new constraint is the new priority (restart at Step One).

• If the constraint has not been broken, recognize that more work is required, and a fresh look needs to be taken, including verifying that the constraint has been correctly identified (restart at Step One).

Page 34: Theory of constraints

The Process in short:

Page 35: Theory of constraints

A comparison of Throughput and traditional accounting systems

Page 36: Theory of constraints

Comparing Three Profit and Loss statement

GAAP Basis CM Basis Throughput Basis

Revenue $500000COGS (120000)

Gross Margin $380000

Selling and Gen. admin expenses (350000)

Operating Income $30000

Revenue $ 500000Variable costs (155000)

Contribution Margin $345000

Fixed Costs (315000)

Operating Income $30000

Revenue $ 500000Direct materials (50000)

Throughput Margin $ 450000

Operating expense (42000)

Operating Income $30000

Page 37: Theory of constraints

Inventory Effects of GAAP versus Throughput Accounting

Assumptions: Sales price is $5,000 per ton; Materials costs are $500 per ton, Conversion costs (labor andmanufacturing overhead are $70,000 per period

GAAP Basis Throughput Basis

Scenario 1:Productionequals sales

Scenario 2:BuildInventory

Scenario 3:ShrinkInventory

Scenario 1:Productionequals sales

Scenario 2:BuildInventory

Scenario 3:ShrinkInventory

Sales 100 tons 100 tons 100 tons 100 tons 100 tons 100 tonsProduction 100 tons 110 tons 90 tons 100 tons 110 tons 90 tonsRevenue $500,000 $500,000 $500,000 $500,000 $500,000 $500,000Expenses: Materials 50,000

a 50,000

a 50,000

a 50,000

b 55,000

c 45,000

d

Conversion 70,000 e

63,636 f

77,778 g

70,000 h

70,000 h

70,000 h

Sell. & Gen. Admin. Exp. 350,000 350,000 350,000 350,000 350,000 350,000 Operating Income $ 30,000 $ 36,364 $ 22,222 $ 30,000 $ 25,000 $ 35,000

Calculations:a 100 tons sold x $500 per ton e

100 tons sold x ($70,000 100 tons produced ) b 100 tons produced x $500 per ton f

100 tons sold x ($70,000 110 tons produced)c

110 tons produced x $500 per ton g 100 tons sold x ($70,000 90 tons produced)

d 90 tons produced x $500 per ton

h Assumed fixed in the short run at $70,000 per period

___________ ___________ ___________ ___________ ___________ ___________

Page 38: Theory of constraints

Attributes of Throughput Accounting:

• Technical Attributes: By enhancing process understanding within

the organization, TOC and throughput accounting provide information that is relevant to making good decisions.

Page 39: Theory of constraints

• Decision RelevanceMuch of the management focus in a TOC operation is on the bottleneck. Because f its central importance to the organization’s capacity to make money, the bottleneck must necessarily receive the lion’s share of management attention.

Managerial accounting plays an important part in the management of bottlenecks by

– improving capacity use – avoiding inventory buildup.

Page 40: Theory of constraints

• Throughput accounting is not a cost system– The full costs of production are not assigned to

products– Does not integrate with the general ledger

• Most organizations need more than one accounting system, some traditional costing System like ABC.

Page 41: Theory of constraints

• Process Understanding :TOC required a through understanding of work processes, the flow of product from one operation to another and capacity & throughput time of each. It provides a financial system wise view of the organization.

Page 42: Theory of constraints

Behavioral Attributes:

• Whenever information systems change and mgt introduces new performance measurement, behaviors are affected.

• Benefits:– Avoids local optimization: encourages cooperation

through the organization to achieve company profit goals instead of rewarding for optimization of individual process.

– Improved Communication between departments

Page 43: Theory of constraints

Cultural Attributes

Creating and receptive culture for TOC: Introducing a new process in an existing

organizational culture is always hard. People have their existing beliefs, values and mindsets. Mgt. should use training, speeches, and internal literature to demonstrate the impact of TOC on a business unit or product line.

Page 44: Theory of constraints

• Mindset change: Making the shift to a TOC based operation often requires that management make significant mindset adjustments. Unlike traditional system, TOC the focus is on producing what customers want instead of the maximum output.

Page 45: Theory of constraints

Assumptions versus The Facts:Prior Assumption Current Fact

Keeping people busy is the key to making money. A focus on labor utilization hinders cash flow due

to high inventory and the emphasis on keeping

people busy.

By keeping utilization high, employees help the

company perform well financially.

High utilization of resources does not correlate to

profitability.

High labor-utilization rates ensure high levels of

customer satisfaction.

High utilization of resources does not necessarily

correlate to high customer satisfaction.

If managers release workers to other areas of the

operation, they may not get them back when they

need them.

Managers will willingly release workers to go

where the work is when right performance

measures are used.

Traditional accounting standards tell managers

whether they are effective as a total enterprise.

Traditional standards are subjective, inaccurate,

and require constant monitoring.

Maximizing the production output per setup and

building inventory is key to making money.

Making only what customers order is the key to

making money, and on-time delivery is the critical

success factor.

Page 46: Theory of constraints

• Creating cross-functional cooperation:• TOC implementation requires cooperation

across functions and processes in an organization.

• Information has to be shared on customers’ want and on the availability of the capacity.

• Teamwork must be the norm. • Everyone must work on elevating the constraint.• Non- constrained operations must subordinate their

needs to needs of the constraint.

Page 47: Theory of constraints

Thank YouThank You