Agenda
• Introduction to Theory of Constraints (TOC)
• 5 Focusing Steps
• Principles of Flow
• Case Studies
![Page 3: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/3.jpg)
3
Theory Of Constraints
1970’s 1980’s 1990’s 2000’s
OPT
Invented by Dr. Eliyahu Goldratt
Aims to continually achieve more of the goal of a system
Derived from the hard sciences (physics)
2010’s
![Page 4: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/4.jpg)
4
Typical Results from TOC Implementations
• DDP 95%+
• 20-50% Capacity exposed
• Lead Time 30+%
• 20-33% Throughput
• 20-50% TAT
• On time Perf. 90+%
• Inventory 20-50%
• Shortages 50+%
• Turn 2x or more
• DDP 99% (44% )
• 25-70% Capacity exposed
• Inventory 49%
• Lead Time 65%
Manufacturing Supply Chain
Engineering, Projects
MRO
Fonte: The World of Theory of Constraints, Vicky Mabin & Steven Balderstone, St. Lucie Press.
![Page 5: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/5.jpg)
5
TOC = FOCUS
Focus
TOC Frameworks
5 Focusing Steps
Root Cause Analysis
Principles of FLOW
“If I’ll need to choose one word to explain what TOC is all about it will be FOCUS.”
Dr. Eli Goldratt
![Page 6: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/6.jpg)
6
Every Organization is a System…
The Organization
Sup
plie
rsC
usto
mers
goodsservices
goodsservices
…. With Dependencies & Variability
What limits the system’s performance relative to its goal?
![Page 7: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/7.jpg)
7
Constraint
The factor that limits a system’s performance relative to its goal.
HOW STRONG IS
THE CHAIN?
![Page 8: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/8.jpg)
8
5 FOCUSING STEPS
![Page 9: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/9.jpg)
9
Identify the constraint
A
B
C
D
E
RM 1
7/hr
10/hr
6/hr
10/hr
9/hr
• What is output of this factory?• Which machine determines the output?
C
![Page 10: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/10.jpg)
10
Exploit the constraint?
A
B
C
D
E
RM 1
7/hr
10/hr
6/hr
10/hr
9/hr
• What happens if the machine C breaks down?
• What happens if some other machine breaks down?
• Where should we test for quality?
• What happens if machine C produces only Red widgets? C
Demand is 24 Red and 24 Blue
![Page 11: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/11.jpg)
11
Exploit the constraint?
A
B
C
D
E
RM 1
7/hr
10/hr
6/hr
10/hr
9/hr
• How do we protect the constraint from disruptions?
• What else can we do to protect output at the constraint?
• What if demand is not fixed at 24 red and 24 blue? What if it is dynamic? C
Demand is 24 Red and24 Blue
![Page 12: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/12.jpg)
12
Subordinate to the Constraint
A
B
C
D
E
RM 1
7/hr
10/hr
6/hr
10/hr
9/hr
• What if E tries to produce 9/hr?
• What if D and B are measured to efficiency?
• How do we stop all other machines from “over” production?
C
Market Demand X Red, Y Blue
![Page 13: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/13.jpg)
13
TOC’s 5 Focusing Steps
1. Identify the constraint
2. Exploit the constraint
3. Subordinate everything else to the constraint
4. Elevate the constraint
5. Go back to Step 1 (don’t allow Inertia to set in)
![Page 14: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/14.jpg)
14
PRINCIPLES OF FLOW
![Page 15: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/15.jpg)
15
TOC for Operations
Improving FLOW is the Primary Goal of Operations
Dr. Goldratt
TOC acknowledges that UNCERTAINTIES & VARIABILITY are intrinsic in all operations
![Page 16: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/16.jpg)
16
Exercise
ABCDEFGHI JKLMNOPQRSTUVWXYZ
1234567891011121314151617181920212223242526
A 1B 2C 3D 4E 5FGHI JKLMNOPQRSTUVWXYZ
67891011121314151617181920212223242526
![Page 17: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/17.jpg)
17
Missed Commitments
(Delays)
Pressure to Release work earlier to meet deadlines
Work piles up & waits for resources
Priority juggling, multitasking,
spreading thin
Tasks take longer, Productivity is low
![Page 18: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/18.jpg)
18
In-Box Prioritized BacklogWIP
Held
Help Needed
Completed
Gary
Rex
Rebecca
Steve
Ryan
Pat
Jeff
Darren
Margaret
STEP 1 STEP 2 STEP 3 STEP 4
Completion and WIP
Full Kit Override
WIP Control
![Page 19: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/19.jpg)
19
![Page 20: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/20.jpg)
20
Setup
Raw Material Supply
Ship to Customers
![Page 21: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/21.jpg)
21
First Day Simulation
Raw Material Supply
Ship to Customers
![Page 22: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/22.jpg)
22
What Day One Looks Like “Real Time”
Raw Material Supply
Ship to Customers
![Page 23: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/23.jpg)
23
Beginning of Day 2
Raw Material Supply
Ship to Customers
![Page 24: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/24.jpg)
24
TOC’s Principles of Flow
• Improving FLOW is a primary objective of operations.
• This primary objective should be translated into a practical mechanism that guides the operation when NOT to produce (i.e. how to maintain Low WIP)
• Local efficiencies must be abolished
• A focusing process to balance flow must be in place
WIP
Thro
ugh
pu
t
![Page 25: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/25.jpg)
25
Backup
![Page 26: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/26.jpg)
26
WIP Control
✓
✓✓✓✓✓
✓
✓
✓
✓
✓
✓
One in
Lead / FK
Manager
WIP Limit = 3Engr
.
WIP Limit = 3Engr
.
WIP Limit = 3Engr
.
One out
![Page 27: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/27.jpg)
27
Bead Simulation
Turn beads flat-
side down
Turn beads flat-
side up
Resource A
Spoon each color
onto separate plateResource B
Resource C
Spoon beads
onto the table
Spoon beads
onto the plate
Resources B & C
Spoon Flip Flip Spoon
Spoon Flip Flip Spoon Resource A
![Page 28: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/28.jpg)
28
Full Kit
• Ensure full preparation of parts, work package, tech. documents, troubleshooting history etc. for the scheduled aircraft
![Page 29: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/29.jpg)
29
Case Study – Delta Air Lines
![Page 30: Theory of Constraints - ndtahq.com](https://reader030.fdocuments.in/reader030/viewer/2022012021/6168a0ccd394e9041f714b83/html5/thumbnails/30.jpg)
30
Challenging Basic Assumptions
The earlier we start, the sooner we will finish
The better the worker/ work center efficiency, the higher the throughput