FIRE-ADAPTED COMMUNITIES LEARNING NETWORK SECOND QUARTER WEBINAR – DEC 13, 2013
Fire Adapted Communities Learning Network
Welcome! Please sign in using the chat box.
Share your name, affiliation and which
pilot community you are working with.
![Page 2: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/2.jpg)
Effective Communications and Partnership Engagement
Agenda
Network Business Update
Learning Topic
Presentation by Georgia partners
Presentation by Minnesota partners
Presentation by Lake Tahoe partners
Presentation by Colorado partners
Discussion about Communications and Partnership
Engagement will all webinar participants
![Page 3: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/3.jpg)
Update on FAC Network Project Developments
Learning and Sharing Plans
Communications Materials
Technical Briefs/Quick Guides
Community Assessment Tool
![Page 4: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/4.jpg)
Upcoming FAC Net Activities
Important dates:
December 31st mid-term project period ends
January 15th mid-term reports due (we will also handle any work plan
adjustments as part of the mid-term reporting process)
March 14th third quarter webinar – Learning Topic TBD…
June 2nd-6th Annual Meeting proposed dates. We’re working on securing a
location in Colorado. We’ll make more information about this available asap
June 13th fourth quarter webinar – Learning Topic TBD. Year 1 final reports
due
June 30th issue 2nd year awards based on negotiated proposals
![Page 5: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/5.jpg)
Questions?
![Page 6: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/6.jpg)
Chestatee-Chattahoochee RC&D Council
Towns County, Georgia Fire Adapted Communities Learning Network Pilot
Project-2013
![Page 7: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/7.jpg)
Lake Chatuge, Towns County Georgia
![Page 8: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/8.jpg)
Those we’ve engaged with:
Towns County Fire Rescue
Towns County Fire Corps (Volunteer organization)
Towns County Sole County Commissioner
Towns County Sheriffs Department
Towns County Planning
Towns County EMA
Towns County School Superintendent/School System
Towns County County-wide Homeowners Association
Georgia Forestry Commission
USDA Forest Service-Chattahoochee-Oconee National Forests
The Nature Conservancy
Southern Governors Association
Georgia State Fire Marshal
Blue Ridge Mountain Electric Membership Corporation
Young Harris College
Local Libraries (2)
Firewise Communities (6 exist-5 more coming on board)
Various NE Georgia County Commissioners
![Page 9: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/9.jpg)
Special events/meetings:
Eleven FAC meetings with collaborators to educate/plan activities-May-September
RC&D-Presentations to 13 individual County Commissioner(s) meetings-July-October
Collaborators-Georgia Mountain Fair-August
RC&D-Wildfire Safe, Sound, & Code Smart Conference-October
Collaborators-Firewise Communities Program Week-November
Collaborators-Various civic organizations presentations-November
RC&D-Georgia Mountains Regional Commission presentation-November
Collaborators-Development and formation of Citizens Coalition meeting-December
IAFC public service announcement filming in Hiawassee-December
![Page 10: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/10.jpg)
http://townscountyfireprevention.wordpress.com/
Towns County FAC Website-designed by the Georgia Forestry Commission
![Page 11: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/11.jpg)
Towns County Commissioner signs Firewise Communities Program Proclamation for the week of November 3rd-9th, 2013
![Page 12: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/12.jpg)
Examples of electronic sign usage
![Page 13: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/13.jpg)
1-Courthouse display with materials 2-Ingle’s Market event 3-Fieldstone Theater advertisement
1 2
3
![Page 14: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/14.jpg)
Towns County Middle School Ag Class “Good Fire and Bad Fire”
![Page 15: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/15.jpg)
Firewise Day Events-”Chipper Days” using Secure Rural Schools Title III funds-3 accomplished this week
![Page 16: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/16.jpg)
Fire Learning Network involvement with The Nature Conservancy
This pilot project will be included as a goal for the expansion of the Southern Blue Ridge Fire Learning Network in the Southern Appalachians
![Page 17: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/17.jpg)
What’s next?
• Citizens Coalition involvement
• Move forward with projects related to elements
• First quarter 2014-present to another location
![Page 18: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/18.jpg)
Major learning event: Attended Minnesota-statewide Firewise meeting in early-October (first of it’s kind for the state and result of long-time leadership vision) Results: -Identified need to develop case studies to “tell the story” about what is working/needed with FAC/Firewise in the state (celebrate successes, influence others, build momentum, etc) -Identified opportunities to address needs & opportunities in Ely with specific activities:
- Explore local leadership potential to adapt county-CWPP to community
- Collaborate with Red Cross on training - Host panel presentation about FAC for
2014 Regenerate Ely Speaker Series - Investigate barriers to successful
recruitment of Level 2 assessors, follow-up opportunities, motivational activities
Great Lakes FAC Hub - Effective Communications and Partnership Engagement
![Page 19: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/19.jpg)
FIRE ADAPTED
COMMUNITIES
LAKE TAHOE BASIN
![Page 20: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/20.jpg)
![Page 21: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/21.jpg)
•Neighbors for Defensible Space •Block Parties •Built grassroots support for a prescribed fire program
1989
![Page 22: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/22.jpg)
•First prescribed fire in district
1995
![Page 23: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/23.jpg)
•Angora Fire •3000 acres •250 homes destroyed •$160 Million costs
•Governors’ Blue Ribbon Commission
2007
![Page 24: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/24.jpg)
•$5 Million in federal funding
2008
![Page 25: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/25.jpg)
2008
TAHOE
FIRE &
FUELS
TEAM
![Page 26: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/26.jpg)
Operations Finance Planning
2008
![Page 27: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/27.jpg)
SUMMER 2011
![Page 28: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/28.jpg)
•NVFSC federal funding •$15 Million since 2008 •$6 Million in reserves
SUMMER 2011
![Page 29: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/29.jpg)
•Nevada Fire Safe Council: •60 Tahoe Fire Safe Chapters •Over 3000 members •Defensible space rebates •Annual conferences
SUMMER 2011
![Page 30: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/30.jpg)
SUMMER 2011
•Multimedia ad campaigns •Mailers •Newspapers •TV and Radio Spots •Social Media •Op-eds
![Page 31: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/31.jpg)
SUMMER 2011
Defensible Space and Fuels Treatment Databases
![Page 32: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/32.jpg)
•Basin Fire Districts: •Five 20-person hand crews •2 chipping crews •4 foresters •Over 120 full-time personnel supported by NVFSC grant funding
SUMMER 2011
![Page 33: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/33.jpg)
SUMMER 2011
Year 1 (08) year 2 (09) Year 3 (10) Year 4 (11)
Target Acres 1315 1755 2750 3225
Acres Treated 1585 2963 4126 4679
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
Cu
mu
latu
ve A
cre
s Tr
eat
ed
Fuels Reduction Treatments
2008 2009 2010 2011
Total 5413 10038 14035 18164
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
Defensible Space Inspections
![Page 34: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/34.jpg)
SUMMER 2011
![Page 35: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/35.jpg)
BLM Tahoe Grants USFS Tahoe Grants
$8,000,000 $5,000,000
BLM Nevada Grants
$1,000,000
-$500,000 -$500,000
Indirect Costs
-$1,500,000 -$1,000,000
![Page 36: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/36.jpg)
•NVFSC declares bankruptcy
•$2.5 Million owed
•Zero assets
2012
![Page 37: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/37.jpg)
•Lost trust from residents •Chapter leaders without support •Fire districts without funding •Strained communication with federal agencies
2012
![Page 38: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/38.jpg)
•Re-engaging the public: •Block Parties •Community Work Days •Community Forestry Guides
2013 AND BEYOND
![Page 39: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/39.jpg)
•Maintaining Tahoe Fire & Fuels Team Structure •Preparing for new funding opportunities •Minimizing financial risk from grants
2013 AND BEYOND
“There are risks and costs to action. But they are far
less than the long range risks of comfortable inaction.”
-John F. Kennedy
![Page 40: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/40.jpg)
Strategies, Successes and Challenges
Front Range Fire Adapted Communities
![Page 41: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/41.jpg)
Different ways to tell the story - Photo Series, Picto Charts,
![Page 42: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/42.jpg)
STUDIO M – METRO STATE UNIVERSITY
![Page 43: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/43.jpg)
Innovation in Engagement
K-12
Neighbors
Fire Professionals
Local Businesses (Restaurants, Equipment Rental Shops)
Local Professionals (Architects, Landscapers)
Training Workshops
On-Site Customer
Workshops
Round Tables
Kick-Off Event NFPA
Community Day of Service
Coupons Fuels Mitigation
Kits
Saw Crews
Neighborhood Work Days
Education Scouts, Honor
Society, Service Projects
![Page 44: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/44.jpg)
Explaining the Risk and Expanding the Impact
![Page 45: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/45.jpg)
Governmental Immunity, Liability and the Use of Rx fire in Colorado
Colorado's government would no longer have immunity from lawsuits over prescribed fires that get out of control under the terms of an agreement state leaders announced - www.denverpost.com
![Page 46: The Watershed Research and Training Center · 2017-03-15 · Upcoming FAC Net Activities Important dates: December 31st mid-term project period ends January 15th mid-term reports](https://reader034.fdocuments.in/reader034/viewer/2022050501/5f93cd492290ec413f03ca3d/html5/thumbnails/46.jpg)
Next steps
FRFAC Kick Off Event – March 1, 2014 Day of Service Event – May 3 2014
Continue Fighting the Good Fight!