The Turkish government’s continuing nuclear ambitions after Fukushima.

21
The Turkish government’s continuing nuclear ambitions after Fukushima. Alidost Numan- Green Party, Turkey

description

The Turkish government’s continuing nuclear ambitions after Fukushima. Alidost Numan- Green Party, Turkey. Akkuyu. The Akkuyu Aggreement. Interstate agreement between Turkey and Russia, outside the durisdiction of national law: First of its kind in the world. - PowerPoint PPT Presentation

Transcript of The Turkish government’s continuing nuclear ambitions after Fukushima.

Page 1: The Turkish government’s continuing nuclear ambitions  after Fukushima.

The Turkish government’s continuing nuclear ambitions

after Fukushima. Alidost Numan- Green Party, Turkey

Page 2: The Turkish government’s continuing nuclear ambitions  after Fukushima.
Page 3: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Akkuyu

Page 4: The Turkish government’s continuing nuclear ambitions  after Fukushima.

The Akkuyu Aggreement• Interstate agreement between Turkey

and Russia, outside the durisdiction of national law: First of its kind in the world.

• 4800 MW, 4 nuclear reactors in Akkuyu• Plans to complete in 10 years – 2020 in

operation

• Total cost is 20 million USD, to be reflected to electricity cost

Page 5: The Turkish government’s continuing nuclear ambitions  after Fukushima.

• Will be built by the Russian state nuclear company (100% of investement and shares belong to Russia)

• Purchase guarantee for electricity for 15 years from avg. 12.35 US cent

• 71 billion USD total payment to Russia from Turkey in 15 years

• Nuclear waste and decomissioning is a question

Page 6: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Category 1 Earthquake zone !The Ecemiş Faultline Workshop conducted at Niğde University in May 1998 determined Akkuyu as a Category 1 Earthquake zone. The site-licence given in 1976 presumed the Ecemiş fault was inactive.

Page 7: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Source: Sungut -.C OrgeN*,G ilberKt ELLING*A*t,i llaU LUG*N, uranG 6rqen.ve Erdeniz Özel: NeotectoniSct structura Features in the Alanya- MersinS Shelf

Area (Southern Turkey) Jeofizik 5(1), 1991.

Page 8: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Figure 1. A simplified tectonic setting of the northeastern corner of the East MediterraneanRegion (Cilicia). All active faults shown are left lateral strike slip. Fault linesare simplified from Saroglu et al. (1992). Abbreviations: AB, Adana Basin (stippled);AF, Amanos Fault; AMB, Amik Basin (stippled); DSF, Dead Sea Fault; EAFZ, EastAnatolian Fault Zone; EF, Ecemis¸ Fault; EHF, East Hatay Fault; GFZ, Go¨ksun FaultZone; IB, Iskenderun Bay; KF, Kozan Fault; KT, Kyrenea Thrust (cross-hatched);MAR, Misis-Andirin Mauntain Range (cross-hatched); and YF, Yumurtalik Fault.

Source: Mehmet Ergin, Mustafa Aktar, and Haluk Eyidoğan: "Present-Day Seismicity and Seismotectonics of the Cilician Basin: Eastern Mediterranean Region of Turkey" In:Bulletin of the Seismological Society of America 94(3), 2004. pp. 930–939.

Page 9: The Turkish government’s continuing nuclear ambitions  after Fukushima.

(b) Snapshot of the initial tsunami generated with the parameters given in (a). Letters and numbers refer to geographical locations where macroseismic observations have been partly reported (Guidoboni & Comastri 2005a), and synthetic tsunami mareograms generated at pseudo-tide-gauge locations.Source: S. Yolsal, T. Taymaz and A. C. Yalçiner: "Understanding tsunamis, potential source regions and tsunami-prone mechanisms in the Eastern Mediterranean.“ In Geological Society, London, Special Publications 2007; v. 291; p. 201-230

Page 10: The Turkish government’s continuing nuclear ambitions  after Fukushima.
Page 11: The Turkish government’s continuing nuclear ambitions  after Fukushima.
Page 12: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Sinop• Agreement for talks with Japan signed

in December 2010. Still going on as Fukushima accident is unfolding.

• Again with an inter-state agreement

• 5600MW, € 10b, 2019 some numbers that are being pronounced

• Very close to North Anatolian faultline.

Page 13: The Turkish government’s continuing nuclear ambitions  after Fukushima.

İğneada in Thrace• The government officially announced

that it plans 3 NPPs by 2023

• Thrace is the most likely site for the third plant, because of relatively less earthquake activity.

• Recently statements by beurocrats confirm İğneada on the Black Sea coast as the possible site.

Page 14: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Esspecially, Sinop is close to N. Anatalian faultline

Page 15: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Proposed sites of NPPs in Turkey

Page 16: The Turkish government’s continuing nuclear ambitions  after Fukushima.

19.03.2011, İstiklal Caddesi, İstanbul

Page 17: The Turkish government’s continuing nuclear ambitions  after Fukushima.

4000 people march against nuclear upon Erdoğan’s announcement they will go on with

nuclear plans.

Page 18: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Villagers march to Ankara: 1994

Page 19: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Greenpeace action infront of Energy Ministry 1994

Page 20: The Turkish government’s continuing nuclear ambitions  after Fukushima.

170,000 petitions delivered to parliament. July 2011. 58 activists still at court.

Page 21: The Turkish government’s continuing nuclear ambitions  after Fukushima.

Turkey’s solar potential. Second to Spain in Europe. Yet...