Find out why ISG is the perfect shopfi tter for your store.
The perfect fi t.
Why ISG?
2 3
PeopleThe right people for each
shop fi t page 6
ConsistentDedicated to delivering a high
quality project, every time page 16
ExperienceLarge shopping centres, bespoke joinery
and store-in-store page 12
SustainableRead our 2020
Sustainability Vision page 11
FlexibleWorking to tight deadlines and within
challenging environments page 16
Our global reachUnited Kingdom
BirminghamBradfordBristolCardiffChorleyExeterGlasgowHuntingdonIpswich
LeedsLiverpoolLondonManchesterReadingWhitstableAustria
Belgium
Czech Republic
Denmark
Finland
France
Germany
Holland
Italy
Luxembourg
Spain
Sweden
Switzerland
Russia
Thailand
Australia
China
BeijingShanghaiHong Kong
Japan
Malaysia
Macau
Singapore
South Korea
Qatar
UAE
Abu DhabiDubaiSouth Africa
Brazil
ISG has an extensive
international offi ce network
delivering fi t out, construction,
engineering services and a
range of specialist solutions,
delivered by local people and
supply chains.
4 5
We pick the best
people to deliver
your shop.
Our people are focused, consistent and dedicated to every shop fi t – no matter the size or sector. Communication is key, we work closely with our customers to deliver the quality of work they expect. Named as the UK’s number one shopfi tter, we combine our experience with our global reach of suppliers, and we are confi dent in the quality of work we deliver – every time.
People
isgplc.com/retail
6
7
“I have known ISG and ISG’s business for
over 15 years so they weren’t new to me.
For me it was a no brainer to use them.”
Ray Clacher, Gieves & Hawkes
Winner of two NAS Design Partnership Awards 2015 –
“Best in Retail” & “Best British Heritage Building”.
7
“ISG went over and beyond what they
needed to do. From beginning to end, they
have been vital in making the store what it is
today, so we are very happy. ISG has one of
the best group of guys I have worked with in
15 years – I am very impressed.”
Peter Bracken CEO, The Toy Store
9
John Lewis, Birmingham
Selfridges, Birmingham Brent Cross Shopping Centre, London
Watches of Switzerland,Oxford StISG joinery facility, Whitstable
8
ISG is committed
to being a
sustainable
business.
Our 2020 Sustainability Vision has been produced to provide ISG with an ambitious sustainability strategy for the years leading up to and including 2020. It covers a wide range of environmental, social and economic issues including our business, stakeholders, resources and communities.
Sustainable
10
Open doors weekend
ISG Academy
University recruitment day
Fundraising for CARE
Joinery apprenticeships
Women in construction event
isgplc.com/retail
10 11
High Street
Please click on each title for specifi c examples of our work.
Luxury
Shopping Centres
Store-in-store
Supermarkets
Banking
Department Stores
Aviation
Experience
13
AsdaGieves & HawkesHackett LondonHalfordsHammersonHome Retail GroupHouse of FraserJD SportsJohn LewisLloydsLongchampLouis VuittonMarks & Spencer
MorrisonsNikePaul SmithQelaRBSSainsbury’sSelfridgesTescoThe Toy StoreTSBUniqloWaitroseWatches of Switzerland
Our customers include:
ISG has been at the top of the Retail Week Shopfi tter’s League table for three years in a row. ISG works with many high-profi le retailers, some of which wish to remain anonymous. The above represents a sample of our customer base.
isgplc.com/retail
12 13
High StreetGieves & Hawkes*Hackett London*HalfordsMonsoonPost Offi ce
PrimarkUniqloThe Toy StoreVictoria’s SecretWatches of Switzerland
Our customers include:
“ISG went over and beyond what they needed to do to make sure the job was fi nished on time. From beginning to end, they have been vital in making the store what it is today, so we are very happy.”Peter Bracken, The Toy Store CEO
The Toy Store, Oxford Street
*printed case studies available
The Toy Store
The Toy Store selected ISG to deliver its
very fi rst store in the UK. The company’s
headquarters, based in Dubai, will use the
new Oxford Street-based fl agship as a
vehicle to expand into Europe.
On-site building began in May, and completed in September, ready for the shop’s opening. The work included fi tting the shop’s 27,000 sq ft ground and fi rst fl oor with all core and non-core fi xtures and fi ttings. The team adapted to unexpected requirements such as re-designing a sweet store written into the brief at the last minute.
Adding value
The ISG team used its building expertise to assist the architects in creating workable designs when the originals did not suit the space. Due to the central location of the store, the team had to overcome delivery restrictions. In line with ISG’s sustainability values, we designated a waste removal carrier which also facilitated segregation for recycling.
Clear communication
Collaborative planning sessions were held with sub contractors and suppliers at pre-development stages, while weekly meetings were held with central management throughout. Maintaining a transparent relationship ensured that all parties were involved in each stage of development, allowing ISG to meet the customer’s high expectations.
For more case studies visit isgplc.com/highstreet
Customer
Toy Store
Value
£3.6m
Programme duration
16 weeks
Completion date
September 2015
approach design planning waste disposal
Collaborative Flexible Sustainable
Start on site
May 2015
Core and non-core
fi xtures and fi ttings
Creating new designs
with the architects
Opening the store
to deadline
September 2015
NEW
ENTRANT
TO UK
MARKET
SupermarketsAsdaMarks & SpencerMorrisonsTesco
Sainsbury’sWaitrose
Our customers include:
Sainsbury’s, Thanet
Sainsbury’s Thanet
ISG was awarded the 75,000 sq ft
Sainsbury’s store in Thanet. This was
the fi rst Sainsbury’s scheme to trial the
effectiveness of a comprehensive Building
Information Modelling (BIM) process.
BIM is a process involving the generation and management of digital representations of physical and functional characteristics of buildings.
Adding value
This project was split into two phases. Phase one was completed in 32 weeks, in time for the store’s fi rst launch in November 2014. This included the new-build on stilts with car parking for 780 cars and provisions for petrol fi lling stations. This required ISG to establish a benefi t from the use of BIM. ISG and Sainsbury’s worked together to identify its BIM needs going forward and the data it would require in the system. The in-depth analysis enabled ISG to tailor the programme to suit Sainsbury’s long-term.
Clear communication
Phase two was completed within 20 weeks. This included the demolition of the existing store and ground remediation in preparation for the further retail development. ISG overcame the challenge of fi nding affordable waste removal by working with authorities to establish a solution which saved the customer substantial project costs.
Both phases include the new highway construction under s278 & s38 agreements. The team overcame the challenges posed by the fast-track delivery programme and project costs.
For more case studies visit isgplc.com/supermarkets
Customer
Sainsbury’s Stores Ltd
Programme duration
52 weeks
Completion date
April 2015
Sainsbury’s scheme to trial BIM
fast-track delivery programme
waste & contamination disposal
First Reliable Effi cient
Start on site
March 2014
Phase one completed
in 32 weeks
Phase two completed
in 20 weeks
Managed cost
challenges
Opening the store
to deadline
November 2014
“ISG has continuously proven their ability to be a competent and well organised principal contractor.”Keith Philpott CDMC L&M
ShoppingCentres
West QuayBrent CrossQueensgateYate RiversideTunsgate
Our customers include:
West Quay Shopping Centre, Southampton
Brent Cross
In early 2013, ISG was awarded the £7.2m
fi t out project to deliver the West Court
extension in Brent Cross Shopping Centre,
London. The work was carried out during
opening hours, without interruption to
shoppers.
Over the course of 65 weeks, this project was split into multiple tasks including the replacement of the skylight, the creation of two large shopping units (internal and external) and future proofi ng the construction works for later plans to deliver a ten screen cinema.
Working in a live environment
Before the works could begin the existing steel structure of the glass atrium had to be removed, which ISG enacted using the largest tower crane in London. The customer was also anxious not to disrupt its customers and avoid platforms that rested on the central fl oor space, so ISG installed and continually re-designed suspended crash decks throughout the project.
The existing West Court skylight was then reconfi gured at a high level, and impressed with new lighting, a smoke curtain and vent systems for a Life Safety system. Following this, ISG demolished and amalgamated fi ve units to create one large one for a new tenant – this required a new steel work mezzanine and skylights to be installed. Finally, we built an external standalone unit for Regis hairdressers by entrance six. This formed part of the future proofi ng works that consisted of 30m deep, 750 sleeved piles with a 1000m concrete slab which would later facilitate a ten screen cinema.
For more case studies visit isgplc.com/shoppingcentres
Customer
Hammersons
Value
£7.2m
Programme duration
65 weeks
Completion date
November 2014
at project completion
suspended crash deck solution
by recycling 90% of materials
Zero defects Innovative Sustainable
Start on site
August 2013
Existing steel
structure removed
Skylights reconfi gured
and installed
Regis Hairdresser
unit built outside
Opening the centre
to deadline
November 2014
“The ISG team has approached all the challenges of fi tting out the full line department store with passion, creativity and a commitment to excellence.”Jamie Strathearn Construction Programme Manager,
John Lewis Partnership Property Services
Department Stores
FenwickHouse of FraserJohn LewisMarks & SpencerSelfridges
Our customers include:
John Lewis, Birmingham New Street
John Lewis
In 2015, ISG delivered the fi t out of John
Lewis’ new store above Birmingham New
Street – one of the Partnership’s largest
stores outside of London.
As part of the development of Birmingham New Street, the busiest train station outside of London, ISG fi tted out four fl oors from a developer shell to a high specifi cation retail environment over a fast-track programme of 33 weeks.
The team began by building the raised access fl oor on the ground level, before adding ceramic tiles to all other fl oors, installing new lifts, and forming an enclosure around the escalators and atrium. To fi nish, advanced LED lighting and sprinkler systems were incorporated, before the fi nal fi t out fi nishes were delivered.
Challenging logistics
The project was logistically very challenging to enact, with restricted access for deliveries, and a very public location with heavy footfall near the station. However, ISG created a bespoke delivery process with an off-site holding area for materials to be kept until they were needed on site; the team also created a complex programme plan for completing the fl oor screed within the allotted time frame.
Both John Lewis and ISG had rigorous sustainability objectives, which were adhered to throughout the project. The store was successfully opened in September 2015.
For more case studies visit isgplc.com/departmentstore
Customer
John Lewis
Value
£15.5m
Programme duration
33 weeks
Completion date
September 2015
fast-track delivery programme
delivery process created
minimal carbon emissions
Reliable Bespoke Sustainable
Start on site
January 2014
Built raise-access fl oors
on level one
Enclosure built around
staircase & escalators
Fit out fi nishes
delivered
Opening the store
to deadline
September 2015
Luxury RetailA. Lange & SöhneArmaniBillionnaireLe Bon MarchéLouis Vuitton
Hugo BossPiagetPaul SmithLongchampTod’s
Our customers include:
Louis Vuitton, Kuala Lumpur
Louis Vuitton
ISG was awarded the refurbishment
and expansion project of Louis Vuitton’s
two-storey fl agship store in Kuala
Lumpur.
Situated in the Starhill Gallery, a luxury mall based in the Bukit Bintang shopping district, this store was a key piece of the brand’s portfolio and its footprint needed to increase from 6,000 sq ft to 15,000 sq ft.
Delivered in three main phases to achieve Absolute Completion, we engaged in signifi cant coordination with the millwork contractor, Redwood, and the façade contractor, MBM, from the start. By working sequentially across the store and in coordination with the direct specialist contractors, we achieved all targeted completion dates and ensured the timely opening of the store to positive acclaim.
With a street frontage of 46m and a location immediately adjacent to the Marriott Hotel’s main entrance, logistics and minimising disruption to the local area was paramount to our store delivery being deemed successful. Through close coordination, we managed to complete the store’s impressive expansion with little interruption to adjacent retail and hotel operations.
The store was delivered to a supreme luxury standard, to the delight of the customer and its discerning clients. The work was started in June 2013 and the store was successfully opened in December 2013.
For more case studies visit isgplc.com/luxuryretail
Customer
Louis Vuitton
Value
$1.2m
Programme duration
22 weeks
Completion date
December 2013
with all contractors from the start
by achieving all targeted completion dates
luxury standard achieved
Coordination Consistent Supreme
BankingHSBCLloydsTSB
NationwideRBSWilliams and Glynn
Our customers include:
Banking
ISG is proud to be an approved contractor
for six major high street fi nancial institutions in
the UK. Our appointment to carry out award
winning renovations is through frameworks
and our relationships date back in excess of
15 years. Projects have varied from full offi ce
and branch fi t outs, to installing ATM solutions
and replacing shop fronts.
Award-winning
ISG provides bespoke resources and supply partners to transform our customer’s estate with a consistent brand and image. Works are often completed out of hours to avoid operational impact to the customer. Our team takes a collaborative approach by conducting meticulous planning with multiple stakeholders including security, IT, local planning and consultants. ISG’s approach ensures full preparation for the project delivery, including planning, consultation and implementation.
In 2015 our team received 12 Client-People awards for outstanding behaviour, good practice and customer relations. ISG also received an RoSPA and GOLD CCS award for a branch refurbishment in Chelmsford. The awards recognised considerate construction, safety and occupational health in the workplace.
Adding value
Our offer is diverse. In addition to supporting the branches, we work in back offi ces and data centres providing engineering solutions and resilience support. Furthermore, our ATM solution team has a high success rate, providing skilled teams across the country.
For more case studies visit isgplc.com/banking
Expertise
Design guide standards
Global engineering guide standards
Responsible, accountable, consulted, informed
Key Events Schedule
KPI and benchmarking targets
UK National coverage
Rapid speed to market
Promote performance targets
with 95% of customers satisfi ed
approach to working
approach to deliveryQuality Collaborative Flexible
Store-in-storeBelstaffHabitatHackett London
Home Retail GroupHugo Boss
Our customers include:
“I just wanted to express my appreciation with the snag free handover today at Salisbury. Thanks for all your hard work.”Piers Hunter, PM of Home Retail Group
Habitat, Newcastle-under-Lyme
Home Retail Group
ISG was awarded fi t out projects
for Argos stores across the UK,
by parent company Home Retail
Group.
The projects were initiated as Home Retail Group increased its market presence by building a series of Argos concessions within existing Homebase stores. In addition to the completion of 20 Argos concessions, the ISG team was selected to fi t out Habitat mini-stores simultaneously, all of which were situated within existing Homebase stores.
The team completed all Argos concession builds, and fi nished the Habitat programme at the end of October – the last in the seven-month programme.
Adding value
At each location, the team worked in both a live environment and out of hours, in order to minimise the impact on customers. ISG delivered each programme within two weeks. Meticulous planning, streamlining all direct processes and close liaison with Homebase stores was central to the projects’ successes.
Innovative design
The new look digital Argos stores include concept browser tables and tablet terminals. Their digital concessions can now be found nationwide. Meanwhile, Habitat’s mini-stores refreshed the brand and increased its visibility in the retail market place.
For more case studies visit isgplc.com/storeinstore
Customer
Home Retail Group
Value
£2.5m
Programme duration
7 months
Completion date
March 2015
delivery of 33 projects
fast-track delivery programme
in working in live environments
Successful Reliable Experienced
Start on site
February 2015
Planning with all
Homebase outlets
Fitting stores in a
live environment
Stores ready to
open to deadline
Opening the stores
to deadline
On-going
Hackett London, Regent St
Selfridges, Birmingham
Gieves & Hawkes, Savile Row
International Services Lounge, Selfridges, Oxford Street
Lloyds, Ilford
15
“ISG communicated exceptionally
well throughout this project and
delivered a world-class lounge for
our customers.”
Allie Stenson Project Manager, International Services Lounge, Selfridges, Oxford Street
14 15
We are fl exible
and consistent in
all our projects.
Our vast experience allows us to intelligently plan around tight deadlines and restricted environments to deliver your shop to a high standard.
Flexible “The ISG team has approached all
the challenges of fi tting out the full
line department store with passion,
creativity and a commitment to
excellence.”
Jamie Strathearn Construction Programme Manager, John Lewis Partnership Property Services