Partners of the green deal for civil engineering
Creating impact in infrastructure
Gijs Termeer
Policy framework
• Policy Goals in the Netherlands – 49% CO2-reduction in 2030, The Netherlands climate
neutral in 2050– Reduce use of primary materials by 50% in 2030, The
Netherlands circular in 2050
• Infrastructure in the Netherlands– Around 13 billion spend annually– Almost all by public authorities (local and national,
semi-public authorities) great potential for green public procurement
Infrastructure
CO2-eq in infrastructure sector
Proportion asphalt, concrete and steel in infrastructuresector (kton)
Asphalt
Concrete
Steel
Use of machines on the constructionsite
Transport on land and water
Transport on land Transport on water
Circularity = Business as usual
Niels van Amstel, sr. Projectmanager Megaborn
The Approach SCE
Vision: It is essential to optimize the use of our‘resources’ (o.a. money, energie, materials) andto organize our processes in that way, that we and our next generations get the best thinkable solution in the environmentalprojects.
Sustainable Civil Engineering
12 theme’s
Several
stakeholders
(intern and extern)Knowledge
and innovation
PPP with focus
The Approach SCE
Principles
– Think in PPP (12 themes), ambitions and stakeholders
– Focus in Project, identify opportunities
– Activate stakeholders
– 6 standard steps and joint instruments for clearcommunication
The sooner, the better
Sustainable Civil
Engineering
Think and act integral
Traditional
projectprocess
By arranging ‘room’ for opportunities
Every project, large and small
With focus and promising effect
EffectCO2-reduction, environment, circularity
ReachableFinancial, technical, social
Promising measures
Six steps in every projectfase
1. Analysis the needs and real ambitions
2. Investigate the opportunities
3. Capture and express max. sustainability ambitions
4. Translation into measures and design
5. Weigh measures and effect
6. Communicate the effect
1 – 3: oriëntation, what’s important
4 – 6: specify, who and what is needed
Four instruments for support
Context appraiser Ambitionweb
What’s thecontext of a
project? Who is needed
What are theambitions
and chancesin the
project? Whocan help?
How sustainable
is thesolution?
How do we realize
maximaleffect?
Why and what’s the best scope?
Profit Planet
People
What is your min-max ambition
Max ambition
Minimal specificationOffered by contractor
First profit: clever design
Wat is DuboCalc?Measuring environmental costs
In design and contracting
With people who are willing
CO2 Performance Ladder
• Helps organizations to structurally reduce their carbon emissions
• Certified organizations receive an award advantage during tenders
• The system is used as both a CO2management system as well as sustainable procurement instrument.
• 5 levels
Better preperation, better projects
1. Prepare well and preset the opportunities
2. Communicate the ambitions
3. Create ‘space’ for utilisation of opportunities
4. Communicate well and control the risc’s
5. High award (> 70-30) sustainability - price
6. Support innovation
Effect: 20% reduction costs, 30% reduction CO2, ….
Easily, so don’t wait, start tomorrow
Practice what you preach
Meinke Schouten
Dutch Water Authorities
Climate adaptation and climate mitigation
- 100% energy neutral in 2025
- 100% circular in 2050
- Climate adaptation
Energy from sewage water
Green deal for sustainable civil engineering
• Helps to apply sustainibility goals on allactivities
• Structures sustainability goals
• Fills in the blank spots
Circularity in practice
Madeleine Schenk
Introduction
How does the market receive the sustainability question?
How does the market (contractors) deal with circularity?
✓ Incentive through contracts
✓ Reward on EMVI
✓ Efficient working is based on re-use
✓ Circular thinking is to understand how to make
Work with work
Sustainibility & circularity in the sector
✓ Optimization design (technology / space / materials / transport)
✓ Involvement and cooperation client-contractor(solution, quality, safety, legislation)
✓ Use of equipment (hybride, bulk transport, ship vs truck)
✓ Planning the work (efficiency, first time right, logistics)
✓ Implementation of the scope (legislation, permits and regulations)
Project targets for CO2 reduction
Heesselt floodplains
More and more often the river Waal has to deal with high water levels, increasing the risk of flooding. The restructuring of the Heesselt floodplains should improve water safety levels in the area and allow the Waal to get rid of its water more easily in 2019.
Project characteristics•Moving of 2.1 million cubic metres of soil.•Working with many different soil types and qualities in several locations at once.•Smart preparations: permit applications were submitted for each individual measure.
Heesselt floodplains
✓ Use of large road plates (steel highway)
✓ Reuse of material (1.2 million m3 of soil)
✓ Use of hybrid machines (cranes)
✓ Use of bulk transport (big ships/ trucks)
✓ Use of loading bridge and split barges
✓ Efficient logistics (first time right principal)
✓ Optimization design (less clay application)
Measures Heesselt Floodplains
Result: 10% CO2 Reduction
Use of large road plates (steel highway)
Result: 40% Reduction of Transport (by ship) /
less Pressure and use of original soil and minerals
Reuse of material (1.2 million m3 of soil)
Result: 30% Reduction of fuel per crane
Use of hybrid machines (cranes)
Use of bulk transport
Result: Reduction of transport
Use of loading bridge and split barges
Result: Less use of cranes and ships (fuel)
Result: Less failure costs (CO2 Emissions)
Efficient logistics (first time right principle)
Optimization design (less clay application)
Result: 50% Reduction of necessary claybecause of using higher quality
How can you stimulate a contractor to work to
sustainable results?
✓ Per measure on CO2 or MKI
✓ LCA improve thinking (fewer materials)
✓ Reward if realized more than expected
✓ Insight in upcoming projects (innovation)
Measure and stimulate
Are we there yet? NO!
Nobody changes just like that!!
This is what we need to do:
✓ Change our revenue model
✓ Be original, start innovation
✓ Combine lifecycles of materials
✓ Work together, get rid of distrust & createopenness
How can we change the future?
Their future is in our hands