Problems

• Data are stored in different databases, technologies, terminologies

• How to retrieve data?

✘Build many retrieval systems

➡difficult maintenance, hard to find the correct system

✘Build a single, big, complex system

➡Hard to meet the requirements of the whole collaboration

➡Management is centralized in a developer or team

• Experiment should last 20+ years, and has a high turnover

• Need for maintenance and training

Page 3: The Glance Project ATLAS Management January 2012.

Example: Equipments

• Different Attributes for each type of equipment

• E.g. Computers (CPU, MAC Address) and Cables (Length, Connector)

• All equipments must be registered and tracked

• Have a single model for all the equipments?

• Have multiple systems for viewing the details of each equipment?

Page 4: The Glance Project ATLAS Management January 2012.

The Glance System

• Single platform for generating Search and Insert/Update interfaces

• Can access any database (technology, location, etc)

• Interfaces are described independently of the database technology, in a high level description language (no coding)

• All interfaces managed by a single system → lower maintenance costs

• Collaborators can create their interfaces and share them → decentralized management of data

• Data can be output in multiple ways

• HTML, XML, Excel files, Plots, ROOT Files

Page 5: The Glance Project ATLAS Management January 2012.

Quick creation of a Search Interface

• http://cern.ch/atglance/ on the Use Glance link

Create SI

Page 6: The Glance Project ATLAS Management January 2012.

Fill in DB Credentials

Page 7: The Glance Project ATLAS Management January 2012.

1. Choose Schema

2. Choose Table

Page 8: The Glance Project ATLAS Management January 2012.
Page 9: The Glance Project ATLAS Management January 2012.

Done!(in 10 clicks)

Page 10: The Glance Project ATLAS Management January 2012.
Page 11: The Glance Project ATLAS Management January 2012.

Browse

Browse ExistingInterfaces

Page 12: The Glance Project ATLAS Management January 2012.

Acessing Saved Interfaces

Page 13: The Glance Project ATLAS Management January 2012.

Modifying Existing Interfaces

Page 14: The Glance Project ATLAS Management January 2012.

Parametric Search

Parametric Search

Operators chosen by the type of the

attribute (automatically identified)

Operators chosen by the type of the

attribute (automatically identified)

Page 15: The Glance Project ATLAS Management January 2012.

Multiple Output Formats

Page 16: The Glance Project ATLAS Management January 2012.

Other File FormatsOther File Formats

Multiple Output Formats

XMLRoot Excel

Results in the WEB browser

Results in the WEB browser

PlotsPlots

Page 17: The Glance Project ATLAS Management January 2012.

Simple Customizatio

ns

Advanced Customizatio

ns

Advanced Customizations of the Interface

Page 18: The Glance Project ATLAS Management January 2012.

Advanced Customizations of the Interface

Page 19: The Glance Project ATLAS Management January 2012.

ATLAS Systems built with Glance

ATLASMembers

CERN Users

GlanceGlance

SearchInterfaces

First version of ATLAS Appointment was built in 4

days!

Page 20: The Glance Project ATLAS Management January 2012.
Page 21: The Glance Project ATLAS Management January 2012.
Page 22: The Glance Project ATLAS Management January 2012.
Page 23: The Glance Project ATLAS Management January 2012.

ATLAS Systems built with Glance

• ATLAS Management: 14

• ATLAS Physics Office

• LHCb: 1 (Traceability)

• Membership (under development)

Page 24: The Glance Project ATLAS Management January 2012.

ATLAS Systems built with Glance

• Cable Database: cables and connections

• MTF Database: equipment inventory

• ATLAS Equipment Traceability (*): tracking and radioactivity measurements

• ATLAS DSS Alarm Viewer: Detector Safety System Alarms configurations

• ATLAS Membership (*): management of members, contracts, institutes and authorship status

• ATLAS Appointment: management of member appointments

• ATLAS Analysis Follow-up: manages the process for publications approval

• ATLAS Analysis Confnotes: manages the process for conference notes approval

• ATLAS Speakers: manages nominations of speakers for ATLAS talks

• ATLAS SSC: manages nominations of speakers for sub-committee talks

(*) Also for LHCb

Page 25: The Glance Project ATLAS Management January 2012.

Goals for 2012

• Improved requirements management

• Configurations for interfaces, rules and access

• FAQ and User support

• Glance 2.0 - improved flexibility, security,