The first Floating Wind Turbine in
France (SEM-REV)I. Le Crom, ECN, EERA Deepwind 19/01/2018
FLOATGEN is co-financed by the European Commission’s 7th Framework Programme for Research and Technological Innovation.
![Page 2: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/2.jpg)
Offshore Wind Ressource in France
01/2018Installed Onshore:> 13.7 GW Forecasted Offshore:> 3.1 GW
Fixed offshore wind turbine:> 80 GW over 10 000 km2
Floating wind turbine:> 140 GW over 25 000 km2
France is investing
![Page 3: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/3.jpg)
BFOW: 1st Commercial Farms in France
To help protect your privacy, PowerPoint has blocked automatic download of this picture.
1st Call : commisionningexpected in 2020-2022
2nd Call : commisionningexpected in 2021-2023
496 MW, 8MW-jacket
480 MW, 6MW-monopile
500 MW, 8MW-jacket
450 MW, 6MW-monopile
496 MW, 8MW-?
498 MW, 6MW-GBF
Perspective: 15GW in 2030
![Page 4: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/4.jpg)
Groix
4 x 6.15 MW
4 x 6 MW
4 x 6 MW
3 x 8 MW
FOW: 1st pre-Commercial Farms in France (EOLFLO)
Commisionningexpected in 2020
3 floatertechnologies
Perspective: 6GW in 2030
![Page 5: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/5.jpg)
Introduction
CENTRALE NANTES and SEM-REV Test Site> LHEEA Laboratory> SEM-REV
Floatgen Project> Floatgen FWT> Status
LHEEA R&D Roadmap> Research Program> Feedback & Perspectives
![Page 6: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/6.jpg)
CENTRALE NANTES & SEM-REV Test Site
![Page 7: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/7.jpg)
Centrale Nantes
• Graduate engineering programs, Masters and PhDs, to French and
international students (2000 students)
• Mechanics, Materials, Energy, Cybernetics, Architecture
• 250 teaching and research staff, 38 partners countries
• 50% R&D budget in collaborative projects with industry
« Widespread recognition of the institute by firms and R&D organizations hasenabled graduates to assume positions of responsibility in every sector... »
![Page 8: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/8.jpg)
LHEEA
Strategy to support R&D projects and technology development to make
the MRE economically viable• By using large scale numerical and testing facilities
• Validation of numerical methods and model tests vs results in real conditions
Numerical modelling
Tank Testing
In situ monitoring and survey
From the first idea To demonstration in real conditions
![Page 9: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/9.jpg)
SEM-REV : Overview
Research centerLe Croisic
Power export cable8MVA, 20kV, 24 optical fibers
Subsea hub
Main steps : 2009 – Test site monitoring, 2012 – Export cable, 2015 – Subsea hub
Onshore substation• CAPEX: 20 M€• 12nm from Le Croisic• 1 km2 restricted area• 35m LAT
Cable protection
Instrumentation
Dynamic cable
![Page 10: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/10.jpg)
SEM-REV
Actual StateInstrumentation> DWR West
ElectricalConnexion> Export Cable> Junction Box> Hub> Umbilical
Moorings (6 lines)> Drag embeddedAnchor – chain -- synthetic rope)
• General view of marine social sciences : consenting, permitting, environment, safety• Responsible for the procurement & installation of Electrical connection + Moorings• Design by IDEOL
![Page 11: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/11.jpg)
Floatgen Project
![Page 12: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/12.jpg)
Floatgen
Rotor Ø = 80m
Wind Turbine2 MW
Floaterconcrete floating
foundation (Damping Pool ® system
designed by Ideol)h = 9.5m, 36m wide
Draught in place 7m
Bouygues TPFloater Construction
ECNInterface with Environment
IDEOLDesign: Floater, UmbilicalConfiguration & Moorings
Pre-Lay Method & Hook-Up
MooringSystem
Industry-led European initiative with partial public support
6 lines (drag embedded
anchor-chain-synthetic rope)
Demonstrate the technicaland economic feasibility ofone multi-MW integratedfloating-wind turbine in theAtlantic Ocean conditions
FLOATGEN is co-financed by the European Commission’s 7th Framework Programme for Research and Technological Innovation.
Video
![Page 13: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/13.jpg)
Floatgen Installation
To do List
ML Hook-Up
Umb Hook-Up
Instrumentation
• 2-years testing program connected to the grid : 2018-2019• R&D on monitoring and fatigue life survey : mooring, cables…
![Page 14: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/14.jpg)
R&D on floating wind turbines @ LHEEA Lab.
![Page 15: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/15.jpg)
Supporting R&D
Collaborative projects with MRE industry
P1 : Marine environment and resources• Environmental Monitoring : SEA-MON, MOSAIC• Marine growth : ABIOP, LEHERO• Soil mechanics : EOGP• Environmental impacts : SPECIES
P2 : MRE Technologies (FOWT, WEC)• Floating wind demonstration (FLOATGEN)• FOWT components and Performances (FORESEA)
P3 : Energy Conversion, Transport and Storage• Subsea connection units : HUB • Export and Dynamic Cables : EMODI, OMDYN
P4 : Security, Safety, Marine operation• Health Monitoring : MHM-EMR• Marine operation and O&M : HUB installation
FLOATGEN
WAVEGEM
BIOCOLMAR3%
6%
9%
WEST EAST
SOUTH
NORTH
0 - 22 - 44 - 66 - 88 - 1010 - 1212 - 1414 - 1616 - 1818 - 2020 - 2222 - 2424 - 26
Rose of 10m-height wind speed (1979-2011)
![Page 16: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/16.jpg)
R&D P1 : Marine environment and resources
![Page 17: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/17.jpg)
Environmental Monitoring Plan
Applied on Electrical Cables & Connections & Protections, Site & Demonstrators and Onshore Buildings…
Compulsory or Complementary Environmental Survey
Including Physical, Biological & Human Environment• Marine life, Birds, • Marine Growth• Corrosion and Abrasion• Anodes, Paints : water • Bathymetry, sediments• Power cables impacts• Marine operations, O&M• Marine traffic (risk an.)
Marine growth : — Additionnal Mass — Hydrodynamic Coeffi (drag/inert.)— Development dissymmetry — Species Identification— Spatio-temporal Evolution
![Page 18: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/18.jpg)
R&D P2 : MRE Technologies
![Page 19: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/19.jpg)
Demonstration and Access to Market FORESEA, MARINETII projects
FORESEA under Interreg NWE program
• Supporting LCT developers to access NW Europe’s test facilities• SME / LCT : New Techno, PTO, Mooring, Umbilicals/connectors, • Test sites benchmarking, Technologies vs market • From 02/2016 to 12/2019• Co-Funding of testing cost up to 60%
MARINET 2 under H2020 Program• Supporting MRE developers to access Europe’s test facilities • Funding : 100% of the test site cost (directly to the test site)
MARINERG-I / ESFRI : French national Research Infrastructure • Ifremer + Centrale Nantes MRE testing facilities
IHES / IBOCS
![Page 20: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/20.jpg)
R&D P3 : Energy Conversion, Transport and
Storage
![Page 21: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/21.jpg)
Power Cables monitoring : from cores to armorsOMDYN project
Dynamic cables: from cores to armors• Mechanical charcateristics of cable components• Loads, motions and deformations• Influence of marine growth• Default diagnostic • Cables stabilization on sea bed
Numerical, Bench test, Model Tests• Numerical modeling of the global configuration and cross section• Experimental analysis of thermo-mechanical fatigue• Forced and free dynamic response
In-situ monitoring• Monitoring throughout the cable life cycle
With : Un Nantes / GeM, IREENA, MMS, IFSTTAR, Ifremer, CEA Tech, RTE, DCNS, EDF, EOLFI, Nexans, Ideol, …
![Page 22: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/22.jpg)
R&D P4 : Security, Safety, Marine operation
![Page 23: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/23.jpg)
Floatgen
Pre-Lay Methodology
> Anchors Positioning & Pre-stretching
> Deployment
> Recovery
> Tensioning
> AbandonmentVideo
![Page 24: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/24.jpg)
Modelling of marine operations
Operations improvementEmbarked Real-time Calculation
FRYDOM project
> Multibody dynamics> Cable dynamics> Unsteady / transient responses> Waves and wind loads> Water entry/impact> Controllers (crane, turbine, winch)> Dynamic positioning
![Page 25: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/25.jpg)
• General overview of the challenges
• Targeting the cost reduction of MRE
• From TRL 1 to TRL 8
• Attractive Research Platform for MRE
• Open to host other concepts or projects
![Page 26: The first Floating Wind Turbine in France (SEM-REV)...France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018 FLOATGEN is co-financed by the European Commission’s 7 th Framework](https://reader034.fdocuments.in/reader034/viewer/2022042807/5f7d453323c2ee562c1466db/html5/thumbnails/26.jpg)