The Secure Residential sychiatric acility: rocess, Design ...
The F acility for A ntiproton and I on R esearch
description
Transcript of The F acility for A ntiproton and I on R esearch
![Page 1: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/1.jpg)
The Facility for Antiprotonand Ion Research
Günther Rosner NuPECC, FZ Jülich, 15/3/13 1
![Page 2: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/2.jpg)
2
Facility for Antiproton & Ion Research
Günther Rosner NuPECC, FZ Jülich, 15/3/13
Dense Bulk Plasmas (Ion-beam bunch compression& petawatt-laser)
Materials Science & Radiation Biology (Ion & antiproton beams) Accelerator Physics
UNILAC
SIS18 SIS100/300p-Linac
HESR
CR &RESR
NESR
Cryring
Rare-IsotopeProduction Target
Anti-ProtonProduction Target
100 m
QCD-Phase Diagram(HI beams 2 to 45 GeV/u)
Hadron Physics (Stored and cooled14 GeV/c anti-protons)
Nuclear Structure & Astrophysics(Rare-isotope beams)
Fundamental Symmetries& Ultra-High EM Fields(Antiprotons & highly stripped ions)
![Page 3: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/3.jpg)
NuPECC, FZ Jülich, 15/3/13 3
Staging
Günther Rosner
Start Version Phase A(SIS100) Phase B
(SIS300)
Modularised Start Version
Module 0 Module 1 Module 2 Module 3 Module 4 Module 5
SIS100 Exp. halls CBM & APPA
Super-FRS NuSTAR
Antiproton FacilityPANDA & options NuSTAR
LEB, NESR, FLAIR
NuSTAR & APPA
RESRPANDA,
NuSTAR & APPA
2018
![Page 4: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/4.jpg)
NuPECC, FZ Jülich, 15/3/13 4
Modularised Start Version
Günther Rosner
APPA
CBM/HADES
NuSTAR
PANDAExperiments
M1: APPAM1: CBM/HADESM2: NuSTARM3: PANDA
M0
M1
M2M3
M3
![Page 5: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/5.jpg)
NuPECC, FZ Jülich, 15/3/13 5
Costs MSV
Günther Rosner
Accelerators and personnel (including Super-FRS) 502 M€
Civil construction (excluding site related costs) 400 M€
FAIR contribution to experimental end stations * 78 M€
FAIR GmbH personnel & running until 2018 (>8 years) 47 M€
Grand Total MSV, Modules 0 - 3 1027 M€
in 2005 € (inflation escalation until 2018: ca. +50%)
* Total experimental end stations (excluding Super-FRS): ca. 210 M€ (2005) = 315 M€ (2018)
![Page 6: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/6.jpg)
NuPECC, FZ Jülich, 15/3/13 6
FAIR Member StatesContracting Party Contribution
(in 2005 M€)Finland 5.00
France 27.00
Germany 705.00
India 36.00
Poland 23.74
Romania 11.87
Russia 178.05
Slovenia 12.00
Sweden 10.00
Total 1.008,66
Günther Rosner
• All numbers in 2005 €(escalation until 2018 ca. +50%)
• UK Associated Membership from 3/5/13
• Spain expected to join soon as a member
• Talks with China on Associate FAIR Member status
• Talks with Italy
• Additional contributions to experiments
![Page 7: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/7.jpg)
Synchrotrons: 1.1 kmWith beamlines: 3.2 km
Existing SIS 18
Civil Construction
Günther Rosner NuPECC, FZ Jülich, 15/3/13 7
Total area > 200 000 m2Area buildings ~ 98 000 m2Usable area ~ 135 000 m2Volume of buildings ~ 1 049 000 m3Substructure:~ 1500 pillars, up to 65 m deep
![Page 8: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/8.jpg)
What will be Visible in the End
Günther Rosner NuPECC, FZ Jülich, 15/3/13 8
![Page 9: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/9.jpg)
36 m down into the ground
Central Switchyard Building
...with complex interior
Günther Rosner NuPECC, FZ Jülich, 15/3/13 9
![Page 10: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/10.jpg)
Building Permit
Günther Rosner NuPECC, FZ Jülich, 15/3/13 10
Submission of 771 folders building application to Darmstadt’s civil construction authority in Aug. 2011
Darmstadt Councilor Brigitte Lindscheid handing over the FAIR building permit (21 folders) to FAIR management at the end of Oct. 2012
![Page 11: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/11.jpg)
Aerial View Jan. 2013
Günther Rosner NuPECC, FZ Jülich, 15/3/13 11
13.01.2013
![Page 12: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/12.jpg)
Webcam March 2013
Günther Rosner NuPECC, FZ Jülich, 15/3/13 12
![Page 13: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/13.jpg)
Roadmap Civil Construction
Günther Rosner NuPECC, FZ Jülich, 15/3/13 13
2011 2012 2013 2014 2015 2016 2017 2018
Ground Exploration
Forest Clearing
Site Preparation
Earthwork and FoundationBatch 1 (Civil Engineering)
Batch 2 (M&E)
Trans-Batch Works
Construction Finished Experiments
![Page 14: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/14.jpg)
14
Fast accelerationHigh gradient, variable frequency
Ferrite & MA loaded cavities
Compact & cost effective acceleratorsFast cycling superconducting magnets
dB/dt ~ 4T/s
Precision beamsElectron & stochastic cooling XHV @ high beam intensities
Extremely high vacuum ~10-12 mbar
Accelerator Challenges
Günther Rosner NuPECC, FZ Jülich, 15/3/13
![Page 15: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/15.jpg)
SIS100 dipole magnets Coil production by BNG
SIS100 sextupole magnets Dubna prototype
Superconducting Magnets
Günther Rosner NuPECC, FZ Jülich, 15/3/13 15
![Page 16: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/16.jpg)
HESR Layout
Main machine parameterMomentum range 1.5 to 15 GeV/cCircumference 575 m Magnetic bending power 50 TmDipole ramp 25 mT/sAcceleration rate 0.2 (GeV/c)/sGeometrical acceptances for βt = 2 m horizontal 4.9 mm mrad vertical 5.7 mm mradMomentum acceptance ± 2.5×10-3
Günther Rosner NuPECC, FZ Jülich, 15/3/13 16
![Page 17: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/17.jpg)
Barrier Bucket Cavity in COSY
-600
-500
-400
-300
-200
-100
0
100
200
0,0 0,5 1,0 1,5 2,0Time / µs
BB
Vol
tage
/ V
-0,1
-0,05
0
0,05
0,1
0,15
0,2
0,25
0,3
Phas
emon
itor
a.u.
Günther Rosner NuPECC, FZ Jülich, 15/3/13 17
![Page 18: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/18.jpg)
HESR Prototyping and Tests at COSY
WASA
2 MeVe-Cooler
Barrier Bucket CavityStochastic
Cooling
Residual Gas Profile Monitor
Pellet Target
Günther Rosner NuPECC, FZ Jülich, 15/3/13 18
![Page 19: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/19.jpg)
19
FAIR Experiments
Günther Rosner NuPECC, FZ Jülich, 15/3/13
CBM
PANDANuSTAR
Super-FRS
APPA
![Page 20: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/20.jpg)
GSI FRS FAIR Super-FRS
Günther Rosner NuPECC, FZ Jülich, 15/3/13 201000 7500
Super-FRS
FRS
![Page 21: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/21.jpg)
Target area
DipolesQuadrupoles
Sextupoles
Experiment NuSTARRadiation Resistant Magnets• Normal conducting magnets
using mineral insulated cable • 3 dipole, 3 quadrupole, and 2
sextupole magnets • Prototype dipole built and
tested by BINP • Prototype dipole delivered
and assembled at GSI
Günther Rosner NuPECC, FZ Jülich, 15/3/13 21
![Page 22: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/22.jpg)
IPP, Hefei
Super-FRS Superferric Dipoles• 24 dipoles required
Iron dominated, warm iron
SC coil• Large aperture
±19cm x ±7cm 50 tons
• Prototype built and tested by China and delivered to GSI
Günther Rosner NuPECC, FZ Jülich, 15/3/13 22
![Page 23: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/23.jpg)
NuPECC, FZ Jülich, 15/3/13 23
Timeline MSV
Günther Rosner
20122011 2013 201620152014
6
Submission building permitsSite preparationCivil construction contractsBuilding of accelerator & detector componentsCompletion of basic civil construction workInstallation & commissioning of accelerators and detectorsData taking
7 108
2017 2018 2019
12
6
7
89
11
12
10
119
![Page 24: The F acility for A ntiproton and I on R esearch](https://reader033.fdocuments.in/reader033/viewer/2022061504/56815f40550346895dce1836/html5/thumbnails/24.jpg)
Thank you very much
Günther Rosner NuPECC, FZ Jülich, 15/3/13 24