THE COMMITTEE AGENDA & REPORTS
for the meeting
Tuesday 5 September 2017
at 5.30 pm
in the Colonel Light Room.
Adelaide Town Hall
The Committee
Meeting Agenda, Tuesday 5 September 2017, at 5.30 pm
Members - The Right Honourable the Lord Mayor [Martin Haese];
Councillor Corbell (Chair);
Councillors Abiad, Antic, Clearihan, Hender, Malani, Martin,
Moran, Slama, Verschoor (Deputy Lord Mayor) and Wilkinson (Deputy Chair).
1. Acknowledgement of Country
At the opening of the Committee Meeting, the Chair will state:
‘Council acknowledges that we are meeting on traditional Country of the Kaurna people of the Adelaide Plains and
pays respect to Elders past and present. We recognise and respect their cultural heritage, beliefs and relationship
with the land. We acknowledge that they are of continuing importance to the Kaurna people living today.
And we also extend that respect to other Aboriginal Language Groups and other First Nations who are present
today.’
2. Acknowledgement of Colonel William Light
Upon completion of the Kaurna Acknowledgment, the Chair will state:
The Council acknowledges the vision of Colonel William Light in determining the site for Adelaide and the design of
the City with its six (6) squares and surrounding belt of continuous Park Lands which is recognised on the National
Heritage List as one of the greatest examples of Australia’s planning heritage.
3. Apologies and Leave of Absence
On Leave: Councillors Antic and Hender.
4. Confirmation of Minutes –15/8/2017
That the Minutes of the meeting of The Committee held on 15 August 2017 be taken as read and be confirmed as
an accurate record of proceedings.
5. Presentations
5.1. O-Bahn Update (DPTI) [20 minutes]
Presenter – Dariusz Fanok, Senior Project Manager, O-Bahn City Access, Project Delivery, Safety and
Service Division
5.2. Tram Extension - Project status (DPTI) [20 minutes]
Presenter – Jon Whelan, General Manager, Infrastructure Delivery, Infrastructure Delivery Directorate
6. CEO Workshop / Discussion Forum Item
Strategic Alignment – Liveable
6.1. City Bikeways East West Route Selection [Page 3] [30 minutes]
Facilitator – Beth Davidson-Park, Director Operations, City of Adelaide
1
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
7. CEO Update [10 minutes]
8. Exclusion of the Public
8.1 Exclusion of the Public [2017/00571] [Page 21]
For the following Chief Executive Officer Workshop seeking discussion in confidence:
Strategic Alignment – Smart
9.1. Ten Gigabit Adelaide Update [s 90(3) (b) & (d)]
For the following Chief Executive Officer Presentation seeking discussion in confidence:
Strategic Alignment – Liveable
10.1 O-Bahn City Access Project - Bus Stop Changes [s 90(3) (j)]
9. Confidential CEO Workshop
Strategic Alignment – Smart
9.1 Ten Gigabit Adelaide Update [45 mins]
Facilitator – Steve Mathewson, Director Services, City of Adelaide
10. Confidential CEO Presentation
Strategic Alignment – Liveable
10.1 O-Bahn City Access Project - Bus Stop Changes [20 mins]
Presenters – Daniel Bennett, Associate Director Design & Strategy & Peter Wong, Team Leader, Transport
Strategy, City of Adelaide
11. Closure
2
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
City Bikeways: East-West Bikeway
WORKSHOP REPORT
PROGRAM: DESIGN AND STRATEGYAUTHOR: Anna McDonald | APPROVING OFFICER: Daniel Bennett
To discuss and seek feedback on the route options for the East-West Bikeway
Workshop Purpose:
A BEAUTIFUL DIVERSE CITY WITH AN ENVIABLE LIFESTYLE THAT IS WELCOMING TO PEOPLE AT ALL STAGES OF LIFE
LIV
EA
BLE
3
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 2
East-West Bikeway
K E Y M E S S AG E S
Key Messages
▪ The City of Adelaide has entered into a Funding Deed with the South Australian Government as part of the City Bikeways Project. The
Funding Deed includes $5.5m to construct the East-West Bikeway between West Terrace and Dequetteville Terrace.
▪ Three route options have been considered for the East-West Bikeway: Pirie-Waymouth streets, Flinders-Franklin streets and Wakefield-Grote
streets. Data collection and analysis have been undertaken to inform the route selection process.
4
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 3
East-West Bikeway
I M P L I C AT I O N S :
IMPLICATION COMMENT:
Policy
Smart Move Interim Action Plan 2016-18: Action 4.2 City Bikeways Project: Deliver an East-West bikeway
route.
Carbon Neutral Adelaide Action Plan 2016-2021: Action 2.8.1 Establish a cycling infrastructure fund and
develop a comprehensive and integrated network of bicycle ways that connect Adelaide, North Adelaide
and surrounding suburbs to provide safe and convenient access to workplaces, services, shops, leisure
activities and bus, train and tram services.
Strategic Plan: Liveable – Plan and deliver priority walking and cycling routes throughout and beyond the
City and Park Lands, including provision of East-West and North-South cycleways and connections.
Consultation
Engagement has been undertaken with the community on general bikeway typologies and design ideas.
No specific consultation has been undertaken yet for the East-West Bikeway.
It is Council policy to consult with adjacent owners/occupiers in relation to changes to on-street parking.
Legislation requires that Council consults with the community in relation to new street tree planting.
Resource $5.5m joint CoA and State Government funding as part of the City Bikeways Funding Deed.
Risk / Legal / Legislative
There is a risk that the required changes to traffic and parking arrangements will cause concern to some
members of the community.
Legislation requires that we consult with the community in relation to new street tree planting.
Opportunities
There are opportunities to enhance the street environment (trees, landscaping, footpath, lighting etc.) to
complement the bikeway.
There are opportunities to reduce the crash rate and improve road safety outcomes.
5
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
IMPLICATION COMMENT:
17/18 Budget Allocation$5.5m has been allocated in the Funding Deed with the State Government as part of the City Bikeways
Project
17/18 Budget Reconsideration
(if applicable)N/A
Proposed 18/19
Budget AllocationN/A
Ongoing Costs
(eg maintenance cost)Not known at this time
Life of Project or
Life Expectancy of AssetBikeway assets will generally have a life expectancy of 25-30 years
Other Funding Sources Existing State Government grant funding as part of the City Bikeways Funding Deed
East-West Bikeway | 5-Sept-17slide 4
East-West Bikeway
B U D G E T / F I N A N C I A L I M P L I C AT I O N S :
6
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 5
East-West Bikeway
B AC KG RO U N D :
▪ The City of Adelaide has entered into a Funding Deed with the State Government as part of the City Bikeways project. The Funding Deed
includes three projects – North-South Bikeway, East-West Bikeway and a Point-to-Point City Bike Share Scheme.
▪ The Funding Deed includes $5.5m for the design and construction of an East-West Bikeway through the city from West Terrace to
Dequetteville Terrace.
▪ A report presented to Council on 26 July 2016 identified three route options for the East-West Bikeway – Pirie-Waymouth streets, Flinders-
Franklin streets and Wakefield-Grote streets.
▪ A comprehensive assessment of each of these three route options has been undertaken to inform the route selection.
7
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 6
East-West Bikeway
RO U T E O P T I O N S
▪ The three route options considered for the East-West Bikeway are Pirie-Waymouth streets, Flinders-Franklin streets and Wakefield-Grote
streets
▪ Each of the three routes could connect to the existing shared path alongside West Terrace at the western end
▪ The proposed routes could connect to local streets and/or bike routes in the eastern inner suburbs as shown below.
WAYMOUTH-PIRIE
FRANKLIN-FLINDERS
GROTE-WAKEFIELD
8
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 7
East-West Bikeway
M I N I M U M S T R E E T W I DT H C O M PA R I S O N
▪ The minimum width required
for a city street with a bikeway
is 16.6 metres.
▪ The three route options were
compared against the
minimum street width that is
required for a city street.
▪ The existing street width
(between kerbs) of the Pirie-
Waymouth street corridor is
13.5 metres, which is not
sufficient to accommodate the
16.6 metres required for a city
street with a bikeway.
▪ The Pirie-Waymouth street
corridor was therefore
eliminated from the selection
process.
9
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 8
East-West Bikeway
A S S E S S M E N T F R A M E W O R K – N E T W O R K I N T E G R AT I O N
FLINDERS STREET - FRANKLIN STREET GROTE STREET - WAKEFIELD STREETN
ET
WO
RK
IN
TE
GR
AT
ION
Connectivity
and a
ccessib
ility
for
all
road u
sers
PEOPLE RIDING BIKES
Connects to:
» Beulah Road Bike Boulevard to Norwood
» Angas/William local streets to Norwood
» West Terrace Bikeway
Closer to more bike riding destinations in
the city (workplaces, shops and
entertainment).
Connects to:
» Angas/William local streets to Norwood
» Grant Avenue to Burnside
» West Terrace Bikeway
Reconciliation Plaza is closed during major events in
Victoria Square, which would require an alternative
route for bike riders during these times.
PEOPLE WALKING
Some footpaths may be widened when the
bikeway is introduced.
Safety outcomes could improve if uncontrolled vehicle
turns are better managed.
The changes to the street required for the bikeway/bus
stop interfaces may reduce footpath widths in areas.
PEOPLE IN CARS
Generally configured to include two traffic lanes in
each direction during peak times and off-peak
parallel parking (apart from the section between
West Terrace and Morphett Street (western end)
which would include one lane of traffic in each
direction and parallel parking at all times).
Remain as two (2) traffic lanes in each direction at all times
PEOPLE USING
PUBLIC TRANSPORT
No bus routes
20 bus stops (serving around 5,000 passengers a
day) would be redesigned and reconstructed to
accommodate the bikeway, with some impacts.
PEOPLE IN
DELIVERY VEHICLES
On-street loading arrangements during peak periods
where off-peak only parking is provided would need to
be negotiated as required.
On-street loading would be permitted at various
locations all day.
The complex loading arrangements at Central Market
would be difficult to integrate with the bikeway.
10
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
FLINDERS STREET - FRANKLIN STREET GROTE STREET - WAKEFIELD STREET
US
AG
E
Vo
lum
es a
nd
oth
er
usa
ge
in
dic
ato
rs
PEOPLE RIDING BIKES
Currently approximately 380 people riding bikes per day
along corridor
Closer to workplaces of more city commuters
Around 80% more end of trip facilities for bike riders in
buildings adjacent to Flinders and Franklin streets than
along Grote and Wakefield streets
The bikeway is generally wider than on Grote – Wakefield.
Currently approximately 260 people riding bikes per day
along corridor
People who ride bikes will be delayed as they will be
required to give-way to bus passengers boarding/alighting
at 20 bus stops
The bikeway will be narrower at each interface with a bus
stop.
PEOPLE DRIVING CARS
Lower traffic volumes (approx 50%) than Grote and Wakefield
streets, resulting in fewer drivers that need to adjust to the
bikeway and less potential conflicts between bike riders and
motor vehicles.
Remains as two (2) traffic lanes in each
direction at all times
PEOPLE USING PUBLIC
TRANSPORT
There are no scheduled metropolitan bus services that use the
corridor.
Approx 5,000 daily bus passengers that board/alight at 20
bus stops would need to adjust to new bus stop/bikeway
interface
16,000 people on buses on this street could be impacted
by the new street layout.
PEOPLE IN
DELIVERY VEHICLES
Lower volumes of heavy vehicles than Grote and Wakefield
streets (approx 20% of the volumes on Grote and Wakefield
streets)
On-street loading would be permitted at various locations all
day.
The complex loading arrangements at the Central Market
would be difficult to integrate with the bikeway.
LOCAL WORKERS
Approx 12,000 workers currently located on the corridor Approx 6,000 workers located on the corridor
ROAD SAFETY
There have been 16 crashes in the last five (5) years for every
1,000 vehicles that travel along the street each day.
There have been 13 crashes in the last five (5) years for every
1,000 vehicles that travel along the street each day.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 9
East-West Bikeway
A S S E S S M E N T F R A M E W O R K : U S AG E
11
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 10
East-West Bikeway
A S S E S S M E N T F R A M E W O R K : S T R E E T E L E M E N T S
FLINDERS STREET - FRANKLIN STREET GROTE STREET - WAKEFIELD STREET
ST
RE
ET
EL
EM
EN
TS
CAR PARKING
All on-street parking would be parallel.
It is possible that the reduction of on-street
parking would be higher due to more angle
parking currently.
All on-street parking would be parallel and could be
permitted all day
TREES
There are opportunities to add street trees,
particularly between Morphett Street and
Pulteney Street
There may be impacts to existing trees and
landscaping at the western and eastern ends
There may be opportunities to add trees,
particularly between Morphett Street and
Pulteney Street.
ECONOMIC
DEVELOPMEN
T
There are more sites with development potential.
OUTDOOR
DINING
There may be some impacts to existing outdoor
dining areas.
There may be opportunities to widen footpaths
in some locations.
There will be minimal impacts on existing outdoor
dining areas.
12
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 11
East-West Bikeway
A S S E S S M E N T F R A M E W O R K : S T R AT E G I C C O N S I D E R AT I O N S
FLINDERS STREET - FRANKLIN STREET GROTE STREET - WAKEFIELD STREET
ST
RA
TE
GIC
CO
NS
IDE
RA
TIO
NS
TRAM
No impacts. Flinders and Franklin streets are not part
of Adelink.
No impacts. Grote and Wakefield streets are not part of
Adelink.
CENTRAL
MARKET ARCADE
N/A
The Central Market Arcade development will have frontage
to the corridor, which is expected to include car park access
and loading bays.
MARKET TO
RIVERBANK
Construction of a bikeway provides the opportunity to
improve connectivity between Bentham and Pitt streets
(on the M2R link) via the ‘dogleg’ on Franklin Street.
Construction of a bikeway will provide the opportunity to
improve the connectivity on the M2R link between Pitt
Street and the Central Market.
VICTORIA SQUARE
The full Victoria Square Masterplan, if implemented,
would not allow bike riders to ride directly along the
corridor without travelling around the square.
Major events that close the centre of Victoria Square
(Reconciliation Plaza) will impact on bikeway access.
HERITAGE
There are various existing sections of heritage kerbing
(including granite, slate and bluestone) that will need to
be considered and preserved during design and
construction.
There is one existing section of heritage stone kerbing
that will need to be considered and preserved during
design and construction.
13
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 12
East-West Bikeway
E X I S T I N G C O N D I T I O N S : F L I N D E R S - F R A N K L I N PA R K I N G
14
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 13
East-West Bikeway
E X I S T I N G C O N D I T I O N S : G ROT E - WA K E F I E L D PA R K I N G
15
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 14
East-West Bikeway
E X I S T I N G C O N I DT I O N S : F L I N D E R S - F R A N K L I N T R A F F I C & B I K E V O LU M E S
16
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 15
East-West Bikeway
E X I S T I N G C O N D I T I O N S : G ROT E - WA K E F I E L D T R A F F I C A N D B I K E V O LU M E S
17
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 16
East-West Bikeway
E X I S T I N G C O N D I T I O N S : E X I S T I N G S T R E E T T R E E S
Existing Street Trees – Flinders-Franklin
Existing Street Trees – Grote-Wakefield
18
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 17
East-West Bikeway
S U M M A RY O F I M PAC T S F O R F L I N D E R S - F R A N K L I N A N D G ROT E - WA K E F I E L D C O R R I D O R S
Flinders-Franklin Grote-Wakefield
Positives
Provides a low-stress and comfortable experience for people riding
bikes by:
▪ providing a route that is closer to where people want to go
▪ has fewer interactions with motor traffic and bus passengers
▪ better connects to low-stress bike routes in the inner-suburbs,
particularly to the east
▪ provision of a wider bikeway for most of the route
Significant potential for:
▪ improved safety for all street users
▪ future commercial/residential development along the route
▪ increasing trees and landscaping
▪ creating a more consistent experience for people driving cars
The generous street width would allow the bikeway to be
installed whilst retaining the median and two traffic lanes
in each direction and parallel parking at all times.
Significant potential for increasing the number of trees
and landscaping.
Negatives
Will have impacts to on-street parking by:
▪ changing all angle parking to parallel parking
▪ providing parking during off-peak times only on some sections
Is likely to have impacts to existing on-street dining areas
Is likely to impact on some existing uncontrolled right turn accesses
to/from Flinders-Franklin streets
Provides a lower level of service for bike riders due to:
▪ delays waiting for passengers boarding/alighting at bus
stops
▪ a route that is further from most of the places that they
want to go, in particular workplaces and shopping.
Will have impacts to on-street parking by changing all
angle parking to parallel parking.
Requires 5,000 bus passengers a day to interact with the
bike riders, creating more potential for conflicts between
these user groups.
Based on this analysis the Flinders-Franklin corridor would provide a lower stress and more comfortable experience for bike riders which better
connects to established and developing bike routes in inner-suburbs. It would have a lower impact on motor vehicle traffic and bus passengers
and there are significant opportunities to improve safety and streetscape outcomes.
19
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
LIVEABLE OUTCOME
East-West Bikeway | 5-Sept-17slide 18
KEY QUESTION
The three street corridors
considered for the East-West
Bikeway are Pirie-Waymouth,
Flinders-Franklin and Grote
Wakefield
Do Elected Members agree that
Flinders-Franklin progress as the
preferred option?
East-West Bikeway
K E Y Q U E S T I O N :
20
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
Exclusion of the Public
ITEM 8.1 05/09/2017
THE COMMITTEE
Program Contact:
Kylie Bennetts, AD Governance
8203 7598
2017/00571
Public
Approving Officer:
Mark Goldstone, Chief Executive
Officer
EXECUTIVE SUMMARY:
It is the recommendation of the Chief Executive Officer that the public be excluded from this Committee meeting
for the consideration of information and matters contained in the following Agenda Items:
Strategic Alignment – Smart
9.1 Ten Gigabit Adelaide Update [s 90(3) (b) & (d)]
Strategic Alignment – Liveable
10.1 O-Bahn City Access Project - Bus Stop Changes [s 90(3) (j)]
The Order to Exclude for Item 9.1 and 10.1:
1. Identifies the information and matters (grounds) from s 90(3) of the Local Government Act 1999 (SA) utilised
to request consideration in confidence;
2. Identifies the basis – how the information falls within the grounds identified and why it is necessary and
appropriate to act in a meeting closed to the public; and
3. In addition identifies for the following grounds – s 90(3) (b), (d) or (j) - how information open to the public
would be contrary to the public interest.
21
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
ORDER TO EXCLUDE FOR ITEM 9.1: THAT THE COMMITTEE:
1. Having taken into account the relevant consideration contained in s 90(3) (b) & (d) and s 90(2) & (7) of the
Local Government Act 1999 (SA), this meeting of The Committee dated 5/9/2017 resolves that it is necessary
and appropriate to act in a meeting closed to the public as the consideration of Item 9.1 [Ten Gigabit
Adelaide Update] listed on the Agenda in a meeting open to the public would on balance be contrary to the
public interest.
Grounds and Basis
This Item contains commercial information of a confidential nature (not being a trade secret) the disclosure of
which could reasonably be expected to confer a commercial advantage on a person with whom the council is
conducting business, prejudice the commercial position of the council and prejudice the commercial position
of the person who supplied the information and confer a commercial advantage to a third party.
Public Interest
The Council is satisfied that the principle that the meeting be conducted in a place open to the public has
been outweighed in the circumstances because the disclosure of this information will result in release of
information which is ‘commercial in confidence’.
2. Pursuant to s 90(2) of the Local Government Act 1999 (SA), this meeting of The Committee dated 5/9/2017
orders that the public (with the exception of members of Corporation staff who are hereby permitted to
remain) be excluded from this meeting to enable this meeting to receive, discuss or consider in confidence
Item 9.1 [Ten Gigabit Adelaide Update] listed in the Agenda, on the grounds that such item of business,
contains information and matters of a kind referred to in s 90(3) (b) & (d) of the Act.
ORDER TO EXCLUDE FOR ITEM 10.1: THAT THE COMMITTEE:
1. Having taken into account the relevant consideration contained in s 90(3) (j) and s 90(2) & (7) of the Local
Government Act 1999 (SA), this meeting of The Committee dated 5/9/2017 resolves that it is necessary and
appropriate to act in a meeting closed to the public as the consideration of Item 10.1 [O-Bahn City Access
Project - Bus Stop Changes] listed on the Agenda in a meeting open to the public would on balance be
contrary to the public interest.
Grounds and Basis
This report includes commercially confidential information provided by the Department of Planning, Transport
and Infrastructure (DPTI) in relation to the development of the O-Bahn City Access Project - Bus Stop
Changes. This confidential information relates to costs and timeframes including the construction schedule of
the Project which may have commercial implications to stakeholders. This information and the concept plans
have been provided to Council in confidence by The Department of Planning Transport and Infrastructure
who have requested that this information remain confidential.
Public Interest
The Committee is satisfied that the principle that the meeting be conducted in a place open to the public has
been outweighed in the circumstances because the disclosure of this information may result in release of
information prior to the finalisation of ‘commercial in confidence’ negotiations between the proponent and
their suppliers and may materially and adversely affect the financial viability of the proponent in relation to
contract negotiations which on balance would be contrary to the public interest.
22
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
2. Pursuant to s 90(2) of the Local Government Act 1999 (SA), this meeting of The Committee dated 5/9/2017
orders that the public (with the exception of members of Corporation staff who are hereby permitted to
remain) be excluded from this meeting to enable this meeting to receive, discuss or consider in confidence
Item 10.1 [O-Bahn City Access Project - Bus Stop Changes] listed in the Agenda, on the grounds that such
item of business, contains information and matters of a kind referred to in s 90(3) (j) of the Act.
DISCUSSION
1. s 90(1) of the Local Government Act 1999 (SA), directs that a meeting of Council Committee must be
conducted in a place open to the public.
2. s 90(2) of the Local Government Act 1999 (SA), states that a Council Committee may order that the public be
excluded from attendance at a meeting if the Council Committee considers it to be necessary and
appropriate to act in a meeting closed to the public to receive, discuss or consider in confidence any
information or matter listed in s 90(3).
3. s 90(3) prescribes the information and matters that a Council Committee may order that the public be
excluded from.
4. s 90(4) of the Local Government Act 1999 (SA), advises that in considering whether an order should be made
under s 90(2), it is irrelevant that discussion of a matter in public may:
4.1 cause embarrassment to the council or council committee concerned, or to members or employees of
the council; or
4.2 cause a loss of confidence in the council or council committee.’
4.3 involve discussion of a matter that is controversial within the council area; or
4.4 make the council susceptible to adverse criticism.
5. s 90(7) of the Local Government Act 1999 (SA) requires that an order to exclude the public:
5.1 Identify the information and matters (grounds) from s 90(3) of the Local Government Act 1999 (SA)
utilised to request consideration in confidence;
5.2 Identify the basis – how the information falls within the grounds identified and why it is necessary and
appropriate to act in a meeting closed to the public; and
5.3 In addition identify for the following grounds – s 90(3) (b), (d) or (j) - how information open to the
public would be contrary to the public interest.
6. s 87(10) of the Local Government Act 1999 (SA) has been utilised to identify in the Agenda and on the Report
for the meeting, that the following reports are submitted seeking consideration in confidence.
6.1 Information contained in Item 9.1 – Ten Gigabit Adelaide Update:
6.1.1 Is not subject to an Existing Confidentiality Order.
6.1.2 The grounds utilised to request consideration in confidence is s 90(3) (b) & (d)
(b) information the disclosure of which—
(i) could reasonably be expected to confer a commercial advantage on a person
with whom the council is conducting, or proposing to conduct, business, or to
prejudice the commercial position of the council; and
(ii) would, on balance, be contrary to the public interest;
(d) commercial information of a confidential nature (not being a trade secret) the disclosure
of which—
23
The Committee Meeting - Agenda - 5 September 2017Licensed by Copyright Agency. You must not copy this work without permission.
(i) could reasonably be expected to prejudice the commercial position of the person
who supplied the information, or to confer a commercial advantage on a third party;
and
(ii) would, on balance, be contrary to the public interest;
6.2 Information contained in Item 10.1 – O-Bahn City Access Project - Bus Stop Changes:
6.2.1 Is not subject to an Existing Confidentiality Order.
6.2.2 The grounds utilised to request consideration in confidence is s 90(3) (j)
(j) information the disclosure of which—
(i) would divulge information provided on a confidential basis by or to a Minister of
the Crown, or another public authority or official (not being an employee of the
council, or a person engaged by the council); and
(ii) would, on balance, be contrary to the public interest;
ATTACHMENTS
Nil
- END OF REPORT -