The Colonnade: Coffee with The Contractor

16
THE COLONNADE BUILDING 5 & 6 (VILLAS 3 & 4) COFFEE WITH THE CONTRACTOR THE WEITZ COMPANY June 5th, 2015

Transcript of The Colonnade: Coffee with The Contractor

THE COLONNADE BUILDING 5 & 6(VILLAS 3 & 4)

COFFEE WITH THE CONTRACTOR

THE WEITZ COMPANY June 5th,

2015

BUILDING 6 (VILLA #4)JUNE 5TH, 2015

BUILDING 6 (VILLA #4)JUNE 5TH, 2015

Framing Layout Marks

BUILDING 6 (VILLA #4)JUNE 5TH, 2015

First coat of insulation, a total of two coats will be applied.

BUILDING 6 (VILLA #4)JUNE 5TH, 2015

BUILDING 6 (VILLA #4)JUNE 5TH, 2015

Spray Insulation Machine

BUILDING 5 (VILLA #3)JUNE 5TH, 2015

BUILDING 5 (VILLA #3)JUNE 5TH, 2015

First Floor- Walls & Joist were completed

in 10 days. (13,500 Livable Sqft)

BUILDING 5 (VILLA #3) FUN FACT FIRST FLOOR VERTICAL LUMBER

What is the length in miles if you lay each vertical stud end to end on the ground?

-Each stud is approximately 10 feet long.

BUILDING 5 (VILLA #3)FUN FACT ANSWER

- 4,200 total 10ft pieces- 7.95 Miles in length

That is the approximant length from the Colonnade Campus to the Loop

101 Freeway

BUILDING 5 (VILLA #3)JUNE 5TH, 2015

Plumbing Rough-In @ Bathroom

BUILDING 5 (VILLA #3)JUNE 5TH, 2015

Overhead Plumbing Manifold Location

BUILDING 5 (VILLA #3)JUNE 5TH, 2015

Electrical Rough-In (Can Lights) @ Kitchen Area

BUILDING 5 (VILLA #3)JUNE 5TH, 2015

Garage

APS ELECTRICAL CONDUITJUNE 5TH, 2015

THE END