The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
-
Upload
derick-booth -
Category
Documents
-
view
212 -
download
0
Transcript of The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
![Page 1: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/1.jpg)
The BoNuS Detector
Concept
Design
Status
Howard Fenker March 11, 2005
![Page 2: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/2.jpg)
Detector Concept
![Page 3: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/3.jpg)
Detector Parameters
• Geometric Acceptance– Sensitive over 148 deg. In phi, 20cm in Z.
• Momentum Acceptance– Protons from ~70 MeV/c
• Proton Identification (next slide)
• Vertex Z resolution <~ 10mm• Track Momentum Resolution • Track E information from dE/dx - studying
• Rate & Timing Issues
![Page 4: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/4.jpg)
Proton ID by dE/dx & Curvature
100 MeV/c pion 100 MeV/c proton
![Page 5: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/5.jpg)
Detector Parameters
• Rate & Timing Issues– Track latency in sensitive gas: 1-2 us– Electronic memory prior to trigger: 1.5 us– Event Size: 0.5 – 10 kBytes (background?)– Deadtime
• Trigger: ~= charge collection interval. ALTRO is ready for new trigger immediately afterwards.
• Data Readout Rate: > 20 Mbytes/second• Expected event rate capability: 2 kHz
![Page 6: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/6.jpg)
Detector Development
• Prototype – flat, ‘standard’ GEMs• Test• Prototype – curved, ‘standard’ GEMs• Test• Prototype – flat, custom GEMs• Test• Production – curved, custom GEMs• June test run in CLAS
![Page 7: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/7.jpg)
Prototypes
![Page 8: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/8.jpg)
Production Model: Exploded View
![Page 9: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/9.jpg)
Production Model
![Page 10: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/10.jpg)
BoNuS Target (11/04)
![Page 11: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/11.jpg)
BoNuS in CLAS
![Page 12: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/12.jpg)
Electronics Development
• Commercial CAMAC Modules – 8 ch.
• Test the whole concept– Cosmic / Source / TUNL Run1
• ALTRO Test Board – 16 ch.– Cosmic / Source / TUNL Run 2
• ALTRO Production System – 128 ch.– Cosmic / Source / TUNL Run 3
• Final ALTRO System – 3200 ch.
![Page 13: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/13.jpg)
BoNuS Signal Readout System
![Page 14: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/14.jpg)
ALICE and BoNuS Readout System
BoNuS Carrier Card
ALICE FECALICE RCU
RibbonsToRTPC
![Page 15: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/15.jpg)
pRTPC w/ Inverter/Driver Cards
RibbonsToReadoutSystem
![Page 16: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/16.jpg)
Detector System Tests
• Readout – 128 channel tests – Analog Electronics
• Prototype test results. – Software– Straight tracks– dE/dx
![Page 17: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/17.jpg)
Proton Tracks at TUNL
![Page 18: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/18.jpg)
dE/dx Analysis from TUNL
![Page 19: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/19.jpg)
dE/dx Analysis from TUNL
![Page 20: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/20.jpg)
dE/dx Analysis from TUNL
![Page 21: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/21.jpg)
Detector Status (1/2)
• Detector Module – Parts Fabrication complete by 4/1– Assembly Complete by 5/1
• Electronics– ALTRO working. Needs faster microcode– $40K fabrication order going out next week
• Uncertain how much available for June test• 6% (256 ch) available on prototypes NOW
![Page 22: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/22.jpg)
Detector Status (2/2)
• Target, Support & Alignment System– Design nearing completion– Fabrication needed by 5/1
• Infrastructure– Gas Lines & Cables pulled in Hall-B– Power available– Need slow controls, DAQ Interface– Detector / Target Gas Panels by 5/1
![Page 23: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/23.jpg)
Bonus Detector Outlook
• Detector Parts Delivery 4/1• Detector Assembly 4/1-5/1• Electronics Fabrication 3/15-5/1-??• Assemble Detector, Target, Support, Readout
5/1-5/15• Checkout: 5/15 – 5/30• Hall-B Install & Test 5/31 – 6/8• Physics Run October 20 – December 22
![Page 24: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/24.jpg)
Software Needs Work, too!• DAQ: Interface w/CLAS data structure• Event visualization – OK and improving• Track Fitting - Straight Tracks OK and
improving
• Need to incorporate– Vdrift(R) (ongoing)– B-Field– Lorentz angle
• Need Simulation and Simulated Data
RHIT vs. Time Bin(Vdrift varies with R)
Curved e- DriftN.B.: nonuniform B
![Page 25: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.](https://reader034.fdocuments.in/reader034/viewer/2022051821/5697c0221a28abf838cd368d/html5/thumbnails/25.jpg)
BoNuS Detector
• Much done.
• .
• .
• .
• Plenty to do.