THE BEBO SYSTEM BY ARMTEC Concrete Arch Bridges Fast bridging solutions in spans to 31 metres ®

Transcript of THE BEBO SYSTEM BY ARMTECfiles.armtec.com/Downloads/Categories/Bridge-Materials/09-0417... · Spans...

THE BEBO SYSTEMBY ARMTEC

Concrete Arch Bridges

Fast bridging solutions in spans

to 31 metres

®

APPLICATIONS

BridgesSpans of 3 metres and more for highway,road, railroad, river, cycle path, golf course,culvert applications and many more.

• highly competitive

• extremely durable

• virtually maintenance free

• low life-cycle costs

• aesthetically pleasing

TunnelsCut-and-cover or cover-and-cut with up to 10metres of fill.

• railways

• highways and transit roads

• utilities, conveyor belts for masshaulage

• sewage outfalls

• underpasses for industrial areas, airports,etc.

Custom tunnel sections designed quickly toowner’s requirements or specific siteconditions.

Grade SeparationsSpans up to 31 metres to suit many roaddesigns.

• Country roads

• Resource roads

• Private developments

• Major roads

• Multiple spans available

THE BEBO SYSTEM BY ARMTEC

2

“Versatility is what makes the BEBO System so attractive for a multitude of applications”

CONCRETE BACKFILLED ARCH STRUCTURES

3

The E-Series

• 78 elliptical shapes - spans of

3.6 to 25.5 metres

• single and twin leaf precast

elements

• standard overfill heights of 0.4

to 4.5 metres

• dedicated designs for up to 15

metres of overfill for spans up

to 7.3 metres

• dedicated designs for up to 6.0

metres of overfill for spans over

7.3 metres

• most economical shape for the

majority of applications

The C-Series

• 37 circular shapes - spans of

9.1 to 16.5 metres

• twin leaf precast elements

• standard overfill heights of 0.4

to 6.0 metres

• dedicated designs for up to 12

metres overfill

• optimized high overfill

elements and foundations

The T-Series

• shallow arch shapes: span to rise

ratios up to 10:1

• any span between 7 and 31

metres

• ideal for low overfill applications.

Head Office: 370 Speedvale Ave. W., P.O. Box 3000, Guelph, ON N1H 6P2www.armtec.comSales Offices: Nanaimo, Prince George, Vancouver, Edmonton, Calgary, Lethbridge, Saskatoon, Winnipeg,Thunder Bay, Sudbury, London, Guelph, Toronto, Peterborough, Chesterville, Forest,Walkerton, Orangeville, Comber, Montreal, Quebec City, St. Clet, Sackville, Truro, SlemonPark, Bishop’s Falls and St. John’s. BEBOR/2M/0509

On of the world’s largest precast overfilledconcrete arches, an E84T BEBO underconstruction in Putrajaya, Malaysia.

A short, precast BEBO railroad tunneldesigned to support high overfills and 500

tonne mining trucks.

Space saving, flat profile, column freeprecast BEBO parking garage under

construction in Germany.

“The comprehensive BEBO products and

support services is difficult to beat”

BEBO History and Application• BEBO arch development started with the first full size test in Switzerland

in 1965.

• The BEBO arch capitalizes on soil-structure-interaction between the

reinforced concrete arch/foundations and the surrounding fill.

• The first BEBO structures were installed in 1966 and are still in excellent

shape.

• Experience shows that overfilled reinforced

concrete arch bridges are extremely durable

and require little maintenance.

BEBO’s experience over many decades and countless applications instills